Sacramento City College

Similar documents
Sacramento City College Strategic Planning System

Sacramento City College

Administrative Services Goals / Objectives * th Quarter Review 30 June 2008 & Annual Program Review

THE UNIVERSITY OF NORTH CAROLINA AT CHAPEL HILL CAPITAL IMPROVEMENT PROJECT PROCESS

CHAPTER 3: PROJECT PRIORITIES AND SELECTION

Status: Structural steel installation complete at primary building. Observatory construction underway. Central Plant modifications are complete.

California Community Colleges

Policy 3-205: Remodeling and Construction Policy

SmallBizU WORKSHEET 1: REQUIRED START-UP FUNDS. Online elearning Classroom. Item Required Amount ($) Fixed Assets. 1 -Buildings $ 2 -Land $

Lassen Community College Institutional Planning and Budget Development Process Handbook

Planning Driven Budget Development Process

Facilities Planning & Construction Report nd Quarter Ending December 31, 2017

CAPITAL PLANNING, DESIGN AND CONSTRUCTION SECTION I -CAPITAL OUTLAY AND PUBLIC WORKS CONTRACTS SECTIONS TABLE OF CONTENTS

State Capital Outlay Program Overview

STATE CAPITAL OUTLAY PLANNING

California State University, Los Angeles University Resource Allocation Process for Change CURRENT ALLOCATION MODEL OVERVIEW

CHAPTER 4: FIVE-YEAR CONSTRUCTION PLAN

FY2019 MEIF / Auxiliary Services / E&G Budget Discussion

Integrated Resource Planning Process University of Wisconsin-Parkside June 21, 2012

Facilities Management Services. Working with Planning, Design, And Construction

Request for Qualifications (RFW: 18-19/01) Architectural/Engineering Firms

Grossmont-Cuyamaca Community College District Project Labor Agreement Evaluation Plan

Facilities Planning (Revised 2016)

Purpose: The North Carolina Administrative Code (NCAC), Title 01, Subchapter 30D Section

I. INTRODUCTION II. ROLES & RESPONSIBILITIES

Final Project Proposal 20 -

University Budget Advisory Committee Composition

CATEGORY 8 PLANNING CONTINUOUS IMPROVEMENT

DRAFT. PROJECT POLICY CAPITAL AND OPERATING Approved by: History: Administrative Policy Policy Number: REYNOLDA CAMPUS CONTENTS:

EASTERN WASHINGTON UNIVERSITY BUDGET PRIMER

UNTHSC. Annual Budget Development Process Fiscal Year 2019 Guidelines & Instructions - Spring 2018

Integrated Planning 1

Work Program Integration Initiative (WPII)

Program Implementation Plan Measure M Bond. San Bernardino Community College District

Measure K Board Workshop December 1, 2008 Building on Success: Schools for the Next Generation

STATE CAPITAL OUTLAY FUNDING

QUESTION 2. QUESTION 3 Which one of the following is most indicative of a flexible short-term financial policy?

ORANGE UNIFIED SCHOOL DISTRICT Measure S Bond Program September 2017 Monthly Progress Report

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: 1 ACTION ITEM

Allan Hancock Joint Community College District

PimaCountyCommunityCollegeDistrict Board of Governors 4905C East Broadway/Tucson, Arizona INFORMATION REPORT

Capital Project Funding Guidelines

Presentation to the UH Faculty Senate. University of Houston FY 2016 Budget For current information see

Status: Structural steel installation complete at primary building. Observatory construction underway. Central Plant modifications are complete.

FOR RELEASE: MONDAY, MARCH 21 AT 4 PM

UNLV COMBINED MAJOR CAPITAL PROJECT AND ONE-TIME PROJECT PLANNING PROCESS (COPP) FY2014 AND UPCOMING 2015 LEGISLATIVE SESSION

REGISTER OF IOWA STATE UNIVERSITY CAPITAL IMPROVEMENT BUSINESS TRANSACTIONS

Solano Community College District REQUEST FOR QUALIFICATIONS (RFQ #14-008) CIVIL ENGINEERING SERVICES CAPITAL IMPROVEMENT PROGRAM

INSTITUTIONAL EFFECTIVENESS Procedures Manual. Developed by the Office of Institutional Effectiveness

Agenda (Items may be taken out of order) D. Active Construction Project Status Report (for receive and file only)

Accreditation Action Plan for Removal of Probation presented to the LACCD Board of Trustees. Aug. 22, 2012 Los Angeles Harbor College

Economic Indicators December 2017

13.0 Capital Improvements

University of Houston Student Leadership Forum Budget and Legislative Processes

SPACE ALLOCATION AND MANAGEMENT PROCEDURE

INSTITUTIONAL EFFECTIVENESS POLICY AND PROCEDURE

A How To On State Capital Outlay. Eric Mittlestead Harold Flood Lan Yuan Eric Thorson

FROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: SEPTEMBER 19, 2001 CMR:354:01

BP 2220 Committees of the Board

CW/P. F a c i l i t i e s M a s t e r P l a n S e p t e m b e r 8,

Review of Registered Charites Compliance Rates with Annual Reporting Requirements 2016

UC MERCED CAPITAL PLANNING PROCESS CAPITAL PROJECT DEVELOPMENT Issued: February 2005 TABLE OF CONTENTS. Table of Contents...1

We produced the Strategic Planning Process (SPP) using the following design principles:

Sequoias Community College District RESOURCE

CONSTRUCTION CALIFORNIA STATE UNIVERSITY, DOMINGUEZ HILLS EDUCATIONAL RESOURCE CENTER ADDITION. Audit Report December 16, 2010

Capital Outlay Management Plan for the Delegation of Capital Outlay Authority For Humboldt State University

Request for Qualifications for General Contractors. 8th & Cooper Multi-use Project

11 May Report.xls Office of Budget & Fiscal Planning

ANNUAL STRATEGIC PLANNING RETREAT AUGUST 21, 2012

VALENCIA COLLEGE FINANCIAL SUMMARY FISCAL YEAR As of March 31, 2016

School Board of Brevard County, Florida Half-Cent Sales Surtax Round 6 Internal Audit Report Fiscal Year February 21, 2019

For. 621 Grant. Yakima, WA until: preparation. Kim Hixson Director

Budget Instructions for the Development of the FY Operating Budget

ONTARIO-MICHIGAN BORDER TRANSPORTATION PARTNERSHIP Planning/Need and Feasibility Study. 1. Work Accomplished This Period (4 Weeks)

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: DISCUSSION ITEM

FDD FIRM STORAGE SERVICE NORTHERN NATURAL GAS COMPANY

Measure M. Board of Trustees Study Session. January 16, 2013

Calendar of Activities

Housing Operations. Housing Division Re-Organization. Rent Supplement Deficit 2016 Audit Results 2018 Operating Budget(s) Next Steps

CHAPTER 5: CAPITAL OUTLAY PROJECT PROPOSALS

Resource Allocation, Management, and Planning Steering Committee #7

FACILITIES PLAN STATUS REPORT July 21, 2014 SADDLEBACK COLLEGE 1. SCIENCES BUILDING

Basis of Accounting and Budgeting, and Fund Descriptions

Georgia Institute of Technology Institute Budget Planning & Administration Policies and Procedures

CAPITAL PROJECT PROCESS

POLICIES AND PROCEDURES MANUAL FOR PLANNING AND CONSTRUCTION

Egg Entrepreneurship Records

MONTHLY FINANCIAL SUMMARY FISCAL YEAR (MARCH)

Pilot Watersheds Plan Development: Work Plan

October 4, 2007 Page 1 of 8

Re-Hiring Retiree Process Step by Step

Guide to the University of California, Santa Barbara, Office of Budget and Planning Collection

Original Revision Total Project Budget: $52,234,000 $8,308,000 $67,358,000 District Funding Commitment: Anticipated State Match:

Cost Estimation of a Manufacturing Company

Facilities Management and Planning Organizational Review Phase II Update

RESOURCE. Sequoias Community College District. College of the Sequoias

Resource Allocation Charter Document

Capital Project Delivery Handbook. Facilities Planning & Construction

38 th A n n u a l C o n f e r e n c e o n S c h o o l F a c i l i t i e s

XML Publisher Balance Sheet Vision Operations (USA) Feb-02

Transcription:

Sacramento City College Strategic Planning System Title: Plan Type: OPR: Collaborative Group: References: Facility Management Resource Allocation Operations Division Campus Development Committee ADA Transition Plan Annual SMSR Project List Facilities Space Inventory Facilities Master Plan (2010) Facility Condition Index Summary Five Year Construction Plan LRCCD Long Range Capital Needs Plan LRCCD Regulation 8417 Non-Instructional Equipment and Infrastructure Program Plan Safety and Environmental Program Plan PURPOSE and OBJECTIVES: The annual resource allocation process must address the need to maintain the college spaces and ground areas in a quality manner which facilitates and enhances the educational and support services offered by the College. This plan is intended to differentiate various levels of maintenance, repair and improvement projects as well as capital modernization and new construction projects. It outlines procedures for collecting annual division/unit facility needs through the unit/program plan process. These procedures will provide the basis for the College s annual facilities plan developed by the Operations Division; provide for appropriate metric tracking tools; and provide the mechanisms for identifying and prioritizing requests within approved funding levels. Summary objectives for this resource allocation plan include: Integrate facility requirements into the division/unit planning system Develop a regular replacement cycle for institutional furniture, fixtures and equipment which is incorporated into the Non-instructional Equipment and Infrastructure Program Plan Develop and document an interactive process to keep the campus community engaged and informed of capital construction projects and the college planning process that brings these projects to fruition.

Develop and document a system for prioritizing and evaluating needs through the shared governance system. Develop tracking tools/metrics for planning and monitoring the status of campus and education center facilities to ensure timely maintenance, repair and improvement is accomplished. Monitor status of ADA transition plans, safety and security improvements and HAZMAT program changes which are incorporated into the Safety and Environmental Program Plan. PROCEDURES: 1. Facility maintenance, repair and improvement (MRI) projects can generally be grouped into three broad categories: a. Emergency / critical: These are unplanned maintenance and repair needs that emerge throughout the year. These are handled as they arise by contacting campus Operations directly (emergency) or by submitting a work order (routine) through the Division office. These type projects are managed by the Director of Operations and the Operation s staff in collaboration with the district s Facilities Maintenance organization and are funded through the College s institutional program as appropriate. An annual estimate, based on historical expenditures is developed by Operations and submitted to the VPA in the Feb/Mar timeframe for the next academic year. VPA budgets institutional funds accordingly. b. Long Range Capital Outlay Projects: These projects are broadly outlined in the SCC Facilities Master Plan (FMP). The FMP considers major new construction and modernization projects predicated on projected future space needs, available local bond funding and anticipated state bond funding. The FMP is actualized through two key documents which are developed and updated by district Facilities Management: The Five Year Construction Plan and the Long Range Capital Needs Plan. These two documents calculate and update essential planning data including capacity-load ratios, project cost estimates, planned funding and project schedules/timelines. Projects which are planned for state facility bond funds must compete for these funds through a state mandated process. To qualify for state funds the district must submit a BOT approved Initial Plan Proposal (IPP). Timing for these submissions vary and are estimated in the table below (timing is shown as actual project start (PS) minus (-) the indicated number of months. If the IPP is approved by the state, the project will proceed to the next step, development of a Final Project Proposal (FPP) which will bring an architect into the project planning process. All projects are developed by the district, in collaboration with all College constituency groups through the Campus Development Committee and the College Facilities Master Plan (2010). They fall into three broad categories: New Construction; Remodeling; and Modernization/Maintenance. See LRCCD Regulation 2

8417 and the College Resource Management and Capital Outlay Program Plan for additional information on these types of MRI projects. The project timing, referenced from the Project Start (PS) date, participants, and phases are described in the following table. TIMING* WHO WHAT PS 24 PS 15 PS 12 Project Start (PS) PS + 3 PS + 7 PS + 8 PS + 13 Facilities Management (FM) Assoc Vice Chancellor, FM Planner, FM Initial Project Proposal (IPP) development. Board of Trustees Approval and submission to the state for potential funding Final Project Proposal (FPP) development. Issues Request for Qualifications (RFQ) to initiate selection of Architectural design firm. Architectural design firm Selection Committee. Preliminary Plan development (schematic design, estimate, California Environmental Quality Act (CEQA) compliance, etc.) Design approvals (State Public Works Board (SPWB) review) Working Drawing Completion 3

PS + 14 PS + 18 PS + 20 PS + 21 PS + 33 45 PS + 30 PS + 35 47 Vice President of Administration Director of Operations Facility Dean Vice President of Administration Director of Operations Facility Dean Selected Construction Firm Vice President of Administration Director of Operations Facility Dean or Designee Campus AV / District IT Project Update Briefing to President s Cabinet, Senior Leadership Team and Executive Council Approvals (Department of State Architect (DSA), California Community College Chancellor s Office (CCCCO), etc. Coordinate On / Off-campus Swing Space Requirements Bid and Contract Award (Bid Document Development, Advertising, Bid Opening, Notice to Proceed, etc.) Construction Coordinate Type II Equipment list and expenditures Campus Move-In * All timelines are notional and subject to modification as scope of project and duration of construction dictate. Consult timeline metric for t current schedule projections. c. Facility Projects: This category involves projects which can be planned to maintain and improve the quality and functionality of the College spaces, but do not reach the threshold for a capital outlay project. This includes the periodic replacement of furniture, fixtures and generic institutional equipment in teaching and support service spaces (specific instructional /unit equipment will be handled through the unit planning process with division level OCB funding). This project type is addressed in the remainder of this planning document. 2. Divisions and units will identify facility projects annually through the Unit Planning Process. Each project will include a brief description of the need and supporting rationale (see on-line unit planning worksheets). Division and College Service Area priorities will be assigned. Each of the College s program and institutional plans will also be reviewed for facility requirements and these will be incorporated into the overall planning process. 3. The Operations Division will maintain a list of deferred MRI projects. In addition, the Operations Division will also maintain a tracking summary indexed to the Facilities Space Inventory of when replacement work (floors, lighting, boards, furniture, equipment, etc.) and maintenance (painting, repairs, minor remodels, etc.) were performed. These data will be integrated with division/unit level requirements to develop 4

a list of potential projects for the next academic year. This integration will be crosschecked with the planned modernization schedule to ensure appropriate project timing/prioritization is applied. In addition, a crosscheck with the ADA Transition Plan, HAZMAT Plan and annual SMSR program will be accomplished. An overall list of proposed projects will be developed and prioritized for the next academic year by the Director of Operations. An estimated cost for these projects will also be developed. Projects to be funded through college discretionary funding (documented in the annual President s Budget Memorandum) will be submitted to the budget committee for integration with budget and IT requests developed through the unit planning process. The project list will be reviewed by the President s Executive Staff prior to submission to the budget committee for consideration. CSA prioritization will be considered. Facility Resource Allocation Process and Timing Summary TIMING* WHO WHAT Sep Oct Dec Nov Jan-Feb Feb - Mar Mar - Apr Units / Operations Departments, Units, Areas Operations Operations Campus Development Committee Budget Committee Conduct preliminary feasibility assessment of proposed/potential facility projects in coordination with Campus Director of Operations. Consider Five Year Construction Plan and the LRCNP schedule of projects. Define facility projects as part of the unit planning process. Rank order through division/unit and College Service Area (CSA). Review Institutional, Program and unit plans for facility related projects. Assess feasibility and develop cost estimates. For CDF funded projects, refine listing for submission to the budget committee for integration with IT and budget requests. Compile campus wide list of facility projects. Include facility needs identified in the Institutional, Program and unit plans, as appropriate. Integrate with known SMSR, HAZMAT, ADA type projects. Cross-check with modernization schedule. Review and prioritize campus wide list to develop a prioritization recommendation for submission to the Budget Committee consistent with College strategic goals and directions. Budget Committee integrates facility projects with IT and financial requests and develops a prioritized recommendation for the President s approval. May - June Operations Develop supporting requisitions, work schedules, FM work orders & contracts as appropriate for approved facility projects. July 1 Operations Implement academic year Facility Project Plan. Track project schedules, costs and completions. * Specific timelines and due dates will be determined by the Planning Division (PRIE) in coordination with the appropriate OPR and/or collaborative group. MEASURES OF MERIT: A number of metric tools will be employed to track facility related projects and to help inform the college community of status of projects. Metric 5

data is reviewed on a regular basis, usually quarterly as part of a broader metric review performed in the Administrative Service CSA. These metric tools are outlined below. - An analysis of on-campus floor space is reviewed quarterly and updated on an annual basis. The analysis will consider what floor space is scheduled for major project improvement to include modernization or new construction. In addition, consideration will be given to planned projects to remediate HAZMAT, ADA transitions and/or other repair and remodel projects. Other floor space will be scheduled as a function of this analysis and will be documented/funded through the Non-Instructional Equipment and Infrastructure Program Plan. - Unit planning facility requests will be reviewed by Operations and the Campus Development Committee (CDC). The objective floor space to be worked each year is approximately 16,000 OGSF. Metric assessment of work order flow and timing will be used to track routine maintenance repair and improvement (MRI) projects. - Capital projects timing and phasing will be updated and summarized quarterly and briefed as part of the VPA metric assessment for the management team. In addition, the Executive Council will be updated at least semi-annually on status of capital projects. Specific emphasis will be placed on design start and construction start timelines. RESOURCES: REQUIREMENTS: Normal administrative procedures and overhead DATE: August 31, 2007 November 4, 2007 September 1, 2008 September 1, 2009 November 15, 2010 November 11, 2011 August 28, 2012 August 21, 2013 May 01, 2015 Update Update REVIEW CYCLE: Annual 6

Capital Project and Modernization Schedule Current as of May 01, 2015* * This schedule to be updated at least semi-annually and briefed to Executive Council, Senior Leadership Team and Campus Development Committee 7