linked to the Australian National University s Work health and safety policy and is one of the procedures within the WHS Management System.

Similar documents
HIGH RISK CONSTRUCTION WORK

Contractor Safety Plan

Work Health and Safety Conditions

Contractor Management Procedure

This policy aims to ensure the health, safety and welfare of contractors working on UEL premises and those affected by their work.

Occupational Safety & Health Policy & Guidelines for Contractors

Health and Safety. Version 5. Category: Corporate. Latest Review Date: December Review Frequency: Annual. Owner: Company Secretary

Single Contractor Agreement for Occupational Health & Safety Workers Compensation Act

Transnet Freight Rail E.4E Transnet (August 2006) A Division of Transnet Ltd. TRANSNET LIMITED (Registration no. 1990/000900/06) PRIEVIEW COPY ONLY

Policy for Occupational Health, Safety and Environment Requirements for Contracted Construction and Maintenance Work

POLICY. Keywords: 1) Hazardous 2) Substances 3) Chemicals

SUPPLY OF PEST CONTROL SERVICES

Appendix 4 :Contractors Health and Safety Questionnaire (Form CCHSQ1) 1. DETAILS OF CONTRACTOR / SUB-CONTRACTOR Name of Company:

WORK HEALTH AND SAFETY REFRESHER

Contractor Guidelines

WORKING WITH CONTRACTORS POLICY AND PROCEDURE

Vend Engineering Pty Ltd. Residential & Commercial construction Site Safety Pack For subcontractors

Control of Contractors Policy

Contractor Information

Contract HSE Management/Part I

AGREEMENT ON OCCUPATIONAL HEALTH AND SAFETY IN TERMS OF SECTION 37(2) OF THE OCCUPATIONAL HEALTH AND SAFETY ACT 85 OF 1993 (AS AMENDED) between

Contractor Health and Safety Code of Practice. Updated June 4, 2018

1.3 All employees are equally responsible for complying with the Ontario Occupational Health & Safety Act and its Regulations.

Prime Contractor Requirements Revised: April 2015

SUB CONTRACTOR INDUCTION PACK

Combined Liability Proposal Form

Supplier accreditation instructions

Health and Safety Management System Overview

Contractors Induction Booklet. Contractor s Name:

SAFETY MANAGEMENT PLAN. WassonMoyCreativeCompliance

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES 2.01

APPLICATION PACKAGE FOR LISTING AS A PROVIDER FOR WATER SERVICE CONNECTIONS (DRILLERS) TO THE MANAGING NEW DEVELOPMENTS PROCESS

CAMBRIDGESHIRE GUIDED BUSWAY OPERATIONS POLICY

Alcumus Health and safety assessment standards

A UNIQUE AND COMPREHENSIVE INSURANCE SCHEME FOR THE ELECTRICAL INDUSTRY

CORPORATE POLICY MANUAL

ASBESTOS POLICY (2017)

Hazard Identification, Risk Assessment and Control Procedure

Strata Management Agency Agreement

Asbestos Management. Date of Approval: Date for Next Scheduled Review: Review Body: Equality Impact Assessment Complete: Policy Published on Web:

Asbestos Management Policy and Plan

Contract appendix: Health and Safety (HAS)

Mine Health and Safety Regulation 2007

RISK CONTROL SOLUTIONS

Between the Western Sydney Parklands Trust (the Trust) (LAND OWNER) and

Roofers and Scaffolders Enquiry Form

Contractor Policy and Procedures. Contractor. Policy and Procedures. Working Together. November Borders College 4/12/ Working Together

Guideline for external contractors working on the premise of MANN+HUMMEL

NFF Contract Template Labour Hire

The University of North Texas at Dallas Policy Manual Chapter

The detailed specifications are attached as Annexure C3.3 Welding Procedure Specifications. 8. Specifications No. 9. Material Summary No

MARKET OH&S PLAN 1 INTRODUCTION 2 OH&S RESPONSIBILITIES

Contractor Safety Management Element November 2018

Auckland Transport HS03-01 Risk and Hazard Management

Between the Parramatta Park Trust (the Trust) (LAND OWNER) and

New Work Health & Safety Legislation What does it mean for you as a Business Owner, Director or Executive?

ajg.com.au Connect and join the The ultimate guide to insurance for the construction industry

The new Workplace Health and Safety Amendments; All your questions answered.

PLEASE NOTE. For more information concerning the history of this Act, please see the Table of Public Acts.

Health & Safety Policy

Minimum SHE Requirements for Construction Related RFQ projects

CONTRACTOR AND VISITOR CONTROLS

WorkSafe Victoria inspectors

Having regard to the Treaty establishing the European Atomic Energy Community, and in particular Articles 31 and 32 thereof,

Health & Safety Policy HSP 06 Asbestos Management Version Status Date Title of Reviewer Purpose/Outcome

KERANG DISTRICT HEALTH CONTRACTORS HANDBOOK

Responsible Officer Approved by

Contractor Safety!!!

Guide to extension of enrolment

ASBESTOS POLICY. November 2015 November 2018 Chair Person/Office Bearers Signature:

2016 CDM Smith All Rights Reserved July 2016 SECTION SAFETY, HEALTH, AND EMERGENCY RESPONSE

WORK IN OR ABOUT QR PROPERTY

PUBLIC COMPANY ORLEN LIETUVA OCCUPATIONAL HEALTH AND SAFETY PROCEDURE FOR CONTRACTORS BDS-40 I. GENERAL. Purpose and Scope of Application

Risk Assessment Policy

Asbestos Management Policy

PREQUALIFICATION QUESTIONNAIRE

UNCONTROLLED WHEN PRINTED

Submission to. WorkSafe Victoria Proposed Occupational Health and Safety Regulations 2017

PEOP-048 OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEM FOR ENZED FRANCHISES

Risk Assessment Procedure

The processes for incorporating health and safety into events held at RFA venues

Evolution and Ecology

Asbestos Management Policy

UC DAVIS. Plant Biology INJURY AND ILLNESS PREVENTION PROGRAM

ASBESTOS CONTAINING MATERIALS POLICY

APPLICATION FOR ALTERATIONS OR ADDITIONS

HAZARD MANAGEMENT POLICY Page 1 of 7 Reviewed: October 2018

TOOLS FOR SAFETY ENFORCEMENT ON CONSTRUCTION AND CONTRACT PROGRAM MANAGEMENT PROCEDURES THAT APPLY TO CONSTRUCTION ALTERATION & REPAIR PROJECTS

Rules of Registration (LPG)

Safe Work Method Statement (SWMS) Customising Instructions Note: To amend SWMS you must have MS Word installed on your computer

Risk Management Report Guidelines for Diploma and Advanced Diploma of OHS/WHS

Repair Authority - Terms of Authority

Policy & Procedures for the management of Asbestos Containing Materials

DEPARTMENT OF ENVIRONMENTAL SAFETY, SUSTAINABILITY & RISK. Chargeback Procedures

RISK MANAGEMENT FRAMEWORK

Property Risk Control Report

WORK INTEGRATED LEARNING (WIL) PROGRAM STUDENT PLACEMENT AGREEMENT. This agreement is made on the day of 20..

National OHS Harmonisation

ABMA BUILDING MANAGEMENT CODE

WHS Risk Assessment and Control Form Science on the Road, CSU Albury-Wodonga Wednesday 2 & Thursday 3 November 2016

Transcription:

Purpose This procedure describes how the Australian National University evaluates and monitors contractors work health and safety for all activities performed at the University. This procedure ensures compliance with Work Health and Safety Act 2011 (Cth), Work Health and Safety Regulations 2011 (Cth). This procedure is linked to the Australian National University s Work health and safety policy and is one of the procedures within the WHS Management System. Definitions Local area refers to a College, Research School or Service Division of the University. Contractor a person, organisation, their staff or workers engaged to carry out work for the University. Contract manager/administrator is the University person(s) who have responsibility for the lifecycle of the procurement and contract process. This can be the same person for both activities or can include a contract manager from the University Procurement and Contracts Office (UPCO) and a contract administrator from the local area. Contractor s representative is the person named on the University s contract who acts on behalf of the contractor and any other person agreed to by the University s contract manager to undertake the role of the contractor s representative. Construction project work is any work involving the construction, alteration, conversion, fitting-out, commissioning, renovation, repair, maintenance, refurbishment, demolition, decommissioning or dismantling of a structure that amounts to $250,000 or more. High risk construction work includes all work as defined in the WHS Regulations 2011 (Cth) Section 291: a. b. involves a risk of a person falling more than 2 metres; or is carried out on a telecommunication tower; or Page 1

c. d. e. involves demolition of an element of a structure that is load*bearing or otherwise related to the physical integrity of the structure; or involves, or is likely to involve, the disturbance of asbestos; or involves structural alterations or repairs that require temporary support to prevent collapse; or f.is carried out in or near a confined space; or g. h. is carried out in or near: (i) a shaft or trench with an excavated depth greater than 1 5 metres; or (ii) a tunnel; involves the use of explosives; or i.is carried out on or near pressurised gas distribution mains or piping; or j.is carried out on or near chemical, fuel or refrigerant lines; or k. is carried out on or near energised electrical installations or services; or l.is carried out in an area that may have a contaminated or flammable atmosphere; or m. involves tilt*up or precast concrete; or n. o. p. q. r. is carried out on, in or adjacent to a road, railway, shipping lane or other traffic corridor that is in use by traffic other than pedestrians; or is carried out in an area at a workplace in which there is any movement of powered mobile plant; or is carried out in an area in which there are artificial extremes of temperature; or is carried out in or near water or other liquid that involves a risk of drowning; or involves diving work. Principal contractor is the person from the contracting organisation, who has the management control of the construction project/workplace. Safe Work Method Statement (SWMS) sets out the requirements to carry out the high risk construction work in a safe and healthy manner and in a logical sequence. WHS management plan defines the contractor s safety management system/s for the project. It reflects the contractor s safety management system and can include; inductions and training, objectives, resources, incident management, emergency preparedness and documentation. Page 2

Worker is defined as anyone who carries out work for the University. Workers include staff, volunteers, contractor, students and visitors at the University. UPCO is the University Procurement and Contracts Office. Procedure Scope 2. This procedure applies to all activities associated with managing contractors and their work at the University. This procedure does not cover individual contractors or consultants, engaged to undertake office based work. 3. The key processes described in this procedure include: contractor evaluation and selection; WHS tender requirements and contract formation; contractor WHS hazard assessment and controls (including additional requirements for construction and high risk construction work); provision of training and induction; consultation, cooperation and coordination of activities with contractors; contractor monitoring (during contract work); and contractor evaluation (at the conclusion of contract work). General 4. The University is responsible for the work health and safety of contractors when work is undertaken on ANU premises or on behalf of the University. 5. Contractors working at the University may be: 6. individual contractors/ sole traders (e.g tradespeople or specialist subject matter experts (SME s)); service contractors (e.g. cleaning, waste removal and printer maintenance companies) maintenance and construction contractors (e.g. working on construction projects) The WHS requirements and the level of contractor monitoring will vary depending on the type of contractors and the level of risk associated with the work. Page 3

Responsibilities 7. Contract managers are responsible for the following: completing contractor pre-qualification reviews during the planning phase of contractor selection; ensuring all appropriate WHS information is included within tendering documentation; conducting WHS hazard assessments to identify and control risks throughout the lifecycle of the proposed contract; developing and ensuring all contractors have an agreement with the ANU; consulting and communicating with relevant stakeholders prior to the commencement of contract and/or project activity; and ensuring a formal contract and contractor evaluation process is undertaken. 8. Contract administrators are responsible for the following: in cooperation with the contract manager conducting WHS hazard assessments to identify and control risks throughout the lifecycle of the proposed contract; ensuring the provision of appropriate inductions, training and any other relevant information to all contractors, relative to the scope and risk of the contract, prior to commencement; consulting and communicating with relevant stakeholders prior to the commencement of contract and/or project activity; and ensuring the overall management and monitoring of the contractor activities and performance, including conducting formal inspections, audits and reviews as a minimum. 9. Contractors are responsible for the following: completing the relevant induction and training as per ANU requirements and relative to the scope and risk of the contract; appointing a safety officer (where required, typically on construction projects and/or large contracts); ensuring the relevant permits, competencies, documentation and/or authority to undertake proposed activities/projects as part of the contractual agreement, are in place. 10. The contractor s safety officer is responsible for: Page 4

hazard assessment, safe working conditions, safe work practices relating to the contractors work processes and activities; and ensuring that applicable legislative and any additional requirements determined by the University are implemented. Contractor evaluation and selection 11. The contract manager, in consultation with the representative from the local area requesting the contracted work, will assess the contractor against the relevant WHS requirements for the contractor type as per Table 2. The responsibility for managing the selection and engagement of various types of contractors is outlined in Table 1. Table 1: Responsibilities for contractor management processes Contractor Type Responsibility as contract manager / administrator for engagement and monitoring Individual contractors/sole traders (e.g. tradespeople or Local area specialist SME s) Service contractors (e.g. UPCO cleaning companies) Maintenance and construction contractors Facilities and Services minor works (<$250,000) Maintenance and construction contractors Facilities and Services/ Major Projects (>$250,000) Table 2: Contractor type WHS requirements WHS requirement Applicable to Page 5

Individual Service Maintenance and Maintenanc contractors / sole contractors construction contractors e and construction traders minor works (<$250,000) contractors (>$250,000 ) Hazard assessment of activities, materials, plant and Yes Yes Yes Yes equipment Training information (such as procedures and Permits to work and or Yes Yes Yes Yes operate ) Induction program Yes Yes Yes Yes Indemnity and liability Yes Yes Yes Yes insurance WHS prequalificatio n (to assess management No Yes Yes Yes control) WHS No No Yes (if relevant) Yes Page 6

prequalificatio n (including construction industry induction training) WHS Management No Yes (if taking management Yes (if taking management Yes Plan control) control) WHS Safety Officer No Yes (if taking management Yes Yes appointed control) AS4801 Accreditation No No No Yes Office of the Federal Safety Commissioner (OFSC) accreditation for contractors entering into a Head Contract arrangement No No No Yes Safe Work Method Statement (SWMS) (or equivalent) per No No No Yes task Page 7

Contractor WHS requirements in tenders 2. The contract manager in consultation with the representative from the local area or contract administrator, will ensure the scope of works includes an appropriate WHS context for all contract activities. The WHS context includes: 3. the inherent hazards associated with the work to be undertaken; the inherent hazards associated with the work environment; the University s mandatory requirements, health and safety policies, procedures and practices required of the contractor; and key WHS performance indicators for the contract. The contract manager will at the time of tendering, include a copy of this procedure to the tendering contractor to ensure that the requirements have been considered in the development of the pricing and planning of the contract. The need for the contractor to abide by the conditions of the University requirements for WHS will be stated in the tender documentation. Contractor WHS hazard identification and controls 4. As early as possible in the procurement process, the contract manager and contract administrator will conduct a WHS hazard assessment to identify and evaluate WHS hazards and controls as per the WHS Hazard management procedure. The key WHS hazards to identify can include, but are not limited to the following: 5. unskilled people; unauthorized access/security; unsafe or high risk plant and equipment (whether free issue or supplied by the contractor); unsafe introduced hazardous materials; impact to the work environment; impacts to normal operating processes such as emergency access/egress and traffic flow; and designs that may not work. The contract manager, local area representative or contract administrator will determine, in consultation with Work Environment Group representatives, if the project is defined as high risk construction work under the WHS Regulations 2011 (Cth). Page 8

Construction work 6. For high risk construction work and any construction work greater than $250,000, the following requirements are to be considered as a minimum: The contract manager and contractor will consult and inform each other of the potential hazards and control measures in place where they have the capacity to influence and control. The contractor is required to document a SWMS or equivalent for the activity which ensures safe systems of work which address both the activity and the work environment, and present this to the University on request. The contractor will supply a documented WHS management plan for project work greater than $250,000. The contractor is required to have the relevant permits and current licenses in place in accordance with legislative requirements. Contract Formation 7. The contract manager will ensure that all contractors have an agreement with ANU that, as a minimum, includes the following requirements to manage health and safety: compliance with all statutes, Acts and Regulations and other requirements which relate in any way to the performance of the works; state each party s responsibilities for the degree of control for WHS requirements; if more than one party is involved, how each party will ensure consultation, cooperation and coordination of activities occurs; the contractor will abide by the relevant University s WHS policies and procedures listed in the contract and made available and accessible on the Policy Library; and the provision of evidence of relevant insurances, licenses, qualifications and registrations as per the pre-qualification requirements. Provision of Induction, Information and training 8. Following the award of the contract, the contract administrator will ensure that the appropriate inductions have occurred for all contractors. Facilities and Services have developed an online contractor Induction training package for this purpose. Page 9

9. For construction contracts, the contract administrator will ensure that general construction induction training is provided to a worker engaged by the person who is to carry out construction work and that this worker holds a general construction induction training card. 10. The contract administrator will verify the contractor is familiar with all WHS requirements relevant to the scope of the contract such as safety procedures, how to access the Workplace incident and hazard reporting system, and the content of the management plan (if in place). 11. The contract administrator will ensure records of the training, inductions, licences and qualifications are kept for the life of the contract. 12. Note visitors are inducted as per the requirements of the WHS Training procedure. Consultation, cooperation and coordination of contractors 13. The contract manager and contract administrator will inform each stakeholder, prior to commencement of the project/activity, if the activity/area has the capacity to impact on the University s business and/or safety of occupants/workers (e.g. interruption to work activities, changes in emergency evacuation arrangements/access, high risk construction work, or work in a high risk area). 14. The contract administrator and contractor s representative will determine how to coordinate and communicate activities where other parties are also engaged in the work area. 15. The contractor administrator and contractor s representative will determine how they will communicate with regulatory authorities should WHS issues arise during the contract. 16. The local area will ensure where the contractor s work may have a health and safety impact on another local area that the other area is consulted prior to the commencement of work. Contract administration (contractor monitoring) 17. The contract administrator has responsibility for the overall management and oversight of the contract and contractor. This includes the requirement that there is effective and ongoing management of contractor WHS performance, including conducting inspections, formal reviews, audits and the provision of feedback. Page 10

18. Scheduled monitoring activities will be undertaken as per the frequencies defined within the contractual arrangement. 19. The University has the right to audit contractor compliance with the WHS Regulations and the contract. 20. Where the contractor is required to appoint a safety officer, the contractor s safety officer will be is responsible for hazard assessment, safe working conditions, safe work practices and will ensure that the applicable legislation as well as additional requirements determined by the University are prepared, authorised by the contract administrator and monitored for compliance. If a safety officer is not required, the contractor s representative will undertake the activities of the safety officer. 21. The identity of the contractor s safety officer will be notified to the contract administrator prior to the contractor commencing work at the University. 22. The contractor s representative/safety officer is required to ensure that a documented SWMS or equivalent (such as a Job Safety Analysis or JSA), is completed and submitted to the contract administrator for all activities at the University prior to work commencing. 23. The contractor will have the relevant permits/permissions (e.g to work within confined spaces and undertake hot works) and/or any licenses/competencies in accordance with legislative requirements. 24. The local area will monitor the tasks on a regular basis to ensure so far as is reasonably practicable, that workers and other persons are not exposed to health and safety risks arising from the activity. 25. The contract administrator will monitor the tasks on a regular basis to: monitor contract work and if activities are considered unsafe, cease the activity and discuss corrective action to be taken; conduct formal checks/audits of contractor activities to ensure their operations are safe (e.g. conformance with their WHS Management Plan, SWMS, Permits to Work as applicable). The frequency of the checks are to be determined by the contract manager based on the level of risk, unless the frequency is specified in the contract; discuss the outcomes of the check with the contractor s representative and where applicable at contract review meetings; ensure corrective actions are implemented by the contractor s representative where applicable; Page 11

26. follow the relevant contractual requirements should a breach of safety under the contract or WHS legislation be identified and the contractor is unable to remedy the breach; place a copy of the completed contractor monitoring template on the contract file; and monitor any trends and act where applicable. For the duration of the contract, regular workplace safety inspections and safety meetings will be conducted by the contract administrator in conjunction with the contractor s representative. The period of the inspections and meetings will be as determined at the commencement of the contract. 27. All contractors will notify the contractor s representative and contract administrator if an incident/injury has occurred as per the WHS incident management procedure. Contractors may in addition use their own organisation s Incident report form and provide a copy to the University by attaching their form to the University s record. 28. For a notifiable incident, the contractor s representative and contract administrator will be informed immediately. Signage additional requirements for construction projects 29. The contractor s safety will ensure that signage is installed that: Detail the contract administrator; the contractor representative s name and telephone contact numbers (including after-hours); Display the location of the site office, if any; Are clearly visible from outside the workplace, or the work area of the workplace where the construction project is being undertaken; and Display the name and phone number of the contractor s safety officer and the name and phone number of the contract administrator. Contractor evaluation 30. At the completion of the contract, a formal close-out review will be completed by the contract manager and contract administrator to ensure that any lessons are understood, shared and sustained. The performance of all contractors will be recorded by the contractor administrator and used for improving the preferred supplier database. Page 12

Training 31. There are no training requirements for this procedure. Sources Legal and other requirements Work Health and Safety Act 2011 (Cth) Work Health and Safety Regulations 2011 (Cth) Procurement Policy Procurement Procedure Contract Management Handbook Project Management Procedure Alterations in and around University Buildings Procedure Campus and Buildings Requirements Manual Page 13

Document information Title Document Type Document Number Contractor work health and safety Procedure ANUP_017807 Version 2 Purpose Audience Category Topic Subtopic This procedure describes how the Australian National University evaluates and monitors contractors work health and safety for all activities performed at the University. Staff Administrative Health, Safety & Environment Occupational Health & Safety Effective Date 24 Apr 2018 Review Date 23 Apr 2021 Responsible Officer Director, Human Resources (director.hr@anu.edu.au) Approved By Contact Area Authority Chief Operating Officer (chris.grange@anu.edu.au) Human Resources Division (director.hr@anu.edu.au) National Self-Insurer WHS Audit Tool Work Health & Safety Act 2011 Work Health and Safety Regulations 2011 Printed On 15 Jun 2018 Please ensure you have the latest version of this document from the Policy Library website before referencing this.