Denise Piszkowski, Q.P.A., Purchasing Agent Bid Results for: 2016-B08 Reconstrucion of Preston Drive Submitted By: JTG Construction Black Rock Enterprises Top Line Construction Reviax Constracting Corp. DeSantis Construction Item No. Description Qty Unit unit price Amount unit price Amount Unit price Amount Unit price Amount Unit price Amount 1A.1 Mobilization and Demobilization $ 25,418.00 $ 25,418.00 $ 15,000.00 $ 15,000.00 $ 40,000.00 $ 40,000.00 $ 45,000.00 $ 45,000.00 $ 4,800.00 $ 4,800.00 1A.2 Traffic Directors, Police (shall not exceed $80.00/hour) 20 Hour $ 80.00 $ 1,600.00 $ 80.00 $ 1,600.00 $ 80.00 $ 1,600.00 $ 80.00 $ 1,600.00 $ 80.00 $ 1,600.00 1A.3 Maintenance and Protection of Traffic $ 3,500.00 $ 3,500.00 $ 6,200.00 $ 6,200.00 $ 11,500.00 $ 11,500.00 $ 1,300.00 $ 1,300.00 $ 3,500.00 $ 3,500.00 1B Site Clearing and Site Restoration $ 5,900.00 $ 5,900.00 $ 34,421.55 $ 34,421.55 $ 40,000.00 $ 40,000.00 $ 14,000.00 $ 14,000.00 $ 74,000.00 $ 74,000.00 1.C Soil Erosion and Sediment Control $ 2,500.00 $ 2,500.00 $ 2,273.60 $ 2,273.60 $ 1,500.00 $ 1,500.00 $ 900.00 $ 900.00 $ 3,500.00 $ 3,500.00 2A Excavation, Unclassified 635 CY $ 18.00 $ 11,430.00 $ 32.00 $ 20,320.00 $ 41.65 $ 26,447.75 $ 23.00 $ 14,605.00 $ 18.00 $ 11,430.00 2B Test Pits 50 CY $ 50.00 $ 2,500.00 $ 75.00 $ 3,750.00 $ 15.00 $ 750.00 $ 200.00 $ 10,000.00 $ 50.00 $ 2,500.00 3 HMA Milling, Between 4 To 6 6250 SY $ 5.60 $ 35,000.00 $ 5.50 $ 34,375.00 $ 4.31 $ 26,937.50 $ 4.00 $ 25,000.00 $ 5.23 $ 32,687.50 4A HMA 9.5 M64 Surface Course 1100 TONS $ 64.00 $ 70,400.00 $ 70.00 $ 77,000.00 $ 65.00 $ 71,500.00 $ 76.00 $ 83,600.00 $ 70.72 $ 77,792.00 4B HMA 9.5 M64 Leveling Course 565 TONS $ 65.00 $ 36,725.00 $ 65.00 $ 36,725.00 $ 0.01 $ 5.65 $ 76.00 $ 42,940.00 $ 70.72 $ 39,956.80 4C HMA 19 M64 Base Course 2100 TONS $ 60.00 $ 126,000.00 $ 67.00 $ 140,700.00 $ 61.28 $ 128,688.00 $ 76.00 $ 159,600.00 $ 64.51 $ 135,471.00 5A Dense Graded Aggregate Base Course, 4 Thick 6000 SY $ 4.60 $ 27,600.00 $ 5.50 $ 33,000.00 $ 6.10 $ 36,600.00 $ 10.00 $ 60,000.00 $ 10.80 $ 64,800.00 5B Dense Graded Aggregate Base Course, If and Where 100 TON $ 18.00 $ 1,800.00 $ 26.30 $ 2,630.00 $ 57.07 $ 5,707.00 $ 40.00 $ 4,000.00 $ 18.00 $ 1,800.00 Page 1 of 8
Denise Piszkowski, Q.P.A., Purchasing Agent Bid Results for: 2016-B08 Reconstrucion of Preston Drive Submitted By: JTG Construction Black Rock Enterprises Top Line Construction Reviax Constracting Corp. DeSantis Construction Item No. Description Qty Unit unit price Amount unit price Amount Unit price Amount Unit price Amount Unit price Amount 5C ¾ Clean Stone (If and where) 490 TON $ 19.00 $ 9,310.00 $ 22.00 $ 10,780.00 $ 14.00 $ 6,860.00 $ 1.00 $ 490.00 $ 20.00 $ 9,800.00 5D Subbase, Borrow Fill (If and where) 300 CY $ 35.00 $ 10,500.00 $ 0.01 $ 3.00 $ 65.32 $ 19,596.00 $ 1.00 $ 300.00 $ 21.00 $ 6,300.00 6 Pavement Edge Restoration 2200 SY $ 7.00 $ 15,400.00 $ 3.19 $ 7,018.00 $ 8.99 $ 19,778.00 $ 10.00 $ 22,000.00 $ 30.00 $ 66,000.00 7A 7B 7C Inlet, Type B, UNC, 4 ft. deep or less (#1, 1A, 2A, 3A, 6A, 7A, 9A, 11A, 12 & 12A) than 4 to 6 deep (#2, 5, 5A, 6, 9, 10, 10A & 11) than 6 to 8 deep (#4) 10 UNIT $ 2,500.00 $ 25,000.00 $ 3,250.00 $ 32,500.00 $ 3,855.40 $ 38,554.00 $ 3,600.00 $ 36,000.00 $ 2,630.00 $ 26,300.00 8 UNIT $ 3,200.00 $ 25,600.00 $ 3,780.00 $ 30,240.00 $ 4,154.67 $ 33,237.36 $ 3,600.00 $ 28,800.00 $ 2,830.00 $ 22,640.00 $ 3,500.00 $ 3,500.00 $ 4,500.00 $ 4,500.00 $ 4,390.02 $ 4,390.02 $ 4,500.00 $ 4,500.00 $ 3,000.00 $ 3,000.00 7D than 8 to 10 deep (#8A) $ 3,700.00 $ 3,700.00 $ 5,500.00 $ 5,500.00 $ 4,721.20 $ 4,721.20 $ 7,700.00 $ 7,700.00 $ 3,250.00 $ 3,250.00 7E Inlet, Type A-1, UNC, 4 ft. or less (#3) $ 2,800.00 $ 2,800.00 $ 3,450.00 $ 3,450.00 $ 3,686.27 $ 3,686.27 $ 3,200.00 $ 3,200.00 $ 1,700.00 $ 1,700.00 7F Inlet, Type A-1, UNC, greater than 8-10 deep (#8) $ 4,700.00 $ 4,700.00 $ 6,750.00 $ 6,750.00 $ 4,764.90 $ 4,764.90 $ 7,700.00 $ 7,700.00 $ 2,350.00 $ 2,350.00 7G Inlet, Type B-1, UNC, greater than 4-6 deep (#7) $ 4,100.00 $ 4,100.00 $ 7,000.00 $ 7,000.00 $ 4,236.51 $ 4,236.51 $ 3,600.00 $ 3,600.00 $ 3,950.00 $ 3,950.00 7H Storm Manhole, UNC, Less than 4 ft. deep (Storm MH #1) $ 2,300.00 $ 2,300.00 $ 3,500.00 $ 3,500.00 $ 3,328.35 $ 3,328.35 $ 4,100.00 $ 4,100.00 $ 1,850.00 $ 1,850.00 7I Reset Manhole Casting, Using Existing Casting 2 UNIT $ 300.00 $ 600.00 $ 385.00 $ 770.00 $ 232.44 $ 464.88 $ 200.00 $ 400.00 $ 275.00 $ 550.00 8A Headwall No. 1 $ 9,800.00 $ 9,800.00 $ 11,000.00 $ 11,000.00 $ 23,576.17 $ 23,576.17 $ 6,800.00 $ 6,800.00 $ 9,589.00 $ 9,589.00 Page 2 of 8
Denise Piszkowski, Q.P.A., Purchasing Agent Bid Results for: 2016-B08 Reconstrucion of Preston Drive Submitted By: JTG Construction Black Rock Enterprises Top Line Construction Reviax Constracting Corp. DeSantis Construction Item No. Description Qty Unit unit price Amount unit price Amount Unit price Amount Unit price Amount Unit price Amount 8B Headwall No. 2 $ 11,000.00 $ 11,000.00 $ 12,000.00 $ 12,000.00 $ 29,185.67 $ 29,185.67 $ 6,800.00 $ 6,800.00 $ 13,992.00 $ 13,992.00 9A 15 HDPE, 4 or less 400 LF $ 48.00 $ 19,200.00 $ 55.00 $ 22,000.00 $ 49.03 $ 19,612.00 $ 55.00 $ 22,000.00 $ 37.90 $ 15,160.00 9B 15 HDPE, greater than 4 to 6 deep 420 LF $ 48.00 $ 20,160.00 $ 62.00 $ 26,040.00 $ 48.15 $ 20,223.00 $ 60.00 $ 25,200.00 $ 38.90 $ 16,338.00 9C 15 HDPE, greater than 6 to 8 deep 15 LF $ 48.00 $ 720.00 $ 75.00 $ 1,125.00 $ 54.47 $ 817.05 $ 80.00 $ 1,200.00 $ 48.00 $ 720.00 9D 15 RCP, Class III, 4 or less 30 LF $ 55.00 $ 1,650.00 $ 89.00 $ 2,670.00 $ 61.15 $ 1,834.50 $ 60.00 $ 1,800.00 $ 39.90 $ 1,197.00 9E 18 HDPE, 4 or less 35 LF $ 65.00 $ 2,275.00 $ 85.00 $ 2,975.00 $ 49.87 $ 1,745.45 $ 60.00 $ 2,100.00 $ 40.90 $ 1,431.50 9F 18 HDPE, greater than 4 to 6 deep 165 LF $ 65.00 $ 10,725.00 $ 88.00 $ 14,520.00 $ 59.34 $ 9,791.10 $ 60.00 $ 9,900.00 $ 42.90 $ 7,078.50 9G 24 RCP, Class III, 4 or less 29 LF $ 90.00 $ 2,610.00 $ 88.00 $ 2,552.00 $ 79.11 $ 2,294.19 $ 70.00 $ 2,030.00 $ 44.90 $ 1,302.10 9H 36 RCP, Class III, 4 to 6 deep 100 LF $ 120.00 $ 12,000.00 $ 145.00 $ 14,500.00 $ 101.96 $ 10,196.00 $ 95.00 $ 9,500.00 $ 49.50 $ 4,950.00 9I 36 RCP, Class III, greater than 8 to 10 deep 30 LF $ 120.00 $ 3,600.00 $ 225.00 $ 6,750.00 $ 146.49 $ 4,394.70 $ 125.00 $ 3,750.00 $ 56.00 $ 1,680.00 10 8 x20 Concrete Vertical Curb 450 LF $ 25.00 $ 11,250.00 $ 30.00 $ 13,500.00 $ 30.00 $ 13,500.00 $ 25.00 $ 11,250.00 $ 28.00 $ 12,600.00 11 HMA Driveway, 6" Thick 1620 SY $ 36.00 $ 58,320.00 $ 42.00 $ 68,040.00 $ 40.00 $ 64,800.00 $ 36.00 $ 58,320.00 $ 37.29 $ 60,409.80 12A Traffic Stripes 4", Long Life Epoxy 300 LF $ 3.90 $ 1,170.00 $ 3.68 $ 1,104.00 $ 3.67 $ 1,101.00 $ 4.00 $ 1,200.00 $ 3.83 $ 1,149.00 Page 3 of 8
Denise Piszkowski, Q.P.A., Purchasing Agent Bid Results for: 2016-B08 Reconstrucion of Preston Drive Submitted By: JTG Construction Black Rock Enterprises Top Line Construction Reviax Constracting Corp. DeSantis Construction Item No. Description Qty Unit unit price Amount unit price Amount Unit price Amount Unit price Amount Unit price Amount 12B Traffic Markings, Long Life Thermoplastic 90 SF $ 10.50 $ 945.00 $ 9.98 $ 898.20 $ 9.97 $ 897.30 $ 10.00 $ 900.00 $ 10.93 $ 983.70 13A Topsoil, 4 Thick 3425 SY $ 4.00 $ 13,700.00 $ 6.00 $ 20,550.00 $ 8.06 $ 27,605.50 $ 1.00 $ 3,425.00 $ 6.00 $ 20,550.00 13B Fertilizing And Seeding, Type A-3 4615 SY $ 1.00 $ 4,615.00 $ 0.50 $ 2,307.50 $ 0.23 $ 1,061.45 $ 1.00 $ 4,615.00 $ 1.00 $ 4,615.00 13C Straw Mulching 4615 SY $ 1.00 $ 4,615.00 $ 0.50 $ 2,307.50 $ 0.23 $ 1,061.45 $ 1.00 $ 4,615.00 $ 1.00 $ 4,615.00 14 Guard Rail 174 LF $ 68.00 $ 11,832.00 $ 64.00 $ 11,136.00 $ 63.23 $ 11,002.02 $ 81.00 $ 14,094.00 $ 90.56 $ 15,757.44 15 Tree Removal (See plans for locations and sizes, 19 units) $ 15,200.00 $ 15,200.00 $ 17,500.00 $ 17,500.00 $ 4,357.40 $ 4,357.40 $ 18,000.00 $ 18,000.00 $ 9,850.00 $ 9,850.00 16 Asphalt Price Adjustment Allowance $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 TOTAL $ 688,270.00 $ 788,481.35 $ 798,909.34 $ 803,834.00 $ 820,495.34 Minor addition errors on proposal form submitted NOTE: The Township has 60 days to Award or Reject bids. An Award of Contract will be made after final review of the bid documents. Page 4 of 8
Denise Piszkowski, Q.P.A., Purchas Bid Results for: 2016-B08 Reconstrucion of Preston D Submitted By: M.S.P Construction Hale Built Your Way Construction Waters & Bugbee Item No. Description Qty Unit unit price Amount Unit price Amount unit price Amount Unit price Amount 1A.1 Mobilization and Demobilization $ 30,000.00 $ 30,000.00 $ 32,945.00 $ 32,945.00 $ 60,750.00 $ 60,750.00 $ 148,000.00 $ 148,000.00 1A.2 Traffic Directors, Police (shall not exceed $80.00/hour) 20 Hour $ 80.00 $ 1,600.00 $ 80.00 $ 1,600.00 $ 80.00 $ 1,600.00 $ 80.00 $ 1,600.00 1A.3 Maintenance and Protection of Traffic $ 6,000.00 $ 6,000.00 $ 4,665.00 $ 4,665.00 $ 3,375.00 $ 3,375.00 $ 12,000.00 $ 12,000.00 1B Site Clearing and Site Restoration $ 20,000.00 $ 20,000.00 $ 43,300.00 $ 43,300.00 $ 11,323.00 $ 11,323.00 $ 145,385.75 $ 145,385.75 1.C Soil Erosion and Sediment Control $ 500.00 $ 500.00 $ 3,812.00 $ 3,812.00 $ 4,050.00 $ 4,050.00 $ 8,000.00 $ 8,000.00 2A Excavation, Unclassified 635 CY $ 38.00 $ 24,130.00 $ 41.44 $ 26,314.40 $ 1.00 $ 635.00 $ 45.00 $ 28,575.00 2B Test Pits 50 CY $ 1.00 $ 50.00 $ 115.00 $ 5,750.00 $ 1.00 $ 50.00 $ 150.00 $ 7,500.00 3 HMA Milling, Between 4 To 6 6250 SY $ 5.80 $ 36,250.00 $ 7.10 $ 44,375.00 $ 4.60 $ 28,750.00 $ 21.00 $ 131,250.00 4A HMA 9.5 M64 Surface Course 1100 TONS $ 79.00 $ 86,900.00 $ 67.35 $ 74,085.00 $ 90.86 $ 99,946.00 $ 75.00 $ 82,500.00 4B HMA 9.5 M64 Leveling Course 565 TONS $ 65.00 $ 36,725.00 $ 72.15 $ 40,764.75 $ 92.40 $ 52,206.00 $ 89.00 $ 50,285.00 4C HMA 19 M64 Base Course 2100 TONS $ 73.25 $ 153,825.00 $ 63.35 $ 133,035.00 $ 84.70 $ 177,870.00 $ 104.00 $ 218,400.00 5A Dense Graded Aggregate Base Course, 4 Thick 6000 SY $ 5.50 $ 33,000.00 $ 5.99 $ 35,940.00 $ 5.60 $ 33,600.00 $ 7.00 $ 42,000.00 5B Dense Graded Aggregate Base Course, If and Where 100 TON $ 16.00 $ 1,600.00 $ 0.01 $ 1.00 $ 29.70 $ 2,970.00 $ 65.00 $ 6,500.00 Page 5 of 8
Denise Piszkowski, Q.P.A., Purchas Bid Results for: 2016-B08 Reconstrucion of Preston D Submitted By: M.S.P Construction Hale Built Your Way Construction Waters & Bugbee Item No. Description Qty Unit unit price Amount Unit price Amount unit price Amount Unit price Amount 5C ¾ Clean Stone (If and where) 490 TON $ 18.00 $ 8,820.00 $ 0.01 $ 4.90 $ 40.50 $ 19,845.00 $ 25.00 $ 12,250.00 5D Subbase, Borrow Fill (If and where) 300 CY $ 30.00 $ 9,000.00 $ 20.00 $ 6,000.00 $ 40.50 $ 12,150.00 $ 50.00 $ 15,000.00 6 Pavement Edge Restoration 2200 SY $ 20.00 $ 44,000.00 $ 13.70 $ 30,140.00 $ 17.10 $ 37,620.00 $ 20.00 $ 44,000.00 7A Inlet, Type B, UNC, 4 ft. deep or less (#1, 1A, 2A, 3A, 6A, 7A, 9A, 11A, 12 & 12A) 10 UNIT $ 2,800.00 $ 28,000.00 $ 3,868.00 $ 38,680.00 $ 2,978.00 $ 29,780.00 $ 3,900.00 $ 39,000.00 7B than 4 to 6 deep (#2, 5, 5A, 6, 9, 10, 10A & 11) 8 UNIT $ 2,950.00 $ 23,600.00 $ 4,520.00 $ 36,160.00 $ 3,794.00 $ 30,352.00 $ 4,700.00 $ 37,600.00 7C than 6 to 8 deep (#4) $ 3,500.00 $ 3,500.00 $ 4,970.00 $ 4,970.00 $ 3,948.00 $ 3,948.00 $ 5,400.00 $ 5,400.00 7D than 8 to 10 deep (#8A) $ 4,500.00 $ 4,500.00 $ 5,290.00 $ 5,290.00 $ 4,826.00 $ 4,826.00 $ 5,500.00 $ 5,500.00 7E Inlet, Type A-1, UNC, 4 ft. or less (#3) $ 2,800.00 $ 2,800.00 $ 3,750.00 $ 3,750.00 $ 2,315.00 $ 2,315.00 $ 3,800.00 $ 3,800.00 7F Inlet, Type A-1, UNC, greater than 8-10 deep (#8) $ 3,900.00 $ 3,900.00 $ 4,015.00 $ 4,015.00 $ 4,731.00 $ 4,731.00 $ 6,000.00 $ 6,000.00 7G Inlet, Type B-1, UNC, greater than 4-6 deep (#7) $ 3,700.00 $ 3,700.00 $ 4,400.00 $ 4,400.00 $ 3,373.00 $ 3,373.00 $ 5,300.00 $ 5,300.00 7H Storm Manhole, UNC, Less than 4 ft. deep (Storm MH #1) $ 3,700.00 $ 3,700.00 $ 3,670.00 $ 3,670.00 $ 2,652.00 $ 2,652.00 $ 4,000.00 $ 4,000.00 7I Reset Manhole Casting, Using Existing Casting 2 UNIT $ 500.00 $ 1,000.00 $ 500.00 $ 1,000.00 $ 470.00 $ 940.00 $ 425.00 $ 850.00 8A Headwall No. 1 $ 7,000.00 $ 7,000.00 $ 23,080.00 $ 23,080.00 $ 21,577.00 $ 21,577.00 $ 57,000.00 $ 57,000.00 Page 6 of 8
Denise Piszkowski, Q.P.A., Purchas Bid Results for: 2016-B08 Reconstrucion of Preston D Submitted By: M.S.P Construction Hale Built Your Way Construction Waters & Bugbee Item No. Description Qty Unit unit price Amount Unit price Amount unit price Amount Unit price Amount 8B Headwall No. 2 $ 8,000.00 $ 8,000.00 $ 20,590.80 $ 20,590.80 $ 20,848.00 $ 20,848.00 $ 51,000.00 $ 51,000.00 9A 15 HDPE, 4 or less 400 LF $ 50.00 $ 20,000.00 $ 69.38 $ 27,752.00 $ 53.00 $ 21,200.00 $ 92.00 $ 36,800.00 9B 15 HDPE, greater than 4 to 6 deep 420 LF $ 75.00 $ 31,500.00 $ 68.97 $ 28,967.40 $ 62.00 $ 26,040.00 $ 90.00 $ 37,800.00 9C 15 HDPE, greater than 6 to 8 deep 15 LF $ 85.00 $ 1,275.00 $ 128.00 $ 1,920.00 $ 70.00 $ 1,050.00 $ 155.00 $ 2,325.00 9D 15 RCP, Class III, 4 or less 30 LF $ 80.00 $ 2,400.00 $ 170.00 $ 5,100.00 $ 84.00 $ 2,520.00 $ 98.00 $ 2,940.00 9E 18 HDPE, 4 or less 35 LF $ 80.00 $ 2,800.00 $ 86.75 $ 3,036.25 $ 80.00 $ 2,800.00 $ 95.00 $ 3,325.00 9F 18 HDPE, greater than 4 to 6 deep 165 LF $ 85.00 $ 14,025.00 $ 109.00 $ 17,985.00 $ 80.00 $ 13,200.00 $ 100.00 $ 16,500.00 9G 24 RCP, Class III, 4 or less 29 LF $ 90.00 $ 2,610.00 $ 187.00 $ 5,423.00 $ 100.00 $ 2,900.00 $ 175.00 $ 5,075.00 9H 36 RCP, Class III, 4 to 6 deep 100 LF $ 190.00 $ 19,000.00 $ 213.79 $ 21,379.00 $ 163.00 $ 16,300.00 $ 190.00 $ 19,000.00 9I 36 RCP, Class III, greater than 8 to 10 deep 30 LF $ 250.00 $ 7,500.00 $ 292.00 $ 8,760.00 $ 163.00 $ 4,890.00 $ 275.00 $ 8,250.00 10 8 x20 Concrete Vertical Curb 450 LF $ 20.00 $ 9,000.00 $ 38.00 $ 17,100.00 $ 28.00 $ 12,600.00 $ 26.00 $ 11,700.00 11 HMA Driveway, 6" Thick 1620 SY $ 43.00 $ 69,660.00 $ 61.14 $ 99,046.80 $ 69.40 $ 112,428.00 $ 70.00 $ 113,400.00 12A Traffic Stripes 4", Long Life Epoxy 300 LF $ 2.00 $ 600.00 $ 3.85 $ 1,155.00 $ 4.73 $ 1,419.00 $ 3.50 $ 1,050.00 Page 7 of 8
Denise Piszkowski, Q.P.A., Purchas Bid Results for: 2016-B08 Reconstrucion of Preston D Submitted By: M.S.P Construction Hale Built Your Way Construction Waters & Bugbee Item No. Description Qty Unit unit price Amount Unit price Amount unit price Amount Unit price Amount 12B Traffic Markings, Long Life Thermoplastic 90 SF $ 35.00 $ 3,150.00 $ 10.45 $ 940.50 $ 12.83 $ 1,154.70 $ 10.00 $ 900.00 13A Topsoil, 4 Thick 3425 SY $ 5.00 $ 17,125.00 $ 4.85 $ 16,611.25 $ 1.00 $ 3,425.00 $ 5.75 $ 19,693.75 13B Fertilizing And Seeding, Type A-3 4615 SY $ 1.00 $ 4,615.00 $ 1.00 $ 4,615.00 $ 1.00 $ 4,615.00 $ 0.55 $ 2,538.25 13C Straw Mulching 4615 SY $ 1.00 $ 4,615.00 $ 0.60 $ 2,769.00 $ 0.50 $ 2,307.50 $ 0.55 $ 2,538.25 14 Guard Rail 174 LF $ 85.00 $ 14,790.00 $ 78.00 $ 13,572.00 $ 78.70 $ 13,693.80 $ 80.00 $ 13,920.00 15 Tree Removal (See plans for locations and sizes, 19 units) $ 8,000.00 $ 8,000.00 $ 16,400.00 $ 16,400.00 $ 11,542.50 $ 11,542.50 $ 7,300.00 $ 7,300.00 16 Asphalt Price Adjustment Allowance $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 829,765.00 $ 935,870.05 $ 941,167.50 $ 1,488,751.00 NOTE: The Township has 60 days to Award or Reject bids. An Award of Contract will be made after final review of the bid documents. Page 8 of 8