Plan Implementation. Pushpa Lal Shakya

Similar documents
Project Planning. Identifying the Work to Be Done. Gantt Chart. A Gantt Chart. Given: Activity Sequencing Network Diagrams

Construction Management

GPE engineering project management. Project Management in an Engineering Context

UNIT-II Project Organization and Scheduling Project Element

CHAPTER 9: PROJECT MANAGEMENT

Project Management Professional (PMP) Exam Prep Course 06 - Project Time Management


Program Evaluation and Review Techniques (PERT) Critical Path Method (CPM):

Textbook: pp Chapter 11: Project Management

CISC 322 Software Architecture

Project planning and creating a WBS

PROJECT MANAGEMENT CPM & PERT TECHNIQUES

Appendix A Decision Support Analysis

Research Methods Outline

SCHEDULE CREATION AND ANALYSIS. 1 Powered by POeT Solvers Limited

A convenient analytical and visual technique of PERT and CPM prove extremely valuable in assisting the managers in managing the projects.

International Project Management. prof.dr MILOŠ D. MILOVANČEVIĆ

Management Management

Implementation of SDGs in Nepal: Some Observations on Prioritization. Yuba Raj Khatiwada

Introduction. Introduction. Six Steps of PERT/CPM. Six Steps of PERT/CPM LEARNING OBJECTIVES

UNIT 5 PROJECT ANALYSIS PERT/CPM MODULE - 2

Project Planning. Planning is an important step in project execution. Planning means:

PROJECT MANAGEMENT DIPLOMA COURSE

1 of 14 4/27/2009 7:45 AM

Real-World Project Management. Chapter 15

Project Management Chapter 13

Appendix B: Glossary of Project Management Terms

Probabilistic Completion Time in Project Scheduling Min Khee Chin 1, Sie Long Kek 2, Sy Yi Sim 3, Ta Wee Seow 4

Network Analysis Basic Components. The Other View. Some Applications. Continued. Goal of Network Analysis. RK Jana

Implementation of the SDGs in Nepal: Status and Challenges

IP-CIS : CIS Project Management

162,951,560 GOOD PRACTICES 1.9% 0.8% 5.9% INTEGRATING THE SDGS INTO DEVELOPMENT PLANNING BANGLADESH POPULATION ECONOMY US$

Project Management. Chapter 2. Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall

MS Project 2007 Page 1 of 18

Teori Pengambilan Keputusan. Week 12 Project Management

SSC-JE STAFF SELECTION COMMISSION CIVIL ENGINEERING STUDY MATERIAL ESTIMATING, COSTING AND VALUATION

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) Sector Performance, Problems, and Opportunities

Zimbabwe National Review Report on SDG Implementation

u w 1.5 < 0 These two results imply that the utility function is concave.

Project Management -- Developing the Project Plan

Project Management with Brief Information regarding CPM and PERT Methods

UNIVERSITY OF BOLTON SCHOOL OF ENGINEERING. MSc CIVIL ENGINEERING MSc CONSTRUCTION PROJECT MANAGEMENT SEMESTER ONE EXAMINATION 2017/2018

IE 102 Spring Project Management

Project Management Fundamentals

6/7/2018. Overview PERT / CPM PERT/CPM. Project Scheduling PERT/CPM PERT/CPM

Macroeconomic Modeling for Planning in Nepal

11/1/2018. Overview PERT / CPM. Network representation. Network representation. Project Scheduling. What is a path?

Reforms to Budget Formulation in Uganda

Project Management Techniques (PMT)

Project Management. Basic Definitions: Project and Project Plan

Disaster Risk Management in Nepalese Development Plans

After complete studying this chapter, You should be able to

INSE 6230 Total Quality Project Management Winter 2018 Quiz I. Max : 70 points. This is a closed book exam. Answer all the questions in the booklet.

Monitoring the Implementation of the IPOA and SDGs: A Focus on Data Challenge

Project Management. Project Mangement. ( Notes ) For Private Circulation Only. Prof. : A.A. Attarwala.

PROJECT MANAGEMENT COURSE 5: PROJECT TIME MANAGEMENT. G.N. Sandhy Widyasthana

SWEN 256 Software Process & Project Management

MnDOT Project Management Office Presents: Project Reporting. Presenter: Jonathan McNatty Senior Schedule Consultant DRMcNatty & Associates, Inc.

06IP/IM74 OPERATIONS RESEARCH

CHARTER FOR FISCAL RESPONSIBILITY

Project Planning. Jesper Larsen. Department of Management Engineering Technical University of Denmark

Meeting on the Post-2015 Development Agenda for LDCs, LLDCs and SIDS in Asia and the Pacific: Nepal s Perspective

Vietnam: IMF-World Bank Relations *

SAMPLE. DETERMINING ACTIVITY DURATIONS TCM Framework: 7.2 Schedule Planning and Development. AACE International Recommended Practice No.

Public Expenditure and Financial Accountability Baseline Report. Central Provincial Government

MnDOT use of Calendars in Primavera P6

Outline. Global Company Profile: Bechtel Group. The Importance of Project Management Project Planning Project Scheduling Project Controlling

INTERNATIONAL MONETARY FUND AND THE INTERNATIONAL DEVELOPMENT ASSOCIATION MALAWI

POLYTECHNIC OF NAMIBIA

CHAPTER 6 CRASHING STOCHASTIC PERT NETWORKS WITH RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM

Programme Evaluation and Review Techniques (PERT) And Critical Path Method (CPM) By K.K. Bandyopadhyay. August 2001

Simple Macroeconomic Model for MDGs based Planning and Policy Analysis. Thangavel Palanivel UNDP Regional Centre in Colombo

POVERTY REDUCTION STRATEGY PAPER JOINT STAFF ADVISORY NOTE

Unit 3 Research Project. Eddie S. Jackson. Kaplan University. IT511: Information Systems Project Management

CASE STUDY 2: GENDER BUDGET INITIATIVE: THE CASE OF TANZANIA

A Project Management Guide for Researchers

Roles & Challenges of Development Assistance in LDCs

THE REPUBLIC OF UGANDA

Project Controls Expo 16 th Nov 2016

ETSF01: Software Engineering Process Economy and Quality

Climate Change Finance in Nepal

Chapter16Project Management and. Scheduling Project management

ISSN: [Mali* et al., 6(3): March, 2017] Impact Factor: 4.116

Recent Experiences in Assessing Public Infrastructure Management in Sri Lanka

Chapter 11: PERT for Project Planning and Scheduling

Systems Engineering. Engineering 101 By Virgilio Gonzalez

Value for Money Division Ministry of Finance. Value for money in Slovakia

Project Risk Management

Cost Reduction: Planning & Control. Impacting the Bottom Line

MACROECONOMIC CHALLENGES OF MDGs SCALING UP IN UGANDA

A/HRC/17/37/Add.2. General Assembly. United Nations

PROJECT CYCLE MANAGEMENT & LOGICAL FRAMEWORK MATRIX TRAINING CYPRIOT CIVIL SOCIETY IN ACTION V INNOVATION AND CHANGES IN EDUCATION VI

RURAL DEVELOPMENT & NATURAL RSOURCE MANAGEMENT: TRENDS, STRATEGY IMPLEMENTATION AND FRAMEWORK PERFORMANCE INDICATOR SYSTEM May 2, 2000

Strengthening Medium Term Budget Frameworks

Direct centralised management Complementary action / Technical Assistance Direct centralised management DAC-code Sector Multi-sector aid

Project Management and Cost Control

International Monetary Fund Washington, D.C.

MINIMIZE TIME AND COST FOR SUCCESSFUL COMPLETION OF A LARGE SCALE PROJECT APPLYING PROJECT CRASHING METHOD

Chapter 5 - Macroeconomic and Expenditure Framework

REPUBLIC OF KENYA COUNTY GOVERNMENT OF WAJIR DEPARTMENT OF FINANCE & ECONOMIC PLANNING

Transcription:

Plan Implementation Pushpa Lal Shakya

Outline of Presentation 1. Plan Implementation: Meaning 2. Use of MTEF in Plan Implementation 3. Plan implementation Process and Implementation Modalities 4. Application of Networking technique in project/program activities 5. Planning and Development Problems in Nepal 6. Issues and Challenges of Development in Nepal 7. Problems of Plan Formulation and Implementation in Nepal 8. Conclusion and Suggestions

1. Plan Implementation: Meaning Development Plans are formulated for implementation. Plan implementation means to allocate budget and mobilise other resources to achieve the stated goals and targets of the Plan. Therefore, effective implementation of the periodic development plan is required to achieve the plan s target and objectives within the plan period and get the development results. To achieve the target we need annual breakdown of the budget and activities

2. Use of MTEF in Plan Implementation The Medium Term Expenditure Framework (MTEF) is a three-year framework within which available total resources for the government (domestic as well as external/foreign resources) are allocated between various sectors MTEF is a tool to: - To link annual programs and budget with Medium-Term Plan. - To prioritize program and budget according objectives and policies. - To select sectoral programs within the budget ceiling. - To ensure allocation of resources for prioritized program

The MTEF can also be described as: A process for matching limited resources with unlimited needs. An integrated system through which all resources (government and donor) are allocated on the basis of policy priorities. A medium term focus into resource planning, so as to plan ahead for changes in policy and expenditure reallocations. Enhancing predictability in the flow of resources, nationally, sectorally and at the ministerial /departmental levels.

3. Plan Implementation Process and Implementation Modalities Plan Implementation Process starts from annual budget process Therefore, annual budget and policies are very crucial for plan implementation. In the context of Nepal, the following planning and budgetary processes are followed. 1. Annual program/budgeting with trimester breakdown 2. Institutional arrangement or project office 3. Human resource management 4. Job responsibility 5. Action plan/procurement plan 6. Activities conduction 7. Coordination mechanism

The MTEF and Annual Budgetary Process The MTEF approach involves both a top-down and bottom up approach of estimating total resource availability for a three years period and dividing these resources between ministries based on priorities of the government/plan. 1. Estimation of the Resource Envelope: o determination of the total resources available, within the context of a stable macroeconomic setting. And this should be based on a consistent macro economic framework 7

1. Projections of domestic and External (donor) inflow including: Domestic revenues Foreign grants and loans Government domestic borrowings 2. From the bottom up, ministries need to prepare budget on the basis of Strategic Plan. The sector Plan set out the Ministry's objectives; output and activities from which an activity-based budget is prepared. Bottom up requirements from each spending sector/agency of the funds required a) For Current Expenditures Wages and salaries Office equipment's. 8

b) For Development/Capital Expenditure To implement existing development budget policy objectives and target. To implement new policy initiatives 3. Matching demands (needs/requirements) with likely resource availability Ministries are required to priorities their activities and related costs within the ceilings and guidelines provided from the NPC. 9

Linkage between SDGs, Periodic Plan, MTEF and Annual Plan/Programs : MTEFs Business Plans Annual Program with trimester Breakdown Periodic Plan & Implementation National Human Development Report SDGs New Periodic Plan

Linkages between Policy, Plan and Annual Program/Budget Policy Broad guidelines Broad development indication e.g. LDC Graduation, Constitutional policies, Education policy, Health sector Stategy, Policy ADS Plan Include the major policy for implementation Macro indicators e.g. GDP growth rate, reduction of poverty, Increase irrigation facility rate by x%, MTEF Tool for linking plan with annual programs Prioritization of Projects/Programs Tool for PFM Link inputs with outputs Annual Program Actual implementation of periodic plan Set annual sectoral targets Resource backup

Implementation Modalities 1. Establishment of a project office 2. Adoption of BOT, BOOT or PPP model or system. 3. Turn Key model 4. Out sourcing 5. Through local or provincial government offices 6. Through NGOs and CBOs 7. Other interim arrangements

Establishment of Project Office Budget Release Acquisition of human resources Prepare Job Responsibility and Job description Establish information system Appointment of consultants Preparing engineering design Preparing bidding document Tender and Contract out Preparing CPM or Gantt Chart for implementation and also trimester breakdown Budget control Monitoring and supervision Progress Reporting

4. Application of Networking Technique in Project/Program Activities To implement projects and programs effectively we need to prepare project planning The steps in Project Planning are: 1.Defining objectives of the project 2.Setting the goals 3.Identifying alternative course of action for achieving goals 4.Estimating the resource availability 5.Selecting most suited action to achieve the desired result.

Therefore, a project plan expresses the objectives & requirements of the project in terms of : Project Scope Project Schedule Resource Requirement Project cost estimation Project Quality, and Project Risk Management

Why do we need project planning? 1. To reduces risk and uncertainty in a project. Project planner needs to make a provision for potential occurrences of uncertainties in advance. With well-planned project we can respond to potential risks, slippages, etc. 2. To save on time, on resources and as a result we can save on cost too. 3. To improve efficiency in implementation

4. To improve monitoring and control. 5.To determine performance standard 6. To enable project manager to translate project requirement into Work breakdown structure (WBS), tasks list, Gantt charts, resource assignment and risk register, etc.

a. Project Scope Planning Any project is expected to provide certain outcome, which is known as project deliverables. These project deliverables depends on the scope of the project. project scope outlines the extent of project deliverables. project scope is what the project is expected to achieve and specify the budget of both time and cost that needs to be provisioned to create the project deliverables.

one needs to take care of clearly carving out project definition & the budgetary requirements. The durations for the various tasks necessary to complete the work are listed and grouped into a work breakdown structure. Setting Time line of the project activities To determine completion date of any projects it is essential to set time line of all the activities of the project to get the output.

b. Project scheduling A project consists of many inter-related activities. It consumes resources like man, money and materials. Therefore we need to schedule them. The project scheduling refers to process of laying out all the activities of the project in time sequence in logical order. Sequencing Techniques The Sequencing Techniques offers solutions to optimisation of project time.

Work Breakdown Structure (WBS) WBS is a hierarchical structure to logically subdivide all the work elements of the project into grahiphical presentation. A project can be logically sub-divided by project phases, location, tasks and time etc. This is also called organisation breakdown structure.

Work Breakdown Structure School Building civil electrical plumbing Foundation digging Construction of wall wiring fitting piping Fitting taps

Advantages of WBS 1. provide clear view of the project. 2. helps to develop a complete lists of activities of the project. 3. helps to estimate the budget for the project.

Gantt Chart It is a pictorial representation which shows the various activities involved in a project. It was developed by Henry L. Gantt One of the useful method of presenting project activity with time duration The Gantt Chart help us in time scale planning and sequencing of tasks in a visual form that can be follow easily by the project manager.

Activities Gantt Chart A Cr B C D Non critical activity E F 1 2 3 4 5 6 7 8 9 10 11 12 13 weeks

Network Techniques Network techniques are useful in reducing time overruns and cost overruns of the project There are basically two methods in network technique of the project scheduling 1.Critical Path Method (CPM) 2.Program Evaluation and Review Technique (PERT) CPM was developed by Morgan R. Walker and James E. Kelly in 1957 and PERT was developed by the US Navy in 1958.

1. Critical Path Method 1. The CP is the sequence of activities between a project s starting and completion time that Network diagram helps to identify critical and non-critical activities of the project. 2. CPM uses a deterministic approach which is useful for the project whose time duration can be predicted. more accurately. 3. It helps to know the duration of the project and its activities. 4. It is the longest path of the project. 5. An activity is any identifiable work that has a beginning and an end. It consumes time human resources, materials and money eg Construction of walls, roof etc.

An Event (also called node) is the beginning or end of an activity. It represent a specific point in time Slack time of an event is the difference between the latest finish time and the earliest start time of that event. Float time is the free time available for an activity. There are four possible activities: 1. Preceding activity 2. Succeeding activity 3. Concurrent activities 4. Dummy activity

Program Evaluation and Review Technique (PERT) PERT uses a probabilistic approach Expected time of activity in PERT= a+4m+b 6 Where, a = most optimistic (shortest) time m = most likely time b = pessimistic (longest) time

5. Planning and Development Problems in Nepal Lack of clear vision Lack of consistency Planning is a multi-dimensional exercise but not adequately considered while formulating plan. Diluted focus and shifting emphasis Poor and inadequate data and information base High dependency on agriculture Lack of industrial development

Lack of adequate participation and ownership Lack of stability in institutions Lacking of real needs, potentials and approaches Difficulty in resource mobilization Less attention to implementation Lack of socio-economic infrastructures Less emphasis on technological development Less ownership and coordination among ministries Weak M & E

6. Issues and Challenges of Development in Nepal: Issues Low economic growth Poverty and backwardness: Low per capita income and employment opportunities: High inflation High inequality: Low resource mobilization and its inefficient and ineffective Use: Low capital formation Large trade gap:

High use of remittances in consumption: Low human development High dependency on foreign assistance for development: Centralized governance system and lack of good governance Under utilization of human resources: Regional, Gender Imbalance and Exclusion:. Gender mainstreaming.

Challenges of Economic Development in Nepal: Reducing poverty Attaining inclusive high growth and development Controlling inflation Improving the living standard of the people Improving governance system Improving service delivery system Increasing resource mobilization and its utilization Reducing income inequality Improving human development index

Reducing external dependency for development Attaining SDGs Enhancing the level of income of the people by generating adequate employment opportunities. Improving human resource management Increasing export trade and reducing trade deficit Protecting environment and addressing climate change issue Managing disaster Ensuring the returns of development to the regions, communities and groups those are left behind in the process of development..

Managing the increasing population appropriately. Increasing investment in the priority sectors by creating investment-friendly environment. Mitigating the impact and potential impacts from the global economic recession. Using remittances in the productive sectors of the economy. Strengthening the democratic system Providing sufficient and reliable energy supply Availing local cooperation in infrastructure development.

7. Problems of Plan Formulation and Implementation in Nepal Lack of Perspective Plan Lack of consistency Formulation of highly ambitious plan Lacks political stability and commitment Planning is a multi-dimensional exercise but not adequately considered while formulating plan. Diluted focus and shifting emphasis Poor and inadequate data and information base

Lack of adequate participation and ownership Lack of stability in institutions Lacking of real needs, potentials and approaches Difficulty in resource mobilization Less attention to implementation Lack on quality at entry mechanism Less ownership and coordination among ministries Weak M & E mechanism

Sustainable development Inclusion Good governance Growth with equity PPP

9. Conclusion and Suggestions More participatory plan exercise is required. Plan should be based on more realistic resource forecast. Political stability is essential for successful implementation of plan. Political commitment should be ensured for effective implementation of Plan Plan should be based on national implementation capacity rather than needs

Need to adopt project screening mechanism in NPC and sector specific screening criteria. Project bank should be established. Implementation mechanism need to be strengthened by establishing quality-at-entry mechanism. M & E should be strengthened and quality of supervision should be improved. Establishing provincial and strengthening local level planning mechanism

Thank You