INCENTIVES & TARGETS KEY FEATURES OF SUCCESSFUL OPERATING CONTRACTS

Similar documents
Use of Operating Contracts for Managing Infrastructure Enterprises under Difficult Conditions. Office of Infrastructure and Engineering USAID

Models of Successful Water Sector Reform: Identifying the Building Blocks

FINANCIAL ANALYSIS. A. Financial Capacity Assessment of MWSS

FINANCIAL ANALYSIS. 1. Introduction and Methodology

Reforming Water Utilities in Western & Central Africa Lessons learned

INTERNAL UTILITY REFORMS THAT WORK: A REVIEW OF TRENDS

FINANCIAL ANALYSIS. Table 1: Project Outputs Output Subcomponents Type of Analysis Enshi Wastewater Enshi Hongmiao WWTP Enshi Dashaba WWTP

A FINANCIAL TURNAROUND STRATEGY FOR PUBLIC WATER AND SANITATION UTILITIES N A Macleod

Private sector participation in WATSAN services

NATIONAL ENERGY REGULATOR OF SOUTH AFRICA. Electricity Subcommittee Public Hearing 3 June 2010

Day 3 Wednesday, May 16 Municipal Financial Sustainability and Financing the City s Sustainability Plans

Albania Water Supply and Sewerage Policy and Financing Strategy Model. Philip D. Giantris President Valu Add Management Services 3 November 2016

The Role of Risk Allocation in Transaction Design: The Case of Power Distribution

Karnataka Integrated Urban Water Management Investment Program (RRP IND 43253) ECONOMIC ANALYSIS

Interim Report. Cost Recovery and Tariff Practices for Urban Water Supply and Sanitation in India. Pune Case Study

Cost recovery and drinking water pricing (experience within the EU and internationally)

What is PBC and how it can help deal with the challenges of reducing NRW?

Water Bond Debt Fee and Water Rate Modification

ORDINANCE NO AN ORDINANCE To Be Entitled:

ECONOMIC ANALYSIS. A. Introduction and Macroeconomic Context

FINANCIAL ANALYSIS. A. Kathmandu Upatyaka Khanepani Limited

MITIGATING THE IMPACT OF THE FINANCIAL CRISIS ON THE URBAN POOR USING RESULTS-BASED FINANCING SUCH AS OUTPUT-BASED AID FOR SLUM UPGRADING

FINANCIAL ANALYSIS. A. Methodology and Assumptions

Municipal Bonds for Financing Urban Development: Some Thoughts. Sanjay Banerji. Nottingham Business School

India: Karnataka Urban Development and Coastal Environmental Management Project

Online supplement to Environmental Externalities and Free-Riding in the Household

OBA Working Paper Series. Regulation of water and sanitation services: getting better service to poor people by Sophie Trémolet and Jonathan Halpern

Winners and Losers in Argentina s Water Sector Reform Cost Benefit Analysis a tool to estimate the distributional impact of water sector reform

Pricing and cost recovery of urban services: issues in the context of decentralized urban governance in India

PREFERRED FINANCIAL PLAN SCENARIO & WATER RATE DESIGN ALTERNATIVE

FINANCIAL ANALYSIS. A. Introduction

WATER Operations in EASTERN EUROPE. Athens European Week. Jean-Patrice POIRIER November 22, 2013

Consumer Grievance Redressal Forum, Kalyan Zone Behind Tejashree", Jahangir Meherwanji Road, Kalyan (West) Ph & Ext:- 122

PERFORMANCE IMPROVEMENT PLANNING MODEL PERFORMANCE ASSESSMENT SYSTEM PROJECT

WATER AND SEWER RATE STUDY

D2.6 Business Model Report

Proposed Draft. Annexes DRAFT UNECE STANDARD ON PPPS IN WATER SUPPLY AND SANITATION. Water Supply and Sanitation Project Team

Public-Private Private partnerships for Urban Water Utilities in Developing Countries: A Review of Experiences in Developing Countries

World Bank IBRD and IDA Guarantees: A Triple A Risk Mitigation

The Challenge of Cooperative Governance. Mike Higgins, Jr. Mike Higgins & Associates, Inc.

FINANCIAL ANALYSIS A. Introduction

Model Concession Agreement for Highways: An Overview

The Hows and Whys of Water Connection Charges

SEWERAGE AND SEWAGE DISPOSAL SERVICE

Financing and Cost of Capital estimation for Regulated Enterprises

Ontario Energy Board (Board Staff) INTERROGATORY #16 List 1

Municipality of Trent Hills 2018 Water and Wastewater Budget Approved: December 19, 2017

Public-Private Infrastructure Advisory Facility (PPIAF) PPPs: An Introduction

WATER Operations in EASTERN EUROPE. Athens European Week November 22, 2012

Solutions for Financing Local Government PV Projects September Nick Hylla, Executive Director Midwest Renewable Energy Association

Methodology for CBA preparation SOP Environment

Eskom 2018/19 Revenue Application

FINANCIAL PLAN 2012 to 2022

Alberta Net Settlement Current State

WATER AND WASTEWATER RATE STUDY

Picture to be changed

By S K Agrawal ED (Commercial) NHPC Ltd.1

REGULATORY SCHEMES FOR WATER PROVISION IN THEORY AND PRACTICE CARLOS A. CHAVEZ * Department of Economics, Universidad de Concepción, Chile

2018 Five Year ( ) Financial Plan Utilities and Other Self-Funded Programs

WEST RANKIN UTILITY AUTHORITY CONTINUING DISCLOSURE ANNUAL REPORT FISCAL YEAR ENDING SEPTEMBER 30, 2011 THE AUTHORITY

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MUMBAI

THE ENVIRONMENTAL CONSEQUENCES OF DISPOSAL OF FIXED CAPITAL. Peter Comisari London Group meeting, Wiesbaden 30 Nov 4 Dec 2009

COMMONWEAL TH OF KENTUCKY ORDER. On October 30, 2018, West Daviess County Water District (West Daviess District)

Mending Power Sector Finances PPP as the Way Forward. Energy Market Forum

MUNICIPALITY OF ARRAN-ELDERSLIE CHESLEY DRINKING WATER SYSTEM FINANCIAL PLAN

US Price per Pound #1) $5 #10) $3 #19) $4 Quantity Demanded #2) 5 #11) 7 #20) 6 Quantity Supplied #3) 5 #12) 3 #21) 4

Interim Report. Cost Recovery and Tariff Practices for Urban Water Supply and Sanitation in India. Volume II. Detailed Case Study Report

From: Lex Warmath and Elaine Conti, Raftelis Financial Consultants, Inc.

Non-Revenue Water Pre-Feasibility Assessment Tool

ONGC LTD. - COMPANY INFORMATION & SWOT ANALYSIS

AN ANALYSIS OF FINANCIAL PERFORMANCE OF POWER SECTOR IN TAMILNADU Dr. AB Angappapillai* 1, P Kandasamy 2. Tamilnadu, India. Tamilnadu, India.

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM

Powering Potential. Mega trends 5-6. GE Energy. Water. New Saudi Arabias. Electricity. Nov 5, New additions. Existing production 40,000 35,000

COMMERCIAL CIRCULAR No. 80

SUMMARY OF OUR HOUSEHOLD CHARGES FOR 2018/19

Interim Report. Cost Recovery and Tariff Practices for Urban Water Supply and Sanitation in India. Volume I. Guidelines. Comparative Analysis Report

Financial Statements 1) What is the link between statutory regulatory statements and IFRS financial statements

Commodity Profile of Wheat for August 2017

Commodity Profile of Wheat for June 2017

IT / ITeS Policy 2015

Lake Villa SD #41. PMA Financial Planning Program Presented by Mike Frances, Senior Financial Consultant PMA Financial Network, Inc.

Projections for outstanding government debt in Japan

SABESP announces 2Q16 results

MTP_Intermediate_Syl2016_June2018_Set 1 Paper 8- Cost Accounting

Meeting Africa s Power Challenges

SEWERAGE AND SEWAGE DISPOSAL SERVICE

BOARD OF PUBLIC UTILITIES KANSAS CITY, KANSAS

Waste Water Treatment: the Milan metropolitan area case

. 15,00,000 20,000 ORS PE- II ~. '- GROUP-II. PAPER-S, INCOME TAX AND CENTllAl, SALES TA:X. Roll No... MAY [Total No. of Printed Pages-7

Africa Power Reform and Prices

SCHEDULE and 2019 Budget Assumptions

Update: Infrastructure Ontario s Loan Program Zone 2 Treasurers Meeting, October 19, Partnering to modernize Ontario s public assets 1

The Payment of Bonus Act, 1965

URBAN REFORMS AGENDA AT ULB LEVEL

The City of Sierra Madre

November 22, British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3

Private sector participation in developing countries

Scheme Financing Infrastructure Projects through the India Infrastructure Finance Company Limited (IIFCL)

Reforming Power Markets: Lessons from Five Developing Countries presented at: World Forum on Energy Regulation Rome, 6 October 2003

2016 WCGFOA Conference

Transcription:

INCENTIVES & TARGETS KEY FEATURES OF SUCCESSFUL OPERATING CONTRACTS PLANNING TRANSITION TO COST RECOVERY Rs. per m3 45 40 35 30 25 20 15 10 5 0 2006 2007 2008 2009 2010 2011 Year 2012 2013 2014 2015 Total Costs, incl. capital Direct Operating Costs Affordability Ceiling Tariff 30-Nov-08 1

Incentives Fixed Fee and bonus Yerevan, Amman Bonus based on cash collected per unit of water produced - Hypothetical Bonus based on operating income Uganda IADMCs Fixed bonus per cubic meter of water billed & collected Cote d Ivoire, Senegal Fixed tariff schedule and fixed lease payment to Government - Lathur 30-Nov-08 2

Management Contract with performance fee. Traditional Management Contracts offer little performance incentive. In this case, bonus is only up to 6% of annual base fee. Operators don t have much interest in major performance gains under this arrangement. Yerevan Annual Payment US Dollars 3500000 3000000 2500000 2000000 1500000 1000000 500000 0 1 2 3 4 Contract Year Base fee Bonus 30-Nov-08 3

Example of an incentive based on cash realization per m3 target MODEL OF A CONTRACT INCENTIVE BASED ON A SHARE OF CASH REALIZATION ABOVE AN ANNUAL TARGET 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 Cash Revenue $543,297 $651,956 $749,750 $854,715 $965,828 $1,081,727 $1,200,717 $1,320,789 $1,400,036 $1,484,038 $1,573,081 Increase in Revenue 20% 15% 14% 13% 12% 11% 10% 6% 6% 6% Units 20,000,000 20,600,000 21,218,000 21,854,540 22,291,631 22,737,463 23,192,213 23,656,057 24,129,178 24,611,762 25,103,997 Realization per Unit 0.027 0.032 0.035 0.039 0.043 0.048 0.052 0.056 0.058 0.060 0.063 Target 0.029 0.034 0.037 0.041 0.044 0.049 0.053 0.057 0.059 0.062 Targeted Increase 7% 6% 6% 6% 2% 2% 2% 2% 2% 2% Difference 0.003 0.002 0.002 0.002 0.003 0.003 0.003 0.001 0.001 0.001 Bonus rate 60% 60% 70% 70% 70% 70% 70% 80% 80% 80% Bonus $31,913 $22,766 $25,297 $29,197 $53,816 $52,702 $50,094 $20,710 $21,953 $23,270 Percent of revenue 4.9% 3.0% 3.0% 3.0% 5.0% 4.4% 3.8% 1.5% 1.5% 1.5% 15 Average montly consumption per connection 180 Average annual consumption per connection 111,111 Number of connections 555,556 Total population 30-Nov-08 4

In an affermage, the operator earns a fixed fee per m3 billed and collected. This gives a strong incentive to reduce theft, deliver more water to customers, and optimize billing and collection. EXAMPLE OF AN AFFERMAGE INCENTIVE MODEL 2008 2009 2010 2011 2012 2013 2014 Allowed Tariff 0.50 0.52 0.53 0.55 0.56 0.58 0.60 Operator Share 0.48 0.48 0.48 0.48 0.48 0.48 0.48 Public Owner Share 0.02 0.04 0.05 0.07 0.08 0.10 0.12 Billed & Collected m3 1,000,000 1,150,000 1,322,500 1,454,750 1,600,225 1,760,248 1,936,272 Tariff Revenue $500,000 $592,250 $701,520 $794,822 $900,534 $1,020,305 $1,156,005 Operator Share $480,000 $552,000 $634,800 $698,280 $768,108 $844,919 $929,411 Operator Cost $500,000 $510,000 $520,200 $530,604 $541,216 $552,040 $563,081 Operator Profit -$20,000 $42,000 $114,600 $167,676 $226,892 $292,878 $366,329 Public Owner Share $20,000 $40,250 $66,720 $96,542 $132,426 $175,386 $226,594 Note that this is a "real price model" not a nominal price model. 30-Nov-08 5

Assumptions for Business Reform Example of an Employee Bonus Poor tied to Performance Laxaminagar Model in Nagpur, India was developed to show the Nagpur Municipal Corporation the Win-Win- Win nature of incentives for employees. 10 year reform plan with corporatisation and employee bonus pool for performance O&M Cost including depreciation Rs.650m in 2006 to increase at annual inflation rate 5% Debt Service Rs.560m constant upto Year 10 Revenue Water at 46% current year to 80% in Year 10 Average Water Tariff Rs. 6/m3 current to Rs.12.50/m3 in Year 10 15% of net gain as incentive to Bonus Pool 30-Nov-08 6

Laxminagar Reform Scenario 80 60 40 Rs. Million 20 0-20 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016-40 -60-80 Surplus/Deficit - Business as usual Surplus/Deficit - Reformed business Net gain to NMC Net gain to Bonus pool 30-Nov-08 7

Results of Reform using an Employee Operating Contract Financially self sustainable in Year 7 Cumulative gain of Rs. 423m to Nagpur Municipal Corporation Cumulative gain of Rs. 37m in Bonus Pool 29% of cumulative wage bill Monthly customer bill Rs. 375 per connection for 2 families in Year 10 Annual revenue surplus over Rs. 100m to be invested into Sewerage Infrastructure from Year 8 30-Nov-08 8

Targets Revenue collected Operating income Cash realization per unit Increase in connections Increase in services in slums Hours of service Collection efficiency Percentage metered Water billed and collected compared to water produced Registered customers Percentage of water that meets quality standards 30-Nov-08 9

Coverage Targets in the Manila West Concession Manila West Zone Targets YEAR Water Access Sewage Access 1996 62.0% 13.0% 2001 87.4% 16.0% 2006 97.1% 20.0% 2011 97.4% 21.0% 2016 97.7% 31.0% 2021 98.4% 66.0% 30-Nov-08 10