Body Corporate ten year maintenance plan example for South Africa

Similar documents
SINKING FUND PLAN UPDATE

FYNBOS PARK BODY CORPORATE TEN YEAR MAINTENANCE PLAN

Sample Only. Maintenance Budget Plan Report

WASHINGTON BROWN DEPRECIATION PTY LTD

Sample Only. Maintenance Budget Plan Report - V2. 1 Sample Street, Melbourne VIC 3022 OC4, OC5, OC6, OC7 & OC8 Plan of Subdivision: PS

THIS IS A PAYMENT CLAIM MADE UNDER THE CONSTRUCTION CONTRACTS ACT 2002 A PAYMENT CLAIM MADE IN RELATION TO THE FOLLOWING CONSTRUCTION CONTRACT:

Maintenance Budget Plan Report. 36 Bay Sample Street Port Melbourne VIC 3207

RESERVE FUND STUDY. Hill & Associates Ltd. Member APEGNB July 2014

DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016

Social Housing Administration Directive No

Comprehensive Reserve Fund Study and Building Condition Assessment for Wellington Standard Condominium Corporation No. 149

Urban Heights Condominium

Ronald E. McNair Discovery Learning Academy

REPLACEMENT RESERVE GUIDE

Update With Site Visit

RESERVE STUDY UPDATE SUMMARY

Listing of Events Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School

Anson County Early College High

Greenbelt Homes, Inc Budget

REPLACEMENT RESERVE REPORT FY 2016

Reserve Fund Study My Condominium Plan

Depreciation Report Level I

Anderson Creek Primary

Integrating Green Building Measures into Capital Planning for HUD Assisted and Public Housing Programs

CAPITAL RESERVE STUDY

Laurel Hill Elementary

DEPRECIATION REPORT Strata VR 1591 The Leicester West 13th Avenue Vancouver BC V6J 2G5

COASTALSTRATA INSIGHTS IN TIME STRATA INSPECTION REPORT. 5/13-15 Keira Street, Wollongong NSW. Date of report Wednesday, 22 November 2017

BUILDING CONDITION ASSESSMENT. A Comprehensive Approach in Energy and Facility Management

Agenda Item # 5b Page 1 of 43

Howsyth Court Condominium Corporation No. CCN Avenue SW Calgary, Alberta

Fieldstone RESERVE STUDY UPDATE. John D. Beatty & Company OWNERS ASSOCIATION. for. Date Prepared: 12/4/2018 for fiscal year 2019.

.USI.COMMERCIAL. The Summerlyn Association of Owners Inc. Lewes, Delaware. Funding Reserve Analysis. for. September 3, 2014

PROFESSIONAL RESERVE STUDY

DEPRECIATION REPORT. Sonoma Pines

Level 3 Reserve Study without a Site a Site Visit Visit

PROJECT TIMELINE *

Leary & Partners. Quantity Surveyors Asset Management Consultants Taxation Depreciation Consultants

Reserve Analysis Report

Reserve Study: Alpenrose Condominium Association

Daniel J. Sullivan CPA, MBA 5389 Kahalakua Street Honolulu, Hawaii

VILLAGE AT LAKE CHELAN

CAPITAL FUNDING SUMMARY

Harnett Central High

- RS. D e sig n atio n

BUDGET APPROVED. GENERAL EXPENSES (158 Units)

TANGLEWOOD HILLS CONDOMINIUM

CONDO ISSUES AND RISK MANAGEMENT

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year

Cottonwoods at Vine. Reserve Study. October 2012

Pacific Tower Condominium Association

Educational & Performing Arts Center: Downriver Campus

Boca Rio Condominium Homeowners Association LEVEL III: UPDATE RESERVE STUDY December 31, 2017

REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA. Ravenel Associates, Inc. Community Management by: Chad Hammond, Property Manager

Reserve Analysis Report

Clearbrook HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2010. Client Reference Number /23/2010 Prepared By

Year Per Manor Per Month Assessment Total Contribution United Laguna Woods Mutual 2019 RESERVES PLAN Reserve 30-Year Funding Plan Interest Earnings Th

RESERVE FUND STUDY REPORT

CONTENTS. Sparger Springs Townhomes Durham, NC

Subject: Capital Reserve Expenditure Guidelines. *incl. former OCHAP/CSHP Peel Access to Housing (PATH)

Reserve Analysis Report

NC School District/430 Harnett County/Middle School Highland Middle Final Campus Assessment Report March 11, 2017

Robert Shaw Theme Elementary

What are Capital Reserves?

GLOBAL Solution Partners, LLC - Toll free phone and fax: (844)

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/15/2013 BUILDING SURVEY DATE

Depreciation Report. Prepared for the Board of Directors for Strata Plan NW Falcon Drive, Coquitlam, British Columbia V3E 2L1 File No.

NEWTON PARISH REPLACEMENT RESERVE REPORT 2008 REPLACEMENT RESERVE REPORT FY CAS, Inc MILLER ~ DODSON ASSOCIATES. Community Management by:

WRITTEN STATEMENT OF SERVICES AND SERVICE LEVEL UNDERTAKING TO THE OWNERS OF THE ELEMENT

DeKalb County School District/Middle Schools Chapel Hill Middle Final School Assessment Report May 20, 2016

CONTENTS. Greens at Lochmere Cary, NC

Your guide to Buildmark

Industry Benchmarks For Trades

A Credit For Rehabilitation Of Historic Barns

RESERVE STUDY UPDATE SUMMARY. for. Vista Tassajara HOMEOWNERS ASSOCIATION

Reserve Study. Willow Lake Homeowner's Association, Inc.

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM

Tax Depreciation: Myths and Recent Changes

Reserve Request Instructions: Documentation Requirements

DeKalb County School District/Middle Schools Peachtree Middle Final School Assessment Report May 20, 2016

Insurance Claims Process

PROFESSIONAL RESERVE STUDY

FLINT HILL MANOR FLINT HILL MANOR. Replacement Reserve Study. Oakton, Virginia. Property Management: Flint Hill Manor Townhouse Association

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION

Central Pointe HOA. Level I Reserve Study. Report Period 1/01/08 12/31/08

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State

FIR RIDGE II CONDOMINIUM

William Bradley Bryant Center

DRAFT FOR BOARD REVIEW. Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION & ALLENTON MANAGEMENT. Prepared by:

2014 Reserve Study. The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee Report No: 2921 Version 2

Harbour Isle at Hutchinson Island West Condominium Association, Inc. Ft. Pierce, Florida File #

REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION. N & H Enterprises MILLER ~ DODSON ASSOCIATES. Community Management by:

DeKalb Elementary School of the Arts at Terry Mills

Hyde Park Place Owners' Association, Inc.

Pleasantdale Elementary

DRAFT CAPITAL RESERVE STUDY. The Piano Works Condominium Association. Deep River, Connecticut FOR THE. Project Number:

Pamwin Component Accounting User Manual December 2009

Calusa Point Association, Inc. Miami, Florida File #

Backlog Reduction Plan

NC School District/520 Jones County/Elementary School Trenton Elementary Final Campus Assessment Report March 11, 2017

Transcription:

Body Corporate ten year maintenance plan example for South Africa Prepared by: Date: This plan covers the period of ten years from.. Building details & report inputs Supplied information Building name Building address Unit title plan Date of deposit of unit plan Number of unit entitlements Number of units Does a Long -term maintenance fund exist (Y / N) If No record arrangements for maintenance funding here: Estimated starting long-term maintenance fund balance Starting date of financial year for report VAT status Current long-term maintenance levy per lot entitlement

Report assumptions & information Assumed interest rate on invested funds (for funds over R10 000) Company taxation rate Interest on invested funds - based on assumed interest rate minus company taxation rate. Calculated only on long-term maintenance fund balances over R10 000. Contingency allowance - For minor and/or unforeseen expenses Assumed rate of inflation for building maintenance costs - Based on average annual building cost increase between and Forecast period - number of years the forecast looks out. 10-Year levy table Year Year To Total Contribution Contribution Per lot entitlement 1 30/09/2017 2 30/09/2018 3 30/09/2019 4 30/09/2020 5 30/09/2021 6 30/09/2022 7 30/09/2023 Quarterly Contribution

8 30/09/2024 9 30/09/2025 10 30/09/2026

10 year Cash-flow tracking sheet The table below can show a cash flow starting with the anticipated Opening balance at the start of the first financial year. Then add the Total levy contributions for the year and any interest on balances greater than R10 000. Any Anticipated expenses are then allowed for leaving a Closing balance for the year which in turn becomes the Opening balance for the following year. In summary: Opening balance + Total levy contributions + Interest Anticipated expenses = Closing balance Year Year To Opening balance Total levy contributions Interest Anticipated expenses Closing balance 1 30/09/2017 2 30/09/2018 3 30/09/2019 4 30/09/2020 5 30/09/2021 6 30/09/2022 7 30/09/2023 8 30/09/2024 9 30/09/2025 10 30/09/2026

10-year anticipated expenditures table This table shows when expenses will occur in the next 10 years. From left to right the columns are:- Expenditure Items- lists the different areas and items of expenditure. Current Cost- shows the current maintenance expenditure costs in today s dollars. Year 1 to Year 10, shows the costs in the year in which they occur including the Assumed rate of inflation compounded annually until the cost is due. Note: the items included are examples only. At the bottom on each column there are three lines. Firstly, a Sub total (Inc. VAT) followed by a line calculating the Contingency allowance (Inc. VAT) for unforeseen and minor expenses and finally Total expenses (Inc. VAT) for that year. Expenditure Item Repaint building exterior Current cost Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Repaint ceilings Repaint downpipes Maintain downpipes (total: Lm) Repaint door face one side Repair aluminium doors Repair aluminium windows Repaint timber balustrades Repaint steel balustrades

Maintain balustrades (total: Lm) Repaint balcony ceilings Replace balcony tiles (total: Lm) Repaint fascia cladding Maintain metal fascia (total m2) Hire scaffolding for work above 2 storeys Surface cleaning program Maintain concrete surface (total: m2 ) Surface cleaning program Maintain concrete surface (total: m2) Repaint line marking Replace paving (total: m2) Topcoat bitumen driveway Maintain bitumen driveway (total: m2)

Building Data List from the Property Inspection for Unit Title Plan This table may have data collected by a building inspector while inspecting the complex. The items are examples only. The columns from left to right could be: Items identifies and describes the maintenance item Qty lets you know the total quantity of that item Unit is the unit rate used to measure the quantity Rate is the cost of each unit in dollars Value is the quantity (Qty) multiplied by the Rate (R) Next due - is the remaining life in years until an item needs money spent on it. Total life - is the total life the item after it is replaced, repaired or repainted. Comments details any useful explanatory notes for the item. Items Qty Unit Rate (R) Value (R) Next Due Estimated age/life span of item Total life once repaired Comments 1. Building exterior Repaint building exterior Repaint ceilings Repaint downpipes Maintain downpipes (total: Lm) 10% Repaint door face one side Repair aluminium doors Repair aluminium windows

Repaint timber balustrades Repaint steel balustrades Maintain balustrades (total: Lm) Repaint balcony ceilings Replace balcony tiles (total: Lm) Repaint fascia cladding Maintain metal fascia (total:. m2) 2. Access for work at heights Hire scaffolding for work above 2 storeys 3. External walkways Surface cleaning program Maintain concrete surface (total: m2 ) 4. Driveway

Surface cleaning program Maintain concrete surface (total:.. m2) Repaint line marking Replace paving (total: m2) Topcoat bitumen driveway Maintain bitumen driveway (total:..m2) Maintain concrete kerbing (total: Lm) Replace storm water grates Maintain storm water drains 5. Basement Surface cleaning program Maintain concrete surface (total:.. m2) Repaint walls Repaint door face one side Maintain chain wire fence

6. Roof Maintain metal roof (total:.. m2) Repair metal flashings (total:.. Lm) Maintain box gutters (total:..lm) 7. Stairwells Repaint underside of stairs and ceilings Repaint timber balustrades Repaint metal balustrades Maintain balustrades (total: Lm) 8. Fixtures and fittings Replace letterboxes 9. Fence maintenance

Maintain paling fence (total:..) 10. Landscaping Maintain block retaining walls (total:..m2) Maintain concrete stairs (total: m2) Maintain Garden 11. Plant - electrical Test main switchboard Subtotal (inc VAT) Contingency allowance (inc VAT) Total expenses (inc VAT)

Non-maintenance The following matters are those the Body Corporate has decided not to maintain during the life of this plan: Specific inspection notes: (Here set out any comments or notes for specific maintenance requirements)

Notes (Amend or delete as necessary) Long-Term Maintenance Plan Long-term maintenance plans (1) A long-term maintenance plan must (a) Cover (i) the common property, building elements, and infrastructure of the unit title development; and (ii) any additional items that the body corporate has decided by ordinary resolution to include in the plan; and (b) identify those items that the body corporate may decide by ordinary resolution not to maintain for any period during the lifetime of the plan; and (c) state the period covered by the plan; and (d) state the estimated age and life expectancy of each item covered by the plan; and (e) state the estimated cost of maintenance and replacement of each item covered by the plan; and (f) state whether there is a long-term maintenance fund; and (g) if there is a long-term maintenance fund, state the amount determined by the body corporate to be applied to maintain the fund each year; and (h) state who has prepared the plan. Figures used and updates - The figures used in the forecast have been reviewed by and believed typical for this type of building and normal usage. The Body Corporate has some discretion in the timing of most maintenance items. The purpose of this plan is to ensure monies are available when required to cover foreseeable expenses. Contingency - A contingency has been allowed for any unforeseen expenses. Interest, Taxation and Inflation - The standard interest rate used is based on Reserve Bank of South Africa s historical interest rates. The company tax rate is applied to interest income. The standard inflation rate used is based upon historical data for Construction Producer Price inflation, commencing. While historical figures are not an accurate predictor of specific future outcomes, over the life of this report interest rates and inflation should approach longterm averages. Changes in economic conditions may affect the accuracy of these figures. This report should be updated at regular intervals to ensure that any such changes are taken into account. Safety - The inspection does not cover safety issues. Lifts - Due to the many types of lift contracts covering varying parts and aspects of lift maintenance, no allowance is made. Items with indefinite lives - There is no allowance for replacement of items that, if properly maintained, should last indefinitely, (unless otherwise requested by the body corporate); for example: sanitary fittings and lift carriage interiors. This plan deals only with estimating the timing of physical obsolescence. Improvements - The Body Corporate may resolve to undertake improvements not related to normal maintenance. No allowance has been made for these items at this stage.

Defects - No allowance has been made for correction of defects resulting from faulty construction. Ongoing maintenance programs - The lives of some items overall may have been extended indefinitely due to the use of an ongoing maintenance program. With allowances for ongoing maintenance programs, allow funds to be available for maintenance, gradual replacement or in some cases accumulation of funds for total replacement in the long term. The lives of some items can vary considerably, especially with issues such as: Usage. Accidental damage to floor tiles, which may or may not be still available or in stock. Fences can be maintained and replaced gradually or all at once. Metal and Aluminium Balustrades can last anywhere between 10 and 50 years, depending on the original quality, coatings (painting) and maintenance. Concrete driveways that have been cracked but are still perfectly sound and serviceable. Pumps and Fans can last indefinitely or wear out relatively quickly. This often depends on the quality of internal construction and finish. Updates - The forecast is made with the best available data at this time. The forecast must be reviewed at least once every three years. This example plan was originally developed by the Ministry of Business, Innovation and Employment of New Zealand and adapted for South African conditions by Pierre Du Plessis on 04 January 2017, who can be contacted from web site https://meridianfinance.co.za/