ITW LTD T/A AVERY WEIGH-TRONIX SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION

Similar documents
Alcumus Health and safety assessment standards

PREQUALIFICATION QUESTIONNAIRE

MAJ Developments (UK) Ltd CONTRACTORS PRE-QUALIFICATION QUESTIONNAIRE (PQQ)

Company Detail Summary

CODE OF PRACTICE FOR SUBCONTRACTORS

HSE MANUAL. PO Box 14659, Zayed bin Sultan Street, Al Ain, U.A.E.., Tel: , Fax

Contractors Induction Booklet. Contractor s Name:

Appendix 4 :Contractors Health and Safety Questionnaire (Form CCHSQ1) 1. DETAILS OF CONTRACTOR / SUB-CONTRACTOR Name of Company:

CAMBRIDGESHIRE GUIDED BUSWAY OPERATIONS POLICY

Safety & Health Manual

RISK ASSESSMENT POLICY

Health & Safety Policy

This document is meant to be a starting point for any company wanting to implement the safety passport scheme for their contractors on site.

If you are unsure of which sections to complete, please contact us on

A UNIQUE AND COMPREHENSIVE INSURANCE SCHEME FOR THE ELECTRICAL INDUSTRY

Health and Safety statement of intent

Guideline for external contractors working on the premise of MANN+HUMMEL

WORKING WITH CONTRACTORS POLICY AND PROCEDURE

Contractor Policy and Procedures. Contractor. Policy and Procedures. Working Together. November Borders College 4/12/ Working Together

SOUTHWATER VILAGE HALL MANAGEMENT COMMITTEE HEALTH AND SAFETY POLICY. This document is the Health and Safety Policy for Southwater Village Hall.

Independent Contractor policy (Fremdfirmenordnung)

Property Inspection Guidelines

GASCADE Gastransport GmbH HSE-GUIDELINE-CONTRACTORS. Version 5 Status: 15th May 2017

This policy aims to ensure the health, safety and welfare of contractors working on UEL premises and those affected by their work.

Risk Assessment Policy

SUB CONTRACTOR INDUCTION PACK

Health & Safety at Work Act 1974 HEALTH & SAFETY POLICY STATEMENT

COMPANY POLICY FOR HEALTH AND SAFETY

Health and Safety. Version 5. Category: Corporate. Latest Review Date: December Review Frequency: Annual. Owner: Company Secretary

London Christian Learning Centre. Risk Assessment

MARKET OH&S PLAN 1 INTRODUCTION 2 OH&S RESPONSIBILITIES

Combined Liability Proposal Form

Contractor Guidelines

Contractor Pre-qualification Questionnaire

SAFETY POLICY PART 1 - GENERAL POLICY

Occupational Safety & Health Policy & Guidelines for Contractors

Subcontractor Approval Form

Risk Assessment Policy

Carson, CA Inland Star Distribution Centers, Inc. PSM/CalARP

Health & Safety Policy& Procedure. Head Office: Marle House Oldham Broadway Business Park Broadgate Chadderton Oldham OL9 9XA

Sub-Contractor Pre-Qualification Questionnaire

2016 CDM Smith All Rights Reserved July 2016 SECTION SAFETY, HEALTH, AND EMERGENCY RESPONSE

SUPPLY OF PEST CONTROL SERVICES

Title: Environmental, Health and Safety Revision No.: 4 Effective Date: January 1, 2017

ARRANGED BY ELECTRICAL & HVAC CONTRACTORS PROPOSAL FORM UNDERWRITTEN BY

Contractor s Environmental Health & Safety Disclosure

KEEPING PEOPLE SAFE: HEALTH & SAFETY POLICY. Our Health & Safety Policy for

RISK ASSESSMENT. Hospitality and Accomodation Services. November 2011

HULCHER CONTRACTOR SAFETY MANAGEMENT PROCESS

CONTRACTORS & SERVICE PROVIDERS PRE-QUALIFICATION QUESTIONNAIRE

Health and Safety Procedure: Risk Assessment. 1. Introduction

Proposal Form. Tradesmen. Commercial Division

HEALTH & SAFETY NEWS. Issue 1 Date: 26 Jan 09 Page: 1 of 6. Overview

CONTRACTOR S RESPONSIBILITY FOR PROJECT SAFETY [Major Construction Category]

SAFETY MANAGEMENT PLAN. WassonMoyCreativeCompliance

Instructions for Investigation Report

Working with third parties

Policy. Safety risk assessment. 1 Why use risk assessment?

CAR WASH FUNDRAiSING Event Notification Form

Conditions of Hire School Premises

BROCKWOOD PARK SCHOOL & INWOODS SMALL SCHOOL

POWER CONSTRUCTION COMPANY CCIP PROGRAM SAFETY REQUIREMENTS

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY ATTACHMENT M SAFETY PROVISIONS GOODS AND SERVICES CONTRACTS

Robert Monk s Foxton Charity. Health and Safety Policy

CONTRACTOR S RESPONSIBILITY FOR PROJECT SAFETY [Major Construction Category]

Fundraising Event Notification Form

3/15/2018» sitrep March 2018 NASC

PEOP-048 OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEM FOR ENZED FRANCHISES

Health and Safety Risk Assessment Policy

Risk Assessment Procedure

Contractor Information

PROJECT RISK ASSESSMENT FORM

Site-Specific Health and Safety Agreement

Risk Assessment and Self Inspection

Power Construction Company CCIP Program Safety Requirements

Tata AIG General Insurance Company Limited

Motor Fleet Haulage. fact finder 6TH FLOOR ONE AMERICA SQUARE 17 CROSSWALL LONDON EC3N 2LB TELEPHONE

Risk assessment Policy and Procedures

ACCIDENT PREVENTION POLICY Signature Page Assign, Sign, & Return this page only to DiFiore Construction

APPROVED (SUB)-CONTRACTOR APPLICATION

Roofers and Scaffolders Enquiry Form

APPROVED CODE OF PRACTICE FOR THE SAFE CONDUCT OF TRACK AND FIELD COMPETITION

Contractor Management Procedure

RISK CONTROL SOLUTIONS

Health & Safety Policy

A Safety, Environmental and Labour rights Guide for Suppliers to British Airways

San Antonio Water System PROJECT CONSTRUCTION PROGRAM HEALTH AND SAFETY PROGRAM

TAMPA ELECTRIC COMPANY ENERGY SUPPLY CONTRACTOR SAFETY COMPLIANCE PROGRAM

Safe Driving at Work Procedure

Visitor information pack

AECOM - SUBPORT Prequalification Questionnaire. General Information. Organization and Experience. Type of Services:

Village hall insurance cover

INGHAM VILLAGE HALL. Registered Charity No

Contractors Plus Proposal Form

SCHEDULE D TENANT TECHNICAL PROPOSAL

Environmental Management Policy

OSHA 1926 Subpart A General

Westside Community Enterprises Terms and Conditions of Use

Terms & Conditions of Hire

Policy for Occupational Health, Safety and Environment Requirements for Contracted Construction and Maintenance Work

Transcription:

ITW LTD T/A AVERY WEIGH-TRONIX SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION January 2018 1

Introduction We recognize that as a customer of Avery Weigh-Tronix, you require details of our management of safety, health and the environment. We have therefore compiled this summary to provide you with key information about the way we discharge our duty of care to our employees, our customers, and the general public. Should you require further information, please contact: Tom Laing, Health and Safety Advisor, Avery Weigh-Tronix, Foundry Lane, Smethwick, West Midlands, B66 2LP Tel: 07720 637488, Fax: 0121 697 5255, Email: tom@h-s-solutions.co.uk Scope of work Avery Weigh-Tronix, are manufactures, distributors, installers and service providers for a wide range of weighing equipment. The company also undertakes third party servicing for a range of IT products. Our customers include raw material producers, public sector groups, and waste management companies, manufacturing companies, the Post Office network and many others. Company Structure and Trading Names Ultimate Parent Company Illinois Tool Works Inc. Registered Office ITW Ltd t/a Avery Weigh-Tronix Nexus House, Station Road, Egham, Surrey, TW20 9LB Head Office Avery Weigh-Tronix Limited, Foundry Lane, Smethwick, West Midlands, B66 2LP Tel: (+44) (0) 845 3070333 E-mail: info@awtxglobal.com Web site: www.averyweightronix.com Company registration No 559693 Date of registration: 7 th November 1960 VAT No: GB164401336 2

Management Structure and Control Measures Lance Read, the Vice President/General Manager of Avery Weigh-Tronix Ltd has ultimate responsibility for the Safety, Health and Environmental policy. Tom Laing the Health and Safety Advisor is responsible for the day-to-day facilitation of Safety, Health and Environmental policies and procedures. Operational Managers throughout the business are responsible for the management of Safety, Health and Environmental matters within their own areas. They are responsible for the preparation of risk assessments and safe working procedures, and are provided with assistance and training from the Safety, Health and Environmental department. All new starters attend formal induction training which includes Safety, Health and Environmental matters. Personnel are required to monitor the working situation and bring to the attention of the relevant person defects in any safe system of work. Insurance Cover The following information is a summary only and the Insurance certificate accompanying this document should be referred to for details. All cover is subject to the full terms, conditions and exceptions of the policies. Employers Liability AIG Europe Limited Policy Number: 21010747 Period: 30 November 2017 to 29 November 2018 Limit of Indemnity: GBP 25,000,000 any one claim or number of claims arising out of one event (reducing to GBP 5,000,000 in respect of any claims arising out of Offshore Activity) Public and Products Liability AIG Europe Limited Policy Number: PLBC010461 Period: 01 November 2017 to 31 October 2018 Limit of Indemnity: The Sterling Equivalent of USD 2,000,000 per occurrence and in the annual aggregate. Excess Layer Public and Products Liability Lexington Insurance Company Policy Number: 62785274 Period: 01 November 2017 to 01 November 2018 Limit of Indemnity: USD 25,000,000 in the annual aggregate in excess of Underlying policy 3

Motor Vehicle AXA Policy: BL FLE 6916668 Expiry date: 30 November 2018 Contract Works Royal & Sun Alliance Policy Number: RSA8007300200 Period: 1 December 2017 to 30 November 2018 Contract Works Limit of Indemnity: GBP 5,000,000 any one contract Hired-in Plant Limit of Indemnity: GBP 1,000,000 any one accident Risk Assessments A continuous programme of risk assessment is carried out for each operational unit. This requires visits to customer s sites to gather information regarding on-site risks. Where hazards are identified on customer premises that may affect the work of our employees, discussions are held with site safety representatives to resolve issues and agree safe systems of work. Method Statements, Working Practices and Safe Working Procedures This knowledge is used to develop method statements and safe working practices. Significant hazards are brought to the attention of the workforce through training courses, safety bulletins, the company intranet and monthly meetings with appointed safety representatives. Risk assessments, safe working instructions, and procedures are incorporated into technical and general training courses as examples of best practice. These procedures are issued to field technicians as a Technical Safety, Health and Environmental Procedures Manual. Generic Method Statements are provided for standard working procedures, these are maintained on the company Intranet. Where specific work is identified as having a significant risk, a specific Method Statement will be produced. This information will be communicated to technical staff and contractors in a pre-work briefing. Hazardous Materials and Coshh The company uses few materials that are classified under the Chemical (Hazard, Information and Packaging for Supply) Regulations or the Control of Substances Hazardous to Health Regulations. In general, where chemical substances are used they are only used in very small quantities, e.g. W D40 and general lubricants. Where necessary, the use of chemicals is monitored under the requirements of COSHH or other legislation. COSHH risk assessments will determine appropriate controls and any necessary health surveillance. Safety data sheets and COSHH assessments are widely available on the company Intranet. 4

Training and the Provision of Information A one day induction training course is provided when new members of staff join the company. This includes Health, Safety and Environmental awareness. Skill and safety training relevant to the type and area of work of an individual is a continuous process that is carried out as required through a personal development plan of the individual. Periodic assessments, the introduction of new equipment or technology determines training requirements. Specialist training, such as SPA Passport to Safety, Core Quarry and Food Industry Passports, Crane Banksman and Appointed Person training, Forklift Operator, Risk Assessment and Manual Handling training, is regularly carried out as required by operational requirements. All Safety, Health and Environmental policies and procedures are available to all employees through the Companies intranet. The results of Risk Assessments and Method Statements or other instructions derived from them are made available to those personnel directly concerned. Information booklets and guidance are also freely distributed. The Safety, Health and Environmental Procedure Manual is published in the Public Folders section of Microsoft Outlook. Pre-work briefings are held to discuss specific hazards. This will include hazard or warning information distributed by main contractors or customers. These briefings will include any sub-contractors who are engaged by the company or with others we are required to co-operate with. All contractors are subject to SHE qualification questionnaire procedure. Supervision and Site Control Except for staff under training, field technicians are classed as peripatetic workers, who will not normally work under the direct supervision of a manager. A technician working on a customer s site is deemed to be competent and is required to comply with all procedures and instructions issued by the company. In addition, the technician is required to follow any on site procedures issued by the customer. Each technician is issued with a personal copy of a technical Safety, Health and Environmental Manual. Where several technicians are working on the same task, one will be appointed as site supervisor and will be responsible for the general control of the work. The company SHE Advisor carries out unannounced sits safety audits. Service team leaders hold toolbox training sessions and regular service meetings, involving all technicians. Accident Reporting Procedures All accidents and near misses are reported and investigated. The senior person present is required to accept responsibility for dealing with an accident until relieved by a member of the management team. The senior person will ensure that the welfare of any casualties has been attended to and that accident reporting, investigation and rectification procedures are followed through. 5

All reportable accidents will be reported to the Health and Safety Executive by the Health and Safety Advisor or a Senior Manager, as appropriate. The Health and Safety Advisor investigates and reports all accidents, assisted by Managers as required. Where necessary this will include visiting customer s sites to identify hazards. The co-operation of the customer will be requested to assist in this process. The results of the investigation will be communicated or discussed with the customer, as appropriate. Accident Statistics 2015 2016 2017 Fatal Accidents 0 0 0 Major Injury Conditions 0 0 0 Reportable Accidents (7/3 day) 4 0 2 Non reportable Accidents 25 12 21 Average No. of hours worked 773,290 780,000 Accident Incident Rate 56.93 30.00 65.08 Frequency Rate 1.121 0.00 5.00 Dangerous Occurrences 0 0 0 Flammable Gas Incidents 0 0 0 Diseases (No of Incidents) 0 0 0 Average No of Employees 404 400 338 Prosecutions received/pending 0 0 0 Prohibition Notices 0 0 0 Improvement Notices 0 0 0 Accident Incident Rate = No. of all accidents X 1000 No. of employees Frequency Rate = No. of Reportable accidents X 100,000 Hours worked Accident statistics are published annually in the form shown above. It is not the policy of the Company to discuss individual accidents. Working at Height Where it is practicable, work will always be conducted from ground level. Work at height is required, suitable access equipment, tower scaffolds, safety barriers, fall arrest harnesses or similar devices operated by competent personnel will be used to provide fall protection. Ladders will only be used for temporary access and will be tied or footed. Where the fall height could result in a significant injury, a risk assessment will be undertaken to determine a safe working procedure. 6

Inspection and Examination of Equipment (PAT testing) and Tools All equipment and tools are supplied by the Company and comply with current legislation, including statutory tests and examination. Procedures require that equipment in service is examined and tested at appropriate intervals. This includes PAT testing of portable electrical appliances., Technicians are required to examine all equipment before use and to take out of service any defective items. Technicians vehicles are subject to maintenance and repair under fleet management arrangements with Inchcape Fleet Solutions Limited. Technicians are required to carry out a weekly inspection of their vehicles, which is documented and audited. Entry into confined spaces Where entry into a confined space is unavoidable, e.g. entry to weighbridge pits, the customer is responsible for ensuring the removal of any noxious, toxic or hazardous substance before the engineer enters the confined space. The technician(s) will conduct a pre entry gas test and entry will only take place subject to positive results. The technician(s) entering the confined space will wear a continuous gas monitor and will leave the space immediately any visual or audible alarm sounds. Entry into a confined space is prohibited unless an adequate method of communication can be maintained with another trained person outside the confined space, who can arrange emergency rescue should it be required. Drugs and Alcohol The Company Policy prohibits members of staff from being under the influence of Alcohol or Drugs while at work. Where a customer has a testing policy, technicians are encouraged to take part. The Company recognizes the problems that may be caused by these substances and will offer help and counselling, as appropriate. First-aid Due to the peripatetic nature of our technical staff, individual first aid kits are issued. These are kept in vehicles for use on site. It is expected that customers will make site first aid facilities available in the event of an injury/illness on site. Although first aiders are trained and appointed at our offices and manufacturing establishments there are few appointed among the field staff. However, first aid awareness courses are offered and technicians are encouraged to attend. Fire Certificates and Fire Precautions All premises are subject to written fire risk assessment. 7

Fire alarms, fire extinguishers and other equipment is provided and maintained under contract. Training is given in fire prevention and procedures as part of the standard Safety, Health and Environmental procedures. Technicians follow Hot Works permit to work procedures. Membership of Trade Organizations Avery Weigh -Tronix is a founding member of the UK Weighing Federation and a member of RoSPA. Waste Disposal All internal waste is disposed of in accordance with the requirements of current legislation. Where it is possible, reusable materials are returned to the company for recycling or recovery. Small amounts of non-h azardous waste that may result from activities on a customer s site may be disposed of on site into specified waste containers with the customer s permission. Other waste materials will be dealt in accordance with any agreement with the customer. The Company is registered as a Hazardous Waste Producer, registration number NAC 717. Environmental Protection The company is accredited to ISO 14001: 2004, certificate No. GB05/66118 The Company environmental policy requires the minimal use of energy and other resources. This and other practices minimize the company s impact on the environment. Where possible, waste material will be recycled or sent for recovery. The Company complies with the Producer Responsibility Obligations (Packaging Waste) Regulations through registration with the Valpak compliance scheme. The Company complies with the Waste Electrical and Electronic Equipment Regulations through registration with the Valpak compliance scheme. Quality control The company is accredited to BS EN ISO 9001: 2000, certificate No. GB95/4715. External Audit of SHE Procedures The company is subject to formal annual audit of its SHE procedures by: 8

Alcumus SafeContractor accreditation Achilles accreditation Certificate No. WA7015 Certificate No. 076720 Expiry date: 11/07/17 Expiry Date: 23/04/17 Avetta SSIP Expiry Date: 14/07/17 Trade References Royal Mail Group Plc British Airports Authority Purchasing Services Heathrow Airport 3 rd Floor North Engineering Department Royal London House Room 231 22 Finsbury Square North W ing London Terminal 3 EC2A 1NL Middlesex UB3 5AP 9