Committee Staff Procurement Backup Book FY 2008/2009 Budget Estimates. February 2007 MISSILE PROCUREMENT, AIR FORCE OPR: SAF/FMB

Similar documents
Committee Staff Procurement Backup Book FY 2007 Budget Estimates. February 2006 MISSILE PROCUREMENT, AIR FORCE OPR: SAF/FMB

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

Committee Staff Procurement Backup Book FY 2005 Budget Estimates. February 2004 AIRCRAFT PROCUREMENT, AIR FORCE VOLUME I OPR: SAF/FMB

Committee Staff Procurement Backup Book FY 2001 Amended Budget Request. February 2000 AIRCRAFT PROCUREMENT, AIR FORCE VOLUME I OPR: SAF/FMB

Department of Defense Fiscal Year (FY) 2013 President's Budget Submission

Department of Defense Fiscal Year (FY) 2019 Budget Estimates

Department of Defense Fiscal Year (FY) 2018 Budget Estimates

Department of Defense Fiscal Year (FY) 2017 President's Budget Submission

O UNIT 6. Risk Management Response. Risk Management, Response, and Recovery for IT Systems

Department of Defense Fiscal Year (FY) 2017 President's Budget Submission

Principals, Business Managers and Special Education Staff. Purchasing Equipment, Supplies, and Contracted Services for Students with Disabilities

P roficy* M aintenance G ateway

FY09 President s Budget America s Edge: Global Vigilance, Reach and Power

MEASURE M CONSTRUCTION PROJECTS REPORT June 2017

"Manufacturing and Cold Test" Contract (MFR) Questions / Answers

Lockheed Martin Reports Second Quarter 2014 Results

L-3 COMMUNICATIONS ANNOUNCES FIRST QUARTER 2007 RESULTS

PART A Electronic lodgment declaration (Form C)

Selected Acquisition Report (SAR)

Town of Sellersburg EMPLOYMENT APPLICATION. Applicant Name

SOT23 3. Part Number Compliance Marking Reel Size(inches) Tape Width(mm) Quantity Per Reel DESDA5V3LQ-7 Automotive RD ,000/Tape & Reel

Finally, the Department determined that modernizing 47 C-5B aircraft and 2 C-5C aircraft best meets the essentiality criteria set forth by the JROC.

Lockheed Martin Reports Third Quarter 2018 Results

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

SUPPLEMENTAL PURCHASE ORDER PROVISIONS UNDER U.S. GOVERNMENT CONTRACTS

Selected Acquisition Report (SAR)

Northrop Grumman Corporation. Acquisition of Orbital ATK. Webcast. September 18, 2017

SUBPART INSURANCE (Revised December 15, 1998)

L-3 Announces First Quarter 2014 Results

FORM 8-K. LOCKHEED MARTIN CORPORATION (Exact name of registrant as specified in its charter)

AF Process Improvement: Enhancing Materiel Readiness

Change Request SUBJECT: Claim Adjustment Reason Code (CARC), Remittance Advice Remark Code (RARC), and Medicare Remit Easy Print (MREP) Update

CONNECTICUT HOUSING FINANCE AUTHORITY

DEPARTMENT OF THE ARMY

General Dynamics Reports Fourth-Quarter, Full-Year 2016 Results

Develop Project Management Plan

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 6 P-1 Line #1

Lockheed Martin Reports First Quarter 2018 Results

Midwestern State University Wichita Falls, Texas

L3 Technologies, Inc.

(in millions, except per share data) Quarters Ended March 25, March 26, 2017 Net sales $ 11,635 $ 11,212

GENERAL DYNAMICS CORPORATION (Exact Name of Registrant as Specified in Its Charter)

GCC RAILWAY DEVELOPMENT: A VISION TO INTEGRATION. Ramiz Al Assar, Ph.D.

For personal use only

Overlook Neighborhood Calls for Service 3 Year Comparison

L-3 Announces Fourth Quarter 2013 Results

GENERAL DYNAMICS CORPORATION (Exact Name of Registrant as Specified in Its Charter)

Selected Acquisition Report (SAR)

Lockheed Martin Reports Second Quarter 2018 Results

General Dynamics Reports Second-Quarter 2017 Results

Current Budget Issues PDI 2014

General Dynamics Reports Fourth-Quarter, Full-Year 2018 Results

Lockheed Martin Reports Third Quarter 2016 Results

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 977 Date: October 27, 2011

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 2236 Date: June 3, 2011

Eric Nemoseck Professor of Business Financial Management Defense Acquisition University (DAU)

WELCOME TO FULL COVER AND DAMAGE COVER

Scorecard - Niagara-on-the-Lake Hydro Inc. 9/24/2017

NOTICE INVITING TENDER. (NIT) SUPPLY, INSTALLATION & COMMISSIONING FULLY AUTOMATIC ORGANIC WASTE COMPOSTER HAVING CAPACITY OF

Transmittal 2163 Date: February 23, 2011

ROOF CONTRACTORS LIABILITY QUESTIONNAIRE

GENERAL CONDITIONS FOR THE SUPPLY OF WORKS

Title 48: Federal Acquisition Regulations System PART 45 GOVERNMENT PROPERTY

News July 29, 2015 Contact: Lucy Ryan Tel:

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 927 Date: July 29, 2011

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 1003 Date: November 25, 2011

Future of the Qatari Defense Industry Market Attractiveness, Competitive Landscape and Forecasts to 2020

GUIDE FOR COMPLETING CO-PLAN DD 2794: COST AND SOFTWARE DATA REPORTING (CSDR) & EARNED VALUE MANAGEMENT (EVM) CO-PLAN

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 896 Date: May 6, 2011

Vineland Board Of Education Report to the Board June 13, 2012 Page 5 RECOMMENDATIONS BY SUPERINTENDENT


Recognizing and Mitigating Risk in Acquisition Programs

Texas Administrative Code

ASC 606: Revenue from Contracts with Customers

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 1008 Date: December 23, 2011

L-3 Announces Second Quarter 2013 Results

DATA ITEM DESCRIPTION

CHAPTER House Bill No. 415

L3 Announces Fourth Quarter and Full Year 2018 Results

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 2008 Date: July 30, 2010

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 971 Date: October 26, 2011

LIMITED WARRANTY AND TECHNICAL SUPPORT AGREEMENT FOR IXIA BRANDED KEYSIGHT PRODUCTS

NORTH DAKOTA INSURANCE RESERVE FUND PUBLIC ASSETS MEMORANDUM OF COVERAGE MOBILE EQUIPMENT AND PERSONAL PROPERTY COVERAGE FORM TABLE OF CONTENTS

Concepts, Techniques and Tools that Support Program Budgeting

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 876 Date: April 22, 2011

Gabelli Asset Management Aircraft Supplier Conference

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 2836 Date: December 13.

DEFENSE FEDERAL ACQUISITION REGULATION SUPPLEMENT (DFARS) FLOWDOWN PROVISIONS FOR SUBCONTRACTS/PURCHASE ORDERS FOR NON-COMMERCIAL ITEMS UNDER A U.

Additional Terms and Conditions For Request for Quotations and Purchase Orders in Support of Government Contracts

Supplement 2 Department of Defense FAR Supplement (DFARS) Government Contract Provisions

Headquarters U.S. Air Force

Selected Acquisition Report (SAR)

XR150/XR550 SERIES PROGRAMMING SHEET

AAR CORP. Jefferies 2016 Industrials Conference. New York City August 10, 2016

2011 Annual Shareholders Meeting February 1, 2011

Master uncontrolled when printed

DATA ITEM DESCRIPTION

Reports Fourth Quarter and Full Year Results 2006 Record Quarterly Revenue and Earnings

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 1600 Date: January 29, 2016

Transcription:

ommittee taff rocurement Backup Book FY 2008/2009 Budget stimates February 2007 II, I F : F/FB

B F FY 2008/2009 Budget stimates II, I F (3020) I 1 ~ Y I xhibit -1 issile rocurement, ir Force 3 I 2 ~ BD DIX X issile rocurement, ir Force ppendix anguage 9 I 3 ~ -1 I I DI BD IIY 01: BII II II QI BII -1 ine Item o. 1 issile eplacement quipment Ballistic 1-1 BD IIY 02: H II I -1 ine Item o. 2 oint ir-to-urface tandoff issile () 2-1 i

B F FY 2008/2009 Budget stimates II, I F (3020) -1 ine Item o. 3 idewinder (I-9X) 2-11 -1 ine Item o. 4 dvanced edium ange ir-to-ir issile () 2-21 -1 ine Item o. 5 Hellfire issile (D2) 2-33 -1 ine Item o. 6 mall Diameter Bomb (DB) 2-43 IDI FIII -1 ine Item o. 7 Industrial Facilities 2-53 BD IIY 03: DIFII F I I II II DIFII xhibit -1, rocurement rograms odification ummary 3-1 -1 ine Item o. 8 129 dvanced ruise issile 3-5 -1 ine Item o. 9-30 inuteman III odifications 3-9 -1 ine Item o. 10-65D averick 3-31 -1 ine Item o. 11-86 ir aunch ruise issile 3-33 ii

B F FY 2008/2009 Budget stimates II, I F (3020) BD IIY 04: D I II D I -1 ine Item o. 12 - Initial and eplenished pares/epair arts 4-1 BD IIY 05: H -1 ine Item o. 13 dvanced HF 5-1 -1 ine Item o. 14 Wideband apfiller atellites 5-7 -1 ine Item o. 15 Wideband apfiller atellites dvance rocurement 5-15 -1 ine Item o. 16 paceborne quipment () 5-19 -1 ine Item o. 17 avstar lobal ositioning ystem () 5-23 1 ine Item o. 18 - avstar lobal ositioning ystem () dvance rocurement 5-33 -1 ine Item o. 18a D Detection ystem (D) 5-37 iii

B F FY 2008/2009 Budget stimates II, I F (3020) -1 ine Item o. 19 Defense eteorological atellite rogram (D) 5-39 -1 ine Item o. 20 Defense upport rogram (D) 5-43 -1 ine Item o. 21 itan pace Boosters 5-47 -1 ine Item o. 22 volved xpendable aunch ehicles () 5-51 -1 ine Item o. 23 edium aunch ehicles () 5 63-1 ine Item o. 23a pace-based Infra-ed ystem (BI) High 5 69-1 ine Item o. 24 pace-based Infra-ed ystem (BI) High dvance rocurement 5 75 iv

FY 2008/2009 BD I FBY 2007 I 1: Y I

HI IIY F BK

FY 2008/2009 BD I FBY 2007 I 2: BD DIX X

HI IIY F BK

Budget ppendix xtract anguage Fiscal Year 2008/2009 Budget stimates issile rocurement, ir Force For construction, procurement, and modification of missiles, spacecraft, rockets, and related equipment, including spare parts and accessories therefor, ground handling equipment, and training devices; expansion of public and private plants, overnment-owned equipment and installation thereof in such plants, erections of structures, and acquisition of land, for the foregoing purposes, and such lands and interests therein, may be acquired, and construction prosecuted thereon prior to approval of title; reserve plant and overnment and contractor-owned equipment layaway; and other expenses necessary for the foregoing purposes including rents and transportation of things; $5,131,002,000 to remain available for obligations until eptember 30, 2010.

HI IIY F BK

"In accordance with the resident's anagement genda, Budget and erformance Integration initiative, programs have been assessed using the rogram ssessment ating ool (). emarks regarding program performance and plans for performance improvement can be located at the xpectmore.gov website."

HI IIY F BK

FY 2008/2009 BD I FBY 2007 I 3: -1 I I DI

HI IIY F BK

FY 2008/2009 BD I BD IIY 01 BII II FBY 2007 1 0

HI IIY F BK

BD I IFII (XHIBI -40) D/B: F/II QI -1 : D: FBY 2007 II QI-BII/I (IW) FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013 QIY (in housands) $40,117 $34,208 $26,446 $27,006 $27,752 $28,477 $29,029 $29,646 Description: 1. his program funds replacement organizational and intermediate level support equipment for all out-of-production missile systems, including ballistic, tactical and other missile weapon systems. quipment procured is used for missile weapon systems maintenance and testing at organizational/intermediate (base/field) launch control facilities, as well as missile testing facilities. 2. FY08 funding provides replacement support equipment items for an aging inventory of equipment which has become increasingly more costly to maintain. hese items will increase ballistic and tactical missile system reliability and maintainability by providing state-of-the-art maintenance repair and testing capability. he program supports missile weapon systems such as the inuteman (-30), dvanced edium ange ir-to-ir issile (I-120) and High-peed nti-adiation issile (-88). equirements are jointly determined by Headquarters nited tates ir Force (HQ F), ir Force ateriel ommand (F), ir ombat ommand () and ir Force pace ommand (F) and are based on established allowance standards. 3. Items requested in FY08 are displayed on the attached -40. Items procured during execution may change based on critical equipment needed to support current ir Force mission requirements. -1 I 1 : 1 age 1 of 1

BD I IFII F D I (XHIBI -40) D: FBY 2007 D/B: F/II QI -1 : II QI-BII/I (IW) I ID FY2006 FY2007 FY2008 FY2009 D QY. QY. QY. QY. I Y I (35) 4 $27,833 XI IIY 5 $9,504 5 $5,863 48 $5,714 II I 2 $2,500 6 $8,500 6 $9,200 BII I H 5 II D $10,284 $20,123 $10,048 $9,961 I/H I H 5 II D $2,000 $2,081 $2,035 $2,131 : 4 $40,117 7 $34,208 11 $26,446 54 $27,006 emarks: ost information is in thousands of dollars. -1 I 1 : 2 age 1 of 1

BD I IFII (XHIBI -40) D: FBY 2007 D/B: F/II QI -1 : XI IIY FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013 QIY (in housands) $0 $9,504 $5,863 $5,714 $2,492 $0 $0 $0 Description: 1. he inuteman III Intercontinental Ballistic issile xplosive et ircuitry est et () prevents accidental missile ignition and/or damage to integrated program operational ground equipment. he is used for missile main assembly end-to-end resistance testing, hazardous electrical current of ground umbilical cabling testing, and electro-explosive ordnance firing circuits resistance testing for all stages of the missile. his portable test set is used on an average of twelve dispatches per week per missile wing by missile maintenance teams. Weapon torage rea (W) personnel at the wings use the daily on reentry systems conducting up to ten tests on each. he electronics lab uses the constantly for assembling missile guidance sets and performing check out procedures on eighty different sets of cables. Due to significantly degrading components, 106 test sets were overhauled and refurbished in 1994. xisting test sets cannot be refurbished again since obsolete integrated circuit cards are no longer supportable and spares are not available. onoperational are being cannibalized to sustain the minimum 77 test sets required to support the user community. arts supportability and repair capability for the test set began to negatively affect depot and field activities in early 2006. 2. Failure to fund this equipment would impact the missile maintenance capability to check ground ordnance at the silo, ordnance on boosters, reentry systems and reentry vehicles, and perform cable troubleshooting. his would also affect force demonstration evaluation flight test preparation at the Western est ange at andenberg FB. 3. Items requested in FY08 are identified on the following -5 and are representative of items to be procured. Items procured during execution may change based on critical equipment needed to support current ir Force mission requirements. -1 I 1 : 3 age 1 of 1

W Y YI (XHIBI -5) D/B: F/II QI -1 : XI IIY D: FBY 2007 W Y II/D FI I FY2006 FY2007 FY2008 FY2009 ID D nit nit nit nit QY ost QY ost QY ost QY ost 5 $1,750,000 $8,750 5 $1,057,400 $5,287 DI II $604 $426 $424 FIII F $150 $150 $150 DI I 48 $107,083 $5,140 : 5 $9,504 5 $5,863 48 $5,714 emarks: otal ost information is in thousands of dollars. -1 I 1 : 4 age 1 of 1

BD HIY I (XHIBI -5) D: FBY 2007 D/B: F/II QI -1 : XI IIY I / FI Y QY. I I F HD & Y D I WD. D D FI D. I W D. I II/D FI I FY2007(1) 5 $1,750,000 F/- /F W/ KW pr-07 ct-07 Yes FY2008(1) 5 $1,057,400 F/- /F KW ct-07 pr-08 Yes DI I FY2009(1) 48 $107,083 F/- /F KW ct-08 ay-09 Yes emarks: ost information is in actual dollars. (1) lanned contract with three option years -1 I 1 : 5 age 1 of 1

BD I IFII (XHIBI -40) D/B: F/II QI -1 : II I D: FBY 2007 FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013 QIY (in housands) $0 $2,500 $8,500 $9,200 $9,800 $0 $0 $0 Description: 1. he inuteman III Intercontinental Ballistic issile transporter trailer is a truck tractor and semi-trailer combination used to transport, roll transfer, and environmentally store assembled inuteman boosters (tages 1-3) between missile wings and flight test and overhaul repair facilities. he inuteman booster transfers through the front or back of its climate-controlled interior. Fifteen trailers were put into service in 1991-1993. urrently there are thirteen serviceable units and two non-operational units due to advanced structural failure. ll inspected trailers show signs of structural failures. railers exhibit evidence of delaminating honeycomb side panels that compromise its structural integrity. anel bonding is losing integrity with age. tress cracks have also been found in the trailer under-carriage. he tractor has a non-industry standard wheel configuration required to mate with the trailer's unique king pin location. ubstitute tractors in use at the missile wings have been deemed unsafe for off-base transport. egular maintenance has become exceedingly difficult due to parts obsolescence. stimated repair/refurbishment cost exceeds seventy-five percent of new equipment purchase price. his highly specialized equipment is specifically designed/configured to transport inuteman III Intercontinental Ballistic issiles and Boosters. 2. Failure to fund this equipment will directly impact the ability to safely and securely transport missile boosters due to structural failures in the transporter trailer. issile modification programs are dependent on maintenance efforts to provide operational transporter trailers to move boosters to comply with mutually dependent deployment schedules. 3. Items requested in FY08 are identified on the following -5 and are representative of the items to be procured. Items procured during execution may change based on critical equipment needed to support current ir Force mission requirements. -1 I 1 : 6 age 1 of 1

W Y YI (XHIBI -5) D/B: F/II QI -1 : II I D: FBY 2007 W Y FY2006 FY2007 FY2008 FY2009 ID D nit nit nit nit QY ost QY ost QY ost QY ost DI 2 $1,000,000 $2,000 6 $1,330,000 $7,980 6 $1,533,333 $9,200 D $250 DI II $250 $520 : 2 $2,500 6 $8,500 6 $9,200 emarks: otal ost information is in thousands of dollars. -1 I 1 : 7 age 1 of 1

BD HIY I (XHIBI -5) D: FBY 2007 D/B: F/II QI -1 : II I I / FI Y QY. I I F HD & Y D I WD. D D FI D. I W D. I DI FY2007(1) 2 $1,000,000 F/- /F W/ KW Feb-07 ep-07 Yes FY2008(1) 6 $1,330,000 F/- /F KW ct-07 ov-07 Yes FY2009(1) 6 $1,533,333 F/- /F KW ct-08 ov-08 Yes emarks: ost information is in actual dollars. (1) lanned contract with three option years -1 I 1 : 8 age 1 of 1

BD I IFII (XHIBI -40) D/B: F/II QI -1 : BII II I H $5 II D: FBY 2007 FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013 QIY (in housands) $10,284 $20,123 $10,048 $9,961 $13,263 $25,325 $25,875 $26,438 Description: 1. Ballistic issile Items ess han $5 illion funds replacement support equipment for the inuteman (-30) missile weapon system. quipment procured is used for missile weapon systems maintenance and testing at organizational/intermediate levels, launch and launch control facilities, and missile testing facilities. rocurement of the items will reduce downtime and delays due to scheduling and non-availability of critical test equipment. hese items will also ensure ir Force personnel accomplish cost effective maintenance on schedule and will increase missile readiness. equirements are jointly determined by Headquarters nited tates ir Force (HQ F), ir Force ateriel ommand (F), and ir Force pace ommand (F), based on established tables of allowances. o individual procurement item in this category exceeds $5 million. 2. FY08 funding reflects an increased priority for inuteman III support equipment. he lectronic ystem est tations are now experiencing significant obsolescence factors and require aggressive replacement. Failure to fund these assets will negatively impact inuteman missile weapon system readiness. 3. Items requested in FY08 are identified on the following -40 and are representative of items to be procured. Items procured during execution may change based on critical equipment needed to support current ir Force mission requirements. -1 I 1 : 9 age 1 of 1

BD I IFII F D I (XHIBI -40-I) D/B: F/II QI -1 : BII II I H $5 II D: FBY 2007 FY2008 FY2009 I QY. QY. I I I 14500128577003 4 $1,763 B I DY 4440011109882 70 $2,200 FIB I 1 $1,300 I III K 4927011137367 22 $1,560 I I 1 $1,125 D II Y I I Y 1 $1,100 I I 4935015073469 1 $1,000 1 $1,000 I III D 4925011743087 14 $1,580 I Y DKI Y I ID D HI D BH 3 $99 49350141288395 12 $4,700 I III D 4925011743086 2 $222 I III 4927011669301 13 $2,360 : $10,048 $9,961-1 I 1 : 10 age 1 of 2

BD I IFII F D I (XHIBI -40-I) D: FBY 2007 D/B: F/II QI -1 : BII II I H $5 II FY2008 FY2009 I QY. QY. emarks: ost information is in thousands of dollars. (1) = ot tock isted -1 I 1 : 11 age 2 of 2

BD I IFII (XHIBI -40) D/B: F/II QI -1 : I II I H $5 II D: FBY 2007 FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013 QIY (in housands) $2,000 $2,081 $2,035 $2,131 $2,197 $2,263 $2,320 $2,378 Description: 1. he actical issile Items ess han $5 illion line procures replacement (common and peculiar) support equipment for tactical missiles. ommon items (used on more than one weapon system) and peculiar items (unique to one weapon system) directly support tactical missile maintenance and servicing requirements. hese replacement items ensure continuation of serviceable equipment over the life of a weapon system. Increased FY08 Funding procures support equipment for the advanced medium range air-to-air missile. 3. ll items have an annual value of less than $5. Items requested in FY08 are identified on the following - 40-I and are representative of items being procured. Items procured during execution may change based on critical equipment needed to support current ir Force mission requirements. -1 I 1 : 12 age 1 of 1

BD I IFII F D I (XHIBI -40-I) D: FBY 2007 D/B: F/II QI -1 : I II I H $5 II FY2008 FY2009 I QY. QY. F 1450 - IDD II HDI & I QI (1) $907 $918 F 6625 - I D I I I D I I (1) $712 $720 F 4935 - IDD II I, I, D HK IIZD QI (1) $39 $3 F 4920 - IF I D I H IIZD QI (1) $156 $158 F 1440 - H D D (1) $221 $331 : $2,035 $2,131 emarks: ost information is in thousands of dollars. (1) In FY08-FY09 $5,784,000 of dvanced edium ange ir-o-ir issile support equipment funds shows in -1 line #12, initial spares/repair parts. -1 I 1 : 13 age 1 of 1

HI IIY F BK

FY 2008/2009 BD I BD IIY 02 I D H II FBY 2007 2-0

HI IIY F BK

xhibit -40, Budget Item ustification Date: February 2007 issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 02 oint ir-to-urface tandoff issile rogram lement for ode B Items: / ther elated rogram lements: 0207325F ID ode rior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 o omp otal roc Qty 704 75 163 210 250 255 260 260 260 2,463 4,900 ost ($ ) 334.970 98.660 166.502 201.125 242.198 243.277 244.138 252.300 256.782 2514.110 4554.062 dvance roc ost ($ ) 0.000 0.000 0.000 Weapon ystem ost ($ ) 334.970 98.660 166.502 201.125 242.198 243.277 244.138 252.300 256.782 2514.110 4554.062 Initial pares ($ ) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 otal roc ost ($ ) 334.970 98.660 166.502 201.125 242.198 243.277 244.138 252.300 256.782 2514.110 4554.062 Flyaway nit ost ($ ) 0.000 1.251 0.972 0.930 0.945 0.928 0.916 0.946 0.963 0.997 0.901 Wpn ys nit ost ($ ) 0.000 1.315 1.003 0.958 0.969 0.954 0.939 0.970 0.988 1.021 0.928 Description he oint ir-to-urface tandoff issile () is an ir Force program designated 1 by the Defense cquisition Board (DB) during the ow ate Initial roduction (I) decision in December 2001. his program provides a long range, conventional air-to-surface, autonomous, precision guided, standoff cruise missile compatible with fighter and bomber aircraft able to attack a variety of fixed or relocatable targets. ircraft integration for the baseline missile is complete on the B-52H, F-16 (Block 50), B-1, and B-2. bjective aircraft include the F-15, F-16 (Block 40), F-117, F-35, and F/-18/F. - increased standoff range will allow us to attack high value targets with precision, deeper into enemy territory while minimizing the threat to the launch aircraft. he threshold integration platform for - is the B-1. here is no requirement for initial spares as a includes a 15 year bumper-to-bumper warranty. he uly 2004 ilestone III eview approved Full ate roduction (F) start for FY 2005 and increased the total procurement from 3,816 to 4,900. otal buy of 4,900 include 2,400 baseline and 2,500 - missiles. urrently on contract are ots 1-5 for 76 units, 100 units, 240 units, 288 units, and 75 units, respectively. ots 1-4 are Firm Fixed rice (FF) ptions to the current D ontract. In late ummer/fall 2004, the Department convened an independent eliability nhancement eam () to review processes, system engineering procedures, and investigate reliability/quality initiatives. he ir Force continues to implement recommendations through a combination of reliability initiatives, component upgrades, producibility enhancements, production quality reviews, comprehensive ground and flight testing, component obsolescence management, and pursue affordability initiatives. he ost, Weapon ystem ost, and otal rocurement ost lines include eek agle (0207590F) funding. he Quantity, Flyaway nit ost and Weapon ystem nit ost lines reflect (0207325F) only. urrently, there is one F buy on contract. ustralia signed an for missiles on 18 uly 2006. he F awarded the F contract on 28 uly 2006. FY 2008 rogram ustification ward production contract for 210 missiles with a mix of and - missiles. FY 2009 rogram ustification ward production contract for 250 missiles with a mix of and - missiles. -1 hopping ist Item o. 02 Budget Item ustification xhibit -40, page 1 of 9 2-1

xhibit -5, Weapon ystem ost nalysis Date: February 2007 issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 02 anufacturer's ame/lant ity/tate ocation ubline Item oint ir-to-urface tandoff issile ockheed artin/roy, labama Weapon ystem Ident otal ost in illions of Dollars ost lements ode FY 2006 FY 2007 FY 2008 FY 2009 Qty nit ost otal ost Qty nit ost otal ost Qty nit ost otal ost Qty nit ost otal ost Quantity 75 163 210 250 ll-p-ound 0 69.819 0 122.978 167.529 206.166 dvance rocurement 0 0.000 0 0.000 0.000 0.000 ngineering hange rders 0 0.000 0 3.878 3.592 3.515 echnical upport 0 3.031 0 4.755 6.422 6.800 0 1.003 0 1.253 1.400 1.476 est upport/eliability/ffordability rogram 0 20.000 0 25.531 16.431 18.178 II FYWY 75 1.251 93.853 163 0.972 158.395 210 0.930 195.374 250 0.945 236.135 ontractor upport 0 4.807 0 5.145 5.751 6.063 Bs 0 0.000 0 0.000 0.000 0.000 W Y 75 1.315 98.660 163 1.003 163.540 210 0.958 201.125 250 0.969 242.198 eek agle 0 0.000 2.962 0.000 0.000 98.660 166.502 201.125 242.198 omments s part of the contract, ockheed artin has accepted total system performance responsibility () and fully warranted weapon performance to the system performance specification. here are no traditional government specifications for. ots 1-4 are FF options to current D contract. ot 5 is a FF contract based on certified cost and pricing data. nit costs for FY07 and beyond have not been negotiated. FY07 production contract will be for approximately 163 baseline missiles. FY08 production contract for 210 includes a mix for and - missiles. -1 hopping ist Item o. 02 Weapon ystem ost nalysis xhibit -5, page 2 of 9 2-2

xhibit -5, rocurement History and lanning Date: February 2007 issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 02 Weapon ystem WB ost lements Qty nit ost ocation of F Issue Date ubline Item ontract ethod oint ir-to-urface tandoff issile Date of ontract ype ontractor and ocation First ward Date Delivery pecs vailable ow? Date evision vailable? emarks FY2003 100 0.520 308th /K glin FB, F FY2004 240 0.420 308th /K glin FB, F FY2005 288 0.474 308th /K glin FB, F FY2006 75 1.315 308th /K glin FB, F FY2007 163 1.003 308th /K glin FB, F FY2008 210 0.958 308th /K glin FB, F / FF ockheed artin, roy, labama / FF ockheed artin, roy, labama / FF ockheed artin, roy, labama ug-05 FF ockheed artin, roy, labama pr-06 FF ockheed artin, roy, labama pr-07 FF ockheed artin, roy, labama ov-02 pr-04 o / Dec-03 ar-05 o / Dec-04 ul-06 o / ar-06 ct-07 o / an-07 ar-08 o / an-08 ar-09 o / -1 hopping ist Item o. 02 rocurement History and lanning xhibit -5, page 3 of 9 2-3

xhibit -21, roduction chedule Date: February 2007 issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 02 Y. QY. I 2001 B D F 2001 2002 F 76 0 76 2003 F 100 0 100 oint ir-to-urface tandoff issile FI Y 2002 FI Y 2003 2001 D Y 2002 D Y 2003 D F D F B Y B Y war d war d 4 4 7 16 11 34 2004 F 240 0 240 240 416 0 416 0 0 4 4 7 16 11 374 D F B Y D F B Y DI D I I HIF H DI D I I/F' I DY X ockheed artin roy, labama 15 1-8 - 5 40 I F K ax rate of 40 per month assumes current facilities. F I F III 0 0 15 15 D 0 0 15 15 100-1 hopping ist Item o. 02 roduction chedule xhibit -21, page 4 of 9 2-4

xhibit -21, roduction chedule Date: February 2007 issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 02 oint ir-to-urface tandoff issile Y. B FI Y 2004 FI Y 2005 I D 2003 D Y 2004 D Y 2005. F D F D F QY 2003 2003 B Y B Y 2002 F 76 42 34 8 0 3 0 9 9 5 0 2003 F 100 0 100 1 3 11 12 8 8 23 16 0 8 10 0 2004 F 240 0 240 war d 6 20 14 0 0 37 19 144 2005 F 288 0 288 war d 288 2006 F 75 0 75 75 2007 F 163 0 163 163 942 42 900 8 0 3 0 9 9 6 3 11 12 8 8 23 16 0 8 10 6 20 14 0 0 37 19 670 DI D I I HIF H DI D I I/F' I DY X ockheed artin roy, labama 15 1-8 - 5 40 I F D F B III 0 0 15 15 D 0 0 15 15 K ax rate of 40 per month assumes current facilities. Due to reductions in the FY06 (ot 5) budget, production deliveries for ots 4 (288) and ot 5 (75) have been combined to facilitate a smooth workflow and sustainment of the production line over a two year period. his action is consistent with congressional language in the FY06 DoD ppropriation Bill which directs the program to maintain hardware procurement at a minimum level to sustain the production line. Y F I D F B F Y -1 hopping ist Item o. 02 roduction chedule xhibit -21, page 5 of 9 2-5

xhibit -21, roduction chedule Date: February 2007 issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 02 Y. QY. I 2005 B D F 2005 oint ir-to-urface tandoff issile FI Y 2006 FI Y 2007 2005 D Y 2006 D Y 2007 D F D F B Y B Y 2002 F 76 76 0 0 2003 F 100 100 0 0 2004 F 240 96 144 17 16 9 38 0 0 0 0 8 0 56 0 2005 F 288 0 288 16 16 16 0 16 24 32 21 21 21 21 21 21 21 21 0 2006 F 75 0 75 war d 75 2007 F 163 0 163 war d 163 942 272 670 17 16 9 38 0 0 0 0 8 16 72 16 0 16 24 32 21 21 21 21 21 21 21 21 238 DI D I I HIF H DI D I I/F' I DY X ockheed artin roy, labama 15 1-8 - 5 40 I F D F B III 0 0 15 15 D 0 0 15 15 K ax rate of 40 per month assumes current facilities. Due to reductions in the FY06 (ot 5) budget, production deliveries for ots 4 (288) and ot 5 (75) have been combined to facilitate a smooth workflow and sustainment of the production line over a two year period. his action is consistent with congressional language in the FY06 DoD ppropriation Bill which directs the program to maintain hardware procurement at a minimum level to sustain the production line. Y F I D F B F Y -1 hopping ist Item o. 02 roduction chedule xhibit -21, page 6 of 9 2-6

xhibit -21, roduction chedule Date: February 2007 issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 02 Y. QY. I 2007 B D F 2007 oint ir-to-urface tandoff issile FI Y 2008 FI Y 2009 2007 D Y 2008 D Y 2009 D F D F B Y B Y 2003 F 100 100 0 0 2004 F 240 240 0 0 2005 F 288 288 0 0 2006 F 75 0 75 16 17 15 19 8 0 2007 F 163 0 163 13 13 13 13 13 14 14 14 14 14 14 14 0 2008 F 210 0 210 war d 17 17 17 17 17 17 18 90 2009 F 250 0 250 war d 250 1,326 628 698 16 17 15 19 8 13 13 13 13 13 14 14 14 14 14 14 14 17 17 17 17 17 17 18 340 DI D I I HIF H DI D I I/F' I DY X ockheed artin roy, labama 15 1-8 - 5 40 I F D F B III 0 0 15 15 D 0 0 15 15 K ax rate of 40 per month assumes current facilities. Due to reductions in the FY06 (ot 5) budget, production deliveries for ots 4 (288) and ot 5 (75) have been combined to facilitate a smooth workflow and sustainment of the production line over a two year period. his action is consistent with congressional language in the FY06 DoD ppropriation Bill which directs the program to maintain hardware procurement at a minimum level to sustain the production line. Y F I D F B F Y -1 hopping ist Item o. 02 roduction chedule xhibit -21, page 7 of 9 2-7

xhibit -21, roduction chedule Date: February 2007 issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 02 Y. QY. I 2009 B D F 2009 oint ir-to-urface tandoff issile FI Y 2010 FI Y 2011 2009 D Y 2010 D Y 2011 D F D F B Y B Y 2005 F 288 288 0 0 2006 F 75 75 0 0 2007 F 163 163 0 0 2008 F 210 120 90 18 18 18 18 18 0 2009 F 250 0 250 20 20 21 21 21 21 21 21 21 21 21 21 0 2010 F 255 0 255 war d 21 21 21 21 21 21 21 21 21 66 2011 F 260 0 260 war d 260 1,501 646 855 18 18 18 38 38 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 326 DI D I I HIF H DI D I I/F' I DY X ockheed artin roy, labama 15 1-8 - 5 40 I F D F B III 0 0 15 15 D 0 0 15 15 K ax rate of 40 per month assumes current facilities. Due to reductions in the FY06 (ot 5) budget, production deliveries for ots 4 (288) and ot 5 (75) have been combined to facilitate a smooth workflow and sustainment of the production line over a two year period. his action is consistent with congressional language in the FY06 DoD ppropriation Bill which directs the program to maintain hardware procurement at a minimum level to sustain the production line. Y F I D F B F Y -1 hopping ist Item o. 02 roduction chedule xhibit -21, page 8 of 9 2-8

xhibit -21, roduction chedule Date: February 2007 issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 02 oint ir-to-urface tandoff issile. B FI Y 2012 FI Y 2013 I D 2011 D Y 2012 D Y 2013. Y F D F D F QY 2011 2011 B Y B Y 2010 F 255 189 66 22 22 22 0 2011 F 260 0 260 21 21 21 21 22 22 22 22 22 22 22 22 0 war 2012 F 260 0 260 21 21 21 21 22 22 22 22 22 66 d war 2013 F 260 0 260 260 d 1,035 189 846 22 22 22 21 21 21 21 22 22 22 22 22 22 22 22 21 21 21 21 22 22 22 22 22 326 DI D I I HIF H DI D I I/F' I DY X ockheed artin roy, labama 15 1-8 - 5 40 I F K D F B Y F I D F B F III 0 0 15 15 D 0 0 15 15 Y -1 hopping ist Item o. 02 roduction chedule xhibit -21, page 9 of 9 2-9

HI IIY F BK 2-10

xhibit -40, Budget Item ustification Date: February 2007 issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 03 I-9X idewinder rogram lement for ode B Items: / ther elated rogram lements: / ID ode rior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 o omp otal roc Qty 995 196 183 172 242 301 207 217 202 2,382 5,097 ost ($ ) 220.177 44.360 43.660 52.690 74.084 80.586 63.355 64.581 65.952 662.221 1371.666 dvance roc ost ($ ) 0.000 0.000 0.000 Weapon ystem ost ($ ) 220.177 44.360 43.660 52.690 74.084 80.586 63.355 64.581 65.952 662.221 1371.666 Initial pares ($ ) 3.595 1.441 1.503 1.538 1.578 0.306 9.961 otal roc ost ($ ) 223.772 45.801 45.163 54.228 75.662 80.586 63.355 64.581 65.952 662.527 1381.627 Flyaway nit ost ($ ) 0.201 0.208 0.243 0.287 0.254 0.287 0.281 0.308 0.278 0.254 Wpn ys nit ost ($ ) 0.226 0.239 0.306 0.306 0.268 0.306 0.298 0.326 0.286 0.269 Description he I-9X (idewinder) short-range air-to-air missile is a long-term evolution of the I-9 series of fielded missiles. he I-9X missile program provides a launch and leave, air combat munition that uses passive infrared (I) energy for acquisition and tracking of enemy aircraft and complements the dvanced edium ange ir-to-ir issile (). ir superiority in the short-range air-to-air missile arena is essential and includes first shot, first kill opportunity against an enemy employing I countermeasures. he I-9X employs several components common with the I-9. nti-amper features have been incorporated to protect improvements inherent in this design. I-9X is an cquisition ategory I (-I) joint-service program with avy lead. he ir Force is procuring a total of 5,097 missiles of which 1,100 are aptive ir raining issiles (s). : 1. he unit cost calculations assume avy procurement quantities remain constant, as depicted in the attached -21 roduction chedule xhibit. roduction quantities were adjusted throughout the FYD due to a new roduction contract and the addition of a new Block II design. : roduction units have been delivered to the government ahead of the projected schedule. FY 2008 rogram ustification ot 8 is the fourth full-rate production (F) buy of I-9X and will occur in FY08. his continues the procurement of ll p ounds ('s)/'s for the ir Force and avy. he FY08 procurement includes associated missile containers; /; training equipment and technical data. he program also includes funding for field activity support, government ystem ngineering/rogram anagement (/) and production technical support. FY 2009 rogram ustification ot 9 is the fifth F buy of I-9X and will occur in FY09. his continues the procurement of 's/s for the ir Force and avy. he FY09 procurement includes associated missile containers, /, training equipment and technical data. he program also includes funding for field activity support, government / and production technical support. -1 hopping ist Item o. 03 Budget Item ustification xhibit -40, page 1 of 9 2-11

xhibit -5, Weapon ystem ost nalysis Date: February 2007 issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 03 I-9X idewinder anufacturer's ame/lant ity/tate ocation ubline Item Weapon ystem Ident otal ost in illions of Dollars ost lements ode FY 2006 FY 2007 FY 2008 FY 2009 Qty nit ost otal ost Qty nit ost otal ost Qty nit ost otal ost Qty nit ost otal ost issile rocurement Quantity 196 183 172 242 Flyaway ost ll p ound () 103 19.428 96 17.951 98 24.890 115 35.943 aptive ir raining issile () 93 15.538 87 14.408 63 11.162 160 26.920 issile ontainers 55 0.570 51 0.540 45 0.441 76 0.756 ngineering hange rders 1.088 1.034 1.095 1.779 pecial est/pecial ooling quipment 0.110 0.112 0.114 0.117 on-ecurring overnment / 2.576 4.032 4.163 3.901 otal issile Flyaway ost 196 0.201 39.310 183 0.208 38.077 172 0.243 41.865 242 0.287 69.416 Weapons upport ost upport quipment raining 0.015 raining quipment D/ 1.823 0.922 3.500 irborne est quipment () 0.783 0.793 0.800 0.804 Data 0.104 0.111 0.124 0.124 roduction echnical upport 2.340 3.757 6.386 3.740 otal Weapons ystem ost 196 0.226 44.360 183 0.239 43.660 172 0.306 52.690 242 0.306 74.084 Initial pares 1.441 1.503 1.538 1.578 otal rocurement ost 45.801 45.163 54.228 75.662 ther osts K (:0207590) 44.360 43.660 52.690 74.084 omments : 1. nit cost calculations assume avy procurement quantities remain constant, as depicted in the attached -21 roduction chedule xhibit. 2. K funding was sourced from 0207590F, and procured 24 missiles and associated irborne est quipment. 3. FY01 ppropriations onference anguage directed the ir Force and avy to budget I-9X (for FY02 and beyond) as a new procurement program instead of a modification -1 hopping ist Item o. 03 Weapon ystem ost nalysis xhibit -5, page 2 of 9 2-12

xhibit -5, Weapon ystem ost nalysis Date: February 2007 issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 03 I-9X idewinder program. s a result, FY01 procurement funding and buy quantity of 67 is addressed as a modification. he FY01 funding is not included in the total quantity and total procurement cost on this -40. -1 hopping ist Item o. 03 Weapon ystem ost nalysis xhibit -5, page 3 of 9 2-13

xhibit -5, rocurement History and lanning Date: February 2007 issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 03 Weapon ystem I-9 WB ost lements Qty nit ost ocation of F Issue Date ubline Item ontract ethod I-9X idewinder Date of ontract ype ontractor and ocation First ward Date Delivery pecs vailable ow? Date evision vailable? FY01 I-9X I 1 ee ote 1 FY02 I-9X I 2 ee ote 2 FY03 I-9X I 3, ot 3 ee ote 2 FY04 I-9X I 4, ot 4 ee ote 2 FY05 I-9X F 1, ot 5 ee ote 2 FY06 I-9X F 2, ot 6 ee otes 2,4,5 FY07 I-9X F 3, ot 7 ee notes 2,4,5 FY08 I-9X F 4, ot 8 ee notes 2,3,4 FY09, I-9X F 5, ot 9 ee notes 2,3,4 / / / 138 0.202 I F aytheon ystems ompany, ucson, Z 286 0.177 I ay-96 F aytheon ystems ompany, ucson, Z 256 0.193 I ay-03 F aytheon ystems ompany, ucson, Z 248 0.195 I ay-04 F aytheon ystems ompany, ucson, Z 196 0.201 I ay-05 F aytheon ystems ompany, ucson, Z 183 0.208 I ay-06 F aytheon ystems ompany, ucson, Z 172 0.243 I ay-07 F aytheon ystems ompany, ucson, Z 242 0.287 I ay-08 F aytheon ystems company, ucson, Z ov-01 ug-03 Yes ov-02 ay-04 Yes an-04 ay-05 Yes ov-04 ay-06 Yes Dec-05 ay-07 Yes ov-06 ay-08 Yes ov-07 ay-09 Yes ov-08 ay-10 Yes emarks : 1. FY01 procurement of 67 missiles was under odification funding ( 3020, B 21). 2. FY01 ppropriations onference anguage directed the ir Force and avy to budget I-9X (for FY02 and beyond) as a new procurement program instead of a modification program. s a result, FY01 procurement funding and buy quantity of 67 is addressed as a modification. he FY01 funding is not included in the total quantity nor the total procurement cost on this -40. 3. ot 8 unit cost calculation assumes avy procurement of 161 (98, 63 ) missiles in FY08. 4. ots 9-13's unit cost calculations assume avy and F procurement quantities remain constant. 5. nit ost consists of,, and ontainer. -1 hopping ist Item o. 03 rocurement History and lanning xhibit -5, page 4 of 9 2-14

xhibit -21, roduction chedule Date: February 2007 issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 03 Y. QY. I 2000 B D F 2000 2002 F 138 0 138 I-9X idewinder FI Y 2001 FI Y 2002 2000 D Y 2001 D Y 2002 D F D F B Y B Y war d 0 0 D F B Y D F B Y DI D I I HIF H DI D I I/F' I DY X aytheon (I III and out) ucson, Z 300 1-8 - 5 1,200 I F III 2 18 D K I 2 ontract warded ov 01 (=100, hift Hours Days=332, ax=1200, fter ct 1=2 wks, F ime=18 onths). F I F 138-1 hopping ist Item o. 03 roduction chedule xhibit -21, page 5 of 9 2-15

xhibit -21, roduction chedule Date: February 2007 issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 03 I-9X idewinder Y. B FI Y 2003 FI Y 2004 I D 2002 D Y 2003 D Y 2004. F D F D F QY 2002 2002 B Y B Y 2002 F 138 0 138 4 8 16 16 16 12 18 24 24 0 2003 F 286 0 286 war d 12 12 16 22 24 200 2004 F 256 0 256 war d 256 2005 F 248 0 248 248 2006 F 196 0 196 196 2007 F 183 0 183 183 2008 F 161 0 161 161 2009 F 275 0 275 275 2002 105 0 105 8 8 8 8 8 7 8 16 17 17 0 2003 284 0 284 war d 20 20 20 20 20 184 2004 103 0 103 war d 103 2005 135 0 135 135 2006 159 0 159 159 2007 174 0 174 174 2008 184 0 184 184 2009 205 0 205 205 3,092 0 3,092 0 8 12 16 24 24 23 20 34 41 41 32 32 36 42 44 2,663 DI D I I HIF DI H D I F I/F' I DY X I aytheon (I III and out) ucson, Z 300 1-8 - 5 1,200 I F III 2 18 D K I 2 ontract warded ov 01 (=100, hift Hours Days=332, ax=1200, fter ct 1=2 wks, F ime=18 onths). D F B Y D F B F Y -1 hopping ist Item o. 03 roduction chedule xhibit -21, page 6 of 9 2-16

xhibit -21, roduction chedule Date: February 2007 issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 03 Y. QY. I 2004 B D F 2004 I-9X idewinder FI Y 2005 FI Y 2006 2004 D Y 2005 D Y 2006 D F D F B Y B Y 2002 F 138 138 0 0 2003 F 286 86 200 24 24 24 32 32 32 32 0 2004 F 256 0 256 24 20 24 24 8 24 28 32 28 12 16 10 6 2005 F 248 0 248 war d 30 30 30 32 32 94 2006 F 196 0 196 war d 196 2007 F 183 0 183 183 2008 F 161 0 161 161 2009 F 275 0 275 275 2002 105 105 0 0 2003 284 100 184 20 24 24 24 24 32 36 0 2004 103 0 103 8 11 16 16 14 13 8 8 9 0 2005 135 0 135 war d 15 15 15 18 18 54 2006 159 0 159 war d 159 2007 174 0 174 174 2008 184 0 184 184 2009 205 0 205 205 3,092 429 2,663 44 48 48 56 56 64 68 32 31 40 40 22 37 36 40 28 21 16 10 45 45 45 50 50 1,691 DI D I I HIF DI H D I F I/F' I DY X I aytheon (I III and out) ucson, Z 300 1-8 - 5 1,200 I F III 2 18 D K I 2 ontract warded ov 01 (=100, hift Hours Days=332, ax=1200, fter ct 1=2 wks, F ime=18 onths). D F B Y D F B F Y -1 hopping ist Item o. 03 roduction chedule xhibit -21, page 7 of 9 2-17

xhibit -21, roduction chedule Date: February 2007 issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 03 Y. QY. I 2006 B D F 2006 I-9X idewinder FI Y 2007 FI Y 2008 2006 D Y 2007 D Y 2008 D F D F B Y B Y 2003 F 286 286 0 0 2004 F 256 256 0 0 2005 F 248 154 94 32 24 25 13 0 2006 F 196 0 196 12 56 25 15 6 32 21 29 0 2007 F 183 0 183 war d 24 24 24 30 20 61 2008 F 161 0 161 war d 161 2009 F 275 0 275 275 2010 F 319 0 319 319 2003 284 284 0 0 2004 103 103 0 0 2005 135 81 54 18 22 14 0 2006 159 0 159 43 1 24 56 35 0 2007 174 0 174 war d 16 16 16 21 25 80 2008 184 0 184 war d 184 2009 205 0 205 205 2010 202 0 202 202 3,370 1,164 2,206 50 46 39 13 55 56 26 15 6 56 56 56 29 40 40 40 51 45 1,487 DI D I I HIF DI H D I F I/F' I DY X I aytheon (I III and out) ucson, Z 300 1-8 - 5 1,200 I F III 2 18 D K I 2 ontract warded ov 01 (=100, hift Hours Days=332, ax=1200, fter ct 1=2 wks, F ime=18 onths). D F B Y D F B F Y -1 hopping ist Item o. 03 roduction chedule xhibit -21, page 8 of 9 2-18

xhibit -21, roduction chedule Date: February 2007 issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 03 Y. QY. I 2008 B D F 2008 I-9X idewinder FI Y 2009 FI Y 2010 2008 D Y 2009 D Y 2010 D F D F B Y B Y 2005 F 248 248 0 0 2006 F 196 196 0 0 2007 F 183 122 61 21 20 20 0 2008 F 161 0 161 20 20 20 20 12 12 12 12 12 12 9 0 2009 F 275 0 275 war d 24 24 24 24 24 155 2010 F 319 0 319 war d 319 2011 F 219 0 219 219 2012 F 228 0 228 228 2005 135 135 0 0 2006 159 159 0 0 2007 174 94 80 27 27 26 0 2008 184 0 184 15 15 21 21 21 15 9 9 18 18 18 4 0 2009 205 0 205 war d 18 21 24 24 24 94 2010 202 0 202 war d 202 2011 200 0 200 200 2012 220 0 220 220 3,308 954 2,354 48 47 46 35 35 41 41 33 27 21 21 30 30 27 4 42 45 48 48 48 1,637 DI D I I HIF DI H D I F I/F' I DY X I aytheon (I III and out) ucson, Z 300 1-8 - 5 1,200 I F III 2 18 D K I 2 ontract warded ov 01 (=100, hift Hours Days=332, ax=1200, fter ct 1=2 wks, F ime=18 onths). D F B Y D F B F Y -1 hopping ist Item o. 03 roduction chedule xhibit -21, page 9 of 9 2-19

HI IIY F BK 2-20

xhibit -40, Budget Item ustification Date: February 2007 issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 04 dvanced edium ange ir-to-ir issile () rogram lement for ode B Items: 0207163F ther elated rogram lements: ID ode rior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 o omp otal roc Qty 7,694 84 87 206 301 334 319 346 377 0 9,748 ost ($ ) 6484.400 103.068 115.409 224.577 275.710 285.373 303.821 309.728 316.346 0.000 8418.432 dvance roc ost ($ ) 0.000 0.000 0.000 Weapon ystem ost ($ ) 6484.400 103.068 115.409 224.577 275.710 285.373 303.821 309.728 316.346 0.000 8418.432 Initial pares ($ ) 60.900 0.072 0.075 0.075 0.078 0.079 0.082 0.084 0.086 0.000 61.531 otal roc ost ($ ) 6545.300 103.140 115.484 224.652 275.788 285.452 303.903 309.812 316.432 0.000 8479.963 Flyaway nit ost ($ ) 0.812 1.209 1.238 1.030 0.835 0.810 0.892 0.839 0.765 0.000 0.825 Wpn ys nit ost ($ ) 0.843 1.227 1.327 1.090 0.916 0.854 0.952 0.895 0.839 0.000 0.864 Description he is the next generation all-weather, all environment radar guided missile developed jointly by the ir Force and avy. is smaller, faster, lighter, and has improved capabilities against very-low and high-altitude high-speed targets in an electronic attack () environment as compared to previously fielded radar guided missiles. he next version, I-120D, is currently under ystem Development and Demonstration (DD) that began procurement in FY06. he I-120D will deliver improved performance from -aided navigation, a two way datalink capability that will enhance aircrew survivability, improved network compatibility, and incorporate new guidance software that will improve the 's kinematic performance. he Defense cquisition Board approved Full ate roduction (ilestone IIIB) in pril 1992. he missile price shown in the -5 includes costs for ystem ngineering and erformance esponsibility () as well as support to fielded systems. he latest ong erm ricing greement () ended with the FY05 procurement. FY06 is a stand alone Firm Fixed rice (FF) contract based on the sale of 600 Foreign ilitary ales (F) missiles. FY07 stand alone FF contract continues procurement of missiles for the F and avy and is based on 350 F units. nnual procurement quantities are estimated based on anticipated 250 F missiles per year for FY08-13. It also includes production transition/producibility engineering, and tooling and test equipment associated with the initiation of I-120D production. FY 2008 rogram ustification ontinue the procurement of for the F and avy in ot 22. rocure 206 s for the F and 79 for the avy. Build additional and modify existing tooling and test equipment to increase production rates to support the production of the I-120D, and support the aptive arry eliability rogram (). F participants will continue to procure I-120-5 missiles, at the projected rate of 250 per year. he training equipment line includes elemetry Instrumentation nits for Weapon ystem valuation rogram (W). rocurement of missiles is critical as both services' existing inventories of air-to-air missiles are declining. ging rocket motors and other parts obsolescence issues are shrinking the inventories by approximately 1300 missiles between FY06-FY10. urrently, the avy is 200 missiles under its shipfill requirement and the F is 300 missiles short of its inventory requirement. otal inventory shortfalls are projected to increase to approximately 2,500 missiles by FY11. he B08 I-120D procurement quantities are required by the services to offset rising inventory shortfalls and, to ensure combat forces have sufficient missiles to fulfill operational requirements and to gain warfighter edge against advancing threats. -1 hopping ist Item o. 04 Budget Item ustification xhibit -40, page 1 of 12 2-21

xhibit -40, Budget Item ustification Date: February 2007 issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 04 dvanced edium ange ir-to-ir issile () FY 2009 rogram ustification ontinue the procurement of for the F and avy in ot 23. rocure 301 s for the F and 97 for the avy. Build additional and modify existing tooling and test equipment to increase production rates to support the production of the I-120D, and support the aptive arry eliability rogram (). F participants will continue to procure I-120-5 missiles, at the projected rate of 250 per year. he training equipment line includes elemetry Instrumentation nits for W. -1 hopping ist Item o. 04 Budget Item ustification xhibit -40, page 2 of 12 2-22

xhibit -5, Weapon ystem ost nalysis Date: February 2007 issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 04 anufacturer's ame/lant ity/tate ocation ubline Item dvanced edium ange ir-to-ir issile () aytheon, ucson Z Weapon ystem Ident otal ost in illions of Dollars ost lements ode FY 2006 FY 2007 FY 2008 FY 2009 Qty nit ost otal ost Qty nit ost otal ost Qty nit ost otal ost Qty nit ost otal ost Quantity 84 87 206 301 Flyaway ost issile Hardware-ecurring 1. issile rice 75.026 78.811 170.380 206.065 2. Warranty 1.231 4.388 9.430 13.590 3. ther Hardware 0.000 1.237 1.275 1.315 4. ngineering hange rders 0.588 2.681 4.492 5.514 ubtotal issile Hardware 76.845 87.117 185.577 226.484 ecurring roduction upport 1. roduction est/upport 11.505 10.944 13.654 11.956 2. rogram anagement dm 1.350 1.211 1.245 1.280 ubtotal ecurring roduction upport 12.855 12.155 14.899 13.236 onrecurring ost 1. roduction Implementation 6.545 3.400 0.000 0.000 2. nique Identification (ID) 0.170 0.000 0.000 0.000 3. ooling and est quip 5.157 5.031 11.711 11.717 ubtotal onrecurring ost 11.872 8.431 11.711 11.717 otal issile Flyaway ost 84 1.209 101.572 87 1.238 107.703 206 1.030 212.187 301 0.835 251.437 upport ost 1. eculiar upport quipment 1.320 1.444 1.988 2.164 2. raining quipment 0.176 6.262 10.402 22.109 ubtotal upport 1.496 7.706 12.390 24.273 eek agle :0207590F (on-add) otal Weapon ystem ost 84 1.227 103.068 87 1.327 115.409 206 1.090 224.577 301 0.916 275.710 ther Weapon ystems osts Initial pares 0.072 0.075 0.075 0.078 eprogramming quip (B) B-22 (on-add) 5.784 5.784 eplenishment pares (on-add) 0.193 0.201 0.205 0.212 103.068 115.409 224.577 275.710-1 hopping ist Item o. 04 Weapon ystem ost nalysis xhibit -5, page 3 of 12 2-23

xhibit -5, Weapon ystem ost nalysis Date: February 2007 issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 04 omments nit ost calculations for F, avy, other requirements assumes 350 F units in FY07 and 250 F missiles for FY08-13. dvanced edium ange ir-to-ir issile () -1 hopping ist Item o. 04 Weapon ystem ost nalysis xhibit -5, page 4 of 12 2-24

xhibit -5, rocurement History and lanning Date: February 2007 issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 04 Weapon ystem WB ost lements Qty nit ost ocation of F Issue Date ubline Item ontract ethod dvanced edium ange ir-to-ir issile () Date of ontract ype ontractor and ocation First ward Date Delivery pecs vailable ow? Date evision vailable? FY06 ot 20 roduction 84 1.227 F/328 W FY07 ot 21 roduction 87 1.327 F/328 W FY08 ot 22 roduction 206 1.090 F/328 W Dec-05 F aytheon, ucson, Z ug-06 ct-07 Yes Dec-06 F aytheon, ucson, Z Feb-07 Feb-09 Yes Dec-07 F aytheon, ucson, Z an-08 Feb-10 Yes emarks nit ost calculations for F, avy, other requirements assumes 350 F units in FY07 and 250 F missiles for FY08-13. -1 hopping ist Item o. 04 rocurement History and lanning xhibit -5, page 5 of 12 2-25

xhibit -21, roduction chedule Date: February 2007 issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 04 dvanced edium ange ir-to-ir issile () Y. B FI Y 2003 FI Y 2004 I D 2002 D Y 2003 D Y 2004. F D F D F QY 2002 2002 B Y B Y 2002 F 190 0 190 1 2 187 2003 F 124 0 124 war d 124 2004 F 159 0 159 war d 159 2002 55 0 55 55 2003 76 0 76 war d 76 2004 42 0 42 war d 42 2002 F 671 0 671 53 69 68 69 69 59 50 33 55 36 8 9 18 14 11 50 2003 F 229 0 229 war d 1 29 11 45 32 111 2004 F 34 0 34 war d 34 2004 15 0 15 war d 15 2004 6 0 6 war d 6 2004 F-18 11 0 11 war d 11 2003 F-35 6 0 6 war d 6 1,618 0 1,618 0 53 69 68 70 69 59 50 33 55 36 8 9 47 26 56 34 876 DI D I I HIF H DI D I I/F' I DY X aytheon ucson, Z 350 2-8-5 1,200 I F K ote: he minimum sustaining production rate is 350 and the maximum is 1200 missiles per year. D F B Y F I D F B F III 0 0 18 24 D Y -1 hopping ist Item o. 04 roduction chedule xhibit -21, page 6 of 12 2-26

xhibit -21, roduction chedule Date: February 2007 issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 04 Y. QY. I 2004 B D F 2004 dvanced edium ange ir-to-ir issile () FI Y 2005 FI Y 2006 2004 D Y 2005 D Y 2006 D F D F B Y B Y 2002 F 190 3 187 2 1 3 2 5 5 4 3 10 8 3 9 10 7 9 19 35 21 21 2 8 0 2003 F 124 0 124 3 1 2 10 22 19 6 61 2004 F 159 0 159 159 2005 F 159 0 159 war d 159 2006 F 84 0 84 war d 84 2002 55 0 55 1 1 3 5 2 2 10 8 2 6 2 3 6 3 1 0 2003 76 0 76 12 12 52 2004 42 0 42 42 2005 37 0 37 war d 37 2006 48 0 48 war d 48 2002 F 671 621 50 1 10 17 12 7 3 0 2003 F 229 118 111 20 21 15 3 3 6 18 20 2 1 2 0 2004 F 34 0 34 8 8 6 8 4 0 2005 F 233 0 233 war d 7 1 2 223 2006 F 241 0 241 8 233 2004 15 0 15 1 14 2005 5 0 5 war d 5 2006 34 0 34 war d 34 2004 6 0 6 6 2005 1 0 1 war d 1 2004 F-18 11 0 11 11 2005 F-18 12 0 12 war d 12 2003 F-35 6 0 6 2 4 2004 F-35 2 0 2 2 2006 F-35 9 0 9 war d 9 2,483 742 1,741 22 24 29 25 20 23 27 28 30 25 12 23 16 10 17 30 37 31 31 24 39 22 1,196 DI D I I HIF H DI D I I/F' I DY X aytheon ucson, Z 350 2-8-5 1,200 I F K ote: he minimum sustaining production rate is 350 and the maximum is 1200 missiles per year. D F B Y F I D F B F III 0 0 18 24 D Y -1 hopping ist Item o. 04 roduction chedule xhibit -21, page 7 of 12 2-27

xhibit -21, roduction chedule Date: February 2007 issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 04 Y. QY. I 2006 B D F 2006 dvanced edium ange ir-to-ir issile () FI Y 2007 FI Y 2008 2006 D Y 2007 D Y 2008 D F D F B Y B Y 2003 F 124 63 61 13 14 11 23 0 2004 F 159 0 159 2 21 28 25 31 34 18 0 2005 F 159 0 159 2 32 19 32 35 39 0 2006 F 84 0 84 1 1 2 4 4 6 10 10 46 2007 F 87 0 87 war d 87 2008 F 206 0 206 war d 206 2003 76 24 52 10 16 26 0 2004 42 0 42 12 12 13 5 0 2005 37 0 37 8 8 8 8 5 0 2006 48 0 48 4 4 4 5 6 5 2 4 14 2007 128 0 128 war d 128 2008 79 0 79 war d 79 2005 F 233 10 223 14 14 11 16 20 20 20 20 26 20 22 20 0 2006 F 241 0 241 8 3 10 20 13 15 15 12 20 20 22 12 3 13 13 13 13 16 2007 F 250 0 250 war d 250 2008 F 250 0 250 war d 250 2004 15 1 14 1 2 4 7 0 2005 5 0 5 5 0 2006 34 0 34 4 4 4 4 4 4 4 4 2 2004 6 0 6 6 0 2005 1 0 1 1 0 2004 F-18 11 0 11 11 0 2005 F-18 12 0 12 12 0 2003 F-35 6 2 4 3 1 0 2004 F-35 2 0 2 2 0 2006 F-35 9 0 9 9 2,304 100 2,204 40 44 59 55 54 60 70 80 91 48 62 60 55 55 51 20 29 31 22 16 27 28 29 31 1,087 DI D I I HIF H DI D I I/F' I DY X aytheon ucson, Z 350 2-8-5 1,200 I F K ote: he minimum sustaining production rate is 350 and the maximum is 1200 missiles per year. D F B Y F I D F B F III 0 0 18 24 D Y -1 hopping ist Item o. 04 roduction chedule xhibit -21, page 8 of 12 2-28

xhibit -21, roduction chedule Date: February 2007 issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 04 dvanced edium ange ir-to-ir issile () Y. B FI Y 2009 FI Y 2010 I D 2008 D Y 2009 D Y 2010. F D F D F QY 2008 2008 B Y B Y 2007 F 87 0 87 7 7 7 7 7 7 7 7 7 8 8 8 0 2008 F 206 0 206 17 17 17 17 17 17 17 17 70 2009 F 301 0 301 war d 301 2010 F 334 0 334 war d 334 2007 128 0 128 11 11 11 11 11 11 11 11 10 10 10 10 0 2008 79 0 79 6 6 6 6 7 7 7 7 27 2009 97 0 97 war d 97 2010 99 0 99 war d 99 2007 F 250 0 250 20 20 21 21 21 21 21 21 20 20 20 20 4 2008 F 250 0 250 20 20 21 21 21 21 21 21 84 2009 F 250 0 250 war d 250 2010 F 250 0 250 war d 250 2,331 0 2,331 0 38 38 39 39 39 39 39 39 37 38 38 38 43 43 44 44 45 45 45 45 1,516 DI D I I HIF H DI D I I/F' I DY X aytheon ucson, Z 350 2-8-5 1,200 I F K ote: he minimum sustaining production rate is 350 and the maximum is 1200 missiles per year. D F B Y F I D F B F III 0 0 18 24 D Y -1 hopping ist Item o. 04 roduction chedule xhibit -21, page 9 of 12 2-29