COMPARING ALTERNATIVES

Similar documents
IE463 Chapter 4. Objective: COMPARING INVESTMENT AND COST ALTERNATIVES

Comparing Mutually Exclusive Alternatives

Comparison and Selection among Alternatives Created By Eng.Maysa Gharaybeh

# 6. Comparing Alternatives

Dr. Maddah ENMG 400 Engineering Economy 07/06/09. Chapter 5 Present Worth (Value) Analysis

ECLT 5930/SEEM 5740: Engineering Economics Second Term

i* = IRR i*? IRR more sign changes Passes: unique i* = IRR

1.011Project Evaluation: Comparing Costs & Benefits

IE 343 Midterm Exam 2

8: Economic Criteria

Chapter 6 Rate of Return Analysis: Multiple Alternatives 6-1

INTERNAL RATE OF RETURN

Chapter 8. Rate of Return Analysis. Principles of Engineering Economic Analysis, 5th edition

What Is a Project? How Do We Justify a Project? 1.011Project Evaluation: Comparing Costs & Benefits Carl D. Martland

MGT201 Lecture No. 11

There are significant differences in the characteristics of private and public sector alternatives.

Chapter 4. Establishing the Planning Horizon & MARR. Principles of Engineering Economic Analysis, 5th edition

IE 343 Section 1 Engineering Economy Exam 2 Review Problems Solutions Instructor: Tian Ni March 30, 2012

IE 343 Midterm Exam 2

SOLUTIONS TO SELECTED PROBLEMS. Student: You should work the problem completely before referring to the solution. CHAPTER 17

Chapter One. Definition and Basic terms and terminology of engineering economy

IE 343 Midterm Exam. March 7 th Closed book, closed notes.

Comparing Mutually Exclusive Alternatives

Chapter 10 The Basics of Capital Budgeting: Evaluating Cash Flows ANSWERS TO SELECTED END-OF-CHAPTER QUESTIONS

Lecture 5 Present-Worth Analysis

29/09/2010. Outline Module 4. Selection of Alternatives. Proposals for Investment Alternatives. Module 4: Present Worth Analysis

Mutually Exclusive Choose at most one From the Set

Nominal and Effective Interest Rates

ENG2000 Chapter 16 Evaluating and Comparing Projects: The MARR. ENG2000: R.I. Hornsey CM: 1

Chapter 7 Rate of Return Analysis

Planin. Software for economic analyzis of planted forests. Edilson Batista de Oliveira.

Department of Humanities. Sub: Engineering Economics and Costing (BHU1302) (4-0-0) Syllabus

IE2140 Engineering Economy Tutorial 3 (Lab 1) Using Excel Financial Functions for Project Evaluation

Cost Benefit Analysis (CBA) Economic Analysis (EA)

Present Worth Analysis

A Refresher on Engineering Economics

Overall ROR: 30,000(0.20) + 70,000(0.14) = 100,000(x) x = 15.8% Prepare a tabulation of cash flow for the alternatives shown below.

Valuation and Tax Policy

Global Financial Management

ENG2000 Chapter 17 Evaluating and Comparing Projects: The IRR. ENG2000: R.I. Hornsey CM_2: 1

Chapter 5 Present Worth Analysis

Project Evaluation. Carl D. Martland Senior Research Associate Dept. of Civil & Environmental Engineering

Ibrahim Sameer (MBA - Specialized in Finance, B.Com Specialized in Accounting & Marketing)

Chapter 13 Breakeven and Payback Analysis

2. Basic Concepts In Project Appraisal [DoF Ch. 4; FP Ch. 3, 4, 5]

Other Analysis Techniques. Future Worth Analysis (FWA) Benefit-Cost Ratio Analysis (BCRA) Payback Period

IE463 Chapter 3. Objective: INVESTMENT APPRAISAL (Applications of Money-Time Relationships)

Selection from Independent Projects Under Budget Limitation

Office of Utility Regulation

Benefit Cost Analysis and Public Sector Economics

Regret Minimization and Security Strategies

TAX ECONOMIC ANALYSIS 1 Haery Sihombing. Learning Objectives

3: Balance Equations

Multiple Choice: 5 points each

University 18 Lessons Financial Management. Unit 2: Capital Budgeting Decisions

Chapter Five. Scale, Timing, Length, and Interdependencies in Project Selection

ECONOMIC ANALYSIS AND LIFE CYCLE COSTING SECTION I

2/22/2017. Engineering Economics Knowledge. Engineering Economics FE REVIEW COURSE SPRING /22/2017

SHIV SHAKTI International Journal in Multidisciplinary and Academic Research (SSIJMAR) Vol. 5, No. 3, June 2016 (ISSN )

All In One MGT201 Mid Term Papers More Than (10) BY

Investment Information and Criterions. Name of student: Admission: Course: Institution: Instructor: Date of Submission:

ENGM 310 Engineering Economy Lecture Notes (MJ Zuo) Page 1 of 36. Introduction

Non-Deterministic Search

Lecture 4 Valuation of Stocks (a)

Techniques for Cash Flow Analysis

Sixth Edition. Global Edition CONTEMPORARY ENGINEERING ECONOMICS. Chan S. Park Department of Industrial and Systems Engineering Auburn University

CE 561 Lecture Notes. Engineering Economic Analysis. Set 2. Time value of money. Cash Flow Diagram. Interest. Inflation Opportunity cost

Principles of Financial Feasibility ARCH 738: REAL ESTATE PROJECT MANAGEMENT. Morgan State University

IE 343 Section 2 - Final Exam

CAPITAL BUDGETING AND THE INVESTMENT DECISION

Principles of Managerial Finance Solution Lawrence J. Gitman CHAPTER 10. Risk and Refinements In Capital Budgeting

Chapter 7. Net Present Value and Other Investment Rules

Richardson Extrapolation Techniques for the Pricing of American-style Options

School of Engineering University of Guelph. ENGG*3240 Engineering Economics Course Description & Outline - Fall 2008

Present Value, Discounted Cash Flow. Engineering Economy

FE Review Economics and Cash Flow

Chapter 7 Rate of Return Analysis

The NPV profile and IRR PITFALLS OF IRR. Years Cash flow Discount rate 10% NPV 472,27 IRR 11,6% NPV

BFC2140: Corporate Finance 1

MGT201 Current Online Solved 100 Quizzes By

The benefits of core-satellite investing


Financial Management Practices of New York Dairy Farms

Corporate Financial Models and Long-Term Planning

CHAPTER 5 R&M ALLOCATION AND APPORTIONMENT CONTENT

COPYRIGHTED MATERIAL. The Very Basics of Value. Discounted Cash Flow and the Gordon Model: CHAPTER 1 INTRODUCTION COMMON QUESTIONS

Capital Budgeting Theory and Capital Budgeting Practice. University of Texas at El Paso. Pierre C. Ehe MBA

Capital Stock Conference March 1997 Agenda Item V. The use of the Perpetual Inventory Method in the UK; Practices and Problems

INTERNATIONAL JOURNAL OF MANAGEMENT RESEARCH AND REVIEW

European Banking Authority (EBA) Discussion Paper

EUROPEAN UNION ACCOUNTING RULE 18 IMPAIRMENT OF ASSETS

Chapter 15 Inflation

Indian Accounting Standard 36 Impairment of Assets

SOLUTIONS TO SELECTED PROBLEMS. Student: You should work the problem completely before referring to the solution. CHAPTER 1

This version includes amendments resulting from IFRSs issued up to 31 December 2008.

ME 353 ENGINEERING ECONOMICS

JSC Microfinance Organization Credo Financial statements. Year ended 31 December 2016 together with independent auditor s report

Time and Agricultural Production Processes

ECONOMIC TOOLS FOR EVALUATING FISH BUSINESS. S.K.Pandey and Shyam.S.Salim

Chapter 11 Constrained Project Selection

Transcription:

CHAPTER 6 COMPARING FEASIBLE DESIGN Alternatives may be mutually exclusive (i.e., choice if one excludes the choice of any other alternative) because : The alternatives being considered may require different amounts of capital investment The alternatives may have different useful lives The subject of this section will help: analyze and compare feasible alternatives select the preferred alternative CASH FLOW ANALYSIS METHODS The cash-flow analysis methods (previously described) used in this process: Present Worth ( PW ) Annual Worth ( AW ) Future Worth ( FW ) Internal Rate of Return ( IRR ) External Rate of Return ( ERR )

RULE FOR CHOOSING AMONG The alternative that requires the minimum investment and produces satisfactory functional results will be chosen unless the incremental capital associated with an alternative having a larger investment can be justified with respect to its incremental savings (or benefits ). The alternative requiring the least investment is the base alternative. Rule ensures that as much capital as possible is invested at a rate of return equal to or greater than the MARR. ENSURING COMPARABLE BASIS FOR SELECTING MUTUALLY-EXCLUSIVE Include any economic impacts of alternative differences in estimated cash flows Two Rules: Rule 1. 1 When revenues and other economic benefits are present,, select alternative that has greatest positive equivalent worth at ι = MARR and satisfies project requirements. Rule 2. 2 When revenues and economic benefits are not present,, select alternative that minimizes cost. INVESTMENT Those alternatives with initial (i.e., front-end) capital investments(s) that produce positive cash flows from increased revenue, savings through reduced costs, or both.

COST Those alternatives with negative cash flows except for a possible positive cash flow element from disposal of assets at the end of the project s useful life. PLANNING HORIZON The selected time period over which mutually exclusive alternatives are compared -- study period May be influenced by factors including: service period required useful life of the shorter-lived alternative useful life of the longer-lived lived alternative company policy It is key that the study period be appropriate for the decision situation under investigation USEFUL LIFE Useful life of an asset is the time period during which it is kept in productive use in a trade or business.

REPEATABILITY ASSUMPTION The study period over which the alternatives are being considered is either indefinitely long or equal to a common multiple of the lives of the alternatives. The economic consequences that are estimated to happen in an alternative s initial useful life span will also happen in all succeeding life spans (replacements) Actual situations in engineering practice seldom meet both conditions COTERMINATED ASSUMPTION A finite and identical study period is used for all alternatives This planning horizon, combined with appropriate adjustments to the estimated cash flows, puts the alternatives on a common and comparable basis Used when repeatability assumption is not applicable Approach most frequently used in engineering practice COTERMINATED ASSUMPTION Guidelines when useful life(s) different in length than study period Useful life < study period a. Cost alternatives -- each cost alternative must provide same level of service as study period : 1) contract for service or lease equipment for remaining time; 2) repeat part of useful life of original alternative until study period ends b. investment alternatives -- assume all cash flows reinvested in other opportunities at MARR to end of study period

COTERMINATED ASSUMPTION Guidelines when useful life(s) different in length than study period Useful life > study period Truncate the alternative at the end of the study period using an estimated market value. This method assumes disposable assets will be sold at the end of the study period at that value SELECT THE EQUIVALENT WORTH ALTERNATIVE WITH THE GREATER WORTH If : PW A (i)) < PW B (i) then PW A (i)) ( A / P,i,N,N ) < PW B (i)) ( A / P,i,N,N ) and AW A (i)) < AW B (i) similarly PW A (i)) ( F / P, i,, N ) < PW B (i)) ( F / P, i,, N ) and FW A (i)) < FW B (i) Select alternative B COMPARING COST For cost alternatives that are compared using the PW method, the alternative that has the least negative PW is most economically desirable. For cost alternatives that are compared using the AW method, the alternative that has the least negative AW is most economically desirable. For cost alternatives that are compared using the FW method, the alternative that has the least negative FW is most economically desirable.

USING RATE OF RETURN METHODS TO EVALUATE MUTUALLY EXCLUSIVE The best alternative produces satisfactory functional results and requires the minimum investment of capital, unless a larger investment can be justified with respect to the incremental costs and benefits it produces RATE OF RETURN METHOD RULES 1. Each increment of capital must justify itself by producing a sufficient rate of return on that increment. 2. Compare a higher investment alternative against a lower investment alternative only when the latter is acceptable. 3. Select the alternative that requires the largest investment of capital as long as the incremental investment is justified by benefits that earn at least the MARR. This maximizes equivalent worth on total investment at i = MARR. INCONSISTENT RANKING PROBLEM Ranking errors can occur when a selection among mutually exclusive alternatives is based wrongly on maximization of IRR on the total cash flow, as opposed to the PW of the total cash flow When the MARR is less than the IRR of the difference between alternative cash flows, an incorrect choice will be made by selecting an alternative that maximizes the IRR of its total cash flow, because -- the IRR method assumes reinvestment of cash flows at the calculated rate(s) of return -- the PW method assumes reinvestment at the MARR

INCREMENTAL INVESTMENT ANALYSIS PROCEDURE ( Helps avoid incorrect ranking problem ) 1. Order the feasible alternatives. 2. Establish a base alternative a. Cost alternatives -- The first alternative is the base b. Investment alternatives - If the first alternative is acceptable, select as base. If the first alternative is not acceptable, choose the next alternative 3. Use iteration to evaluate differences (incremental cash flows) between alternatives until no more alternatives exist a. If incremental cash flow between next alternative and current alternative is acceptable, choose the next b. Repeat, and select as the preferred alternative the last one for which the incremental cash flow was acceptable THREE ERRORS COMMON TO INCREMENTAL INVESTMENT ANALYSIS PROCEDURE APPLIED TO IRR Choosing the feasible Alternative with: 1. the highest overall IRR on total cash flow 2. the highest IRR on an incremental capital investment 3. the largest capital investment that has an IRR greater than or equal to the MARR Incremental analysis must be used with rate of return methods to ensure the best alternative is selected INCREMENTAL ANALYSIS PROCEDURE USED WITH EQUIVALENT WORTH METHODS Equivalent worth methods may also be applied using the incremental analysis procedure to compare mutually exclusive alternatives Alternative ranking will be consistent with equivalent worth values based on total investment of each alternative Ranking will be consistent with ROR methods when using incremental analysis When equivalent worth of investment cash flow > 0 at i = MARR, its IRR > MARR Equivalent worth methods using incremental investment analysis can be used as a screening method for the IRR method

IMPUTED MARKET VALUE TECHNIQUE When current marketplace data is unavailable for an asset, it is sometimes necessary to estimate the market value of an asset Referred to as an imputed or implied market value Estimating is based on logical assumptions about the remaining life for the asset MV T = [ EW at the end of year T of remaining capital recovery amounts ] + [ EW at the end of year T of original market value at the end of useful life ] T < useful life EW is equivalent worth at i = MARR COMPARING USING THE CAPITALIZED WORTH METHOD Capitalized Worth (CW) method -- Determining the present worth of all revenues and / or expenses over an infinite length of time Capitalized cost -- Determining the present worth of expenses only over an infinite length of time Capitalized worth or capitalized cost is a convenient basis for comparing mutually exclusive alternatives when a period of needed services is indefinitely long and the repeatability assumption is applicable CAPITALIZED WORTH METHOD Capitalized worth of a perpetual series of end-of of-period uniform payments, A, with interest i% per period: A ( P /A, i%, ) CW = PW N --> = A ( P / A, i%, ) ( 1+i ) N - 1 = A lim ------------- = A ( 1 / i ) N --> i ( 1 + i ) N 8 8 8 8

THREE GROUPS OF MAJOR INVESTMENT 1. Mutually exclusive : At most one project out of the group can be chosen 2. Independent : The choice of a project is independent of the choice of any other project in the group, so that all or none of the projects may be selected or some number in between 3. Contingent : The choice of the project is conditional on the choice of one or more other projects