PROJECT MANAGEMENT CPM & PERT TECHNIQUES

Similar documents
CHAPTER 9: PROJECT MANAGEMENT

Project Planning. Identifying the Work to Be Done. Gantt Chart. A Gantt Chart. Given: Activity Sequencing Network Diagrams

UNIT-II Project Organization and Scheduling Project Element

A convenient analytical and visual technique of PERT and CPM prove extremely valuable in assisting the managers in managing the projects.

CISC 322 Software Architecture

GPE engineering project management. Project Management in an Engineering Context

Project Management. Chapter 2. Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall

Textbook: pp Chapter 11: Project Management

6/7/2018. Overview PERT / CPM PERT/CPM. Project Scheduling PERT/CPM PERT/CPM

SCHEDULE CREATION AND ANALYSIS. 1 Powered by POeT Solvers Limited

Project Management Techniques (PMT)

Project Planning. Jesper Larsen. Department of Management Engineering Technical University of Denmark

Program Evaluation and Review Techniques (PERT) Critical Path Method (CPM):

CHAPTER 6 CRASHING STOCHASTIC PERT NETWORKS WITH RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM

Project Management Chapter 13

SSC-JE STAFF SELECTION COMMISSION CIVIL ENGINEERING STUDY MATERIAL ESTIMATING, COSTING AND VALUATION

Introduction. Introduction. Six Steps of PERT/CPM. Six Steps of PERT/CPM LEARNING OBJECTIVES

PROJECT MANAGEMENT COURSE 5: PROJECT TIME MANAGEMENT. G.N. Sandhy Widyasthana

Construction Management

Programme Evaluation and Review Techniques (PERT) And Critical Path Method (CPM) By K.K. Bandyopadhyay. August 2001

Teori Pengambilan Keputusan. Week 12 Project Management

IE 102 Spring Project Management

Project Management with Brief Information regarding CPM and PERT Methods

Management Management

11/1/2018. Overview PERT / CPM. Network representation. Network representation. Project Scheduling. What is a path?

Probabilistic Completion Time in Project Scheduling Min Khee Chin 1, Sie Long Kek 2, Sy Yi Sim 3, Ta Wee Seow 4

Project Management Fundamentals

06IP/IM74 OPERATIONS RESEARCH

Appendix A Decision Support Analysis

After complete studying this chapter, You should be able to

1 of 14 4/27/2009 7:45 AM

Project Management -- Developing the Project Plan

Real-World Project Management. Chapter 15

Outline. Global Company Profile: Bechtel Group. The Importance of Project Management Project Planning Project Scheduling Project Controlling

Network Analysis Basic Components. The Other View. Some Applications. Continued. Goal of Network Analysis. RK Jana

MODULE: INTRODUCTION TO PROJECT MANAGEMENT / PROJECT MANAGEMENT

Project Management Professional (PMP) Exam Prep Course 06 - Project Time Management

Line Balancing S K Mondal Chapter 3

Optimization of Rescheduling and Economy. Analysis of the Implementation of Kwitang Office. Park Building Construction Project in Jakarta

Project Management. Project Mangement. ( Notes ) For Private Circulation Only. Prof. : A.A. Attarwala.

INSE 6230: Assignment 1 - Winter (0% of final grade) 1. The table below provides information about a short IT project.

Chapter 2 The PERT/CPM Technique

THE ACCELERATING OF DURATION AND CHANGE OF COST ON CONSTRUCTION PROJECT IMPLEMENTATION

UNIT 5 PROJECT ANALYSIS PERT/CPM MODULE - 2

ETSF01: Software Engineering Process Economy and Quality

VALLIAMMAI ENGINEERING COLLEGE

Project Management and Cost Control

UNIVERSITY OF BOLTON SCHOOL OF ENGINEERING. MSc CIVIL ENGINEERING MSc CONSTRUCTION PROJECT MANAGEMENT SEMESTER ONE EXAMINATION 2017/2018

PROJECT MANAGEMENT. Trying to manage a project without project management is like trying to play a football game without a game plan

Plan Implementation. Pushpa Lal Shakya

Lecture 3 Project Scheduling

The Critical Path Method

Optimization Prof. A. Goswami Department of Mathematics Indian Institute of Technology, Kharagpur. Lecture - 18 PERT

u w 1.5 < 0 These two results imply that the utility function is concave.

Programme Evaluation and Review Technique


CHAPTER 5. Project Scheduling Models

International Project Management. prof.dr MILOŠ D. MILOVANČEVIĆ

WHY ARE PROJECTS ALWAYS LATE?

Outline. Project Management. Introduction. What is a Project?

A UNIT BASED CRASHING PERT NETWORK FOR OPTIMIZATION OF SOFTWARE PROJECT COST PRITI SINGH, FLORENTIN SMARANDACHE, DIPTI CHAUHAN, AMIT BHAGHEL

Handout 4: Deterministic Systems and the Shortest Path Problem

EXERCISE Draw the network diagram. a. Activity Name A B C D E F G H

Chapter 11: PERT for Project Planning and Scheduling

MnDOT use of Calendars in Primavera P6

Comparison between Deterministic and Stochastic Time Estimating Techniques

INSE 6230 Total Quality Project Management Winter 2018 Quiz I. Max : 70 points. This is a closed book exam. Answer all the questions in the booklet.

ECSE 321: INTRODUCTION TO SOFTWARE ENGINEERING

NETWORK ANALYSIS QUESTION BANK

POLYTECHNIC OF NAMIBIA

A METHOD FOR STOCHASTIC ESTIMATION OF COST AND COMPLETION TIME OF A MINING PROJECT

MnDOT Project Management Office Presents: Project Reporting. Presenter: Jonathan McNatty Senior Schedule Consultant DRMcNatty & Associates, Inc.

MS Project 2007 Page 1 of 18

A SINGLE STEP CPM TIME-COST TRADEOFF ALGORITHM. In Mathematics and Computing. Under the guidance of Dr. Mahesh Kumar Sharma

CHAPTER 5 SCHEDULING AND TRACKING WORK IN CONSTRUCTION PROJECT MANAGEMENT. UWB10202 Effective Communication by Norazmi Danuri

A Comparison Between the Non-Mixed and Mixed Convention in CPM Scheduling. By Gunnar Lucko 1

SWEN 256 Software Process & Project Management

If you have a question during any portion of this exam, raise your hand and speak to the proctor. Write legibly.

Logistics. Lecture notes. Maria Grazia Scutellà. Dipartimento di Informatica Università di Pisa. September 2015

Project Network Analysis Model to Dredging Operations In Niger Delta

Project Management. Basic Definitions: Project and Project Plan

SAMPLE. DETERMINING ACTIVITY DURATIONS TCM Framework: 7.2 Schedule Planning and Development. AACE International Recommended Practice No.

Cost Reduction: Planning & Control. Impacting the Bottom Line

56:171 Operations Research Midterm Examination Solutions PART ONE

Project planning and creating a WBS

Formulas to Know for EXAM

Decision Support Tool for Project Time-Cost Trade-off

Ins. Luay Dwaikat Fall 2013/2014

Research Methods Outline

ADVANCED QUANTITATIVE SCHEDULE RISK ANALYSIS

PROJECT MANAGEMENT: PERT AMAT 167

Project Controls Expo 16 th Nov 2016


CHAPTER 5 STOCHASTIC SCHEDULING

UNIVERSITY OF SWAZILAND FACULTY OF COMMERCE DEPARTMENT OF BUSINESS ADMINISTRATION FINAL EXAMINATION PAPER MAY 2016 ROJECT MANAGEMENT THREE [3] HOURS

Impacting the Bottom Line. Cost Reduction: Planning & Control. Bottom Line (costs) A = Costs (what we expend) B = Revenue, sales (what we generate)

Lecture 5: Project Management

CONSTRUCTION MANAGEMENT CHAPTER 3 PLANNING

Allocate and Level Project Resources

56:171 Operations Research Midterm Examination Solutions PART ONE

Transcription:

PROJECT MANAGEMENT CPM & PERT TECHNIQUES

FLOW OF PRESENTATION INTRODUCTION NETWORK PLANNING ESTIMATING TIME CPM PERT

Project Management Project A project is an interrelated set of activities that has a definite starting and ending point and that results in a unique product or service. Project management Project management is a scientific way of planning, implementing, monitoring & controlling the various aspects of a project such as time, money, materials, manpower & other resources.

Network Planning Methods Methods used for network planning are: CPM PERT Managing a project with network planning methods involves four steps: 1. Describing the Project. 2. Diagramming the Network. 3. Estimating time of completion. 4. Monitoring Project Progress.

Network Diagram Concepts Activity Precedence relationship Successor Event

Guidelines for network diagram 1. Before an activity can begin, its preceding activities must be completed. 2. Arrows indicate logical precedence. 3. Flow of the diagram is from left to right. 4. Arrows should not intersect. 5. Dangling should be avoided.

APPRAOCHES FOR NETWORK DIAGRAM ACTIVITY ON ARC(AOA): Uses arcs to represent activities and nodes to represent events. It is Event Oriented. 3 1 2 6 7 8 4 5

DUMMY ACTIVITY AOA approach requires the addition of a Activity to clarify the precedence relationships the two activities. It is a zero time activity and consumes no resources. Dummy between Dummy Activity is used in two situations: 1) When two or more activities start and end at the same nodes 1 3 2

2) When two or more activities share the same precedence activity but not all the precedence are shared. 1 3 5 7 2 4 6

ACTIVITY ON NODE(AON): Uses nodes to represent activities precedence relationships between It is Activity Oriented. and arcs indicate them.

ESTIMATING TIME OF COMPLETION Planning the schedule of the project Time estimates include: 1) Total time for completion. 2) ES- Earliest start time: the earliest time at which the activity can start given that its precedent activities must be completed first. 3) EF-Earliest finish time: equals to the earliest start time for the activity plus the time required to complete the activity. 4) LF- Latest finish time: the latest time in which the activity can be completed without delaying the project. 5) LS- Latest start time: equal to the latest finish time minus the time required to complete the activity.

6) FORWARD PASS: The early start and early finish times are calculated by moving forward through the network and considering the predecessor activities Considers maximum 7) BACKWARD PASS: The latest start and finish times are calculated by moving backward through the network. Considers minimum 8) SLACK TIME: Slack time for an activity is the difference between its earliest and latest start time or between the earliest and latest finish time. Critical path is the path of activities having zero Slack time.

A Simple Project Activity Immediate Expected Predecessor Time A - 5 B - 6 C A 4 D A, B 2

Precedence Diagram

ES EF LS LF Slack Earliest Starting (time) Earliest Finishing Latest Starting Latest Finishing Difference Time

CRITICAL PATH METHODS(CPM) HISTORY : It was developed by J.E.KELLY of REMINGTON-RAND and M.R.WALKER of DU PONT and the emphasis was on the trade-off between the cost of project and its overall completion time. The first test was made in 1958,when CPM was applied to the construction of a new chemical plant. DEFINITION: Critical path is the sequence of activities between a project s start and finish that takes the longest time to complete.

STEPS IN DETERMINING CRITICAL PATH Specify the individual activities. Determine the sequence of the activities. Draw the network diagram. Estimate the activity completion time. Identify the critical path. Update the CPM diagram.

Activit y Preceden ce Normal time (week) Normal Cost (Rs) A - 3 300 B A 3 30 C A 7 420 D A 9 720 E D 5 250 F B,C,E 6 320 G F 4 400 H F 13 780 I G 10 1000 Total 4220

4 7 1 2 5 6 3 8

Overhead cost as per the given data- Rs.50 Paths in the network diagram : A-D-F-G-I = 32 A-D-F-H = 31 A-C-F-H = 29 A-C-F-G-I = 30 A-B-E-F-H = 30 A-B-E-F-G-I = 31

Critical path A-D-F-G-I = 32 4 7 1 2 5 6 3 8

TIME ESTIMATES o Optimistic time (to) It is the shortest time activity can be completed. o Most likely time (tm) It is the probable time required to perform the activity. o Pessimistic time (tp) It is the longest estimated time required to perform an activity. o Expected time te = to + 4tm + tp 6 in which the

STEPS IN PERT 1. Identify the specific activities. 2. Determine proper sequence of the activities. 3. Construct the network diagram. 4. Estimate the time required for each activity. 5. Determine the critical path. 6. Update the PERT chart.

Activity Descrip tion Preced ence Optimis tic time Most Likely time Pessimi stic time Expecte d time A B C D E F G Initial design Survey market Build prototype Test prototype Redesign ing Market testing Set up productio n - 12 16 26 17 A 6 9 18 10 A 8 10 18 11 C 2 3 4 3 B,D 3 4 11 5 E 6 8 10 8 F 15 20 25 20

1 2 4 5 6 7 3 A-B-E-F-G = 60 A-C-D-E-F-G = 64 (CRITICAL PATH)

Advantages of PERT Expected project completion time. Probability of completion before a specified date. The critical path activities that directly impact the completion time. The activities that have slack time and that can lend resources to critical path activities. Activity start and end dates.

LIMITATIONS The PERT Formula Requires Too Much Work. The network charts tend to be large and unwieldy. Calculating the time estimates is very complex for all the activities. Updating of the project is time consuming and requires high costs. Emphasis is laid only on time factors and cost factors are neglected.

Difference between CPM & PERT CPM CPM works with fixed deterministic time CPM is useful for repetitive and non complex projects with a certain degree of time estimates. CPM includes time-cost trade off. CPM- for construction projects. PERT PERT works with probabilistic time PERT is useful for non repetitive and complex projects with uncertain time estimates. PERT is restricted to time variable. PERT- used for R&D programs.

Thank You