CITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS

Similar documents
CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

TOTAL QUANTITY UNIT COST UNIT

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown

Rock Chalk Park - Infrastructure Report. July 2013

Department of Public Works Engineering

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

ADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO

NE WEST KINGSTON ROAD CULVERT REPLACEMENT

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

OKLAHOMA TURNPIKE AUTHORITY

BID TABULATION BID REQUEST NO

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL

PART A ROADWAY - BASE BID

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal

PRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer

Reviax Constracting Corp. DeSantis Construction

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

SUBDIVISION IMPROVEMENTS AGREEMENT

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List

RFB Addendum 3

OKLAHOMA TURNPIKE AUTHORITY

Market Street Gateway Improvements Phase 1

CITY OF TAMPA ADDENDUM 2. April 18, 2018

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018

ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL

LETTING : CALL : 056 COUNTIES : MILLE LACS

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION

TAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc.

Addendum 1 Downtown North CRA Sidewalks

CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS NEWCASTLE WAY, SUITE 200 DECEMBER 18, CALL TO ORDER

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.

TAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc.

Regular. NECESSARY RESOURCES/IMPACTS (OTHER) n/a. Fiscal Impact

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE

CITY OF SAN MARCOS ENGINEERING DIVISION

AWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET

OKLAHOMA TURNPIKE AUTHORITY

BID TABULATION PAGE 1 OF 8

BID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562

STRAIGHT STRIPE PAINTING, INC. 22b Remove Pavement Markings with Sand Blasting Per Hour 1 $ $ $ $


Opinion of Probable Cost

SECTION BID. Valley Court Force Main Replacement Contract No. BE17-029

Northumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate

Fuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $

I. J~ /.. RrECE~VfEfD 9J7J:. 13~ 7b 1/1~ COUNCIL. ~ 1-j r-(lk. 1 1-'> lft:; WHATCOM COUNTY COUNCIL AGENDA BILL

North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL

CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS

REPLACEMENT OF MERCER COUNTY BRIDGE

CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT

CITY OF MISSION VIEJO PUBLIC WORKS FEE SCHEDULE

Public Works Maintenance STORMWATER AND

Sandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING

2018 Road Improvements Engineer's Project Number: LK 01 Bid Deadline: May 1, 2018 at 2:00 p.m. local time

CONTRACT TIME DETERMINATION

OKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE. PAGE NO. 1 DATE PRINTED : May 22, 2018

Munilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL

ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT

Job No Wastewater Collection System Small Main Rehabilitation at Focus Areas Pipebursting Method BID PROPOSAL. Dollars Cents $ $ Dollars

Addendum 1 13 TH Street Streetscape. September 1, 2017

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.

For Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No.

TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number:

PART II - Prospect Street 37. 8" Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050.

REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO OF THE CITY OF SAN JACINTO

Certified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University

Applying for a Kinder Morgan Canada. Proximity Permit. Design and Construction Guidelines CANADA

PRELIMINARY DESIGN OF AIRFIELD COMPONENTS (25%) ESTIMATE OF PROBABLE CONSTRUCTION COST

Engineer's Preliminary Estimate - 100% Submittal

Utility Committee Meeting AGENDA. October 3, 2017

Appendix B Example Project Designs and Engineers Opinion of Costs

BID TABULATION. Engineer's Estmated Opinion of Costs

ADDENDUM No. 1 January 29, Paving Program Village of Milford

BID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as

The bid due date has been changed to 2:50 p.m. May 25, 2018.

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

Patchogue Road Culvert Crossing IFB ADDENDUM #1 07/13/2015. Addendum #1 addresses the questions submitted by contractors.

ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:

BID TABULATION 32-04MAY06-Asphalt Overlay & Roadway Drainage Improvements

CITY OF DEERFIELD BEACH Request for City Commission Agenda

Solicitation No. B RA 2010 Concrete Placement Work Order Construction Contract Package No. 2 PROPOSAL. PROPOSAL OF, a corporation a

NAME OF CONTRACTOR CONTRACTORS ADDRESS Buffalo Road th ave Ct SW Walcott, IA North Liberty, IA

SAN RAFAEL CITY COUNCIL AGENDA REPORT

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.

August 22, Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA

Job No Medina River Sewer Outfall, Segment 4 Solicitation No. B DD BID PROPOSAL

City of Fortuna. Construction Services for the CITY OF FORTUNA (CIP# 9983) HILLSIDE AND ROHNER CREEKS MINOR FLOOD CONTROL IMPROVEMENTS PROJECT

Transcription:

1 2 3 4 5 6 MOBILIZATION per the General Requirements, Sections 01292 and 01721 ALLOWANCE for Differing Site Condition per the General Requirements, Sections 01212 and 01253 ALLOWANCE for Participating in Community Impact Mitigation per the General Requirements, Sections 01212, and 01112 ALLOWANCE for protecting/supporting existing private retaining walls ALLOWANCE to Pothole unknown substructures per General Requirements, Section 01212, 01253, 01732 Clearing and Grubbing per SSPWC Section 300-1 including but not limited to retaining curb and informal stairs both wood and concrete LS $ 82,565.00 $ 82,562.00 $ 140,000.00 LS $ 300,647.00 $ 916,393.00 $ 371,500.00 REMOVALS ENVIRONMENTAL CONSTRUCTION INC. JOHN S. MEEK 7 Street Light Removal including foundation and appurtenances EA 24 $ 985.00 $ 23,640.00 $ 590.00 $ 14,160.00 $ 3,195.00 $ 76,680.00 8 AC Cold Mill (min. 2") SF 410 $ 10.00 $ 4,100.00 $ 81.00 $ 33,210.00 $ 11.50 $ 4,715.00 9 Hand Excavation (to expose DWP waterline) CY 110 $ 130.00 $ 14,300.00 $ 100.00 $ 11,000.00 $ 485.00 $ 53,350.00 10 Unclassified Excavation including haul away and disposal CY 3,806 $ 90.00 $ 342,540.00 $ 57.00 $ 216,942.00 $ 76.00 $ 289,256.00 11 Type C Integral Curb and Gutter (a=2', b= 8" CH=5"-6"); per Standard Plan S-410 CONSTRUCTION LF 4,072 $45.00 $ 183,240.00 $ 30.00 $ 122,160.00 $ 54.00 $ 219,888.00 12 Short Retaining Curb (CH=10"-36") per Detail E per Drawing C-002 LF 1,004 $80.00 $ 80,320.00 $ 344.00 $ 345,376.00 $ 60.00 $ 60,240.00 13 Supply and Install 3/8" pea gravel including non-woven fabric CY 108 $506.00 $ 54,648.00 $ 111.00 $ 11,988.00 $ 170.00 $ 18,360.00 14 Type A Curb; per Standard Plan S-410 LF 306 $25.00 $ 7,650.00 $ 17.00 $ 5,202.00 $ 57.00 $ 17,442.00 15 Grade Soil at Median Island CY 738 $130.00 $ 95,940.00 $ 50.00 $ 36,900.00 $ 89.00 $ 65,682.00 16 Concrete Cross Gutter per Standard Plan S-410 SF 148 $12.00 $ 1,776.00 $ 10.00 $ 1,480.00 $ 52.00 $ 7,696.00 17 Retaining Wall per Detail R per Drawing C-002 LF 80 $135.00 $ 10,800.00 $ 200.00 $ 16,000.00 $ 900.00 $ 72,000.00 18 12" Crushed Miscellaneous Base under roadway SF 41,898 $9.00 $ 377,082.00 $ 2.00 $ 83,796.00 $ 5.00 $ 209,490.00 19 6" Concrete Driveway per Standard Plan S-440 SF 5,051 $9.00 $ 45,459.00 $ 10.00 $ 50,510.00 $ 13.00 $ 65,663.00 20 4" Concrete sidewalk per Standard Plan S-444 SF 9,754 $7.00 $ 68,278.00 $ 6.00 $ 58,524.00 $ 12.00 $ 117,048.00 21 4" Crushed Miscellaneous Base under sidewalk/driveway SF 25,653 $3.00 $ 76,959.00 $ 1.00 $ 25,653.00 $ 2.00 $ 51,306.00 Page 1 of 6

ENVIRONMENTAL CONSTRUCTION INC. JOHN S. MEEK 22 6" AC Pavement TON 1,519 $115.00 $ 174,685.00 $ 132.00 $ 200,508.00 $ 136.00 $ 206,584.00 23 Variable AC Pavement (min. 2") TON 9 $110.00 $ 990.00 $ 132.00 $ 1,188.00 $ 270.00 $ 2,430.00 24 Adjust Maintenance Hole (MH) to grade EA 8 $800.00 $ 6,400.00 $ 450.00 $ 3,600.00 $ 1,475.00 $ 11,800.00 25 Adjust Gas Valves to grade EA 5 $600.00 $ 3,000.00 $ 350.00 $ 1,750.00 $ 850.00 $ 4,250.00 26 Adjust Water Meter to grade EA 42 $600.00 $ 25,200.00 $ 350.00 $ 14,700.00 $ 730.00 $ 30,660.00 27 Relocate/Adjust Water Service Connections EA 24 $5,000.00 $ 120,000.00 $ 1,000.00 $ 24,000.00 $ 2,900.00 $ 69,600.00 28 Slurry Backfill per Brown Book Section 201-6 CLSM (DWP-water line CY blanket) 110 $305.00 $ 33,550.00 $ 250.00 $ 27,500.00 $ 340.00 $ 37,400.00 29 Adjust Water Valve to grade EA 10 $400.00 $ 4,000.00 $ 350.00 $ 3,500.00 $ 850.00 $ 8,500.00 30 Pipe Guardrail, Type-B1 with concrete curb per Standard Plan S-463 LF 75 $192.00 $ 14,400.00 $ 220.00 $ 16,500.00 $ 245.00 $ 18,375.00 31 3" DIA. Curb Drain LF 319 $36.00 $ 11,484.00 $ 15.00 $ 4,785.00 $ 125.00 $ 39,875.00 32 3" Diameter PVC Weephole on existing private retaining wall EA 41 $51.00 $ 2,091.00 $ 150.00 $ 6,150.00 $ 350.00 $ 14,350.00 33 Tensar Grid TX5-475 (Installed) SY 6,000 $5.00 $ 30,000.00 $ 7.00 $ 42,000.00 $ 8.00 $ 48,000.00 34 Landscaping LS $ 200,130.00 $ 80,774.00 $ 115,000.00 35 Irigation LS $ 40,000.00 $ 57,530.00 $ 92,000.00 36 Street Lighting including pullboxes LS $ 254,500.00 $ 255,000.00 $ 314,400.00 37 Traffic Control LS $ 30,000.00 $ 55,000.00 $ 228,000.00 38 Street Sign Post (Includes storage and relocation of existing street signs onto new post) EA 21 $221.00 $ 4,641.00 $ 500.00 $ 10,500.00 $ 540.00 $ 11,340.00 39 Relocate/ Street Signs EA 4 $214.00 $ 856.00 $ 500.00 $ 2,000.00 $ 184.00 $ 736.00 40 Traffic Striping (Includes removal) LS $ 4,000.00 $ 100.00 $ 15,200.00 Total Bid Amount: $ 2,834,703.00 $ 2,943,773.00 $ 3,213,648.00 High 3.85% High 13.37% Page 2 of 6

41 42 Clearing and Grubbing per SSPWC Section 300-1 including but not limited to retaining curb and informal stairs both wood and concrete Type C Integral Curb and Gutter (a=2', b= 8" CH=6"); per Standard Plan S-410 ENVIRONMENTAL CONSTRUCTION INC. JOHN S. MEEK LS $ 2,268.00 $ 12,000.00 $ 29,500.00 LF 66 $45.00 $ 2,970.00 $ 50.00 $ 3,300.00 $ 85.00 $ 5,610.00 43 6" AC PAVEMENT TON 14 $115.00 $ 1,610.00 $ 500.00 $ 7,000.00 $ 570.00 $ 7,980.00 44 8" Concrete Cross Gutter SF 56 $12.00 $ 672.00 $ 20.00 $ 1,120.00 $ 50.00 $ 2,800.00 45 12" Crushed Miscellaneous Base under roadway and intersection gutter SF 421 $9.00 $ 3,789.00 $ 3.00 $ 1,263.00 $ 22.00 $ 9,262.00 46 4" Crushed Miscellaneous Base under curb and gutter SF 152 $3.00 $ 456.00 $ 6.00 $ 912.00 $ 22.00 $ 3,344.00 47 48 49 Pothole to verify depth and type of existing utilities; including site restoration and cleaning. Install 18-inch diameter HDPE per SSPWC Section 207-18 with case 1 bedding; including shoring, removal and haul away of soil, 1-sack slurry backfill, site restoration and cleaning. Construct curb opening catch basin (CB) per SPPWC 302-2, W=2grates, V=8', with bike safe grate per standard plan S-342-4. EA 2 $1,200.00 $ 2,400.00 $ 2,000.00 $ 4,000.00 $ 1,500.00 $ 3,000.00 LF 210 $350.00 $ 73,500.00 $ 435.00 $ 91,350.00 $ 750.00 $ 157,500.00 CY 2 $15,000.00 $ 30,000.00 $ 7,000.00 $ 14,000.00 $ 14,350.00 $ 28,700.00 50 Install collar around pipe to pipe connections. EA 2 $5,000.00 $ 10,000.00 $ 1,500.00 $ 3,000.00 $ 2,435.00 $ 4,870.00 51 Construct connection from pipe to catch basin EA 4 $3,000.00 $ 12,000.00 $ 500.00 $ 2,000.00 $ 2,900.00 $ 11,600.00 52 Convert existing 2-grate catch basin into a transition box structure. SF 1 $9,000.00 $ 9,000.00 $ 2,500.00 $ 2,500.00 $ 25,750.00 $ 25,750.00 TOTAL ADDITIVE ALTERNATIVE BIDS: $ 148,665.00 $ 142,445.00 $ 289,916.00 Low -4.18% High 95.01% Page 3 of 6

MIKE PRLICH AND SONS, INC. CLARKE CONTRACTING CORPORATION 1 2 3 4 5 6 MOBILIZATION per the General Requirements, Sections 01292 and 01721 ALLOWANCE for Differing Site Condition per the General Requirements, Sections 01212 and 01253 ALLOWANCE for Participating in Community Impact Mitigation per the General Requirements, Sections 01212, and 01112 ALLOWANCE for protecting/supporting existing private retaining walls ALLOWANCE to Pothole unknown substructures per General Requirements, Section 01212, 01253, 01732 Clearing and Grubbing per SSPWC Section 300-1 including but not limited to retaining curb and informal stairs both wood and concrete LS $ 82,565.00 $ 82,564.00 $ 82,565.00 LS $ 300,647.00 $ 500,000.00 $ 910,000.00 REMOVALS 7 Street Light Removal including foundation and appurtenances EA 24 $ 985.00 $ 23,640.00 $ 2,400.00 $ 57,600.00 $ 1,500.00 $ 36,000.00 8 AC Cold Mill (min. 2") SF 410 $ 10.00 $ 4,100.00 $ 12.00 $ 4,920.00 $ 9.00 $ 3,690.00 9 Hand Excavation (to expose DWP waterline) CY 110 $ 130.00 $ 14,300.00 $ 400.00 $ 44,000.00 $ 335.00 $ 36,850.00 10 Unclassified Excavation including haul away and disposal CY 3,806 $ 90.00 $ 342,540.00 $ 210.00 $ 799,260.00 $ 185.00 $ 704,110.00 CONSTRUCTION 11 Type C Integral Curb and Gutter (a=2', b= 8" CH=5"-6"); per Standard Plan S-410 LF 4,072 $45.00 $ 183,240.00 $ 42.00 $ 171,024.00 $ 70.00 $ 285,040.00 12 Short Retaining Curb (CH=10"-36") per Detail E per Drawing C-002 LF 1,004 $80.00 $ 80,320.00 $ 44.00 $ 44,176.00 $ 148.00 $ 148,592.00 13 Supply and Install 3/8" pea gravel including non-woven fabric CY 108 $506.00 $ 54,648.00 $ 120.00 $ 12,960.00 $ 350.00 $ 37,800.00 14 Type A Curb; per Standard Plan S-410 LF 306 $25.00 $ 7,650.00 $ 80.00 $ 24,480.00 $ 27.00 $ 8,262.00 15 Grade Soil at Median Island CY 738 $130.00 $ 95,940.00 $ 160.00 $ 118,080.00 $ 80.00 $ 59,040.00 16 Concrete Cross Gutter per Standard Plan S-410 SF 148 $12.00 $ 1,776.00 $ 100.00 $ 14,800.00 $ 26.00 $ 3,848.00 CONSTRUCTION 17 Retaining Wall per Detail R per Drawing C-002 LF 80 $135.00 $ 10,800.00 $ 700.00 $ 56,000.00 $ 800.00 $ 64,000.00 18 12" Crushed Miscellaneous Base under roadway SF 41,898 $9.00 $ 377,082.00 $ 8.00 $ 335,184.00 $ 10.00 $ 418,980.00 19 6" Concrete Driveway per Standard Plan S-440 SF 5,051 $9.00 $ 45,459.00 $ 12.00 $ 60,612.00 $ 13.00 $ 65,663.00 20 4" Concrete sidewalk per Standard Plan S-444 SF 9,754 $7.00 $ 68,278.00 $ 9.00 $ 87,786.00 $ 8.00 $ 78,032.00 Page 4 of 6

MIKE PRLICH AND SONS, INC. CLARKE CONTRACTING 21 4" Crushed Miscellaneous Base under sidewalk/driveway SF 25,653 $3.00 $ 76,959.00 $ 5.00 $ 128,265.00 $ 6.00 $ 153,918.00 22 6" AC Pavement TON 1,519 $115.00 $ 174,685.00 $ 100.00 $ 151,900.00 $ 165.00 $ 250,635.00 23 Variable AC Pavement (min. 2") TON 9 $110.00 $ 990.00 $ 600.00 $ 5,400.00 $ 145.00 $ 1,305.00 24 Adjust Maintenance Hole (MH) to grade EA 8 $800.00 $ 6,400.00 $ 1,200.00 $ 9,600.00 $ 1,500.00 $ 12,000.00 25 Adjust Gas Valves to grade EA 5 $600.00 $ 3,000.00 $ 600.00 $ 3,000.00 $ 230.00 $ 1,150.00 26 Adjust Water Meter to grade EA 42 $600.00 $ 25,200.00 $ 400.00 $ 16,800.00 $ 250.00 $ 10,500.00 27 Relocate/Adjust Water Service Connections EA 24 $5,000.00 $ 120,000.00 $ 4,500.00 $ 108,000.00 $ 1,500.00 $ 36,000.00 Slurry Backfill per Brown Book Section 201-6 CLSM (DWP-water line 28 CY 110 $305.00 $ 33,550.00 $ 200.00 $ 22,000.00 $ 185.00 $ 20,350.00 blanket) 29 Adjust Water Valve to grade EA 10 $400.00 $ 4,000.00 $ 350.00 $ 3,500.00 $ 230.00 $ 2,300.00 30 Pipe Guardrail, Type-B1 with concrete curb per Standard Plan S-463 LF 75 $192.00 $ 14,400.00 $ 220.00 $ 16,500.00 $ 250.00 $ 18,750.00 31 3" DIA. Curb Drain LF 319 $36.00 $ 11,484.00 $ 50.00 $ 15,950.00 $ 35.00 $ 11,165.00 32 3" Diameter PVC Weephole on existing private retaining wall EA 41 $51.00 $ 2,091.00 $ 400.00 $ 16,400.00 $ 150.00 $ 6,150.00 33 Tensar Grid TX5-475 (Installed) SY 6,000 $5.00 $ 30,000.00 $ 5.00 $ 30,000.00 $ 8.00 $ 48,000.00 34 Landscaping LS $ 200,130.00 $ 97,000.00 $ 150,000.00 35 Irigation LS $ 40,000.00 $ 60,000.00 $ 100,000.00 36 Street Lighting including pullboxes LS $ 254,500.00 $ 250,000.00 $ 350,000.00 37 Traffic Control LS $ 30,000.00 $ 400,000.00 $ 150,000.00 38 Street Sign Post (Includes storage and relocation of existing street signs onto new post) EA 21 $221.00 $ 4,641.00 $ 500.00 $ 10,500.00 $ 350.00 $ 7,350.00 39 Relocate/ Street Signs EA 4 $214.00 $ 856.00 $ 500.00 $ 2,000.00 $ 350.00 $ 1,400.00 40 Traffic Striping (Includes removal) LS $ 4,000.00 $ 35,000.00 $ 4,000.00 Total Bid Amount: $ 2,834,703.00 $ 3,900,093.00 $ 4,382,277.00 High 37.58% High 54.59% Page 5 of 6

MIKE PRLICH AND SONS, INC. CLARKE CONTRACTING CORPORATION 41 Clearing and Grubbing per SSPWC Section 300-1 including but not limited to retaining curb and informal stairs both wood and concrete LS $ 2,268.00 $ 13,000.00 42 Type C Integral Curb and Gutter (a=2', b= 8" CH=6"); per Standard Plan S-410 LF 66 $45.00 $ 2,970.00 $ 120.00 $ 7,920.00 $ 36.00 $ 2,376.00 43 6" AC PAVEMENT TON 14 $115.00 $ 1,610.00 $ 250.00 $ 3,500.00 $ 500.00 $ 7,000.00 44 8" Concrete Cross Gutter SF 56 $12.00 $ 672.00 $ 120.00 $ 6,720.00 $ 41.00 $ 2,296.00 45 12" Crushed Miscellaneous Base under roadway and intersection gutter SF 421 $9.00 $ 3,789.00 $ 20.00 $ 8,420.00 $ 10.00 $ 4,210.00 46 4" Crushed Miscellaneous Base under curb and gutter SF 152 $3.00 $ 456.00 $ 15.00 $ 2,280.00 $ 8.00 $ 1,216.00 47 48 49 Pothole to verify depth and type of existing utilities; including site restoration and cleaning. Install 18-inch diameter HDPE per SSPWC Section 207-18 with case 1 bedding; including shoring, removal and haul away of soil, 1-sack slurry backfill, site restoration and cleaning. Construct curb opening catch basin (CB) per SPPWC 302-2, W=2grates, V=8', with bike safe grate per standard plan S-342-4. EA 2 $1,200.00 $ 2,400.00 $ 2,500.00 $ 800.00 $ 1,600.00 LF 210 $350.00 $ 73,500.00 $ 250.00 $ 52,500.00 $ 650.00 $ 136,500.00 CY 2 $15,000.00 $ 30,000.00 $ 10,000.00 $ 10,500.00 $ 21,000.00 50 Install collar around pipe to pipe connections. EA 2 $5,000.00 $ 10,000.00 $ 1,000.00 $ 2,000.00 $ 1,500.00 $ 3,000.00 51 Construct connection from pipe to catch basin EA 4 $3,000.00 $ 12,000.00 $ 1,000.00 $ 4,000.00 $ 1,500.00 $ 6,000.00 52 Convert existing 2-grate catch basin into a transition box structure. SF 1 $9,000.00 $ 9,000.00 $ 4,500.00 $ 4,500.00 TOTAL ADDITIVE ALTERNATIVE BIDS: $ 148,665.00 $ 137,340.00 $ 202,698.00 Low -7.62% High 36.35% Page 6 of 6