Committee Staff Procurement Backup Book FY 2007 Budget Estimates. February 2006 MISSILE PROCUREMENT, AIR FORCE OPR: SAF/FMB

Similar documents
Committee Staff Procurement Backup Book FY 2008/2009 Budget Estimates. February 2007 MISSILE PROCUREMENT, AIR FORCE OPR: SAF/FMB

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

Committee Staff Procurement Backup Book FY 2005 Budget Estimates. February 2004 AIRCRAFT PROCUREMENT, AIR FORCE VOLUME I OPR: SAF/FMB

Committee Staff Procurement Backup Book FY 2001 Amended Budget Request. February 2000 AIRCRAFT PROCUREMENT, AIR FORCE VOLUME I OPR: SAF/FMB

Department of Defense Fiscal Year (FY) 2013 President's Budget Submission

Department of Defense Fiscal Year (FY) 2019 Budget Estimates

Department of Defense Fiscal Year (FY) 2018 Budget Estimates

Department of Defense Fiscal Year (FY) 2017 President's Budget Submission

Department of Defense Fiscal Year (FY) 2017 President's Budget Submission

O UNIT 6. Risk Management Response. Risk Management, Response, and Recovery for IT Systems

"Manufacturing and Cold Test" Contract (MFR) Questions / Answers

Selected Acquisition Report (SAR)

Town of Sellersburg EMPLOYMENT APPLICATION. Applicant Name

Develop Project Management Plan

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

Principals, Business Managers and Special Education Staff. Purchasing Equipment, Supplies, and Contracted Services for Students with Disabilities

Selected Acquisition Report (SAR)

FY09 President s Budget America s Edge: Global Vigilance, Reach and Power

SOT23 3. Part Number Compliance Marking Reel Size(inches) Tape Width(mm) Quantity Per Reel DESDA5V3LQ-7 Automotive RD ,000/Tape & Reel

Lockheed Martin Reports Second Quarter 2014 Results

L-3 Announces First Quarter 2014 Results

Midwestern State University Wichita Falls, Texas

Finally, the Department determined that modernizing 47 C-5B aircraft and 2 C-5C aircraft best meets the essentiality criteria set forth by the JROC.

P roficy* M aintenance G ateway

MEASURE M CONSTRUCTION PROJECTS REPORT June 2017

Northrop Grumman Corporation. Acquisition of Orbital ATK. Webcast. September 18, 2017

Overlook Neighborhood Calls for Service 3 Year Comparison

2013 NATIONAL TECHNICAL ASSISTANCE. Risk Adjustment 101 July 22, 2013

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 6 P-1 Line #1

Change Request SUBJECT: Claim Adjustment Reason Code (CARC), Remittance Advice Remark Code (RARC), and Medicare Remit Easy Print (MREP) Update

For personal use only

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 927 Date: July 29, 2011

L-3 COMMUNICATIONS ANNOUNCES FIRST QUARTER 2007 RESULTS

GCC RAILWAY DEVELOPMENT: A VISION TO INTEGRATION. Ramiz Al Assar, Ph.D.

Lockheed Martin Reports Third Quarter 2018 Results

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 1003 Date: November 25, 2011

Vineland Board Of Education Report to the Board June 13, 2012 Page 5 RECOMMENDATIONS BY SUPERINTENDENT

FORM 8-K. LOCKHEED MARTIN CORPORATION (Exact name of registrant as specified in its charter)

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 977 Date: October 27, 2011

PART A Electronic lodgment declaration (Form C)

(in millions, except per share data) Quarters Ended March 25, March 26, 2017 Net sales $ 11,635 $ 11,212

L3 Technologies, Inc.

GUIDE FOR COMPLETING CO-PLAN DD 2794: COST AND SOFTWARE DATA REPORTING (CSDR) & EARNED VALUE MANAGEMENT (EVM) CO-PLAN

Lockheed Martin Reports First Quarter 2018 Results

SUPPLEMENTAL PURCHASE ORDER PROVISIONS UNDER U.S. GOVERNMENT CONTRACTS

DEPARTMENT OF THE ARMY

Transmittal 2163 Date: February 23, 2011

SUBPART INSURANCE (Revised December 15, 1998)

XR150/XR550 SERIES PROGRAMMING SHEET

L-3 Announces Fourth Quarter 2013 Results

CONNECTICUT HOUSING FINANCE AUTHORITY

GLOSSARY COVER TYPE REQUIRED. 1.1 Physical loss & damage to UAV

Harris Corporation Reports Fiscal 2018 First Quarter Results With Robust Orders Across All Segments

Purchasing in Fiscal Year 17-18

L3 Announces Fourth Quarter and Full Year 2018 Results

For personal use only

Headquarters U.S. Air Force

L3 Announces Second Quarter 2018 Results

Selected Acquisition Report (SAR)

DIVISION OF REVENUE AND TAXATION

Welcome. to the General Ledger Manual. How to Use This Guide. Contents. Index. Modules

Lockheed Martin Reports Second Quarter 2018 Results

CHAPTER House Bill No. 415

Eric Nemoseck Professor of Business Financial Management Defense Acquisition University (DAU)

ECHO tourism STAT istics. Performance Report on Québec City and Area Tourist Industry

News Release For Immediate Release

L-3 Announces Second Quarter 2013 Results

Recognizing and Mitigating Risk in Acquisition Programs

DATA ITEM DESCRIPTION

3 rd Quarter FY 2015 Conference Call

Federal Emergency Management Agency

E U R O P E A N R E S E A R C H N E T W O R K F O R E V A L U A T I O N A N D

3 rd Quarter FY 2017 Conference Call

WELCOME TO FULL COVER AND DAMAGE COVER

CIP PROJECT STATUS - DECEMBER 2014

AAR CORP. Jefferies 2016 Industrials Conference. New York City August 10, 2016

SALES AND USE TAX EXEMPTIONS

AeroVironment, Inc. Overview for Raymond James Defense & Government Services Conference

FISCAL 2018 FIRST QUARTER EARNINGS CALL PRESENTATION HARRIS.COM #HARRISCORP

Full-Year 2017 results: Airbus overachieved on all key performance indicators

ViaSat, Inc. FY17 Q2 Results

Future of the Qatari Defense Industry Market Attractiveness, Competitive Landscape and Forecasts to 2020

Lockheed Martin Reports Third Quarter 2016 Results

NORTH DAKOTA INSURANCE RESERVE FUND PUBLIC ASSETS MEMORANDUM OF COVERAGE MOBILE EQUIPMENT AND PERSONAL PROPERTY COVERAGE FORM TABLE OF CONTENTS

Contract Performance Report

SUTTER INSURANCE COMPANY 1301 Redwood Way, Suite 200, Petaluma, CA COMMERCIAL VEHICLE APPLICATION CA

Concepts, Techniques and Tools that Support Program Budgeting

Outline Congressional Enactment Examples of budgetary reporting How it is used


Texas Administrative Code

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 896 Date: May 6, 2011

General Dynamics Reports Fourth-Quarter, Full-Year 2018 Results

Tactical Missile Bluebook Cost Model Development Presented to 2012 ISPA/SCEA Joint Conference Orlando, FL

St. Joseph s School for the Deaf

UNITED STATES SECURITIES AND EXCHANGE COMMISSION WASHINGTON, D.C FORM 10-K

DATA ITEM DESCRIPTION

Information For Immediate Release

Current Budget Issues PDI 2014

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 2008 Date: July 30, 2010

Transcription:

ommittee taff rocurement Backup Book FY 2007 Budget stimates February 2006 II, I F : F/FB

IFID B F FY 2007 Budget stimates II, I F (3020) I 1 ~ Y I xhibit -1 issile rocurement, ir Force 3 I 2 ~ BD DIX X issile rocurement, ir Force ppendix anguage 9 I 3 ~ -1 I I DI BD IIY 01: BII II II QI BII -1 ine Item o. 1 issile eplacement quipment Ballistic 1-1 BD IIY 02: H II I -1 ine Item o. 2 oint ir-to-urface tandoff issile () 2-1 i IFID

IFID B F FY 2007 Budget stimates II, I F (3020) -1 ine Item o. 3 oint tandoff Weapon (W) 2-9 -1 ine Item o. 4 idewinder (I-9X) 2-11 -1 ine Item o. 5 dvanced edium ange ir-to-ir issile () 2-21 -1 ine Item o. 6 reditor Hellfire issile (D2) 2-31 -1 ine Item o. 7 mall Diameter Bomb (DB) 2-39 IDI FIII -1 ine Item o. 8 Industrial Facilities 2-47 BD IIY 03: DIFII F I I II II DIFII xhibit -1, rocurement rograms odification ummary 3-1 -1 ine Item o. 9 dvanced ruise issile () 3-5 -1 ine Item o. 10/11 inuteman III odifications 3-9 -1 ine Item o. 12-65D averick 3-33 ii IFID

IFID B F FY 2007 Budget stimates II, I F (3020) -1 ine Item o. 13 ir aunch ruise issile () 3-35 BD IIY 04: D I II D I -1 ine Item o. 14 - Initial and eplenished pares/epair arts 4-1 BD IIY 05: H -1 ine Item o. 15 dvanced HF 5-1 -1 ine Item o. 16 dvanced HF dvance rocurement 5-7 -1 ine Item o. 17 Wideband apfiller atellites 5-11 -1 ine Item o. 18 Wideband apfiller atellites dvance rocurement 5-19 -1 ine Item o. 19 paceborne quipment () 5-23 -1 ine Item o. 20 avstar lobal ositioning ystem () 5-27 iii IFID

IFID B F FY 2007 Budget stimates II, I F (3020) 1 ine Item o. 21 - avstar lobal ositioning ystem () dvance rocurement 5-33 -1 ine Item o. 22 Defense eteorological atellite rogram (D) 5-37 -1 ine Item o. 23 Defense upport rogram (D) 5-41 -1 ine Item o. 24 Defense atellite ommunications ystem (D) 5-45 -1 ine Item o. 25 itan pace Boosters 5-49 -1 ine Item o. 26 volved xpendable aunch ehicles () 5-53 -1 ine Item o. 27 edium aunch ehicles () 5 63 iv IFID

IFID FY 2007 BD I FBY 2006 I 1: Y I IFID

IFID HI IIY F BK IFID

IFID D F H I F FY 2007 Y 27 2006 ($ I II) II: II, I F ------------------------------------- IIY FY 2005 FY 2006 FY 2007 -------- ------- ------- ------- 01. BII II 23.5 40.1 34.3 02. H II 363.9 340.4 533.5 03. DIFII F II II 662.1 695.3 703.8 04. D I 63.5 76.6 50.6 05. H 3,219.5 3,965.7 2,881.9 II, I F 4,332.6 5,118.1 4,204.1 IFID F-14

IFID D F H I F FY 2007 XHIBI -1 II: 3020F II, I F D: 27 2006 II F D I ID FY 2005 FY 2006 FY 2007 I D QIY QIY QIY ---- ----------------- ----- -------- ------- -------- ------- -------- ------- - BD IIY 01: BII II ------------------- II QI - BII 1 II Q-BII 23.5 40.1 34.3 ------- ------- ------- BII II 23.5 40.1 34.3 BD IIY 02: H II ------------------- I 2 288 139.2 75 98.7 234 187.2 3 I DFF W 1.0 4 IDWID (I-9X) 248 52.4 196 44.4 195 43.8 5 159 106.9 166 103.1 215 135.9 6 D HFI II 320 34.3 401 37.9 677 65.3 7 DI BB 199 29.1 567 53.3 1343 99.1 IDI FIII 8 ID' D/ I 2.1 2.1 2.2 ------- ------- ------- H II 363.9 340.4 533.5 BD IIY 03: DIFII F II II ------------------- I 9 DD I II 4.1 3.2 1.4 10 II Q-BII.8 11 III DIFII 636.7 667.7 691.7 12-65D IK.2.2 IFID F-15

IFID D F H I F FY 2007 XHIBI -1 II: 3020F II, I F D: 27 2006 II F D I ID FY 2005 FY 2006 FY 2007 I D QIY QIY QIY ---- ----------------- ----- -------- ------- -------- ------- -------- ------- - 13 I H I II 21.1 24.4 9.7 ------- ------- ------- DIFII F II II 662.1 695.3 703.8 BD IIY 04: D I ------------------- II + I 14 III /I 63.5 76.6 50.6 ------- ------- ------- D I 63.5 76.6 50.6 BD IIY 05: H ------------------- 15 DD HF 1 (599.4) : D (Y) (-78.2) ------- ------- ------- 521.1 16 DD HF D (Y) 78.2 (FY 2005 F FY 2006) () (78.2) 17 WIDBD FI I() (35.4) (21.8) 1 (413.9) : D (Y) (-50.2) ------- ------- ------- 35.4 21.8 363.7 18 WIDBD FI I() D (Y) 50.2 50.7 (FY 2006 F FY 2007) () (50.2) (FY 2007 F FY 2008) () (50.7) 19 B QI () 9.2 9.4 10.1 IFID F-16

IFID D F H I F FY 2007 XHIBI -1 II: 3020F II, I F D: 27 2006 II F D I ID FY 2005 FY 2006 FY 2007 I D QIY QIY QIY ---- ----------------- ----- -------- ------- -------- ------- -------- ------- - 20 B III () 3 (328.7) 3 (300.7) (139.2) : D (Y) (-30.9) (-29.6) (-42.0) ------- ------- ------- 297.8 271.1 97.2 21 B III () D (Y) 29.6 42.0 43.3 (FY 2005 F FY 2006) () (29.6) (FY 2006 F FY 2007) () (42.0) (FY 2007 F FY 2008) () (43.3) 22 DF I () 88.0 66.3 86.7 23 DF () 105.3 42.1 38.4 24 DF I Y() 5.2 25 I B() 33.2 65.3 31.1 26 D XDB H H() 2 414.0 4 773.2 4 936.5 27 DI H HI() 82.1 109.4 102.0 I 28 D.1 29 DF 330.9 316.4 214.3 30 I 31 I D 125.6 26.2 131.4 ------- ------- ------- H 3,219.5 3,965.7 2,881.9 ------- ------- ------- II, I F 4,332.6 5,118.1 4,204.1 IFID F-17

IFID FY 2007 BD I FBY 2006 I 2: BD DIX X IFID

IFID HI IIY F BK IFID

Budget ppendix xtract anguage Fiscal Year 2007 Budget stimates issile rocurement, ir Force For construction, procurement, and modification of missiles, spacecraft, rockets, and related equipment, including spare parts and accessories therefor, ground handling equipment, and training devices; expansion of public and private plants, overnment-owned equipment and installation thereof in such plants, erections of structures, and acquisition of land, for the foregoing purposes, and such lands and interests therein, may be acquired, and construction prosecuted thereon prior to approval of title; reserve plant and overnment and contractor-owned equipment layaway; and other expenses necessary for the foregoing purposes including rents and transportation of things; $5,174,474,000 to remain available for obligations until eptember 30, 2009.

IFID HI IIY F BK IFID

iew imilar rograms I What his ating eans pace aunch his set of programs provides the nited tates with satellite launch capability. he systems includes the launch vehicles, ground infrastructure and launch range capability to support satellite launches and other national security space operations. FI dequate he assessment found that the volved xpendable aunch ehicle () program has demonstrated good progress in achieving its annual and long-term goals. he has performed flawlessly to date, with a 100% launch success rate. ew independent evaluations will need to be accomplished in the next cycle to evaluate the effectiveness of achieving cost, schedule and performance goals for various space launch programs. I bout Improvement lans We are taking the following actions to improve the performance of the program: ontinue monitoring milestones for schedule compliance to ensure programmatic adjustments can be made in a timely and efficient manner without disrupting planned satellite launches. nsure the satellite launch programs are flexible enought to respond to changing conditions, while maintaining the necessary capabilities described in ational pace ransportation policy. Details and urrent tatus of this program assessment. How all Federal programs are assessed. earn more about pace aunch.

IFID HI IIY F BK IFID

iew imilar rograms I What his ating eans ational ecurity pace Weather rograms he weather satellite programs reviewed include current operational systems and the next generation satellites under development. Weather satellites collect global high resolution visible and thermal cloud imager and other meteorological/oceanographic date supporting DoD forces and civil agencies. FI dequate he ational ecurity Weather atellite rograms are adequately meeting their mission requirements. he current weather satellite program continues to provide the DoD assured access to weather data remote areas such as fghanistan and Iraq. he next-generation weather satellite system being developed jointly with D, has experienced some development challenges and cost overruns, and is currently under review by the DoD and D. However, this new program will fully meet military and civil user requirements and significantly improve weather forecasting and climate prediction in the future. I bout Improvement lans We are taking the following actions to improve the performance of the program: Working with ommerce to address programmatic problems and analyzing system and architectural replan options based on findings from various studies provided by the program office. Details and urrent tatus of this program assessment. How all Federal programs are assessed. earn more about ational ecurity pace Weather rograms.

IFID HI IIY F BK IFID

IFID FY 2007 BD I FBY 2006 I 3: -1 I I DI IFID

IFID HI IIY F BK IFID

IFID FY 2007 BD I BD IIY 01 BII II FBY 2006 1 0 IFID

IFID HI IIY F BK IFID

IFID BD I IFII (XHIBI -40) D/B: F/II QI -1 : D: FBY 2006 II QI-BII/I (IW) QIY (in housands) FY2005 FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 $23,534 $40,123 $34,344 $31,395 $32,083 $32,349 $27,588 Description: 1. his program funds replacement organizational and intermediate level support equipment for all out-of-production missile systems, including ballistic, tactical and other missile weapon systems. quipment procured is used for missile weapon systems maintenance and testing at organizational/intermediate (base/field) launch control facilities, as well as missile testing facilities. 2. FY07 funding provides replacement support equipment items for an aging inventory of equipment which has become increasingly more costly to maintain. hese items will increase ballistic and tactical missile system reliability and maintainability by providing state-of-the-art maintenance repair and testing capability. he program supports missile weapon systems such as the inuteman (-30), dvanced edium ange ir-to-ir issile (I-120) and High-peed nti-adiation issile (-88). equirements are jointly determined by Headquarters nited tates ir Force (HQ F), ir Force ateriel ommand (F), ir ombat ommand () and ir Force pace ommand (F) and are based on established allowance standards. 3. Items requested in FY07 are displayed on the attached -40. Items procured during execution may change based on critical equipment needed to support current ir Force mission requirements. -1 I 1 : 1-1 IFID age 1 of 1

IFID BD I IFII F D I (XHIBI -40) D: FBY 2006 D/B: F/II QI -1 : II QI-BII/I (IW) I FY2005 FY2006 FY2007 ID D QY. QY. QY. QY. I Y I (35) 4 $23,534 4 $27,840 XI IIY 5 $9,504 II I 2 $2,500 BII I H 5 II D (1) $10,283 $20,259 I/H I H 5 II D $2,000 $2,081 : 4 $23,534 4 $40,123 7 $34,344 emarks: ost information is in thousands of dollars. (1) FY07 funding for "BII I H 5 II D" reflects increased (new) requirements for assets that support two new programs. hese programs are the xplosive et ircuitry est et and the issile ransporter ractor railer planned for FY07. -1 I 1 : 1-2 IFID age 1 of 1

IFID BD I IFII (XHIBI -40) D: FBY 2006 D/B: F/II QI -1 : XI IIY QIY (in housands) FY2005 FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 $0 $0 $9,504 $9,028 $5,007 $4,920 $0 Description: 1. he inuteman III Intercontinental Ballistic issile xplosive et ircuitry est et () prevents accidental missile ignition and/or damage to integrated program operational ground equipment. he is used for missile main assembly end-to-end resistance testing, hazardous electrical current of ground umbilical cabling testing, and electro-explosive ordnance firing circuits resistance testing for all stages of the missile. his portable test set is used on an average of twelve dispatches per week per missile wing by missile maintenance teams. Weapon torage rea (W) personnel at the wings use the daily on reentry systems conducting up to ten tests on each. he electronics lab uses the constantly for assembling missile guidance sets and performing check out procedures on eighty different sets of cables. Due to significantly degrading components, 106 test sets were overhauled and refurbished in 1994. xisting test sets cannot be refurbished again since obsolete integrated circuit cards are no longer supportable and spares are not available. on-operational are being cannibalized to sustain the minimum 77 test sets required to support the user community. Based on the current linear failure rate, supportability for parts and repair capability for the test set will negatively affect depot and field activities in early 2006. 2. Failure to fund this equipment would impact the missile maintenance capability to check ground ordnance at the silo, ordnance on boosters, reentry systems and reentry vehicles, and perform cable troubleshooting. his would also affect force demonstration evaluation flight test preparation at the Western est ange at andenberg FB. 3. Items requested in FY07 are identified on the following -5 and are representative of items to be procured. Items procured during execution may change based on critical equipment needed to support current ir Force mission requirements. -1 I 1 : 1-3 IFID age 1 of 1

W Y YI (XHIBI -5) D/B: F/II QI IFID -1 : XI IIY D: FBY 2006 W Y II/D FI I ID D nit QY ost QY FY2005 FY2006 FY2007 nit ost QY nit ost QY nit ost 5 $1,750,000 $8,750 DI II $604 FIII F $150 : 5 $9,504 emarks: otal ost information is in thousands of dollars. -1 I 1 : 1-4 IFID age 1 of 1

IFID BD HIY I (XHIBI -5) D/B: -1 : F/II QI XI IIY D: FBY 2006 I / FI Y QY. I I F HD & Y D I WD. D D FI D. I W D. I II/D FI I FY2007 5 $1,750,000 F/- /F W/ KW Feb-07 ct-08 Yes emarks: ost information is in actual dollars. lanned contract with three option years -1 I 1 : 1-5 IFID age 1 of 1

IFID BD I IFII (XHIBI -40) D/B: F/II QI -1 : II I D: FBY 2006 QIY (in housands) FY2005 FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 $0 $0 $2,500 $4,800 $4,500 $4,200 $0 Description: 1. he inuteman III Intercontinental Ballistic issile transporter trailer is a truck tractor and semi-trailer combination used to transport, roll transfer, and environmentally store assembled inuteman boosters (tages 1-3) between missile wings and flight test and overhaul repair facilities. he inuteman booster transfers through the front or back of its climate-controlled interior. Fifteen trailers were put into service in 1991-1993. urrently there are thirteen serviceable units and two non-operational units due to advanced structural failure. ll inspected trailers show signs of structural failures. railers exhibit evidence of delaminating honeycomb side panels that compromise its structural integrity. anel bonding is losing integrity with age. tress cracks have also been found in the trailer under-carriage. he tractor has a non-industry standard wheel configuration required to mate with the trailer's unique king pin location. ubstitute tractors in use at the missile wings have been deemed unsafe for off-base transport. egular maintenance has become exceedingly difficult due to parts obsolescence. stimated repair/refurbishment cost exceeds seventy-five percent of new equipment purchase price. his highly specialized equipment is specifically designed/configured to transport inuteman III Intercontinental Ballistic issiles and Boosters. 2. Failure to fund this equipment will directly impact the ability to safely and securely transport missile boosters due to structural failures in the transporter trailer. issile modification programs are dependent on maintenance efforts to provide operational transporter trailers to move boosters to comply with mutually dependent deployment schedules. 3. Items requested in FY07 are identified on the following -5 and are representative of the items to be procured. Items procured during execution may change based on critical equipment needed to support current ir Force mission requirements. -1 I 1 : 1-6 IFID age 1 of 1

IFID W Y YI (XHIBI -5) D/B: F/II QI -1 : II I D: FBY 2006 W Y ID D nit QY ost QY FY2005 FY2006 FY2007 nit ost QY nit ost QY nit ost DI 2 $750,000 $1,500 D $500 DI II $500 : 2 $2,500 emarks: otal ost information is in thousands of dollars. -1 I 1 : 1-7 IFID age 1 of 1

IFID BD HIY I (XHIBI -5) D: FBY 2006 D/B: F/II QI -1 : II I I / FI Y QY. I I F HD & Y D I WD. D D FI D. I W D. I DI FY2007 2 $750,000 F/- /F W/ KW Feb-07 ep-07 Yes emarks: ost information is in actual dollars. -1 I 1 : 1-8 IFID age 1 of 1

IFID BD I IFII (XHIBI -40) D/B: F/II QI -1 : BII II I H $5 II D: FBY 2006 QIY (in housands) FY2005 FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 $0 $10,283 $20,259 $9,748 $14,661 $21,005 $25,325 Description: 1. Ballistic issile Items ess han $5 illion funds replacement support equipment for the inuteman (-30) missile weapon system. quipment procured is used for missile weapon systems maintenance and testing at organizational/intermediate levels, launch and launch control facilities, and missile testing facilities. rocurement of the items will reduce downtime and delays due to scheduling and non-availability of critical test equipment. hese items will also ensure ir Force personnel accomplish cost effective maintenance on schedule and will increase missile readiness. equirements are jointly determined by Headquarters nited tates ir Force (HQ F), ir Force ateriel ommand (F), and ir Force pace ommand (F), based on established tables of allowances. o individual procurement item in this category exceeds $5 million. ll items are ode. 2. FY07 funding reflects an increased priority for inuteman III support equipment. hese assets were deferred in previous years due to higher priority funding of the lectronic ystem est tation but are now experiencing significant obselesence factors and require aggressive replacement. Failure to fund these assets will negatively impact inuteman missile weapon system readiness. 3. Items requested in FY07 are identified on the following -40 and are representative of items to be procured. Items procured during execution may change based on critical equipment needed to support current ir Force mission requirements. -1 I 1 : 1-9 IFID age 1 of 1

IFID BD I IFII F D I (XHIBI -40-I) D: FBY 2006 D/B: F/II QI -1 : BII II I H $5 II FY2007 I QY. QY. K21 1 $4,800 DB I 6920004000976 2 $2,500 I I I 14500128577003 8 $2,910 II I 24 $3,000 HI I I 1450012877003 3 $1,000 B I DY 4440011109882 70 $1,500 ID I HYI IY Y 19 $2,459 B 23, Y-Z 4935000752238 14 $2,090 : $20,259 emarks: ost information is in thousands of dollars. (1) = ot tock isted -1 I 1 : 1-10 IFID age 1 of 1

IFID BD I IFII (XHIBI -40) D/B: F/II QI -1 : I II I H $5 II D: FBY 2006 QIY (in housands) FY2005 FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 $0 $2,000 $2,081 $7,819 $7,917 $2,224 $2,263 Description: 1. he actical issile Items ess han $5 illion line procures replacement (common and peculiar) support equipment for tactical missiles. ommon items (used on more than one weapon system) and peculiar items (unique to one weapon system) directly support tactical missile maintenance and servicing requirements. hese replacement items ensure continuation of serviceable equipment over the life of a weapon system. 2. ll items have an annual value of less than $5. Items requested in FY07 are identified on the following - 40-I and are representative of items being procured. Items procured during execution may change based on critical equipment needed to support current ir Force mission requirements. -1 I 1 : 1-11 IFID age 1 of 1

IFID BD I IFII F D I (XHIBI -40-I) D: FBY 2006 D/B: F/II QI -1 : I II I H $5 II I FY2007 QY. QY. F 1450 - IDD II HDI & I QI $242 F 6625 - I D I I I D I I $190 F 4935 - IDD II I, I, D HK IIZD QI $1,397 F 4920 - IF I D I H IIZD QI $43 F 1440 - H D D $209 : $2,081 emarks: ost information is in thousands of dollars. -1 I 1 : 1-12 IFID age 1 of 1

IFID FY 2007 BD I BD IIY 02 I D H II FBY 2006 2-0 IFID

IFID HI IIY F BK IFID

IFID xhibit -40, Budget Item ustification Date: February 2006 ppropriation (reasury) ode//b/b/item ontrol umber issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 02-1 ine Item omenclature oint ir-to-urface tandoff issile rogram lement for ode B Items: / ther elated rogram lements: 0207325F ID ode rior Years FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 o omp otal roc Qty 416 288 75 234 272 415 361 272 2,567 4,900 ost ($ ) 195.756 139.214 98.676 187.165 233.799 342.978 292.410 203.984 2106.738 3800.720 dvance roc ost ($ ) 0.000 0.000 0.000 Weapon ystem ost ($ ) 195.756 139.214 98.676 187.165 233.799 342.978 292.410 203.984 2106.738 3800.720 Initial pares ($ ) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 otal roc ost ($ ) 195.756 139.214 98.676 187.165 233.799 342.978 292.410 203.984 2106.738 3800.720 Flyaway nit ost ($ ) 0.000 0.459 1.257 0.763 0.839 0.810 0.792 0.728 0.800 0.751 Wpn ys nit ost ($ ) 0.000 0.483 1.316 0.787 0.860 0.826 0.810 0.750 0.821 0.774 Description he oint ir-to-urface tandoff issile () is an ir Force program designated 1 by the Defense cquisition Board (DB) during the ow ate Initial roduction (I) decision in December 2001. his program provides an affordable long range, conventional air-to-surface, autonomous, precision guided, standoff cruise missile compatible with fighter and bomber aircraft able to attack a variety of fixed or relocatable targets. ircraft integration for the baseline missile is complete on the B-52H, F-16 (Block 50), B-1, and B-2. bjective aircraft include the F-15, F-16 (Block 40), F-117, F-35, and F/-18/F. - increased standoff range will allow us to attack high value targets with precision, deeper into enemy territory while minimizing the threat to the launch aircraft. he threshold integration platform for - is the B-1. here is no requirement for initial spares as a includes a 15 year bumper-to-bumper warranty. he uly 2004 ilestone III eview approved Full ate roduction (F) start for FY 2005 and increased the total procurement from 3,816 to 4,900. otal buy of 4,900 include 2,400 baseline and 2,500 -. urrently on contract are ots 1-4 for 76 units, 100 units, 240 units, and 288 units, respectively. ots 1-4 are Firm Fixed rice (FF) ptions to the current D ontract. ot 5 was reduced to a minimum sustaining quantity due to ongressional reductions. In late ummer 2004, the Department convened an independent eliability nhancement eam () to review processes, system engineering procedures, and investigate reliability/quality initiatives. he ir Force continues to implement recommendations through a combination of detailed design analysis, production quality reviews, and comprehensive ground and flight testing. he ost, Weapon ystem ost, and otal rocurement ost lines include eek agle (0207590F) funding. he Quantity, Flyaway nit ost and Weapon ystem nit ost lines reflect (0207325F) only. urrently, there are no F buys on contract. FY 2007 rogram ustification ward production contract for 234 with a mix of and - missiles. -1 hopping ist Item o. 02 Budget Item ustification xhibit -40, page 1 of 8 IFID 2-1

IFID xhibit -5, Weapon ystem ost nalysis Date: February 2006 ppropriation (reasury) ode//b/b/item ontrol umber issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 02 anufacturer's ame/lant ity/tate ocation ubline Item -1 ine Item omenclature oint ir-to-urface tandoff issile ockheed artin/roy, labama Weapon ystem Ident otal ost in illions of Dollars ost lements ode FY 2005 FY 2006 FY 2007 Qty nit ost otal ost Qty nit ost otal ost Qty nit ost otal ost Quantity 288 75 234 ll-p-ound 0 112.252 0 70.000 0 155.165 dvance rocurement 0 0.000 0 0.000 0 0.000 ngineering hange rders 0 1.316 0 0.000 0 3.038 echnical upport 0 5.856 0 3.200 0 5.127 0 1.002 0 1.092 0 1.358 est upport/eliability rogram 0 11.700 0 20.000 0 14.927 II FYWY 288 0.459 132.126 75 1.257 94.292 234 0.768 179.615 ontractor upport 0 4.262 0 4.384 0 4.576 Bs 0 0.000 0 0.000 0 0.000 W Y 288 0.474 136.388 75 1.316 98.676 234 0.787 184.191 eek agle 7 2.826 0 0.000 7 2.974 139.214 98.676 187.165 omments s part of the contract, ockheed artin has accepted total system performance responsibility () and fully warranted weapon performance to the system performance specification. here are no traditional government specifications for. ots 1-4 are FF options to current D contract. nit costs for FY06 and beyond have not been negotiated. urrently, there are no F buys on contract. FY07 production contract for 234 includes a mix of and - missiles. -1 hopping ist Item o. 02 Weapon ystem ost nalysis xhibit -5, page 2 of 8 IFID 2-2

IFID xhibit -5, rocurement History and lanning Date: February 2006 ppropriation (reasury) ode//b/b/item ontrol umber issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 02 Weapon ystem WB ost lements Qty nit ost ocation of F Issue Date ubline Item ontract ethod -1 ine Item omenclature oint ir-to-urface tandoff issile Date of ontract ype ontractor and ocation First ward Date Delivery pecs vailable ow? Date evision vailable? emarks FY2003 100 0.520 /K glin FB, F FY2004 240 0.420 /K glin FB, F FY2005 288 0.474 /K glin FB, F FY2006 75 1.316 /K glin FB, F FY2007 234 0.787 /K glin FB, F / FF ockheed artin, roy, labama / FF ockheed artin, roy, labama / FF ockheed artin, roy, labama ug-05 FF ockheed artin, roy, labama ar-06 FF ockheed artin, roy, labama ov-02 pr-04 o / Dec-03 an-05 o / Dec-04 pr-06 o / Feb-06 ug-07 o / Dec-06 an-08 o / -1 hopping ist Item o. 02 rocurement History and lanning xhibit -5, page 3 of 8 IFID 2-3

IFID xhibit -21, roduction chedule Date: February 2006 ppropriation (reasury) ode//b/b/item ontrol umber issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 02 Y. QY. I 1 2001 B D F 1 2001 2002 F 76 0 76 2003 F 100 0 100-1 ine Item omenclature oint ir-to-urface tandoff issile FI Y 2002 FI Y 2003 2001 D Y 2002 D Y 2003 D F D F B Y B Y war d war d 4 4 7 16 11 34 2004 F 240 0 240 240 416 0 416 0 0 4 4 7 16 11 374 D F B Y D F B Y DI D I I HIF H DI D I I/F' I DY X ockheed artin roy, labama 20 1-8 - 5 40 I 1 F 1 K ax rate of 40 per month assumes current facilities. F I F 1 III 0 0 15 15 D 0 0 15 15 100-1 hopping ist Item o. 02 roduction chedule xhibit -21, page 4 of 8 IFID 2-4

IFID xhibit -21, roduction chedule Date: February 2006 ppropriation (reasury) ode//b/b/item ontrol umber issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 02-1 ine Item omenclature oint ir-to-urface tandoff issile Y. B FI Y 2004 FI Y 2005 I D 2003 D Y 2004 D Y 2005. F D F D F QY 1 1 2003 2003 B Y B Y 2002 F 76 42 34 8 0 3 0 9 9 5 0 2003 F 100 0 100 1 3 11 12 8 8 23 16 8 10 0 2004 F 240 0 240 war d 6 20 14 0 0 37 19 144 2005 F 288 0 288 war d 288 2006 F 75 0 75 75 2007 F 234 0 234 234 1,013 42 971 8 0 3 0 9 9 6 3 11 12 8 8 23 16 0 8 10 6 20 14 0 0 37 19 741 DI D I I HIF H DI D I I/F' I DY X ockheed artin roy, labama 20 1-8 - 5 40 I 1 F 1 D F B III 0 0 15 15 D 0 0 15 15 K ax rate of 40 per month assumes current facilities. Due to reductions in the FY06 (ot 5) budget, production deliveries for ots 4 (288) and ot 5 (75) have been combined to facilitate a smooth workflow and sustainment of the production line over a two year period. his action is consistent with congressional language in the FY06 DoD ppropriation Bill which directs the program to maintain hardware procurement at a minimum level to sustain the production rate line. Y F I D F B F 1 Y -1 hopping ist Item o. 02 roduction chedule xhibit -21, page 5 of 8 IFID 2-5

IFID xhibit -21, roduction chedule Date: February 2006 ppropriation (reasury) ode//b/b/item ontrol umber issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 02 Y. QY. I 1 2005 B D F 1 2005-1 ine Item omenclature oint ir-to-urface tandoff issile FI Y 2006 FI Y 2007 2005 D Y 2006 D Y 2007 D F D F B Y B Y 2002 F 76 76 0 0 2003 F 100 100 0 0 2004 F 240 96 144 17 16 9 52 25 25 0 2005 F 288 0 288 20 18 18 18 18 18 18 14 12 14 18 18 18 18 20 22 6 0 2006 F 75 0 75 war d 15 20 40 2007 F 234 0 234 war d 234 1,013 272 741 17 16 9 52 25 25 20 18 18 18 18 18 18 14 12 14 18 18 18 18 20 22 21 20 274 DI D I I HIF H DI D I I/F' I DY X ockheed artin roy, labama 20 1-8 - 5 40 I 1 F 1 D F B III 0 0 15 15 D 0 0 15 15 K ax rate of 40 per month assumes current facilities. Due to reductions in the FY06 (ot 5) budget, production deliveries for ots 4 (288) and ot 5 (75) have been combined to facilitate a smooth workflow and sustainment of the production line over a two year period. his action is consistent with congressional language in the FY06 DoD ppropriation Bill which directs the program to maintain hardware procurement at a minimum level to sustain the production rate line. Y F I D F B F 1 Y -1 hopping ist Item o. 02 roduction chedule xhibit -21, page 6 of 8 IFID 2-6

IFID xhibit -21, roduction chedule Date: February 2006 ppropriation (reasury) ode//b/b/item ontrol umber issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 02 Y. QY. I 1 2007 B D F 1 2007-1 ine Item omenclature oint ir-to-urface tandoff issile FI Y 2008 FI Y 2009 2007 D Y 2008 D Y 2009 D F D F B Y B Y 2003 F 100 100 0 0 2004 F 240 240 0 0 2005 F 288 288 0 0 2006 F 75 35 40 20 20 0 2007 F 234 0 234 19 19 19 19 19 19 20 20 20 20 20 20 0 2008 F 272 0 272 war d 22 22 22 22 23 23 23 23 23 69 2009 F 415 0 415 war d 415 1,624 663 961 20 20 0 19 19 19 19 19 19 20 20 20 20 20 20 22 22 22 22 23 23 23 23 23 484 DI D I I HIF H DI D I I/F' I DY X ockheed artin roy, labama 20 1-8 - 5 40 I 1 F 1 D F B III 0 0 15 15 D 0 0 15 15 K ax rate of 40 per month assumes current facilities. Due to reductions in the FY06 (ot 5) budget, production deliveries for ots 4 (288) and ot 5 (75) have been combined to facilitate a smooth workflow and sustainment of the production line over a two year period. his action is consistent with congressional language in the FY06 DoD ppropriation Bill which directs the program to maintain hardware procurement at a minimum level to sustain the production line. Y F I D F B F 1 Y -1 hopping ist Item o. 02 roduction chedule xhibit -21, page 7 of 8 IFID 2-7

IFID xhibit -21, roduction chedule Date: February 2006 ppropriation (reasury) ode//b/b/item ontrol umber issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 02 Y. QY. I 1 2009 B D F 1 2009-1 ine Item omenclature oint ir-to-urface tandoff issile FI Y 2010 FI Y 2011 2009 D Y 2010 D Y 2011 D F D F B Y B Y 2005 F 288 288 0 0 2006 F 75 75 0 0 2007 F 234 234 0 0 2008 F 272 203 69 23 23 23 0 2009 F 415 0 415 34 34 34 34 34 35 35 35 35 35 35 35 0 2010 F 361 0 361 war d 30 30 30 30 30 30 30 30 30 91 2011 F 272 0 272 war d 272 1,917 800 1,117 23 23 23 34 34 34 34 34 35 35 35 35 35 35 35 30 30 30 30 30 30 30 30 30 363 DI D I I HIF H DI D I I/F' I DY X ockheed artin roy, labama 20 1-8 - 5 40 I 1 F 1 D F B III 0 0 15 15 D 0 0 15 15 K ax rate of 40 per month assumes current facilities. Due to reductions in the FY06 (ot 5) budget, production deliveries for ots 4 (288) and ot 5 (75) have been combined to facilitate a smooth workflow and sustainment of the production line over a two year period. his action is consistent with congressional language in the FY06 DoD ppropriation Bill which directs the program to maintain hardware procurement at a minimum level to sustain the production line. Y F I D F B F 1 Y -1 hopping ist Item o. 02 roduction chedule xhibit -21, page 8 of 8 IFID 2-8

IFID xhibit -40, Budget Item ustification Date: February 2006 ppropriation (reasury) ode//b/b/item ontrol umber issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 03-1 ine Item omenclature oint tand-ff Weapon rogram lement for ode B Items: / ther elated rogram lements: ID ode rior Years FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 o omp otal roc Qty 274 0 274 ost ($ ) 181.942 0.958 0.000 182.900 dvance roc ost ($ ) 0.000 0.000 0.000 Weapon ystem ost ($ ) 181.942 0.000 0.958 0.000 0.000 0.000 0.000 0.000 0.000 182.900 Initial pares ($ ) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 otal roc ost ($ ) 181.942 0.000 0.958 0.000 0.000 0.000 0.000 0.000 0.000 182.900 Flyaway nit ost ($ ) / 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Wpn ys nit ost ($ ) / 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Description he oint tandoff Weapon (W) is a joint F/ program with the avy as the lead service. W is an inertial navigation/lobal ositioning ystem precision glide weapon with a stealthy, kinematically efficient airframe, providing all-weather launch/leave standoff capability to attack targets from outside enemy defenses. djustment terminates F portion of W procurement beginning in FY05. Funding in FY06 is to support eek agle efforts. FY 2007 rogram ustification o ir Force W production in FY07; he last year of ir Force buy of W was in FY04. -1 hopping ist Item o. 03 Budget Item ustification xhibit -40, page 1 of 2 IFID 2-9

IFID xhibit -40, Budget Item ustification for ggregated Items Date: February 2006 ppropriation (reasury) ode//b/b/item ontrol umber issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 03-1 ine Item omenclature oint tand-ff Weapon rocurement Items ($) ID ode rior Years FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 o omp otal W ummary 172.097 0.000 0.000 0.000 0.000 0.000 0.000 172.097 Quantity 223 0 0 0 0 0 0 223 0.000 W 154-101.086 0.000 0.000 0.000 0.000 0.000 0.000 101.086 Quantity 194 0 0 0 0 0 0 194 0.000 W 154 -B 29.865 0.000 0.000 0.000 0.000 0.000 0.000 29.865 Quantity 11 0 0 0 0 0 0 11 0.000 B-57 41.146 0.000 0.000 0.000 0.000 0.000 0.000 41.146 Quantity 306 0 0 0 0 0 0 306 0.000 eek agle 9.845 0.000 0.958 0.000 0.000 0.000 0.000 10.803 Quantity 69 0 0 0 0 0 0 69 otal djustments 181.942 0.000 0.958 0.000 0.000 0.000 0.000 0.000 0.000 182.900 Quantity otal 274 0 0 0 0 0 0 0 0 274 emarks -1 hopping ist Item o. 03 Budget Item ustification for ggregated Items xhibit -40, page 2 of 2 IFID 2-10

IFID xhibit -40, Budget Item ustification Date: February 2006 ppropriation (reasury) ode//b/b/item ontrol umber issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 04-1 ine Item omenclature I-9X idewinder rogram lement for ode B Items: / ther elated rogram lements: / ID ode rior Years FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 o omp otal roc Qty 491 248 196 195 202 328 350 275 2,526 4,811 ost ($ ) 115.095 52.352 44.368 43.834 44.884 73.540 79.532 62.570 533.539 1049.714 dvance roc ost ($ ) 0.000 0.000 0.000 Weapon ystem ost ($ ) 115.095 52.352 44.368 43.834 44.884 73.540 79.532 62.570 533.539 1049.714 Initial pares ($ ) 3.595 1.752 1.441 1.509 1.514 1.566 0.000 11.377 otal roc ost ($ ) 118.690 54.104 45.809 45.343 46.398 75.106 79.532 62.570 533.539 1061.091 Flyaway nit ost ($ ) 0.189 0.199 0.208 0.197 0.191 0.190 0.202 0.204 0.200 Wpn ys nit ost ($ ) 0.211 0.226 0.239 0.212 0.201 0.198 0.213 0.214 0.213 Description he I-9X (idewinder) short-range air-to-air missile is a long-term evolution of the I-9 series of fielded missiles. he I-9X missile program provides a launch and leave, air combat munition that uses passive infrared (I) energy for acquisition and tracking of enemy aircraft and complements the dvanced edium ange ir-to-ir issile (). ir superiority in the short-range air-to-air missile arena is essential and includes first shot, first kill opportunity against an enemy employing I countermeasures. he I-9X employs several components common with the I-9. nti-amper features have been incorporated to protect improvements inherent in this design. I-9X is an cquisition ategory I (-I) joint-service program with avy lead. he ir Force is procuring a total of 5,097 missiles of which 1,100 are aptive ir raining issiles (s). : 1. he unit cost calculations assume avy procurement quantities remain constant, as depicted in the attached -21 roduction chedule xhibit. ots 4-9's unit cost calculations assume avy and F procurement quantities remain constant. 2. he FY04 quantity has decreased 22 missiles, the FY05 quantity has decreased 19 missiles and FY06 quantity has decreased by 5 missiles since the FY04-1, due to an increase in unit cost. his increase was indicated in the current rogram ffice stimate (), given the latest inflation data. : 1. FY01 ppropriations onference anguage directed the ir Force and avy to budget I-9X (for FY02 and beyond) as a new procurement program instead of a modification program. s a result, FY01 procurement funding and buy quantity of 67 is addressed as a modification in B02, -1 ine Item # 13, odification # 3479. he FY01 funding is not included in the total quantity nor are the total procurement cost included in the total cost on this -40. 2. cquisition Decision emorandum (D) for I II and III was signed in ovember 2001. I I was signed in ugust 2003. 3. I occurred in ovember 2003. 4. D was completed December 2003. 5. III was approved ay 2004. FY 2007 rogram ustification ot 7, is the third full-rate production buy of I-9X, and will occur in FY07. his continues the procurement of s and s for the ir Force and avy. he FY07 procurement includes 183 missiles (96 s and 87 s); associated missile containers; pecial ooling/pecial est quipment (/); training equipment and technical data. he program also includes funding for field activity support, government / and production technical support. -1 hopping ist Item o. 04 Budget Item ustification xhibit -40, page 1 of 9 IFID 2-11

IFID xhibit -5, Weapon ystem ost nalysis Date: February 2006 ppropriation (reasury) ode//b/b/item ontrol umber issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 04-1 ine Item omenclature I-9X idewinder anufacturer's ame/lant ity/tate ocation ubline Item Weapon ystem Ident otal ost in illions of Dollars ost lements ode FY 2005 FY 2006 FY 2007 Qty nit ost otal ost Qty nit ost otal ost Qty nit ost otal ost issile rocurement Quantity 248 196 183 Flyaway ost ll p ound () 178 31.671 103 19.428 96 17.951 aptive ir raining issile () 70 11.037 93 15.538 87 14.408 issile ontainers 69 0.689 55 0.570 51 0.540 ngineering hange rders 1.302 1.088 1.034 pecial est/pecial ooling quipment 0.110 0.110 0.112 on-ecurring overnment / 3.545 2.576 4.032 otal issile Flyaway ost 248 0.195 48.395 196 0.194 37.976 183 0.205 37.593 Weapons upport ost upport quipment raining 0.030 raining quipment D 0.425 1.823 0.922 0.000 irborne est quipment () 1.315 0.783 0.793 Data 0.104 0.104 0.111 roduction echnical upport 2.124 2.348 3.931 otal Weapons ystem ost 248 0.211 52.392 196 0.226 44.368 183 0.240 43.834 Initial pares 1.752 1.460 1.471 otal rocurement ost 54.354 45.815 44.091 ther osts K (:0207590) 52.352 44.368 43.834 omments : 1. nit cost calculations assume avy procurement quantities remain constant, as depicted in the attached -21 roduction chedule xhibit. 2. K funding sourced from 0207590F. his funding is intended to procure 24 missiles and associated irborne est quipment. 3. FY01 ppropriations onference anguage directed the ir Force and avy to budget I-9X (for FY02 and beyond) as a new procurement program instead of a modification -1 hopping ist Item o. 04 Weapon ystem ost nalysis xhibit -5, page 2 of 9 IFID 2-12

IFID xhibit -5, Weapon ystem ost nalysis Date: February 2006 ppropriation (reasury) ode//b/b/item ontrol umber issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 04-1 ine Item omenclature I-9X idewinder program. s a result, FY01 procurement funding and buy quantity of 67 is addressed as a modification in B02, -1 ine Item # 13, odification # 3479. he FY01 funding is not included in the total quantity and total procurement cost on this -40. -1 hopping ist Item o. 04 Weapon ystem ost nalysis xhibit -5, page 3 of 9 IFID 2-13

IFID xhibit -5, rocurement History and lanning Date: February 2006 ppropriation (reasury) ode//b/b/item ontrol umber issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 04 Weapon ystem I-9 WB ost lements Qty nit ost ocation of F Issue Date ubline Item ontract ethod -1 ine Item omenclature I-9X idewinder Date of ontract ype ontractor and ocation First ward Date Delivery pecs vailable ow? Date evision vailable? FY01 I-9X I 1 ee ote 1 FY02 I-9X I 2 ee ote 2 FY03 I-9X I 3, ot 3 ee ote 2 FY04 I-9X I 4, ot 4 ee ote 2 FY05 I-9X F 1, ot 5 ee ote 2 FY06 I-9X F 2, ot 6 ee otes 2,4,5 FY07 I-9X F 3, ot 7 ee notes 2,4,5 / / / 138 0.202 I F aytheon ystems ompany, ucson, Z 286 0.177 I ay-96 F aytheon ystems ompany, ucson, Z 256 0.193 I ay-03 F aytheon ystems ompany, ucson, Z 248 0.195 I ay-04 F aytheon ystems ompany, ucson, Z 196 0.194 I ay-05 F aytheon ystems ompany, ucson, Z 183 0.205 I ay-06 F aytheon ystems ompany, ucson, Z ov-01 ug-03 Yes ov-02 ay-04 Yes an-04 ay-05 Yes ov-04 ay-06 Yes Dec-05 ay-07 Yes ov-06 ay-08 Yes emarks ote: 1. FY01 procurement of 67 missiles is under odification funding ( 3020, B 21). 2. FY01 ppropriations onference anguage directed the ir Force and avy to budget I-9X (for FY02 and beyond) as a new procurement program instead of a modification program. s a result, FY01 procurement funding and buy quantity of 67 is addressed as a modification in B02, -1 ine Item # 13, odification # 3479. he FY01 funding is not included in the total quantity nor the total procurement cost on this -40. 3. ot 6 unit cost calculation assumes avy procurement of 165 (121, 44 ) missiles in FY06. 4. ots 7-11's unit cost calculations assume avy and F procurement quantities remain constant. 5. nit ost consists of,, and ontainer. -1 hopping ist Item o. 04 rocurement History and lanning xhibit -5, page 4 of 9 IFID 2-14

IFID xhibit -21, roduction chedule Date: February 2006 ppropriation (reasury) ode//b/b/item ontrol umber issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 04 Y. QY. I 1 2000 B D F 1 2000 2002 F 138 0 138-1 ine Item omenclature I-9X idewinder FI Y 2001 FI Y 2002 2000 D Y 2001 D Y 2002 D F D F B Y B Y war d 0 0 D F B Y D F B Y DI D I I HIF H DI D I I/F' I DY X aytheon (I III and out) ucson, Z 300 1-8 - 5 1,200 I 1 F 1 III 2 18 D K I 2 ontract warded ov 01 (=100, hift Hours Days=332, ax=1200, fter ct 1=2 wks, F ime=18 onths). F I F 1 138-1 hopping ist Item o. 04 roduction chedule xhibit -21, page 5 of 9 IFID 2-15

IFID xhibit -21, roduction chedule Date: February 2006 ppropriation (reasury) ode//b/b/item ontrol umber issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 04-1 ine Item omenclature I-9X idewinder Y. B FI Y 2003 FI Y 2004 I D 2002 D Y 2003 D Y 2004. F D F D F QY 1 1 2002 2002 B Y B Y 2002 F 138 0 138 4 8 16 16 16 12 18 24 24 0 2003 F 286 0 286 war d 12 12 16 22 24 200 2004 F 256 0 256 war d 256 2005 F 248 0 248 248 2006 F 196 0 196 196 2007 F 183 0 183 183 2008 F 199 0 199 199 2009 F 341 0 341 341 2002 105 0 105 8 8 8 8 8 7 8 16 17 17 0 2003 284 0 284 war d 20 20 20 20 20 184 2004 103 0 103 war d 103 2005 135 0 135 135 2006 165 0 165 165 2007 213 0 213 213 2008 195 0 195 195 2009 181 0 181 181 3,228 0 3,228 0 8 12 16 24 24 23 20 34 41 41 32 32 36 42 44 2,799 DI D I I HIF DI H D I F I/F' I DY X I aytheon (I III and out) ucson, Z 300 1-8 - 5 1,200 I F 1 1 III 2 18 D K I 2 ontract warded ov 01 (=100, hift Hours Days=332, ax=1200, fter ct 1=2 wks, F ime=18 onths). D F B Y D F B F 1 Y -1 hopping ist Item o. 04 roduction chedule xhibit -21, page 6 of 9 IFID 2-16

IFID xhibit -21, roduction chedule Date: February 2006 ppropriation (reasury) ode//b/b/item ontrol umber issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 04 Y. QY. I 1 2004 B D F 1 2004-1 ine Item omenclature I-9X idewinder FI Y 2005 FI Y 2006 2004 D Y 2005 D Y 2006 D F D F B Y B Y 2002 F 138 138 0 0 2003 F 286 0 286 24 24 24 32 32 32 32 86 2004 F 256 0 256 20 20 20 20 20 20 20 20 24 24 24 24 0 2005 F 248 0 248 war d 24 24 24 24 20 132 2006 F 201 0 201 war d 201 2007 F 187 0 187 187 2008 F 199 0 199 199 2009 F 341 0 341 341 2002 105 105 0 0 2003 284 100 184 20 24 24 24 24 32 36 0 2004 103 0 103 14 8 8 8 8 8 8 8 8 8 8 9 0 2005 135 0 135 war d 14 14 14 14 10 69 2006 165 0 165 war d 165 2007 213 0 213 213 2008 195 0 195 195 2009 181 0 181 181 3,237 343 2,894 44 48 48 56 56 64 68 34 28 28 28 28 28 28 28 32 32 32 33 38 38 38 38 30 1,969 DI D I I HIF DI H D I F I/F' I DY X I aytheon (I III and out) ucson, Z 300 1-8 - 5 1,200 I F 1 1 III 2 18 D K I 2 ontract warded ov 01 (=100, hift Hours Days=332, ax=1200, fter ct 1=2 wks, F ime=18 onths). D F B Y D F B F 1 Y -1 hopping ist Item o. 04 roduction chedule xhibit -21, page 7 of 9 IFID 2-17

IFID xhibit -21, roduction chedule Date: February 2006 ppropriation (reasury) ode//b/b/item ontrol umber issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 04 Y. QY. I 1 2006 B D F 1 2006-1 ine Item omenclature I-9X idewinder FI Y 2007 FI Y 2008 2006 D Y 2007 D Y 2008 D F D F B Y B Y 2003 F 286 286 0 0 2004 F 256 256 0 0 2005 F 248 117 131 20 20 20 20 20 20 12-1 2006 F 201 0 201 28 28 20 20 20 16 16 12 12 12 12 5 2007 F 187 0 187 war d 20 20 20 20 20 87 2008 F 199 0 199 war d 199 2009 F 341 0 341 341 2003 284 284 0 0 2004 103 103 0 0 2005 135 72 63 14 10 10 10 10 10 5-6 2006 165 0 165 16 16 16 16 16 16 16 12 12 12 12 5 0 2007 213 0 213 war d 20 20 20 20 20 113 2008 195 0 195 war d 195 2009 181 0 181 181 2,994 1,118 1,876 34 30 30 30 30 30 17 44 44 36 36 36 32 32 24 24 24 24 5 40 40 40 40 40 1,114 DI D I I HIF DI H D I F I/F' I DY X I aytheon (I III and out) ucson, Z 300 1-8 - 5 1,200 I F 1 1 III 2 18 D K I 2 ontract warded ov 01 (=100, hift Hours Days=332, ax=1200, fter ct 1=2 wks, F ime=18 onths). D F B Y D F B F 1 Y -1 hopping ist Item o. 04 roduction chedule xhibit -21, page 8 of 9 IFID 2-18

IFID xhibit -21, roduction chedule Date: February 2006 ppropriation (reasury) ode//b/b/item ontrol umber issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 04 Y. QY. I 1 2008 B D F 1 2008-1 ine Item omenclature I-9X idewinder FI Y 2009 FI Y 2010 2008 D Y 2009 D Y 2010 D F D F B Y B Y 2005 F 248 248 0 0 2006 F 201 201 0 0 2007 F 187 187 0 20 20 20 8 8 7-83 2008 F 199 0 199 20 20 20 24 24 24 24 12 12 12 7 0 2009 F 341 0 341 war d 28 32 32 32 32 32 153 2010 F 377 0 377 war d 377 2005 135 161-26 -26 2006 165 172-7 -7 2007 213 80 133 20 16 16 16 20 20 5 20 2008 195 0 195 20 20 20 20 20 20 16 12 16 20 11 0 2009 131 0 131 war d 20 20 20 20 16 16 19 2010 181 0 181 war d 181 2,573 1,049 1,524 40 36 36 24 28 27 5 40 40 40 44 44 44 40 24 28 32 18 48 52 52 52 48 48 634 DI D I I HIF DI H D I F I/F' I DY X I aytheon (I III and out) ucson, Z 300 1-8 - 5 1,200 I F 1 1 III 2 18 D K I 2 ontract warded ov 01 (=100, hift Hours Days=332, ax=1200, fter ct 1=2 wks, F ime=18 onths). D F B Y D F B F 1 Y -1 hopping ist Item o. 04 roduction chedule xhibit -21, page 9 of 9 IFID 2-19

HI IIY F BK 2-20

IFID xhibit -40, Budget Item ustification Date: February 2006 ppropriation (reasury) ode//b/b/item ontrol umber issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 05-1 ine Item omenclature dvanced edium ange ir-to-ir issile () rogram lement for ode B Items: 0207163F ther elated rogram lements: ID ode rior Years FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 o omp otal roc Qty 7,535 159 166 215 381 466 482 478 0 9,882 ost ($ ) 6377.600 106.857 103.086 135.869 221.231 273.838 281.750 300.240 0.000 7800.471 dvance roc ost ($ ) 0.000 0.000 0.000 Weapon ystem ost ($ ) 6377.600 106.857 103.086 135.869 221.231 273.838 281.750 300.240 0.000 7800.471 Initial pares ($ ) 60.800 0.072 0.072 0.075 0.074 0.077 0.078 0.081 0.000 61.329 otal roc ost ($ ) 6438.400 106.929 103.158 135.944 221.305 273.915 281.828 300.321 0.000 7861.800 Flyaway nit ost ($ ) 0.824 0.552 0.525 0.575 0.542 0.529 0.523 0.563 0.000 0.757 Wpn ys nit ost ($ ) 0.846 0.672 0.621 0.632 0.581 0.588 0.585 0.628 0.000 0.789 Description he dvanced edium ange ir-to-ir issile () is the next generation all-weather, all environment radar guided missile developed jointly by the ir Force and avy. is smaller, faster, lighter, and has improved capabilities against very-low and high-altitude high-speed targets in an electronic attack () environment as compared to previously fielded radar guided missiles. he next version that is currently under ystem Development and Demonstration (DD) is the I-120D that begins procurement in FY06. he I-120D will deliver improved performance from -aided navigation, include a two way datalink capability that will enhance aircrew survivability, include improved network compatibility, and incorporate new guidance software that will improve the 's kinematic performance. he Defense cquisition Board approved Full ate roduction (ilestone IIIB) in pril 1992. In FY02, the program included a price-based acquisition strategy offered to a single rime ontractor. he missile price shown in the -5 is based on a ong erm ricing greement () and includes costs for ystem ngineering and erformance esponsibility () as well as support to fielded systems. he latest ended with the FY05 procurement. FY06 stand alone Firm Fixed rice (FF) contract initiates procurement of the I-120D missiles for the F and avy. nnual procurement quantities are estimated based on planned 600 F missiles per year. It also includes production transition/producibility engineering, and tooling and test equipment associated with the initiation of I-120D production. FY 2007 rogram ustification ontinues the procurement of the for the F and avy in ot 21. he plan is to procure 215 s for the F, 150 for the avy, and 15 missiles for the rmy. dditional tooling and test equipment and production transition/producibility engineering will be procured to support the production of the I-120D. F participants will continue to procure I-120-5 missiles. he training equipment line includes 70 additional elemetry Instrumentation nits for W. -1 hopping ist Item o. 05 Budget Item ustification xhibit -40, page 1 of 10 IFID 2-21

IFID xhibit -5, Weapon ystem ost nalysis Date: February 2006 ppropriation (reasury) ode//b/b/item ontrol umber issile rocurement, ir Force, Budget ctivity 02, ther issiles, Item o. 05 anufacturer's ame/lant ity/tate ocation ubline Item -1 ine Item omenclature dvanced edium ange ir-to-ir issile () aytheon, ucson Z Weapon ystem Ident otal ost in illions of Dollars ost lements ode FY 2005 FY 2006 FY 2007 Qty nit ost otal ost Qty nit ost otal ost Qty nit ost otal ost Quantity 159 166 215 Flyaway ost issile Hardware-ecurring 1. issile rice 68.284 64.581 98.771 2. Warranty 0.659 1.200 3.743 3. ther Hardware 0.537 1.260 1.237 4. ngineering hange rders 3.347 3.227 4.273 ubtotal issile Hardware 72.827 70.268 108.024 ecurring roduction upport 1. roduction est/upport 13.127 15.274 13.911 2. Interim ontractor upport (I) 0.000 0.000 0.000 3. rogram anagement dm 1.689 1.560 1.549 ubtotal ecurring roduction upport 14.816 16.834 15.460 onrecurring ost ubtotal onrecurring ost 0.000 0.000 0.000 otal issile Flyaway ost 159 0.552 87.715 166 0.525 87.174 215 0.575 123.559 upport ost 1. eculiar upport quipment 1.235 1.252 1.727 2. Depot 0.000 0.000 0.000 3. raining quipment 17.907 14.660 10.583 4. Data 0.000 0.000 0.000 ubtotal upport 19.142 15.912 12.310 eek agle :0207590F (on-add) otal Weapon ystem ost 159 0.672 106.857 166 0.621 103.086 215 0.632 135.869 ther Weapon ystems osts Initial pares 0.072 0.072 0.075 eprogramming quip (B) B-22 (on-add) eplenishment pares (on-add) 0.268 0.193 0.202 106.857 103.086 135.869-1 hopping ist Item o. 05 Weapon ystem ost nalysis xhibit -5, page 2 of 10 IFID 2-22