NHS England National Individual Placement and Support (IPS) Expansion

Similar documents
Housing Market Report

What salary will a typical first-time buyer need in 2020?

Enterprise Adviser (EA) Network Enterprise Adviser profile

Report on the results of auditors work 2015/16. Local government bodies

Local Transport Body contacts

Local Government Pension Scheme (England and Wales) Actuarial valuation as at 31 March 2013 Report on data used for experience analysis

As part of the BEIS Local Energy programme, BEIS has allocated 2.7m in this financial year to support the capacity of LEPs and local authorities to:

NHS Planning Guidance 2016/ /21

Help to Buy Buyer s Guide

Disability and Work Division. Provider-Led Pathways to Work: Official Statistics

Report on the results of auditors work 2015/16: NHS bodies

Quarter 4: Clinical Trials where the Date Site Selected occurred in the last 12 months to 31/03/2017

Contracted-out reconciliation

Cause célèbre or cause for concern? Local enterprise partnerships one year on


PRODUCT GUIDE FOR BUY TO LET MORTGAGES BY AXIS BANK

HomeBuy Direct Buyers Guide

MC/10/66. Financial Reporting in the Methodist Connexion (Annual Accounts) Basic Information

The Public Private Partnership (PPP) approach to delivering waste infrastructure - does it work? A Street Director, SLR Consulting Limited, UK

About the author. About the Education Policy Institute

The Autumn Statement, Business Rates, and Local Government

The Annual Audit Letter for Staffordshire and Stoke on Trent Partnership NHS Trust

Cordis Briefing April 2016

Audit Future Plans. Current position. Future funding. Links with NCIN. Revision of dataset. Bespoke audits

Systemic Anti Cancer Therapy (SACT) CTYA SSCRG. Kellie Peters

Established by Act of Pa,flartcnt

Fair Funding For Mental Health IPPR s Better Health & Care Programme

Survey of FRA Local Pension Boards 2017

INTRODUCTION. Economic Value of the Independent Museum Sector: Toolkit

LONDON ALLOWANCES. Introduction. Background. Types of allowances

LONDON ALLOWANCES. L o n d o n A l l o w a n c e s. Introduction. Background. Types of allowances

Help to Buy Buyer s Guide

Kingston Clinical Commissioning Group Report Summary

THE LOCAL GOVERNMENT PENSION SCHEME: BEYOND ASSET POOLING

LOCAL AUTHORITY SOCIAL SERVICES LETTER. 10 December 2007

NHS Operating Framework Key point summary, Page 1

GREATER MANCHESTER HEALTH AND SOCIAL CARE PARTNERSHIP STRATEGIC PARTNERSHIP BOARD

GB 15/096. Scoping a Personal Health Budget Service for Nottinghamshire. 1. Background

Property Investment Guide: Bradford

NHS Education for Scotland Board Paper Summary

Children and Young People s Mental Health Services Baselining Report

This report is to update the Committee on matters pertaining to primary medical care within NHS England.

Marmot Indicators 2015 A preliminary summary with graphs

2018/19 Planning, Commissioning Intentions and Governing Body Assurance Framework

POLICE FEDERATION OF ENGLAND AND WALES SURVEY OF MEMBERS 2006 TOP-LINE REPORT

FINANCIAL STATEMENTS FOR THE YEAR ENDED 31ST DECEMBER 2015

Civitas Social Housing PLC. Half Year Report to 30 September 2018

Meeting of the West of England Academic Health Science Network Board. Agenda Item: 4.2. WEAHSN Business Plan 2017/18

Welfare to work programmes: an overview

SHEFFIELD TEACHING HOSPITALS NHS FOUNDATION TRUST EXECUTIVE SUMMARY REPORT TO THE BOARD OF DIRECTORS 21 FEBRUARY 2018

Operational Plan Document for 2018 & Oxford Health NHS Foundation Trust

Regional employer National Insurance contributions Holiday for New Businesses. Technical Note, Draft Legislation and Explanatory Notes

Payment system reform proposals for 2019/20. A joint publication by NHS England and NHS Improvement

member support HR & Employment Law Update support when you most need it Sarah Linden Deputy Senior Solicitor, ASCL 4 June 2015

Finance and QIPP (Quality, Innovation, Productivity & Prevention) Plan 2015/16 John Ingham, Chief Financial Officer

Stephen Butler. Renewal notice. Charity and Community Insurance renewal pack

Investment in the NHS facing up to the reform agenda. Professor Nick Bosanquet Andrew Haldenby Henry de Zoete

HALLETT ARENDT RAJAR TOPLINE RESULTS - WAVE /LAST PUBLISHED DATA

Monopsony in the UK. 10th October Abstract. We study the evolution and effects of monopsony power in the UK private sector labour market from

TAMESIDE AND GLOSSOP SINGLE COMMISSIONING BOARD. 11 April 2017

Commissioning for Quality and Innovation (CQUIN)

GOVERNING BODY REPORT

2017/18 Financial Plan and Budgets. John Ingham, Chief Finance Officer, NHS Norwich CCG. Discussion and Approval

The Committee is asked to receive this report and note the recommended actions.

Gender Pay Gap Report 2017

Report. Chris Ford Joint Chief Finance Officer

Agenda Item 6.4 CCG Board EXECUTIVE SUMMARY SHEET

NHS financial sustainability

Financing the future HSC achieving sustainability?

DEVON TOPS THE LEAGUE TABLE OF PENSIONER WELLBEING

Internal Medicine National Programme of Care

CIoS System Strategic Estates Group Briefing

The survey was conducted on a self-completion basis through an online survey. Overall 39 valid responses were received.

3 February 2016 Enclosure H1

BVCA Private Equity and Venture Capital Report on Investment Activity 2012

The Economic Impact of Housing Organisations on the North: Wakefield and District Housing

LGPS Pooling: Delivering the Benefits

FUNDING FOR MENTAL HEALTH SERVICES MOVING TOWARDS PARITY OF ESTEEM?

2017/18 Quality, Innovation, Productivity and Prevention Programme

Vicki Taylor, Deputy Chief Finance Officer. Vicki Taylor 16/03/2018. No Commissioning, Finance and Performance Committee

Little sign of a summer lull

NHS Finance. Denise Lewis Deputy Director of Finance

Tussell Index of UK Public Procurement. May 2017

MEETING: Governing Body AGENDA ITEM: 6 DATE: 13 December 2018 TITLE: Governing Body Assurance Framework December 2018 AUTHOR:

Agenda Item 8: National Infrastructure Commission and Budget Update

update on indicators of financial sustainability in the NHS

Clinical Commissioning Policy Statement: Fampridine for Multiple Sclerosis (MS) April 2013 Reference : NHSCB/D04/PS/c

BOARD PAPER - NHS ENGLAND. Title: Allocation of resources to NHS England and the commissioning sector for 2015/16

Public Sector Exit Payments: response to the consultation

Country profile Key indicators. United Kingdom. Directorate-General. Analysis Unit B1. Regional and Urban Policy

Fraud Investigations NHS Clinical Commissioning Groups

Manchester Health and Care Commissioning. Finance Committee. Terms of Reference

2015 No. 755 PUBLIC SERVICE PENSIONS, ENGLAND AND WALES. The Local Government Pension Scheme (Amendment) Regulations 2015

NHS financial temperature check

Healthcare costing standards for England

MEMORANDUM OF UNDERSTANDING

Appendix:6.2 MEETING: Paul Sinden Director of Commissioning CONTACT AUTHOR: DETAILS: SUMMARY:

South Central Ambulance Service NHS Trust. Annual Audit Letter Audit 2006/07 October 2007

INVITATION TO TENDER

Policy and Resources Committee 21 March 2017

Transcription:

NHS England National Individual Placement and Support (IPS) Expansion Lauren Melleney (lauren.melleney@nhs.net) Adult Mental Health Programme, NHS England 28/11/2018 www.england.nhs.uk

The Mental Health FYFV target NHS England has committed to doubling access to Individual Placement and Support (IPS) services by 2020/21 enabling people with SMI to find and retain employment. 2016/17 2017/18 2018/19 2019/20 2020/21 Baseline audit of IPS provision undertaken www.england.nhs.uk STP areas selected for targeted funding 25% increase in access to IPS 60% increase in access to IPS 100% increase in access to IPS

NHS Benchmarking Baseline Data Collection Service Location Shows office location for submissions received Some services cover wide geographical areas Colour coded by NHS England region

Summary

Service users being supported Service users on the caseload on 31 st March Includes job seeking and job retention Range from 10 to 600 per team (not benchmarked) Where population data was available, this showed an average of 24 service users being supported per 100,000 population.

Job seeking vs job retention (patients on caseload) IPS includes Placing people in jobs and supporting them to remain in those jobs, but not supporting people to retain jobs they did not obtain via IPS.

National Service User Profile Gender 53% 47% Age

Referrals to Employment Services In total, 14,602 referrals were received during 2016/17. Teams reported receiving an average of 195 referrals during 2016/17. Where population data was available, teams reported an average of 85 referrals per 100,000 population.

Referrals to Employment Services Range in acceptance of referrals. Around ¼ of Employment Support teams accept 100% of referrals. National average = 87%

Access: Waiting lists Waiting list data shows 507 service users were on the waiting list on 31 st March. Some variation in how waiting lists were calculated e.g. awaiting assessment or assessed and awaiting a case worker. Participants reported a median position of 4 weeks from referral to first appointment with the team. This is comparable to initial waits to access Generic Community Mental Health Teams.

Jobs achieved 5,140 paid jobs achieved last year, ranging from fewer than 10 to nearly 400 per team. The median position reported was 37 per team. In part, depends on team focus e.g. job seeking vs. job retention.

Jobs sustained 3 months On average, 72% of jobs achieved are sustained for at least 3 months.

Jobs sustained 6 months On average, 60% of jobs achieved are sustained for at least 6 months. Thus, jobs sustained for 3 months are likely to continue until at least 6 months. Most jobs (58%) are for at least 16 hours per week.

NHS England Investment Strategy Year 1 Year 2 Year 3 2018/19 2019/20 2020/21 Application Process Wave 1 Expansion at pace (2018/19) Wave 1 Expansion at pace (2019/20) Application Process Wave 2 Increasing provision in areas that do not have any/ provision is limited (2019/20) Wave 2 Increasing provision in areas that do not have any/ provision is limited (2020/21) www.england.nhs.uk

www.england.nhs.uk 21 STPs awarded Wave 1 NHS England transformation funding

Investment in IPS: Wave 1 funding (2018/19 2019/20) STP Bedford, Luton and Milton Keynes STP Black Country and West Birmingham STP Buckinghamshire, Oxfordshire and Berkshire West STP Cheshire & Merseyside STP Devon STP Frimley STP Herefordshire and Worcestershire STP Lincolnshire STP Mid and South Essex STP North East London STP North West London STP Northamptonshire STP Shropshire STP Somerset STP South East London STP South West London STP Staffordshire and Stoke on Trent STP Suffolk & North Essex STP and Hertfordshire & West Essex STP Sussex and East Surrey STP West Yorkshire and Harrogate STP These STPs have been awarded transformation funding in Wave 1, as they have existing high-quality, independently assured IPS services that will expand at pace over the next two years to good fidelity. www.england.nhs.uk

Wave 2 process Proposal 1. In order to better manage demand, we will request invitations of interest up front, to help us manage funding. The expression of interest will be requested in the autumn and we will allow areas time to return an initial proposal form to us outlining: Current service provision and set up; Fidelity review and scores plus dates of reviews; Outline of initial plans for expansion; Numbers seen at present; Accurate estimates of numbers to be seen; Rough estimate of costs required 2. This would be followed by a second part to the proposal (likely in January again), which would ask for responses, similar to Wave 1, Approach to reducing inequalities; covering: Approach to coproduction; Plan for workforce development; Systems for monitoring on activity and outcomes; Plans for sustainability of the services. www.england.nhs.uk 17

Wave 2 process Proposal (2) 1. Services that missed out on wave 1 e.g. Services that are IPS services which haven t undergone an independent assessment/ fidelity review. Expansion 2. Services that currently work to a different model but want to become IPS compliant. Alignment 3. Completely new services that need setting up from scratch. New Service Development www.england.nhs.uk 18

IPS support initiative Phase 1 In order to support the growth of high quality IPS services, the Joint Work and Health Unit funded the discovery phase of an initiative in 2017/18. Led by Social Finance and a consortium of IPS experts, they developed materials and a website: o For service delivery; o For service users; o For commissioners; o For prospective IPS staff The initiative is known as IPS Grow, and the outputs of this programme can be found under http://ipsgrow.org.uk/. www.england.nhs.uk 19

IPS support initiative Phase 2 In order to ensure that more people in the UK are able to achieve job outcomes through the growth of consistently high quality IPS services, NHS England and the Joint Work and Health Unit intend to invest in a comprehensive support programme in 2018/19 and beyond. The support offer will include 3 different areas of activity: 1. Hands-on implementation support from a network of IPS experts; 2. A workforce development programme to support recruitment and training of IPS staff; 3. Developing, cascading and embedding tools to facilitate effective reporting, monitoring and evaluation the support provided by IPS services. This programme of work is currently undergoing national procurement processes. www.england.nhs.uk 20

Primary aims of EA in IAPT To more than double the number of EAs within IAPT services Increase the provision of combined mental health treatment and employment support, and standardise and improve the quality of employment support provided in IAPT services To assess the impact of Health and Employment outcomes of additional EAs ahead of potential bids to finance the roll-out of the programme nationally if it proves successful To allow IAPT therapists currently undertaking employment support to return to providing therapy increasing the clinical capacity of IAPT services www.england.nhs.uk 21

Progress in meeting these aims Doubling the number of EAs working in IAPT services: This aim was reached in February 2018 and we now have over 180 EAs and SEAs in post well in advance of the 127 whole time equivalent EAs in post in 2015 Providing more combined psychological treatment and employment support: Over 1,000 people a month starting employment support in each month since May 2018 More than 70% of these people are in wave 1 sites Standardise and improve the quality of employment support: Competency Framework, Training Needs Analysis of Wave 1 EAs, Learning Outcomes completed and Draft Curricula being agreed with training provider. Training Course Provider in place and EAs being registered to take part in training. Training for new and existing EAs in wave 1 services due to commence on 03 December 2018 and complete by 31 March 2019 www.england.nhs.uk 22

Progress in meeting these aims Improve mental health and employment outcomes for people by providing combined psychological treatment and employment support: Changes made to IAPT Minimum Data Set to better collect and report employment data items, further improvements will be part of IAPT Data Standard V2 update. Evaluation underway although much work is needed to encourage clients to take part in evaluation so that we get enough people involved to add the necessary power to our analysis to get concrete results Bid for Spending Review funding to extend EA in IAPT to all IAPT services in England: Bid submitted to continue to fund Wave 1 and Wave 2 sites until 31 March 2021 Bid submitted to extend EA in IAPT to all IAPT services during next Spending Review period. This will be dependent on positive evaluation outcomes. Increase IAPT therapy provision capacity by removing need for therapists to provide employment support We will be speaking to services to establish whether the provision of employment advisers has had a positive impact on the productivity of services www.england.nhs.uk 23

Next steps Recruitment Complete the recruitment of wave 2 SEAs and EAs by 31 December 2018 Continue to match therapist expansion with extra EAs to maintain the 1:8 ratio in both wave 1 and wave 2 sites Training Complete the Training Curriculum with the Training Provider Deliver the training for wave 1 EAs and SEAs Learn lessons from Wave 1 training, update course and deliver training to Wave 2 EAs and SEAs Review first year of wave 1 operation Complete the survey Host a visit from your Relationship Manager to discuss the content of the survey Results and lessons learnt from the review will be shared with Wave 2 sites Ate course and www.england.nhs.uk 24

Comments? Questions? www.england.nhs.uk 25