inemi Statement of Work (SOW) Name TIG Name Project

Similar documents
PROJECT CHARTER PLAN VERSION: 1A (DRAFT) <DD-MM-YY> <SECTION NAME>

National Planning Guide Summary A Practical Approach to Health Security Capacity Building Draft 21 July 2017

Trillium Community Health Plan Innovation Fund

Strategic Plan Request for Proposals. March 2018

TERMS OF REFERENCE FOR THE PROVISION OF OUTSOURCED INTERNAL AUDIT SERVICE

ABORIGINAL ECONOMIC PARTNERSHIPS Program Application Guidelines

Wanganui District Council. Waste Minimisation Fund Policy 2014

NATIONAL IDENTITY THEFT VICTIM ASSISTANCE NETWORK EXPANSION PROGRAM (NITVAN II)

Goshen STAFF Alumni Association Proposal Chapter 2: For the next 50 Years! Last edited

Section 4: Nominating Committee. Approved: 07/24/17. Policy

NUMBER: BUSF 3.30 Business and Finance. Other Educational and General Program Accounts ("E" Funds) Date: October 18, 2006 I. PURPOSE OF THE POLICY

VA/DoD Health Executive Committee Joint Incentive Fund (JIF) New Program Manager Training. March 2015

Community Planning Association of Southwest Idaho FY Strategic Plan Report No Approved by the COMPASS Board, December 16, 2013

2018 Sponsorship Guidelines

University of Pittsburgh Office of the Controller General Accounting

Call for Proposals from the Royal Academy of Engineering Research projects in engineering education

Design Council CONSULTANT GUIDELINES

APPLICATION FORM FOR ASSISTANCE FROM THE AFRICAN WORLD HERITAGE FUND

Green Climate Fund (GCF) Readiness Programme in Ghana. Terms of Reference: Development of Climate Change Budget and Finance Tracking Tools

HOC Works Program Requirements

Knowledge-directed Artificial Intelligence Reasoning Over Schemas (KAIROS) Program HR001119S0014

*** A DRAFT starting point *** South Central Fresno Community Steering Committee Charter

Audit & Risk Committee Charter

Scope of Services and Timeline. PHASE 1: Project Organization & Best Practices Research Week Completed

Agency Reorganization Process

Copiague Chamber of Commerce

REA Space Unit guidelines for Individual Evaluation Report Coordination & support actions. DT-SPACE-07-BIZ-2018: Space hubs for Copernicus

Criteria of Peer-Reviewed Content

2019 Curriculum Enhancement Grant (CEG) Request for Proposals

ABORIGINAL ECONOMIC PARTNERSHIPS Program Grant Application Guidelines

OMIC R&D TECHNOLOGY BOARD Ball Screw Rapid Forming Request for Proposals

PERFORMANCE DEVELOPMENT SYSTEM. Supervisory and Management Staff Appraisal. Department: Reviewer s Name: Review Period:

WRITTEN DIRECTIVES & POLICY DESSEMINATION SOG

GSS Research Award 2019 Guidelines

AUDIT & RISK COMMITTEE CHARTER

Ramsey Million Partnership

The Lockwood Foundation Grant Application Instructions

Accounting PCAR 293. edu. appointmen. Over the. use a. financial. informed reporting. Syllabus. A510 Course. Page 1

SCHEDULE OF FEES AND CHARGES FOR GENERATOR CONNECTIONS

Engineering IT Application Development Governance Workflow

Work Breakdown Structures

2018 Major Grant Guidelines

APPENDIX A TECHNICAL SPECIFICATIONS REWARDS AND RECOGNITION PROGRAM

GUIDELINES FOR BIRAC-PATH (PATENTING & TECHNOLOGY TRANSFER FOR HARNESSING INNOVATIONS) AND BIRAC AS A FACILITATOR UNDER SIPP (START-UP INTELLECTUAL

Collaboration Assessment Worksheets

Standard INT Evaluation of Interchange Transactions

Audit and Risk Management Committee Charter

TASSAL GROUP LIMITED ABN

City of Tacoma PLANNING AND DEVELOPMENT SERVICES DEPARTMENT. Customer Queuing and Scheduling System Specification No. PL F

List of Services that we provide:

1a-Copyright Year Budget Planning and Forecasting (OS1) Followed by: 2-PM Pre-Assignment (PM2)

EXECUTIVE SUMMARY INTERNAL AUDIT REPORT. IOM Kingston JM JULY 2017

Academic and Administrative and Other Related Staff Annual Review

AUDIT COMMITTEE CHARTER

FISCAL OFFICER TRAINING MANUAL

TERMS OF REFERENCE FOR CONSULTANTS

PROJECT SUPPORT FUND OVERVIEW

Terms of Reference - Board of Directors (approved by the Board on 12 April 2018)

Sewer Blockage Procedure

Financial Aid Satisfactory Academic Progress Appeal Request Spring 2019 Deadline: January 3, 2019

Tracey Sopp Head of Accounting and Processing James Duncan, Deputy Chief Executive / Executive Director of Finance. Contents

Policy and Procedures Date: April 23, Subject: Policy and Procedures for Establishment of New Schools at Virginia Tech

Student Government Association Funding Guidelines

HUMAN RESOURCES AND COMPENSATION COMMITTEE CHARTER

Grant Application Guidelines

equote Practical Exercise Lawn Equipment

Request for Proposal

Legend The legend, as shown below, contains all of the unique symbols that are important to help you interpret your Degree Works audit.

2018 ADASS Tutorial Selection Process, Criteria and Requirements

AACIDs TRANSIT FEASIBLITY STUDY: PUBLIC INVOLVEMENT PLAN (PIP)

MINNESOTA LEGISLATURE LEGISLATIVE COORDINATING COMMISSION REQUEST FOR INFORMATION FOR BUSINESS INTELLIGENCE SOLUTIONS

Best Practice in Gift Agreements

Request for Proposals. South Dakota Governor s Research Center Program

Audit Committee Charter. St Andrew s Insurance (Australia) Pty Ltd St Andrew s Life Insurance Pty Ltd St Andrew s Australia Services Pty Ltd

The Virtual PMO. This paper covers the following topics:

ENVIRONMENTAL STEWARDSHIP AND CLIMATE CHANGE GROUP PROGRAM

CONSTRUCTION DIVISION

Tacoma Power Water Access Grant 2019 Due date: March 22, 2019

CRSP Index Governance Committees Terms of Reference. Introduction... 2 Governance and Oversight Control Framework... 3 Index Oversight Committee...

Missouri 4-H Legislative Academy

OFFICE OF THE PRESIDENT HUMAN RESOURCES POLICY MANUAL SECTION 11 JULY 28, 2006 REDUCTION IN FORCE GUIDELINES

Artists working with communities; communities working with artists providing arts access to all.

SAPHEDRA project. Building a European Platform for evaluation of consequence models

ACI-NA Marketing and Communication Committee Participation Plan

Mayor s Office of Recovery Services. Request For Proposal. Strategic Planning Consultant

REQUEST FOR QUALIFICATIONS (RFQ)

Audit Committee Charter

CUTV Production Grant Form

Internal Control Requirements for Adopting New Accounting Standards

ARIZONA FIRE DISTRICT ASSOCIATION FINANCIAL PROCEDURES POLICY

REIMBURSEMENT GUIDELINES FOR FUSION FOR ENERGY (F4E) GRANTS

Greenfield Project Proposal Template

Expression of Interest for Project Management Unit (PMU) for monitoring Real Estate Projects in Greater Noida City

THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES

Guidelines and Application Instructions. University Research Challenge Fund Deadline: January 30, 2019

Corporate Governance Principles

Part I: Eligibility Guidelines

INT Evaluation of Interchange Transactions. A. Introduction

Request for Proposals # Tulsa Transit CNG Fuel Station Maintenance Amendment# 3 October 9, 2018

Topic: SAP PPM Close Project. Contents

Transcription:

inemi Statement f Wrk (SOW) Name TIG Name Prject Instructins fr use: 1. Save this file as Prject Name Statement f Wrk Draft 1.0 2. All bld headings shuld be left as they are. These will frm the structure f the dcument. 3. The Basic Prject Infrmatin sectin shuld cver all the bulleted items, but nly briefly. The first draft will cnsist f nly this basic infrmatin. Later drafts will include detailed infrmatin in the Prject Plan sectin. The rder f the sub-headers is up t the frmatin team t determine hw best t describe the scpe and reasning behind the prpsal. 4. The bullets beneath each heading are suggestins f what shuld be included in that sectin. All bullets may nt apply t all prjects. If nne f the bullets apply, then substitute what yu think is necessary r simply state nt applicable. Fr the first draft, d nt delete the heading even if it is nt used. 5. Fr the first draft, the Prject Plan sectin will usually nt be filled in. Just state Prject Plan is being develped. Leave all the headings in place s that it will be easy t fill in the Prject Plan in subsequent drafts. When yu are ready t include the Prject Plan, prvide all available details fr each tpic. 6. In the Prject Plan sectin, if there are mre than tw phases, add additinal sectin via cut and paste. If the prject cnsists f just ne phase, delete the entire phase 2 sectin. 7. When yu are finished, yu can delete these instructins. Versin # Date: Prject Leader: C-Prject Leader: inemi Staff: Basic Prject Infrmatin Backgrund/Cntext Prvide any backgrund infrmatin that explains why this prject is being prpsed. Scpe f Wrk Describe what wrk will be dne State the majr gals f the prject at the end f prject deliverables Prvide an apprximate timeframe fr majr phases f the prject and fr cmpletin Purpse f Prject Explain hw the prject aligns t the radmap and what gaps will be filled Will the prject prvide a cmplete slutin r be part f a cmplex slutin? List anticipated benefits t participants, t the inemi membership in general, and the industry Page 1 f 5

IS / IS NOT Analysis This Prject IS: This Prject IS NOT: Prject 1: XXX Develpment f a specific standard(s) Repeat f prir r existing wrk Biased twards specific suppliers, gegraphies, r market segments Business Impact Prvide infrmatin n what impact this prject will have n Participating rganizatin inemi member cmpanies Industry as a whle Outcme f Prject List addressed issues that are expected t addressed and/r reslved, e.g., identify gaps, reprt(s) n results f any testing, etc. List expected deliverables List any prject milestnes Sharing Prject Results: T be determined by the prject team n what infrmatin will be shared utside f the team. Previus Related Wrk Review any related research r develpment dne within the industry Summarize, briefly, directly related academic research, if any Prspective Participants List prspective participants. Strive t include representatives f all facets f the industry, including custmers, suppliers, and manufacturers. NOTE: All changes t SOW must be apprved by the Technical Cmmittee fr versin cntrl Page 2 f 5

Prject Plan Schedule with Milestnes Prject plan with identified tasks, intermediate check pints, and end dates A detailed timeline, including each prject activity and each scheduled prject review. Use the fllwing frmat: Phase 1 Task 1 Task 2 Task n Phase 2 Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 TENTATIVE (18mnths) TENTATIVE (18mnths) TENTATIVE (18mnths) Phase 1 Detailed Infrmatin Task 1 Task n (include the fllwing infrmatin fr each task in a separate bullet list, remve any bullets that dn t apply t the specific task, e.g., materials and prcesses may nt be applicable fr f existing dcuments) Resurces A detailed list the resurces needed and expenditures expected fr the prject, including human resurces, mney, and equipment List f cmmitted resurces frm participating cmpanies State surce f funding fr any cmpnents, assembly, design, and testing needs. Alternatives include participant dnatin, inemi direct funding, and supplier dnatin. Materials and Prcesses Identify the materials t be used. Standard materials shuld be used whenever pssible. Use f standard materials reduces csts, imprves yields, and assures the widest applicability f results within the industry. Justificatin shuld be prvided if nn-standard materials are t be used. Describe any prcesses t be used, including applicable standards and specificatins. Use f standard prcesses reduces csts, imprves yields, and assures the widest applicability f results within the industry. Use f any nn-standard prcesses must be justified. Any specific suppliers r technlgies required and reasns fr the requirement In cases where custm cmpnents are necessary, state which prject participant is respnsible fr assuming this cst Testing Prcedures State anticipated number f parts t be tested. Use discriminatin in chsing samples fr failure analysis t maximize ROI. NOTE: All changes t SOW must be apprved by the Technical Cmmittee fr versin cntrl Page 3 f 5

Use IPC 9701 0-100C as baseline ATC unless justificatin can be given fr alternate test parameters Fr test vehicle design and fabricatin, it is recmmended that reference cmpnents that have been ATC tested n previus prjects be used t prvide a baseline and facilitate cmparisn f results between prjects. Explain design prtcl. Use standard design practices and cmmnly used sftware t reduce csts and widen applicability f results. At what stages testing will be dne and time needed Phase 2 Detailed Infrmatin Task 1 Task n (include the fllwing infrmatin fr each task in a separate bullet list, remve any bullets that dn t apply t the specific task, e.g., materials and prcesses may nt be applicable fr f existing dcuments) Resurces A detailed list the resurces needed and expenditures expected fr the prject, including human resurces, mney, and equipment List f cmmitted resurces frm participating cmpanies State surce f funding fr any cmpnents, assembly, design, and testing needs. Alternatives include participant dnatin, inemi direct funding, and supplier dnatin. Materials and Prcesses Identify the materials t be used. Standard materials shuld be used whenever pssible. Use f standard materials reduces csts, imprves yields, and assures the widest applicability f results within the industry. Justificatin shuld be prvided if nn-standard materials are t be used. Describe any prcesses t be used, including applicable standards and specificatins. Use f standard prcesses reduces csts, imprves yields, and assures the widest applicability f results within the industry. Use f any nn-standard prcesses must be justified. Any specific suppliers r technlgies required and reasns fr the requirement In cases where custm cmpnents are necessary, state which prject participant is respnsible fr assuming this cst Testing Prcedures State anticipated number f parts t be tested. Use discriminatin in chsing samples fr failure analysis t maximize ROI. Use IPC 9701 0-100C as baseline ATC unless justificatin can be given fr alternate test parameters Fr test vehicle design and fabricatin, it is recmmended that reference cmpnents that have been ATC tested n previus prjects be used t prvide a baseline and facilitate cmparisn f results between prjects. Explain design prtcl. Use standard design practices and cmmnly used sftware t reduce csts and widen applicability f results. At what stages testing will be dne and time needed Prject mnitring plans Ensure pen lines f cmmunicatin amng participants Review all prject requirements with participants befre the prject begins. Prject participants will meet bi-weekly t review varius aspects f the prject and make plans fr next phases f the prject. Meeting minutes prvided thrugh e-mail Fllw-up with individuals n an as-needed basis NOTE: All changes t SOW must be apprved by the Technical Cmmittee fr versin cntrl Page 4 f 5

Prvide any prject specific mnitring r cmmunicatins plans, e.g., multiple prject meetings t cver multiple regins (EMEA, Asia, Americas) Wrkshps and face-t-face meetings as determined by the prject team Prgress reprts will be prvided upn request fr presentatin at regularly scheduled inemi meetings (e.g. a shrt series f PwerPint slides shwing the wrk in prgress at member cuncil meetings). Track and dcument apprximate man-mnths per quarter per team member (this will require the active members f the team t prvide estimates). Track and dcument apprximate number f peple n the prject per quarter (this can be tracked thrugh inemi's WebEx accunt.) General and Administrative Guidelines fr this prject and all ther inemi Prjects are dcumented at http://thr.inemi.rg/webdwnlad/jin/general_and_admnistrative_prject_guidelines.pdf NOTE: All changes t SOW must be apprved by the Technical Cmmittee fr versin cntrl Page 5 f 5