Public Disclosure Copy

Similar documents
The World Bank Indonesia Power Transmission Development Project (P117323)

Public Disclosure Copy

Public Disclosure Copy

The World Bank Indonesia Infrastructure Guarantee Fund Project (P118916)

Public Disclosure Copy

Public Disclosure Copy

The World Bank Indonesia Power Transmission Development Project (P117323)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report CAPE VERDE - Recovery and Reform of the Electricity Sector Project (P115464)

Public Disclosure Copy

The World Bank Municipal Services Improvement (P096481)

The World Bank Building a Modern Fiscal System Technical Assistance (P154694)

MicroSmall&Medium Enterprise and Large Enterprise Supply Chain Finance (P157691)

Public Disclosure Copy

Key Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions

The World Bank Bangladesh Ghorashal Unit 4 Repowering Project (P128012)

Public Disclosure Copy

Public Disclosure Copy

TR Third Access to Finance for SMEs (SME III) (P130864)

The World Bank Albania-Enhancing Quality of Financial Reporting (EQ-FINREP) (P152567)

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report CO Rio Bogota Environmental Recuperation and Flood Control Project (P111479)

Zambia Kafue Town - Muzuma - Victoria Falls Regional Transmission Line Reinforcement Project

Innovative Access to Finance (P147183)

Public Disclosure Copy

The World Bank Jamaica Strategic Public Sector Transformation (P146688)

Public Disclosure Copy

Debt Management Strengthening Programme at Ministry of Finance, Government of Pakistan (P161451)

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report QUALISUS-REDE Brazil Health Network Formation and Quality Improvement Project (P088716)

Public Disclosure Copy. Implementation Status & Results Report Savings and Credit Sector Consolidation and Financial Inclusion Project (P123367)

The World Bank Bangladesh Ghorashal Unit 4 Repowering Project (P128012)

Public Disclosure Copy

Road Sector Development Project (P149322)

The World Bank Kabul Urban Transport Efficiency Improvement Project (P131864)

The World Bank Palestinian Recovery & Development Plan MDTF (P110690)

The World Bank Nigeria - Public/Private Partnership Program (P115386)

The World Bank Water Resources and Irrigation Sector Management Program 2 (P114348)

Bangladesh Insurance Sector Development Project (P156823)

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Gansu Cultural and Natural Heritage Protection and Development Project (P091949)

Public Disclosure Copy. Implementation Status & Results Report Dominican Republic DRM Development Policy Loan with a Cat DDO (P159351)

The World Bank Burkina Faso Donsin Transport Infrastructure Project (P120960)

The World Bank Nigeria - Public/Private Partnership Program (P115386)

Public Disclosure Copy

Public Disclosure Copy. East-West Roads Project (Almaty-Korgos Section): Western Europe - Western China International Transit

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Ghana: Energy Development and Access Project (P074191) Key Dates. Project Development Objectives. Components

Key Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions

Jordan Ozone Depleting Substances HCFC Phase-Out Project (ODS3) (P127702)

Public Disclosure Copy

State Owned Financial Institutions Reform Project (P156837)

West Bengal PRI (P105990)

The World Bank Urban Transport Corridor Development in Surabaya - RETF (P147893)

Justice Sector Support Project (P104749)

Public Disclosure Copy. Implementation Status & Results Report Pacific Regional Connectivity Program 2:Palau-FSM Connectivity Project (P130592)

Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized The World Bank Power Recovery Project (P144029)

The World Bank Pacific Islands Regional Oceanscape Program - Tuvalu (P151780)

The World Bank MN-Mining Infrastructure Investment Supp (P118109) (P118109)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

The World Bank Second Karnataka State Highway Improvement (P107649)

The World Bank Mozambique Public Financial Management for Results Program (P124615)

Public Disclosure Copy

The World Bank Revenue Administration Modernization Project (P130202)

Public Disclosure Copy. Implementation Status & Results Report Improving Maternal and Child Health through Integrated Social Services (P123706)

The World Bank Integrated Disaster Risk Management and Resilience Program (P144539)

The World Bank Kenya Cash Transfer for Orphans and Vulnerable Children (P111545)

The World Bank Research and Innovation in Science and Technology Project (P121842)

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Federally Administered Tribal Areas (FATA) Governance and Policy Program (P156412)

The World Bank Transport Connectivity and Asset Management Project (P132833)

The World Bank Egypt National Railways Restructuring Project (P101103)

West Bank and Gaza: Finance for Jobs (P151089)

The World Bank Egypt National Railways Restructuring Project (P101103)

The World Bank Egypt National Railways Restructuring Project (P101103)

Public Disclosure Copy

Public Disclosure Copy

The World Bank Egypt National Railways Restructuring Project (P101103)

The World Bank Pakistan Punjab Jobs and Competitiveness Program for Results (P155963)

The World Bank Ghana - PPP Project (P125595)

The World Bank Climate Change and Green Growth in Vietnam (P155824)

Justice Services Strenghtening (P083904)

Second Science & Technology Project (P127308)

The World Bank Public Expenditure and Fiscal Risk Management DPF-DDO (P154981)

PNG - Small and Medium Enterprise Access to Finance Project (P120707)

The World Bank. Ghana: Energy Development and Access Project (P074191) Key Dates. Project Development Objectives. Components

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Costa Rica Catastrophe Deferred Draw Down Option (CAT DDO) (P111926)

Public Disclosure Copy

The World Bank Tax Administration Modernization Project (P111942)

IRAQ: SECOND EXPENDITURE RATIONALIZATION, ENERGY EFFICIENCY AND STATE-OWNED ENTERPRISE GOVERNANCE PROGRAMMATIC DPF (P161

Key Dates. Global Development Objectives. Components. Overall Ratings

SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR (CAREC 1B & 6B) (P099270)

The World Bank Transport Connectivity and Asset Management Project (P132833)

Public Disclosure Copy. Implementation Status & Results Report Costa Rica Catastrophe Deferred Draw Down Option (CAT DDO) (P111926)

Public Disclosure Copy. Implementation Status & Results Report Transparency and Accountability in Mongolian Education (TAME) (P150842)

Transcription:

Public Disclosure Authorized EUROPE AND CENTRAL ASIA Poland Water Global Practice IBRD/IDA Investment Project Financing FY 2007 Seq No: 20 ARCHIVED on 07-Dec-2017 ISR30355 Implementing Agencies: Republic of Poland, Ministry of Environment Public Disclosure Authorized Key Dates Key Project Dates Bank Approval Date:21-Mar-2007 Planned Mid Term Review Date:26-Sep-2011 Original Closing Date:30-Nov-2014 Project Development Objectives Effectiveness Date:09-Jul-2007 Actual Mid-Term Review Date:26-Sep-2011 Revised Closing Date:30-Jun-2020 Public Disclosure Authorized Project Development Objective (from Project Appraisal Document) The main development objective o f the Project i s to protect the population in the ORB against loss o f life and damage to property caused by severe flooding. This would be achieved by: (i) reducing the extreme flood peaks through storage in a dry polder on the Odra River just upstream o f Raciborz town, enabling a reduction o f the flood peak downstream o f the reservoir and allowing bettercontrol o f the operation o f t he river system; and (ii)by increasing the flood carrying capacity o f t he Odra River channels through and around Wroclaw. The Project would protect more than 2.5 million people against flooding in several towns such as Raciborz, Kedzierzyn, Kozle, Krapkowice, Opole, Brzeg, Olawa and Wroclaw, and settlements in the three voivodships o f Slaslue, Opolskie and Dolnoslaslue. Has the Project Development Objective been changed since Board Approval of the Project Objective? No PHRPDODEL Components Public Disclosure Authorized Name Construction of Raciborz Flood Retention Reservoir:(Cost $286.78 M) Modernization of Wroclaw Floodway System:(Cost $333.55 M) Improving Flood Management, Monitoring & Evaluation and Supervision of EA, EMP and RAP:(Cost $35.47 M) Project Management Technical Assistance and Training:(Cost $7.62 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Moderately Unsatisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Unsatisfactory Moderately Satisfactory 12/7/2017 Page 1 of 7

Overall Risk Rating Moderate Moderate Implementation Status and Key Decisions Works on the main Wroclaw Floodway System (WFS) are complete (B1 and B2 contracts) and delivering flood protection benefits. Of the B3 contracts, B3.1 is progressing satisfactorily including the construction of the main Widawa flap weir. This weir is a critical element of the WFS as it will divert peak water flows around the city of Wroclaw under emergency situations. The B3.2 contract, however, faced some delays, although completion is expected during the 4th quarter of 2017. Following the termination of the contractor for the Raciborz investment (A11), sub-contractors were hired directly to secure the site, prevent existing works from damage, and continue with necessary works until selection of the new contractor takes place (e.g. soil strengthening, preparation of execution designs). These contracts proceeded well and are either completed or very close to completion. The Bank provided the no objection to the BER for the new Raciborz works contract (A14) on October 24, 2017 and the letter of acceptance was issued to the contractor on November 20, 2017. Progress with the new village continues to be exemplary. All community infrastructure is almost completed, although some delays due to change of distribution of multi-purpose building and soil conditions in the football field, have led to a contract extension until June 30th, 2018. Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance -- Substantial Substantial Macroeconomic -- Low Low Sector Strategies and Policies -- Low Low Technical Design of Project or Program -- Moderate Moderate Institutional Capacity for Implementation and Sustainability -- Moderate Substantial Fiduciary -- Low Low Environment and Social -- Substantial Substantial Stakeholders -- Low Low Other -- -- -- Overall -- Moderate Moderate Results Project Development Objective Indicators PHINDPDOTBL Reduction in area flooded, damages avoided and lives saved due to floods of various magnitudes and return periods (Text, Custom) 12/7/2017 Page 2 of 7

PHINDIRITBL Area flooded during 1997 floods. Flood of 1997: The hectares that were affected during the 1997 flood: About 485 000 ha. The value of assets lost during the 1997 flood: 14,0 billion PLN (including flood fighting costs). People died during 1997 flood: 57 construction progress: are completed and are in the defects notification period. Final settlement of B2 contracts under way. B3 progress is overall acceptable (except for B3.2) and anticipated to be completed by July 2017. A1 activity is in progress (43%) and faces delays due to termination of the contract. A re-tender is already in progress. construction progress until project is fully finished: are completed. B3 progress is overall acceptable (except for B3 2) and anticipated to be substantially completed by November 2017. A1 activity is in progress (50%) and continues to face delays due to termination of the contract. A re-tender is already in progress and the Bank has received the Bid Evaluation Report. Full protection against floods of the 1997 magnitude. The hectares that will be affected: 0 ha. The value of assets that will be lost: 0 PLN. People who will die: 0 Date 20-Jul-1997 31-Mar-2017 31-Mar-2017 30-Jun-2020 Overall Comments Intermediate Results Indicators Component A. Reduction in area flooded, damages avoided and lives saved in cities and settlements between Raciborz and Wroclaw city (Text, Custom) Area flooded during 1997. The hectares that were affected during the 1997 flood between Raciborz and Wroclaw: About 475 000 ha. The value of assets lost during the 1997 flood between Raciborz and Wroclaw: 9.0 to 9.2 billion PLN (including flood fighting costs). People died during 1997 flood between Raciborz and Wroclaw: 54 construction progress: A1 activity is in progress and faces delays due to termination of the contract. A re-tender is already in progress. construction progress until project is fully finished: A re-tender is already in progress and the Bank has provide the no objection to the Bid Evaluation Report. Full protection against floods of the 1997 magnitude between Raciborz and Wroclaw city. The hectares that will be affected: 0 ha. The value of assets that will be lost: 0 PLN. People who will die: 0 Date 05-Jul-2007 31-Mar-2017 31-Mar-2017 30-Jun-2020 12/7/2017 Page 3 of 7

PHINDIRITBL PHINDIRITBL Construction completion and expenditures (Text, Custom Supplement) 0% 43% 43% 100% (cumulative) Component B: Full protection to Wroclaw city against flooding. (Text, Custom) Area flooded during 1997 floods. The hectares that were affected during the 1997 flood in Wroclaw: About 9 000 ha. The value of assets lost during the 1997 flood in Wroclaw: 4.23 billion PLN (including flood fighting costs). People died during 1997 flood in Wroclaw: 0 construction progress: are completed and are in the defects notification period. Final settlement of B2 contracts under way. B3 progress is overall acceptable (except for B3.2) and anticipated to be completed by July 2017. construction progress until project fully finished: are completed (construction progress 100%). B3 progress is overall acceptable (except for B3 2) and anticipated to be substantially completed by November 2017. Construction progress of B3: 92 % Full protection against floods of the 1997 magnitude in Wroclaw. The hectares that will be affected: 0 ha. The value of assets that will be lost: 0 PLN. People who will die: 0 Date 05-Jul-2007 31-Mar-2017 31-Mar-2017 30-Jun-2020 12/7/2017 Page 4 of 7

PHINDIRITBL PHINDIRITBL PHINDIRITBL Construction completion and expenditures (Text, Custom Supplement) 0% 75% are completed (construction progress 100%). B3 progress is overall acceptable (except for B3 2) and anticipated to be substantially completed by November 2017. Construction progress of B3: 92 % Expenditures as percentage of estimated total component B cost of Euro 395 885 000,00 in percent: 71%. 100% (cumulative) Component C: Improved flood forecasting and better linkage of forecaster and communication with flood management (Text, Custom) Status of forecast and communication during 1997 floods. No linkage between flood forecasting and management system These activities are successfully completed and indicators have been fully achieved. These activities are successfully completed and indicators have been fully achieved. Established institutional and communication setup for operation of various structures in the system. Date 20-Jul-1997 31-Mar-2017 31-Mar-2017 30-Jun-2020 Component D: Implementation of RAP design of infrastructure and constructions completion on time. (Text, Custom) Not yet due All RAP prepared. All RAP prepared and RAP influenced designs (new village) scheduled to be completed April 2018. Complete constructions of all project facilities. Date 20-Jul-1997 31-Mar-2017 31-Mar-2017 30-Jun-2020 Overall Comments 12/7/2017 Page 5 of 7

Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P086768 IBRD-74360 Effective USD 184.00 184.00 0.00 154.19 24.61 84% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P086768 IBRD-74360 Effective 21-Mar-2007 11-May-2007 09-Jul-2007 30-Nov-2014 30-Jun-2020 Cumulative Disbursements Restructuring History Level 2 Approved on 31-Jan-2014,Level 2 Approved on 10-Jul-2014,Level 2 Approved on 20-Oct-2017 12/7/2017 Page 6 of 7

Related Project(s) There are no related projects. 12/7/2017 Page 7 of 7