DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

Similar documents
RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING EARLY CHILDHOOD CARE AND DEVELOPMENT FOR FLOATING VILLAGES PROJECT APPROVED ON JUNE 10, 2016

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BD IDENTIFICATION SYSTEM FOR ENHANCING ACCESS TO SERVICES (IDEA) PROJECT

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY ANALYSIS CAPACITY APPROVED ON APRIL 28, 2017

The World Bank Water and Sanitation in Tourist Areas (P054221)

The World Bank NEITI Reporting Compliance (P162344)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT APPROVED ON JULY 31, 2008

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INSTITUTIONS BUILDING TECHNICAL ASSISTANCE PROJECT (IBTAL)

The World Bank Third Secondary and Local Roads Project (P148048)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT PROJECT APPROVED ON JUNE 29, 2010

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE APPROACH (SWAP) DEVELOPMENT PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RIO GRANDE DO SUL SWAP APPROVED ON MAY 1, 2012 STATE OF RIO GRANDE DO SUL, BRAZIL

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE

INFRASTRUCTURE & INSTITUTIONS EMERGENCY RECOVERY APPROVED ON MARCH 18, 2010 MINISTRY OF ECONOMY AND FINANCE, MEF,MINISTRY OF FINANCE AND ECONOMY

The World Bank Industrial Waste Management and Cleanup Project (P122139)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE PROJECT (CASA-1000)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES PROJECT

Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN

Public Disclosure Copy

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING OF THE SAFETY NET ADVANCEMENT PROJECT APPROVED JULY 5, 2011 GRENADA

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

The World Bank LK GPOBA - Access to Sanitation Project (P111161)

The World Bank Social Assistance System Strengthening Project (P123960)

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931)

The World Bank Disease Prevention and Control Project (P128442)

Implementation Status & Results Colombia Disaster Vulnerability Reduction First Phase APL (P082429)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016

Implementation Status & Results Brazil Sao Paulo Feeder Roads Project (P106663)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

The World Bank Sustainable Croatian Railways in Europe (P147499)

Implementation Status & Results China China Wuhan Second Urban Transport (P112838)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

The World Bank Malawi Strategic Program for Climate Resilience (P163245)

The World Bank Indonesia Infrastructure Guarantee Fund Project (P118916)

SENEGAL: TRANSPORT & URBAN MOBILITY PROJECT APPROVED ON JUNE 1, 2010 COORDINATION DU PATMUR,MINISTERE DE L'ECONOMIE, DES FINANCES ET DU PLAN

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING SERBIA COMPETITIVENESS AND JOBS PROJECT (P152104) APPROVED ON SEPTEMBER 16, 2015

The World Bank Kabeli-A Hydro Electric Project (P122406)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT

Implementation Status & Results Philippines National Program Support for Tax Administration Reform. (P101964)

The World Bank SEE Catastrophe Risk Insurance Facility TA SECO (P156455)

Public Disclosure Copy. Implementation Status & Results Report Savings and Credit Sector Consolidation and Financial Inclusion Project (P123367)

Implementation Status & Results India Assam State Roads Project (P096018)

Public Disclosure Copy

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016

Public Disclosure Copy

Public Disclosure Copy

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE WESTERN PROVINCES RURAL WATER SUPPLY, SANITATION AND HYGIENE PROMOTION PROJECT

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207)

Implementation Status & Results Peru PERU Participatory intervention model to improve child nutrition (P120888)

TR Third Access to Finance for SMEs (SME III) (P130864)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INCOME SUPPORT AND EMPLOYABILITY PROJECT LOAN 7811-SV

The World Bank St. Petersburg Economic Development Project (P069063)

Public Disclosure Copy. Implementation Status & Results Report CO Rio Bogota Environmental Recuperation and Flood Control Project (P111479)

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585)

Implementation Status & Results Brazil BR APL 1 Para Integrated Rural Dev (P082651)

The World Bank Kabul Urban Transport Efficiency Improvement Project (P131864)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF MUNICIPAL SERVICES PROJECT LOAN 7885-TU

Implementation Status & Results India Strengthening India's Rural Credit Cooperatives (P102768)

Implementation Status & Results Croatia Revenue Administration Modernization Project (P102778)

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826)

Public Disclosure Copy

Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

Public Disclosure Copy. Implementation Status & Results Report Costa Rica Catastrophe Deferred Draw Down Option (CAT DDO) (P111926)

State Owned Financial Institutions Reform Project (P156837)

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report QUALISUS-REDE Brazil Health Network Formation and Quality Improvement Project (P088716)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT )

The World Bank Jamaica Strategic Public Sector Transformation (P146688)

MicroSmall&Medium Enterprise and Large Enterprise Supply Chain Finance (P157691)

Implementation Status & Results Chile Ministry of Public Works Institutional Strenghtening TAL (P102931)

Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991)

Implementation Status & Results Tajikistan Tax Administration (P127807)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

Implementation Status & Results Burkina Faso Local Government Support Project (P120517)

Public Disclosure Copy

Implementation Status & Results Haiti Strengthening the Management of Agriculture Public Services (GFRP) (P113623)

Implementation Status & Results Indonesia Sustainable Management of Agricultural Research and Technology Dissemination (SMARTD) (P117243)

The World Bank Mozambique - Artisanal Fisheries and Climate Change (P149992)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00

Public Disclosure Copy

Implementation Status & Results Indonesia Project for Indonesian Tax Administration Reform (PINTAR) (P100740)

Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577)

The World Bank Indonesia Power Transmission Development Project (P117323)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

Implementation Status & Results Azerbaijan Corporate and Public Sector Accountivility Project (P099924)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Improving Maternal and Child Health through Integrated Social Services (P123706)

Transcription:

Public Disclosure Authorized DOCUMENT OF THE WORLD BANK REPORT NO.: RES30282 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized MEXICO REDUCING INEQUALITY OF EDUCATIONAL OPPORTUNITY PROJECT APPROVED ON OCTOBER 24, 2014 TO THE UNITED MEXICAN STATES Public Disclosure Authorized EDUCATION LATIN AMERICA AND CARIBBEAN Regional Vice President: Acting Country Director: Senior Global Practice Director: Practice Manager/Manager: Task Team Leader: Jorge Familiar Jutta Ursula Kern Jaime Saavedra Chanduvi Reema Nayar Ciro Avitabile

ABBREVIATIONS AND ACRONYMS CONAFE GoM ISR PDO National Council for Education Development (Consejo Nacional de Fomento Educativo) Government of Mexico Implementation Status and Results Report Project Development Objective

BASIC DATA Product Information Project ID P149858 Original EA Category Not Required (C) Approval Date 24-Oct-2014 Financing Instrument Investment Project Financing Current EA Category Not Required (C) Current Closing Date 31-Dec-2018 Organizations Borrower United Mexican States Responsible Agency Consejo Nacional de Fomento Educativo (CONAFE) Project Development Objective (PDO) Original PDO The objectives of the Project are: (a) to improve parental competencies in early childhood development in targeted rural communities; and (b) increase the transition rate from the primary to the secondary education level in CONAFEadministered schools in targeted municipalities. Summary Status of Financing Ln/Cr/Tf Approval Signing Effectiveness Closing Net Commitment Disbursed Undisbursed IBRD-84480 24-Oct-2014 14-Sep-2015 11-Dec-2015 31-Dec-2018 150.00 87.06 62.94 Policy Waiver(s) Does this restructuring trigger the need for any policy waiver(s)? No

I. PROJECT STATUS AND RATIONALE FOR RESTRUCTURING 1. The Project was approved by the Board on October 24, 2014 and became effective on December 11, 2015. The Project has three components: (1) Early Childhood Development; (2) Mobile Pedagogical Support (Asesores Pedagógicos Itinerantes); and (3) Technical Cooperation, Research, and Innovation. 2. Progress towards achievement of the Project Development Objectives (PDO) and the Overall Implementation Progress were downgraded to Moderately Satisfactory in the latest Implementation Status Report (ISR) in December 2017 due to: i) budgetary restrictions that hindered activities under Component 3, which consequently affected the quality of activities under Component 1. The budgetary constraints delayed the National Council for Education Development (Consejo Nacional de Fomento Educativo, CONAFE) from hiring the firm responsible for implementing the new parenting practices model (Component 1) and the firm responsible for measuring PDO indicator 1 Score of parenting practices among caregivers of children ages 0-4, in selected states (Component 3). Because these two firms responsible for implementation and measurement of the intervention were not hired until later in the life of the Project (October 2017), progress towards achievement of the first PDO remained stagnant and unmeasured. The rating was also downgraded because ii) actual disbursements have been lower than originally estimated. The Project was expected to have disbursed US$125M (83.3%) by the end of June 2017. To date, US$80.7M (53.8%) has been disbursed, leaving US$69.3M (46.2%) to be disbursed by the loan closing date of December 31, 2018. In contrast, PDO indicator 2, which measures the transition rate from primary to lower secondary education for CONAFE administered school graduates, is above the annual target and most of the intermediate results indicators are in line with or above the initial targets. 3. The proposed restructuring would cancel US$30M (20%) of the original loan amount of US$150M and would adjust the disbursement estimates accordingly, component costs, and disbursement category amounts. The partial cancellation is needed to respond to the substantial change in the dollar-peso exchange rate since Project appraisal, which has increased significantly. A subsequent restructuring due by February 2018 would adjust the Project activities and indicator targets as a result of the partial cancellation. Since the baseline and target values for the updated indicators will not be available by CONAFE until January 2018, the second restructuring would be processed once the indicator values are finalized and provided to the Bank. II. DESCRIPTION OF PROPOSED CHANGES 4. This is the first restructuring of this Project and will be a Level 2 Restructuring. The changes were discussed with the Government of Mexico (GoM) during the Mid-Term Review mission held from September 6-8, 2017 and recorded in the corresponding Aide Memoire. The GoM sent a formal request for the partial loan cancellation on October 27, 2017. Once the first restructuring is approved, it will be effective as of the date of receipt of the request. 5. The proposed changes are the following: a. Cancellations Proposed. US$30M will be cancelled due to the increase in the dollar-peso exchange rate since Project appraisal.

b. Change in Disbursement Estimates. As a result of the slower disbursement rate and the cancellation, the GoM has adjusted the Disbursement Estimates of the Loan. The lower level of disbursements is mainly due to the increase in the exchange rate and the budgetary restrictions experienced by CONAFE that prevented the commitment of funds for the hiring of two firms under Component 3. The new estimates reflect what was disbursed in fiscal years 2015-2017 and what is expected to disburse through the Closing Date of the Loan given the cancellation. c. Change in Components and Cost. i. Component 1: Early Childhood Development The allocation to this component will be decreased by US$21.1M, 18.2% of the original allocation. ii. Component 2: Mobile Pedagogical Support (Asesores Pedagógicos Itinerantes) The allocation to iii. this component will be decreased by US$7.1M, 22.6% of the original allocation. Component 3: Technical Cooperation, Research, and Innovation The allocation to this component will be decreased by US$1.8M, 80.2% of the original allocation. The allocation will be reduced substantially in response to the budgetary restrictions that have prevented CONAFE from executing activities under this component. d. Reallocation between Disbursement Categories. While there are no reallocations between disbursement categories, this section reflects the reduced allocations to the disbursement categories. These reductions reflect the adjustments to the Component Costs described above. 6. The second restructuring would adjust the Project activities and indicator targets. The baseline data was collected in December 2017 for the updated indicators. The analysis to set the baseline and target values is expected to be completed by mid-january 2018. Upon receipt of the data, the Bank will process the second restructuring and plans to have it approved by February 2018. III. SUMMARY OF CHANGES Changed Change in Components and Cost Not Changed Cancellations Proposed Reallocation between Disbursement Categories Change in Disbursement Estimates Change in Implementing Agency Change in DDO Status Change in Project's Development Objectives Change in Results Framework Change in Loan Closing Date(s) Change in Disbursements Arrangements Change in Overall Risk Rating Change in Safeguard Policies Triggered

OPS_DETAILEDCHANGES_COMPONENTS_TABLE OPS_DETAILEDCHANGES_CANCELLATIONS_TABLE Change of EA category Change in Legal Covenants Change in Institutional Arrangements Change in Financial Management Change in Procurement Change in Implementation Schedule Other Change(s) Change in Economic and Financial Analysis Change in Technical Analysis Change in Social Analysis Change in Environmental Analysis IV. DETAILED CHANGE(S) COMPONENTS Current Component Name Current Cost (US$M) Action Proposed Component Name Proposed Cost (US$M) Early Childhood Development 115.97 Revised Early Childhood Development 94.87 Mobile Pedagogical Support (Asesores Pedagógicos Itinerantes) Technical Assistance, Research and Innovation 31.41 Revised 2.24 Revised Mobile Pedagogical Support (Asesores Pedagógicos Itinerantes) Technical Assistance, Research and Innovation TOTAL 149.62 119.62 24.31 0.44 CANCELLATIONS Ln/Cr/Tf Status Currency IBRD- 84480-001 Disburs ing USD Current Amount 150,000,000.0 0 Cancellation Amount Value Date of Cancellation 30,000,000.00 07-Nov-2017 New Amount 120,000,000.0 0 Reason for Cancellation BORROWER' S REQUEST FOR

COUNTRY REASONS OPS_DETAILEDCHANGES_REALLOCATION _TABLE REALLOCATION BETWEEN DISBURSEMENT CATEGORIES Current Allocation Actuals + Committed Proposed Allocation Financing % (Type Total) Current Proposed IBRD-84480-001 Currency: USD ilap Category Sequence No: 1 Current Expenditure Category: ECD Sup & Capacity Build Pt 1a & 1b 115,970,000.00 68,054,626.25 94,870,000.00 100.00 100.00 ilap Category Sequence No: 2 Current Expenditure Category: API Sup & Capacity Build Pt 2a & 2b 31,410,000.00 18,630,384.54 24,310,000.00 100.00 100.00 ilap Category Sequence No: 3 Current Expenditure Category: NCS & Cs Parts 1c, 2c & 3 2,245,000.00 0.00 445,000.00 100.00 100.00 ilap Category Sequence No: 5 Current Expenditure Category: PREMIUM FOR CAPS/COLLARS 0.00 0.00 0.00 Total 149,625,000.00 86,685,010.79 119,625,000.00 OPS_DETAILEDCHANGES_DISBURSEMENT_TABLE DISBURSEMENT ESTIMATES Change in Disbursement Estimates Yes Year Current Proposed 2015 35,010,000.00 375,000.00 2016 45,000,000.00 37,252,252.33 2017 45,000,000.00 26,924,619.76 2018 24,990,000.00 37,853,461.39

2019 0.00 17,594,666.52 2020 0.00 0.00