REPLACEMENT OF MERCER COUNTY BRIDGE

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

BID TABULATION PAGE 1 OF 6

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012

Tabulation of Bids. Counties: ROUTE 94 BLACK CREEK TRIBUTARY CULVERT REPLACEMENT

PART II - Prospect Street 37. 8" Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050.

2018 Road Improvements Engineer's Project Number: LK 01 Bid Deadline: May 1, 2018 at 2:00 p.m. local time

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

Northumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562

Rock Chalk Park - Infrastructure Report. July 2013

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

OKLAHOMA TURNPIKE AUTHORITY

TOTAL QUANTITY UNIT COST UNIT

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122

LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY

New Jersey Department of Transportation DATE : 06/22/10 PAGE : TABULATION OF BIDS

BID TABULATION PAGE 1 OF 8

Certified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University

NAME OF CONTRACTOR CONTRACTORS ADDRESS Buffalo Road th ave Ct SW Walcott, IA North Liberty, IA

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.

ADDENDUM No. 1 January 29, Paving Program Village of Milford

New Jersey Department of Transportation DATE : 11/16/10 PAGE : TABULATION OF BIDS

SUBDIVISION IMPROVEMENTS AGREEMENT

CONTRACT TIME DETERMINATION

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal

BID TABULATION BID REQUEST NO

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION

CITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS

NE WEST KINGSTON ROAD CULVERT REPLACEMENT

RECONSTRUCTION OF SOUTH BROAD STREET

NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 CHANGES TO PROPOSAL OR PLANS

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $

PART A ROADWAY - BASE BID

SECTION BID. Valley Court Force Main Replacement Contract No. BE17-029

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price

BID TABULATION 32-04MAY06-Asphalt Overlay & Roadway Drainage Improvements

CECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075

LETTING : CALL : 056 COUNTIES : MILLE LACS

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS

BID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #

Opinion of Probable Cost

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST

OKLAHOMA TURNPIKE AUTHORITY

Job No Wastewater Collection System Small Main Rehabilitation at Focus Areas Pipebursting Method BID PROPOSAL. Dollars Cents $ $ Dollars

The bid due date has been changed to 2:50 p.m. May 25, 2018.

CITY OF TAMPA ADDENDUM 2. April 18, 2018

ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT

AWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET

Fuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $

Addendum 1 13 TH Street Streetscape. September 1, 2017

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

PRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer

AB COMFORT STATION AT MERCER COUNTY PARK FESTIVAL GROUNDS DESCRIPTION SAKOUTIS J.H. WILLIAMS SCOZZARI LEVY TRICON RED OAK VISION DELL-TECH

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

Department of Public Works Engineering

Addendum 1 Downtown North CRA Sidewalks

PROJECT COST. Prepared for City of Burlington, Iowa Downtown/Riverfront Revitalization Project

BID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE

OKLAHOMA TURNPIKE AUTHORITY

For Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No.

Engineer's Preliminary Estimate - 100% Submittal

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11

BID TABULATION. Engineer's Estmated Opinion of Costs

AVGPR14.Y01 2/11/2014 DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 12/01/13 AND 12/31/13 BY ITEM GROUP

CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS NEWCASTLE WAY, SUITE 200 DECEMBER 18, CALL TO ORDER

CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL

CITY, STATE, ZIP BLACKWOOD, NJ EWING, NJ WESTVILLE, NJ MEDFORD, NJ KENILWORTH, NEW JERSEY 07033

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN

CITY OF SAN MARCOS ENGINEERING DIVISION

ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL

The following documentation is an electronicallysubmitted vendor response to an advertised solicitation from the West Virginia Purchasing Bulletin

PROPOSAL FOR IMPROVEMENTS TO OGDEN - HINCKLEY AIRPORT OGDEN, UTAH AIP PROJECT NO

Regular. NECESSARY RESOURCES/IMPACTS (OTHER) n/a. Fiscal Impact

PROJECT NO PID BEL TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02

A DESIGN-BUILD PROJECT

CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT

New Jersey Department of Transportation DATE : 01/10/08 PAGE : TABULATION OF BIDS CALL ORDER : 167 CONTRACT ID : COUNTIES : CAPE MAY

Market Street Gateway Improvements Phase 1

TABULATION OF BIDS 1 L.S. $ 5, $ 5, $ 27, $ 27,000.00

RFB Addendum 3

BID DOCUMENTS & SPECIFICATIONS

**REVISED BID PRICE FORM** October 24, 2018

ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:

ADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO

CANTON COMMUNITY REQUEST FOR BOARD ACTION

August 22, Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA

BID TABULATION JAMES STREET TRUNK SEWER IMPROVEMENTS CORALVILLE, IOWA

1 DEPARTMENT MAKING REQUEST 2 MEETING DATE 4 AGENDA 5 IS THIS ITEM BUDGETED ( IF APPLICABLE ) -

Sandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 HIGHWAY: FM 1988 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:

Transcription:

Denise Piszkowski, Q.P.A., Purchasing Agent Bid Results for: 2016-B08 Reconstrucion of Preston Drive Submitted By: JTG Construction Black Rock Enterprises Top Line Construction Reviax Constracting Corp. DeSantis Construction Item No. Description Qty Unit unit price Amount unit price Amount Unit price Amount Unit price Amount Unit price Amount 1A.1 Mobilization and Demobilization $ 25,418.00 $ 25,418.00 $ 15,000.00 $ 15,000.00 $ 40,000.00 $ 40,000.00 $ 45,000.00 $ 45,000.00 $ 4,800.00 $ 4,800.00 1A.2 Traffic Directors, Police (shall not exceed $80.00/hour) 20 Hour $ 80.00 $ 1,600.00 $ 80.00 $ 1,600.00 $ 80.00 $ 1,600.00 $ 80.00 $ 1,600.00 $ 80.00 $ 1,600.00 1A.3 Maintenance and Protection of Traffic $ 3,500.00 $ 3,500.00 $ 6,200.00 $ 6,200.00 $ 11,500.00 $ 11,500.00 $ 1,300.00 $ 1,300.00 $ 3,500.00 $ 3,500.00 1B Site Clearing and Site Restoration $ 5,900.00 $ 5,900.00 $ 34,421.55 $ 34,421.55 $ 40,000.00 $ 40,000.00 $ 14,000.00 $ 14,000.00 $ 74,000.00 $ 74,000.00 1.C Soil Erosion and Sediment Control $ 2,500.00 $ 2,500.00 $ 2,273.60 $ 2,273.60 $ 1,500.00 $ 1,500.00 $ 900.00 $ 900.00 $ 3,500.00 $ 3,500.00 2A Excavation, Unclassified 635 CY $ 18.00 $ 11,430.00 $ 32.00 $ 20,320.00 $ 41.65 $ 26,447.75 $ 23.00 $ 14,605.00 $ 18.00 $ 11,430.00 2B Test Pits 50 CY $ 50.00 $ 2,500.00 $ 75.00 $ 3,750.00 $ 15.00 $ 750.00 $ 200.00 $ 10,000.00 $ 50.00 $ 2,500.00 3 HMA Milling, Between 4 To 6 6250 SY $ 5.60 $ 35,000.00 $ 5.50 $ 34,375.00 $ 4.31 $ 26,937.50 $ 4.00 $ 25,000.00 $ 5.23 $ 32,687.50 4A HMA 9.5 M64 Surface Course 1100 TONS $ 64.00 $ 70,400.00 $ 70.00 $ 77,000.00 $ 65.00 $ 71,500.00 $ 76.00 $ 83,600.00 $ 70.72 $ 77,792.00 4B HMA 9.5 M64 Leveling Course 565 TONS $ 65.00 $ 36,725.00 $ 65.00 $ 36,725.00 $ 0.01 $ 5.65 $ 76.00 $ 42,940.00 $ 70.72 $ 39,956.80 4C HMA 19 M64 Base Course 2100 TONS $ 60.00 $ 126,000.00 $ 67.00 $ 140,700.00 $ 61.28 $ 128,688.00 $ 76.00 $ 159,600.00 $ 64.51 $ 135,471.00 5A Dense Graded Aggregate Base Course, 4 Thick 6000 SY $ 4.60 $ 27,600.00 $ 5.50 $ 33,000.00 $ 6.10 $ 36,600.00 $ 10.00 $ 60,000.00 $ 10.80 $ 64,800.00 5B Dense Graded Aggregate Base Course, If and Where 100 TON $ 18.00 $ 1,800.00 $ 26.30 $ 2,630.00 $ 57.07 $ 5,707.00 $ 40.00 $ 4,000.00 $ 18.00 $ 1,800.00 Page 1 of 8

Denise Piszkowski, Q.P.A., Purchasing Agent Bid Results for: 2016-B08 Reconstrucion of Preston Drive Submitted By: JTG Construction Black Rock Enterprises Top Line Construction Reviax Constracting Corp. DeSantis Construction Item No. Description Qty Unit unit price Amount unit price Amount Unit price Amount Unit price Amount Unit price Amount 5C ¾ Clean Stone (If and where) 490 TON $ 19.00 $ 9,310.00 $ 22.00 $ 10,780.00 $ 14.00 $ 6,860.00 $ 1.00 $ 490.00 $ 20.00 $ 9,800.00 5D Subbase, Borrow Fill (If and where) 300 CY $ 35.00 $ 10,500.00 $ 0.01 $ 3.00 $ 65.32 $ 19,596.00 $ 1.00 $ 300.00 $ 21.00 $ 6,300.00 6 Pavement Edge Restoration 2200 SY $ 7.00 $ 15,400.00 $ 3.19 $ 7,018.00 $ 8.99 $ 19,778.00 $ 10.00 $ 22,000.00 $ 30.00 $ 66,000.00 7A 7B 7C Inlet, Type B, UNC, 4 ft. deep or less (#1, 1A, 2A, 3A, 6A, 7A, 9A, 11A, 12 & 12A) than 4 to 6 deep (#2, 5, 5A, 6, 9, 10, 10A & 11) than 6 to 8 deep (#4) 10 UNIT $ 2,500.00 $ 25,000.00 $ 3,250.00 $ 32,500.00 $ 3,855.40 $ 38,554.00 $ 3,600.00 $ 36,000.00 $ 2,630.00 $ 26,300.00 8 UNIT $ 3,200.00 $ 25,600.00 $ 3,780.00 $ 30,240.00 $ 4,154.67 $ 33,237.36 $ 3,600.00 $ 28,800.00 $ 2,830.00 $ 22,640.00 $ 3,500.00 $ 3,500.00 $ 4,500.00 $ 4,500.00 $ 4,390.02 $ 4,390.02 $ 4,500.00 $ 4,500.00 $ 3,000.00 $ 3,000.00 7D than 8 to 10 deep (#8A) $ 3,700.00 $ 3,700.00 $ 5,500.00 $ 5,500.00 $ 4,721.20 $ 4,721.20 $ 7,700.00 $ 7,700.00 $ 3,250.00 $ 3,250.00 7E Inlet, Type A-1, UNC, 4 ft. or less (#3) $ 2,800.00 $ 2,800.00 $ 3,450.00 $ 3,450.00 $ 3,686.27 $ 3,686.27 $ 3,200.00 $ 3,200.00 $ 1,700.00 $ 1,700.00 7F Inlet, Type A-1, UNC, greater than 8-10 deep (#8) $ 4,700.00 $ 4,700.00 $ 6,750.00 $ 6,750.00 $ 4,764.90 $ 4,764.90 $ 7,700.00 $ 7,700.00 $ 2,350.00 $ 2,350.00 7G Inlet, Type B-1, UNC, greater than 4-6 deep (#7) $ 4,100.00 $ 4,100.00 $ 7,000.00 $ 7,000.00 $ 4,236.51 $ 4,236.51 $ 3,600.00 $ 3,600.00 $ 3,950.00 $ 3,950.00 7H Storm Manhole, UNC, Less than 4 ft. deep (Storm MH #1) $ 2,300.00 $ 2,300.00 $ 3,500.00 $ 3,500.00 $ 3,328.35 $ 3,328.35 $ 4,100.00 $ 4,100.00 $ 1,850.00 $ 1,850.00 7I Reset Manhole Casting, Using Existing Casting 2 UNIT $ 300.00 $ 600.00 $ 385.00 $ 770.00 $ 232.44 $ 464.88 $ 200.00 $ 400.00 $ 275.00 $ 550.00 8A Headwall No. 1 $ 9,800.00 $ 9,800.00 $ 11,000.00 $ 11,000.00 $ 23,576.17 $ 23,576.17 $ 6,800.00 $ 6,800.00 $ 9,589.00 $ 9,589.00 Page 2 of 8

Denise Piszkowski, Q.P.A., Purchasing Agent Bid Results for: 2016-B08 Reconstrucion of Preston Drive Submitted By: JTG Construction Black Rock Enterprises Top Line Construction Reviax Constracting Corp. DeSantis Construction Item No. Description Qty Unit unit price Amount unit price Amount Unit price Amount Unit price Amount Unit price Amount 8B Headwall No. 2 $ 11,000.00 $ 11,000.00 $ 12,000.00 $ 12,000.00 $ 29,185.67 $ 29,185.67 $ 6,800.00 $ 6,800.00 $ 13,992.00 $ 13,992.00 9A 15 HDPE, 4 or less 400 LF $ 48.00 $ 19,200.00 $ 55.00 $ 22,000.00 $ 49.03 $ 19,612.00 $ 55.00 $ 22,000.00 $ 37.90 $ 15,160.00 9B 15 HDPE, greater than 4 to 6 deep 420 LF $ 48.00 $ 20,160.00 $ 62.00 $ 26,040.00 $ 48.15 $ 20,223.00 $ 60.00 $ 25,200.00 $ 38.90 $ 16,338.00 9C 15 HDPE, greater than 6 to 8 deep 15 LF $ 48.00 $ 720.00 $ 75.00 $ 1,125.00 $ 54.47 $ 817.05 $ 80.00 $ 1,200.00 $ 48.00 $ 720.00 9D 15 RCP, Class III, 4 or less 30 LF $ 55.00 $ 1,650.00 $ 89.00 $ 2,670.00 $ 61.15 $ 1,834.50 $ 60.00 $ 1,800.00 $ 39.90 $ 1,197.00 9E 18 HDPE, 4 or less 35 LF $ 65.00 $ 2,275.00 $ 85.00 $ 2,975.00 $ 49.87 $ 1,745.45 $ 60.00 $ 2,100.00 $ 40.90 $ 1,431.50 9F 18 HDPE, greater than 4 to 6 deep 165 LF $ 65.00 $ 10,725.00 $ 88.00 $ 14,520.00 $ 59.34 $ 9,791.10 $ 60.00 $ 9,900.00 $ 42.90 $ 7,078.50 9G 24 RCP, Class III, 4 or less 29 LF $ 90.00 $ 2,610.00 $ 88.00 $ 2,552.00 $ 79.11 $ 2,294.19 $ 70.00 $ 2,030.00 $ 44.90 $ 1,302.10 9H 36 RCP, Class III, 4 to 6 deep 100 LF $ 120.00 $ 12,000.00 $ 145.00 $ 14,500.00 $ 101.96 $ 10,196.00 $ 95.00 $ 9,500.00 $ 49.50 $ 4,950.00 9I 36 RCP, Class III, greater than 8 to 10 deep 30 LF $ 120.00 $ 3,600.00 $ 225.00 $ 6,750.00 $ 146.49 $ 4,394.70 $ 125.00 $ 3,750.00 $ 56.00 $ 1,680.00 10 8 x20 Concrete Vertical Curb 450 LF $ 25.00 $ 11,250.00 $ 30.00 $ 13,500.00 $ 30.00 $ 13,500.00 $ 25.00 $ 11,250.00 $ 28.00 $ 12,600.00 11 HMA Driveway, 6" Thick 1620 SY $ 36.00 $ 58,320.00 $ 42.00 $ 68,040.00 $ 40.00 $ 64,800.00 $ 36.00 $ 58,320.00 $ 37.29 $ 60,409.80 12A Traffic Stripes 4", Long Life Epoxy 300 LF $ 3.90 $ 1,170.00 $ 3.68 $ 1,104.00 $ 3.67 $ 1,101.00 $ 4.00 $ 1,200.00 $ 3.83 $ 1,149.00 Page 3 of 8

Denise Piszkowski, Q.P.A., Purchasing Agent Bid Results for: 2016-B08 Reconstrucion of Preston Drive Submitted By: JTG Construction Black Rock Enterprises Top Line Construction Reviax Constracting Corp. DeSantis Construction Item No. Description Qty Unit unit price Amount unit price Amount Unit price Amount Unit price Amount Unit price Amount 12B Traffic Markings, Long Life Thermoplastic 90 SF $ 10.50 $ 945.00 $ 9.98 $ 898.20 $ 9.97 $ 897.30 $ 10.00 $ 900.00 $ 10.93 $ 983.70 13A Topsoil, 4 Thick 3425 SY $ 4.00 $ 13,700.00 $ 6.00 $ 20,550.00 $ 8.06 $ 27,605.50 $ 1.00 $ 3,425.00 $ 6.00 $ 20,550.00 13B Fertilizing And Seeding, Type A-3 4615 SY $ 1.00 $ 4,615.00 $ 0.50 $ 2,307.50 $ 0.23 $ 1,061.45 $ 1.00 $ 4,615.00 $ 1.00 $ 4,615.00 13C Straw Mulching 4615 SY $ 1.00 $ 4,615.00 $ 0.50 $ 2,307.50 $ 0.23 $ 1,061.45 $ 1.00 $ 4,615.00 $ 1.00 $ 4,615.00 14 Guard Rail 174 LF $ 68.00 $ 11,832.00 $ 64.00 $ 11,136.00 $ 63.23 $ 11,002.02 $ 81.00 $ 14,094.00 $ 90.56 $ 15,757.44 15 Tree Removal (See plans for locations and sizes, 19 units) $ 15,200.00 $ 15,200.00 $ 17,500.00 $ 17,500.00 $ 4,357.40 $ 4,357.40 $ 18,000.00 $ 18,000.00 $ 9,850.00 $ 9,850.00 16 Asphalt Price Adjustment Allowance $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 TOTAL $ 688,270.00 $ 788,481.35 $ 798,909.34 $ 803,834.00 $ 820,495.34 Minor addition errors on proposal form submitted NOTE: The Township has 60 days to Award or Reject bids. An Award of Contract will be made after final review of the bid documents. Page 4 of 8

Denise Piszkowski, Q.P.A., Purchas Bid Results for: 2016-B08 Reconstrucion of Preston D Submitted By: M.S.P Construction Hale Built Your Way Construction Waters & Bugbee Item No. Description Qty Unit unit price Amount Unit price Amount unit price Amount Unit price Amount 1A.1 Mobilization and Demobilization $ 30,000.00 $ 30,000.00 $ 32,945.00 $ 32,945.00 $ 60,750.00 $ 60,750.00 $ 148,000.00 $ 148,000.00 1A.2 Traffic Directors, Police (shall not exceed $80.00/hour) 20 Hour $ 80.00 $ 1,600.00 $ 80.00 $ 1,600.00 $ 80.00 $ 1,600.00 $ 80.00 $ 1,600.00 1A.3 Maintenance and Protection of Traffic $ 6,000.00 $ 6,000.00 $ 4,665.00 $ 4,665.00 $ 3,375.00 $ 3,375.00 $ 12,000.00 $ 12,000.00 1B Site Clearing and Site Restoration $ 20,000.00 $ 20,000.00 $ 43,300.00 $ 43,300.00 $ 11,323.00 $ 11,323.00 $ 145,385.75 $ 145,385.75 1.C Soil Erosion and Sediment Control $ 500.00 $ 500.00 $ 3,812.00 $ 3,812.00 $ 4,050.00 $ 4,050.00 $ 8,000.00 $ 8,000.00 2A Excavation, Unclassified 635 CY $ 38.00 $ 24,130.00 $ 41.44 $ 26,314.40 $ 1.00 $ 635.00 $ 45.00 $ 28,575.00 2B Test Pits 50 CY $ 1.00 $ 50.00 $ 115.00 $ 5,750.00 $ 1.00 $ 50.00 $ 150.00 $ 7,500.00 3 HMA Milling, Between 4 To 6 6250 SY $ 5.80 $ 36,250.00 $ 7.10 $ 44,375.00 $ 4.60 $ 28,750.00 $ 21.00 $ 131,250.00 4A HMA 9.5 M64 Surface Course 1100 TONS $ 79.00 $ 86,900.00 $ 67.35 $ 74,085.00 $ 90.86 $ 99,946.00 $ 75.00 $ 82,500.00 4B HMA 9.5 M64 Leveling Course 565 TONS $ 65.00 $ 36,725.00 $ 72.15 $ 40,764.75 $ 92.40 $ 52,206.00 $ 89.00 $ 50,285.00 4C HMA 19 M64 Base Course 2100 TONS $ 73.25 $ 153,825.00 $ 63.35 $ 133,035.00 $ 84.70 $ 177,870.00 $ 104.00 $ 218,400.00 5A Dense Graded Aggregate Base Course, 4 Thick 6000 SY $ 5.50 $ 33,000.00 $ 5.99 $ 35,940.00 $ 5.60 $ 33,600.00 $ 7.00 $ 42,000.00 5B Dense Graded Aggregate Base Course, If and Where 100 TON $ 16.00 $ 1,600.00 $ 0.01 $ 1.00 $ 29.70 $ 2,970.00 $ 65.00 $ 6,500.00 Page 5 of 8

Denise Piszkowski, Q.P.A., Purchas Bid Results for: 2016-B08 Reconstrucion of Preston D Submitted By: M.S.P Construction Hale Built Your Way Construction Waters & Bugbee Item No. Description Qty Unit unit price Amount Unit price Amount unit price Amount Unit price Amount 5C ¾ Clean Stone (If and where) 490 TON $ 18.00 $ 8,820.00 $ 0.01 $ 4.90 $ 40.50 $ 19,845.00 $ 25.00 $ 12,250.00 5D Subbase, Borrow Fill (If and where) 300 CY $ 30.00 $ 9,000.00 $ 20.00 $ 6,000.00 $ 40.50 $ 12,150.00 $ 50.00 $ 15,000.00 6 Pavement Edge Restoration 2200 SY $ 20.00 $ 44,000.00 $ 13.70 $ 30,140.00 $ 17.10 $ 37,620.00 $ 20.00 $ 44,000.00 7A Inlet, Type B, UNC, 4 ft. deep or less (#1, 1A, 2A, 3A, 6A, 7A, 9A, 11A, 12 & 12A) 10 UNIT $ 2,800.00 $ 28,000.00 $ 3,868.00 $ 38,680.00 $ 2,978.00 $ 29,780.00 $ 3,900.00 $ 39,000.00 7B than 4 to 6 deep (#2, 5, 5A, 6, 9, 10, 10A & 11) 8 UNIT $ 2,950.00 $ 23,600.00 $ 4,520.00 $ 36,160.00 $ 3,794.00 $ 30,352.00 $ 4,700.00 $ 37,600.00 7C than 6 to 8 deep (#4) $ 3,500.00 $ 3,500.00 $ 4,970.00 $ 4,970.00 $ 3,948.00 $ 3,948.00 $ 5,400.00 $ 5,400.00 7D than 8 to 10 deep (#8A) $ 4,500.00 $ 4,500.00 $ 5,290.00 $ 5,290.00 $ 4,826.00 $ 4,826.00 $ 5,500.00 $ 5,500.00 7E Inlet, Type A-1, UNC, 4 ft. or less (#3) $ 2,800.00 $ 2,800.00 $ 3,750.00 $ 3,750.00 $ 2,315.00 $ 2,315.00 $ 3,800.00 $ 3,800.00 7F Inlet, Type A-1, UNC, greater than 8-10 deep (#8) $ 3,900.00 $ 3,900.00 $ 4,015.00 $ 4,015.00 $ 4,731.00 $ 4,731.00 $ 6,000.00 $ 6,000.00 7G Inlet, Type B-1, UNC, greater than 4-6 deep (#7) $ 3,700.00 $ 3,700.00 $ 4,400.00 $ 4,400.00 $ 3,373.00 $ 3,373.00 $ 5,300.00 $ 5,300.00 7H Storm Manhole, UNC, Less than 4 ft. deep (Storm MH #1) $ 3,700.00 $ 3,700.00 $ 3,670.00 $ 3,670.00 $ 2,652.00 $ 2,652.00 $ 4,000.00 $ 4,000.00 7I Reset Manhole Casting, Using Existing Casting 2 UNIT $ 500.00 $ 1,000.00 $ 500.00 $ 1,000.00 $ 470.00 $ 940.00 $ 425.00 $ 850.00 8A Headwall No. 1 $ 7,000.00 $ 7,000.00 $ 23,080.00 $ 23,080.00 $ 21,577.00 $ 21,577.00 $ 57,000.00 $ 57,000.00 Page 6 of 8

Denise Piszkowski, Q.P.A., Purchas Bid Results for: 2016-B08 Reconstrucion of Preston D Submitted By: M.S.P Construction Hale Built Your Way Construction Waters & Bugbee Item No. Description Qty Unit unit price Amount Unit price Amount unit price Amount Unit price Amount 8B Headwall No. 2 $ 8,000.00 $ 8,000.00 $ 20,590.80 $ 20,590.80 $ 20,848.00 $ 20,848.00 $ 51,000.00 $ 51,000.00 9A 15 HDPE, 4 or less 400 LF $ 50.00 $ 20,000.00 $ 69.38 $ 27,752.00 $ 53.00 $ 21,200.00 $ 92.00 $ 36,800.00 9B 15 HDPE, greater than 4 to 6 deep 420 LF $ 75.00 $ 31,500.00 $ 68.97 $ 28,967.40 $ 62.00 $ 26,040.00 $ 90.00 $ 37,800.00 9C 15 HDPE, greater than 6 to 8 deep 15 LF $ 85.00 $ 1,275.00 $ 128.00 $ 1,920.00 $ 70.00 $ 1,050.00 $ 155.00 $ 2,325.00 9D 15 RCP, Class III, 4 or less 30 LF $ 80.00 $ 2,400.00 $ 170.00 $ 5,100.00 $ 84.00 $ 2,520.00 $ 98.00 $ 2,940.00 9E 18 HDPE, 4 or less 35 LF $ 80.00 $ 2,800.00 $ 86.75 $ 3,036.25 $ 80.00 $ 2,800.00 $ 95.00 $ 3,325.00 9F 18 HDPE, greater than 4 to 6 deep 165 LF $ 85.00 $ 14,025.00 $ 109.00 $ 17,985.00 $ 80.00 $ 13,200.00 $ 100.00 $ 16,500.00 9G 24 RCP, Class III, 4 or less 29 LF $ 90.00 $ 2,610.00 $ 187.00 $ 5,423.00 $ 100.00 $ 2,900.00 $ 175.00 $ 5,075.00 9H 36 RCP, Class III, 4 to 6 deep 100 LF $ 190.00 $ 19,000.00 $ 213.79 $ 21,379.00 $ 163.00 $ 16,300.00 $ 190.00 $ 19,000.00 9I 36 RCP, Class III, greater than 8 to 10 deep 30 LF $ 250.00 $ 7,500.00 $ 292.00 $ 8,760.00 $ 163.00 $ 4,890.00 $ 275.00 $ 8,250.00 10 8 x20 Concrete Vertical Curb 450 LF $ 20.00 $ 9,000.00 $ 38.00 $ 17,100.00 $ 28.00 $ 12,600.00 $ 26.00 $ 11,700.00 11 HMA Driveway, 6" Thick 1620 SY $ 43.00 $ 69,660.00 $ 61.14 $ 99,046.80 $ 69.40 $ 112,428.00 $ 70.00 $ 113,400.00 12A Traffic Stripes 4", Long Life Epoxy 300 LF $ 2.00 $ 600.00 $ 3.85 $ 1,155.00 $ 4.73 $ 1,419.00 $ 3.50 $ 1,050.00 Page 7 of 8

Denise Piszkowski, Q.P.A., Purchas Bid Results for: 2016-B08 Reconstrucion of Preston D Submitted By: M.S.P Construction Hale Built Your Way Construction Waters & Bugbee Item No. Description Qty Unit unit price Amount Unit price Amount unit price Amount Unit price Amount 12B Traffic Markings, Long Life Thermoplastic 90 SF $ 35.00 $ 3,150.00 $ 10.45 $ 940.50 $ 12.83 $ 1,154.70 $ 10.00 $ 900.00 13A Topsoil, 4 Thick 3425 SY $ 5.00 $ 17,125.00 $ 4.85 $ 16,611.25 $ 1.00 $ 3,425.00 $ 5.75 $ 19,693.75 13B Fertilizing And Seeding, Type A-3 4615 SY $ 1.00 $ 4,615.00 $ 1.00 $ 4,615.00 $ 1.00 $ 4,615.00 $ 0.55 $ 2,538.25 13C Straw Mulching 4615 SY $ 1.00 $ 4,615.00 $ 0.60 $ 2,769.00 $ 0.50 $ 2,307.50 $ 0.55 $ 2,538.25 14 Guard Rail 174 LF $ 85.00 $ 14,790.00 $ 78.00 $ 13,572.00 $ 78.70 $ 13,693.80 $ 80.00 $ 13,920.00 15 Tree Removal (See plans for locations and sizes, 19 units) $ 8,000.00 $ 8,000.00 $ 16,400.00 $ 16,400.00 $ 11,542.50 $ 11,542.50 $ 7,300.00 $ 7,300.00 16 Asphalt Price Adjustment Allowance $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 829,765.00 $ 935,870.05 $ 941,167.50 $ 1,488,751.00 NOTE: The Township has 60 days to Award or Reject bids. An Award of Contract will be made after final review of the bid documents. Page 8 of 8