The World Bank Integrated Disaster Risk Management and Resilience Program (P144539)

Similar documents
Public Disclosure Copy

Public Disclosure Copy

The World Bank Building a Modern Fiscal System Technical Assistance (P154694)

The World Bank Indonesia Power Transmission Development Project (P117323)

MicroSmall&Medium Enterprise and Large Enterprise Supply Chain Finance (P157691)

The World Bank Indonesia Infrastructure Guarantee Fund Project (P118916)

The World Bank Pakistan Punjab Jobs and Competitiveness Program for Results (P155963)

The World Bank MA-National Initiative for Human Development 2 (P116201)

Public Disclosure Copy

Innovative Access to Finance (P147183)

The World Bank Indonesia Power Transmission Development Project (P117323)

Public Disclosure Copy. Implementation Status & Results Report CAPE VERDE - Recovery and Reform of the Electricity Sector Project (P115464)

Public Disclosure Copy

Public Disclosure Copy

The World Bank Municipal Services Improvement (P096481)

Public Disclosure Copy

Jordan Ozone Depleting Substances HCFC Phase-Out Project (ODS3) (P127702)

The World Bank. Ghana: Energy Development and Access Project (P074191) Key Dates. Project Development Objectives. Components

Public Disclosure Copy

Public Disclosure Copy

Key Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions

Public Disclosure Copy. Implementation Status & Results Report QUALISUS-REDE Brazil Health Network Formation and Quality Improvement Project (P088716)

Public Disclosure Copy

The World Bank MA-National Initiative for Human Development 2 (P116201)

The World Bank Albania-Enhancing Quality of Financial Reporting (EQ-FINREP) (P152567)

Public Disclosure Copy

TR Third Access to Finance for SMEs (SME III) (P130864)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

The World Bank Pacific Islands Regional Oceanscape Program - Tuvalu (P151780)

Public Disclosure Copy

The World Bank Palestinian Recovery & Development Plan MDTF (P110690)

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Revenue Mobilization Program for Results: VAT Improvement Program (VIP) (P129770)

Bangladesh Insurance Sector Development Project (P156823)

The World Bank IN Swachh Bharat Mission Support Operation (P153251)

Public Disclosure Copy. Implementation Status & Results Report Costa Rica Catastrophe Deferred Draw Down Option (CAT DDO) (P111926)

Public Disclosure Copy. Implementation Status & Results Report Revenue Mobilization Program for Results: VAT Improvement Program (VIP) (P129770)

Public Disclosure Copy

Public Disclosure Copy. Name Previous Rating Current Rating

Public Disclosure Copy

West Bank and Gaza: Finance for Jobs (P151089)

State Owned Financial Institutions Reform Project (P156837)

The World Bank Jamaica Strategic Public Sector Transformation (P146688)

The World Bank. Ghana: Energy Development and Access Project (P074191) Key Dates. Project Development Objectives. Components

The World Bank Bangladesh Ghorashal Unit 4 Repowering Project (P128012)

West Bengal PRI (P105990)

Public Disclosure Copy. Implementation Status & Results Report Savings and Credit Sector Consolidation and Financial Inclusion Project (P123367)

The World Bank Nigeria - Public/Private Partnership Program (P115386)

Public Disclosure Copy. Implementation Status & Results Report Dominican Republic DRM Development Policy Loan with a Cat DDO (P159351)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Key Dates. Global Development Objectives. Components. Overall Ratings

Public Disclosure Copy. Implementation Status & Results Report Costa Rica Catastrophe Deferred Draw Down Option (CAT DDO) (P111926)

The World Bank Mozambique Public Financial Management for Results Program (P124615)

The World Bank Urban Transport Corridor Development in Surabaya - RETF (P147893)

Public Disclosure Copy. Implementation Status & Results Report Costa Rica Catastrophe Deferred Draw Down Option (CAT DDO) (P111926)

Public Disclosure Copy

West Bengal Institutional Strengthening of Gram Panchayats Program II (P159427)

IRAQ: SECOND EXPENDITURE RATIONALIZATION, ENERGY EFFICIENCY AND STATE-OWNED ENTERPRISE GOVERNANCE PROGRAMMATIC DPF (P161

Public Disclosure Copy. Implementation Status & Results Report Uganda Reproductive, Maternal and Child Health Services Improvement Project (P155186)

Public Disclosure Copy

The World Bank Kenya Infrastructure Finance/PPP project (P121019)

Public Disclosure Copy

Public Disclosure Copy

The World Bank Nigeria - Public/Private Partnership Program (P115386)

Public Disclosure Copy. Implementation Status & Results Report Gansu Cultural and Natural Heritage Protection and Development Project (P091949)

Public Disclosure Copy. Implementation Status & Results Report Revenue Mobilization Program for Results: VAT Improvement Program (VIP) (P129770)

Debt Management Strengthening Programme at Ministry of Finance, Government of Pakistan (P161451)

Key Dates. Project Development Objectives. Components. Overall Ratings

Public Disclosure Copy

The World Bank Transport Connectivity and Asset Management Project (P132833)

PNG - Small and Medium Enterprise Access to Finance Project (P120707)

Myanmar Southeast Asia Disaster Risk Management Project (P160931)

Road Sector Development Project (P149322)

Public Disclosure Copy. Name Previous Rating Current Rating

Key Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions

Public Disclosure Copy. Implementation Status & Results Report Federally Administered Tribal Areas (FATA) Governance and Policy Program (P156412)

Public Disclosure Copy

The World Bank Egypt National Railways Restructuring Project (P101103)

Nigeria - Program to Support Saving One Million Lives (P146583)

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Disaster Risk Management Development Policy Loan with CAT DDO (P148861)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank Bangladesh Ghorashal Unit 4 Repowering Project (P128012)

Public Disclosure Copy

Public Disclosure Copy

The World Bank Kabul Urban Transport Efficiency Improvement Project (P131864)

The World Bank Egypt National Railways Restructuring Project (P101103)

Public Disclosure Copy. Implementation Status & Results Report CO Rio Bogota Environmental Recuperation and Flood Control Project (P111479)

Saint Lucia Health System Strengthening Project (P166783)

The World Bank Water Resources and Irrigation Sector Management Program 2 (P114348)

Results-Based Rural Water Supply and Sanitation Under the National Target Program (P127435)

The World Bank Kenya Cash Transfer for Orphans and Vulnerable Children (P111545)

Public Disclosure Copy

The World Bank MN-Mining Infrastructure Investment Supp (P118109) (P118109)

The World Bank Ghana - PPP Project (P125595)

Zambia Kafue Town - Muzuma - Victoria Falls Regional Transmission Line Reinforcement Project

Second Science & Technology Project (P127308)

The World Bank Pastoral Community Development Project III (P130276)

Transcription:

Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Morocco Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Program-for-Results FY 2016 Seq No: 3 ARCHIVED on 08-Aug-2017 ISR28528 Implementing Agencies: Ministry of Economy and Finance, Ministry of Interior Public Disclosure Authorized Program Development Objectives Program Development Objective (from Program-for-Results Appraisal Document) The program development objective (PDO) is to improve the institutional framework to finance disaster risk reduction activities andstrengthen financial resilience to natural disasters for targeted populations in the Program Area. Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Substantial Substantial Implementation Status and Key Decisions The implementation of the operation is advancing well. The PforR was approved on April 20, 2016, became effective on November 16, 2016 and the Borrower subsequently withdrew an advance of US$ 50 million (25% of the total loan amount). In addition, the DLR verification process for DLRs 1.1 and 7.1 has been successfully completed during Q2 and Q3 FY17 with a total of US$ 22.5 million of disbursement linked to DLRs achieved. A total of two full implementation support missions and three technical missions have taken place during FY17. In all three sub-programs of the PforR, significant progress is being made, including in terms of advancing instituting reforms to improve the effectiveness of Morocco s risk management architecture, reforming Morocco s Fonds de Lutte contre les Effets des Catastrophes Naturelles (FLCN), and implementing a comprehensive disaster risk insurance and finance program. Public Disclosure Authorized Public Disclosure Authorized Page 1 of 10

Page 2 of 10

Page 3 of 10

Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P144539 IBRD-86090 Effective USD 200.00 200.00 0.00 65.00 135.00 33% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P144539 IBRD-86090 Effective 20-Apr-2016 26-Jul-2016 16-Nov-2016 31-Dec-2021 -- Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance -- Moderate Moderate Macroeconomic -- Low Low Sector Strategies and Policies -- Substantial Substantial Technical Design of Project or Program -- Substantial Substantial Institutional Capacity for Implementation and Sustainability -- Substantial Substantial Fiduciary -- Substantial Substantial Environment and Social -- Substantial Substantial Stakeholders -- Moderate Moderate Other -- Moderate Moderate Overall -- Substantial Substantial Disbursement Linked Indicators (DLI) Page 4 of 10

The FCLN strategic orientation and governance structure are redesigned with a focus on disaster risk reduction (Text) Value The FLCN focuses mainly on post disaster event risk response outside the context of a larger DRM strategy -- Preparation of: (i) draft provisions to be included in the Borrower s 2017 budget law, regarding the establishment of the Steering Committee, and the inclusion of local governments (collectivités territoriales) among the beneficiaries of FLCN financing; and (ii) draft circulars (Circulaires) to be issued by the MoI regarding the establishment of the National Selection Commission and the Secretariat. Date 20-Apr-2016 -- 20-Jun-2017 Cumulative amount of FLCN funds allocated to eligible subprojects (Number) Value 0.00 -- -- Comments Value in MAD Minimum percentage of FLCN funds allocated to eligible structural subprojects (Percentage) Value 0.00 -- -- Minimum percentage of total funding of eligible subprojects provided by the entities responsible for implementation and their partners (Percentage) Value 0.00 -- -- Page 5 of 10

Cumulative value of total funding of completed eligible subprojects achieving disaster risk reduction targets (Number) Value 0.00 -- -- Comments Value in MAD Minimum percentage of entities responsible for the implementation of eligible subprojects having received technical assistance and/or training (Percentage) Value 0.00 -- -- Adoption of the catastrophic risk insurance legislative and regulatory framework and minimum number of people in the Program Area insured for bodily injuries against catastrophic events (Text) Value -- -- The draft catastrophic risk insurance law is transmitted by the General Secretary of the Government (Secrétariat Général du Gouvernement) to the relevant Ministries, and is adopted by the Government Cabinet (Conseil du Gouvernement) Date 20-Apr-2016 -- 20-Jun-2017 Establishment and operationalization of the FSEC to protect the uninsured (Text) Value - -- -- Page 6 of 10

Results Results Area Intermediate Results Area Promoting Institutional Reform and Capacity Building Scaling-Up Disaster Risk Reduction Activities Improving Disaster Risk Financing and Insurance Project Development Objective Indicators PHINDPDOTBL The FLCN strategic orientation and governance structure are redesigned with a focus on disaster risk reduction (Text, Custom) Value The FLCN focuses mainly on post disaster event risk response outside the context of a larger DRM strategy -- Preparation of: (i) draft provisions to be included in the Borrower s 2017 budget law, regarding the establishment of the Steering Committee, and the inclusion of local governments (collectivités territoriales) among the beneficiaries of FLCN financing; and (ii) draft circulars (Circulaires) to be issued by the MoI regarding the establishment of the National Selection Commission and the Secretariat. The Minister of Interior has decided on the annual allocation from the FLCN for the financing of Eligible Subprojects The Steering committee, the National Selection Commission, the Secretariat, and the FLCN website are maintained. A national integrated natural DRM strategy is adopted by the Steering Committee Date 20-Apr-2016 -- 20-Jun-2017 31-Dec-2020 Page 7 of 10

PHINDIRITBL PHINDPDOTBL Cumulative number of beneficiaries from eligible risk reduction subprojects (% women) (Number, Custom) Value 0.00 -- -- 40,000.00 PHINDPDOTBL Minimum number of people in the Program Area insured for bodily injury against catastrophic events (Number, Custom) Value 0.00 -- -- 5,850,000.00 PHINDPDOTBL Establishment and operationalization of the FSEC to protect the uninsured (Text, Custom) Value - -- -- FSEC received initial financial contributions as per the provisions of the catastrophic risk insurance law 31-Dec-2019 Overall Comments Intermediate Results Indicators Minimum percentage of entities responsible for the implementation of eligible subprojects having received technical assistance and/or training (Percentage, Custom) Value 0.00 -- -- 50.00 Page 8 of 10

PHINDIRITBL PHINDIRITBL PHINDIRITBL PHINDIRITBL Improved risk assessment models developed and operational (Text, Custom) Value No -- -- Probabilistic cat risk models for i) evaluation and assessment (MoI), and ii) catastrophe risk insurance program as per the draft law (MEF) are operational 31-Dec-2019 Cumulative amount of FLCN funds allocated to eligible subprojects (Number, Custom) Value 0.00 -- -- 850,000,000.00 Minimum percentage of FLCN funds allocated to eligible non-structural subprojects (Percentage, Custom) Value 0.00 -- -- 10.00 Minimum percentage of total funding of eligible subprojects provided by the entities responsible for implementation and partners (Percentage, Custom) Value 0.00 -- -- 50.00 Page 9 of 10

PHINDIRITBL PHINDIRITBL Cumulative value of total funding of completed eligible subprojects achieving disaster risk reduction targets (Number, Custom) Value 0.00 -- -- 600,000,000.00 Adoption of the catastrophic risk insurance legislative and regulatory framework (Text, Custom) Value - -- The draft catastrophic risk insurance law is transmitted by the General Secretary of the Government (Secrétariat Général du Gouvernement) to the relevant Ministries, and is adopted by the Government Cabinet (Conseil du Gouvernement) The implementation legal documents referred to in Article 71 of the draft catastrophic risk insurance law and providing for the effectiveness of the insurance scheme, are adopted by the Government Date 20-Apr-2016 -- 20-Jun-2017 31-Dec-2018 Overall Comments Page 10 of 10