CITY OF MOUNTLAKE TERRACE RESOLUTION NO.

Similar documents
RESOLUTION NO A RESOLUTION OF THE CITY OF NEWPORT REVOKING ALL PRIOR FEE RESOLUTIONS AND ADOPTING A NEW FEE SCHEDULE.

TOWN OF WOODWAY FEE SCHEDULE PAGE 1 EFFECTIVE APRIL 18, 2017

Douglas County Transportation & Land Services Consolidated Permit Cost Recovery Schedule Res. TLS Effective January 26, 2009

Building & Planning. Community Long. Range Planning

Fee Schedule for 2017

Schedule of Fees & Escrow Charges

CITY OF NORMANDY PARK ADOPTED FEE SCHEDULE

UNIFIED DEVELOPMENT ORDINANCE TABLE OF CONTENTS. Chapter 1 General Provisions Article 1.1 Introduction

ORDINANCE # NOW THEREFORE, The City Council of the City of Ferndale do ordain as follows:

Chapter CONCURRENCY

TOWN OF LANTANA ADOPTED FEES AND CHARGES SCHEDULE (R ) EFFECTIVE JULY 10, 2017 UNLESS OTHERWISE SPECIFIED

FEE SCHEDULES. Class "B" Fermented Malt $ per year

INSPECTION SERVICES DIVISION FEE SCHEDULE

PORT OF SEATTLE 2017 STATUTORY BUDGET

City of New Smyrna Beach Permit Fee Schedule

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36TH STREET MERCER ISLAND, WA PHONE:

ORDINANCE NO WHEREAS, the City anticipates revising its SDCs in light of growth trends and infrastructure needs within the next two years.

PLANNING DEPARTMENT. Town Goals. Goal: Ensure that infrastructure exists for current and future needs identified in the comprehensive plan.

ORDINANCE NO Section 1. The City Council finds the above recitals are true and correct and incorporated herein by this reference.

EXHIBIT A CITY OF OLDSMAR PERMIT, INSPECTION AND PLANS EXAMINATION FEE SCHEDULE

The Board of Supervisors of the County of Riverside ordains as follows:

AMENDMENT TO SUBDIVISION AGREEMENT

RESOLUTION NO A RESOLUTION ESTABLISHING PLAN REVIEW, PERMIT, AND INSPECTION FEES; RESCINDING RESOLUTION NO

Section 575 Public Utilities Department Fees

CITY OF HEALDSBURG RESOLUTION NO

Residential Permit Fee Schedule

RESOLUTION # THE MUNICIPALITY OF EAST BRADFORD TOWNSHIP CHESTER COUNTY, PENNSYLVANIA

ORDINANCE NO. CID-3193

City of Monte Sereno

PLANNING DEPARTMENT ADMINISTRATION

IC Chapter 14. Redevelopment of Areas Needing Redevelopment Generally; Redevelopment Commissions

Gordon County Permit Fees Effective August 1, 2012

North Pecos Water & Sanitation District. Rates, Charges, Fees and Penalties Effective January 1, 2015

PUBLIC NOTICE OF APPLICATION

Village of Batavia Proposed Resolution Establishing Community Reinvestment Area

2018 RACINE COUNTY DEVELOPMENT SERVICES DEPARTMENT FEE SCHEDULE

Village Plan Commission Ordinances

RESOLUTION NUMBER 3415

TABLE OF CONTENTS CHAPTER 80: AREA ZONING CODE

Schedule of Rates and Fees. Fiscal Year 2017/2018

SECTION 110A FEE TABLES

Section License/Fee Type Fee Amount

4. New $ 100 Minimum Plumbing, HVAC, Alarms, Sprinklers, and any permanent systems 5. Replacement $ 50 Minimum

CAPITAL RECOVERY POLICY TABLE OF CONTENTS

SPECIAL EVENT APPLICATION

WHEREAS, notice of the public hearing was duly given as required by Section of the Act or has been duly waived by the property owner; and

CITY OF SOLVANG FEES, CHARGES, AND FINES

SILVER LAKE WATER AND SEWER DISTRICT SNOHOMISH COUNTY, WASHINGTON RESOLUTION NO. 677

Cedar River Water and Sewer District FEE AND CHARGE SCHEDULE AMENDED January 21, 2014

NOW THEREFORE, BE IT ORDAINED BY THE BOARD OF COMMISSIONERS OF THE TOWN OF PINE LEVEL, THAT:

CEQA Checklist for School Districts

(3/01) NW T.O. INDIANA AMERICAN WATER COMPANY, INC.

ARTICLE 6. EXCISE TAX ON PLATTING AND BUILDING

WHEREAS, a fee study is required to recover cost for new services or changes in service; and

9 th Revision of Sheet No. 85 Canceling 8 th Revision WN U-60 of Sheet No. 85

ORDINANCE NO

RULE H NEW SERVICE ATTACHMENTS AND DISTRIBUTION LINE INSTALLATIONS OR ALTERATIONS

RESOLUTIONS OF THE CITY OF HELENA, MONTANA

GENERAL FUND REVENUES BY SOURCE

CITY OF MISSION VIEJO PUBLIC WORKS FEE SCHEDULE

CHAPTER 5: FEES, FINES & FRANCHISE GRANTS

CITY OF SONOMA 2017 FEE SCHEDULE INDEX EFFECTIVE FEBRUARY 13, 2017

SECTION 110A FEE TABLES

The Planning & Zoning Commission did meet and approved this request on August 21, 2018.

2013 CITY COUNCIL MEETING SCHEDULE

KITTITAS RECLAMATION DISTRICT RESOLUTION NO

NOTICE IS HEREBY GIVEN

City of Hanover 2018 Fee Schedule

CITY OF MISSION VIEJO

THE PEOPLE OF THE CITY OF LOS ANGELES DO ORDAIN AS FOLLOWS:

Town of Windermere. Fee Directory

BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA

Meeting Date: July 10, 2017 Agenda Item No:

CHAPTER ONE. ORGANIZATION, FUNCTIONS AND GENERAL PROVISIONS. Subchapter 1.10: Master Fee Schedule

PUBLIC NOTICE OF APPLICATION

ORDINANCE NO NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF BONNEY LAKE, WASHINGTON DO ORDAIN AS FOLLOWS,

Agenda Item C.1 PUBLIC HEARING Meeting Date: April 21, 2015

CITY OF MILAN OFFICAL FEE SCHEDULE

OFFICE OF THE HEARING EXAMINER FOR THURSTON COUNTY

PUBLIC NOTICE OF APPLICATION

WISCONSIN PUBLIC SERVICE CORPORATION. C4. Standard Rules & Regulations Construction Policy RIIIM

Honorable Mayor and Members of the City Council. Elizabeth Corpuz, Director of Planning and Building Services Jason P. Clarke, Senior Planner

Borough of Phoenixville Master Schedule of Fees Effective January 1, 2015

TOWN OF PERINTON FEE SCHEDULE 2018 DEPARTMENT OF PUBLIC WORKS PERMIT & INSPECTION FEES. $60 per inspection / $150 per re-inspection

RATE & FEE SCHEDULE AMENDED July 1, 2018

Title 5 Code Amendments: Short-Term Rental (STR) Operating License. Adopted through Ordinance 2028 on November 29, 2016

VILLAGE OF TOLONO CHAMPAIGN COUNTY, ILLINOIS ORDINANCE NO TAX LEVY ORDINANCE

City of Keizer Fees and Charges for Services As of July 2017

ORDINANCE NO

TOWN OF JOHNSTOWN, COLORADO ORDINANCE NO

TOWN OF BETHLEHEM PLANNING BOARD FEE SCHEDULE SP - SITE PLANS

CITY OF LE SUEUR REQUEST FOR COUNCIL ACTION

GENERAL ADMINISTRATION AND CORPORATE SERVICES (Administration/Corporate/Finance Departments)

TITLE 19 ELECTRICITY AND GAS CHAPTER 1 GAS 1

CITY OF CHEYENNE CITY COUNCIL AGENDA ITEM SHEET

ORDINANCE NO

Session of HOUSE BILL No By Committee on Judiciary 2-7

BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY

Heather Hafer, Senior Management Analyst Kate Whan, Public Works Administrative Manager SAN PABLO SUBDIVISION LANDSCAPE & LIGHTING DISTRICT A-03

BUILDING PERMIT RESIDENTIAL BASEMENT FINISH

Transcription:

CITY OF MOUNTLAKE TERRACE RESOLUTION NO. A RESOLUTION OF THE CITY OF MOUNTLAKE TERRACE ESTABLISHING FEES AND DEPOSITS APPLICABLE TO CIVIL ENGINEERING CONSTRUCTION APPLICATIONS AND PERMITS, AND ESTABLISHING FEES APPLICABLE TO LAND USE AND DEVELOPMENT APPLICATIONS, AND REPEALING RESOLUTION NO. 715 WHEREAS, the City has determined to set forth a schedule of fees to cover the costs of civil engineering construction permits and land use s; and and WHEREAS, Chapter 3.150 MTMC authorizes fee schedules to be adopted by resolution; WHEREAS, pursuant to MTMC 3.150.090, changes to the fee schedule will be considered upon completion of a cost of service study every three years, and annual adjustments will be made to reflect the Seattle Area Consumer Price Index (CPI); and WHEREAS, the City studied the cost of development services and the City Council last approved new fee schedules effective 2013; and WHEREAS, in 2015, the City studied the cost of development services and the City Council considered new fee schedules at a work session on December 3, 2015 and a public meeting on December 7, 2015; and NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOUNTLAKE TERRACE, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Civil Engineering Construction Permit and Deposit Schedule. A Civil Engineering Construction Fee and Deposit Schedule is approved, adopted and established as herein set forth. Civil Engineering Construction Permits and Deposits Engineering Construction Permits The permit fee includes plan check and inspection fees. A base fee is the minimum amount due at time of. Hourly rates apply to plan check and inspections. Final fees paid are the greater of the base fee or actual number of hours required. Deposits are intended to cover hours needed in excess of those included in the nonrefundable base fee. Additional deposits may be required and must be submitted upon request by the City based on the City s estimate of the number of hours anticipated to finalize the permit.

Resolution No. Establishing 2016 Fees Page 2 of 7 Construction Valuation Application Fee* Deposit less than $25,000 12.7% of construction value; 15 hours 1-hour minimum, 10-hours maximum $25,000-49,999.99 20-hours minimum 20 hours $50,000-79,999.99 40-hours minimum 40 hours $80,000 or more Base fee per City Engineer ** Same as base fee *Application fee consists of a filing fee, plan check and permit (construction inspection) fee. The fee is non-refundable, subject to the refund provisions. The plan check and permit fee are each considered of the fee including filing fee. Hours are tracked and billed for based on actual hours spent or as set forth in city code regulating civil permit plan check and inspections, Chapter 13.05 MTMC, whichever applies (see Other Permit Fees). ** City Engineer is authorized to make a determination on the estimated number of hours for plan review and inspection to establish initial permit fee and deposit to be paid. Grading Permit Cubic Yards Fee* 51 to 100 cubic yards (40 m 3 to 76.5 m 3 $154 ) Up to 1,000 cubic yards $154 for the first 100 cubic yards (76.5 m³) + $26 for each (764.6 m 3 ) additional 100 cubic yards (76.5 m³) or fraction thereof Up to 10,000 cubic yards $388 for the first 1,000 cubic yards (764.6 m 3 ) + $52 for each (7645.5 m 3 ) additional 1,000 cubic yards (764.6 m³) or fraction thereof Up to 100,000 cubic yards $856 for the first 10,000 cubic yards (7645.5 m 3 ) + $156 for each ( 76,455 m 3 ) additional 10,000 cubic yards (7645.5 m 3 ) or fraction thereof *The fee for a grading permit authorizing additional work to a valid permit shall be the difference between the original permit fee and the amended fee. Other Permit Fees Permit type Driveway, Residential Erosion control (TESC) Hydrant use Landscape and Irrigation plans Right-of-way use Permit Type A Type B Type C Fees (Hourly rate applies, unless otherwise noted) 12.7% of value (minimum 1-hour; maximum 2-hours) 12.7% of value 1-hour + $200 + $2,085 deposit. Actual water usage billed 1-hour minimum; deposit amount determined at time of $70 (dumpster 1-hour minimum; and based on cost estimate. 4-hours minimum. When related to work under a civil permit, additional staff time will be added to that permit. Other Type C permits to be billed hourly after 4 hours. Does not include lease agreements or other fees.

Resolution No. Establishing 2016 Fees Page 3 of 7 Sanitary sewer (side sewer) New Repair Water meter installation New Repairs (if damaged) Replace meter 1-hour + see Utility Connection Fee Schedule 1-hour 1-hour + $154 installation fee + capital improvement fee (see Utility Connection Fee Schedule) 2-hours 1-hour + $154 installation fee + actual cost of meter Performance Guarantees Type Erosion control Street invasion Deposit (Refundable when not used) $1,000 for each acre of development site area or fraction thereof $1,500 for each invasion of improved public right-of-way Public and Privately Owned Utilities Type of Utility Service Overhead services Individual Distribution line (with or without services) Underground services Individual, disturbing an improved portion of the right-of-way Individual, not disturbing an improved portion of the right-of-way Distribution line (with or without services) Fees 1-hour 1-hour per installation, or 2.2% of value of construction, whichever is greater $358 per installation (street invasion deposit not applicable to companies with city franchise) 2-hours per installation 2-hours per installation including extensions, repairs or modifications, or 4.4% of value of construction, whichever is greater Other Civil Construction Permit Services and Fees Additional plan review required by changes, additions, revision to plans and supporting documents (for approved or issued permits)...hourly, 2-hour minimum Expedited Review request (fees are in addition to normal review and permit fees): In-house...Actual time + 4 hours Consultant.. 4 hours, plus City s actual cost for outside consultant Expired permit (in review) new filing and plan check fees (no permit fee applies) Expired approved or issued permit..new filing fee and of permit fee (no plan check fee applies) Inspections - for which no fee is specifically indicated 2 hours, minimum Inspection - outside of normal business hours (8 AM 4 PM).. Hourly x 2 (2 hours, minimum) Investigation Fees equal to permit fee Revision to approved plans Hourly, 2 hours minimum Re-inspection fees 2 hours, minimum

Resolution No. Establishing 2016 Fees Page 4 of 7 Time Extensions for unexpired s, approved or issued permits 4-hours or of the fee, whichever is less Work without a permit investigation fee + permit fee Section 2. Land Use and Development Application Fee and Deposit Schedule. A Land Use and Development Fee and Deposit Schedule is approved, adopted and established as herein set forth. Land Use and Development Application Fees and Deposits All fees are minimums, based on the hourly rate in effect at the time of service, unless a fixed fee is stated. Trust deposits, when applicable, are in addition to the base fee and payable at time of. Additional deposits may be required and must be submitted upon request by the City based on an estimated number of hours anticipated to complete processing of the. Land Use and Development Type Deposit Application and Processing Fee (as a % of (Minimum fee, billed actual hours at hourly rate, unless otherwise stated) fee) Accessory dwelling unit $520 Annexation petition $1,410 Appeal of final decision to Hearing 4 hours, $1,000 Examiner plus actual cost for Hearing Examiner Appeal of code violation to Hearing 2 hours $1,000 Examiner Comprehensive Plan amendment: Text or Map (excluding SEPA review) 60 hours Conditional Use Accessory Conditional Use - Primary Environmental Review (SEPA): Critical area checklist (standard) Minor (checklist, DNS only) Major (MDNS, EIS or Critical Area review) Planned Action ordinance confirmation: With concurrent site plan Without concurrent site plan Reasonable use exception SEPA appeal Filing fee (for documents to be recorded with Snohomish County Auditor Office) Home occupation Administrative Conditional Use 60 hours, 1 hour 15 hours Included in site plan See appeal 1 hour, plus actual cost of recording $105 4 hours, Hourly rate $141

Resolution No. Establishing 2016 Fees Page 5 of 7 Land Use and Development Type Lot Line or Boundary Line adjustment or consolidation Level 1: lot consolidation by same owner in single family residential district, no site development Level 2: all other Mailing, public notice Planned unit development (PUD) Preliminary Final (includes Rezone) Pre- conference Shoreline Substantial Development Permit Major Minor Signs Permanent, on-site (private property): wall, freestanding or monument sign Permanent, off-premise directional sign On private property In public right-of-way Application and Processing Fee (Minimum fee, billed actual hours at hourly rate, unless otherwise stated) 6 hours 15 hours Actual cost 60 hours 30 hours 4 hours (half applied to actual ) 30 hours Building fee schedule applies 4-hours, plus any additional cost to City to purchase and install Deposit (as a % of fee) Temporary signs (grand opening, new $30 each per event, $60 maximum business, or special event) Per Resolution No. 613 Banners over right-of-way Site Development Plan Amendment, Major Same as for new Amendment, Minor 30 hours Larger Scale, Administrative 60 hours Larger Scale, Hearing examiner 60 hours, plus cost of hearing examiner Smaller Scale 60 hours Special Event See Special Event fee schedule Street vacation 30 hours Subdivision Final (binding site plan, fee simple, 30 hours preliminary plat) Preliminary (binding site plan, fee 60 hours simple, plat) Plat Alteration 30 hours Short Plat 30 hours

Resolution No. Establishing 2016 Fees Page 6 of 7 Land Use and Development Type Telecommunications (wireless communication) facilities Antenna co-location, administrative Monopole, pole replacement, or not administrative When a franchise agreement is required Temporary Use, Accessory Special Events Time extensions (to approved land use s, when applicable) Variance Single family Commercial and multi-family Reasonable use exception Other Verification requests (written) Minor Research required Zoning amendment Text only Map amendment (rezone) - when associated with a concurrent when not associated with a concurrent Application and Processing Fee (Minimum fee, billed actual hours at hourly rate, unless otherwise stated) 20 hours See Resolution No. 647, as amended; contact the Administrative Department 2 hours See Special Event fee schedule 4 hours per or approval 20 hours See Environmental Review 5 hours 2 hours 2 hours 30 hours Not applicable Deposit (as a % of fee) Section 3. Costs Outside Consultants. Costs for use of outside consultants are approved, adopted and established as herein set forth. For use of outside consultants for plan checking, inspections, or both, the cost shall be the actual cost to the City, in addition to the permit fees and any other fees required by this resolution. Section 4. Effective January 1, 2016 Hourly Rate. Effective January 1, 2016, the hourly rate on the fee schedule shall be $141. Section 5. Effective January 1, 2017 Fee Schedule Adjustments. Effective January 1, 2017, a new 2017 fee schedule shall be provided by the Community and Economic Development Department to reflect adjustments to the fees based on the Seattle Area Consumer

Resolution No. Establishing 2016 Fees Page 7 of 7 Price Index for All Urban Consumers during the past one-year period, with resultant figures rounded up to the next whole dollar. Section 6. Effective January 1, 2018 Fee Schedule Adjustments. Effective January 1, 2018, a new 2018 fee schedule shall be provided by the Community and Economic Development Department to reflect adjustments to the fees in the 2017 fee schedule based on the Seattle Area Consumer Price Index for All Urban Consumers during the past one-year period, with resultant figures rounded up to the next whole dollar. Section 7. Repealer Resolution. Resolution No. 715 of the City of Mountlake Terrace is hereby repealed effective Midnight, December 31, 2015. Section 8. Fees Nonrefundable - Exception. All fees shall be non-refundable, except that the Department Director may allow a refund for withdrawn s when the following circumstances are present: 1) a written request for a refund, stating reasons for withdrawing the, has been made to the Planning Official; 2) not more than 28 business days have lapsed since the was submitted; 3) the Department Director has determined that substantive staff review of the has not begun; and 4) the refund is not more than 80% of the fee paid by the applicant. Any filing fee is nonrefundable in all cases. Section 9. Repealer. All ordinances or resolutions or parts of ordinances or resolutions of the City of Mountlake Terrace in conflict herewith, be and the same are hereby repealed. Section 10. Effective Date Resolution. The Civil Engineering Construction Fee and Deposit Schedule and the Land Use and Development Application and Deposit Fee Schedule shall take effect and be in force on and after Midnight, December 31, 2015 and shall remain in effect until amended, revised or repealed and replaced by a subsequent fee schedule(s). PASSED by the City Council of the City of Mountlake Terrace this day of December, 2015 and signed in authentication of its passage this day of December, 2015. ATTEST: CITY CLERK MAYOR JERRY SMITH APPROVED AS TO FORM: Gregory G. Schrag, City Attorney \\mlts13\cd\planning\budget_and_revenues\fee Update\2015\CC 12.07.15\RESO_Civil & Land Use Dev Fees_2015.12.07_REVISIONS ACCEPTED_11.30.15.doc