BOARD OF WATER AND SEWER COMMISSIONERS OF THE CITY OF MOBILE PUBLIC NOTICE

Similar documents
CHAPTER XI. WATER & SEWER ARTICLE A. WATER CONNECTION FEES. New Water Connection Fees. Inside City Limits

MOBILE AREA WATER AND SEWER SYSTEM

FY18 SCHEDULE OF USER FEES October 1, 2017 September 30, UTILITIES - RECLAIMED WATER Adopted

ORANGE WATER AND SEWER AUTHORITY SCHEDULE OF RATES, FEES, AND CHARGES APPLICABLE TO ALL BILLINGS AND SERVICES ON AND AFTER OCTOBER 1, 2017

SOUTH WALTON UTILITY COMPANY, INC. 369 Miramar Beach Drive Miramar Beach, FL Telephone: (850) Fax (850)

AMADOR WATER AGENCY SCHEDULE OF MISCELLANEOUS FEES AND CHARGES

Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee. Residential Water

JEFFERSON WATER AND SEWER DISTRICT DEPOSIT, FEE AND CHARGE SCHEDULE (Includes Rate Adjustments Effective January 1, 2019)

M A N I T O B A ) Order No. 18/05 ) THE PUBLIC UTILITIES BOARD ACT ) February 7, 2005

RATE INFORMATION. A. The rates adopted by the Authority will be in accordance with of the Code of Virginia, as amended.

Rate Schedule. Fiscal Year-2018 (July 1, 2017 June 30, 2018) P.O. Box 5911 Virginia Beach, Virginia

Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee. Residential Water

RESOLUTION CONNECTION CHARGES, PLANT INVESTMENT FEES, AND UTILITY RATES FOR WATER AND SEWER SERVICE

Cedar River Water and Sewer District FEE AND CHARGE SCHEDULE AMENDED January 21, 2014

Rate Schedule. Fiscal Year-2015 (July 1, 2014 June 30, 2015) Amended July 22, 2014 Amended August 26, 2014

North Pecos Water & Sanitation District. Rates, Charges, Fees and Penalties Effective January 1, 2015

Hart County Water and Sewer Authority

APPENDIX A. Effective January 1, WATER AND SEWER TAP FEES - SINGLE FAMILY RESIDENTIAL TAP FEE

Title 6 WATER AND SEWER FEES AND CHARGES

RATE & FEE SCHEDULE AMENDED July 1, 2018

SECTION G. RATES AND SERVICE FEES

ADMINISTRATIVE POLICY AND PROCEDURES MANUAL FOR UTILITY BILLING AND COLLECTIONS

3.1. Construction Meter Additional Charges for Temporary Meters OTHER FEES, CHARGES, AND DEPOSITS CAPACITY FEES...

CHATOM UTILITIES SERVICE RULES AND REGULATIONS

M A N I T O B A ) Order No. 8/05 ) THE PUBLIC UTILITIES BOARD ACT ) January 17, 2005

UTILITIES BOARD OF THE CITY OF GULF SHORES RESOLUTION NO. 4-90

UTILITY SERVICES CUSTOMER INFORMATION PACKET

WARREN COUNTY WATER DISTRICT SEWER SERVICE

City of Winder Title: Water Service Policy Date Issued: 5/2012 Policy: 500

Town of Boones Mill Water and Sewer Ordinance Rules and Regulations

WEST MORGAN-EAST LAWRENCE WATER & SEWER AUTHORITY SERVICE RULES AND REGULATIONS

City of St. Albans Water and Wastewater Rates and Fees Summary

ORDINANCE NO

TOWN OF LANTANA ADOPTED FEES AND CHARGES SCHEDULE (R ) EFFECTIVE JULY 10, 2017 UNLESS OTHERWISE SPECIFIED

Public Utility District Act to provide potable water and sewer collection service to lands within the District; and,

BREEZY HILL WATER & SEWER CO., INC.

SECTION 7 - CHARGES, FEES AND DEPOSITS

ORDINANCE NO

CHAPTER 7 CHARGES, FEES, OR DEPOSITS

Development Impact Fee Adjustment Effective July 1, 2017

BE IT RESOLVED BY THE BOARD OF DIRECTORS OF GALVESTON COUNTY MUNICIPAL UTILITY DISTRICT NO.

Borough of Phoenixville Master Schedule of Fees Effective January 1, 2015

RATE AND FEE SCHEDULE FOR 2018

General Business Rules and Regulations

MOUNTAIN HOME WATER DISTRICT 2323 SW Buckman Road West Linn, OR 97068

FINAL 2017 RATE SUPPORTED BUDGET TABLE OF CONTENTS

1. Schedule of Commodity Rates & February 1, 2019 Quarterly Service Charge

South Australian Water Corporation Fees and Charges Schedule Rates and Sales

TABLE OF CONTENTS ARTICLE 1. GENERAL PROVISION

CHAPTER 6A- WASTEWATER SERVICE CHARGES. ARTICLE I Wastewater Service Charges

CITY OF TITUSVILLE ORDINANCE. Sec Schedule of water and sewer charges

COMMERCIAL TENANT PROTOCOL PRIOR TO ESTABLISHING WATER/WASTEWATER SERVICE

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON. Docket WJ 34

VOLUME 2 - RULES AND REGULATIONS. Part B - Schedule of Rates, Fees and Other Charges. Table of Contents. 1. Definitions... 1

WARREN COUNTY WATER DISTRICT WATER SERVICE

M A N I T O B A ) Order No.17/14 ) THE PUBLIC UTILITIES BOARD ACT ) February 6, 2014

Instructions for Fax or Applications for Service


CITY OF CHANUTE. Department of Utilities. Utility Information Rates and Fees. Utility Payment Options INDEX. Title Page. Key Telephone Numbers 2

Water Works and Sewer Department of the Town of Eclectic

WATER DEPARTMENT POLICY MANUAL

RULES AND REGULATIONS OF BRYAN COUNTY RURAL WATER, SEWER AND SOLID WASTE MANAGEMENT DISTRICT #2

DOMESTIC SERVICE CHARGE:

Section 575 Public Utilities Department Fees

ANGLER S COVE/SHADY COVE HEIGHTS WATER COMPANY

RESOLUTION

SCHEDULE OF RATES, FEES AND CHARGES

PWC SCHEDULE OF DEPOSITS, FEES AND CHARGES. Table of Contents

TOWN OF BOILING SPRINGS NC

WATER AND WASTEWATER FUND REVENUES

M A N I T O B A ) Order No. 45/15 ) THE PUBLIC UTILITIES BOARD ACT ) April 28, 2015

Building Permit Fees

ARTICLE I. Section 1. "City" shall mean the City of Marion, Linn County, Iowa.

LAS CRUCES UTILITIES Sheet No. W Revision Approval Date: July 14, 2016 Effective Billing Date: October 1, 2010 LCUB Resolution No.

CITY OF SOLVANG FEES, CHARGES, AND FINES

MANHEIM AREA WATER & SEWER AUTHORITY Resolution : Fee Schedule

GENERAL TERMS AND CONDITIONS

ARTESIAN WATER MARYLAND, INC. TARIFF

GREENBRIER COUNTY PUBLIC SERVICE DISTRICT NO. 2 a public utility SEWERAGE AND SEWAGE DISPOSAL SERVICE

ORDINANCE NO AN ORDINANCE To Be Entitled:

RULES & REGULATIONS PWSD#1 OF MONTGOMERY COUNTY

M A N I T O B A ) Order No. 136/10 ) THE PUBLIC UTILITIES BOARD ACT ) December 22, 2010

& Fees. Rates. Charge (water) Rate. Meter Size. Total. Water Sewer ¾ 1 1 ½ $9.84 $4.92 $9.84 $7.38 $60 $7.98. Footnotes. base fee in addition

M A N I T O B A ) Order No. 100/10 ) THE PUBLIC UTILITIES BOARD ACT ) October 6, 2010 MUNICIPALITY OF KILLARNEY TURTLE MOUNTAIN WATER AND SEWER RATES

CITY OF LAKE MARY, FLORIDA

Charges. Retail. Charge (water) & Builder. Account Activation Fee. Meter Size. Meter Fee. Water Sewer. Total $7.485 $4.99 $9.98 $9.

2018 SEWER PERMIT APPLICATION updated 1/4/18

ALBUQUERQUE BERNALILLO COUNTY WATER UTILITY AUTHORITY WATER AND SEWER RATE ORDINANCE

TARIFF. Issued: August 19, 2016 Effective: September 1, 2016 ISSUED BY: Arturo Gabaldon, President Community Water Company of Green Valley

ERWIN UTILITIES CUSTOMER SERVICE POLICIES

WATER SERVICE TARIFF RATES, TERMS AND CONDITIONS FOR WATER SERVICE WITHIN MARION COUNTY, INDIANA. Issued By The

ADVERTISED 2018 ANNUAL BUDGET. Draft November 9, 2017

SECTION SERVICE RULES AND POLICIES

CHAPTER 1 WATER REGULATIONS; RATES

RED LION MUNICIPAL AUTHORITY Center Square, P.O. Box 190, Red Lion, Pennsylvania WATER SYSTEM RULES AND REGULATIONS

Schedule of Rates and Fees. Fiscal Year 2017/2018

APPLICATION FOR WATER SERVICE EXISTING METER

Sewer and Water Permit Check List

REVISED JUNE 16, 2016

Fee Schedule for 2017

Transcription:

BOARD OF WATER AND SEWER COMMISSIONERS OF THE CITY OF MOBILE PUBLIC NOTICE Notice is hereby given by the Board of Water and Sewer Commissioners of the City of Mobile, Alabama, that a public hearing will be held on Tuesday, November 28, 2017, at 6 P.M. local time, at MAWSS Park Forest Plaza, 4725 Moffett Road, Mobile, AL, for the purpose of hearing objections, if any, to the adoption of the 2018 Operation and Maintenance Budget and proposed changes to the Policy and Procedure Manual of MAWSS. The 2018 Budget includes a rate adjustment and miscellaneous fee increase as recommended by Staff. The increase is needed to repair and replace aging infrastructure, to protect public health and the environment. Any recommended adjustments to the Budget will be discussed at that time. All interested parties may appear in person or by agent to present any objections to the adoption of the 2018 budget. A copy of the proposed Budget, and Rate and Fee Schedule may be viewed at www.mawss.com.

THE BOARD OF WATER AND SEWER COMMISSIONERS OF THE CITY OF MOBILE OPERATION AND MAINTENANCE BUDGET 2017 BUDGET 2018 PROPOSED BUDGET (including proposed rate and fee changes) REVENUE 1. Revenue Derived from Levy and Collection of Water Charges $ 36,331,000 37,765,799 2. Water Connection (Service Line) Fees 346,000 346,000 3. Water Connection (Capacity) Fees 217,000 217,000 4. Miscellaneous Water Revenue 2,658,000 3,029,480 5. Water Supply System (Industrial) 1,429,000 1,464,725 6. Total Water Revenue 40,981,000 42,823,004 7. Revenue Derived from Levy and Collection of Sewer Charges 58,182,000 60,508,722 8. Sewer Connection (Service Line) Fees 197,000 197,000 9. Sewer Connection (Capacity) Fees 544,000 544,000 10. Pre-treatment Fees 744,000 744,000 11. Miscellaneous Sewer Revenue 1,278,000 1,566,680 12. Total Sewer Revenue 60,945,000 63,560,402 13. Investment Revenue 250,000 375,000 14. Miscellaneous Rentals and Other 400,000 425,000 15. Gross Revenue 102,576,000 107,183,406 EXPENSES - OPERATION AND MAINTENANCE Total Operation and Maintenance 16. Less Capitalized Labor and Materials 59,260,000 62,184,000 Net Revenue Before Transfers and 17. Debt Service 43,316,000 44,999,406 TRANSFERS AND DEBT SERVICE 18. Bond Principal and Interest Requirements 18,437,950 17,462,777 19. State Revolving Loans P & I Requirements 5,406,588 6,414,082 20. Transfers to CIP Fund Cash Transfers 18,031,462 19,677,547 Capitalized Labor and Materials 1,440,000 1,445,000 19,471,462 21,122,547 21. Total Transfers and Debt Service 43,316,000 44,999,406 Net Revenue After Transfers and 22. Debt Service $ - $ - 23. Principal and Interest Coverage 1.82 1.88 (Targeted debt service ratio is 1.50.)

MOBILE AREA WATER AND SEWER SYSTEM FEE SCHEDULE EFFECTIVE JANUARY 1, 2018 I. MONTHLY FEES & CHARGES Existing Fee 2017 PROPOSED FEE 2018 PROPOSED FEE 2019 A. BASIC WATER & SEWER RATE PER 1000 GALS In Gals OVER - UP TO WATER SEWER WATER SEWER WATER SEWER 0-500,000 $ 3.10 (1) $ 7.26 (1) $3.12 $7.57 $3.28 $7.95 500,000-2,000,000 $ 2.65 $ 7.26 $2.67 $7.57 $2.80 $7.95 2,000,000-10,000,000 $ 2.37 $ 7.26 $2.39 $7.57 $2.51 $7.95 (1) Indicated rate/1,000 gal. plus $2.00 10,000,000 - Over $ 1.56 $ 7.26 $1.57 $7.57 $1.65 $7.95 If water-only or sewer-only customer, plus $4.00 Admin Fee Water & Sewer $ 2.00 $ 2.00 $2.30 $2.30 $2.30 $2.30 Water-only/ Sewer-only $ 4.00 $ 4.00 $4.60 $4.60 $4.60 $4.60 B. MINIMUM CHARGE/METER SIZE AND CONSUMPTION (1,000 GALLONS) LINE SIZE MIN. CONS. WATER (2) SEWER (2) WATER SEWER WATER SEWER 5/8" - 3/4" 2.5 $ 9.75 $ 20.15 $10.10 $21.23 $10.50 $22.18 1" 8 $ 26.80 $ 60.08 $27.26 $62.86 $28.54 $65.90 1 1/2" 17 $ 54.70 $ 125.42 $55.34 $130.99 $58.06 $137.45 2" 29 $ 91.90 $ 212.54 $92.78 $221.83 $97.42 $232.85 3" 63 $ 197.30 $ 459.38 $198.86 $479.21 $208.94 $503.15 4" 126 $ 392.60 $ 916.76 $395.42 $956.12 $415.58 $1,004.00 6" 218 $ 677.80 $ 1,584.68 $682.46 $1,652.56 $717.34 $1,735.40 8" 346 $ 1,074.60 $ 2,513.96 $1,081.82 $2,621.52 $1,137.18 $2,753.00 10" 463 $ 1,437.30 $ 3,363.38 $1,446.86 $3,507.21 $1,520.94 $3,683.15 (2) Add $2.00 if only one service provided by MAWSS 12" 860 $ 2,506.00 $ 6,245.60 $2,523.50 $6,512.50 $2,650.30 $6,839.30 C. FIRE SERVICE - STAND-BY CHARGE LINE SIZE MONTHLY CHARGE LINE SIZE MONTHLY CHARGE LINE SIZE MONTHLY CHARGE 2" $ 10.00 2" No Change 2" $10.50 3" $ 10.00 3" No Change 3" $10.50 4" $ 10.00 4" No Change 4" $10.50 6" $ 20.00 6" No Change 6" $21.00 8" $ 30.00 8" No Change 8" $31.50 10" $ 40.00 10" No Change 10" $42.00 12" $ 50.00 12" No Change 12" $52.50 >12" To be based on cost >12" Based on Cost >12" Based on Cost D. UNTREATED INDUSTRIAL WATER RATE* OVER - UP TO OVER - UP TO Rate ($/ MG) OVER - UP TO Rate ($/ MG) rate per million gallons 0-10 min $ 391.00 0-10 $394 0-10 TBD (effective May 1, 2017) 10-100 $ 334.00 10-100 $336 10-100 TBD 100 - over $ 244.00 100 - over $246 100 - over TBD *Recalculated every April 1 E. DECENTRALIZED SYSTEMS Calculated at 140% of the above monthly fees and charges F. WHOLESALE WATER WATER Spanish Fort Water $3.75 Prichard Water and Sewer $2.04 Proposed Rate Changes 1

II. SERVICE CONNECTION FEES & CHARGES Existing 2017 PROPOSED FEE 2018 A. CAPACITY COMPONENT - Calculated on the basis of an Equivalent Residential Connection (ERC) for No Change dwelling units and meter-based for all other users. DWELLING UNIT ERC WATER SEWER Single Family 1.00 $ 280.00 $ 720.00 2 to 4 Dwelling Units (each unit) 0.75 $ 210.00 $ 540.00 Mobile Home/Multi-Family (each apt./condo. Unit) 0.50 $ 140.00 $ 360.00 Hotel/Motel/Guest House/Bed & Brkfst. (each room) 0.25 $ 70.00 $ 180.00 OTHER USERS METER SIZE ERC WATER SEWER 5/8" 1.0 $ 280.00 $ 720.00 3/4" 1.5 $ 420.00 $ 1,080.00 1" 2.5 $ 700.00 $ 1,800.00 1.5" 5.0 $ 1,400.00 $ 3,600.00 2" 8.0 $ 2,240.00 $ 5,760.00 3" 16.0 $ 2.00 $ 11,520.00 $ 2.00 4" 25.0 $ 4.00 $ 18,000.00 $ 4.00 6" 36.0 $ 10,080.00 $ 25,920.00 8" 64.0 $ 17,920.00 $ 46,080.00 10" 100.0 $ 28,000.00 $ 72,000.00 B. SERVICE LINE COMPONENT CHARGES - Cost to establish service in the immediate vicinity of the No Change property served, distributed on a parcel size basis. (See Fee-7 for charges by parcel size.) WATER SEWER Single-Family Projects by Others (per unit) a) Prior to 01/01/2011 $ 150.00 $ 100.00 b) Post 01/01/2011 - Radio Read Meter Required $ 250.00 $ 100.00 Proposed Fee Meter- Water $350 Meter- Sewer $100 III. CUSTOMER DEPOSITS No Change ALL USERS $100 for residential, 2 times the estimated avg. monthly billing for non-residential but not less than $100 $200 Security Deposit for Special Events Service Commercial Accounts - Cash, Indemnity Bond, or Bank Letter of Credit 3 times the estimated average monthly billing for tampering with meters or any services - minimum of $150 Governments, Public Schools, Public Universities: No Deposit Required Proposed Rate Changes 2

IV. Tapping Fee Charges (must be prepaid) Existing Fee 2017 PROPOSED FEE 2018 Irrigation: Double Head Irrigation Meter, including backflow $310 $540 1" Double Head Irrigation Meter, including backflow $420 $890 Other services: Double Head Apartment Meter $200 $390 5/8" Meter $600 $1,590 1" Meter $650 $1,620 1.5" Meter & Larger Cost Backflow preventer required; cost not included Wet Taps (Tapping Valve & Sleeve) PROPOSED FEE 2018 4"x2" (Tapping Valve & Sleeve) $240 $240 4"x4" $1,080 $1,080 6"x2" $240 $240 6"x4" $1,080 $1,080 6"x6" $1,490 $1,490 8"x2" $240 $240 8"x4" $1,080 $1,080 8"x6" $1,490 $1,490 8"x8" $1,690 $1,690 10"x2" $240 $240 10"x4" $1,080 $1,080 10"x6" $1,490 $1,490 10"x8" $1,640 $1,640 12"x2" $290 $290 12"x4" $1,110 $1,110 12"x6" $1,490 $1,490 12"x8" $1,640 $1,640 12"x10" $2,150 $2,150 16"x2" $320 $320 16"x4" $1,110 $1,110 16"x6" $1,490 $1,490 16"x8" $1,640 $1,640 16"x10" $2,150 $2,150 16"x12" $2,850 $2,850 20"x2" $440 $440 20"x6" $1,490 $1,490 20"x8" $1,640 $1,640 24"x6" $1,490 $1,490 24"x8" $1,640 $1,640 24"x10" $2,150 $2,150 24"x12" $2,850 $2,850 30"x6" $1,490 $1,490 30"x8" $1,640 $1,640 30"x10" $2,150 $2,150 30"x12" $2,850 $2,850 36"x2" $540 $540 36"x6" $1,490 $1,490 36"x8" $1,640 $1,640 36"x12" $2,850 $2,850 Fire Line Connection Cost 6" Sewer Lateral - 0'-8' Depth $1,400 $2,410 6" Sewer Lateral - 8'-12' Depth $2,000 $2,710 6" Sewer Lateral - 12' Depth & Deeper Cost 8" Sewer Lateral & Larger Cost Proposed Rate Changes 3

V. Tapping Fee Charges - Additional Services When tap requires work within the City right-of-way, City permit fees will be charged. PROPOSED FEE 2018 Water Permit $150 Sewer Permit $250 Additional costs for street cutting will be charged at cost. 2 2 4 4 Proposed Rate Changes 4

VI. INDUSTRIAL PRETREATMENT PROGRAM FEES AND CHARGES Existing 2017 PROPOSED FEE 2018 Category 2 Category 2 Category 3 Food Service Industrial Industrial Annual Administrative $ 75 $ 250 $ 250 No Change Compliance Sampling Inspection Fee (per sampling day) $ 15 $ 100 $ 100 No Change Compliance Evaluation Inspection (annual) $ 200 $ 200 No Change Grease trap smaller than recommended (requires sampling*) per month $ 50 No Change Grease trap sized as recommended (no sampling required) per month $ 20 No Change Surcharges: Oil and Grease (>100 mg/l) $ 0.25/lb $ 0.25/lb $ 0.25/lb No Change Total Suspended Solids (>250 mg/l) $ 0.25/lb $ 0.25/lb No Change Biochemical Oxygen Demand (>280 mg/l) $ 0.23/lb $ 0.23/lb No Change Ammonia Nitrogen (greater than 20 ppm) $ 0.46/lb $ 0.46/lb $0.92/lb 2 2 *Contact laboratory analysis fees are billed to user on a dire 4 4 Pretreatment Rules and Regulations stipulate that Industrial Users shall pay a minimum charge of $1,000 for each violation. Proposed Rate Changes 5

VII. MISCELLANEOUS FEES & CHARGES 1) SERVICE CHARGE Existing 2017 PROPOSED FEE 2018 a) Regular Service, next day service, 8:00 a.m. to 5:00 p.m. $40 $60 b) Same Day Service, 8:00 a.m. to 5:00 p.m. $60 $80 c) Priority Service, nights, weekends and holidays $100 $100 d) Go Back/Turn on Charge $40 $60 e) Cut for Repairs $40 $40 2) METER TEST FEE - 5/8" TO 1 1/2" $50 $50 Meter Test Fee - 2" through 4" $300 $300 Meter Test Fee - 6" through 10" $500 $500 3) TAMPERING CHARGE $40 Plus Cost Straight Line: Initial Occurrence (minimum) $200 $200 Repeat Occurrence (minimum) $500 $500 4) DELINQUENT ACCOUNT CHARGE $5 +10% of the delinquent amount Minimum $20 5) DELINQUENT PROCESSING FEE $5 $5 6) RETURN CHECK CHARGE Maximum Allowed by Law $35 7) CUSTOMER REQUESTED REFUND CHECK PROCES 2 2 $20 8) DUPLICATE BILL 4 4 $5 9) BACKDATED SERVICE CHARGE $10 $10 10) DORMANT ACCOUNT CHARGE (Annually) $10 $10 11) INSTALLMENT PAYMENT INTEREST RATE-single family residential customers only (compounded monthly on unpaid balance) 10% 10% 12) REPRODUCTION CHARGE (per page) $0.50 $0.50 13) STATE TAX (Water Only) 4% 4% 14) DEVELOPMENT REVIEW and INSPECTION FEE a) Subdivision Fee $50 per lot Minimum of $500 $50 (Establish minimum of $500) b) Commercial Development (per acre) $100 $100 (Establish minimum of $500) c) Apartments Fee (per unit) $10 $10 (Establish minimum of $500) 15) EASEMENT/RIGHT-OF-WAY VACATION CHARGE (each) $75 $75 16) FIRE HYDRANT METER RENTAL CHARGES (must be prepaid) Hydrant Meter a) Rental $200/year(monthly prorated) Fee Removed b) Security deposit on rental (refundable) $1,000 $1,500 c) Delivery service charge $40 $100 17) METER REDUCTION FEES (must be prepaid) Meter Reduction 1" or 1 1/2" to 5/8" $200 $200 2" to 5/8" $340 $340 2" to 1 1/2" $400 $400 2" to 1" $400 $400 4" to 2" $585 $585 All Other Reductions Cost 18) METER INCREASE FEES Cost 19) METER RELOCATION CHARGE a) Developed Subdivision $310 $470 b) All Others Cost 20) TIPPING FEE (per truck - minimum) $15 $15 a) Waste, non-surchargeable Basic sewer rates b) Septic waste (per 500 gallons) $25 No Change 21) GREASE TREATMENT (per gallon) $0.09 No Change 22) TOXICITY TESTING $10 $10 Proposed Rate Changes 6

VII. MISCELLANEOUS FEES & CHARGES (continued) Existing 2017 PROPOSED FEE 2018 23) LOCATE SEWER SERVICE CONNECTION a) Locate by video $200 $1,170 b) Locate by excavation $400 $400 24) UNPLUGGING SEWER ONLY LATERAL $2,500 $2,500 25) MOBILIZATION and DEMOBILIZATION FEE (i.e. disconnecting sewer only customers) $325 $325 26) RE-ESTABLISH CUT-OFF SEWER SERVICE (from delinquent status) $500 $500 27) CUTTING LATERAL IF ELDER VALVE IN PLACE $250 $250 28) RECONNECTING LATERAL IF ELDER VALVE IN PLACE $250 $250 29) UNAUTHORIZED STORMWATER/RAINFALL, OTHER DRAINAGE INFLOW INTO SEWAGE SYSTEM CHARGE a) Non-rental residential per month $25 $25 b) Other properties per month $75 $75 30) CAPACITY REQUEST APPLICATION a) Private residence in existing reserved subdivision no charge b) Private residence not in existing reserved subdivis 2 2 $50 c) Commercial development (per building) 4 4 $300 d) Proposed subdivision, apartments, or condominiums $600 $600 e) Industrial development $1,500 $1,500 31) RESERVED CAPACITY 25%-100% of the Capacity Fee 25%-100% of the Capacity Fee 32) READ DEDUCT METERS OR FOR EACH ADDITIONAL METER $10 $10 33) METER REREAD FEE $40 $40 34) UNCOVER/INACCESSIBLE METER CHARGE a) Charge to uncover meter due to dirt, debris, blacktop Cost to MAWSS b) Charge to remove vehicle off meter box Towing Fee Plus Cost c) Gated communities where access is limited $15 per meter $15 per meter d) Fenced meters/gate locked/meter inaccessible $50 per meter $50 per meter 35) HOT METER $50 $50 36) FIRE FLOW TESTING $100 $110 37) BACK FLOW PREVENTION a) Assembly testing $90/Test $90 b) Assembly repair and re-testing Cost 38) RADIO READ CONVERSION $150 $350 The Board retains the right to charge customers for the cost of providing special services in unique circumstances not anticipated by the above standard fees and charges. Proposed Rate Changes 7

SERVICE LINE COMPONENT OF THE CONNECTION FEE Parcel Size (acres) Service Line Fee Parcel Size (acres) Service Line Fee 0.2 $1,600 2.7 $5,010 0.3 $1,800 2.8 $5,065 0.4 $2,200 2.9 $5,120 0.5 $2,500 3.0 $5,170 0.6 $2,750 3.1 $5,220 0.7 $3,000 3.2 $5,270 0.8 $3,200 3.3 $5,315 0.9 $3,340 3.4 $5,360 1.0 $3,500 3.5 $5,405 1.1 $3,645 3.6 $5,450 1.2 $3,780 3.7 $5,490 1.3 $3,900 3.8 $5,530 1.4 $4,015 3.9 $5,570 2 2 1.5 $4,115 4.0 $5,610 4 4 1.6 $4,215 4.1 $5,645 1.7 $4,305 4.2 $5,680 1.8 $4,395 4.3 $5,720 1.9 $4,475 4.4 $5,750 2.0 $4,555 4.5 $5,790 2.1 $4,630 4.6 $5,820 2.2 $4,700 4.7 $5,850 2.3 $4,765 4.8 $5,885 2.4 $4,830 4.9 $5,915 2.5 $4,890 5.0 $5,950 2.6 $4,955 Over 5.0 $6,000 SERVICE LINE COMPONENT OF THE CONNECTION FEE WATER Meter Size (inches) Service Line Fee 5/8 $ 350 3/4 $ 400 1 $ 525 1.5 $ 700 2 $ 1,000 3 $ 1,800 4 $ 3,000 6 $ 5,000 8 $ 8,000 10 $ 12,000 NOTE: The above standard service line connnection fees do not affect fees for connection to distribution and collection facilities constructed in cooperation with other customers. Proposed Rate Changes 8