SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR (CAREC 1B & 6B) (P099270)

Similar documents
Implementation Status & Results Kazakhstan SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR (CAREC 1B & 6B) (P099270)

Public Disclosure Copy. East-West Roads Project (Almaty-Korgos Section): Western Europe - Western China International Transit

Public Disclosure Copy

Road Sector Development Project (P149322)

The World Bank Burkina Faso Donsin Transport Infrastructure Project (P120960)

Public Disclosure Copy

The World Bank Bangladesh Ghorashal Unit 4 Repowering Project (P128012)

The World Bank Indonesia Power Transmission Development Project (P117323)

The World Bank Building a Modern Fiscal System Technical Assistance (P154694)

Public Disclosure Copy

The World Bank Indonesia Power Transmission Development Project (P117323)

MicroSmall&Medium Enterprise and Large Enterprise Supply Chain Finance (P157691)

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report CO Rio Bogota Environmental Recuperation and Flood Control Project (P111479)

Public Disclosure Copy

The World Bank Municipal Services Improvement (P096481)

The World Bank Transport Connectivity and Asset Management Project (P132833)

Public Disclosure Copy

The World Bank Transport Connectivity and Asset Management Project (P132833)

The World Bank Kabul Urban Transport Efficiency Improvement Project (P131864)

The World Bank Egypt National Railways Restructuring Project (P101103)

Public Disclosure Copy

The World Bank Second Karnataka State Highway Improvement (P107649)

The World Bank Egypt National Railways Restructuring Project (P101103)

State Owned Financial Institutions Reform Project (P156837)

TR Third Access to Finance for SMEs (SME III) (P130864)

The World Bank Indonesia Infrastructure Guarantee Fund Project (P118916)

The World Bank Egypt National Railways Restructuring Project (P101103)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

The World Bank Egypt National Railways Restructuring Project (P101103)

Zambia Kafue Town - Muzuma - Victoria Falls Regional Transmission Line Reinforcement Project

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)

Public Disclosure Copy

The World Bank Bangladesh Ghorashal Unit 4 Repowering Project (P128012)

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Dominican Republic DRM Development Policy Loan with a Cat DDO (P159351)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

IRAQ: SECOND EXPENDITURE RATIONALIZATION, ENERGY EFFICIENCY AND STATE-OWNED ENTERPRISE GOVERNANCE PROGRAMMATIC DPF (P161

Public Disclosure Copy

Bangladesh Insurance Sector Development Project (P156823)

Public Disclosure Copy

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207)

The World Bank Jamaica Strategic Public Sector Transformation (P146688)

Public Disclosure Copy. Implementation Status & Results Report Savings and Credit Sector Consolidation and Financial Inclusion Project (P123367)

The World Bank Revenue Administration Modernization Project (P130202)

The World Bank Research and Innovation in Science and Technology Project (P121842)

West Bank and Gaza: Finance for Jobs (P151089)

Public Disclosure Copy. Implementation Status & Results Report CAPE VERDE - Recovery and Reform of the Electricity Sector Project (P115464)

Public Disclosure Copy

The World Bank DRC Multi-modal Transport (P092537)

The World Bank. Ghana: Energy Development and Access Project (P074191) Key Dates. Project Development Objectives. Components

Debt Management Strengthening Programme at Ministry of Finance, Government of Pakistan (P161451)

The World Bank Water Resources and Irrigation Sector Management Program 2 (P114348)

Justice Sector Support Project (P104749)

Implementation Status & Results India Assam State Roads Project (P096018)

Public Disclosure Copy. Implementation Status & Results Report Pacific Regional Connectivity Program 2:Palau-FSM Connectivity Project (P130592)

Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized The World Bank Power Recovery Project (P144029)

Innovative Access to Finance (P147183)

Public Disclosure Copy

The World Bank Recife Swap Education and Public Management (P126372)

Public Disclosure Copy. Implementation Status & Results Report QUALISUS-REDE Brazil Health Network Formation and Quality Improvement Project (P088716)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank Albania-Enhancing Quality of Financial Reporting (EQ-FINREP) (P152567)

Saint Lucia Health System Strengthening Project (P166783)

Public Disclosure Copy

The World Bank Palestinian Recovery & Development Plan MDTF (P110690)

Public Disclosure Copy

Public Disclosure Copy

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank NP: Strengthening the Office of the Auditor General (P127040)

Public Disclosure Copy

Key Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions

Results-Based Rural Water Supply and Sanitation Under the National Target Program (P127435)

PNG - Small and Medium Enterprise Access to Finance Project (P120707)

Jordan Ozone Depleting Substances HCFC Phase-Out Project (ODS3) (P127702)

Public Disclosure Copy. Implementation Status & Results Report Gansu Cultural and Natural Heritage Protection and Development Project (P091949)

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Federally Administered Tribal Areas (FATA) Governance and Policy Program (P156412)

The World Bank Mauritania Public Sector Governance Project (P146804)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Revenue Mobilization Program for Results: VAT Improvement Program (VIP) (P129770)

Public Disclosure Copy

Key Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions

The World Bank Urban Transport Corridor Development in Surabaya - RETF (P147893)

Public Disclosure Copy. Implementation Status & Results Report Improving Maternal and Child Health through Integrated Social Services (P123706)

Public Disclosure Copy

The World Bank Public Expenditure and Fiscal Risk Management DPF-DDO (P154981)

The World Bank Pakistan Punjab Jobs and Competitiveness Program for Results (P155963)

Transcription:

Public Disclosure Authorized SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR EUROPE AND CENTRAL ASIA Kazakhstan Transport & ICT Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 18 ARCHIVED on 20-Jun-2017 ISR28492 Implementing Agencies: REPUBLIC OF KAZAKHSTAN, Ministry of Investments and Development Public Disclosure Authorized Key Dates Key Project Dates Bank Approval Date:30-Apr-2009 Planned Mid Term Review Date:03-Dec-2012 Original Closing Date:31-Dec-2013 Effectiveness Date:09-Dec-2009 Actual Mid-Term Review Date:27-Nov-2012 Revised Closing Date:30-Jun-2018 Public Disclosure Authorized Project Development Objectives Project Development Objective (from Project Appraisal Document) The proposed Project aims to increase transport efficiency along the road sections between Aktobe/Kyzylorda Oblast border and Shymkent and to improve road management and traffic safety in Kazakhstan. Has the Project Development Objective been changed since Board Approval of the Project Objective? Yes Board Approved Revised Project Development Objective (If project is formally restructured)phrpdodel The objective of the Project is to improve transport efficiency along road sections in Kyzylorda, South Kazakhstan and Almaty Oblasts, improve road management and increase traffic safety in Kazakhstan. Public Disclosure Authorized Components Name Upgrade and reconstruction of road sections along the WE-WC Corridor within Kyzylorda oblast (excluding the bypass to Kyzylorda):(Cost $1260.00 M) Upgrade and reconstruction of road sections within South Kazakhstan oblast, including the bypass to Kyzylorda:(Cost $880.00 M) Project Management Consultants:(Cost $14.00 M) Institutional Development, Road Safety, Road Services and Road Asset Management System:(Cost $4.00 M) Supervision of civil works:(cost $66.00 M) Upgrade and reconstruction of road sections within Almaty oblast:(cost $276.00 M) Overall Ratings 6/20/2017 Page 1 of 7

Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Moderate Moderate Implementation Status and Key Decisions Total disbursements have reached US$ 1.771 billion (83% of total Loan) as of June 5, 2017 with undisbursed balance of US$ 353.8 million. The project records the US$302 million savings, which the Borrower asked to use to finance two additional road sections Kurty-Togyz and Otar-Uzynagash. The Project restructuring is underway. The team launched advance procurement and CR will be ready to sign contracts with civil works contractors and supervision consultants as soon as the Project becomes effective. Construction of 1,060 km (original Project scope) out of the financed 1,150 km has been successfully completed and is open to traffic. The team is launching evaluation survey to identify perceptions of users (including businesses, local residents, freight forwarders, and other road users) with regards to the change in economic conditions before and after road construction. The section that remains under construction was added to the original scope of the Project in 2012 under the first restructuring of SWRP. The main concern is a contract where the client is taking a proactive decision and resolving technical and contractual issues. The contractor in charge of the tunnel construction has demobilized and left the construction site unattended with risk of collapse of the structure. The Client is terminating the contract and launching competitive bidding to complete remaining works on the site. Overall the progress on institutional development components during FY2017 has been satisfactory. The outcome of the main components supporting the policy dialogue between the World Bank and the GoK during the past year can be summarized as follows: Road Asset Management (RAMS): The consultant has delivered the activities on time and according to the TOR. The project team accessed an early version of the database that the consultant has built for the client. The quality of the output is satisfactory. The Committee for Roads (CR) expressed their willingness to expand on the RAMS activities. It was agreed to extend the scope of the assignment, increase total cost and extend the timeframe by 10 months as an answer to this request. The Project team recommended that the institutional arrangements and responsibilities over RAMS management, data collection and quality control be clarified during the extended assignment, and that the roles and responsibilities between KazAftojhol (KAZ), CR, and other agencies (laboratory and Kazdornii) be agreed upon. Also it was agreed to align the RAMS with the responsibilities of the newly created National Center for Quality. Road Safety: The activities related to road safety financed under the project have been completed. The Project team discussed with the CR the role of the MoID s Committee for Technical Regulation and Metrology. The team also discussed possible additional activities that were so far designed under the Center West and Center South Projects (both postponed by GoK) and that are planned to implemented under the restructuring of the project. Last, the Project team started an irap design audit of selected road sections that will be financed out of a World Bank administered trust fund aiming at preparing recommendations to adjust Kazakhstan SNIP norms for better integration of road safety during detailed designs. Overall environmental performance under the project remains moderately satisfactory. Significant part of works has been completed without major negative environmental impacts, however, some issues remain to be addressed by the CR. The incompliance with environmental safeguards results from: (a) unsatisfactory and incoherent monitoring of environmental safeguards; (b) sporadic deployment of environmental safeguards specialist of the supervision engineer; (c) inadequate qualifications of environmental specialist hired by the contractor and by the supervision engineer; (d) reluctance of contractors to divert/allocate resources for environmental mitigation measures. Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating 6/20/2017 Page 2 of 7

Political and Governance -- Moderate Moderate Macroeconomic -- Moderate Moderate Sector Strategies and Policies -- Moderate Moderate Technical Design of Project or Program -- Low Low Institutional Capacity for Implementation and Sustainability -- Moderate Moderate Fiduciary -- Low Low Environment and Social -- Moderate Moderate Stakeholders -- Low Low Other -- Moderate Moderate Overall -- Moderate Moderate Results Project Development Objective Indicators Reduce, by the end of the Project, Road User Costs from US$0.26/veh-km to US$0.23/veh-km on Project road sections. (Text, Custom) Value 0.26 0.23 0.24 0.23 Proportion of the Republican road network length that are in Good or Fair conditions (Text, Custom) Value 53% to be extracted from RAMS 67.00 86% Reduce, by the end of the Project, the rate (per 100 million veh-km) of road crash fatalities along the Project road sections by atleast 10% (Text, Custom) Value 11.00 to be extracted from RAMS to be extracted from RAMS 9.50 6/20/2017 Page 3 of 7

Date 01-Jun-2007 19-Dec-2016 06-Jun-2017 30-Jun-2018 Implementation and Effective use of Road Management System by the Committee (Text, Custom) Value No system in place RAMS activities framework completed. Equipment being tested. RAMS activities framework completed. Equipment being tested. System in place Overall Comments Intermediate Results Indicators Number of kilometers of roads upgraded (cumulative km) (Text, Custom) Value 0.00 1,200.00 1,148.00 1,227.00 Works, Goods, and Consulting Services contracts processed and managed by the PMC (Text, Custom) Value 0 (W); 0 (G); 0 (CS) 24(w), (0) G, 9(CS) 24(w), (0) G, 9(CS) 28(W);1(G);11( CS) 6/20/2017 Page 4 of 7

Training received by the Committee staff from PMC (staff-hours) (Text, Custom) Value 0.00 3,000.00 3,500.00 3,000.00 Date 09-Jun-2009 19-Dec-2016 19-Dec-2016 30-Jun-2018 Updating of road data for Republican roads (% of total length per year) (Text, Custom) Value 0% 100.00 67.00 100% Date 09-Jun-2009 19-Dec-2016 19-Dec-2016 30-Jun-2018 Road asset management strategy, Rolling multiyearroad maintenance, and rehabilitation programestablished (Text, Custom) Value Not established system in place, being tested system in place, being tested Established Date 09-Jun-2009 19-Dec-2016 19-Dec-2016 30-Jun-2018 Prepare road safety strategy and action plan (Text, Custom) Value Not established Established Established Established Date 09-Jun-2009 18-Dec-2015 18-Dec-2015 30-Jun-2018 Overall Comments 6/20/2017 Page 5 of 7

Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P099270 IBRD-76810 Effective USD 2,125.00 2,125.00 0.00 1,775.57 349.43 84% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P099270 IBRD-76810 Effective 30-Apr-2009 13-Jun-2009 09-Dec-2009 31-Dec-2013 30-Jun-2018 Cumulative Disbursements Restructuring History Level Approved on 25-Jun-2012,Level 1 Approved on 25-Jun-2015 6/20/2017 Page 6 of 7

Related Project(s) There are no related projects. 6/20/2017 Page 7 of 7