FINANCIAL ANALYSIS. 2. Taking into account the financial costs, the total amount needed to finance the Padma Bridge Project is presented in Table 1.

Similar documents
People's Republic of Bangladesh: Padma Multipurpose Bridge Project

ECONOMIC AND FINANCIAL ANALYSIS

FINANCIAL ANALYSIS. A. Background

FINANCIAL ANALYSIS A. Introduction

FINANCIAL ANALYSIS OF TRANCHE 1

FINANCIAL ANALYSIS. 1. Introduction and Methodology

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS

FINANCIAL ANALYSIS. 3. Assumptions. The following assumptions were used in carrying out the financial analysis:

FINANCIAL ANALYSIS: PROJECT 1

ECONOMIC AND FINANCIAL ANALYSES FOR TRANCHE 2

Tanahu Hydropower Project (RRP NEP 43281) FINANCIAL ANALYSIS. A. Introduction

Bangladesh: Road Maintenance and Improvement Project

FINANCIAL ANALYSIS. Table 1: Project Outputs Output Subcomponents Type of Analysis Enshi Wastewater Enshi Hongmiao WWTP Enshi Dashaba WWTP

ECONOMIC ANALYSIS. Table 1: Total Cost Estimate (Economic Costs) (CNY million)

Report and Recommendation of the President to the Board of Directors

PROJECT PREPARATORY TECHNICAL ASSISTANCE

FINANCIAL ANALYSIS. A. Introduction

FINANCIAL ANALYSIS. Second Greater Mekong Subregion Tourism Infrastructure for Inclusive Growth Project (RRP REG 49387)

ECONOMIC AND FINANCIAL ANALYSIS

Country Operations Business Plan. August Bangladesh

FINANCIAL ANALYSIS. A. Financial Capacity Assessment of MWSS

Viet Nam: Ho Chi Minh City Long Thanh DauGiay Expressway Technical Assistance Project

ECONOMIC ANALYSIS. Table 1: Economic costs by project component

LINKING EAST AND WEST BANGLADESH: THE JAMUNA BRIDGE PROJECT

STUDY SCHEDULE STUDY PURPOSE

People s Republic of Bangladesh: Updating the Road Master Plan

FINANCIAL ANALYSIS. A. Methodology and Major Assumptions

ASIAN DEVELOPMENT BANK FINANCIAL REPORT MANAGEMENT S DISCUSSION AND ANALYSIS AND ANNUAL FINANCIAL STATEMENTS

India: National Highway Sector II Project

Management s Discussion and Analysis and Condensed Quarterly Financial Statements

South Asia Subregional Economic Cooperation Power System Expansion Project (RRP NEP 44219) FINANCIAL ANALYSIS

FINANCIAL APPRAISAL OF PROJECTS

ATTACHED TECHNICAL ASSISTANCE

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT

ECONOMIC AND FINANCIAL ANALYSIS

Comparison between new financial analysis and ECI-result (2002)

PERIODIC FINANCING REQUEST. RE: Higher Education in the Pacific Investment Program: Periodic Financing Request #1

PROJECT AGREEMENT. (Greater Dhaka Sustainable Urban Transport Project) between ASIAN DEVELOPMENT BANK. and BANGLADESH BRIDGE AUTHORITY

ASIAN DEVELOPMENT BANK

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

PROJECT PREPARATORY TECHNICAL ASSISTANCE

Report and Recommendation of the President to the Board of Directors

Bangladesh: Urban Governance and Infrastructure Improvement (Sector) Project

Buenos Aires - Colonia Bridge Project, Financial and Economic Appraisal. Chun-Yan Kuo International Tax Program, Harvard University

Periodic Financing Request Report. India: Railway Sector Investment Program (Tranche 3)

Financial Results for Third Quarter of FY2011 (From April 1, 2010 to December 31, 2010)

TABLE OF CONTENTS. 1. Title Definitions and Interpretation Billing Organization Dispute Resolution...12

INFORMATION STATEMENT

ASIAN DEVELOPMENT BANK

Briefing Memorandum: Second Nile Crossing at Jinja- Uganda. ICA Meeting: Financing Transport for Growth in Africa

ECONOMIC ANALYSIS. A. Introduction

Summary of Consolidated Earnings Report for the Second Quarter of the Fiscal Year Ending March 31, 2011 (Japanese GAAP)

SECTOR ASSESSMENT (SUMMARY): CHHATTISGARH ROAD SECTOR. 1. Sector Performance, Problems, and Opportunities

SR 520 BRIDGE. Investment Grade Traffic and Revenue Study Update. SR 520 Bridge and the Eastside plus West Approach Bridge Project

ASIAN DEVELOPMENT BANK

FINANCIAL ANALYSIS. A. Introduction

Economic Assessment of a Fixed Link across the Fehmarn Belt

Trung Son Hydropower Project. Financial Analysis

Financial Results for Second Quarter of FY2010 (From April 1, 2009 to September 30, 2009) October 28, Hino Motors, Ltd.

The Development Status and Country Classification of Palau

MTA 2018 Adopted Budget

Team Leader: Srinivasan Palle Venkata, Evaluation Specialist ( Contact:

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project

Bangladesh: Greater Dhaka Sustainable Urban Transport Project

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

Kazakhstan: MFF-CAREC Corridor 1 (Zhambyl Oblast Section) Investment Program

ECONOMIC AND FINANCIAL ANALYSIS

People's Republic of China: Ganzhou Longyan Railway Project

Report and Recommendation of the President to the Board of Directors

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS

PROJECT PREPARATION TECHNICAL ASSISTANCE

JCR-VIS Credit Rating Company Limited. Affiliate of Japan Credit Rating Agency, Ltd.

Long-Term Financial Integrity of the ADF

Tampa Bay Express Planning Level Traffic and Revenue (T&R) Study

Dr. Joseph A. Weinstock Asian Development Bank

ADF-14 Second meeting. Innovative Financial Instruments for ADF-14

Papua New Guinea: Town Electrification Investment Program, Tranche 2

PROJECT PREPARATORY TECHNICAL ASSISTANCE

India: Supporting the Second West Bengal Development Finance Program

Benefit-Cost Analysis

Executive Summary: Review Result of Jakarta MRT Project

ADF Liquidity Policy

BHU: Second Green Power Development Project

Bangladesh: Chittagong Port Trade Facilitation Project

Planning & Economic Analysis I

1/21 Financial Results for First Quarter of FY2011 (From April 1, 2010 to June 30, 2010)

FRAMEWORK FINANCING AGREEMENT (Greater Mekong Subregion Ben Luc-Long Thanh Expressway Project)

ECONOMIC ANALYSIS. A. Introduction and Macroeconomic Context

Draft TransAction Plan: Overview and Findings. Martin E. Nohe, Chairman July 13, 2017

Validation Report. Sri Lanka: Colombo Port Efficiency and Expansion Project. Independent Evaluation Department

Mongolia: Social Security Sector Development Program

TEXAS TRANSPORTATION FUNDING, INCLUDING TEXAS CLEAR LANES AND CONGESTION RELIEF UPDATE

Equity Dimensions of Transportation Funding in the Central Puget Sound Region May 2015

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE

Alleviating Traffic Congestion in Manila, Appraisal of the Pasig Expressway. Baher El-Hifnawi Cambridge Resources International Inc.

IFAD s lending terms and conditions: Interest rate for the year 2010 for loans on ordinary and intermediate terms

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011

FINANCIAL ANALYSIS. A. Kathmandu Upatyaka Khanepani Limited

Piloting Results-Based Lending for Programs: Proposed Increase in Resource Allocation Ceiling

Transcription:

Padma Multipurpose Bridge Project (RRP BAN 35049) FINANCIAL ANALYSIS A. Introduction 1. A financial analysis assessed the viability of the proposed project investment based on the capacity of Bangladesh Bridge Authority (BBA) to generate sufficient revenues to cover the capital costs of the project. The analysis was carried out on an incremental basis, using the discounted cash flow method and measuring the financial internal rate of return of the project. B. Project Cost 2. Taking into account the financial costs, the total amount needed to finance the Padma Bridge Project is presented in Table 1. Table1: Project Financing Plan World Bank ADB JICA IDB Government Component Total A. Main Bridge A1 Main bridge and viaducts A1.1 Main bridge and viaducts 500.0 300.0 300.0 239.8 1,339.8 A1.2 Construction yards 57.5 57.5 A2 Approach roads and bridge-end facilities A2.1 Mawa side 35.0 35.0 A2.2 Janjira side 35.0 140.0 18.9 193.9 Subtotal (A) 570.0 300.0 300.0 140.0 316.2 1,626.2 B. River Training Works 275.0 248.0 276.9 799.9 C. Implementation of SAP and EMP C1 SAP 206.3 66.9 273.2 C2 EMP 18.7 18.7 Subtotal (C) 225.0 0.0 0.0 0.0 66.9 291.9 D. Consultancies for Supervision D1 Construction supervision and project management support 65.0 65.0 D2 M&E and supervision of EMP and SAP 7.0 7.0 Subtotal (D) 72.0 0.0 0.0 0.0 0.0 72.0 E. Project Management, TA, Training E1 Project management support and audits 7.0 7.0 E2 BBA strengthening, TA, POE, and training 14.0 14.0 E3 Strategic studies 5.0 5.0 Subtotal (E) 26.0 0.0 0.0 0.0 0.0 26.0 Total Project Cost 1,168.0 548.0 300.0 140.0 660.0 2,816.0 Financing Costs 32.0 67.0 99.0 Total Project Cost 1,200.0 615.0 300.0 140.0 660.0 2,915.0 ADB = Asian Development Bank, BBA = Bangladesh Bridge Authority, EMP = environmental management plan, IDB = Islamic Development Bank, JICA = Japan International Cooperation Agency, POE = panel of experts, SAP = social action plan, TA = technical assistance. Sources: Government of Bangladesh, Asian Development Bank estimates

2 3. Project financing needs were determined with the financing terms shown in Table 2. For the purpose of analysis, the term of the ADB loan from the ordinary capital resources is 25 years with a 5-year grace period. Table 2: Financing Terms ADB OCR ADF World Bank JICA IDB Loan or credit amount ($million) 539 76 1,200 300 140 Interest rate LIBOR +0.3% floating 1.0% 1.5% 0.75% 0.01% LIBOR +1.2% Fixed at the end of construction Other fees and charges 0.15% 0% 0% 0% 0% Loan period (years) 25 32 40 40 20 Grace period (years) 5 8 10 10 4 ADB = Asian Development Bank, ADF = Asian Development Fund, IDA = International Development Association, IDB = Islamic Development Bank, JICA = Japan International Cooperation Agency, LIBOR = London interbank offered rate, OCR = ordinary capital resources, SDR = special drawing right. Sources: Asian Development Bank estimates C. Traffic Forecast 4. Using detailed information on socioeconomics and travel patterns, a transport model was developed to forecast traffic volumes and revenues for the Padma bridge. The basic steps involved in the transport modeling are to (i) build the base and future year networks; (ii) determine base year river crossing demand using an origin destination survey undertaken in May 2009 and calibrate it to current conditions of road traffic; (iii) determine growth in future demand by forecasting growth in car ownership and changes in socio-demographics, including population and employment; (iv) calculate, based on the relative costs of each mode, how mode choice may change for future year demand; (v) assess freight movements; and (vi) assign motorized traffic to a representation of the road network. 5. Two traffic scenarios have been analyzed. A high-traffic scenario, considered the base case, results from the traffic model run and is based on sustained traffic growth rates as well as a high diversion rate of approximately 80% from other ferry crossings, mainly the Paturia ferry crossing. As part of a sensitivity analysis requested by the cofinanciers, a low-traffic scenario is also presented. This scenario is an adjusted result based on lower traffic growth rates, especially for 2010 2020, and on a 70% diversion rate from Paturia. The lower diversion rate from Paturia has a significant impact, as diversion from Paturia should contribute approximately 65% of Padma bridge traffic. 6. In both cases, the following toll increases agreed by the government were applied: a graduated increase in toll rates from the current Jamuna bridge schedule of 40% in 2011, 80% in 2016, and 100% in 2021 (over 2009 levels). Table 3: Toll Rates Taka per Vehicle Vehicle type 2009 2011 2016 2021 Truck 935 1,309 1,683 1,870 Bus 795 1,113 1,431 1,590 Car 400 560 720 800 Motorcycle 30 42 54 60 Source: Design Consultant calculations.

3 1. High-Traffic Scenario (Base Case) Table 4: Traffic Forecast for Padma (Base Case) (annual average daily traffic) Year Truck Bus Light Vehicle Total 2014 3,389 2,812 1,491 7,835 2015 4,323 3,413 2,015 9,944 2016 5,257 4,013 2,539 12,054 2017 6,192 4,614 3,063 14,163 2018 7,285 5,294 3,701 16,272 2019 8,572 6,074 4,471 18,382 2020 10,086 6,969 5,402 20,491 2024 14,094 9,474 7,731 28,928 2029 18,910 11,041 12,267 38,602 2034 23,204 12,032 16,816 48,691 2040 28,060 13,081 22,205 60,460 Source: Design Consultant calculations. 2. Low-Traffic Scenario Table 5: Traffic Forecast (annual average daily traffic) Year Truck Bus Light Vehicle Total 2015 1,868 1,533 825 4,300 2016 2,685 2,191 1,193 6,176 2017 3,802 3,088 1,697 8,738 2018 4,334 3,490 1,952 9,948 2019 4,941 3,943 2,245 11,325 2020 5,633 4,259 2,716 12,831 2024 9,513 5,794 5,822 21,508 2029 14,755 7,320 11,084 33,747 2034 17,249 8,080 13,703 39,719 2040 19,425 8,835 15,892 44,925 Source: World Bank calculations. D. Financial Analysis 7. A financial benefit cost analysis was undertaken over a 30-year period following the opening of the Padma bridge. All costs and revenues were expressed in nominal prices. Surplus revenues from operation of the Jamuna bridge were incorporated in the analysis. 8. As the timeline for building a railway line across the Padma bridge has yet to be confirmed, the corresponding cost and benefits were not included in the analysis. However, the implementation of the railway line during the life span of the bridge, assuming a bridge life of 100 years, is highly likely. 1. Weighted Average Cost of Capital 9. The appropriate discount rate to use in the financial evaluation is the weighted average cost of capital (WACC). This rate serves as a proxy for the financial opportunity cost of capital to assess the financial viability of projects. It represents the cost incurred by the government in raising the capital necessary to implement the project.

4 10. Table 6 shows the calculation of the project WACC following Asian Development Bank (ADB) guidelines. The cost of government funds has been taken as the yield on the 20-year Bangladesh Government Treasury Bond, which was 8.97% in July 2009. 1 Table 6: Weighted Average Cost of Capital (%) ADB OCR ADB ADF World Bank JICA IDB Government Total Amount 539 76 1,200 300 140 660 2,915 Weighting 18.51 2.61 41.21 10.30 4.81 22.56 100.0 Nominal cost 5.20 1.50 0.75 0.01 4.40 9.00 Tax rate 0 0 0 0 0 0 Tax-adjusted nominal rate 5.20 1.50 0.75 0.01 4.40 9.00 Inflation rate 0 0 0 0 0 6.00 Real cost 5.20 1.50 0.75 0.01 4.40 2.83 Weighted component 0.96 0.04 0.31 0.00 0.21 0.64 WACC 2.16 ADB = Asian Development Bank, ADF = Asian Development Fund, IDB = Islamic Development Bank, JICA = Japan International Cooperation Agency, OCR = ordinary capital resources, WACC = weighted average cost of capital. 2. High-Traffic Scenario (Base Case) 11. The deficits and surpluses will have to be analyzed against the current financial situation of BBA. Although it is suspected that BBA may have a significant revenue surplus at present, this will have to be confirmed after reviewing the latest audited financial statements, which are under preparation. In the following tables, it is assumed that BBA has no reserve. Table 7: Net Surplus/(Deficit) for the High-Traffic Scenario 2011 2015 2016 2020 2021 2025 2026 2030 Padma bridge 0 30 (8) 24 Jamuna bridge (68) 103 171 249 Total (68) 133 163 273 12. Considering the revenue stream presented in Table 7, the financial internal rate of return (FIRR) is 7.9% in nominal terms, and the payback period is 17 years, to fiscal year (FY) 2027. 3. Low-Traffic Scenario Table 8: Net Surplus/(Deficit) for the Low-Traffic Scenario 2011 2015 2016 2020 2021 2025 2026 2030 Padma bridge 0 (172) (226) (137) Jamuna bridge (86) 84 174 304 Total (86) (88) (52) 167 1 Source: Bangladesh Bank (2009).

5 13. Considering the revenue stream presented in Table 8, the FIRR is 6.5% in nominal terms, and the payback period is 19 years to FY2029. 4. Conclusion 14. In the low-traffic scenario, which constitutes a worst-case scenario for the Padma bridge, the critical period for the project is 2011 2015 and, most importantly, the first 10 years after the Padma bridge opens. As such, the low-traffic scenario cannot be used as a basis to determine toll levels, as they would be unreasonable. However, ADB could contribute to improving financial sustainability during the critical period by extending the grace period, currently set at 5 years. If the government wished to pursue its objective to maintain BBA as a self-sustaining entity, the final recourse would be to keep maintenance at a minimum, which needs to be avoided. 15. Considering the revenue stream presented in table 9, the financial internal rate of return (FIRR) is 6.5% (in nominal terms); and the payback period is 19 years (FY2029), identical to the scenario with a 5 year grace period. Table 9: Net Surplus / (Deficit) for the Low Traffic Scenario with 7 year grace period (US$ million) 2011-2015 2016-2020 2021-2025 2026-2030 Padma Bridge 0 (152) (220) (126) Jamuna Bridge (86) 84 174 304 Total (86) (68) (46) 178 16. The above analyses are based on the assumption that BBA currently has no cumulative income surplus. However BBA s financial statements for financial year 2009-10, which have not been audited yet, appear to have a cumulative surplus in the order of $ 100 million equivalent. With this amount of cumulative surpluses, the objective of maintaining BBA as a self sustaining entity would be achievable, subject to appropriate financial management of BBA s resources.