The World Bank Water and Sanitation in Tourist Areas (P054221)

Similar documents
The World Bank LK GPOBA - Access to Sanitation Project (P111161)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE APPROACH (SWAP) DEVELOPMENT PROJECT

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INSTITUTIONS BUILDING TECHNICAL ASSISTANCE PROJECT (IBTAL)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES PROJECT

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BD IDENTIFICATION SYSTEM FOR ENHANCING ACCESS TO SERVICES (IDEA) PROJECT

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE

The World Bank Third Secondary and Local Roads Project (P148048)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT PROJECT APPROVED ON JUNE 29, 2010

INFRASTRUCTURE & INSTITUTIONS EMERGENCY RECOVERY APPROVED ON MARCH 18, 2010 MINISTRY OF ECONOMY AND FINANCE, MEF,MINISTRY OF FINANCE AND ECONOMY

Public Disclosure Copy

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY ANALYSIS CAPACITY APPROVED ON APRIL 28, 2017

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING EARLY CHILDHOOD CARE AND DEVELOPMENT FOR FLOATING VILLAGES PROJECT APPROVED ON JUNE 10, 2016

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE PROJECT (CASA-1000)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT APPROVED ON JULY 31, 2008

Implementation Status & Results Colombia Disaster Vulnerability Reduction First Phase APL (P082429)

Public Disclosure Copy. Implementation Status & Results Report Dominican Republic DRM Development Policy Loan with a Cat DDO (P159351)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RIO GRANDE DO SUL SWAP APPROVED ON MAY 1, 2012 STATE OF RIO GRANDE DO SUL, BRAZIL

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931)

Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INCOME SUPPORT AND EMPLOYABILITY PROJECT LOAN 7811-SV

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016

The World Bank Sustainable Croatian Railways in Europe (P147499)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016

The World Bank NEITI Reporting Compliance (P162344)

RESTRUCTURING PAPER ON A

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

The World Bank Public Expenditure and Fiscal Risk Management DPF-DDO (P154981)

Public Disclosure Copy. Implementation Status & Results Report CAPE VERDE - Recovery and Reform of the Electricity Sector Project (P115464)

The World Bank Mozambique - Artisanal Fisheries and Climate Change (P149992)

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826)

Implementation Status & Results Haiti Strengthening the Management of Agriculture Public Services (GFRP) (P113623)

The World Bank Kabul Urban Transport Efficiency Improvement Project (P131864)

Public Disclosure Copy. Implementation Status & Results Report Costa Rica Catastrophe Deferred Draw Down Option (CAT DDO) (P111926)

The World Bank Disease Prevention and Control Project (P128442)

Implementation Status & Results Brazil Sao Paulo Feeder Roads Project (P106663)

Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991)

The World Bank Palestinian Recovery & Development Plan MDTF (P110690)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF MUNICIPAL SERVICES PROJECT LOAN 7885-TU

The World Bank Indonesia Infrastructure Guarantee Fund Project (P118916)

The World Bank Social Assistance System Strengthening Project (P123960)

MicroSmall&Medium Enterprise and Large Enterprise Supply Chain Finance (P157691)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING OF THE SAFETY NET ADVANCEMENT PROJECT APPROVED JULY 5, 2011 GRENADA

Public Disclosure Copy

The World Bank Malawi Strategic Program for Climate Resilience (P163245)

Public Disclosure Copy

Implementation Status & Results Peru PERU Participatory intervention model to improve child nutrition (P120888)

Document of The World Bank RESTRUCTURING PAPER

Public Disclosure Copy. Implementation Status & Results Report CO Rio Bogota Environmental Recuperation and Flood Control Project (P111479)

SENEGAL: TRANSPORT & URBAN MOBILITY PROJECT APPROVED ON JUNE 1, 2010 COORDINATION DU PATMUR,MINISTERE DE L'ECONOMIE, DES FINANCES ET DU PLAN

Public Disclosure Copy. Implementation Status & Results Report Improving Maternal and Child Health through Integrated Social Services (P123706)

Public Disclosure Copy. Implementation Status & Results Report Costa Rica Catastrophe Deferred Draw Down Option (CAT DDO) (P111926)

The World Bank SEE Catastrophe Risk Insurance Facility TA SECO (P156455)

TR Third Access to Finance for SMEs (SME III) (P130864)

The World Bank Kabeli-A Hydro Electric Project (P122406)

Implementation Status & Results Azerbaijan Corporate and Public Sector Accountivility Project (P099924)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT

Implementation Status & Results Brazil BR APL 1 Para Integrated Rural Dev (P082651)

Public Disclosure Copy. Name Previous Rating Current Rating

Justice Sector Support Project (P104749)

IRAQ: SECOND EXPENDITURE RATIONALIZATION, ENERGY EFFICIENCY AND STATE-OWNED ENTERPRISE GOVERNANCE PROGRAMMATIC DPF (P161

Improving Maternal and Child Health through Integrated Social Services (P123706)

The World Bank Revenue Administration Modernization Project (P130202)

Implementation Status & Results Philippines Rural Power Project (P066397)

Implementation Status & Results Croatia Revenue Administration Modernization Project (P102778)

Implementation Status & Results Indonesia Government Financial Management and Revenue Administration Project (P085133)

Bangladesh Insurance Sector Development Project (P156823)

Implementation Status & Results Indonesia Project for Indonesian Tax Administration Reform (PINTAR) (P100740)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

The World Bank Income Support and Employability Project (P117440)

Public Disclosure Copy

The World Bank Kenya Infrastructure Finance/PPP project (P121019)

Public Disclosure Copy. Implementation Status & Results Report Costa Rica Catastrophe Deferred Draw Down Option (CAT DDO) (P111926)

Nigeria - Program to Support Saving One Million Lives (P146583)

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Savings and Credit Sector Consolidation and Financial Inclusion Project (P123367)

Saint Lucia Health System Strengthening Project (P166783)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

The World Bank. losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized. Public Disclosure Copy

State Owned Financial Institutions Reform Project (P156837)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

Implementation Status & Results India Assam State Roads Project (P096018)

Innovative Access to Finance (P147183)

The World Bank Municipal Services Improvement (P096481)

Public Disclosure Copy

The World Bank Mauritania Public Sector Governance Project (P146804)

The World Bank Water Resources and Irrigation Sector Management Program 2 (P114348)

Implementation Status & Results Afghanistan Afghanistan Capacity Building for Results Facility (CBR) (P123845)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011

Debt Management Strengthening Programme at Ministry of Finance, Government of Pakistan (P161451)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT )

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE WESTERN PROVINCES RURAL WATER SUPPLY, SANITATION AND HYGIENE PROMOTION PROJECT

Public Disclosure Copy

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GOVERNMENT S CENTRAL PUBLIC ADMINISTRATION REFORM (CPAR) PROJECT

Implementation Status & Results India Strengthening India's Rural Credit Cooperatives (P102768)

Transcription:

Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF WATER AND SANITATION IN TOURIST AREAS APPROVED ON APRIL 2, 2009 TO THE DOMINICAN REPUBLIC REPORT NO.: RES29512 Public Disclosure Authorized WATER GLOBAL PRACTICE LATIN AMERICA AND CARIBBEAN REGION Public Disclosure Authorized Regional Vice President: Country Director: Senior Global Practice Director: Practice Manager/Manager: Task Team Leader: Jorge Familiar Calderon Tahseen Sayed Khan Guang Zhe Chen Rita E. Cestti Marco Antonio Aguero

ABBREVIATIONS AND ACRONYMS AOB: APL: CMU: CORAAPPLATA: DDO: DR: EA: GP: IBRD: ICR: ID: IP: ISR: MEPYD: MS: OP/BP: PASCT: PDO: Absence of Objection Adaptable Program Loan Country Management Unit Puerto Plata s Water and Sanitation Utility (Corporación de Acueductos y Alcantarillados de Puerto Plata) Deferred Drawdown Option Dominican Republic Environmental Assessment Global Practice International Bank for Reconstruction and Development Implementation Completion and Results Report Project Identification Code Implementation Progress Implementation Status and Results Report Ministry of Economy, Planning and Development (Ministerio de Economía Planificación y Desarrollo) Moderately Satisfactory Rating Operational Policy and Bank Procedures Water and Sanitation in Tourist Areas Project Project Development Objective

BASIC DATA Product Information Project ID P054221 Original EA Category Full Assessment (A) Approval Date 02-Apr-2009 Financing Instrument Investment Project Financing Current EA Category Full Assessment (A) Current Closing Date 31-Mar-2018 Organizations Borrower Dominican Republic Responsible Agency Unidad Ejecutora del PASCT,Ministerio de Economía Planificación y Desarrollo (MEPyD) Project Development Objective (PDO) Original PDO The objectives of the first phase of the proposed APL (the Project, APL I) are: (i) strengthening and consolidating the policy framework of the water and sanitation sector in the Dominican Republic; (ii) improving and expanding access to sanitation and wastewater treatment and disposal services in the Puerto Plata region; (iii) improving the financial and operational performance of CORAAPLATA, the regionâ s water utility; and (iv) enhancing operational and commercial performance of other regional utilities and preparing them to participate in the second phase of the Program (APL II). Summary Status of Financing Ln/Cr/Tf Approval Signing Effectiveness Closing Net Commitment Disbursed Undisbursed IBRD-76800 02-Apr-2009 18-Sep-2009 25-Feb-2010 31-Mar-2018 27.50 26.43 1.07 Policy Waiver(s) Does this restructuring trigger the need for any policy waiver(s)? No

I. PROJECT STATUS AND RATIONALE FOR RESTRUCTURING A. Project Status 1. The US$27.5 million IBRD loan was approved on April 2, 2009 and was declared effective on February 25, 2010. The current closing date is March 31, 2018. 2. The Project has retained the IP and DO ratings of Moderately Satisfactory (MS) over the past three ISRs, which reflect a positive progress on achieving the PDO and its indicators. At present, the PDO and IP ratings, as well as ratings for all other components are rated "MS" or higher. 3. Since the last extension granted in June 2017, disbursements have improved and now stand at 96 percent, up from 78.93 percent in June 2017, and all loan proceeds have been committed. As of November 13, 2017, a total of US$ 1.07 million still needs to be disbursed by the end of June 2018. The remaining funds are allocated to the two ongoing construction contracts: (i) the Submarine Outfall in Puerto Plata, and (ii) the Pretreatment Plant and Sewerage of Neighboring Areas. Project works are in the final stage, and the project is expected to be fully completed before the closing date. The Project has also contributed to improve the commercial and financial performance of the three utilities participating in the Project. It is worth highlighting the progress in the implementation of the Single Treasury Account for this Project, selected as part of a pilot for projects financed with external resources; this implementation continues to proceed smoothly without slowing down the execution of the Project. B. Rationale for Restructuring 4. As expressed in the Government's restructuring request of October 25, 2017, the Dominican Republic Water and Sanitation in Tourist Areas Project (Loan No. 7680-DO) and the water sector in general, have a high priority in the national agenda, and it is of the authorities best interest to complete the project in a satisfactory manner. The Government has requested to adjust the PDO and results framework, by removing all references related to the APL instrument. Delays during the early stages of the project implementation, forced the client to drop the second phase of the APL, deciding to prioritize efforts to complete the designs and infrastructure works of the submarine outfall and the wastewater pretreatment plant, as they are key to the Project s success. 5. The proposed Level II restructuring complies with the Articles of Agreement of the Bank, and with the updated OP/BP 10.00, where all World Bank investment instruments are now consolidated Investment Policy Financing

(IPF). The Bank is also not contemplating a follow-up operation for the current project as it was envisaged in the original APL. In addition, if the PDO would remain unchanged, it could potentially downgrade the Project s performance, despite the good progress made to date. Notwithstanding the above, the team is proposing to remove the APL references in the PDO and Results Framework, to allow a clear alignment of the Project s objectives and results to the current policy, at the same time reflecting the Project s priorities, which progress can now be accurately evaluated through the Implementation Completion and Results Report. 6. DESCRIPTION OF PROPOSED CHANGES 6. The current PDOs are: i) strengthening and consolidating the policy framework of the water and sanitation sector in the Dominican Republic; (ii) improving and expanding access to sanitation and wastewater treatment and disposal services in the Puerto Plata region; (iii) improving the financial and operational performance of CORAAPPLATA, the region s water utility; and (iv) enhancing operational and commercial performance of other regional utilities and preparing them to participate in the second phase of the Program (APL II). Associated with above numeral (iv), the current Results Framework also includes references to the APL II related to preparation activities for the APL II. 7. The proposed restructuring would entail specifically a change in the PDO s fourth objective: (iv) enhancing operational and commercial performance of other regional utilities and preparing them to participate in the second phase of the Program (APL II). The team is recommending to remove the reference related to the APL II in objective number iv as well as the associated references in the Loan Agreement and the Results Framework. The proposed revised PDO for the fourth objective would read as follows: iv) enhancing operational and commercial performance of other regional utilities. The remaining objectives at the PDO level remain unchanged. 8. The last Intermediate Outcome Indicator (vii) of the Results Framework has also been revised to remove all references to the APL instrument. The original intermediate outcome indicator was defined as: 70% of loan committed and 50% disbursed by the expected start of APL II, and the proposed indicator would read as follows: project successfully implemented in targeted utility. 9. The proposed restructuring fully complies with OP/BP 10.00 as: (a) the Project is not subject to suspension of disbursements; (b) the Borrower does not have any outstanding audit reports nor there are audit reports, which are not satisfactory to the Bank; and (c) no additional safeguards will be triggered.

II. SUMMARY OF CHANGES Changed Change in Project's Development Objectives Not Changed Change in Results Framework Change in Implementing Agency Change in DDO Status Change in Components and Cost Change in Loan Closing Date(s) Cancellations Proposed Reallocation between Disbursement Categories Change in Disbursements Arrangements Change in Disbursement Estimates Change in Systematic Operations Risk-Rating Tool (SORT) Change in Safeguard Policies Triggered Change of EA category Change in Legal Covenants Change in Institutional Arrangements Change in Financial Management Change in Procurement Change in Implementation Schedule Other Change(s) Change in Economic and Financial Analysis Change in Technical Analysis Change in Social Analysis Change in Environmental Analysis

PDO_IND_TABLE The World Bank IV. DETAILED CHANGE(S) OPS_DETAILEDCHANGES_PDO_TABLE PROJECT DEVELOPMENT OBJECTIVE Current PDO The objectives of the first phase of the proposed APL (the Project, APL I) are: (i) strengthening and consolidating the policy framework of the water and sanitation sector in the Dominican Republic; (ii) improving and expanding access to sanitation and wastewater treatment and disposal services in the Puerto Plata region; (iii) improving the financial and operational performance of CORAAPLATA, the regionâ s water utility; and (iv) enhancing operational and commercial performance of other regional utilities and preparing them to participate in the second phase of the Program (APL II). Proposed New PDO The objectives the Project are: (i) strengthening and consolidating the policy framework of the water and sanitation sector in the Dominican Republic; (ii) improving and expanding access to sanitation and wastewater treatment and disposal services in the Puerto Plata region; (iii) improving the financial and operational performance of CORAAPPLATA, the regional's water utility; and (iv) enhancing operational and commercial performance of other regional utilities. OPS_DETAILEDCHANGES_RESULTS_TABLE RESULTS FRAMEWORK Project Development Objective Indicators Setting-up of the Water Sector Council Unit of Measure: Yes/No Value No Yes Yes No Change Date 14-May-2009 31-May-2017 31-Mar-2018 Development and adoption by the Water Sector Council of a National Strategy for the WSS sector Value Partially met: a strategy was developed with Project financing, but was not officially Strategy developed No WSS has been adopted by the Water and adopted by the developed Sector Council (given that Water Sector Council passing the Water Law No Change was deemed as a necessary condition to adopt it). A new

sanitation strategy is currently under review by the Water Council and will likely be approved. Date 14-May-2009 31-May-2017 31-Mar-2018 Consumers that receive access to improved or new sanitation and to wastewater treatment and disposal services in the Puerto Plata region Value 0 0 128,000 No Change Date 14-May-2009 31-May-2017 31-Mar-2018 Consumers that receive access to network sanitation in the Puerto Plata region Breakdown Value 0 8000 18,000 No Change Date 14-May-2009 31-May-2017 31-Mar-2018 Percentages of consumers and hotels that are connected to the sanitation network in Puerto Plata Value 60% for consumers and 80% for consumers Data under preparation No Change 50% for hotels and 70% for hotels Date 14-May-2009 31-May-2017 31-Mar-2018 CORAAPPLATA has identified 100% of its potential consumers and has made operational an active registry of at least 40,000 users, covering at least 60% of its operational areas Value No cadastre was No Change available Partially met: CORAAPPLATA has identified 100% of potential consumers, current active registry CORAAPPLATA has identified 100% of its potential consumers and has made operating an active

increased from 8,200 to 16,100 connections (from approx. 27,000 people to 53,000, assuming 3.3 people/household - see ONE Censo 2010) registry of at least 40,000 users, covering at least 60% of its operational areas The CORAA's commercial system is now operated under a contract by a private firm (AAA). Goal will be likely met during 2017, but not at project closing date. Date 14-May-2009 31-May-2017 31-Mar-2018 Compliance agreements have been signed on improving of cadastre, commercial systems, administrative and financial systems of CORAAPPLATA, CORAAMOCA and COAAROM, as well as an sewerage systems O&M stre Value Partially met: compliance Compliance agreements with the agreements have been three CORAAs have been signed on improving of signed, but have not cadastre, commercial been monitored or systems, No compliance enforced. Nevertheless, administrative and agreement or sewerage this has not affected financial systems of O&M strengthening their performance. The No Change CORAAPPLATA, program has been strengthening program CORAAMOCA and signed or developed. for sewerage O&M with COAAROM, as well as CORAAPPLATA is under an sewerage systems preparation and is O&M strengthening expected to be in place program for by project closing. CORAAPPLATA Date 14-May-2009 31-May-2017 31-Mar-2018 Intermediate Indicators IO_IND_TABLE Completion of business and modernization plans for regional utilities

Value Business and Business and N/A modernization plans modernization plans No Change completed completed Date 14-May-2009 28-Nov-2016 31-Mar-2018 80 percent of consumers are connected to network sanitation in Puerto Plata. Value 60% Partially met: almost 100% in the city center of Puerto Plata and 60% of consumers are connected to networks in the PP area. 80% No Change Date 14-May-2009 28-Nov-2016 31-Mar-2018 70 percent of the occupancy capacity of hotel in the Puerto Plate region are connected to communal sanitation networks. Value 50% Data being gathered by CORAAPPLATA, but target likely not to be met by project closing. The largest hotel complexes will not be connected to CORAAPPLATA's network, but rather to either their own private sewerage systems or shared networks. 70% No Change Date 14-May-2009 28-Nov-2016 31-Mar-2018

Cadastre operational Value N/A Cadastre operational Cadastre operational No Change Date 14-May-2009 28-Nov-2016 31-Mar-2018 Metering coverage reaches 12% of all consumers in CORAAPPLATA Metering coverage has reached 26% of all domestic users and 100% of large consumers in CORAAPPLATA YR1 5%; YR2 4%; YR3 Value 3% operational areas. 4%; YR4 12% Target Metering has improved revised during last No Change significantly under rrestructuring) project financing as well as under the delegation contract with a private operator (AAA). Date 14-May-2009 28-Nov-2016 31-Mar-2018 60% of domestic and 60% of hotel sector consumers are 'Satisfied' or 'Highly Satisfied' with CORAAPPLATA performance based on results from consumer satisfaction surveys Value Customer survey not yet No particular target N/A No Change started as per restructuring Date 14-May-2009 28-Nov-2016 31-Mar-2018 The project was succesfully implemented in targeted utility

Value N/A Most likely to be implemented successfully; to date 3 utilities have been supported through the project, CORAAPPLATA. COAAROM and CORAMOCA. Project successfully implemented in targeted utility. Date 14-May-2009 28-Nov-2016 31-Mar-2018 Revised

Note to Task Teams: End of system generated content, document is editable from here.