Negotiated Rate Agreements Filing; El Paso Natural Gas Company, L.L.C.; Docket No. RP19-

Similar documents
March 26, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.

Negotiated Rate Agreement Filing; El Paso Natural Gas Company, L.L.C.; Docket No. RP18-

Re: Negotiated Rate Agreement Update; El Paso Natural Gas Company, L.L.C.; Docket No. RP19-

Non-Conforming Negotiated Rate Agreement Update; El Paso Natural Gas Company, L.L.C.; Docket No. RP19-

Non-Conforming, Negotiated Rate Transportation Service Agreement Filing; El Paso Natural Gas Company, L.L.C.; Docket No. RP17-

March 28, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

August 1, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

June 5, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

Operational Purchases and Sales Report, Wyoming Interstate Company, L.L.C.; Docket No. RP18-

October 5, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426

Mailing Address: P.O. Box 1642 Houston, TX

Mailing Address: P.O. Box 1642 Houston, Texas September 1, 2011

April 10, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.

August 1, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

STATEMENT OF NATURE, REASONS AND BASIS

June 5, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

STATEMENT OF NATURE, REASONS AND BASIS

March 31, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

Mailing Address: P.O. Box 1642 Houston, TX

November 29, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.

Sierrita is hereby submitting its responses to the April 3, 2018 OEMR Data Request questions.

March 25, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

April 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

January 31, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

June 1, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

April 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

April 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

Rover Pipeline LLC Docket No. RP Compliance with Order on Compliance Filing

January 3, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

Statement of the Nature, Reasons, and Basis for the Filing

Rover Pipeline LLC. Explanatory Note

THE UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. El Paso Natural Gas Company, L.L.C. ) Docket No.

FERC GAS TARIFF ORIGINAL VOLUME NO. 1 RUBY PIPELINE, L.L.C.

REVISED OPEN SEASON NOTICE (PREVIOUS NOTICE 16834) Arizona Gas Storage Project

Table of Contents. Viking Gas Transmission Company Volume No. 1 Tariff. Tariff - Volume No. 1. Part Table of Contents

Steckman Ridge, LP, Docket No. RP

June 29, Currently Effective Rates ITS and AOR /1/2018 Change. Currently Effective Rates PALS

December 6, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

September 30, Part Version Title V LNG Rates

September 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

May 8, Response to Show Cause Order, Filing of Revised Tariff Sheet And Request for Any Necessary Waivers. The Dayton Power and Light Company

144 FERC 61,159 FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C August 28, 2013

Woodbridge Delivery Lateral Project Service Agreement Containing Negotiated Rates And Non-Conforming Provisions Docket No. RP15

December 6, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.

Cheyenne Plains Gas Pipeline Company, LLC Fifth Report of Service Interruption and/or Damage to Facilities Pursuant to Section 260.

December 6, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

Any questions regarding this filing should be directed to the undersigned at (402)

May 8, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

December 18, Filing in Compliance with November 26, 2018 Order Docket No. ER

December 19, Cal. Indep. Sys. Operator Corp., 165 FERC 61,140 (2018) (November 19 Order).

October 11, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.

December 18, Columbia Gas Transmission, LLC, Docket No. RP Offer of Settlement and Petition for Approval of Settlement

BY ELECTRONIC FILING Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

DEPARTMENT OF ENERGY Federal Energy Regulatory Commission. Combined Notice Of Filings

May 22, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

September 6, Via efiling. Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

All rates in Item 200 have been increased by the F.E.R.C. Annual Index of %.

March 7, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

Natural Gas Pipeline Company of America LLC Part 6. Eighth Revised Volume No. 1 Version GENERAL TERMS AND CONDITIONS

American Electric Power Service Corporation Docket No. ER10- -

November 29, RE: Southern California Edison Company s Formula Transmission Rate Annual Update Filing in Docket No. ER (TO2019)

GridLiance West Transco LLC Docket No. ES Amendment to Application Under Section 204 of the Federal Power Act

Re: Rockland Electric Company, Docket No. EL18-111

October 31, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Magalie R. Salas, Secretary. Docket No.

Transportation of Customer-Secured Natural Gas (T-1)

October 11, Ms. Kimberly Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D. C

Dominion Energy Transmission, Inc. Current Rates Effective November 1, 2017

December 23, By etariff Filing Hon. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426

(1) NextEra Energy Marketing, LLC ( NextEra ) (Service Package No ) (b) Negotiated Rate Agreement, ( NRA ) dated June 14, 2018.

158 FERC 61,044 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Transportation Service Using Dedicated Transmission Facilities (T-2)

Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: May 4, 2012 Service Agreement Number Northeast

CURRENTLY EFFECTIVE RATE SCHEDULES AND STATEMENT OF OPERATING CONDITIONS OF ONEOK GAS TRANSPORTATION, L.L.C. SUBJECT TO THE JURISDICTION OF

95 FERC 61,259 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

May 18, Black Hills Power, Inc. Docket Nos. ER and EL Compliance Filing Revising Attachment H Formula Rate Protocols

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC

January 17, via etariff

RE: Southern California Edison Company s Formula Transmission Rate Annual Update Filing in Docket No. ER (TO11)

150 FERC 61,116 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Montana-Dakota Utilities Co. A Division of MDU Resources Group, Inc. 400 N 4 th Street Bismarck, ND 58501

August 16, Attachment 1 to the Formula Rate is the Formula Protocols, and Attachment 2 is the Formula Spreadsheet. 2

SECURITIES AND EXCHANGE COMMISSION. Washington, D.C FORM 8-K CURRENT REPORT

APPENDIX E NOMINATION AND BALANCING PROVISIONS APPLICABILITY

March 25, 2016 VIA ELECTRONIC FILING

Algonquin Gas Transmission

July 15, 2015 VIA ELECTRONIC FILING

RE: Southern California Edison Company s Formula Transmission Rate Annual Update Filing in Docket No. ER (TO11)

126 FERC 61,172 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER AMENDING CERTIFICATE. (Issued February 25, 2009)

October 4, 2013 VIA ELECTRONIC FILING

UNITED STATES OF AMERICA BERFORE THE FEDERAL ENERGY REGULATORY COMMISSION

WASHINGTON GAS LIGHT COMPANY GENERAL SERVICE PROVISIONS THE DISTRICT OF COLUMBIA. Communications Covering Rates Should Be Addressed to:

December 7, Compliance with Order No. 844 Response to Deficiency Letter

June 20, Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

SCHIFF HARDIN LLP A Limited Liability Partnership

Pursuant to section 205 of the Federal Power Act ( FPA ), 1 and part 35 of the regulations

Transmission Access Charge Informational Filing

June 9, Filing of CAISO Rate Schedule No. 92 Powerex EIM Implementation Agreement Docket No. ER

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. ) Constitution Pipeline Company, LLC ) Docket No.

March 19, MidAmerican Central California Transco, LLC Docket No. ER

ALSTON&BIRD LLP. The Atlantic Building 950 F Street, NW Washington, DC Fax:

Transcription:

November 29, 2018 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Commissioners: Re: Negotiated Rate Agreements Filing; El Paso Natural Gas Company, L.L.C.; Docket No. RP19- El Paso Natural Gas Company, L.L.C. ("EPNG") hereby tenders for filing and acceptance by the Federal Energy Regulatory Commission ("Commission") the following tariff records shown on Attachment A for inclusion in EPNG s FERC Gas Tariff, Third Revised Volume No. 1A ( Tariff ). EPNG is proposing to update the in its Tariff to reflect the addition of four conforming, negotiated rate transportation service agreements ( TSAs ) for firm transportation service under Rate Schedule FT-1. As discussed below, EPNG respectfully requests a waiver of the 30-day notice requirement to permit the tariff records to become effective on December 1, 2018, consistent with the effective date of the TSAs. Reason for Filing EPNG has executed four new conforming, negotiated rate TSAs associated with its Permian North Project. 1 The General Terms and Conditions ( GT&C ) Section 4.18 of EPNG s Tariff allows EPNG and a shipper to agree to a transportation rate that varies from the minimum-to-maximum range provided on the Tariff s Statement of Rates. Moreover, the Commission s policy requires pipelines, when implementing a negotiated rate TSA, to either include the TSA in its Tariff or submit a Statement of Rate tariff 1 EPNG submitted its Prior Notice Request for Authorization of the Permian North Project on July 11, 2018 in Docket No. CP18-522-000. In the Prior Notice, EPNG sought authorization to construct certain system enhancements that included station yard piping, and valve and compressor modifications to its Eunice, Pecos River, and Plains Compressor Stations. EPNG anticipates the facilities will be in-service as early as December 1, 2018.

Federal Energy Regulatory Commission 2 November 29, 2018 record identifying the transaction. 2 Accordingly, EPNG is submitting herein for the Commission s review and acceptance four conforming negotiated rate TSAs which are described below. Description of the TSAs 3 TSA Nos. 610678-FT1EPNG and 610679-FT1EPNG ETC Marketing, Ltd. ( ETC ) ETC and EPNG executed conforming, negotiated rate TSA No. 610678- FT1EPNG which includes a negotiated reservation rate of $14.2880 per dekatherm ( Dth ) per month. This TSA has a two-year term commencing on the in-service date of the Permian North Project. The transportation contract demand ( TCD ) is 30,000 Dth per day. TSA No. 610678-FT1EPNG specifies a primary receipt point of IJALCPLX and a primary delivery point of DSCALTOP. ETC and EPNG also executed conforming, negotiated rate TSA No. 610679- FT1EPNG which includes a negotiated reservation rate of $14.5920 per Dth per month. This TSA has a two-year term commencing on the in-service date of the Permian North Project. The TCD is 20,000 Dth per day. TSA No. 610679-FT1EPNG specifies a primary receipt point of SIDRICH and a primary delivery point of DSCALTOP. TSA No. 610720-FT1EPNG EOG Resources, Inc. ( EOG ) EOG and EPNG executed conforming, negotiated rate TSA No. 610720- FT1EPNG which includes a negotiated reservation rate of $12.7750 per Dth per month. This TSA has a two-year term commencing on the in-service date of the Permian North Project. The TCD is 20,000 Dth per day. TSA No. 610720-FT1EPNG specifies a primary receipt point of IROCKDOV and a primary delivery point of DSCALTOP. 2 3 See Natural Gas Pipeline Negotiated Rate Policies and Practices, 104 FERC 61,134 at PP 25-27, 31-32 (2003). Subsequent to the execution of three of these conforming negotiated rate TSAs, EPNG submitted a modification to its Rate Schedule FT-1 Pro Forma Service Agreement, which was accepted by the Commission in an unpublished letter order dated June 4, 2018 in Docket No. RP18-762-000. Specifically, TSA Nos. 610678-FT1EPNG, 610679-FT1EPNG and 610724-FT1EPNG conformed to EPNG s then effective pro forma agreement when they were executed. EPNG is submitting these TSAs as conforming TSAs, consistent with the Commission finding that an existing agreement that conformed to the pro forma when executed should automatically incorporate subsequent changes to the terms and conditions of a pipeline s tariff, including changes implemented through a revision to the pro forma agreement. See Northern Natural Gas Company, 135 FERC 61,207 (2011).

Federal Energy Regulatory Commission 3 November 29, 2018 TSA No. 610724-FT1EPNG Tesoro Refining & Marketing Company, LLC ( TRMC ) TRMC and EPNG executed conforming, negotiated rate TSA No. 610724- FT1EPNG which includes a negotiated reservation rate of $12.3654 per Dth per month. This TSA has a two-year term commencing on the in-service date of the Permian North Project. The TCD is 20,000 Dth per day. TSA No. 610724-FT1EPNG specifies a primary receipt point of IRAMSEYN and a primary delivery point of DSCALTOP. Negotiated Rate Applicability at Alternate Points Additionally, all four of the TSAs provide that the applicable negotiated rate will apply to certain alternate receipt and delivery point combinations for the full term of each TSA. As displayed on the proposed tariff records, these alternate receipt points include available Anadarko, Permian and San Juan Basin receipt points and the alternate delivery points of DSCALTOP, DPG&ETOP, DSCALEHR, SOCWR and KRAMER. Tariff Provisions EPNG is submitting the following tariff records pursuant to 18 C.F.R. 154.112(b) (2018) and Part 154, Subpart C of the Commission's regulations: Part II, Stmt. of Negotiated Rates is modified to add four conforming, negotiated TSAs to the. Part II, Sections 5.11, 5.12, 5.13 and 5.14 describe the conforming negotiated rate TSAs. The negotiated rates are applicable for the full term of the TSAs and are not subject to the maximum or minimum reservation rate. 4 The proposed tariff records state the exact legal name of the shipper, the negotiated rates, the receipt and delivery points, the quantity of gas to be transported, the applicable Rate Schedule for the service, and the contract term. Procedural Matters Inasmuch as this filing is fully described herein, the statement of the nature, the reasons and the basis for the instant tariff filing required by 18 C.F.R. 154.7(a)(6) (2018) of the Commission's regulations is omitted. 4 In addition to the applicable reservation charges, ETC, EOG and TRMC will pay all applicable commodity charges, fuel and lost and unaccounted-for gas charges, and all other applicable surcharges.

Federal Energy Regulatory Commission 4 November 29, 2018 In accordance with the applicable provisions of Part 154 of the Commission's regulations, EPNG is submitting an etariff XML filing package, which includes the following: a) a transmittal letter; b) Attachment A, a list of the proposed tariff records; and c) clean and marked versions of each tariff record in PDF format. EPNG respectfully requests the Commission accept the tendered tariff records for filing and permit them to become effective December 1, 2018, consistent with the anticipated in-service date of the facilities described herein. As such, EPNG requests the Commission grant a waiver of the notice requirements found in Section 154.207 of the Commission s regulations and any other waivers necessary consistent with Commission policy. 5 With respect to any tariff provisions the Commission allows to go into effect without change, EPNG hereby moves to place the tendered tariff provisions into effect at the end of the suspension period. to: Correspondence and communications concerning this filing should be directed Mr. Francisco Tarin Mr. David K. Dewey Director, Regulatory Assistant General Counsel El Paso Natural Gas Company, L.L.C. El Paso Natural Gas Company, L.L.C. Post Office Box 1087 Post Office Box 1087 Colorado Springs, CO 80944 Colorado Springs, CO 80944 Telephone: (719) 667-7517 Telephone: (719) 520-4227 Facsimile: (719) 520-4697 Facsimile: (719) 520-4415 EPNGRegulatoryAffairs@kindermorgan.com EPNGLegalFERC@kindermorgan.com These persons have been designated for service in accordance with Rule 203 of the Commission's Rules of Practice and Procedure (18 C.F.R 385.203 (2018)). The undersigned hereby certifies that he has read this filing and knows (i) the contents of such filing and the attachments; (ii) that the contents as stated in the filing and in the attachments are true to the best of his knowledge and belief; and (iii) that he possesses full power and authority to sign this filing. 5 See, e.g., Gulfstream Natural Gas System, L.L.C., 105 FERC 61,164, at P 11 (2003).

Federal Energy Regulatory Commission 5 November 29, 2018 Respectfully submitted, EL PASO NATURAL GAS COMPANY, L.L.C. By: /s/ Enclosures Francisco Tarin Director, Regulatory

Certificate of Service I hereby certify that I have this day caused a copy of the foregoing document to be served upon all shippers on EPNG s pipeline system and interested state regulatory commissions, in accordance with the requirements of 18 C.F.R 154.208 and 385.2010 (2018) of the Commission's Rules of Practice and Procedures. Dated at Colorado Springs, Colorado as of this 29 th day of November 2018. By: /s/ Francisco Tarin Director, Regulatory Post Office Box 1087 Colorado Springs, CO 80944 (719) 667-7517

Attachment A EL PASO NATURAL GAS COMPANY, L.L.C Negotiated Rate Agreements Filing RP19- Third Revised Volume No. 1A Part II Section 5 Stmt of Negotiated Rates Version 12.0.0 Part II Section 5.11 ETC Marketing, Ltd. #610678-FT1EPNG Version 0.0.0 Part II Section 5.12 ETC Marketing, Ltd. #610679-FT1EPNG Version 0.0.0 Part II Section 5.13 EOG Resoureces, Inc. #610720-FT1EPNG Version 0.0.0 Part II Section 5.14 Tesoro Refining & Marketing Co LLC. #610724-FT1EPNG Version 0.0.0

Section 5 - Stmt of Negotiated Rates Third Revised Volume No. 1A Version 12.0.0 Section 5.1 El Paso Marketing Company, L.L.C. #FT2K2000 Section 5.2 WPX Energy Marketing, LLC #FT3HF000 Section 5.3 Mexicana de Cobre, S.A. de C.V. #FT3HK000 Section 5.4 ARM Energy Management, LLC #FT3HQ000 Section 5.5 Southwestern Public Service Company #610337-FH8EPNG Section 5.6 Arizona Public Service Company #610506-FH8EPNG Section 5.7 MRC Permian Company #610834-FT1EPNG Section 5.8 GIGO Transport, Inc. #610868-FT1EPNG Section 5.9 Centennial Resources Production, LLC #610782-FT1EPNG Section 5.10 Southwestern Public Service Company #611653-FH8EPNG Section 5.11 ETC Marketing, Ltd. #610678-FT1EPNG Section 5.12 ETC Marketing, Ltd. #610679-FT1EPNG Section 5.13 EOG Resources, Inc. #610720-FT1EPNG Section 5.14 Tesoro Refining & Marketing Company LLC #610724-FT1EPNG

Section 5.11 - ETC Marketing, Ltd. #610678-FT1EPNG Third Revised Volume No. 1A Version 0.0.0 (Rates per Dth/day) Rate Schedule FT-1 Term of TCD Reservation Usage Primary Receipt Primary Delivery Shipper Identification Service (Dth/d) Rate 1/ Rate Point(s) Point(s) ETC Marketing, Ltd Beginning on the 30,000 1a/ 1/ IJALCPLX DSCALTOP #610678-FT1EPNG in-service date and ending twenty-four months after the in-service date Alternate Receipt Alternate Delivery 1a/ 1/ Point(s) Point(s) STML ANA DSCALTOP STML PER STML SJN DPG&ETOP DSCALEHR SOCWR KRAMER 1/ Unless otherwise agreed by the Parties in writing, the rates for service shall be Transporter s maximum rates, as may be changed from time to time, for service under Rate Schedule FT-1 or other superseding Rate Schedules. The reservation rate shall be payable regardless of quantities transported. 1a/ As provided in Section 4.18 of the GT&C of Transporter s Tariff, the parties agree to the following negotiated rate(s) of $14.2880 per Dekatherm per month which shall not be subject to the applicable maximum or minimum Rate Schedule FT-1 reservation rate for the corresponding rate zone as set forth in Transporter s Tariff and which shall be payable regardless of quantities transported. 2/ Fuel and L&U shall be as stated on Transporter s Statement of Rates in the Tariff, as they may be changed from time to time, unless otherwise agreed between the Parties. 3/ Surcharges, if applicable: Unless otherwise specified, all applicable surcharges shall be the maximum surcharge rate as stated on the Statement of Rates, as they may be changed from time to time. ACA: The ACA Surcharge shall be assessed pursuant to Section 17 of the GT&C of the Tariff. 4/ This contract does not deviate in any material aspect from the form of service agreement.

Section 5.12 - ETC Marketing, Ltd. #610679-FT1EPNG Third Revised Volume No. 1A Version 0.0.0 (Rates per Dth/day) Rate Schedule FT-1 Term of TCD Reservation Usage Primary Receipt Primary Delivery Shipper Identification Service (Dth/d) Rate 1/ Rate Point(s) Point(s) ETC Marketing, Ltd Beginning on the 20,000 1a/ 1/ SIDRICH DSCALTOP #610679-FT1EPNG in-service date and ending twenty-four months after the in-service date Alternate Receipt Alternate Delivery 1a/ 1/ Point(s) Point(s) STML ANA DSCALTOP STML PER STML SJN DPG&ETOP DSCALEHR SOCWR KRAMER 1/ Unless otherwise agreed by the Parties in writing, the rates for service shall be Transporter s maximum rates, as may be changed from time to time, for service under Rate Schedule FT-1 or other superseding Rate Schedules. The reservation rate shall be payable regardless of quantities transported. 1a/ As provided in Section 4.18 of the GT&C of Transporter s Tariff, the parties agree to the following negotiated rate(s) of $14.5920 per Dekatherm per month which shall not be subject to the applicable maximum or minimum Rate Schedule FT-1 reservation rate for the corresponding rate zone as set forth in Transporter s Tariff and which shall be payable regardless of quantities transported. 2/ Fuel and L&U shall be as stated on Transporter s Statement of Rates in the Tariff, as they may be changed from time to time, unless otherwise agreed between the Parties. 3/ Surcharges, if applicable: Unless otherwise specified, all applicable surcharges shall be the maximum surcharge rate as stated on the Statement of Rates, as they may be changed from time to time. ACA: The ACA Surcharge shall be assessed pursuant to Section 17 of the GT&C of the Tariff. 4/ This contract does not deviate in any material aspect from the form of service agreement.

Section 5.13 - EOG Resources, Inc. #610720- FT1EPNG Third Revised Volume No. 1A Version 0.0.0 (Rates per Dth/day) Rate Schedule FT-1 Term of TCD Reservation Usage Primary Receipt Primary Delivery Shipper Identification Service (Dth/d) Rate 1/ Rate Point(s) Point(s) EOG Resources, Inc. Beginning on the 20,000 1a/ 1/ IROCKDOV DSCALTOP #610720-FT1EPNG in-service date and ending twenty-four months after the in-service date Alternate Receipt Alternate Delivery 1a/ 1/ Point(s) Point(s) STML ANA DSCALTOP STML PER STML SJN DPG&ETOP DSCALEHR SOCWR KRAMER 1/ Unless otherwise agreed by the Parties in writing, the rates for service shall be Transporter s maximum rates, as may be changed from time to time, for service under Rate Schedule FT-1 or other superseding Rate Schedules. The reservation rate shall be payable regardless of quantities transported. 1a/ As provided in Section 4.18 of the GT&C of Transporter s Tariff, the parties agree to the following negotiated rate(s) of $12.7750 per Dekatherm per month which shall not be subject to the applicable maximum or minimum Rate Schedule FT-1 reservation rate for the corresponding rate zone as set forth in Transporter s Tariff and which shall be payable regardless of quantities transported. 2/ Fuel and L&U shall be as stated on Transporter s Statement of Rates in the Tariff, as they may be changed from time to time, unless otherwise agreed between the Parties. 3/ Surcharges, if applicable: Unless otherwise specified, all applicable surcharges shall be the maximum surcharge rate as stated on the Statement of Rates, as they may be changed from time to time. ACA: The ACA Surcharge shall be assessed pursuant to Section 17 of the GT&C of the Tariff. 4/ This contract does not deviate in any material aspect from the form of service agreement.

Section 5.14 - Tesoro Refining & Marketing #610724-FT1EPNG Third Revised Volume No. 1A Version 0.0.0 (Rates per Dth/day) Rate Schedule FT-1 Term of TCD Reservation Usage Primary Receipt Primary Delivery Shipper Identification Service (Dth/d) Rate 1/ Rate Point(s) Point(s) Tesoro Refining & Beginning on the 20,000 1a/ 1/ IRAMSEYN DSCALTOP Marketing Co LLC #610724-FT1EPNG in-service date and ending twenty-four months after the in-service date Alternate Receipt Alternate Delivery 1a/ 1/ Point(s) Point(s) STML ANA DSCALTOP STML PER DPG&ETOP STML SJN DSCALEHR SOCWR KRAMER 1/ Unless otherwise agreed by the Parties in writing, the rates for service shall be Transporter s maximum rates, as may be changed from time to time, for service under Rate Schedule FT-1 or other superseding Rate Schedules. The reservation rate shall be payable regardless of quantities transported. 1a/ As provided in Section 4.18 of the GT&C of Transporter s Tariff, the parties agree to the following negotiated rate(s) of $12.3654 per Dekatherm per month which shall not be subject to the applicable maximum or minimum Rate Schedule FT-1 reservation rate for the corresponding rate zone as set forth in Transporter s Tariff and which shall be payable regardless of quantities transported. 2/ Fuel and L&U shall be as stated on Transporter s Statement of Rates in the Tariff, as they may be changed from time to time, unless otherwise agreed between the Parties. 3/ Surcharges, if applicable: Unless otherwise specified, all applicable surcharges shall be the maximum surcharge rate as stated on the Statement of Rates, as they may be changed from time to time. ACA: The ACA Surcharge shall be assessed pursuant to Section 17 of the GT&C of the Tariff. 4/ This contract does not deviate in any material aspect from the form of service agreement.

Section 5 - Stmt of Negotiated Rates Third Revised Volume No. 1A Version 12.0.0 Section 5.1 El Paso Marketing Company, L.L.C. #FT2K2000 Section 5.2 WPX Energy Marketing, LLC #FT3HF000 Section 5.3 Mexicana de Cobre, S.A. de C.V. #FT3HK000 Section 5.4 ARM Energy Management, LLC #FT3HQ000 Section 5.5 Southwestern Public Service Company #610337-FH8EPNG Section 5.6 Arizona Public Service Company #610506-FH8EPNG Section 5.7 MRC Permian Company #610834-FT1EPNG Section 5.8 GIGO Transport, Inc. #610868-FT1EPNG Section 5.9 Centennial Resources Production, LLC #610782-FT1EPNG Section 5.10 Southwestern Public Service Company #611653-FH8EPNG Section 5.11 ETC Marketing, Ltd. #610678-FT1EPNG Section 5.12 ETC Marketing, Ltd. #610679-FT1EPNG Section 5.13 EOG Resources, Inc. #610720-FT1EPNG Section 5.14 Tesoro Refining & Marketing Company LLC #610724-FT1EPNG

Section 5.11 - ETC Marketing, Ltd. #610678-FT1EPNG Third Revised Volume No. 1A Version 0.0.0 (Rates per Dth/day) Rate Schedule FT-1 Term of TCD Reservation Usage Primary Receipt Primary Delivery Shipper Identification Service (Dth/d) Rate 1/ Rate Point(s) Point(s) ETC Marketing, Ltd Beginning on the 30,000 1a/ 1/ IJALCPLX DSCALTOP #610678-FT1EPNG in-service date and ending twenty-four months after the in-service date Alternate Receipt Alternate Delivery 1a/ 1/ Point(s) Point(s) STML ANA DSCALTOP STML PER STML SJN DPG&ETOP DSCALEHR SOCWR KRAMER 1/ Unless otherwise agreed by the Parties in writing, the rates for service shall be Transporter s maximum rates, as may be changed from time to time, for service under Rate Schedule FT-1 or other superseding Rate Schedules. The reservation rate shall be payable regardless of quantities transported. 1a/ As provided in Section 4.18 of the GT&C of Transporter s Tariff, the parties agree to the following negotiated rate(s) of $14.2880 per Dekatherm per month which shall not be subject to the applicable maximum or minimum Rate Schedule FT-1 reservation rate for the corresponding rate zone as set forth in Transporter s Tariff and which shall be payable regardless of quantities transported. 2/ Fuel and L&U shall be as stated on Transporter s Statement of Rates in the Tariff, as they may be changed from time to time, unless otherwise agreed between the Parties. 3/ Surcharges, if applicable: Unless otherwise specified, all applicable surcharges shall be the maximum surcharge rate as stated on the Statement of Rates, as they may be changed from time to time. ACA: The ACA Surcharge shall be assessed pursuant to Section 17 of the GT&C of the Tariff. 4/ This contract does not deviate in any material aspect from the form of service agreement.

Section 5.12 - ETC Marketing, Ltd. #610679-FT1EPNG Third Revised Volume No. 1A Version 0.0.0 (Rates per Dth/day) Rate Schedule FT-1 Term of TCD Reservation Usage Primary Receipt Primary Delivery Shipper Identification Service (Dth/d) Rate 1/ Rate Point(s) Point(s) ETC Marketing, Ltd Beginning on the 20,000 1a/ 1/ SIDRICH DSCALTOP #610679-FT1EPNG in-service date and ending twenty-four months after the in-service date Alternate Receipt Alternate Delivery 1a/ 1/ Point(s) Point(s) STML ANA DSCALTOP STML PER STML SJN DPG&ETOP DSCALEHR SOCWR KRAMER 1/ Unless otherwise agreed by the Parties in writing, the rates for service shall be Transporter s maximum rates, as may be changed from time to time, for service under Rate Schedule FT-1 or other superseding Rate Schedules. The reservation rate shall be payable regardless of quantities transported. 1a/ As provided in Section 4.18 of the GT&C of Transporter s Tariff, the parties agree to the following negotiated rate(s) of $14.5920 per Dekatherm per month which shall not be subject to the applicable maximum or minimum Rate Schedule FT-1 reservation rate for the corresponding rate zone as set forth in Transporter s Tariff and which shall be payable regardless of quantities transported. 2/ Fuel and L&U shall be as stated on Transporter s Statement of Rates in the Tariff, as they may be changed from time to time, unless otherwise agreed between the Parties. 3/ Surcharges, if applicable: Unless otherwise specified, all applicable surcharges shall be the maximum surcharge rate as stated on the Statement of Rates, as they may be changed from time to time. ACA: The ACA Surcharge shall be assessed pursuant to Section 17 of the GT&C of the Tariff. 4/ This contract does not deviate in any material aspect from the form of service agreement.

Section 5.13 - EOG Resources, Inc. #610720- FT1EPNG Third Revised Volume No. 1A Version 0.0.0 (Rates per Dth/day) Rate Schedule FT-1 Term of TCD Reservation Usage Primary Receipt Primary Delivery Shipper Identification Service (Dth/d) Rate 1/ Rate Point(s) Point(s) EOG Resources, Inc. Beginning on the 20,000 1a/ 1/ IROCKDOV DSCALTOP #610720-FT1EPNG in-service date and ending twenty-four months after the in-service date Alternate Receipt Alternate Delivery 1a/ 1/ Point(s) Point(s) STML ANA DSCALTOP STML PER STML SJN DPG&ETOP DSCALEHR SOCWR KRAMER 1/ Unless otherwise agreed by the Parties in writing, the rates for service shall be Transporter s maximum rates, as may be changed from time to time, for service under Rate Schedule FT-1 or other superseding Rate Schedules. The reservation rate shall be payable regardless of quantities transported. 1a/ As provided in Section 4.18 of the GT&C of Transporter s Tariff, the parties agree to the following negotiated rate(s) of $12.7750 per Dekatherm per month which shall not be subject to the applicable maximum or minimum Rate Schedule FT-1 reservation rate for the corresponding rate zone as set forth in Transporter s Tariff and which shall be payable regardless of quantities transported. 2/ Fuel and L&U shall be as stated on Transporter s Statement of Rates in the Tariff, as they may be changed from time to time, unless otherwise agreed between the Parties. 3/ Surcharges, if applicable: Unless otherwise specified, all applicable surcharges shall be the maximum surcharge rate as stated on the Statement of Rates, as they may be changed from time to time. ACA: The ACA Surcharge shall be assessed pursuant to Section 17 of the GT&C of the Tariff. 4/ This contract does not deviate in any material aspect from the form of service agreement.

Section 5.14 - Tesoro Refining & Marketing #610724-FT1EPNG Third Revised Volume No. 1A Version 0.0.0 (Rates per Dth/day) Rate Schedule FT-1 Term of TCD Reservation Usage Primary Receipt Primary Delivery Shipper Identification Service (Dth/d) Rate 1/ Rate Point(s) Point(s) Tesoro Refining & Beginning on the 20,000 1a/ 1/ IRAMSEYN DSCALTOP Marketing Co LLC #610724-FT1EPNG in-service date and ending twenty-four months after the in-service date Alternate Receipt Alternate Delivery 1a/ 1/ Point(s) Point(s) STML ANA DSCALTOP STML PER DPG&ETOP STML SJN DSCALEHR SOCWR KRAMER 1/ Unless otherwise agreed by the Parties in writing, the rates for service shall be Transporter s maximum rates, as may be changed from time to time, for service under Rate Schedule FT-1 or other superseding Rate Schedules. The reservation rate shall be payable regardless of quantities transported. 1a/ As provided in Section 4.18 of the GT&C of Transporter s Tariff, the parties agree to the following negotiated rate(s) of $12.3654 per Dekatherm per month which shall not be subject to the applicable maximum or minimum Rate Schedule FT-1 reservation rate for the corresponding rate zone as set forth in Transporter s Tariff and which shall be payable regardless of quantities transported. 2/ Fuel and L&U shall be as stated on Transporter s Statement of Rates in the Tariff, as they may be changed from time to time, unless otherwise agreed between the Parties. 3/ Surcharges, if applicable: Unless otherwise specified, all applicable surcharges shall be the maximum surcharge rate as stated on the Statement of Rates, as they may be changed from time to time. ACA: The ACA Surcharge shall be assessed pursuant to Section 17 of the GT&C of the Tariff. 4/ This contract does not deviate in any material aspect from the form of service agreement.