TOTAL QUANTITY UNIT COST UNIT

Market Street Gateway Improvements Phase 1

LETTING : CALL : 056 COUNTIES : MILLE LACS

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

REPLACEMENT OF MERCER COUNTY BRIDGE

NAME OF CONTRACTOR CONTRACTORS ADDRESS Buffalo Road th ave Ct SW Walcott, IA North Liberty, IA

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION

Northumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

Rock Chalk Park - Infrastructure Report. July 2013

OKLAHOMA TURNPIKE AUTHORITY

Exhibit 4 Page 1 of 8

Addendum 1 13 TH Street Streetscape. September 1, 2017

BID TABULATION BID REQUEST NO

Addendum 1 Downtown North CRA Sidewalks

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.

AVGPR14.Y01 2/11/2014 DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 12/01/13 AND 12/31/13 BY ITEM GROUP

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012

OKLAHOMA TURNPIKE AUTHORITY

Engineer's Preliminary Estimate - 100% Submittal

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown

NE WEST KINGSTON ROAD CULVERT REPLACEMENT

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122

SUBDIVISION IMPROVEMENTS AGREEMENT

BID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as

Fuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $

Munilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL

Certified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University

New Jersey Department of Transportation DATE : 01/10/08 PAGE : TABULATION OF BIDS CALL ORDER : 167 CONTRACT ID : COUNTIES : CAPE MAY

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $

BID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List

PART A ROADWAY - BASE BID

OKLAHOMA TURNPIKE AUTHORITY

A DESIGN-BUILD PROJECT

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.

Department of Public Works Engineering

Reviax Constracting Corp. DeSantis Construction

CITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS

ADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO

CITY OF TAMPA ADDENDUM 2. April 18, 2018

CITY OF TAMPA ADDENDUM NO. 1. DATE: December 3, Contract 14-C-00033; Tampa Riverwalk Doyle Carlton Drive Segment and Seawall Repair

PRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer

NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1. Project No. 253F Contract No

ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN

CONTRACT TIME DETERMINATION

CECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075

Sandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING

2001 Average Bid Tabs

PAM'S PERENNIAL PLANT FARM, LLC Item List January 20, 2019 Plant Quantity On Hand PRICE

ITB-PW-U Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2

ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN

TABULATION OF BIDS 1 L.S. $ 5, $ 5, $ 27, $ 27,000.00


CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19

PROJECT NO PID BEL TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02

ADDENDUM No. 1 January 29, Paving Program Village of Milford

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates

The bid due date has been changed to 2:50 p.m. May 25, 2018.

Tabulation of Bids. Counties: ROUTE 94 BLACK CREEK TRIBUTARY CULVERT REPLACEMENT

1 DEPARTMENT MAKING REQUEST 2 MEETING DATE 4 AGENDA 5 IS THIS ITEM BUDGETED ( IF APPLICABLE ) -

CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS NEWCASTLE WAY, SUITE 200 DECEMBER 18, CALL TO ORDER

Job No Medina River Sewer Outfall, Segment 4 Solicitation No. B DD BID PROPOSAL

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/17/00 PAGE : 1 TABULATION OF BIDS

**REVISED BID PRICE FORM** October 24, 2018

North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL

ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL

DENVER INTERNATIONAL AIRPORT BID FORMS. CONTRACT NAME: Rehabilitate East Employee Parking Lot Contract No.: BID LETTER

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST

AWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET

WAYNE COUNTY AIRPORT AIRPORT CAPITAL IMPROVEMENT PROGRAM (ACIP)

Job No Medina River Sewer Outfall, Segment 5 Solicitation No. B BB BID PROPOSAL

What are Capital Reserves?

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL

Utility Committee Meeting AGENDA. October 3, 2017

LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY

FLOOD DIVERSION AUTHORITY FINANCE COMMITTEE AGENDA FOR THURSDAY, MAY 11, Fargo City Commission Chambers 3:00 PM

Both bids are substantially higher than the engineer s estimate of $362, The attached Bid Abstract shows the bid details.

COST ESTIMATE and LETTER OF CREDIT FOR SITE DEVELOPMENT WORKS. PREPARED BY CSD-Planning Division. City of Kitchener- Letter of Credit (2017)

Town of Holly Springs Town Council Meeting Agenda Cover Sheet

TABLE OF CONTENTS. Table of Contents 3 List of Drawings 1. Procurement Requirements Advertisement for Bids 2

CITY OF SAN MARCOS ENGINEERING DIVISION

Opinion of Probable Cost

CITY OF DEERFIELD BEACH Request for City Commission Agenda

DRAFT For Review SETTLERS POINTE LEXINGTON, SC. Prepared for: SETTLERS POINTE HOMEOWNERS ASSOCIATION. Prepared by:

APPENDIX A-3: Cost Engineering

SECTION BID. Valley Court Force Main Replacement Contract No. BE17-029

Transcription:

Addendum 2 Invitation for Bids WAKE FOREST INNOVATION QUARTER (WFIQ) RAIL TRAIL NORTH GREENWAY PROJECT BIDS WILL BE RECEIVED UNTIL ***** BID OPENING DUE DATE AND TIME CHANGE ***** January 28, 2016 2:00 PM, Friday, January 29, 2016 in City Hall Building 101 North Main Street Room 16 Winston-Salem, NC 27101 Please acknowledge receipt of this Addendum and include with your proposal. Company Authorized Signature Date **** Time and Date change **** Changes have been made to the Proposal Form in the bid documents You MUST submit your bid using the Addendum 2 Proposal page Bids Due - 2:00 PM, Friday, January 29, 2016 FB1620 Addendum 2 WFIQ Rail Trail North Greenway Page 1 of 1

Addendum 2 Itemized Proposal Form Item No. Description Quantity Units Price Total 1 800 Mobilization 1 LS $ $ 2 801/SP Construction Surveying 1 LS $ $ 3 226/SP Grading 1 LS $ $ 4 226 Supplemental Clearing and Grubbing 0.75 AC $ $ 5 226 Undercut 863 CY $ $ 6 270 Geotextile for Soil Stabilization 5111 SY $ $ 7 SP 8 SP 9 SP Hauling and Disposal of Contaminated Soil to WFIQ Brownfield Property 700 CY $ $ Hauling and Disposal of Contaminated Soil to an approved/licensed landfill 1200 TN $ $ Hauling and Disposal of Petroleum Contaminated Soil to an approved/licensed facility 1200 TN $ $ 10 300/SP Foundation Conditioning Materials, Minor Structures 17 TN $ $ 11 300/SP Foundation Conditioning Geotextile 53 SY $ $ 12 310/SP 6" HDPE Pipe Culvert 117 LF $ $ 13 310/SP 6" Schedule 40 PVC Pipe Culvert 97 LF $ $ 14 310/SP 8" HDPE Pipe Culvert 218 LF $ $ 15 310/SP 12" HDPE Pipe Culvert 298 LF $ $ 16 310/SP 18" R.C. Pipe Culvert, Class III 5 LF $ $ 17 340/SP Pipe Removal 149 LF $ $ 18 402 Removal of Existing Structure at Station 11+35.46 to 11+92.15 1 LS $ $ 19 402 Removal of Existing Structure at Station 19+78.60 to 20+29.01 1 LS $ $ 20 505/SP Shallow Undercut 864 CY $ $ 21 505/SP Class IV Subgrade Stabilization 1709 TN $ $ 22 520 Aggregate Base Course 1182 TN $ $ 23 610/SP Asphalt Concrete Surface Course, SF9.5A 80 TN $ $ 24 620 Asphalt Binder for Plant Mix 10 TN $ $ 25 654 Asphalt Plant Mix, Pavement Repair 10 TN $ $ 26 SP Granite Street Marker 8 EA $ $ 27 815 Subdrain Excavation 84 CY $ $ 28 815 Geotextile for Subsurface Drains 500 SY $ $ 29 815 Subdrain Coarse Aggregate 84 CY $ $ 30 815 6" Perforated Subdrain Pipe 133 LF $ $ 31 840/SP Masonry Drainage Structures 8 EA $ $ 32 840 Masonry Drainage Structures 6.75 LF $ $ 33 840 Frame with Cover, Std. 840.16 2 EA $ $

34 840 Frame with Cover, Std. 840.54 6 EA $ $ 35 SP Trench Drains 209 LF $ $ 36 SP Inline Drain with Dome Grates 10 EA $ $ 37 SP Concrete Pavers 1040 SF $ $ 38 848/SP 4" Concrete Sidewalk 158 SY $ $ 39 848/SP 5" Thick Concrete Paving 3133 SY $ $ 40 SP Concrete Steps 20.1 CY $ $ 41 858/SP Adjustment of Manholes 8 EA $ $ 42 858 Adjustment of Grate Inlets 1 EA $ $ 43 SP Fixed Bollards 2 EA $ $ 44 SP Adjustable Bollards 11 EA $ $ 45 SP 8' Fence 543 LF $ $ 46 SP 54" Fence 797 LF $ $ 47 SP Guardrail With Mesh Panels 78 LF $ $ 48 SP Cable Guardrail 24 LF $ $ 49 SP Stainless Steel Handrail 14 LF $ $ 50 SP Steel Edging 21 LF $ $ 51 876/SP Rip Rap Dissipator 1 EA $ $ 52 SP Wood Bench 88 LF $ $ 53* SP Bicycle Rack 20 EA $ $ 54 SP Litter Receptacle 7 EA $ $ 55 SP Recycling Receptacle 7 EA $ $ 56 SP Pet Waste Station 2 EA $ $ 57 SP Drinking Fountain 1 EA $ $ 58 SP Reinstall Push Pad 1 LS $ $ 59 SP Monument Sign at MLK Jr. Drive 1 LS $ $ 60 SP Wayfinding Sign 2 EA $ $ 61 SP Traffic control 1 LS $ $ 62 1205/SP Paint Pavement Markings 1 LS $ $ 63 SP Electrical System 1 LS $ $ 64 SP Luminaire, Type L1A 6 EA $ $ 65 SP Luminaire, Type L1AWIFI 2 EA $ $ 66 SP Luminaire, Type L1B 18 EA $ $ 67 SP Luminaire, Type L1B2 1 EA $ $ 68 SP Luminaire, Type L1BWIFI 11 EA $ $ 69 SP Luminaire, Type L2 2 EA $ $ 70 SP Luminaire, Type L4 23 EA $ $ 71 SP Luminaire, Type L6 3 EA $ $ 72 SP Luminaire, Type L7 2 EA $ $ 73 SP 1" Water Connection 4 EA $ $ 74 SP 1" Backflow Prevention Assembly 3 EA $ $ 75 SP Irrigation System 1 LS $ $ 76 SP Construction Entrance 3 EA $ $ 77 SP Silt fence 1391 LF $ $

78 SP Stone Outlet 6 EA $ $ 79 SP Inlet Protection 20 EA $ $ 80 SP Matting for Erosion Control 243 SY $ $ 81 1650/SP Wooded Area Cleanup 0.1 AC $ $ 82 1660/SP Seeding and Mulching (Temporary and Permanent) 5.57 AC $ $ 83 1660 Mowing 1.7 AC $ $ 84 1664/SP Sodding 884 SY $ $ 85 1667 Specialized Hand Mowing 96 MH $ $ Plant Materials - Deciduous Canopy Tree 86 SP 87 SP Acer saccharum Green Mountain (2" Min. Cal, 12-14' Ht., BB) 2 EA $ $ Quercus nuttallii (2.5-3" Cal, 12-14' Ht., BB) 5 EA $ $ Plant Materials - Large Evergreen Tree 88 SP Pinus nigra (2-2.5" Cal, 7-8' Ht.,BB, Tree Form) 2 EA $ $ 89 SP Juniperus virginiana (2.5-3", 7-8' Ht., BB) 4 EA $ $ 90 SP Pinus taeda (8-10' Ht., BB, Tree Form) 4 EA $ $ 91 SP 92 SP 93 SP 94 SP 95 SP 96 SP Plant Materials - Understory/Ornamental Deciduous Tree Amelanchier x grandiflora 'Autumn Brilliance' (1.5" Min. Ea. Cal., 8-10' Ht., Multi-stem) 5 EA $ $ Cornus florida 'Cherokee Brave' (1.5" Min.Cal., 8-10' Ht.) 4 EA $ $ Cercis canadensis 'Appalachian Red' (2" Min.Cal., 8-10' Ht.) 5 EA $ $ Cercis canadensis 'Forest Pansy' (1.5-2" Min.Cal., 8-10' Ht.) 5 EA $ $ Chionanthus virginicus (1.5-2" Min.Cal., 8-10' Ht.) 2 EA $ Prunus serrulata 'Snow Goose' (2.5-3" Min.Cal., 9-10' Ht.) 17 EA $ $ 97 SP Cotinus coggyria 'Royal Purple' (1.5" Cal., 6-7' Ht.) 3 EA $ $ Plant Materials - Small Evergreen Tree $ 98 SP Ilex cornuta 'Needlepoint' (4-5' Ht.) 9 EA $ 99 SP Magnolia virginiana 'Jim Wilson' (1.5" Min. Ea., 8-10' Ht., BB, Multi-Stem, Tree Form) 3 EA $ $ Plant Materials - Evergreen Shrub 100 SP Encore Azalea 'Autumn Angel' (18-24") 15 EA $ $ 101 SP Encore Azalea 'Autumn Ruby' (18-24") 6 EA $ $ 102 SP Distylium 'Blue Cascade' (18-24") 30 EA $ $ $

103 SP Camellia sasanqua 'Shi Shi Gashira' (15-18") 9 EA $ $ 104 SP Ilex cornuta 'Carissa' (18-24") 83 EA $ $ 105 SP Cephalotaxus harringtonia 'Prostrata' (12" Min.) 33 EA $ $ 106 SP Juniperus virginiana 'Grey Owl' (18-24") 3 EA $ $ 107 SP Ilex crenata 'Hoogendorn' (18-24") 54 EA $ $ Raphiolepis umbellata 'Eleanor Tabor' (18-108 SP 24") 88 EA $ $ 108 SP Perovskia 'Filigran' (15-18") 49 EA $ $ 110 SP Ilex crenata Helleri (18-24") 48 EA $ $ 111 SP Juniperus chinensis 'Sea Green' (18-24") 27 EA $ $ 112 SP Ilex glabra 'Shamrock' (18-24") 133 EA $ $ 113 SP Ilex crenata 'Steeds' (18-24") 44 EA $ $ Plant Materials - Deciduous Shrub 114 SP Aesculus parviflora (24-30") 3 EA $ $ 115 SP Buddleia davidii 'Nanho Blue' (18-24") 10 EA $ $ 116 SP Clethra alnifolia 'Hummingbird' (24" Min.) 6 EA $ $ 117 SP Callicarpa americana (18-24") 5 EA $ $ 118 SP Clematis viticella 'Etoile Violette' (4') 1 EA $ $ 119 SP Bignonia capreolata (4') 1 EA $ $ 120 SP Deutzia gracilis 'Nikko' (18-24") 19 EA $ $ 121 SP Rosa 'radrazz' (18-24") 10 EA $ $ 122 SP Hydrangea paniculata 'Little Lime' (18-24") 8 EA $ $ 123 SP Hydrangea quercifolia 'Pee Wee' (18-24") 9 EA $ $ 124 SP Hypericum calycinum 'Aaron's Beard' (1 gal) 17 EA $ $ $ 125 SP Lonicera sempervirens 'Magnifica' (5' Ht.) 2 EA $ 126 SP Itea virginica 'Little Henry' (18-24") 10 EA $ $ 127 SP Ilex verticillata 'Red Sprite' (18-24") 7 EA $ $ 128 SP Ilex verticillata 'Jim Dandy' (24" Min.) 5 EA $ $ Plant Materials - Perennial 129 SP Amsonia hubrichtii 'Blue Star' (1 gal) 43 EA $ $ 130 SP Iberis sempervirens Alexanders White (1 gal) 13 EA $ $ 131 SP Coreopsis 'Jethro Tull' (1 gal) 44 EA $ $ 132 SP Hemerocallis 'Happy Returns' (1 gal) 61 EA $ $ 133 SP Hemerocallis 'Ruby Stella' (1 gal) 36 EA $ $ 134 SP Echinacea purpurea 'Kim's Knee High' (1 gal) 36 EA $ $ 135 SP Geranium x Rozanne (1 gal) 37 EA $ $ 136 SP Achillea millefolium Paprika (1 gal) 22 EA $ $

137 SP Solidago Baby Gold (1 gal) 63 EA $ $ 138 SP Heuchera 'Dolce Creme Brulee' (1 gal) 53 EA $ $ 139 SP Heuchera 'Green Spice' (1 gal) 59 EA $ $ 140 SP Heuchera 'Pinot Gris' (1 gal) 34 EA $ $ 141 SP Echinacea Cheyenne Spirit (1 gal) 26 EA $ $ 142 SP Salvia guaranitica Black and Blue (1 gal) 56 EA $ $ 143 SP Monarda Petite Delight (1 gal) 37 EA $ $ 144 SP Delosperma cooperi (1 gal) 22 EA $ $ 145 SP Eupatorium dubium 'Little Joe' (1 gal) 21 EA $ $ 146 SP Stachys byzantina 'Countess Helen von Stein' (1 gal) 10 EA $ $ 147 SP Rudbeckia fulgida 'Goldsturm' (1 gal) 59 EA 148 SP Salvia nemerosa 'Caradonna' (1 gal) 63 EA $ $ 149 SP Sedum x 'Autumn Joy' (1 gal) 57 EA $ $ Chrysanthemum x superbum 'Becky' (1 150 SP gal) 41 EA $ $ 151 SP Verbena 'Homestead' (1 gal) 13 EA $ $ Plant Materials - Ornamental Grass (container) 152 SP Bouteloua gracilis 'Blonde Ambition' (1 gal) 93 EA $ $ 153 SP Pennisetum alopecuroides 'Cassian' (1 gal) 50 EA $ $ 154 SP Panicum virgatum 'Heavy Metal' (3 gal) 84 EA 155 SP Pennisetum orientale 'Karley Rose' (3 gal) 134 EA $ $ 156 SP Miscanthus sinensis 'Morning Light' (3 gal) 39 EA $ $ 157 SP Muhlenbergia capillaris 'Pink' (3 gal) 116 EA $ $ 158 SP Panicum virgatum 'Shenandoah' (3 gal) 75 EA $ $ Plant Materials - Groundcover 159 SP Ajuga reptans 'Catlin's Giant' (1 gal) 89 EA $ $ 160 SP Liriope muscari 'Big Blue' (1 gal) 736 EA $ $ 161 SP Juniperus conferta Blue Pacific (3 gal) 131 EA $ $ 162 SP Narcissus pseudonarcissus 'Tête-à-Tête' (Bulb) 125 EA $ $ 163 SP Liriope muscari 'Variegated' (1 gal) 169 EA $ $ Plant Materials - Ornamental Grass (plug) 164 SP Carex pensylvanica (Plug) 518 EA $ $ Plant Materials - Meadow Seed 165 SP Meadow Seed 9155 SF $ $ 166 SP Pre-emergent Herbicidal Treatment for Plant Beds 2955 SY $ $ 167 1670/SP Mulch for Planting 247 CY $ $ 168 1670/SP Soil Amendment 247 CY $ $ 169 SP Landscape Ballast.5 TN $ $ 170 SP Telecommunications System 1 LS $ $

Item No. Description Quantity Units Price Total 171* SP CIP Gravity Retaining Walls 803 SF $ $ 172 SP 173 SP Prefabricated Steel Pedestrian Bridge, Sta. 5+98.65 - Sta. 6+66.40 (E. Fourth Street) 1 LS $ $ Prefabricated Steel Pedestrian Bridge, Sta. 11+35.46 - Sta. 11+92.15 (E. Fifth Street) 1 LS $ $ Prefabricated Steel Pedestrian Bridge, Sta. 174 SP 19+78.60 - Sta. 20+29.01 (Seventh Street) 1 LS $ $ 175 SP Precast Concrete Crossing 58 LF $ $ Base Bid Estimated Cost $ *Quantities were corrected. ADD ALTERNATE A - 4 th STREET STAIRS 1 LS $ The Contractor shall provide a lump sum price for the installation of the stairs and amenities at 4th Street as shown in the plans. Construction of the 4 th Street stairs and amenities shall include, but is not limited to, clearing and grubbing, grading, erosion control, drainage, precast concrete crossing, concrete paving, concrete sidewalk, litter and recycling receptacles, wood bench, retaining wall, stairs, bollards, cable guardrail, handrail, electrical, lighting, wall mounted lights, wall mounted signs, wall trellis, landscaping. Bidders must provide a price for all add alternates. Failure to provide prices for all add alternates may render the bid non-responsive and may be rejected.