Marion County Marion Public County Works Public Building Works Inspection Division

Similar documents
BUILDING PERMIT FEES

Building Division Fees 2018

Building Permit Fees

One and two family residences... $ Mobile Homes... $73.73 Commercial Building... $ All other miscellaneous applications... $44.

CITY OF EL SEGUNDO SCHEDULE B-1 BUILDING & SAFETY FEE SCHEDULE BUILDING PERMIT FEES PROPOSED

EXHIBIT A CITY OF OLDSMAR PERMIT, INSPECTION AND PLANS EXAMINATION FEE SCHEDULE

VILLAGE OF FRANKLIN MASTER FEE SCHEDULE

2018 INSPECTION DIVISION FEE SCHEDULE ( ref. MN Rules , subd. 1, subd. 2) State Surcharge (except fixed fees) $0 $500 $49 FEES

Town of Windermere. Fee Directory

Highlands County Building Department 501 South Commerce Avenue Sebring, FL (863) Fee Schedule FY 17-18

BUILDING SUBCODE FEES:

PHONE: (407)

1. The fee for plan review shall be due upon completion of subcode review.

Yakima County Code ~ Building and Construction ~ Title FEES

NOTICE OF ANNUAL BUILDING DIVISION FEE INCREASES. EFFECTIVE: July 1, 2017

CITY OF TAMARAC BUILDING DEPARTMENT Schedule of Permit Fees

Fee Schedule for 2017

East Brunswick Township Uniform Construction Code Building Permit Application

Code Reference: Section , F.S. Chapter ; FS Section ; Responsible Dept.: Community Development/Building Division

FEE SCHEDULES. Class "B" Fermented Malt $ per year

City of Beaumont Fee Schedule

CITY OF SAN CARLOS COST OF SERVICES (USER FEES) FY Adopted Schedule of Community Development Department, Building Department Fees

CLASSES OF PERMITS AND FEES PAYABLE. Item Class of Permit Reference Fee Payable 1. Building Permit 6(3) See Part C

All electrical, gas and plumbing applications, together with the fee amount, must be mailed or delivered to:

APPLICATION FOR PLUMBING PERMIT Application Date / / Commercial Residential INSTALL REPAIR REPLACE

Cost of Services (User Fee) Study DRAFT Report CITY OF WINTERS, CALIFORNIA

Building & Planning. Community Long. Range Planning

CITY OF LATHRUP VILLAGE FEE SCHEDULE

Table 3-A BUILDING PERMIT FEES

TOWNSHIP OF FRANKLIN O-6-18 ORDINANCE AMENDING CHAPTER OF THE CODE OF THE TOWNSHIP OF FRANKLIN- CONSTRUCTION PERMITS

What did they tell me?

City of Morgan Hill. Development Services User Fee Study - Full Cost Recovery Results -

DEVELOPMENT SERVICES FEE SCHEDULE

ST. LOUIS COUNTY REVISED ORDINANCES (SLCRO) TITLE XI PUBLIC WORKS AND BUILDING REGULATIONS CHAPTER 1100 CODE ENFORCEMENT FEE SCHEDULES

Gordon County Permit Fees Effective August 1, 2012

GENERAL ADMINISTRATION AND CORPORATE SERVICES (Administration/Corporate/Finance Departments)

UNIFORM SYSTEM OF FEES REGULATION

Residential Permits R-2, R-3, R-4, and U Occupancies 2018 Building Permit Valuation/Fee Schedule

SECTION 110A FEE TABLES

~ (3) For a valuation over $15, up to and including

TITLE 110 LEGISLATIVE RULE STATE TAX DEPARTMENT

SECTION 110A FEE TABLES

ELECTRICAL SAFETY LAW (2015 Edition)

Questions by Vendors: District Answers are in Red. Vendor Questions are in Black.

CITY OF OWOSSO 2013 FEE SCHEDULE. Effective September 1, 2013

Subject: Capital Reserve Expenditure Guidelines. *incl. former OCHAP/CSHP Peel Access to Housing (PATH)

ELECTRICAL FEE SCHEDULE. Effective October 1, 2013 Revision June 2018

CITY OF NORMANDY PARK ADOPTED FEE SCHEDULE

SERVICE PROVIDER INFORMATION

Province of Alberta SAFETY CODES ACT PERMIT REGULATION. Alberta Regulation 204/2007. With amendments up to and including Alberta Regulation 208/2017

SCHEDULE OF FEES FOR CITY OF LONGWOOD BUILDING DIVISION. As Updated by Resolution , Effective February 3, 2017

1 Integrated Planning & Public Works

UTILITIES BOARD OF THE CITY OF GULF SHORES RESOLUTION NO. 4-90

Residential Permit Fee Schedule

Agenda Item # 5b Page 1 of 43

FARMERS MUTUAL INSURANCE CO. OF NOBLE COUNTY HOMEOWNERS/FARMOWNERS UNDERWRITING GUIDELINES

A ROUGH INSPECTION for all DUCTWORK must be completed PRIOR to a BUILDING FRAME INSPECTION

XXXXXXX Association, Inc Maintenance Standards Policy

SENATE, No STATE OF NEW JERSEY. 218th LEGISLATURE INTRODUCED FEBRUARY 1, 2018

Residential Permit Fee Schedule

National Flood Insurance Program. Summary of Coverage

Reserve Request Instructions: Documentation Requirements

RESOLUTION NO A RESOLUTION ESTABLISHING PLAN REVIEW, PERMIT, AND INSPECTION FEES; RESCINDING RESOLUTION NO

REPLACEMENT RESERVE GUIDE

CITY OF PORT ARANSAS 2015 Fee Schedule Resolution No R14 Exhibit 1

City of New Smyrna Beach Permit Fee Schedule

CITY OF PORT ARANSAS 2017 Fee Schedule Resolution No R43 AMENDMENT - 07/20/2017 SERVICES CHARGE/FEE COMMENTS

RRC STAFF OPINION PLEASE NOTE: THIS COMMUNICATION IS EITHER 1) ONLY THE RECOMMENDATION OF AN RRC

Integrating Green Building Measures into Capital Planning for HUD Assisted and Public Housing Programs

THE TOWN OF Angier N O R T H C A R O L I N A

FEBRUARY 10, 2009 DRAFT VERSION

Douglas County Transportation & Land Services Consolidated Permit Cost Recovery Schedule Res. TLS Effective January 26, 2009

RATE & FEE SCHEDULE AMENDED July 1, 2018

Service is our Hallmark.

Oak Island 1999 Hurricane Floyd

Year Per Manor Per Month Assessment Total Contribution United Laguna Woods Mutual 2019 RESERVES PLAN Reserve 30-Year Funding Plan Interest Earnings Th

House Bill 2447 Ordered by the House May 20 Including House Amendments dated March 20 and May 20

RULES OF TENNESSEE DEPARTMENT OF COMMERCE AND INSURANCE DIVISION OF FIRE PREVENTION CHAPTER NEW MANUFACTURED HOMES AND RECREATIONAL VEHICLES

HIGH VALUE DWELLING INSPECTIONS

Listing of Events Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School

C I T Y O F A L E X A NDRI A

Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee. Residential Water

DRAFT. Stormwater Management Program Credit Policy and Appeals Process Manual Policies & Procedures LOWER ALLEN TOWNSHIP STORMWATER AUTHORITY

New Construction and additions require verification of setbacks by a Massachusetts Registered Land Surveyor (RPLS).

SCHEDULE OF FEES - EFFECTIVE JULY 1, 2018 (A) LIQUOR LICENSES. Class A License (drink/package-consumption on or off Premises)... $ 5,329.

CITY OF LAKE MARY, FLORIDA

CITY OF FORT PIERCE BUILDING DEPARTMENT

Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee. Residential Water

2018 RACINE COUNTY DEVELOPMENT SERVICES DEPARTMENT FEE SCHEDULE

Educational & Performing Arts Center: Downriver Campus

REQUEST FOR BID POLE BUILDING CONSTRUCTION

Property Assessed Clean Energy Programs and How PACE Can Benefit Your Community

PUBLIC WORKS FEE SCHEDULE

Summary of Your Flood Insurance Coverage

TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL Phone: (561) Fax: (561)

Equipment Breakdown from Prepared Insurance Homeowners

4. New $ 100 Minimum Plumbing, HVAC, Alarms, Sprinklers, and any permanent systems 5. Replacement $ 50 Minimum

The first 6 months are complimentary

Contractor Application Instructions

Cedar River Water and Sewer District FEE AND CHARGE SCHEDULE AMENDED January 21, 2014

Transcription:

FEE SCHEDULE The final determination of valuation, occupancy, and/or construction type under any of the provisions of this order shall be made by the Building Official. A. Structural Permits: The valuation shall be calculated in accordance with Oregon Administrative Rule (OAR) Chapter 918, Division 50. The valuation to be used in computing the structural permit and structural plan review fees shall be the total value (rounded up to the nearest dollar) of all construction work for which the permit is issued, as well as all finish work, painting, roofing, electrical, plumbing, heating, air conditioning, elevators, fire extinguishing systems and any other permanent equipment. It also includes the contractor s profit which should not be omitted. The valuation for new commercial structures and additions will be calculated using the valuation table adopted and required by the State of Oregon multiplied by the square footage of the structure or as stated by the applicant, whichever is greater. The valuation for new residential structures and additions will be calculated using the valuation table adopted and required by the State of Oregon multiplied by the square footage of the new structure or addition. The valuation of pole buildings accessory to one or two family dwellings, carports, decks and covered patios/porches shall be calculated using the 50% of the valuation indicated for private garages. The fees for each structural permit for other than new one or two family dwellings, shall be as set forth in Tables A-1 and A-3. The fees for each structural permit for new one or two family dwellings shall be as set forth in Tables A-2 and A-3 Order No. Exhibit A Page 1 of 10

Table A-1: Structural Permit Table Total Valuation Structural Permit $1 to $2,000 $60.00 $2,001 to $25,000 $25,001 to $50,000 $50,001 to $100,000 $100,001 and up $60.00 for the first $2000 plus $8.00 for each additional $1000, or fraction thereof, to and including $25,000 $244.00 for the first $25,000 plus $6.25 for each additional $1000, or fraction thereof, to and including $50,000 $400.25 for the first $50,000 plus $4.75 each additional $1000, or fraction thereof, to and including $100,000 $637.75 for the first $100,000 plus $3.95 for each additional $1000, or fraction thereof Table A-2: Structural Permit for New 1 & 2 Family Dwellings Only Total Valuation Structural Permit $1 to $50,000 $70.00 $50,001 to $200,000 $200,001 to $300,000 $300,001 to $330,000 $330,001 and up $70.00 for the first $50,000 plus $4.00 for each additional $1,000, or fraction thereof, to and including $200,000 $670.00 for the first $200,000 plus $6.50 for each additional $1,000, or fraction thereof, to and including $300,000 $1,320.00 for the first $300,000 plus $7.50 each additional $1,000 or fraction thereof. $1,545.00 for the first $330,000 plus $3.95 each additional $1,000 or fraction thereof. Order No. Exhibit A Page 2 of 10

Table A-3: Structural Permits - Related s: Zoning Surcharge 20% of the structural permit fee Plan Review 65% of the structural permit fee Fire Life & Safety Plan Review 40% of the structural permit fee When assessed, in accordance with ORS 455.058 Investigation - work done without permits the fee will be based on, and will not exceed, the actual or average cost of the additional expense to Marion County to ensure compliance with the applicable codes. Reinspection $52.00 Inspections outside of normal business hours See Table G Inspections for which no fee is specifically indicated $67.25/ hr (one hour minimum) Additional Plan Review required by changes to the approved plans $67.25/ hr (one-half hour minimum) Administrative fee for processing State of Oregon Master Plans or Plans reviewed by a Third Party Plans Examiner Reissuance fee to reissue a permit that will expire by limitation and the project has not been abandoned. Phased Permitting In addition to standard permit fees Residential 1& 2 Family Stand-Alone Fire Sprinkler Systems Review for Deferred Submittals (for commercial projects only) Review for Deferred Submittals for single family dwelling or duplex Solar Photovoltaic Systems installed using the prescriptive path described in section 305.4 of the Oregon Solar Installation Specialty Code (OSISC). Temporary Certificate of Occupancy 10% of the structural permit fee, maximum fee of $250.00 $67.25 $250 application fee per phase plus 10% of the total Building permit fee. Up to 2000 square feet $98.00 2001 sf to 3600 sf $103.50 3601sf to 7000 sf $139.75 Over 7000sf $186.25 65% of the structural permit fee calculated using the valuation of the deferred portion of the project, with a minimum fee of $250. 35.00 $67.25 (includes application fee and one inspection) $150.00 for commercial/multifamily: Includes application fee and initial issuance if approved.$75.00 for renewal of commercial/multifamily temporary certificate of occupancy State Surcharge Seismic Surcharge $50.00 one-time fee for 1 & 2 Family Dwellings As set by the State of Oregon As set by the State of Oregon Order No. Exhibit A Page 3 of 10

B. Mechanical Permits: The fees for each permit shall be as set forth in Tables B-1, B-2 and B-3. The valuation used to determine the commercial mechanical permit fee using Table B-1 shall include the value of all mechanical materials, equipment, labor, overhead and profit. Table B-1: Commercial Mechanical Permit Table Commercial: New, Alterations, Additions, Repairs, & Accessory Structure Multifamily: New, Alterations, Additions, Repairs, & Accessory Structures Total Valuation $1 to $2,000 $67.25 Mechanical Permit $2,001 to $25,000 $25,001 to $50,000 $50,001 to $100,000 $100,001 and up $65.00 for the first $2000 plus $11.00 for each additional $1000, or fraction thereof, to and including $25,000 $318.00 for the first $25,000 plus $9.00 for each additional $1000, or fraction thereof, to and including $50,000 $543.00 for the first $50,000 plus $6.00 for each additional $1000, or fraction thereof, to and including $100,000 $843.00 for the first $100,000 plus $4.00 for each additional $1000, or fraction thereof Table B-2: 1 & 2 Family Mechanical Permit Schedule 1 & 2 Family Dwelling: New, Additions, Alterations, Repairs, & Accessory Structures Manufactured Dwellings: New, Additions, Alterations, Repairs, & Accessory Structures Item (per appliance/equipment) HVAC For the installation, replacement, or relocation of each: Air Handling Unit, Air Conditioner, Boiler, Heat Pump, Furnace, Heater (permit includes ducts and vents for the appliance) $20.75 Decorative Fireplace, Fireplace Insert, or Woodstove $20.75 Other $20.75 Fuel Piping - any number of outlets $20.75 Vents or Ducts (dryer, kitchen hood, exhaust fan) $10.25 Minimum Permit $67.25 Reinspection $52.00 State Surcharge As required by the State Order No. Exhibit A Page 4 of 10

Table B-3: Mechanical Permits Related s Other Inspections and s Mechanical Plan Review when required or requested 25 % of the permit fee Reinspection $52.00 Inspections outside of normal business hours See Table G Inspections for which no fee is specifically indicated $67.25/ hr (one hour minimum) Addition Plan Review required by changes, additions, or revisions to $67.25/ hr (one-half hour minimum) the approved plans When assessed, in accordance with ORS 455.058 the fee will Investigation be based on, and will not exceed, the actual or average cost of the additional expense to Marion County to ensure compliance with the applicable codes. State Surcharge As set by the State of Oregon Seismic Surcharge As set by the State of Oregon C. Manufactured Dwelling Placement Permits: One single permit fee is assessed to cover the placement of the manufactured dwelling, earthquake-resistant bracing system, plumbing connection including 30 feet each of sewer and water lines, electrical feeder connection, and mechanical connection. This permit does not include an electrical service. Manufactured Home Placement Permit... $ 285.00 Zoning Surcharge...$ 50.00 State Surcharge..... As required by the State State Administrative... As required by the State D. Camp and Park Permits: The fees for each permit issue for the construction, addition, or alteration of a manufactured dwelling park, recreational vehicle park, or organizational camp developed shall be calculated using the valuation of the work and Tables A-1 & A-3. Order No. Exhibit A Page 5 of 10

E. Electrical Permits: ITEM A. Residential Per Unit, Service Included FEE Allowed Number of Inspections 1000 ft 2 or less $139.75 4 Each additional 500 ft 2 $26.00 Limited Energy $67.25 2 Manufactured Home or Modular Dwelling Service or der $67.25 2 B. Services or ders Installation, Alterations or Relocation (Does not include branch circuits) 200 amps or less $82.75 2 201 amps to 400 amps $98.25 2 401 amps to 600 amps $163.50 2 601 amps to 1000 amps $212.00 2 Over 1000 amps or volts $491.50 2 Reconnect only $67.25 1 C. Temporary Services/ders Installation, Alteration, or Relocation 200 amps or less $67.25 2 201 amps to 400 amps $89.00 2 401 amps to 600 amps $129.50 2 601 amps to 1000 amps $212.00 2 Over 1000 amps or volts $491.50 2 D. Branch Circuits Inspections With service or feeder fee - each branch circuit $5.50 2 Without service or feeder fee - first branch circuit $67.25 2 - each additional branch circuit $5.50 E. Miscellaneous (Service or der Not Included) Each pump or Irrigation circle $67.25 2 Each sign or outline lighting $67.25 2 Signal circuit(s) or limited energy panel, alteration or extension $67.25 2 F. Renewable Electrical Energy 5 kva or less $79.00 3 5.01 to 15 kva $94.00 3 15.01 to 25 kva $156.00 3 For wind generation systems in excess of 25 kva 25.01 kva to 50 kva 50.10 kva to 100 kva Over 100 kva Base fee for solar generation systems in excess of 25 kva Plus for each additional kva over 25 (permit fee will not increase beyond the calculation for 100 kva) $204.00 3 $469.00 Use sections C & D $156.00 $6.25 3 Order No. Exhibit A Page 6 of 10

Electrical Table (continued) G. Other Inspections and s Each additional inspection over allowable $52.00 Reinspection $52.00 Hourly rate for Inspections made outside of normal business hours See Table G Hourly rate for during normal business hours $67.25 (1-hour min) Master Electrical Permit (per hour) $67.25 When assessed, in accordance with ORS 455.058 the fee will be based on, and will Investigation not exceed, the actual or average cost of the additional expense to Marion County to ensure compliance with the applicable codes. Plan Review A plan review is required for complex structures as defined by OAR Chapter 918, Division 311 25 % of the permit fee State Surcharge As set by the State of Oregon (This section intentionally blank) Order No. Exhibit A Page 7 of 10

F. Plumbing Permits: The fees for each permit shall be as set forth in Table F-1, F-2 and F-3. Table F-1: New 1 & 2 Family Dwelling Plumbing Permit Schedule 1 & 2 Family Dwelling: New Description (Note: A half bath is equivalent to a single bathroom) One Bathroom $285.00 Includes one kitchen and up to 100 feet each Two Bathrooms of water, sewer, and storm lines. $363.00 Three Bathrooms $441.00 Each additional Bath/kitchen $78.00 Each additional 100 feet of water, sewer, or storm line $26.00 Up to 2000 square feet $98.00 Multipurpose or Continuous Loop Fire 2001 ft 2 to 3600 ft 2 $103.50 Suppression System (13-D systems) 3601 ft 2 to 7200 ft 2 $139.75 (Plan Review Required) Over 7200 ft 2 $186.25 Table F-2: Plumbing Permit Schedule 1 & 2 Family Dwelling: Additions, Alterations, Repairs, & Accessory Structures Commercial: New, Additions, Alterations, Repairs, & Accessory Structures Multifamily: New, Additions, Alterations, Repairs, & Accessory Structures Manufactured Dwellings: New, Additions, Alterations, Repairs, & Accessory Structures Each Fixture area drain, backflow preventer, bathtub, bidet, catch basin, clothes washer, dental unit, cuspidor, drinking fountain, floor drain, hose bib, ice maker, interceptor, laundry tub, receptor, shower, sink, trough drain, tub/shower, urinal, water closet, water heater, water softener, wet bar $17.50 Up to 2000 square feet $98.00 Multipurpose or Continuous Loop Fire 2001 ft 2 to 3600 ft 2 $103.50 Suppression System (13-D systems) 3601 ft 2 to 7200 ft 2 $139.75 (Plan Review Required) Over 7200 ft 2 $186.25 Water Line First 100 feet $41.00 each additional 100 feet $26.00 Storm Sewer First 100 feet $41.00 each additional 100 feet $26.00 Sewer Line First 100 feet $41.00 each additional 100 feet $26.00 Medical Gas Installation (plan review required) Based on valuation using Table A-1 Other fixtures or items not named above $17.50 Minimum Permit $67.25 Order No. Exhibit A Page 8 of 10

Table F-3: Plumbing Permits Related s Plan Review A plan review is required for Medical Gas Installations, Fire Suppression Systems, and complex structures as defined 30% of the permit fee by OAR Chapter 918, Division 780. Inspections made outside of normal business hours ( two hour min) See Table G Additional inspections during normal business hours ( one hour min) $67.25/hr Reinspection fee $52.00 When assessed, in accordance with ORS 455.058 the fee will be based on, and will not exceed, the actual or Investigation work done without permits average cost of the additional expense to Marion County to ensure compliance with the applicable codes. As set by the State or State Surcharge Oregon G. Expedited Services: Expedited services are designed to help meet the specific and unique needs of our customers. These services are only available by special request, and are only available (with the exception of an onsite plan review) when staff is available to perform these duties outside of normal working hours. These fees are in addition to standard plan review and permit fees. Table G: Expedited Services Expedited Plan Review Service Option Expedited Inspections (after hours, etc.) Onsite Plan Review - Plan review specific to tenant improvements in an existing structure, considered minor in nature. 50% of the plan review fees, with a minimum fee of $200.00 $95.00/hr 50% of the plan review fees, with a minimum fee of $200.00 Order No. Exhibit A Page 9 of 10

H. Onsite Sewage Disposal Permits: New Site Evaluations Single Family Dwelling - First Lot - each additional lot evaluated during initial visit FEE $625 $575 Commercial Facility System First 1,000 Gallons $625 Each Additional 500 Gallons $120 Construction Installation Permits Standard System, Redundant System, Saprolite, Seepage Pit, Steep Slope, $750 Alternate Treatment Technologies, Capping Fill, Pressure Distribution, Tile $990 Dewatering, Sand Filter, Recirculation Gravel Filters $1200 Gray Water Disposal Sump $290 Holding Tank $559 Major Repair $600 Minor Repair $100 Major Alteration Permit $675 Minor Alteration Permit $175 Permit w/sewage flow > 1000 gallons per day in addition to above, per 500 gallons $75 per day Pump System - in addition to permit fee $50 Permit Renewal - Field Visit $336 Permit Renewal - No Field Visit $26 Other on-site activities Authorization Notice with Field Visit $450 Authorization Notice without Field Visit $150 Pumper Truck Inspection - First Truck $98 Pumper Truck Inspection - Additional Truck $50 Existing System Report $435 Mobile Hardship Renewal Inspection $264 Annual Report Evaluation Holding Tanks/ Alternate Systems $50 Alternate System Inspection $341 Hourly Inspection Rate $67.25 Reinspection $52 Compliance Recovery When authorized by OAR 340-071-0140 Not to exceed the permit application fee In addition to the permit fee Record Review $47 Commercial Plan Review Gallon/day = 601-1000 Gallons $250 Each 500 Gallons per day above 1000 $50 State DEQ Surcharge As required by the State Order No. Exhibit A Page 10 of 10