INVESTMENT STUDY DYNAMIC PLAN UDC : (045) Rada Plavšić, Drago Soldat

Similar documents
SELECTION OF MOST APPROPRIATE PROJECT ALTERNATIVES FOR REALIZATION OF INVESTMENT STUDY UDC

Project Planning. Planning is an important step in project execution. Planning means:

International Project Management. prof.dr MILOŠ D. MILOVANČEVIĆ

Program Evaluation and Review Techniques (PERT) Critical Path Method (CPM):

USAGE OF DYNAMIC PLANS IN CIVIL ENGINEERING OF SERBIA UDC (497.11)=111. Milorad Zlatanović, Biljana Matejević

A Theory of Optimized Resource Allocation from Systems Perspectives

EVALUATION OF FISCAL TRENDS AND STRUCTURAL REFORMS IN Summary

Features of Cash Flow Compared to Profit

International Journal of Advanced Engineering and Management Research Vol. 2 Issue 4, ISSN:

Optimization of Rescheduling and Economy. Analysis of the Implementation of Kwitang Office. Park Building Construction Project in Jakarta

COST MANAGEMENT IN CONSTRUCTION PROJECTS WITH THE APPROACH OF COST-TIME BALANCING

UNIVERSITY OF BOLTON SCHOOL OF ENGINEERING. MSc CIVIL ENGINEERING MSc CONSTRUCTION PROJECT MANAGEMENT SEMESTER ONE EXAMINATION 2017/2018

Program Evaluation and Review Technique (PERT) in Construction Risk Analysis Mei Liu

Estimation and Management of Construction Cost

Appendix B: Glossary of Project Management Terms

Ran Gao 1, *, Beijin Ye 2 1 Department of Engineering Management, School of Civil Engineering of Northeast

Construction Management

Report of the Advisory Committee on Administrative and Budgetary Questions

COSTING AND PROJECT EVALUATION USING NODOC

Feasibility Study of construction project in compliance with Bank Investment Supervision requirements

Project Management. A Practitioner s Guide. Steven M. Bragg

CAPITAL BUDGET NUCLEAR

MINES CLOSURE STRATEGY

RISK MANAGEMENT IN CONSTRUCTION PROJECTS

Mr. Paul Cheung UN Statistics Division (UNSD) Two United Nations Plaza DC2 1670, New York, NY10017 U.S.A.

Standard Summary Project Fiche IPA centralised programmes Project Fiche: 18

Project Management. Chapter 2. Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall

2 ND PROJECT AND CONSTRUCTION MANAGEMENT PROFESSIONS CONFERENCE MIDRAND, OCTOBER 2014

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

After complete studying this chapter, You should be able to

THE METHODOLOGY OF PROJECT MANAGEMENT OF SOFTWARE DEVELOPMENT AT THE NATIONAL BANK OF SERBIA

Cash Flow Of High Rise Residential Building

Journal of Central Banking Theory and Practice, 2017, 1, pp Received: 6 August 2016; accepted: 10 October 2016

Full Proposal Application Form

Monitoring and Controlling RCC Work in Delayed Construction Projects

Chapter16Project Management and. Scheduling Project management

Plan Implementation. Pushpa Lal Shakya

King Fahd University of Petroleum and Minerals College of Environmental Design CEM 520: Construction Contracting

RISK ASSESSMENT IN CONSTRUCTION INDUSTRY

Methods for Overcoming the Financial Crisis of Enterprises

FORECASTING THE FINANCIAL DISTRESS OF MINING COMPANIES: TOOL FOR TESTING THE KEY PERFORMANCE INDICATORS

PERFORMANCE APPRAISAL OF HPCL THROUGH FREE CASH FLOW

SECTION PROJECT SCHEDULE 08/08

Systems Engineering. Engineering 101 By Virgilio Gonzalez

BFO Theory Principles and New Opportunities for Company Value and Risk Management

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Address Directorate General Privatization and Administration of State Participations in Energy no /

Project planning and creating a WBS

SECTION PROJECT SCHEDULES (SMALL PROJECTS DESIGN/BID/BUILD)

REORGANIZATION OF THE UNDISCHARGED BANKRUPT

NETWORK ANALYSIS QUESTION BANK

SOME COMPARATIVE CONSIDERATIONS OF REVENUE, ECONOMY, PROFIT, AND PROFITABILITY FUNCTIONS * UDC Miroljub Đ. Milojević, Vesna M.

THE ACCELERATING OF DURATION AND CHANGE OF COST ON CONSTRUCTION PROJECT IMPLEMENTATION

Financial Instruments Transformation and Elimination in Accordance with International Financial Reporting Standards

International Cost Estimating & Analysis Association. Supplier Cost/Price Analyses June 20, 2013

THE AVAILABILITY OF COMPONENTS ACCOUNTING RESPONSIBILITY IN INDUSTRIAL COMPANIES IN AQABA CITY

Project Management Chapter 13

CISC 322 Software Architecture

OPTIMIZATION OF THE TOLLING PROJECT OF USING THE METHODS OF NETWORK ANALYSIS

PROJECT MANAGEMENT DIPLOMA COURSE

The impact of financial balance indicators on the companies - Analysis on economic sectors

THE PERSPECTIVE OF E-BANKING IN SMALL BUSINESS BANKING SECTOR

The novelties in the legislation of the Russian Federation on public financial control

Evaluation of Construction Risks Impact on Construction Project Manager s

Policy Paper. March Establishing the Project Design Facility

Project Scoping Guidebook for Metropolitan Planning Organization Transportation Projects

Dynamic Strategic Planning. Evaluation of Real Options

Terms of Reference for an Individual National Consultant to conduct the testing of the TrackFin Methodology in Uganda.

Project management. Prof Ahmed Kovacevic. Mechanical Analysis and Design ME Lecture 3

COPYRIGHTED MATERIAL. Index

LAW OF UKRAINE On Amendment of the Law of Ukraine. (regarding procedural issues of an anti-dumping investigation)

Chapter 2 Procurement Planning

Prince2 Foundation.exam.160q

Small innovative company's valuation within venture capital financing of projects in the construction industry

Science and Information Resources Division

EFFECTS OF DBFM CONTRACTS ON PROJECT EXECUTION - EXPERIENCES FROM THE FIELD -

UNIT 11: STANDARD COSTING

COMPARATIVE ANALYSIS OF METHODOLOGIES FOR RISK MANAGEMENT OF STRATEGIC INVESTMENT PROJECTS

ETSF01: Software Engineering Process Economy and Quality

Financial Management of Economic Entity from the Perspective of Alternative Approach

machine design, Vol.7(2015) No.4, ISSN pp

Appendix A Decision Support Analysis

DECISION ON RISK MANAGEMENT BY BANKS

Session 10 and 11 EXECUTING THE WORK & CLAIMS AND DISPUTES

Fundamentals of Project Risk Management

Available online at ScienceDirect. Procedia Engineering 161 (2016 )

CONCEPTUAL FOUNDATIONS OF COMPANY CASH FLOW PLANNING

CONSTRUCTION MANAGER AGREEMENT BETWEEN THE UNIVERSITY OF ROCHESTER AND. Insert CM Firm. Insert Name of Project. Insert Project Number

Advantages and Ddisadvantages of Project Financing UDC: 005.8

INTERNAL FINANCIAL ACCOUNTING CONTROL OF PRIVATE ENTITIES

Comparative Study Of Pre-Planning And Actual Planning Process In Construction Industries

REPORT 2015/094 INTERNAL AUDIT DIVISION

NEW POSSIBILITIES IN VISUALIZATION OF PROJECT PLANS

PROJECT MANAGEMENT DIPLOMA COURSE

Textbook: pp Chapter 11: Project Management

Detailed Recommendations 10: Develop Environmental Cost Analysis

SCM 301 (Lutz) Exam 1 Practice Exam Solutions

Belgium-Brussels: IPA Support for the management of the EU funds 2016/S Service contract notice

Actualtests.PRINCE2Foundation.120questions

DIVISION 1 - GENERAL REQUIREMENTS SECTION 01315A PROJECT SCHEDULE

Transcription:

UNIVERSITY OF NIŠ The scientific journal FACTA UNIVERSITATIS Series: Architecture and Civil Engineering Vol.1, N o 5, 1998 pp. 597-603 Editors of series: Dragan Veličković, Dušan Ilić, e-mail: facta@ni.ac.yu Address: Univerzitetski trg 2, 18000 Niš, YU Tel: +381 18 547-095, Fax: +381 18 547-950 INVESTMENT STUDY DYNAMIC PLAN UDC 69.05+65.012.5:336.645(045) Rada Plavšić, Drago Soldat Beogradska banka, a.d. Institute for Investment Economics Knez Mihailova 2, Belgrade, Yugoslavia Abstract. Dynamic plan of project realization forms the basis for financial analysis during investment preparation. The resume of investment study analyses consists of selection and detailed description of optimal term plan for project realization. Authors pay special attention to the analysis of coordination of physical and financial realization of the project. This paper suggests contents and methods for analyses of dynamic implementation plan elements. In comparison with existing solutions given by valid investment evaluation methodology, these analyses provide for more reliable planning of necessary times and resources. 1. INTRODUCTION Investment study is a compulsory document according to which investment decisions containing basic elements of intended investment realization plan are made. Project feasibility analysis represents evaluation of real possibilities of project realization from the aspect of basic organizational and technical solutions, level of equipment of all participants in the realization and their real ability to complete an investment process without exceeding planned times and planned financial resources. Consistent feasibility evaluation includes assessment of critical points of the plan as well as the elaboration of anticipated solutions in order to supersede all (existing or possible) limitations. Dynamic plan of realization of an undertaking in an investment study forms the basis for financial analysis during investment preparation. According to valid investment evaluation methodology, financial construction is closed in terms of current prices according to dynamic plan for payment of financial obligations [1]. Thus, it is very important to plan in detail the duration of investment and to predict precisely the moment in which financial funds from individual sources of project financing will be spent. Received August 25,1999

598 R. PLAVŠIĆ, D. SOLDAT Selection of methods for reliable prediction of project realization flow and for realistic evaluation of terms in a dynamic plan are significant because they represent the basic prerequisite for project success during realization as well as during exploitation. Practical issues of articulation and elaboration related to dynamic investment realization plan require a more thorough, more complex and more realistic approach than the one given by existing solutions based on valid domestic methodology for investment evaluation. 1 Mutual coordination between physical and financial dynamics of project realization is the issue of special importance. Projections resulting from the dynamic plan consist of correct selection of representative activities, followed by reliable estimate and calculation of their duration, definition of interrelated activities, supply of resources according to plan and individual sources [2]. The greater the investment and the more complex the investment undertaking is, the more important is the reality of project feasibility, preliminary evaluation and prediction of dynamics of physical and financial realization. This paper gives an overview of necessary analyses and methodological solutions for investment evaluation based on research and experience arising from their implementation in Yugoslav banks and investment funds. This paper also aims to demonstrate the required contents of necessary analyses and the way to define and present relevant dynamic plan data during the process of preparation and evaluation of investment study. 2. DYNAMIC PLAN OF PHYSICAL PROJECT REALIZATON Dynamic plan of physical project realization includes specification of all necessary activities and evaluation of time required for their completion. Valid investment evaluation methodology regulates evaluation of time plan feasibility according to: how complete investment technical documentation is, how realistic planned beginning and ending of project are and is it possible to obtain permits and concords. This approach does not usually include analyses and prognoses of key terms thus making control and tracking of realization flow practically very hard for the financier's revisor and supervisor. It is obvious that estimating the end of project realization and the beginning of its exploitation is a very problematic issue, especially in cases where no dynamic plan of operations is devised. In domestic practice, plans of operations are usually rough and arbitrary. This can be especially risky for capital projects, because it can cause huge resources and time to be spent [3]. Depending on the complexity and the size of project, realization dynamics can be planned empirically, according to offers made by contractors and equipment suppliers or 1 Joint methodology for evaluation of social and economic justification and efficiency of investments in SFRY, Official Gazzette of SFRY, no.50/87; Book of regulations on contents and scope of preliminary justification study and justification study, Official Herald of RS, no.39/99.

Investment Study Dynamic Plan 599 according to one of network planning techniques, such as PERT or CPM. Gantt charts 2 consist of global activities or groups of work acrivities, such as preparatory works, rough construction, craft works, plumbing works, finishing works, equipment assembly, etc. (Table 1). Horizontal time scale of this diagram depends on planned duration of the entire project realization. As a rule, scale is comprised of smaller time periods (weeks or months) for shorter duration, quarters for medium duration, while for projects that last for several years, dynamic plan is expressed in semesters or years. Table 1. Term plan of physical project realization Terms N 0 Investment activity I II III quarter quarter quarter 1. Compilation of investment documentation 2. Procurement of financial sources 3. Preparatory works 4. Contracting 5. Rough construction works 6. Craft works 8. Plumbing and utilities 7. Finishing works 9. Arrangement of free surfaces 10. Acquisition of concords and permits 11. Equipment delivery 12. Equipment assembly 13. Staff training 14. Test production 15. Regular production IV quarter The degree of accuracy of time estimates for project realization, during preparatory phase (investment study compilation), directly depends on the level of completeness of investment technical documentation. Total reliability of term plan is determined by the accuracy of evaluation of individual activities duration (or duration of group of operations or construction stages). It is necessary to predict the time needed for all planned operations according to their usual average duration. For example, compilation of contracting projects for smaller objects from two to three months, for medium sized three to four, and for large and complex no less than six months; then, acquisition of permits and concords at least 15 days (according to legal regulations), for tender a little over 30 days (legal deadline for conclusion of a tender is 30 days) etc. It is important to include time needed to close the financial construction; it should be estimated according to duration of individual activities: assessment of investment project evaluation (30-60 days) and creditor's decision making (at least 15 days) [4]. As far as deadline for constuction of facilities is concerned, it is best to respect fixed terms if empirical, rough control confirms that such dynamics is possible [5]. In 2 In English literature "Gantt chart", introduced as a planning tool by Henry Gantt in 1900.

600 R. PLAVŠIĆ, D. SOLDAT geographic areas where weather conditions dictate the timetable of project realization, it has to be coordinated with realistic possibilities of work performance. For example, it is not realistic to plan to dig foundations of a mountain resort hotel during winter; an October deadline for completion of cold storage for berrylike fruits is also unacceptable and so on. Part of the dynamic project realization plan that refers to furnishing and putting into operation (items no.11-15), usually requires that preceding investment activities from Table 1. are completed, or, in cases where it is possible, these activities can go on simultaneously. Equipment delivery is planned according to dynamics agreed on during negotiations with manufacturers or suppliers. Dynamics of delivery depend on type of activity, complexity, diversity and number of equipment items estimated during investment realization process. Projects of low and medium complexity are characterized by delivery of equipment in one shipment, while delivery of equipment in projects of higher complexity 3 is usually gradual. Equipment delivery dynamics ranges from 3-18 months, while this period is even longer in processing industry. Assembly of equipment, especially for production, should be coordinated with delivery activities, which, as was already mentioned, can be whole or gradual. It is advisable to include maintenance specialists as well as direct production workers into equipment assembly process regardless of the agreed upon method of investment realization, which can be based on utilization of investor's own staff or staff engaged according to engineering principles. Experiences of this paper's authors show that assembly takes from 1 to 12 months, depending on the criteria that are identical to equipment delivery dynamics. Staff training is an important issue in the process of investment realization. It is common practice to transform training of key staff members into training of prospective operators of certain pieces of equipment in the production process. Duration and organization of staff training directly depends on the type of activity and complexity of equipment and ranges from 1 to 3 months. For training of maintenance staff it is suficient to provide 1/3 less time than the time needed for training of direct production workers [6]. Test production is a very important issue in the process of investment realization. In equipment for processing industry, it is required to coordinate its characteristics for uninterrupted functioning of the investment during the period of investor's regular activity. Prediction of test production in projects outside processing industry and continuous work process should make it possible to conquer new technologies or specific knowledge and skills. Test production in previously mentioned cases should be planned to last from 3 to 6 months. It is neither technically argumented nor justified to plan for longer duration than this. Finally, it should be said that it is not recommended to make plans based on minimum necessary time unless such an approach can be supported by strong arguments. Shorter total time for investment realization should be achieved by solid preparation and organization, so that so called "day zero" is activated in the optimal moment. When plan begins to develop without previous preparations, "lateral" or subsequent activities caused by this lack of preparation can take up a lot of time and significantly extend all planned terms. 3 For a more detailed discussion, see: Plavsic, R., Soldat, D., Dubonjic, R., Milanovic, Lj. D., Knezevic, S., Izrada investicione studije, op.cit.

Investment Study Dynamic Plan 601 From the above discussion, it can be concluded that dynamics of investment project physical realization is one of the factors of investment cost optimization as well as one of the factors of optimization of total effects of investments. 3. DYNAMIC PLAN OF FINANCIAL PROJECT REALIZATON Once the dynamic plan for physical project realization is completed, analysis of dynamic finance plan is performed. Necessary financial resources are obtained from planned sources in accordance with dynamics of financial realization and determined terms. Dynamic plan of financial realization includes sums invested in individual items of physical realization plan specified according to dates when funds are spent. 4 Realization dynamics and financing dynamics do not have to coincide, and as a matter of fact they are often parallel activities of unequal duration. When planning financial realization of customary (nonspecific) projects, dynamic plan is based on preliminary information or offers made by prospective contractors. In more complex cases, project financial realization plan can precede the tender. In this way, investor sets certain conditions by which oprimization of terms and costs should be achieved, while for contractors they define certain specifics required by the investor. This refers primarily to time terms and conditions of payment because creditor cannot always be expected to be ready to approve smaller installments for temporary monthly situations. Having this in mind, it is also important to obtain accordance from contractors to negotiate payment conditions in accordance with investment financing terms. Dynamic plan of investment financial realization contains analytical cost structure (broken up by objects, types of works, equipment, etc.) and it is presented in a form used for recapitulation based on global division into primary items, according to structure given in Table 2. Table 2. Dynamic plan of project financial realization Investment purpose description Value per period (din) total structure Investment year/quarter I II III IV dinars % 1. FIXED ASSETS 1.1 Land purchase and furnishing 1.2. Infrastructure 1.3. Building facilities 1.4. Equipment 1.4.1. Domestic equipment 1.4.2. Imported equipment 1.4.3. Customs and import duties 1.5. Foundation capital 1.6. Physical reserves 2. PERMANENT CAPITAL GOODS TOTAL INVESTMENTS 4 Moment of withdrawal or deposit of money represents a business event in investment projects

602 R. PLAVŠIĆ, D. SOLDAT Projection of money spendings according to term plan is based on current values of investment costs, so called "fixed prices", thus making it possible to reduce all values to the same time plane 5 and balance in this way the uneven effects of investments during time. The actual value in the investment base period is called "project fixed prices". They are the values according to which project can be realized at the moment in which preliminary calculation is made. However, part of financial spendings refers to the future so that the present value has to be recalculated to obtain the value at the moment when resources are engaged. These values are called "current prices" and they represent future value of the costs. In order to build the financial construction which should be based on values and duration of engagement of resources, particular items from the dynamic plan are expressed in current prices. In order to recalculate costs from fixed into current prices it is important to anticipate the increase in prices during the construction period. For spendings in domestic currency so called planned rate of annual inflation is used, while for foreign funds average annual rate of domicile currency inflation is utilized. 6 4. CONCLUSION Dynamic plan of project realization forms basis for financial analysis during investment preparation. Evaluations of realization dynamics include prediction of conditions and circumstances that may influence realization of the plan as well as other elements of the plan that are significant for project completion. Projections resulting from the dynamic plan require correct selection of representative activities, calculation of their duration, definition of interrelated activities, provision for resources according to plan and according to individual sources, prediction of conditions and circumstances which may influence realization of the plan and other elements of the plan significant for project completion. Research and experience of the authors demonstrate that one of the reasons for inefficiency of investments in Yugoslavia is the inadequate project preparation consisting of unrealistic and/or unreliable elements of the project realization dynamic plan. Even though detailed dynamic plan is one of the desired preliminary studies, valid methodology does not require it to be made in standard cases, but requires only a basic term plan to be presented (i.e. beginning and duration of key events in relation to turning points of physical realization of the project beginning of realization, ending of realization, putting into operation). Depending on project size and complexity, dynamics of realization can be planned empirically, according to offers presented by building contractors and equipment suppliers. Gantt charts are commonly used in investment 5 Definitions taken from literature on Economics : Fixed prices are project prices that reflect current values in the moment in which estimate is made; in an investment study they are fixed on price level of basic term (usually month and year in which study is compiled); Current prices are projected (planned) prices calculated to neutralize the expected (estimated) price inflation in the future. 6 Data provided by Federal Bureau of Statistics is used for domestic inflation, while Economic Survey, OECD, is New York is used for inflation of foreign currency.

Investment Study Dynamic Plan 603 studies. In the process of planning for complex, large and long-term projects one of the network planning techniques, such as PERT or CPM are applicable. Financing dynamics together with estimation of cost scope and structure (by time in which resources are spent) represent a separate segment of realization of all projects. Total investments at the moment in which investment study is being prepared should be projected into the future and expressed in fixed and current prices. Dynamic plan is an element of crucial significance for the overall efficiency of investment project realization. It is done on the basis of analyses of predicted solutions and estimates of resources necessary for their realization. Planning of time and resources necessary for project realization must be based on reliable preliminary research and scientific prognoses. Methods which can make this possible deserve attention of all participants in the process of investment planning. REFERENCES 1. Priručnik za primenu Zajedničke metodologije za ocenjivanje društvene i ekonomske opravdanosti i efikasnosti investiranja u SFRJ, Operativno uputstvo za izradu investicionog programa, Udruženje banaka Jugoslavije, Beograd, 1989. 2. Plavšić, R., Inženjerski aspekti ocene investicionih projekata, (doktorska disertacija), Arhitektonski fakultet Univerziteta u Beogradu, Beograd, 1994. 3. Hackney, W. J., Control and Management of capital projects, John Wiley & sons, New York, 1965. 4. Plavšić, R., Soldat, D., Dubonjić, R., Milanović, Lj. D., Knezević, S., Izrada investicione studije, AŠ Delo, Beograd, 1998. 5. Dokumentacija Instituta za ekonomiku investiranja, Beogradska banka, a.d., Beograd, (case study), Beograd, 1988-1998. 6. Soldat, D., Efikasnost odrzavanja, KIZ "Altera", Beograd, 1993. DINAMIČKI PLAN U INVESTICIONOJ STUDIJI Rada Plavšić, Drago Soldat Dinamički plan izvodjenja projekta čini osnovu za finansijsku analizu u pripremi investicije. Rezime analiza u investicionoj studiji obuhvata izbor i detaljni opis optimalnog terminskog plana realizacije projekta. Posebnu pažnju autori posvećuju analizi planske usaglašenosti fizičke i finansijske realizacije projekta. U radu se sugerišu sadržaj i metode analiza elemenata dinamičkog plana implementacije koje obezbedjuju veću pouzdanost planiranja potrebnog vremena i sredstava u odnosu na rešenja u važećoj metodologiji za ocenu investicija.