DISNEY Construction Extra Work Bill Summary

Similar documents
DISNEY Construction Extra Work Bill Summary

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN

!LEE COUNTY SOLJT II W EST PLO I< ID A Lee County Procurement Management BID TABULATION FORM

TORQUE: STRONG & COMMITTED MISSION STATEMENT

REFERENCE A EXAMPLE OF FORCE ACCOUNT SUMMARY AND BREAKDOWN Effective: April 1, 2006 Page 1 of 10

06-X Emergency Services Term Contract Attachment #10 - Price Schedule - Index

Description Please provide fully burdened rates for decriptions personnel and equipme

Cost of Construction Labor and Equipment

Catalogue. Quality products and services for construction and contractors. REGINA SASKATOON WINNIPEG

State of West Virginia Solicitation Response

REQUISITION & PROPOSAL

Operating Engineers Agreement. between. The AGC of Michigan Detroit Area. and

Tuesday, August 28 th 2018

TITLE II ADMINISTRATIVE REGULATIONS VEHICLE/EQUIPMENT REPLACEMENT POLICY

Plumbers & Steamfitters Local Union 342

DATE: December 9, 2014 BID NO.: 15-E-029F "SALE OF SURPLUS MISCELLANEOUS EQUIPMENT & VEHICLES

Adam's Auction & Real Estate Service, Inc.

Loss Mitigation in the Mining Down Turn Speaker:

Engineer's Preliminary Estimate - 100% Submittal

TOWN OF FARMINGTON, CT REQUEST FOR PROPOSALS FOR CONSTRUCTION EQUIPMENT RENTALS AND ON CALL CONSTRUCTION SERVICES

COLLECTIVE BARGAINING AGREEMENT MICHIANA BUILDERS ASSOCIATION, INC.

APPENDIX NO. 8 A - OPERATING ENGINEERS - COMMERCIAL

MASTER AGREEMENT FOR HAWAII between OPERATING ENGINEERS LOCAL UNION NO. 3

City of Dauphin. Heavy Equipment Rental Proposals

Job No Medina River Sewer Outfall, Segment 4 Solicitation No. B DD BID PROPOSAL

Time Value of Money, Construction Equipment and Methods

( X ) INVITATION FOR BID VENDOR: BID OPENING:

City and County of San Francisco

Attachment 17 RTD Pricing Conditions

REQUISITION & PROPOSAL ALABAMA STATE PORT AUTHORITY DATE: June 7, 2011

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price

CIRCUIT BALANCING VALVES

EXHIBIT 'A' SCOPE OF WORK

EXHIBIT 2: ANNUAL TIPPING FEE ADJUSTMENT. Disposal Services Contract

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE

CITY OF CLEVELAND DEPARTMENT OF PUBLIC UTILITIES REQUEST FOR PROPOSAL FOR WATER MAINS RENEWAL PROGRAM ADDENDUM No. 1

DIVISION 1 GENERAL REQUIREMENTS SECTION MODIFICATION PROCEDURES AND PRICING OF CHANGED WORK

JOB: TILT UP WAREHOUSE, TYPICAL By : Foothill Consultants

Public Utility District #1 of Ferry County Budget. December 19, 2016

ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL

KITSAP COUNTY DEPARTMENT OF ADMINISTRATIVE SERVICES PURCHASING OFFICE INFORMAL BID TREE SERVICES ROSTER

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

BID PACKAGE LEGAL NOTICE - BIDS WANTED. Water Well and Pump Related Maintenance and Repair Services GENERAL INFORMATION AND INSTRUCTION

EX BUCKET CYLINDER 2 Replace C/O RHS Bucket 11856hrs on changed out due to leaking.

STATE OF CALIFORNIA DEPARTMENT OF CORRECTIONS AND REHABILITATION INVITATION FOR BID

Projected Business Results

MASSACHUSETTS BAY TRANSPORTATION AUTHORITY CONSTRUCTION CONTRACT CHANGE ORDER GUIDELINES FOR COSTS AND SUPPORTING DOCUMENTS

2015 GOLD & SILVER BOOTH MONITOR REPLACEMENT FORM

As a broker, we need to have the following information in our files

Self-Insured Coverage Document Auto Physical Damage

The Equipment Report. US Edition. January

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal

(BUILDING) Hoisting and Portable Engineers International Union of Operating Engineers - AFL-CIO. Locals 98,98A, 98B and 98R.

CITY OF SUNSET VALLEY 11. AGENDA DATE: May 15, 2018

CITY OF TAVARES E = PROPOSED BUDGET P = FISCAL YEAR RUNNING SUMMARY OF CITY ADMINISTRATOR'S BUDGET DELETIONS ITEMS LISTED WERE DELETED FROM

Mining Metals, Minerals, Ore, and Taconite 147

Safety Program 1. Is there a formal written Safety Program in effect? 2. Are Regular safety meetings conducted? How Often? 3. Is there a Safety Commit

BID IDENTIFICATION NO. 5

REQUEST FOR QUOTE # 15341

Budget Summary Property Value Summary Tax Rate Summary

POWER CONSTRUCTION COMPANY CCIP PROGRAM SAFETY REQUIREMENTS

BID PROPOSAL Mobilization for Non-Emergency Work Orders; 200 EA $ $ Mobilization for Emergency Work Orders; 2 EA $ $

BID TABULATION BID REQUEST NO

The Equipment Report. US Edition. July

Construction Accounting

Public Service Relocation and Employment Expenses Regulation

Alabama State Port Authority

THIS WARRANTY APPLIES ONLY TO 2015 AND LATER YEAR MODELS OF NEW K-TEC SCRAPERS ( K-TEC SCRAPER ).

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

NE WEST KINGSTON ROAD CULVERT REPLACEMENT

LOCAL AGENCY BILLING SUMMARY

AUTOMOBILE PHYSICAL DAMAGE COVERAGE

Permit Application This is NOT a Permit

AGREEMENT. between the LABOR RELATIONS DIVISION. of the MICHIGAN INFRASTRUCTURE AND TRANSPORTATION ASSOCIATION, ROAD AGREEMENT.

Power Construction Company CCIP Program Safety Requirements

City of Palmer Action Memorandum No Originator Information:

PORT OF ANACORTES CAP SANTE MARINA

APPENDICES APPENDICES

WATERTOWN MUNICIPAL UTILITIES GENERAL POLICIES. INDEX (Updated February 26, 2018)

CONTRACTORS EQUIPMENT RENTAL GENERAL LIABILITY APPLICATION

Fee Schedule (Approved Order #18-102)

MASTER AGREEMENT for DISTRIBUTION PIPELINE CONSTRUCTION IN CANADA. AGREEMENT made this first day of May, AD., 2016.

SALE LISTING of HAND TOOLS etc

Request for Proposal Skid Steer May 17, 2017

Fee Schedule for 2017

Typed Resource Definitions

Albemarle County Service Authority FY 2005 Budget

Sandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING

MANITEX INTERNATIONAL, INC.

City of Portsmouth Portsmouth, New Hampshire Public Works Department INVITATION TO BID

Part A: Hired Commercial Vehicle Program- Contractor Application Forms

(THE GOOD, THE BAD AND THE UGLY)

TENDER NO: BCL/RD/Valuer/P & M/ December 23, 2017

Adopted Budget Fixed Assets FY Department Total $ 28,000 $ 28,000 $ 28, Telecom Datasafes $ 5,000 $ 5,000 $ 5,000 $ 5,000

CSD Pool Auto Physical Damage Coverage Form

1 Exam Prep Business and Finance Practice Test 7

Total expenditures 17,465,000 18,301,000

CECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075

.z:> By: Dan Tadic, P.E. Acting Public Works Director

NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 CHANGES TO PROPOSAL OR PLANS

Transcription:

DISNEY Construction Extra Work Bill Summary JERROLD AVE BRIDGE REPLACEMENT CCO#: 8 PENINSULA CORRIDOR JOINT POWER BOARD CCO Description: Pile Relocation CONTRACT NO. 10-PCJPB-C-037 Billing Date 10/24/2011 THRU: 10/25/2011 DCI JPB DISNEY DATE PAY TAG PERFRMD BY CCO # CCO REPOT NO PERFMD DISNEY CCO JPB CCO DESCRIPTION TYPE AMOUNT BILLED BECHO 8 021BI N/A Pile Relocation DELETED Relocate pile work FA 0.00 BECHO 8 021BIa N/A Pile Relocation Relocate pile work FA 5,066.50 5/4/2011 BECHO 8 021BIb N/A Pile Relocation Relocate pile work FA 5,297.90 5/4/2011 BECHO 8 021BIc N/A Pile Relocation Relocate pile work FA 5,066.50 8/8/2011 BECHO 8 021BId N/A Pile Relocation Relocate pile work FA 5,140.85 5,140.85 8/8/2011 DISNEY 8 024F3 N/A Pile Relocation Surveying new pile locations FA 1,596.00 1,596.00 5/4/2011 DISNEY 8 029DC 02/02/11 Pile Relocation REVISED disney crew support during pi FA 0.00 0.00 5/4/2011 DISNEY 8 029DCa 02/02/11 Pile Relocation disney crew support during pile relocatio FA 1,317.89 1,317.89 5/4/2011 TOTAL Billing for: Pile Relocation 8,054.74 MM-007 JERROLD Extra Work Log.xlsx PRINT DATE: 10/25/2011 PAGE 1

DISNEY CONSTRUCTION, INC. DAILY EXTRA WORK REPORT 875 MAHLER ROAD, BURLINGAME, CA. 94010-1615 PH: (650) 259-9545 FAX: (650) 259-9673 REPORT NUMBER: 029DCb DATE OF REPORT: 5/19/11 WORK PERFORMED FOR: JPB JOB NAME: Jerrold Avenue Bridge Replacement DATE WORK PERFORMED: 2/2/11 JOB #: 007 DESCRIPTION OF WORK: Disney Crew during relocating the pile for Caltrain Work Classification OWNER CCO# DISNEY CCO# Concrete Construction - Bridge 8 LABOR RT* HRS OT* HRS DT HRS RT* RATE OT* RATE DT RATE RT TOTAL OT TOTAL MATERIAL INVOICE QTY UNIT COST TOTAL OE - MANTOR, CHUCK 2.0 2.0 67.40 89.40 103.14 $134.80 $178.80 LAB - FERREIRA, PEDRO N 2.0 2.0 48.32 64.46 80.59 $96.64 $128.91 *night time rates SUBTOTAL: SUBCONTRACTOR / RENTAL EQUIPMENT INVOICE TOTAL Springline 029DC-S $300.67 SUBTOTAL: $300.67 LABOR SUB-TOTAL (RT) $ 231.44 LABOR SURCHARGE (RT) 14% $ 32.40 LABOR SUB-TOTAL (OT) $ 307.71 SUBTOTAL: $231.44 $307.71 LABOR SURCHARGE (OT) 13% $ 40.00 OWNED EQUIPMENT CODE HOURS RATE TOTAL TOTAL COST OF LABOR $ 611.55 CHEVROLET 2500 HD 01001 4 HR $19.76 $79.04 LABOR MARKUP 20% $ 122.31 SKYTRAK REACH FKLIFT 05002 2 HR $48.51 $97.02 TOTAL LABOR $ 733.86 BOBCAT S220 09001 2 HR $28.63 $57.26 DISNEY EQUIPMENT SUB-TOTAL $ 233.32 EQUIPMENT MARKUP 15% $ 35.00 TOTAL EQUIPMENT $ 268.32 MATERIAL SUB-TOTAL $ - MARKUP ON MATERIAL 15% $ - TOTAL MATERIAL $ - SUBS & RENTED EQUIPMENT SUB-TOTAL $ 300.67 MARKUP ON SUBS & RENTED EQUIPMENT 5% $ 15.03 TOTAL SUBS & RENTED EQUIPMENT $ 315.70 SUBTOTAL: $233.32 INVOICE TOTAL $ 1,317.89

DISNEY CONSTRUCTION, INC. DAILY EXTRA WORK REPORT 875 MAHLER ROAD, BURLINGAME, CA. 94010-1615 PH: (650) 259-9545 FAX: (650) 259-9673 REPORT NUMBER: 021BId DATE OF REPORT: 4/28/11 WORK PERFORMED FOR: JPB JOB NAME: Jerrold Avenue Bridge Replacement DATE WORK PERFORMED: N/A JOB #: 007 DESCRIPTION OF WORK: Extra work by Becho from moving Pile 2 to new location Work Classification OWNER CCO# DISNEY CCO# Concrete Construction - Bridge 8 LABOR RT HRS OT HRS DT HRS RT RATE OT RATE DT RATE RT TOTAL OT TOTAL MATERIAL INVOICE QTY UNIT COST TOTAL SUBTOTAL: SUBCONTRACTOR / RENTAL EQUIPMENT INVOICE TOTAL Becho 10/24/11 $4,896.05 SUBTOTAL: $4,896.05 LABOR SUB-TOTAL (RT) $ - LABOR SURCHARGE (RT) 14% $ - LABOR SUB-TOTAL (OT) $ - SUBTOTAL: LABOR SURCHARGE (OT) 13% $ - OWNED EQUIPMENT CODE HOURS RATE TOTAL TOTAL COST OF LABOR $ - LABOR MARKUP 20% $ - TOTAL LABOR $ - DISNEY EQUIPMENT SUB-TOTAL $ - EQUIPMENT MARKUP 15% $ - TOTAL EQUIPMENT $ - MATERIAL SUB-TOTAL $ - MARKUP ON MATERIAL 15% $ - TOTAL MATERIAL $ - SUBS & RENTED EQUIPMENT SUB-TOTAL $ 4,896.05 MARKUP ON SUBS & RENTED EQUIPMENT 5% $ 244.80 TOTAL SUBS & RENTED EQUIPMENT $ 5,140.85 SUBTOTAL: INVOICE TOTAL $ 5,140.85

Shaft P2 Relocation Extra Work 02/04/2011 SUMMARY OF COSTS Description Amount Owned Equipment $ 3,438.21 Rented Equipment $ 122.41 Labor $ 1,335.43 Total $ 4,896.05

Shaft P2 Relocation Extra Work 02/04/2011 EQUIPMENT COSTS Owned Equipment: Description Qty Working Hours 2/4/11 Standby Hours Total WK Hrs Total SB Hrs Hourly Rate Delay Factor Standby Rate Liebherr 883 1 4 0 4 0 $ 444.43 0.25 $ 111.11 $ 1,777.72 Leffer 3m Oscillator w/ PP 1 4 0 4 0 $ 224.35 0.31 $ 69.55 $ 897.40 2.8m Reduction Inserts 1 4 0 4 0 $ 3.90 0.56 $ 2.18 $ 15.60 Sany 310 Excavator 1 0 4 0 4 $ 72.22 0.22 $ 15.89 $ 63.55 Leffer 2.5m Grab 1 0 4 0 4 $ 58.11 0.56 $ 32.54 $ 130.17 Leffer 2.5m Chisel 1 0 4 0 4 $ 8.31 0.53 $ 4.40 $ 17.62 Leffer 2.5m Casing Brush (sets) 1 0 4 0 4 $ 5.45 0.56 $ 3.05 $ 12.21 2800mm Casing (daily rate per 79 1 0 1 0 $ 0.32 0.56 $ 0.18 foot) $ 25.28 Service Trucks 2 0 4 0 4 $ 24.47 0.17 $ 4.16 $ 33.28 Welder 1 0 4 0 4 $ 8.38 0.22 $ 1.84 $ 7.37 100' tremie pipe (daily rate) 1 0 1 0 1 $ 16.46 0.58 $ 9.55 $ 9.55 Sub Total $ 2,989.75 Mark-up (15%) $ 448.46 Total $ 3,438.21 Rental Equipment: 2/4/11 Description Qty Working Standby Total WK Total SB Delay Standby Hourly Rate Hours Hours Hrs Hrs Factor Rate Total 4" Diesel Pump 1 0 4 0 4 $ 21.25 0.37 $ 7.86 $ 31.45 175 Air Compressor 1 0 4 0 4 $ 14.91 0.15 $ 2.24 $ 8.95 60' Boom Lift 1 0 4 0 4 $ 42.13 0.23 $ 9.69 $ 38.76 Submersible 4" 1 0 4 0 4 $ 21.25 0.37 $ 7.86 $ 31.45 Generator 1 0 4 0 4 $ 10.67 0.14 $ 1.49 $ 5.98 Sub Total $ 116.58 Mark-up (5%) $ 5.83 Total $ 122.41 Total

Shaft P2 Relocation Extra Work 02/04/2011 LABOR COSTS Labor: Name/ Classification ST OT Hours Actual Wages Straight Time ST Labor Surcharge (16%) Overtime OT Labor Surcharge (13%) Subsistence and Travel Allowance (per RT hr) Chris Hillig-Operator 4 0 $ 66.42 $ 10.63 $ 99.63 $ 12.95 $ - $ 308.19 Ken Bourgeois-Operator 4 0 $ 59.58 $ 9.53 $ 89.37 $ 11.62 $ - $ 276.45 Frank Prosser- Operator 4 0 $ 61.99 $ 9.92 $ 92.99 $ 12.09 $ - $ 287.63 Kyle Robinson-Operator 4 0 $ 51.85 $ 8.30 $ 77.78 $ 10.11 $ - $ 240.58 Total Sub Total: $ 1,112.86 Markup (20%) $ 222.57 Total $ 1,335.43

CALTRANS EQUIPMENT RATES EQUIPMENT CLASS MAKE CODE CLASS DESCRIPTION MAKE DESCRIPTION CODE DESCRIPTION RW DELAY OVER- TIME RENTAL RATE REMARKS PUBLICATION Liebherr 883 S&CCL LIEB 883HD SHOVELS & CRANES, CRAWLER LIEBHERR HS 883 HD 0.25 0.78 444.43 Misc Leffer 3m Oscillator w/ PP HAMMR LFFR 3050T HAMMER, CASING OSCILLATOR LEFFER VRM 3050T 0.31 0.72 224.35 Misc 2.8m Reduction Inserts AUGAC CHPN 2280 AUGER, ACCESSORIES CHAMPION 2200/2080 MM 0.56 0.48 3.9 Misc EQUIPMENT CASING ADPTR Sany 310 Excavator HCECL CAT 0350 HYRDAULIC CRANES AND EXCAVATORS, CRAWLER MOUNTED CATERPILLAR 330L 0.22 0.8 125.65 LS & EER Leffer 2.5m Grab AUGAC LFFR G3-250 AUGERS ACCESSORIES, SPHERICAL GRAB BUCKET Leffer 2.5m Chisel DRLAC CHPN 24K124 DRILLING ACCESSORIES, DROP CHISEL, CRANE MTD. LEFFER LKG3-250 0.56 0.47 58.11 RATE PLUS CARRIER. Misc CHAMPION EQUIPMENT Leffer 2.5m Casing Brush AUGAC COBL 96 AUGER, ACCESSORIES CHAMPION EQUIPMENT 124" -- 24,000 LBS 0.53 0.5 8.31 RATE PLUS CONSUMABLES PER INVOICE OR WEAR ALLOWANCE. 96 INCH CORE BARREL Misc 0.56 0.48 5.45 Misc 2800mm Casing NONOP Misc 180 CASING, 3000MM DIA, PER FOOT 0.56 1 0.32 DAILY RATE LS & EER Service Trucks TRUCK T&TT 12-20 TRUCK, TRUCK TRAILERS TRUCKS 12000-20000LSB 0.17 0.85 24.47 LS & EER Air hose 50Ft x 1"dia AIRCP HOSE 0-2.5 AIR COMPRESSOR, HOSE N/A 0"-2.5" DIA X 50 LF 0.15 0.86 0.09 RATE PER HOUR. Misc AIR HOSE RATE PER 50 LF. Welder WELD AWM 500 WELDING EQUIPMENT ARC WELDING MACHINES OVER 500 AMPS 0.22 0.81 8.38 LS & EER 100' tremie pipe NONOP MISC ATP1 NON-OPERATED EQUIPMENT (DAILY RATE) AGRA FOUNDATIONS TREMIE PIPE -280' (AGRA) 0.58 1 16.46 DAILY RATE Misc Low Bed Trailer 3-Axle 4 Tires TRAIL LB-A 300 TRAILERS, EQUIPMENT, LOW BED LOW BED B 4 TIRES PER AXLE 0.43 0.62 17.25 LS & EER 4" Diesel Pump PUMPWA APMP 050-125 PUMPS, WATER HOSE A PUMP 50K-125K G/HR 0.37 0.66 21.25 LS & EER 175 Air Compressor AIRCP PORT 016-025 AIR COMPLRESSOR PORTABLE 160-250 CFM 0.15 0.86 14.91 INCLUDES 50FT HOSE LS & EER 60' Boom Lift HYLFT BOOM 50-74 HYDRAULIC PERSONNEL LIFTS AND AERIAL WORK PLATFORMS BOOM TYPE 50-75FT BOOM 0.23 0.79 42.13 LS & EER Submersible 4" PUMPWA APMP 050-125 PUMPS, WATER HOSE A PUMP 50K-125K G/HR 0.37 0.66 21.25 LS & EER Generator ELGEN GEN 025-050 ELECTRIC GENERATORS AND LIGHGENERATOR 25-50KW 0.14 0.87 10.67 LS & EER Notes 1. LS & EER = Caltran's Labor Surchage and Equipment Rental Rate book, 4/1/10-3/31/11 2. Misc = Caltran's Miscellaneous Equipment guide 3. Air hose not charged as replacement value less than $1,000