Comparing Mutually Exclusive Alternatives

Similar documents
Comparing Mutually Exclusive Alternatives

Effects of Inflation on Project Cash Flows

Lecture 5 Present-Worth Analysis

Chapter 5 Present Worth Analysis

Discounted Cash Flow Analysis

Chapter 4. Establishing the Planning Horizon & MARR. Principles of Engineering Economic Analysis, 5th edition

Benefit-Cost Ratio. Lecture No. 53 Chapter 16 Contemporary Engineering Economics Copyright Contemporary Engineering Economics, 6e, GE Park

INTERNAL RATE OF RETURN

Sixth Edition. Global Edition CONTEMPORARY ENGINEERING ECONOMICS. Chan S. Park Department of Industrial and Systems Engineering Auburn University

Selection from Independent Projects Under Budget Limitation

i* = IRR i*? IRR more sign changes Passes: unique i* = IRR

IE463 Chapter 4. Objective: COMPARING INVESTMENT AND COST ALTERNATIVES

Chapter 7 Rate of Return Analysis

Engineering Economics

IE463 Chapter 5. Depreciation. Depreciable Property. Basic Terminology STRAIGHT-LINE (SL) METHOD DEPRECIATION AND INCOME TAXES

Nominal and Effective Interest Rates

Other Analysis Techniques. Future Worth Analysis (FWA) Benefit-Cost Ratio Analysis (BCRA) Payback Period

29/09/2010. Outline Module 4. Selection of Alternatives. Proposals for Investment Alternatives. Module 4: Present Worth Analysis

FREDERICK OWUSU PREMPEH

Multiple Choice: 5 points each

Present Worth Analysis

IE463 Chapter 5 DEPRECIATION AND INCOME TAXES

Inflation Homework. 1. Life = 4 years

Department of Humanities. Sub: Engineering Economics and Costing (BHU1302) (4-0-0) Syllabus

STRAIGHT-LINE (SL) METHOD

Chapter 7 Rate of Return Analysis

COMPARING ALTERNATIVES

Chapter 8. Rate of Return Analysis. Principles of Engineering Economic Analysis, 5th edition

Engineering Economics

# 6. Comparing Alternatives

Chapter Sixteen Equipment Acquisition and Disposal

Dr. Maddah ENMG 400 Engineering Economy 07/06/09. Chapter 5 Present Worth (Value) Analysis

Tax Homework. A B C Installed cost $10,000 $15,000 $20,000 Net Uniform annual before 3,000 6,000 10,000

Chapter 6 Rate of Return Analysis: Multiple Alternatives 6-1

Carefully read all directions given in a problem. Please show all work for all problems, and clearly label all formulas.

T. Rowe Price Retirement Funds

Overall ROR: 30,000(0.20) + 70,000(0.14) = 100,000(x) x = 15.8% Prepare a tabulation of cash flow for the alternatives shown below.

ACF719 Financial Management

CHAPTER 7: ENGINEERING ECONOMICS

Homework 4. Public Projects. (a) Using the benefit cost ratio, which system should be selected?

8: Economic Criteria

Lesson TVM xx. Present Value Annuity Due

Mutually Exclusive Choose at most one From the Set

ECONOMIC ANALYSIS AND LIFE CYCLE COSTING SECTION I

EFFECTIVE BUDGETING & OPERATIONAL COST CONTROL FINANCE & ACCOUNTING

Chapter 13 Breakeven and Payback Analysis

Annuities in Retirement Income Planning

(Refer Slide Time: 3:03)

ME 353 ENGINEERING ECONOMICS

(Refer Slide Time: 0:50)

Nothing in life is certain except death, taxes and the second law of thermodynamics. Seth Lloyd (Nature, 26 Aug. 2004)

Chapter 14: Effects of Inflation

Topic 2: Define Key Inputs and Input-to-Output Logic

Finance 402: Problem Set 5 Solutions

Chapter 16 Depreciation Methods

MBF1223 Financial Management Prepared by Dr Khairul Anuar

There are significant differences in the characteristics of private and public sector alternatives.

Lecture 4 Valuation of Stocks (a)

IE463 Chapter 3. Objective: INVESTMENT APPRAISAL (Applications of Money-Time Relationships)

Principles of Financial Feasibility ARCH 738: REAL ESTATE PROJECT MANAGEMENT. Morgan State University

Chapter One. Definition and Basic terms and terminology of engineering economy

Comparison and Selection among Alternatives Created By Eng.Maysa Gharaybeh

Engineering Economy. Lecture 8 Evaluating a Single Project IRR continued Payback Period. NE 364 Engineering Economy

BUSINESS FINANCIAL & ACCOUNTING SKILLS

IE 360 Engineering Economic Analysis Exam 2 Sample Test - Dr. Park Copyright 1998

Topic 3: An introduction to cost terms and concepts

***************************** SAMPLE PAGES FROM TUTORIAL GUIDE *****************************

ENGM 310 Engineering Economy Lecture Notes (MJ Zuo) Page 1 of 36. Introduction

Chapter 15 Inflation

Global Financial Management

SOLUTIONS TO SELECTED PROBLEMS. Student: You should work the problem completely before referring to the solution. CHAPTER 17

2. Basic Concepts In Project Appraisal [DoF Ch. 4; FP Ch. 3, 4, 5]

ENGINEERING ECONOMIC ANALYSIS

The target profile: Its role within the DRM accounting model and how is it determined (paragraphs 6 25);

The formula for the net present value is: 1. NPV. 2. NPV = CF 0 + CF 1 (1+ r) n + CF 2 (1+ r) n

Table of Contents. Page 1 7/1/2016

See Target Date Solutions FROM A WHOLE NEW PERSPECTIVE

Topic 1 (Week 1): Capital Budgeting

Overview. Overview. Chapter 19 9/24/2015. Centre Point: Reversion Sale Price

STRATEGIC PARTNERS HORIZON ANNUITY PROSPECTUS: April 30, 2018

Cost Benefit Analysis (CBA) Economic Analysis (EA)

Part III. Cycles and Growth:

EGR 312 ENGINEERING ECONOMY PRACTICE FINAL EXAM

Assignment 1.2 Basic Concepts 2

The time value of money and cash-flow valuation

CE 561 Lecture Notes. Engineering Economic Analysis. Set 2. Time value of money. Cash Flow Diagram. Interest. Inflation Opportunity cost

All In One MGT201 Mid Term Papers More Than (10) BY

Introduction to Stock Valuation

Solvency II - Risk Management Strategies for Insurance Businesses

ECLT 5930/SEEM 5740: Engineering Economics Second Term

Chapter 8. Capital Budgeting Cash Flow

STRATEGIC PARTNERS HORIZON ANNUITY PROSPECTUS: April 30, 2018

An Interesting News Item

Econ 219 Spring Lecture #11

Decision Rules. Kevin Frick, PhD. Johns Hopkins University

CHAPTER 16. Managing Bond Portfolios INVESTMENTS BODIE, KANE, MARCUS. Copyright 2011 by The McGraw-Hill Companies, Inc. All rights reserved.

IE2140 Engineering Economy Tutorial 3 (Lab 1) Using Excel Financial Functions for Project Evaluation

Solvency II - Risk Management Strategies for Insurance Businesses

CAPITAL BUDGETING PRACTICE PROBLEMS. Self-Study Question

Lecture 20: Bond Portfolio Management. I. Reading. A. BKM, Chapter 16, Sections 16.1 and 16.2.

Transcription:

Comparing Mutually Exclusive Alternatives Lecture No. 18 Chapter 5 Contemporary Engineering Economics Copyright 2016

Comparing Mutually Exclusive Projects: Basic Terminologies Mutually Exclusive Projects Alternative vs. Project Do-Nothing Alternative

Revenue Versus Service Projects Revenue Projects o Project revenues depend on the choice of alternatives o Revenue and cost streams vary with the choice of alternatives Service Projects o Project revenues do not depend on the choice of alternatives o Fixed (or constant) revenues for all alternatives

Analysis Period Versus Required Service Period Analysis Period The time span over which the economic effects of an investment will be evaluated (study period or planning horizon) Required Service Period The time span over which the service of equipment (or investment) will be needed

Road Map: A Process of Making a Choice Among Mutually Exclusive Alternatives

Comparing Mutually Exclusive Projects Principle: Projects must be compared over an equal time span. Rule of Thumb: If the required service period is given, the analysis period should be the same as the required service period.

Case 1 Analysis Period Equals Project Lives What to do: Compute the NPW for each project over its life and select the project with the largest NPW.

Comparing Projects Requiring Different Levels of Investment Assume that the unused funds will be invested at MARR. This portion of investment will earn a 10% return on investment. PW(10%) $4,000 $450( P / F,10%,1) $600( P / F,10%,2) A $4,493( P/ F,10%,3) $283

Analysis Period Implied in Comparing Mutually Exclusive Alternatives

Case 2 Project Lives Longer Than the Analysis Period What to do o Estimate the salvage value at the end of the required service period. o Compute the NPW for each project over the required service period. o PW(15%) A = $362 o PW(15%) B = $364

Case 3A: Service Projects Project Lives Shorter than the Analysis Period What to do o Come up with replacement projects that match or exceed the required service period. o Compute the NPW for each project over the o o required service period. PW(15%) A = $34,359 PW(15%) B = $31,031

Case 3B: Revenue Projects Analysis Period Coincides with the Project with the Longest Life in the Mutually Exclusive Group What to do Compute the NPW of each project over its analysis period, assuming no cash flows after the service life for the shorter-lived project. PW(15%) Drill = $2,208,470 PW(15%) Lease = $2,180,210

Case 4 Analysis Period Is Not Specified What to do o o o o Come up with replacement projects that serve out the least common multiple period (LCM). Compute the NPW for each project over the LCM. PW(15%) A = $53,657 PW(15%) B = $48,534

Summary Present worth is an equivalence method of analysis in which a project s cash flows are discounted to a lump sum amount at the present time. The MARR, or minimum attractive rate of return, is the interest rate at which a firm can always earn or borrow money. MARR is generally dictated by management and is the rate at which NPW analysis should be conducted. Two measures of investment, the net future worth and the capitalized equivalent worth, are variations of the NPW criterion.

The term mutually exclusive means that when one of several alternatives that meet the same need is selected, the others will be rejected. Revenue projects are those for which the income generated depends on the choice of project. Service projects are those for which income remains the same, regardless of which project is selected. The analysis period (study period) is the time span over which the economic effects of an investment will be evaluated.

The required service period is the time span over which the service of equipment (or investment) will be needed. The analysis period should be chosen to cover the required service period. When not specified by management or company policy, the analysis period to use in a comparison of mutually exclusive projects may be chosen by the individual analyst.