NORTH EASTERN REGION CAPITAL CITIES DEVELOPMENT INVESTMENT PROGRAMME (LOAN NO 2528-IND & 2834-IND)

Similar documents
ANNEXURE-2 URBAN INSTITUTIONAL, FINANCIAL, REGULATORY, AND OPERATIONAL REFORM AGENDA

URBAN REFORMS AGENDA AT ULB LEVEL

Nagar Nigam- Bareilly

Assam State Public Finance Institutional Reforms (ASPIRe) Project (P157198)

MFF - Bihar Urban Development Investment Program (Facility Concept)

Date of Approval by GoI. Project Component Housing Municipality

CHECKLIST OF REFORM E-GOVERNANCE

Urban Sanitation: Swachh Bharat Mission

The Tamilnadu Urban Development Fund (TNUDF)

PROJECT PREPARATORY TECHNICAL ASSISTANCE

P Performance Benchmarking of Urban Water

Consultants have to submit all the construction drawings; within 30 days after finalization of Concept Reports.

ORISSA PUBLIC PRIVATE PARTNERSHIP POLICY-2007

TERMS OF REFERANCE FOR PROJECT MANAGEMENT CONSULTANTS [PMC]

Means of Verification. J F M A M J J A S O N D 1 Project kickstarting activities. Baseline Data accumulated

GOVERNMENT OF ARUNACHAL PRADESH DEPARTMENT OF URBAN DEVELOPMENT ARUNACHAL PRADESH CIVIL SECRETARIAT:ITANAGAR

Annex 1 Citizen s summary 1

GOVERNMENT OF ARUNACHAL PRADESH DEPARTMENT OF PLANNING

TENDER-Bioremediation and scientific closure of existing Page 1. (TENDER NO. UDD/JNN/ 09/18 Dated: )

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826)

Report and Recommendation of the President to the Board of Directors

M2i s Experience in Microfinance

PROFILE Solid Waste Management

The following rules and regulations are observed in the discharge of its functions:

REQUEST FOR PROPOSALS FOR PROJECT MANAGEMENT CONSULTANCY FOR SMART CITY, AMRUT & OTHER INFRASTRUCTURE PROJECTS IN GUJARAT SEPTEMBER-2015

ARM: Sustainable Urban Development Investment Program, Tranche 1

FLOOD AND RIVER EROSION MANAGEMENT AGENCY OF ASSAM (FREMAA)

Ministry of Housing and Urban Poverty Alleviation Government of India

PERFORMANCE IMPROVEMENT PLANNING MODEL PERFORMANCE ASSESSMENT SYSTEM PROJECT

MEMORANDUM OF UNDERSTANDING BETWEEN MINISTRY OF POWER, GOVERNMENT OF INDIA AND NORTH EASTERN ELECTRIC POWER CORPORATION LIMITED PART-I

Socialist Republic of Vietnam. Reporting Period: From 08/20/2017 to 04/03/2018 Report Date: 04/03/2018 Ministry of Natural Resources and Environment

S.No Original Clause Query Response from DMICDC 1. Experience of preparation of DPR s/detailed Master Plans including Business Plans for

PROJECT PREPARATORY TECHNICAL ASSISTANCE

Pre-Bid Query Clause No. reference Clarification. Contractor has satisfactorily. completed construction and 2

KANPUR City Development Plan (CDP)

POS No.1 Fund released under 12 th & 13 th Finance Commission Observations.

WELCOME e-govenance IN ULGs OF KERALA

Role of Private Equity in Urban

Chairman's Address. Dear Shareholders,

F. No. 1(1)PF- II/2011 Government of India Department of Expenditure (Plan Finance-II Division) OFFICE MEMORANDUM

Ministry of Urban Development, Government of India Capacity Building for Urban Development. Revised City Development Plan for Udaipur City

Karnataka Integrated Urban Water Management Investment Program (RRP IND 43253) ECONOMIC ANALYSIS

THIRD PARTY INSPECTION AND MONITORING

There is no other scheme with overlapping in other Ministry/Departments of the Central or the State Govt.

SPECIAL ECONOMIC ZONES (SEZ) An Indian Perspective

Curriculum Vitae. Telephone Work : (91-22) Home : (91-22) Mobile: Work History

Municipal Programme for Solid Waste Management in Bosnia and Herzegovina Programme Document

About Public Services Department. Public Services Department is one of the. in supervising the various facilities that are

NOTIFICATION. Recruitment Rule Government of West Bengal Finance Department Audit Branch. Rules

Expression of Interest for Core Team of the National Program Management Unit (NPMU) for the Heritage City Development and Augmentation Yojana (HRIDAY)

Guidelines For Rajasthan Infrastructure Project Development Fund (RIPDF)

Monitoring Arrangements for Urban Water Supply and Sanitation in Gujarat - A Paper

AASTHI (GIS BASED PROPERTY TAX SYSTEM) Dept of Urban Development Govt. of Karnataka. Directorate of Municipal Administration

TARIFF AND GOVERNANCE ASSESSMENT

CORPORATE SOCIAL RESPONSIBILITY

Delegations will find attached Commission document DEC 24/2017.

The impact of the Challenging Economic Times on Local Governments: Strategies for coping with the economic crisis (Reflections from India)

INDIA LOW INCOME HOUSING FINANCE PROJECT. Request for Expressions of Interest

MEGAPROJECT Case Study

Appraisal Note: Andaman & Nicobar Islands

TOOLKIT FOR ANALYSIS OF URBAN INFRASTRUCTURE PROJECTS FOR PUBLIC PRIVATE PARTNERSHIPS (PPP)

URBAN GOVERNANCE ASSESSMENT

Draft Design and Monitoring Framework

Phase 2 Joint Waste Management Procurement: Progress Report

WEST BENGAL TEXT BOOK CORPORATION LIMITED. (A Govt. of West Bengal Undertaking) 11, B.T. Road, Kolkata

HPEC (Ahluwalia) Report 2011

Thiruvananthapuram Corporation

West Bengal Institutional Strengthening of Gram Panchayats Program II (P159427)

Proposed Multitranche Financing Facility India: Tamil Nadu Urban Flagship Investment Program

I. General 1. Project information:

Proceedings of the Government of Karnataka

Strategy Session Dates

Housing and Regeneration Cabinet Committee. The Review of HRA Subsidy System and Council Rents Cabinet Member for Community Services

EXTERNAL AUDIT REPORT

RESETTLEMENT POLICY FRAMEWORK

Government of karnataka R F D. (Results-Framework Document) for. Department of Housing ( )

National Bank of Pakistan. Standalone Financial Statements

Smart Metering Entity (SME) Licence Order Working Group

Together We Keep Tonga Clean, Green and Healthy.

Terms of Reference for Senior Non-Key Short-Term Expert: e- Commerce Regulatory Issues

India: Karnataka Urban Development and Coastal Environmental Management Project

GUYANA FORESTRY COMMISSION

Public Private Partnership in Highway Sector in Punjab, India

Pradhan Mantri Awaas Yojana - Gramin (PMAY-G) Ministry of Rural Development Government of India

National Mission for Clean Ganga (NMCG) Ministry of Water Resources, River Development & Ganga Rejuvenation

Public Financial Management & Accountability in Urban Local Bodies

UGANDA DEVELOPMENT PARTNER. Division of Labour Exercise AID INFORMATION MAP. Introduction and Instructions for DP Questionnaire.

GUNTUR MUNICIPAL CORPORATION QUERRIES FURNISHED BY THE HYDERABAD INTEGRATED MSW LTD., HYDERABAD ON FOR BIO-MINING (RFP)

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS

Design & Planning of EPWP Phase II

TENDER NOTICE GUJARART NARMADA VALLEY FERTILISERS & CHEMICALS LIMITED. 1 Department Name

MANAGING FOR RESULTS: An Implementation Plan for the City of Portland

Tax Compliance Measures

Strategy beyond Twelfth Five Year Plan - Achievement of Sustainable Development Goals

FAIR FOR LIFE & FOR LIFE. Procedure for Scheme Revision

Financial scrutiny uncovered. A guide for Members by the Committee Office Scrutiny Unit

National Rural Roads Development Agency (Ministry of Rural Development, GoI)

NORTHERN IRELAND CIVIL SERVICE CODE OF ETHICS CIVIL SERVICE COMMISSIONERS CORE GUIDANCE MAY 2013

<<Name of ULB>> <<Name of the State>> REQUEST FOR PROPOSAL

TABLE OF CONTENTS SUBJECTS 1. INTRODUCTION 2. INSTITUTIONAL ARRANGEMENTS. Roles and responsibilities

Transcription:

NORTH EASTERN REGION CAPITAL CITIES DEVELOPMENT INVESTMENT PROGRAMME (LOAN NO 2528-IND & 2834-IND) PROJECT IMPLEMENTATION STATUS FOR SHILLONG-MEGHALAYA (7 th May 2012)

TRANCHE I STATUS A. CONSTRUCTING AND EQUIPPING A SANITARY LANDFILL SITE DEVELOPMENT OF A SHORT TERM LANDFILL OVER AN AREA OF 6500 SQ M HAS BEEN APPROVED UNDER TRANCHE I. THE ESTIMATED AMOUNT IS RS 30.73 MILLION. CONTRACT AWARD OF WORK COMPLETED IN DEC 2011 CUTTING OF TREES AT PROJECT SITE COMPLETED IN MARCH 2012. WORK UNDER PROGRESS AND 30% EXCAVATION WORK FOR RETAINING WALL FOUNDATION (PART-1) AND LANDFILL CELL COMPLETED.

B. CONSULTANCY SERVICES TRANCHE I STATUS Mott Macdonald appointed as DSMC w.e.f. Dec 2009 with term upto 2015. Presently involved in supervision of T-1 work and finalisation of DPR for T-3. T-2 DPR completed by the firm. Pricewaterhouse Coopers appointed as IDC w.e.f. April 2010 with term upto April 2012. The progress of works for the IDC is reflected in the reforms status. SIEC has recommended for extension of the term of IDC by 6 months. ADB has conveyed its no-objection to the extension.

TRANCHE I STATUS Although substantial progress has been made on the accounting module, self-assessment system of property tax, e-governance, and IT Application in SMB, additional time input is required for completion of the GIS based property tax survey particularly for the conversion to self assessment. Additional input is also required for handholding and capacity building for accounting module. On the city utility, as instructed by the State Level Reforms Committee, the consultants has prepared an institutional structure of the city utility for service delivery and the same is under consideration of the State Govt., hence further expert inputs will be required from the consultants. Further, in view of public opinion on municipalisation and urban governance, the State Government felt that efforts should be made on restructuring Shillong Municipal Board, capacity building of SMB staff and additional e-governance initiatives in SMB. In this module additional time input is required for preparation of human resource manual and financial plan of SMB. The expenditure under the IDC contract till March 2012 is INR 23.34 million and the projected expenditure for the proposed extended phase is INR 28.28 million including INR 9.76 million for Remuneration and OPE. Considering the extended phase, the projected expenditure will be INR 51.62 million which is well within the overall contract amount of INR 54.77 million.

TRANCHE 2 PROJECT ACTIVITIES ON THE RECOMMENDATION OF MOUD, THE TRANCHE 2 PROJECT FOR SHILLONG HAS BEEN CURTAILED TO COVER ONLY THE SHILLONG MUNICIPAL BOARD AREAS AND INCLUDES:- i. HOUSE TO HOUSE COLLECTION. ii. IMPROVEMENT OF PRIMARY AND SECONDARY COLLECTION AND TRANSPORTATION INCLUDING GARAGE. THE APPROVED PROJECT COST FOR SMB IS Rs.367.76 LACS. THE APPROVED BASE COST IS Rs.357.05 LACS ( 3 PACKAGES WHICH ARE NOT RELATED TO ENVIRONMENTAL CLEARANCE ISSUES) EVALUATION COMPLETED FOR 2 PACKAGES AND 1 PACKAGE REBIDDED WITH 7 TH JUNE 2012 AS DATE OF CLOSING. TIMELINES TO START CIVIL WORK(1 PACKAGE) & PROCUREMENT (1 PACKAGE) IS JULY 2012. FOR REBIDDED PACKAGE IS OCT 2012.

TRANCHE 2 PROJECT ACTIVITIES Summary of Cost for Tranche 2 sub projects for Shillong as per approved DPR Details Amount in INR Amount in INR Civil works, Package- I : construction of 1 Garage cum Workshop Shed & Staff Rest Room at the old landfill site at Marten 1,20,50,000.00 Goods, Package - II : Procurement of 2 primary and secondary collection vehicles( 1,43,50,000.00 16 Nos.) and workshop machineries 3 Goods, Package - III : Procurement of different types of bins, personal protective 93,05,000.00 equipment and polythene bags 4 Total Base Cost 1,20,50,000.00 2,36,55,000.00 5 Contingencies @ 3% for civil works 3,61,500.00 7,09,650.00 6 Total Cost 1,24,11,500.00 2,43,64,500.00 Total Base Cost for Civil Works & Goods 3,57,05,000.00 Total Cost for Civil Works & Goods 3,67,76,000.00

TRANCHE 3 PROPOSED PROJECT SWM for areas outside SMB Development of a long term landfill site with 150TPD compost plant/waste to energy plant Laying of sewerage system with 20MLD STP Construction of community toilet blocks

ACTION INITIATED FOR TRANCHE 3 PROJECT WASTE CHARACTERISATION AND QUANTIFICATION COMPLETED AND FINAL REPORT SUBMITTED BY NEHU. BASELINE FIELD SURVEY COMPLETED. FINAL REPORT IS AWAITED. COMMUNITY AWARENESS AND CONSULTATIONS ARE ONGOING. SURVEY FOR IDENTIFICATION OF FEMALE HEADED HH S COMPLETED. TOPOGRAPHICAL SURVEY AS PER ORIGINAL TOR COMPLETED. EIA CONSULTANTS DEPLOYED, PREPARATION OF EIA FOR ENVIRONMENTAL CLEARANCE BASED ON FINAL TOR FOR EIA FROM MOEF RECEIVED ON 19 SEPT 2011. EIA REPORT PREPARED. PUBLIC HEARING DURING MAY 2012.

STATUS OF IMPLEMENTATION OF REFORM AGENDA UNDER NERCCDIP SHILLONG A. INSTITUTIONAL On devolution of functions: Road map for devolution of functions and proper human resource management plan for the ULBs has been prepared for the proposed urban governance structure. This however involves expansion of the municipality, which has not found favour with TIs. Meantime work on capacity building, restructuring, resource programme etc are ongoing in Shillong Municipal Board. On the need for an urban governance set up for the Greater Shillong area: Three models have been prepared and discussed with stakeholders. However, the SLRC has decided that the State Govt will examine in greater details the options available, before a final decision is taken on the matter. A public debate / conclave is proposed to be held in the month of May, 2012 as required under the programme.

A. INSTITUTIONAL On restructuring plan of SMB: Restructuring plan of SMB has been submitted to government. (Organization structure review, detailed analysis of the employee profile, revised organization structure, redeployment of staffs, new recruitment, recruitment rules etc). The human resource manual for SMB is under preparation. On launching of grievance redressel system of SMB: The online grievance redressel system for SMB has been launched and necessary training has been provided to SMB staffs for day to day use. A small cell has been created within SMB to take care of the system supported by a dedicated landline number for the use of public. System working satisfactorily.

STATUS OF IMPLEMENTATION OF REFORM AGENDA UNDER NERCCDIP SHILLONG B. SERVICE DELIVERY On creation of one single city ring fenced area for city water and sewerage operations: A performance based agreement between PHED and SMB for water supply has been prepared and sent to line departments for their concurrence. For the long term, a broad framework of the new model for water and sewerage utility structure for the city has also been prepared for the city. SLRC has approved the jurisdiction, scope and regulatory framework of the utility agency on 1st Feb 2012. Based on the direction of the SLRC, the IDC has worked out the organisational structure of the city utility and draft outline act for the water utility. This has been circulated amongst SLRC members and finalised in next meeting to be held in May 2012.

B. SERVICE DELIVERY On preparation of RFP for PPP in Solid Waste Management: IDC has submitted the RFP, Term sheet and Project Information memorandum for the proposed waste to energy plant to be implemented on PPP mode. Financial model has been prepared and presented to the government. The RFP has already been floated by the government. Training and preparation of framework and policy on PSP for municipal assets like bus sheds, toilets and markets ongoing. On Benchmarking exercise for Water supply and Solid waste management: Benchmarking exercise for water supply and solid waste management service has been completed and the same has been notified by the government.

STATUS OF IMPLEMENTATION OF REFORM AGENDA UNDER NERCCDIP SHILLONG C. FINANCIAL Implementation of Double Entry Accrual based accounting System in SMB Opening balance sheet for 2009-2010 approved and 2010-2011 finalised. Transaction entry in the new system for the financial year 2010-11, 2011-12 ongoing and completed till February 2012. Accounting manual approved and adopted. Draft amendments in Municipal Act prepared and the bill has been passed in the last assembly. IDC is working closely with NIC for development of customized accounting software. As an interim arrangement accounting entries are done with Tally software. Training of staff of SMB on DEA is also ongoing. Govt. notification for complete migration under process.

STATUS OF IMPLEMENTATION OF REFORM AGENDA UNDER NERCCDIP SHILLONG Reform in property Tax Management System: Unit area method of assessment already in force. Up dation of GIS database for property and survey in 16 wards completed. Completion of field survey in the entire SMB is expected by the end of May 2012. Verification of survey data along with SMB staffs is ongoing for 16 wards. Thirteen meetings of Valuation Committee held for fixing new rate structure and direction for shifting to self assessment system. MVC report has been finalised and will be sent to government by May 2012. Required amendment in the MM act has been drafted. Present collection efficiency for property tax is more than 70%. First round of GIS training has been completed in SMB. Demonstration on property tax management software has been completed

STATUS OF IMPLEMENTATION OF REFORM AGENDA UNDER NERCCDIP SHILLONG Introduction and rationalisation of user charges: Overall financial improvement plan for SMB has been submitted as part of the user charge report of SMB. Under examination of State Govt. New tariff structure has been proposed for cost recovery for the SWM sub project. Under examination of Valuation Committee. Valuation committee report on property taxes/user charges to be submitted to State Govt during May 2012. Although there is no water supply component under NERCCDIP, Shillong, volumetric water charges is expected to be initiated once the metering program for water supply is completed by PHED under the water supply project sanctioned under JNNURM. Till the time meters are not installed the water charge is to be collected on a flat monthly basis as a user charge component.

STATUS OF IMPLEMENTATION OF REFORM AGENDA UNDER NERCCDIP SHILLONG Training support and e-governance programme in SMB Training of municipal staff conducted on computer applications, accounting and PPP. Training of SMB and other Govt. officials on soft skills by IIM, Shillong. Workshop with SMB, PHED and other Govt. officials on benchmarking. Municipal Accounting software is being developed by NIC with support from IDC. Some modules under trial run. Municipal website is updated. On-line public grievance redressal system, citizens charter developed and formally launched by Minister Urban Affairs on 22 nd Dec 2011.

FINANCIAL PROGRESS/PROJECTIONS FOR TRANCHE 1 & 2 UNDER ADB/GOVERNMENT OF INDIA ASSISTED NERCCDIP FOR SHILLONG as on 1st May 2012 Period Amount 2009-2010 2010-2011 2011-2012 2012-2013 Sl.No Activity/Sub project in Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Rupees 1 2 3 4 5 6 7 Consulting Services- Design, Supervision and Management Consultancy Consulting Services- Institutional Development Consultancy Tranche 1 : Development of Short term Sanitary Landfill Site- Civil Works & Procurement of Equipments Tranche 2 : Procurement of Primary & Secondary Collection Vehicles, Household Bins, PPE, Construction of Workshop and Workshop Equipments Project Administration & Implementation TOTAL (in million Rupees) TOTAL -Financial Year wise (in million Rupees) 100.66 million 54.77 million 30.70 million 36.77 million 25.76 million Projections 7.51 3.73 6.09 8.63 7.90 6.85 5.86 5.87 4.00 8.30 7.12 4.37 4.51 Actuals 8.28 1.23 3.26 2.40 2.39 2.18 4.80 4.62 5.56 Projections 6.73 4.95 5.45 5.45 8.06 8.06 8.06 4.00 9.40 9.40 9.40 Actuals 3.89 3.86 1.64 2.17 1.31 2.92 0.94 6.6 Revised Projections Actuals 3.70 3.70 9.30 3.70 3.70 Projections 3.33 3.54 12.54 Actuals Projections 0.65 2.87 2.13 2.13 2.13 2.13 2.17 2.17 2.17 2.17 2.17 2.17 2.17 2.17 Actuals 0.65 2.30 0.87 1.09 1.19 0.54 0.95 0.92 1.54 1.53 Projections 0.65 10.38 12.59 13.17 16.21 15.48 17.0816.0916.10 13.87 23.57 31.32 23.18 22.92 Actuals 0.65 10.58 5.99 8.21 5.23 5.10 4.44 8.64 7.10 13.69 0.00 0.00 0.00 0.00 Projections 11.03 57.45 63.14 100.9 Actuals 11.23 24.53 33.87 0.00 Note: Projections for Consulting Services are exclusive of taxes and annual incremental cost.

ISSUES EXTENSION OF CONTRACT PERIOD OF IDC FOR ACCOUNTING, AND PROPERTY TAX AND SERVICE DELIVERY MODULES FOR AN ADDITIONAL PERIOD OF 6 (SIX) MONTHS. CLARITY ON DEVELOPMENT OF IPPMS. CLARITY ON BASELINE SURVEY. UTILISATION OF T 1 SAVINGS.

THANK YOU