Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized The World Bank Power Recovery Project (P144029)

Similar documents
Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized The World Bank Power Recovery Project (P144029)

The World Bank Indonesia Power Transmission Development Project (P117323)

MicroSmall&Medium Enterprise and Large Enterprise Supply Chain Finance (P157691)

Public Disclosure Copy

The World Bank Indonesia Power Transmission Development Project (P117323)

Public Disclosure Copy. Implementation Status & Results Report CAPE VERDE - Recovery and Reform of the Electricity Sector Project (P115464)

Public Disclosure Copy

The World Bank. Ghana: Energy Development and Access Project (P074191) Key Dates. Project Development Objectives. Components

Public Disclosure Copy

Public Disclosure Copy

TR Third Access to Finance for SMEs (SME III) (P130864)

Public Disclosure Copy

The World Bank Indonesia Infrastructure Guarantee Fund Project (P118916)

Public Disclosure Copy

Public Disclosure Copy

Innovative Access to Finance (P147183)

Public Disclosure Copy

Public Disclosure Copy

The World Bank Revenue Administration Modernization Project (P130202)

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Dominican Republic DRM Development Policy Loan with a Cat DDO (P159351)

The World Bank Bangladesh Ghorashal Unit 4 Repowering Project (P128012)

Bangladesh Insurance Sector Development Project (P156823)

The World Bank. Ghana: Energy Development and Access Project (P074191) Key Dates. Project Development Objectives. Components

Public Disclosure Copy. Implementation Status & Results Report CO Rio Bogota Environmental Recuperation and Flood Control Project (P111479)

The World Bank Albania-Enhancing Quality of Financial Reporting (EQ-FINREP) (P152567)

Zambia Kafue Town - Muzuma - Victoria Falls Regional Transmission Line Reinforcement Project

West Bengal PRI (P105990)

The World Bank Building a Modern Fiscal System Technical Assistance (P154694)

The World Bank Municipal Services Improvement (P096481)

Road Sector Development Project (P149322)

Public Disclosure Copy

Public Disclosure Copy

State Owned Financial Institutions Reform Project (P156837)

Public Disclosure Copy

The World Bank Nigeria - Public/Private Partnership Program (P115386)

Justice Sector Support Project (P104749)

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report QUALISUS-REDE Brazil Health Network Formation and Quality Improvement Project (P088716)

Public Disclosure Copy

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank Jamaica Strategic Public Sector Transformation (P146688)

Public Disclosure Copy. Implementation Status & Results Report Savings and Credit Sector Consolidation and Financial Inclusion Project (P123367)

Public Disclosure Copy

The World Bank Water Resources and Irrigation Sector Management Program 2 (P114348)

Debt Management Strengthening Programme at Ministry of Finance, Government of Pakistan (P161451)

Public Disclosure Copy. Implementation Status & Results Report Gansu Cultural and Natural Heritage Protection and Development Project (P091949)

Public Disclosure Copy

Public Disclosure Copy

The World Bank Bangladesh Ghorashal Unit 4 Repowering Project (P128012)

Second Science & Technology Project (P127308)

West Bank and Gaza: Finance for Jobs (P151089)

Public Disclosure Copy

The World Bank Burkina Faso Donsin Transport Infrastructure Project (P120960)

Public Disclosure Copy

Public Disclosure Copy

The World Bank Kenya Cash Transfer for Orphans and Vulnerable Children (P111545)

The World Bank Palestinian Recovery & Development Plan MDTF (P110690)

Public Disclosure Copy

Public Disclosure Copy

PNG - Small and Medium Enterprise Access to Finance Project (P120707)

The World Bank Kabul Urban Transport Efficiency Improvement Project (P131864)

Public Disclosure Copy

The World Bank Nigeria - Public/Private Partnership Program (P115386)

IRAQ: SECOND EXPENDITURE RATIONALIZATION, ENERGY EFFICIENCY AND STATE-OWNED ENTERPRISE GOVERNANCE PROGRAMMATIC DPF (P161

Public Disclosure Copy. Implementation Status & Results Report Costa Rica Catastrophe Deferred Draw Down Option (CAT DDO) (P111926)

Key Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions

Public Disclosure Copy

The World Bank Research and Innovation in Science and Technology Project (P121842)

The World Bank Urban Transport Corridor Development in Surabaya - RETF (P147893)

The World Bank Pastoral Community Development Project III (P130276)

The World Bank KI: Telecommunications and ICT Development Project (P126324)

Public Disclosure Copy. East-West Roads Project (Almaty-Korgos Section): Western Europe - Western China International Transit

The World Bank Public Expenditure and Fiscal Risk Management DPF-DDO (P154981)

Public Disclosure Copy. Implementation Status & Results Report Federally Administered Tribal Areas (FATA) Governance and Policy Program (P156412)

Public Disclosure Copy

Saint Lucia Health System Strengthening Project (P166783)

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)

Public Disclosure Copy. Implementation Status & Results Report Pacific Regional Connectivity Program 2:Palau-FSM Connectivity Project (P130592)

Public Disclosure Copy

Public Disclosure Copy

Jordan Ozone Depleting Substances HCFC Phase-Out Project (ODS3) (P127702)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

The World Bank Sri Lanka - Second Health Sector Development Project (P118806)

The World Bank Pacific Islands Regional Oceanscape Program - Tuvalu (P151780)

SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR (CAREC 1B & 6B) (P099270)

The World Bank Egypt National Railways Restructuring Project (P101103)

The World Bank Second Karnataka State Highway Improvement (P107649)

Key Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions

The World Bank Egypt National Railways Restructuring Project (P101103)

The World Bank Transport Connectivity and Asset Management Project (P132833)

The World Bank Egypt National Railways Restructuring Project (P101103)

The World Bank MN-Mining Infrastructure Investment Supp (P118109) (P118109)

The World Bank Egypt National Railways Restructuring Project (P101103)

Public Disclosure Copy

The World Bank IN Swachh Bharat Mission Support Operation (P153251)

Public Disclosure Copy

Key Dates. Global Development Objectives. Components. Overall Ratings

Transcription:

Public Disclosure Authorized EUROPE AND CENTRAL ASIA Albania Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 5 ARCHIVED on 31-Dec-2017 ISR30419 Implementing Agencies: Ministry of Energy and Industry, Republic of Albania Public Disclosure Authorized Key Dates Key Project Dates Bank Approval Date:29-Sep-2014 Planned Mid Term Review Date:30-Mar-2018 Original Closing Date:30-Nov-2019 Project Development Objectives Effectiveness Date:30-Jan-2015 Actual Mid-Term Review Date:-- Revised Closing Date:30-Nov-2019 Public Disclosure Authorized Project Development Objective (from Project Appraisal Document) The project development objective is to improve reliability of power supply and financial viability of the power sector. Has the Project Development Objective been changed since Board Approval of the Project Objective? No PHRPDODEL Components Name Short Term Complementary Power Import Support:(Cost $30.00 M) Upgrading Distribution Infrastructure:(Cost $93.00 M) Public Disclosure Authorized Transmission Meter/Data Center Upgrade:(Cost $20.00 M) Supporting Power Sector Reforms and Project Implementation:(Cost $7.00 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Unsatisfactory Overall Risk Rating High High 12/31/2017 Page 1 of 11

Implementation Status and Key Decisions There has been considerable progress since project effectiveness in achieving the Project objectives, all underpinned by the Financial recovery Plan approved by the Government during project design: i) reduction of losses from 45% to 28%; ii) the clearance of arrears from KESH to IPPs (from euro 120 million down to zero); iii) payment of invoiced bills to KESH (generation) from OSHEE (distribution--from 40% to 110%); iv) increase in cash collection at OSHEE from about 65% to over 92%; v) reduction of the Sector s dependence on Government budget guarantees; vi) arrangements for financial restructuring of KESH short-term debt (euro 218 million) with EBRD support; and vii) introduction of an updated Power Law aligning the sector along the 3rd Energy Package, including development of a commercial market place in the form of a Power Exchange & Balancing market, enabling Kosovo s power system to join it as a control block in the future. These are all notable achievements in any power system over the last three years. However, the Albanian power sector is once again under financial stress, created by the combination of: (i) A down-turn in rainfall precipitation led to incremental power imports in 2017 of about euro 120 million, as compared to 2016; (ii) A capital expenditure program at distribution company OSHEE that has not yet yielded loss reduction, leading to a slippage in the annual loss reduction program 28% vs targets of 26% and 22 % in the years 2016 and 2017 respectively; and (iii) the imposition of a financially unviable public sector obligation (PSO) upon the power generator KESH. There is, therefore, a likelihood that unless there is a renewed effort to expedite the loss reduction program, a key project development objectives in loss reduction and financial viability would not be met by the scheduled closing date. This requires concerted actions by Government and implementing agencies to update the Financial Recovery plan and address implementation gaps, and the Bank will closely provide the necessary implementation supports. 12/31/2017 Page 2 of 11

12/31/2017 Page 3 of 11

Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance -- Substantial Substantial Macroeconomic -- Moderate Moderate 12/31/2017 Page 4 of 11

Sector Strategies and Policies -- Moderate Moderate Technical Design of Project or Program -- High High Institutional Capacity for Implementation and Sustainability -- High High Fiduciary -- High High Environment and Social -- Moderate Low Stakeholders -- High High Other -- -- -- Overall -- High High Results Project Development Objective Indicators Electricity losses per year in the project area (Percentage, Custom) Value 45.00 28.00 28.00 14.00 Total net injected generation (Megawatt hour(mwh), Custom Supplement) Value 7,145,000.00 6,400,000.00 6,400,000.00 7,850,000.00 Electricity losses per year in the project area- Technical (Percentage, Custom Supplement) Value 15.30 15.00 15.00 12.60 12/31/2017 Page 5 of 11

Electricity losses per year in the project area- Non-Technical (Percentage, Custom Supplement) Value 29.80 13.00 13.00 1.40 Collection rate of distribution company (Percentage, Custom) Value 78.00 93.00 93.00 93.00 Reliability of MV level at Tirana area (Percentage, Custom) Value 100.00 95.00 95.00 70.00 Total amount of intercompany arrears (Days, Custom) Value 1,200.00 600.00 600.00 550.00 Overall Comments Intermediate Results Indicators 12/31/2017 Page 6 of 11

Number of medium voltage customers in deregulated market (Number, Custom) Value 0.00 65.00 65.00 5,000.00 Power sector reforms implemented (Text, Custom) Value No The new Power Law is approved and it is under implementation since May 2015. Regulatory Entity (ERE) is preparing the Bylaws (Rules and Regulations). GoA approved the new Albanian Market Model on Jul 7, 2016. The Wholesale supply was abrogated and KESh is a generation company only. GoA approved the Public Service Obligation act on March 31, 2016. The consultant (NordPool) supported by the Bank and Vienna Energy Secretariat, is working together with Ministry of Energy to establish the proposed power exchange in Albania by the end of 2017. The Bank (IBRD and IFC) is supporting financially the establishment of Albanian Market Operator and Albanian Balancing Market. The distribution company is prepared to unbundle the wires from retail supply. The plan for deregulation of MV customers and IPP is under implementation. The process is going to be delayed because of The new Power Law is approved and it is under implementation since May 2015. Regulatory Entity (ERE) is preparing the Bylaws (Rules and Regulations). GoA approved the new Albanian Market Model on Jul 7, 2016. The Wholesale supply was abrogated and KESh is a generation company only. GoA approved the Public Service Obligation act on March 31, 2016. The consultant (NordPool) supported by the Bank and Vienna Energy Secretariat, is working together with Ministry of Energy to establish the proposed power exchange in Albania by the end of 2017. The Bank (IBRD and IFC) is supporting financially the establishment of Albanian Market Operator and Albanian Balancing Market. The distribution company is prepared to unbundle the wires from retail supply. The plan for deregulation of MV customers and IPP is under implementation. The process is going to be delayed because of the general election on The cost recovery tariff mechanism is implemented. New market is functioning and 40% of market is deregulated 12/31/2017 Page 7 of 11

the general election on June 18, 2017. The Power Law needs to be amended to facilitate the establishment of Market Operator as independent company with state and private ownership. June 18, 2017. The Power Law needs to be amended to facilitate the establishment of Market Operator as independent company with state and private ownership. Implementation of a new billing and collection management system (Text, Custom) Value The risk management mechanism is not in place The Billing System package is contracted (Jul14, 2016) and is under implementation. The hardware installation is completed and the contractor is working for software customization. The full system is expected to be in operation by the end of 2018. The Billing System package is contracted (Jul14, 2016) and is under implementation. The hardware installation is completed and the contractor is working for software customization. The full system is expected to be in operation by the end of 2018. The new Billing and Management System in Operation Implemented Risk management mechanism for weather related power imports (Text, Custom) Value No The ToR is prepared and will be cleared and approved. Since July 2026, the electricity market model is changed. The hydrology risk is transferred from KESH (wholesale is abrogated) to OSHEE (the distribution company is responsible for end-users security of supply). The new market place (Alb Power exchange) to be established by the end of 2017, will accommodate also the The ToR is prepared and will be cleared and approved. Since July 2026, the electricity market model is changed. The hydrology risk is transferred from KESH (wholesale is abrogated) to OSHEE (the distribution company is responsible for end-users security of supply). The new market place (Alb Power exchange) to be established by the end of 2017, will accommodate also the hydrology risk in The Risk Mitigation Mechanisms are established and implemented. 12/31/2017 Page 8 of 11

hydrology risk in Albania. Albania. Share of meters installed by OST (Percentage, Custom) Value 0.00 0.00 0.00 100.00 Debt-to-Capitalization Ratio of OShEE, KESh and OST (Percentage, Custom) Value 300.00 220.00 220.00 60.00 Debt to Equity Ratio of OShEE, KESh and OST (Number, Custom) Value 0.10 0.23 0.23 1.60 12/31/2017 Page 9 of 11

OShEE monthly revenues used to pay for energy purchases to KESh and transmission fees to OST (Percentage, Custom) Value 40.00 100.00 100.00 100.00 Direct project beneficiaries (Number, Custom) Value 0.00 0.00 0.00 200,000.00 Female beneficiaries (Percentage, Custom Supplement) Value 0.00 0.00 0.00 52.00 Overall Comments Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P144029 IBRD-84290 Effective USD 150.00 150.00 0.00 52.16 89.14 35% Key Dates (by loan) 12/31/2017 Page 10 of 11

Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P144029 IBRD-84290 Effective 29-Sep-2014 03-Nov-2014 30-Jan-2015 30-Nov-2019 30-Nov-2019 Cumulative Disbursements Restructuring History There has been no restructuring to date. Related Project(s) There are no related projects. 12/31/2017 Page 11 of 11