Department of Public Works Engineering

Similar documents
RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

ADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO

BID TABULATION BID REQUEST NO

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221

Rock Chalk Park - Infrastructure Report. July 2013

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL

LETTING : CALL : 056 COUNTIES : MILLE LACS

CITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS

SUBDIVISION IMPROVEMENTS AGREEMENT

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

TOTAL QUANTITY UNIT COST UNIT

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates

Utility Committee Meeting AGENDA. October 3, 2017

Certified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University

PART II - Prospect Street 37. 8" Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050.

CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List

Fuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018

Munilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL

OKLAHOMA TURNPIKE AUTHORITY

BID TABULATION PAGE 1 OF 6

ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT

Engineer's Preliminary Estimate - 100% Submittal

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

REPLACEMENT OF MERCER COUNTY BRIDGE

PART A ROADWAY - BASE BID

BID TABULATION PAGE 1 OF 8

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.

CITY OF TAMPA ADDENDUM 2. April 18, 2018

Patchogue Road Culvert Crossing IFB ADDENDUM #1 07/13/2015. Addendum #1 addresses the questions submitted by contractors.

ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:

ADDENDUM No. 1 January 29, Paving Program Village of Milford

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST

RFB Addendum 3

Addendum 1 Downtown North CRA Sidewalks

ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN

OKLAHOMA TURNPIKE AUTHORITY

PRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer

AWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET

OKLAHOMA TURNPIKE AUTHORITY

LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY

NE WEST KINGSTON ROAD CULVERT REPLACEMENT

BID TABULATION. Engineer's Estmated Opinion of Costs


Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

CITY OF SAN MARCOS ENGINEERING DIVISION



Addendum 1 13 TH Street Streetscape. September 1, 2017

Reviax Constracting Corp. DeSantis Construction

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562

ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL

TAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc.

Sandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING

CITY OF DEERFIELD BEACH Request for City Commission Agenda

STRAIGHT STRIPE PAINTING, INC. 22b Remove Pavement Markings with Sand Blasting Per Hour 1 $ $ $ $

TAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc.

Tabulation of Bids. Counties: ROUTE 94 BLACK CREEK TRIBUTARY CULVERT REPLACEMENT

I. J~ /.. RrECE~VfEfD 9J7J:. 13~ 7b 1/1~ COUNCIL. ~ 1-j r-(lk. 1 1-'> lft:; WHATCOM COUNTY COUNCIL AGENDA BILL

City of Palmer Action Memorandum No

Exhibit 4 Page 1 of 8

NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1. Project No. 253F Contract No

ITB-PW-U Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2

BID FORM. PROJECT: 2017 Water line replacement

SAN RAFAEL CITY COUNCIL AGENDA REPORT


CONTRACT TIME DETERMINATION

2001 Average Bid Tabs

NAME OF CONTRACTOR CONTRACTORS ADDRESS Buffalo Road th ave Ct SW Walcott, IA North Liberty, IA

Public Works Maintenance STORMWATER AND

Market Street Gateway Improvements Phase 1

CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT

TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number:

BID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #

New Jersey Department of Transportation DATE : 06/22/10 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 11/16/10 PAGE : TABULATION OF BIDS

CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS NEWCASTLE WAY, SUITE 200 DECEMBER 18, CALL TO ORDER

AB COMFORT STATION AT MERCER COUNTY PARK FESTIVAL GROUNDS DESCRIPTION SAKOUTIS J.H. WILLIAMS SCOZZARI LEVY TRICON RED OAK VISION DELL-TECH

Pflugerville, TX St. Hedwig, TX 78152

BID TABULATION JAMES STREET TRUNK SEWER IMPROVEMENTS CORALVILLE, IOWA

OKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE. PAGE NO. 1 DATE PRINTED : May 22, 2018

Opinion of Probable Cost

Solicitation No. B RA 2010 Concrete Placement Work Order Construction Contract Package No. 2 PROPOSAL. PROPOSAL OF, a corporation a

Route Route Z Intersection Realignment

Transcription:

Department of Public Works Engineering DATE: January 27, 2016 TO: Honorable Chairman and Public Utility Authority Members FROM: Cynthia M. Herrera, MMC, Interim Executive Director/ City Clerk BY: Nathan Coapstick, Public Works Project Coordinator SUBJECT: BID RESULTS FOR ADELANTO TOWN CENTER OFF-SITE IMPROVEMENTS RECOMMENDATION: Approve the Bid results and approve Lewis Development to award the contract to Vance Corporation for the construction of the Adelanto Town Center off-site improvements. SUMMARY: Attached are the bid results and Vance Corporations bid package for review and approval of the Bid. This project is to be performed and administered by Lewis development, with reimbursements for expenditures per the executed development agreement between Lewis Development and the City of Adelanto. BIDS: Received (Qualified) 1. Vance Corporation 2. Sully-Miller Contracting 3. All American Asphalt Received (Un-Qualified) 1. Lyle Parks Jr. Construction BUDGET: The City has previously entered into a Development Agreement with Lewis Development Corp which allocates $3,700,000 of Regional Measure I funds to perform the installation of the improvements. ATTACHMENTS: 1. Bid Opening Tabulation Chart 2. Vance Corporations Bid Schedule

Adelanto Bid Spread 12-17-15 Project Title: Adelanto Towne Center Off-Site Improvements Project Location: Adelanto, CA Bid Opening Location: 160 S. Old Spring Rd., Ste 210 Bid Opening Date/Time: Dec 17th, 2015-2:00 PM 0 1 2 Sully-Miller Contracting 3 4 Vance Corporation Company All American Asphalt ***Lyle Parks Jr. Construction Rialto, CA Brea, CA Corona, CA Corona, CA Item Unit of Item No. Measure Quantity Unit Price Total Unit Price Total Bid Unit Price Total Bid Unit Price Total Bid Unit Price Their Total 1 Mobilization And Demobilization LS 2 $ - $ - $ 63,000.00 $ 126,000.00 $ 51,000.00 $ 102,000.00 $ 40,000.00 $ 80,000.00 $ 3,500.00 $ 3,500.00 2 Clearing And Grubbing LS 1 $ - $ - $ 3,900.00 $ 3,900.00 $ 8,845.05 $ 8,845.05 $ 20,000.00 $ 20,000.00 $ 28,730.00 $ 28,730.00 3 SWPPP: Contractor To Prepare, Submit To The State Board, And Implement Approved SWPPP Prepared And Signed By Contractor's QSD LS 1 $ - $ - $ 29,000.00 $ 29,000.00 $ 7,000.00 $ 7,000.00 $ 20,000.00 $ 20,000.00 $ 46,200.00 $ 46,200.00 4 Traffic Control And Lane Closures Implementation LS 1 $ - $ - $ 96,500.00 $ 96,500.00 $ 100,000.00 $ 100,000.00 $ 370,000.00 $ 370,000.00 $ 18,000.00 $ 18,000.00 5 Construction Staking And Survey LS 1 $ - $ - $ 22,995.00 $ 22,995.00 $ 9,500.00 $ 9,500.00 $ 19,000.00 $ 19,000.00 $ 12,000.00 $ 12,000.00 6 As-Built Drawings LS 1 $ - $ - $ 1,870.00 $ 1,870.00 $ 1,300.00 $ 1,300.00 $ 5,500.00 $ 5,500.00 $ - 7 Trench Shoring And Bracing LS 1 $ - $ - $ 10,500.00 $ 10,500.00 $ 14,000.00 $ 14,000.00 $ 16,200.00 $ 16,200.00 $ - 8 Sawcut Remove And Dispose Existing Pavement SF 53,000 $ - $ - $ 0.60 $ 31,800.00 $ 1.10 $ 58,300.00 $ 1.40 $ 74,200.00 $ 1.89 $ 105,560.00 9 Adjust Valve/Meter/Vaults/Manholes To Grade EA 6 $ - $ - $ 1,260.00 $ 7,560.00 $ 235.00 $ 1,410.00 $ 1,100.00 $ 6,600.00 $ 700.00 $ 4,200.00 10 Relocate Existing Sign EA 5 $ - $ - $ 184.00 $ 920.00 $ 635.00 $ 3,175.00 $ 325.00 $ 1,625.00 $ 350.00 $ 1,750.00 11 Relocate Existing Fence LF 960 $ - $ - $ 1.00 $ 960.00 $ 26.00 $ 24,960.00 $ 20.00 $ 19,200.00 $ 6.50 $ 6,240.00 12 Earthwork - Export CY 5,500 $ - $ - $ 7.90 $ 43,450.00 $ 14.00 $ 13.25 $ 22.00 $ 121,000.00 $ 13.25 $ 132,500.00 13 Earthwork - Earthwork Within Project CY 10,500 $ - $ - $ 7.50 $ 78,750.00 $ 8.50 $ 89,250.00 $ 17.00 $ 178,500.00 $ 69,434.00 $ 69,434.00 14 Coldplane And Overlay Existing Pavement 0.25' Thick W/ HMA Type C SF 13,000 $ - $ - $ 0.44 $ 5,720.00 $ 2.80 $ 36,400.00 $ 3.20 $ 41,600.00 $ 2.75 $ 35,750.00 15 Fine Grade SF 150,000 $ - $ - $ 0.25 $ 37,500.00 $ 0.25 $ 37,500.00 $ 0.25 $ 37,500.00 $ 0.31 $ 27,368.00 16 0.80' Thick Hot Mix Asphalt SF 102,500 $ - $ - $ 5.75 $ 589,375.00 $ 5.60 $ 574,000.00 $ 7.00 $ 717,500.00 $ 5.95 $ 609,875.00 17 1.40' Thick Class II Aggregate Base SF 102,500 $ - $ - $ 1.35 $ 138,375.00 $ 1.80 $ 184,500.00 $ 3.30 $ 338,250.00 $ 1.95 $ 199,875.00 18 Curb And Gutter (Caltrans Std A87A Type A2-6) LF 1,100 $ - $ - $ 19.50 $ 21,450.00 $ 24.00 $ 26,400.00 $ 28.00 $ 30,800.00 $ 26.00 $ 35,750.00 19 Bicycle Ramp (FHWA-RD-00-067 W/ Caltrans DIB 80-01) SF 160 $ - $ - $ 12.70 $ 2,032.00 $ 4.00 $ 640.00 $ 20.00 $ 3,200.00 $ 10.50 $ 1,680.00 20 Commercial Driveway Approach (Caltrans Std A87A) SF 270 $ - $ - $ 7.80 $ 2,106.00 $ 6.50 $ 1,755.00 $ 12.00 $ 3,240.00 $ 10.50 $ 2,835.00 21 PCC Cross Gutter (City Of Adelanto Std 119) SF 2,000 $ - $ - $ 8.50 $ 17,000.00 $ 8.50 $ 17,000.00 $ 11.50 $ 23,000.00 $ 9.00 $ 17,685.00 22 4" Thick PCC Sidewalk (Caltrans StdSpecs 73) SF 10,200 $ - $ - $ 4.10 $ 41,820.00 $ 5.00 $ 51,000.00 $ 5.70 $ 58,140.00 $ 6.20 $ 67,611.00 23 ADA Compliant Curb Ramp With Cast In Place Detectable Warning Surface (Caltrans Std A88A Case A) EA 5 $ - $ - $ 2,150.00 $ 10,750.00 $ 1,800.00 $ 9,000.00 $ 2,200.00 $ 11,000.00 $ 1,200.00 $ 6,000.00 24 0.35' Thick Hot Mix Asphalt Over 1.85' CL II AB SF 7,300 $ - $ - $ 4.60 $ 33,580.00 $ 2.75 $ 20,075.00 $ 9.00 $ 65,700.00 $ 5.70 $ 41,610.00 25 Temporary Stripings/Markings On Hwy 395 LS 1 $ - $ - $ 1,820.00 $ 1,820.00 $ 6,500.00 $ 6,500.00 $ 9,000.00 $ 9,000.00 $ - $ - 26 Drain Inlet (Std. D72 Type OL) With Fossil Filter And Local Depression EA 1 $ - $ - $ 10,100.00 $ 10,100.00 $ 6,000.00 $ 6,000.00 $ 11,300.00 $ 11,300.00 $ 9,300.00 $ 9,300.00 27 Concrete Collar (SPPWC Std 380-4) EA 1 $ - $ - $ 263.00 $ 263.00 $ 1,800.00 $ 1,800.00 $ 860.00 $ 860.00 $ 600.00 $ 600.00 28 24" RC Pipe (D-2000) Includes Trenching And Backfill LF 35 $ - $ - $ 175.00 $ 6,125.00 $ 250.00 $ 8,750.00 $ 210.00 $ 7,350.00 $ 420.00 $ 14,700.00 29 36" x 6" Rectangular CI Pipe (Includes Trenching And Backfill) LF 10 $ - $ - $ 263.00 $ 2,630.00 $ 400.00 $ 4,000.00 $ 370.00 $ 3,700.00 $ 330.00 $ 3,300.00 30 Concrete Manhole (SPPWC Std 320-2) EA 1 $ - $ - $ 4,900.00 $ 4,900.00 $ 8,500.00 $ 8,500.00 $ 6,000.00 $ 6,000.00 $ 8,000.00 $ 8,000.00 31 Shoulder Backing (Caltrans SSP 19-9) SF 2,500 $ - $ - $ 1.28 $ 3,200.00 $ 1.50 $ 3,750.00 $ 5.00 $ 12,500.00 $ 1.25 $ 3,125.00 32 AC Trapezoidal Channel (Includes 3" Curb) SF 2,300 $ - $ - $ 6.70 $ 15,410.00 $ 6.00 $ 13,800.00 $ 6.00 $ 13,800.00 $ 8.00 $ 18,400.00 33 24" Deep Concrete Cutoff Wall (Includes Base Section) LF 28 $ - $ - $ 143.00 $ 4,004.00 $ 150.00 $ 4,200.00 $ 105.00 $ 2,940.00 $ 150.00 $ 4,200.00 34 12" Tick Rip Rap (Includes Base Section) SF 450 $ - $ - $ 15.00 $ 6,750.00 $ 15.00 $ 6,750.00 $ 20.00 $ 9,000.00 $ 17.00 $ 7,650.00 35 Metal Flared End Section (Caltrans Std. D94A-D94B) EA 1 $ - $ - $ 760.00 $ 760.00 $ 1,500.00 $ 1,500.00 $ 4,000.00 $ 4,000.00 $ 3,000.00 $ 3,000.00 36 Metal Beam Guardrailing (Caltrans Std A77A1-A77K2) LF 60 $ - $ - $ 113.00 $ 6,780.00 $ 135.00 $ 8,100.00 $ 125.00 $ 7,500.00 $ 80.00 $ 4,800.00 37 Infiltration Trench Per Detail. (Includes 0" Perimiter Curb, Observation Wells, And Filter Fabric) SF 2,400 $ - $ - $ 25.40 $ 60,960.00 $ 53.00 $ 127,200.00 $ 50.00 $ 120,000.00 $ 31.00 $ 74,400.00 38 Signal Modification (Hwy 395 & Mojave Dr.) LS 1 $ - $ - $ 97,000.00 $ 97,000.00 $ 100,000.00 $ 100,000.00 $ 130,000.00 $ 130,000.00 $ 92,550.00 $ 92,550.00 39 Install Traffic Signal Conduits At The Intersection Of Hwy 395 & Joshua St) Per Traffic Signal Plan (Sheet 11 Of 13) LS 1 $ - $ - $ 5,800.00 $ 5,800.00 $ 100,000.00 $ 100,000.00 $ 211,000.00 $ 211,000.00 $ 5,510.00 $ 5,510.00 6" PVC Pipe, C-900 CL 200 (Includes Trenching, Fittings, Thrust 40 Blocks, Restrained Joints, Backfill, Tape, And Tracer Wire As LF 100 $ - $ - $ 103.00 $ 10,300.00 $ 105.00 $ 10,500.00 $ 175.00 $ 17,500.00 $ - $ - Required) 41 12" PVC Pipe, C-900 CL 200 (City Of Adelanto Std Plate 8) (Includes Trenching, Thrust Blocks, Restrained Joints, Backfill, LF 140 $ - $ - $ 142.00 $ 19,880.00 $ 160.00 $ 22,400.00 $ 185.00 $ 25,900.00 $ 220.00 $ 30,800.00 Tape, And Tracer Wire As Required) 42 12" Butterfly Valve EA 1 $ - $ - $ 3,600.00 $ 3,600.00 $ 8,000.00 $ 8,000.00 $ 3,500.00 $ 3,500.00 $ 3,300.00 $ 3,300.00 43 Connect To Existing 12" Waterline W/Hot Tap EA 8 $ - $ - $ 5,100.00 $ 40,800.00 $ 3,500.00 $ 28,000.00 $ 1,600.00 $ 12,800.00 $ 9,750.00 $ 78,000.00 44 Install Super Fire Hydrant Assembly 6"x4" 2.5"x2.5" Dry Barrel (Includes Trenching, Backfill, Pipe, Gate Valve, Hydrant Marker, Thrust Blocks, And Restrained Joints As Required) EA 5 $ - $ - $ 8,400.00 $ 42,000.00 $ 7,500.00 $ 37,500.00 $ 10,700.00 $ 53,500.00 $ 8,600.00 $ 43,000.00 45 Install 2" Water Service w/meter Box (City of Adelanto Std) EA 11 $ - $ - $ 2,770.00 $ 30,470.00 $ 2,000.00 $ 22,000.00 $ 7,400.00 $ 81,400.00 $ 3,200.00 $ 35,200.00 46 Install 1 1/2" Water Service w/meter Box (City of Adelanto Std) EA 2 $ - $ - $ 2,300.00 $ 4,600.00 $ 2,800.00 $ 5,600.00 $ 7,100.00 $ 14,200.00 $ 3,000.00 $ 6,000.00 47 2-42" x 6" Rectangular RC Pipe LF 120 $ - $ - $ 274.00 $ 32,880.00 $ 850.00 $ 102,000.00 $ 1,050.00 $ 126,000.00 $ 1,200.00 $ 144,000.00 48 Permanent K Rail LF 70 $ - $ - $ 23.00 $ 1,610.00 $ 140.00 $ 9,800.00 $ 45.00 $ 3,150.00 $ 207.00 $ 14,490.00 49 Joint Trench (SCE & CATV) LF 1,650 $ - $ - $ 16.20 $ 26,730.00 $ 15.00 $ 24,750.00 $ 14.00 $ 23,100.00 $ 8.18 $ 13,497.00 50 Sole Trench - CATV LF 125 $ - $ - $ 13.70 $ 1,712.50 $ 15.00 $ 1,875.00 $ 14.00 $ 1,750.00 $ 4.40 $ 550.00 51 Sole Trench - SCE LF 70 $ - $ - $ 13.70 $ 959.00 $ 15.00 $ 1,050.00 $ 14.00 $ 980.00 $ 7.86 $ 550.20 52 3" Sand Base LF 1,850 $ - $ - $ 1.05 $ 1,942.50 $ 1.10 $ 2,035.00 $ 1.10 $ 2,035.00 $ 1.08 $ 1,998.00 53 12" Sand Shade Over SCE LF 1,720 $ - $ - $ 1.57 $ 2,700.40 $ 1.70 $ 2,924.00 $ 1.65 $ 2,838.00 $ 4.61 $ 7,929.20 54 6" Sand Shade Over CATV LF 1,780 $ - $ - $ 1.30 $ 2,314.00 $ 1.40 $ 2,492.00 $ 1.35 $ 2,403.00 $ 2.25 $ 4,005.00 55 Full Electric Conduit Encasement Per SCE Drawings LF 1,440 $ - $ - $ 21.00 $ 30,240.00 $ 22.00 $ 31,680.00 $ 21.50 $ 30,960.00 $ 8.33 $ 11,995.20 56 6" SCE Conduit LF 3,225 $ - $ - $ 11.00 $ 35,475.00 $ 12.00 $ 38,700.00 $ 11.30 $ 36,442.50 $ 11.78 $ 37,990.50 57 5" SCE Conduit LF 7,070 $ - $ - $ 10.50 $ 74,235.00 $ 11.00 $ 77,770.00 $ 10.80 $ 76,356.00 $ 10.75 $ 76,002.50 58 7'x14' SCE Vault EA 2 $ - $ - $ 31,500.00 $ 63,000.00 $ 32,000.00 $ 64,000.00 $ 32,500.00 $ 65,000.00 $ 10,350.00 $ 20,700.00 59 66"x72" SCE Concrete Pad EA 1 $ - $ - $ 1,580.00 $ 1,580.00 $ 1,700.00 $ 1,700.00 $ 1,700.00 $ 1,700.00 $ 1,450.00 $ 1,450.00 60 3" Schedule 40 CATV Conduit LF 3,055 $ - $ - $ 2.10 $ 6,415.50 $ 2.20 $ 6,721.00 $ 2.15 $ 6,568.25 $ 6.11 $ 18,666.05 61 24"x36" CATV Vault EA 4 $ - $ - $ 525.00 $ 2,100.00 $ 550.00 $ 2,200.00 $ 550.00 $ 2,200.00 $ 1,100.00 $ 4,400.00 62 Remove Traffic Striping SF 4,062 $ - $ - $ 1.58 $ 6,417.96 $ 1.60 $ 6,499.20 $ 1.60 $ 6,499.20 $ - $ - 63 Relective R.P.M. EA 521 $ - $ - $ 5.25 $ 2,735.25 $ 5.50 $ 2,865.50 $ 5.40 $ 2,813.40 $ - $ - 64 Furnish And Install Signs EA 7 $ - $ - $ 305.00 $ 2,135.00 $ 325.00 $ 2,275.00 $ 315.00 $ 2,205.00 $ - $ - 65 Install Thermopalstic Markings SF 201 $ - $ - $ 4.40 $ 884.40 $ 4.75 $ 954.75 $ 4.55 $ 914.55 $ - $ - 66 Remove And Salvage Signs EA 1 $ - $ - $ 210.00 $ 210.00 $ 225.00 $ 225.00 $ 220.00 $ 220.00 $ - $ - 67 12" Crosswalk & Limit Line LF 440 $ - $ - $ 4.20 $ 1,848.00 $ 4.50 $ 1,980.00 $ 4.30 $ 1,892.00 $ - $ - 68 4" Solid LF 250 $ - $ - $ 1.05 $ 262.50 $ 1.10 $ 275.00 $ 1.10 $ 275.00 $ - $ - 69 8" Solid LF 1,300 $ - $ - $ 2.10 $ 2,730.00 $ 2.25 $ 2,925.00 $ 2.15 $ 2,795.00 $ - $ - 70 Detail 12 LF 2,790 $ - $ - $ 0.65 $ 1,813.50 $ 0.70 $ 1,953.00 $ 0.67 $ 1,869.30 $ - $ - 71 Detail 22 LF 1,885 $ - $ - $ 1.68 $ 3,166.80 $ 1.80 $ 3,393.00 $ 1.75 $ 3,298.75 $ - $ - 72 Detail 27B LF 2,890 $ - $ - $ 0.78 $ 2,254.20 $ 0.80 $ 2,312.00 $ 0.80 $ 2,312.00 $ - $ - 73 Detail 29 LF 1,105 $ - $ - $ 3.36 $ 3,712.80 $ 3.60 $ 3,978.00 $ 3.45 $ 3,812.25 $ - $ - 74 Detail 38 LF 475 $ - $ - $ 1.57 $ 745.75 $ 1.70 $ 807.50 $ 1.65 $ 783.75 $ - $ - 75 Miscellaneous Pavement Markings, Legends, Etc. LS 1 $ - $ - $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,500.00 $ 5,500.00 $ - $ - Sum = $ 2,049,875.06 Sum = $2,318,013.25 Sum = $ 3,436,177.95 Sum = $ 2,752,908.65 Bid = Bid = Bid = Difference = $ 2,049,875.06 Difference = $2,318,013.25 Difference = $ 3,436,177.95 Some Items Not Included That Did Not Match Note(s): 1. Red Text Indicates a Mathematical Error Page 1 of 1