Metropolitan Water District s 2010/11 Proposed Rates and Charges. Imported Water Committee January 28, 2010

Similar documents
Finance and Insurance Committee Item 8-1 April 11, 2016

TEN YEAR FINANCIAL FORECAST

BIENNIAL BUDGET SUMMARY FY 2016/17 & 2017/18

Rate Structure Administrative Procedures Handbook FY 2018/19

Rate Structure Administrative Procedures Handbook FY 2017/18

Administrative and Finance Committee June 23, 2011

Proposed Calendar Year 2018 Rates and Charges

July 1, Tier Percent of Allocation Cost per ccf $0.91 $1.27 $2.86 $4.80 $ % % % % 201+%

Meeting #1 June 29, 2012

FINANCIAL PROJECTIONS FOR REVENUES FROM IID/SDCWA AGREEMENT

7/25/2012. July 25, Rate Refinement Workgroup Page 1 July 25, 2012

2004/05 Long Range Finance Plan

Metropolitan s Water Supply Allocation Plan (WSAP)

California WaterFix Benefit Cost Analysis

Table 2-2 Projected Water Production and Costs

MWD Emergency Water Supply Agreement with LADWP: NOTICE OF OBJECTION AND INTENT TO RECOVER ILLEGAL RATES AND CHARGES

5. CONSIDER APPROVAL OF THE MINUTES OF THE NOVEMBER 14, 2018 REGULAR FINANCE COMMITTEE MEETING

EASTERN MUNICIPAL WATER DISTRICT BIENNIAL BUDGET FISCAL YEARS AND

Special Administrative and Finance Committee March 20, San Diego County Water Authority

Central Basin Municipal Water District Fiscal Year Budget and Rates Workshop May 10, 2013

General Manager s Recommended Budget for Fiscal Years 2018 & Maureen A. Stapleton, General Manager

Maureen A. Stapleton, General Manager May 23, 2013

Drought Allocation Plan for the Western Municipal Water District of Riverside County. Updated May 2015

Executive Financial Report Table of Contents For the Six Months Ended December 31, 2011

Long Beach Water Department Fiscal Year 2014 Annual Budget Summary

SANTA FE IRRIGATION DISTRICT

WATER RESOURCE MANAGEMENT

Rainbow Municipal Water District

WATER VALIDATION, COST OF SERVICE & RATE DESIGN ANALYSIS WASTEWATER VALIDATION & RATE ANALYSIS MISCELLANEOUS FEES & OVERHEAD RATE ANALYSIS

Santa Ynez River Water Conservation District, ID No. 1. Water Rates & Finances. December 13, 2016

FITCH RATES METRO WATER DIST OF SOUTHERN CA SUB LIEN REVS 'AA+' & SIFMA INDEX BONDS 'AA+/F1+'

PREFERRED FINANCIAL PLAN SCENARIO & WATER RATE DESIGN ALTERNATIVE

FY 2013/14 Budget and FY 2013/ /23 Ten Year Capital Improvement Plan. Board of Directors June 19, 2013

Water Shortage Contingency Plan During the California Drought and the Use of Allocation Based Tiered Rates

ALAMEDA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT, ZONE 7

Appendix 5D Water Transfer Analysis Methodology and Results

RE: Board Memo 5G 2: Adopt resolution maintaining the tax rate for fiscal year 2013/14 OPPOSE

2016 Water and Recycled Water Rate Study PUBLIC HEARING DECEMBER 12, 2016

3.1. Construction Meter Additional Charges for Temporary Meters OTHER FEES, CHARGES, AND DEPOSITS CAPACITY FEES...

Executive Financial Report For the Twelve Months Ended June 30, 2012 (Preliminary)

CITY MANAGER S OFFICE ADMINISTRATIVE REPORT May 17, La Palma City Council. Laurie Murray, City Manager. In This Week s Report

Executive Financial Report Table of Contents For the Six Months Ended December 31, 2012

WATER AND SEWER RATE STUDY

YORBA LINDA WATER DISTRICT

IMPORTED WATER COMMITTEE AGENDA FOR MARCH 25, Additions to agenda (Government Code Section (b)).

Department of Water and Power City of Los Angeles. City of Los Angeles 4th Regional Investors Conference March 19, 2018

SPECIAL MEETING ADMINISTRATIVE AND FINANCE COMMITTEE FISCAL SUSTAINABILITY

WHEREAS, the adoption of this ordinance is exempt from CEQA for the same reason;

Final COST OF SERVICE STUDY SEPTEMBER City of San Clemente

GREAT OAKS WATER COMPANY P.O. Box San Jose, California (408)

ADMINISTRATION & FINANCE COMMITTEE

Transparency Continue to provide a platform for transparent communication and timely reporting.

GENERAL COUNSEL DEPARTMENT

COST OF SERVICE AND RATE STRUCTURE STUDY

FY 2019 Approved Budget Approved by the Board of Directors on March 1, 2018

Report of Independent Auditors and Financial Statements for. Imperial Irrigation District


FINANCIAL PLANNING AND RISK ASSESSMENT. October 27, 2015

Discussion and Consideration of Action to Recommend that the Board approve the 2016 Final Rate Schedule

FY 2018 and FY 2019 Public Hearing, Rates & Charges. Board of Directors Meeting July 11, 2017

VENTURA COUNTY WATERWORKS DISTRICTS Representing: Ventura County Waterworks Districts No. 1, 16, 17 & 19

General Provisions (CY 12-mo Components)

REVISED AGENDA 3. APPROVAL OF MINUTES OF FEBRUARY 25, 2016 AND MARCH 8, 2016

OPERATING BUDGET. Fiscal Year Dedicated to Satisfying our Community s Water Needs. MesaWater.org. Mesa Water District, Costa Mesa, California

Long-Term Financial Stability Workshop #4. Capital Investment & Financing. Board of Directors September 23, 2014

Santa Clarita Water Division

OFFICE OF THE GENERAL COUNSEL

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY

STAFF REPORT. ITEM NO. 4 MEETING DATE: March 7, 2017 MEETING: Board of Directors SUBJECT:

SAN ANTONIO WATER SYSTEM (SAWS) RATE ADVISORY COMMITTEE: MEETING 3

Water Rate Study FINAL January 31, 2018

FAP Agenda Number 5 & 6.

Agenda Rio Linda / Elverta Community Water District Planning Committee

CALLEGUAS MUNICIPAL WATER DISTRICT 2100 Olsen Road, Thousand Oaks, California

Water Rates Rate Restructure and Rate Adjustments

Study Workshops are designed to be both educational and to seek broad direction from the Board

1. Accept staff report on the updated study of cost of service to provide potable water to San Jose Municipal Water System (SJMWS) customers; and

LONG BEACH WATER DEPARTMENT COST OF SERVICE AND RATE STUDY

Water Rates Adjustments Phase 2

Consideration of Support of DWR s Approval of California WaterFix Project. ACWD Board Meeting October 12, Month, Day, Year

Analysis of the Cost of a Bay-Delta Conveyance Structure: Rate Impacts to Los Angeles

Alameda County Water District. Financial Workshop Proposed Rates & Charges

Fiscal Year 2004/05 Draft Budget Presentation April 14, 2004

Consideration of Adjustments to the San Dieguito Water District' s Water Rates and Meter

Engineering and Operations Committee April 23, Frank Belock

CITY OF OXNARD PUBLIC WORKS INTEGRATED MASTER PLAN DRAFT WATER COST OF SERVICE STUDY. FINAL July 2017

Valencia Water Company. Cost of Service Study

CITY OF BEVERLY HILLS. BEVERY III U.S cx PUBLIC WORKS SERVICES DEPARTMENT MEMORANDUM TO: Public Works Commission FROM:

Public Hearing on Water and Sewer Rates. September 20, 2017

Contra Costa Water District Reserve Policy

Proposed Staff Recommendation Consent Calendar for March 24, 2016

Through: Finance, Legal, and Administration Committee (06/10/15) Chief Financial Officer / Assistant General Manager

February 14, Attention: Administrative and Finance Committee. Controller s Report on Monthly Financial Reports.

Purpose The purpose of the Controller s Report is to provide summarized financial information on a monthly basis to the Board of Directors.

SEWER FUND Budget Jan-11 % Collected Budget Jan-10 % Collected SOLID WASTE Budget Jan-11 % Collected Budget Jan-10 % Collected

General Provisions (CY 12-mo Components)

CENTRAL ARIZONA PROJECT Special Meeting of the Board of Directors November 15, :00 AM

City of Signal Hill Cherry Avenue Signal Hill, CA RESOLUTION DECLARING INTENTION TO AMEND SIGNAL HILL

Comprehensive Rate Study & Cost Allocation Analysis. Public Workshop December 4, 2017

Metropolitan Water District of So. California

Transcription:

Metropolitan Water District s 2010/11 Proposed Rates and Charges Imported Water Committee January 28, 2010

MWD 2010/11 Budget o o o MWD sales and exchanges 2010: 1.9 maf, includes 150 taf SDCWA exchanged water 2011: 2.0 maf, includes 160 taf SDCWA exchanged water Proposed expenditures: $1.74 Billion $328M for capital projects ($90M PAYG proposed to reduce long-term costs and to reach debt service coverage target) Rising revenue requirements ($1.28 Billion) due to increased SWP delivery costs, debt service, PAYGO capital funding, and power costs on the Colorado River 2

Two Rate Scenarios presented Sales & exchanges of 1.9 maf for CY 2010; 2.0 maf for CY 2011 o Single-year rate increase Recovers full cost of service in 2010/11 Average increase of 12.6% on 1/1/11 o Two-year rate increase Recovers full cost of service in 2011/12 Adopts a two-year rates/charges Requires draws from reserves in 2010/11 Average increase of 7.5% each in 2011 and again in 2012 3

Single-Year Rate Increase Million Dollars 800 700 600 500 400 300 200 100 0 AVG RATE INCREASE Reserves Maximum Reserve Minimum Reserve 2006 2007 2008 2009 2010 2011 Fiscal Year Ending 2012 2013 2014 2015 2% 3% 6% 14% 20% 12.6% 2% 4% 6% 6% PAYGO, $M 88 95 43 30 37 95 125 125 125 125 REV BOND CVG 1.8 2.2 1.8 1.8 1.6 1.9 2.1 1.9 2.0 2.0 FIXED CHG CVG. 1.3 1.7 1.3 1.3 1.1 1.3 1.5 1.3 1.3 1.3 4

Single-Year Rate Increase (Based On Existing COS Method) Rates and Charges Effective January 1 Full Service Untreated Volumetric Cost ($/AF) 2010 2011 Change $ Change % Tier 1 $484 $558 $74 15.3 Tier 2 $594 $675 $81 13.6 Replenishment Water Rate Untreated ($/AF) $366 $440 $74 20.2 Interim Agricultural Water Program Untreated ($/AF) $416 $513 $97 23.3 Full Service Treated Volumetric Cost ($/AF) Tier 1 $701 $775 $74 10.6 Tier 2 $811 $892 $81 9.9 Replenishment Water Rate Treated ($/AF) $558 $632 $74 13.3 Interim Agricultural Water Program Treated ($/AF) $615 $718 $103 16.7 Untreated Wheeling/Exchange Rate $314 $395 $81 25.8 5

Single-Year Rate Increase Individual Rate Elements Rates and Charges Effective January 1 2010 2011 Change $ Change % Tier 1 Supply Rate ($/AF) $101 $112 $11 10.9 Delta Supply Surcharge ($/AF) $69 $51 $(18) -24.1 Tier 2 Supply Rate ($/AF) $280 $280 - - System Access Rate ($/AF) $154 $217 $63 40.9 Water Stewardship Rate ($/AF) $41 $43 $2 4.9 System Power Rate ($/AF) $119 $135 $16 13.4 Treatment Surcharge ($/AF) $217 $217 - - Readiness-to-Serve Charge ($M) $114 $135 $21 18.4 Capacity Charge ($/cfs) $7,200 $7,200 - - 6

Impact to Water Authority o Average rate increase at MWD increase to Water Authority o MWD services Water Authority purchases: treated water, untreated water, IAWP, and exchange (wheeling) o MWD rate proposal disproportionately impacts exchange (wheeling) rate Exchange rate increase is 25.8% under single-year rate increase 7

Impact to the Water Authority (cont.) o o o o CRACA Committee s findings used as basis for developing Water Authority s FYs 2010 and 2011 budget Adopted multi-year budget incorporated MWD s average rate increase of 19.7 percent effective on September 1, 2009 and a forecasted average rate increase of 20 percent for CY 2011 One-time 2011 MWD average rate increase of 12.6% to Water Authority in 2011 is consistent with underlying assumptions of the rate forecast presented in the adopted multi-year budget (~20%) Two-year MWD average rate increase of 7.5% per year to Water Authority is slightly less than assumed in the adopted multi-year budget 8

Reduced Sales Represent Risk o If sales decreased by 100 taf Single-year rate increase of 16.0% in 2011 Two-year rate increase of 10.5% per year in 2011 and 2012 o If sales decreased by 300 taf Showed a rate increase scenario of 7.5% increase per year in 2011 and 2012 Sharply reduced PAYG expenditures to minimum for FYs 2011 2013 Significant rate increase in CY 2013 (29%) still not enough Increased reserve draws resulting in reserves falling below minimum levels in FYs 2011 2014 9

Next Steps o MWD board budget workshops: January 26 & February 23 o Public hearing on rates: March 8 o Budget, rates and allocation adoptions: April 13 o o o Water Authority jointly funded study with the cities of Long Beach and Los Angeles and Calleguas Municipal Water District to review MWD s 2010/11 budget Following the conclusion of IRP strategic policy discussion, a comprehensive rate structure review and cost of service adjustment will follow Staff to continue to provide updates on actions taken 10

11

CRACA Lite Rate Forecasts All-in Treated Water Rate $1,700 $1,500 $/Acre-Foot $1,300 $1,100 $900 $700 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 CRACA High Rate $766 $990 $1,133 $1,254 $1,324 $1,389 $1,458 $1,522 $1,587 $1,686 CRACA High % Change 11.9% 29.3% 14.4% 10.7% 5.6% 4.9% 5.0% 4.3% 4.3% 6.2% CRACA Low Rate $766 $932 $1,039 $1,144 $1,210 $1,255 $1,311 $1,355 $1,398 $1,480 CRACA Low % Change 11.9% 21.6% 11.6% 10.0% 5.8% 3.7% 4.5% 3.4% 3.2% 5.9% Recommended $766 $905 $1,063 $1,185 $1,329 $1,416 $1,516 $1,587 $1,660 $1,757 Recommended % Change 11.9% 18.1% 17.5% 11.5% 12.1% 6.6% 7.1% 4.6% 4.6% 5.9% Calendar Year RECOMMENDATION 12

MWD Supply Rate Forecast 25.0% Projected MWD Rate Increases* Annual % Increase 20.0% 15.0% 10.0% 5.0% 0.0% CY11 CY12 CY13 CY14 CY15 CY16 CWA Projection MWD Projection * MWD projections from 2/24/09 budget presentation RECOMMENDATION 13

MWD Budget Assumptions o Water sales and exchanges of 1.93 MAF o State Water Project allocation of 35 percent o Colorado River Aqueduct Deliveries of 1.2 MAF o Continued discontinuance of replenishment sales and interim agricultural water sales curtailment 14

Revenue Requirements o Revenues required from rate and charges: $1.39 Billion $68.9M higher than 2009/10 budget, $148.3M higher than 09/10 projected $77M lower than forecasted in 2009/10 as needed for 2010/11 Lower projected expenditures in 2009/10 resulting in higher reserves Lower debt service projection Reductions in supply program cost assumptions: lower Drought Water Bank purchases, lower LRP yield from 5- year action plan 15

Impact of Two-Year Rate Increase Million Dollars 800 700 600 500 400 300 200 100 0 Reserves Maximum Reserve Minimum Reserve 2006 2007 2008 2009 2010 2011 Fiscal Year Ending 2012 2013 2014 2015 AVG RATE INCREASE 2% 3% 6% 14% 20% 7.5% 7.5% 5% 5% 5% PAYGO, $M 88 95 43 30 37 95 125 125 125 125 REV BOND CVG 1.8 2.2 1.8 1.8 1.6 1.9 2.0 2.0 2.0 2.0 FIXED CHG CVG. 1.3 1.7 1.3 1.3 1.1 1.2 1.4 1.4 1.4 1.4 16

Potential Rates under Two-Year Increase (Based on existing COS method) Rates and Charges Effective January 1 Full Service Untreated Volumetric Cost ($/AF) 2010 2011 2012 Tier 1 $484 $532 $560 Tier 2 $594 $657 $686 Replenishment Water Rate Untreated ($/AF) $366 $414 $442 Interim Agricultural Water Program Untreated ($/AF) $416 $487 $537 Full Service Treated Volumetric Cost ($/AF) Tier 1 $701 $739 $794 Tier 2 $811 $864 $920 Replenishment Water Rate Treated ($/AF) $558 $596 $651 Interim Agricultural Water Program Treated ($/AF) $615 $682 $795 Untreated Wheeling/Exchange Rate $314 $377 $396 17

Potential Rates under Two-Year Increase (Based on existing COS method) Rates and Charges Effective January 1 2010 2011 2012 Change % 2010-12 Tier 1 Supply Rate ($/AF) $101 $104 $106 5 Delta Supply Surcharge ($/AF) $69 $51 $58-15.9 Tier 2 Supply Rate ($/AF) $280 $280 $290 3.6 System Access Rate ($/AF) $154 $207 $217 40.9 Water Stewardship Rate ($/AF) $41 $41 $43 4.8 System Power Rate ($/AF) $119 $129 $136 14.3 Treatment Surcharge ($/AF) $217 $207 $234 7.8 Readiness-to-Serve Charge ($M) $114 $128 $146 28.0 Capacity Charge ($/cfs) $7,200 $7,200 $7,400 2.8 18

FY2010/11 projected Costs and Revenues $ million 1,600 1,400 1,200 1,000 800 600 400 200 0 Costs Variable Fixed Revenues Fixed Revenues include RTS, CC, and Taxes/Annexations Variable Costs includes SWP Variable Power, Variable Treatment, and Supply Programs

MWD Budget Revenues and Expenditures Budget Summary -- Total Expenditures (Dollars in Millions) Change from: 2008/09 Actual 2009/10 Budget 2009/10 Projected 2010/11 Proposed 2009/10 Budget 2009/10 Projected Expenditures $ $ $ $ $ $ State Water Contract 394.7 478.8 452.7 501.0 22.2 48.3 Supply Programs 84.1 125.5 113.8 103.2 (22.3) (10.7) Colorado River Power 37.4 49.8 46.3 59.6 9.8 13.3 Debt Service 287.1 330.7 305.0 348.1 17.4 43.1 Demand Management 75.6 59.8 76.9 58.2 (1.6) (18.6) Departmental O&M 291.5 289.3 294.2 295.5 6.2 1.4 Treatment Chemicals, Solids & 28.4 32.8 29.5 26.5 (6.3) (3.0) Power Other O&M 24.8 18.7 16.6 15.9 (2.8) (0.6) Subtotal Expenditures 1,223.6 1,385.5 1,334.9 1,408.1 22.6 73.2 Capital Investment Plan 416.7 412.1 346.7 327.6 (84.5) (19.1) Fund Deposits 88.8 228.3 80.4 295.3 67.0 214.9 TOTAL $ 1,729.1 $ 2,025.8 $ 1,762.0 $ 2,030.9 $ 5.1 $ 268.9 20

Rates and Charges Rates and Charges Effective Jan 1, 2010* Effective Jan 1, 2011 Percent Increase/ (Decrease) Tier 1 Supply Rate ($/AF) $101 $112 2.8% Delta Supply Surcharge ($/AF) $69 $51 (26.1%) Tier 2 Supply Rate ($/AF) $280 $280 -- System Access Rate ($/AF) $154 $217 40.9% Water Stewardship Rate ($/AF) $41 $43 4.8% System Power Rate ($/AF) $119 $135 13.4% Treatment Surcharge ($/AF) $217 $217 -- Readiness-to-Serve Charge ($M) $114 $135 18.4% Capacity Charge ($/cfs) $7,200 $7,200 -- *Most rates effective Sept 1, 2009 21

Supplies Drive MWD s Rates $ $$ $$$ $$$$ Colorado River State Water Project Spot Water Transfers Loss of Sales (Shortage) <2003 2003-2007 2008> 2009-10.. Metropolitan s cost structure has been permanently altered by the shift in water supplies resulting from dry conditions, legislation, litigation and regulation. Status of the 2008 Long Range Finance Plan, MWD Board memo, Dec. 9, 2008, Item 9-2 22