Work Method and OH&S Statement

Similar documents
Contractors Induction Booklet. Contractor s Name:

WORKING WITH CONTRACTORS POLICY AND PROCEDURE

Occupational Safety & Health Policy & Guidelines for Contractors

COMPANY POLICY FOR HEALTH AND SAFETY

MARKET OH&S PLAN 1 INTRODUCTION 2 OH&S RESPONSIBILITIES

SUB CONTRACTOR INDUCTION PACK

Contractor Safety Management Element November 2018

A Safety, Environmental and Labour rights Guide for Suppliers to British Airways

To provide all new employees with a standardized orientation to the county s safety program.

Control of Asbestos Regulations 2012 (SI 2012 No. 632)

(a) Implement and maintain this Safety and Health Program. (b) Conduct an aggressive loss prevention program.

OHS RISK MANAGEMENT GUIDELINES

Northern Territory Airports

Contractor Information

Vend Engineering Pty Ltd. Residential & Commercial construction Site Safety Pack For subcontractors

ATTACHMENT "I" SUBCONTRACTOR SAFETY, HEALTH, AND ENVIRONMENTAL MINIMUM PERFORMANCE STANDARD (MPS)

CONTRACTOR S RESPONSIBILITY FOR PROJECT SAFETY [Major Construction Category]

Contractor Guidelines

2016 CDM Smith All Rights Reserved July 2016 SECTION SAFETY, HEALTH, AND EMERGENCY RESPONSE

Contractor Management Procedure

PERSONAL PROTECTIVE EQUIPMENT. Your Practical Guide

Guideline for external contractors working on the premise of MANN+HUMMEL

S.I.A.S. Società Incremento Automobilismo e Sport SpA

PUBLIC COMPANY ORLEN LIETUVA OCCUPATIONAL HEALTH AND SAFETY PROCEDURE FOR CONTRACTORS BDS-40 I. GENERAL. Purpose and Scope of Application

PROHSP6 Control health and safety risks

Independent Contractor policy (Fremdfirmenordnung)

CONTRACTOR S RESPONSIBILITY FOR PROJECT SAFETY [Major Construction Category]

PEOP-048 OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEM FOR ENZED FRANCHISES

SAFETY POLICY. Office Address 5195 W. 58 th Ave. Unit F Arvada, CO

Minimum SHE Requirements for Construction Related RFQ projects

LEGAL SUPPLEMENT 1269

ENVIRONMENTAL INCIDENT RESPONSE

POWER CONSTRUCTION COMPANY CCIP PROGRAM SAFETY REQUIREMENTS

Preventing. slips and trips at work

Health and Safety Management System Overview

RISK CONTROL SOLUTIONS

HAZARD IDENTIFICATION AND ASSESSMENT

1.3 All employees are equally responsible for complying with the Ontario Occupational Health & Safety Act and its Regulations.

If you are unsure of which sections to complete, please contact us on

SASKATCHEWAN OCCUPATIONAL HEALTH AND SAFETY REGULATIONS

CONTRACTOR S RESPONSIBILITIES

KERANG DISTRICT HEALTH CONTRACTORS HANDBOOK

Working with third parties

Risk Assessment and Methodology Statement 2018

Guidelines on Occupational Safety and Health Management at the TEPCO Fukushima Daiichi Nuclear Power Plant

A1) General Safety Guidelines applicable to external employees at all Company workplaces.

Hazard Identification, Risk Assessment and Control Procedure

Power Construction Company CCIP Program Safety Requirements

PREQUALIFICATION QUESTIONNAIRE

Work Health and Safety Conditions

Health & Safety Policy

Safety & Health Manual

RULES, REGULATIONS AND GENERAL SPECIFICATIONS FOR SUB CONTRACT WORK

HONDA AUSTRALIA MOTORCYCLE AND POWER EQUIPMENT PTY LTD Hume Highway Campbellfield VIC OCCUPATIONAL HEALTH AND SAFETY

Contractors Registration Package

COMPREHENSIVE MINE SAFETY PROGRAM COMPANIES PROVIDING CONTRACT LABOR AT UNDERGROUND MINES

Skanska s Standard Terms and Conditions for Subcontracting

HEALTH, SAFETY & ENVIRONMENT PLAN

GASCADE Gastransport GmbH HSE-GUIDELINE-CONTRACTORS. Version 5 Status: 15th May 2017

Maxion Wheels Czech s.r.o.

Quick Guide to Incident Investigation and Reporting for Employers

Site-Specific Health and Safety Agreement

NZQA registered unit standard version 4 Page 1 of 5

Mine Health and Safety Regulation 2007

Health and Safety statement of intent

OSHA 1926 Subpart A General

Risk assessment Policy and Procedures

PROJECT RISK ASSESSMENT FORM

Table of contents. SaskPower Orientation Sign-off Form Contractor HSE Orientation Checklist... 37

HSE MANUAL. PO Box 14659, Zayed bin Sultan Street, Al Ain, U.A.E.., Tel: , Fax

INGHAM VILLAGE HALL. Registered Charity No

UNDERGROUND SERVICE STRIKES

PAGE 1 OF 7 HEALTH, SAFETY & ENVIROMENTAL MANUAL PROCEDURE: S220 Hazard Communication Program REV /13/2012

WORK IN OR ABOUT QR PROPERTY

COLIN PEACOCK LTD HEALTH AND SAFETY POLICY June 2014 PREFACE

Contractor Policy and Procedures. Contractor. Policy and Procedures. Working Together. November Borders College 4/12/ Working Together

CODE OF PRACTICE FOR SUBCONTRACTORS

WORK INTEGRATED LEARNING (WIL) PROGRAM STUDENT PLACEMENT AGREEMENT. This agreement is made on the day of 20..

Code of Practice. The principles, standards of behaviour and service delivery requirements for all FPA Australia Corporate Members

SITE RULES FOR CONTRACTORS At Darwin International Airport Version 3.0 August 2014

RISK ASSESSMENT POLICY 2018

Promoting Best Practices in safety and risk management with CDRA member companies CDRA Best Practices in Safety Awards Application

Supplier accreditation instructions

August 2008 I Queensland Mining Industry Health and Safety Conference

SAFETY POLICY PART 1 - GENERAL POLICY

Electric Transmission Texas, LLC Supplemental Safety Terms and Conditions

Environmental Management Policy

The Workers Advisers Office (WAO)

TAMPA ELECTRIC COMPANY ENERGY SUPPLY CONTRACTOR SAFETY COMPLIANCE PROGRAM

Sample Slip, Trip and Fall Prevention Program

Risk Assessment Policy

Information on Risk Assessments and Guidance on the Completion of KeeleSU General Risk Assessment Form

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY ATTACHMENT M SAFETY PROVISIONS GOODS AND SERVICES CONTRACTS

ab0cd EBRD CONTRACTOR CODE OF CONDUCT AND HEALTH AND SAFETY POLICY C:\WINDOWS\Temp\Temporary Internet Files\Contractor Code of Conduct.

Auckland Transport HS03-01 Risk and Hazard Management

HEALTH AND SAFETY POLICY

Driving for Work. HSA Perspective. Deirdre Sinnott Senior Inspector Work Related Vehicle Safety Program

Contractor Induction Handbook

APPROVED CODE OF PRACTICE FOR THE SAFE CONDUCT OF TRACK AND FIELD COMPETITION

Cooperation with the University s representatives, addressing specific safety issues at the Project.

Transcription:

Work Method and OH&S Statement for (Customer name) Work Site: (TBA) Quotation ref: (TBA) Produced by: Accredited Epoxy Applicators Pty Ltd (date) ACCREDITED EPOXY APPLICATORS PTY LTD 2007 Page 1

CONTENTS General Description and Information Description of the Project Attendances by the Main Contractor Specialist Method Statements AEA (QLD) Health and Safety Statement & Environmental Policy Quality Management System Test Certificate(s) Certificate(s) of Competence AEA (QLD) Management Management Structure Health and Safety Structure Personal Protective Equipment Appendix Closing Statement ACCREDITED EPOXY APPLICATORS PTY LTD 2007 Page 2

GENERAL DESCRIPTION and INFORMATION General The work covered by this Method Statement includes the preparation, supply and application of epoxy flooring systems and related work at AEA (QLD). Responsibilities Items to be supplied by AEA (QLD) are detailed on the schedule, including any additional items/matters. Specialists Method Statements Specialist s Method Statements where applicable will be listed below. Health and Safety The works will be executed in accordance with the relevant Health and Safety requirements and as our policies: - 'AEA (QLD) Health and Safety Policy Statement' 'AEA (QLD) Environmental Policy' Quality Management System AEA (QLD) operates a quality management system that complies with the requirements of ISO 9001-2000. Test Certificate Test Certificates for any relevant plant and/or equipment will be made available and listed below. Certificates of Competence Certificates of Competence were applicable will be made available and listed below. ACCREDITED EPOXY APPLICATORS PTY LTD 2007 Page 3

MANAGEMENT STRUCTURE ACCREDITED EPOXY APPLICATORS PTY LTD 2007 Page 4

HEALTH & SAFETY POLICY STATEMENT AEA (QLD) is totally committed to the promotion of Health & Safety. The Directors and I will provide, as far as is reasonably practicable, the necessary leadership and resources required to maintain health and safety. The company recognises that Health & Safety is a business function and must, therefore, continually progress and change. Our approach to safety is based upon the identification and control of risks. The company believes in constantly improving Health & Safety standards and performance. To this end it will endeavour to ensure that all relevant legislation, regulations and Codes of Practice are complied with. The minimum standards that will be adopted by the company are those required by law, although the company will always seek to exceed these where there is a demonstrable benefit. The company recognises that safety is the responsibility of everyone and not just a function of management. Our Worksite Supervisors have specific duties and responsibilities to comply with the letter and the spirit of company policy. However, the Health & Safety of our staff and of other people is an area in which ALL staff have obligations and responsibilities. The company actively promotes the involvement of all staff in safety management. In accordance with the requirements of the Health & Safety Act and the Management of Health & Safety at Work regulations, the Company will: Carry out suitable and sufficient risk assessments. Investigate accidents and near misses in order to determine their causes and take action to prevent a recurrence. In order to provide: safe plant and equipment safe place of work safe systems of work adequate supervision, training, instruction and Information To ensure that this policy is effective we will: review it annually, or on significant changes in our business make any such changes known to our staff maintain procedures for communication and consultation between all levels of staff on Health & Safety matters. Joseph R Kocka Operations Manager AEA (QLD) ACCREDITED EPOXY APPLICATORS PTY LTD 2007 Page 5

ENVIRONMENTAL POLICY AEA (QLD) recognises that concern for the environment is fundamental to the way in which it conducts business; and is committed to promoting awareness and a responsible attitude amongst its staff. In particular the company will: Comply with legal requirements, including Codes of Practice and other guidelines; obtain licences and other authorisations as required in order to comply with appropriate regulations. Make efficient use of energy and natural resources. Minimise waste and where practicable, ensure that waste products are re-cycled. Restrict the use of packaging to a minimum and where practicable, maximise the use of recycled materials. Controls air, water and noise pollution by the best available techniques not entailing excessive cost. Encourage the efficient and economical use of transport. Maintain the condition and appearance of company premises. Develop and provide products and services that help to conserve energy resources and; have no adverse effect on the environment. Promote awareness amongst all staff of company environmental policy and ensure their co-operation in implementing these standards and procedures. Encourage suppliers and customers to increase their awareness of, and improve environmental standards. Regularly review our environmental standard and procedures, and strive for continuous improvement in our performance, towards a standard which is greater than mere regulatory compliance. ACCREDITED EPOXY APPLICATORS PTY LTD 2007 Page 6

PERSONAL PROTECTIVE EQUIPMENT AEA (QLD) approved protective footwear and suitable high visibility clothing must be worn at all times when on site. Eye protection and respirator mask must be worn when treating concrete where there is danger from dust, debris or fragments of aggregate. High visibility jackets to be worn whenever required. Minimum P.P.E to be used when treating concrete will be: Respirator mask Safety boots High visibility jacket Gloves ACCREDITED EPOXY APPLICATORS PTY LTD 2007 Page 7

PART 1 PROCEDURES, HAZARDS AND SAFETY CONTROLS PROCEDURE (in steps) 1. All electrical equipment being used on worksite to be safe and operational 2. Delivery of work equipment onto worksite POSSIBLE HAZARDS Electrical fault and shock Collision with other workers or pedestrians may cause injury SAFETY CONTROLS Electrical equipment to be inspected independently by worksite supervisor to ensure certification and tagging is as per relevant State legislation Movement of equipment to be conducted slowly with second worker watching to warn of persons moving around area 3. Setup of work site Injury may occur to persons not familiar with worksite. Damage may be caused to equipment by improper use of worksite The worksite is to be set up with safety barriers in place to indicate worksite limits. During progress of work, worksite supervisor to continuously check safety barriers each day 4. Preparation of worksite floor for application of various flooring systems 5. Application of various flooring systems 6. Cleanup of worksite after completion of project 7. Someone has advised all workers about a FIRE or other emergency Ensure all grinding and floor preparation conducted without evicting flooring material which could cause injury Work should remain within safety barriers to ensure no other persons come in contact with materials being used Movement of equipment and materials from site, and final cleanup Fire may affect equipment and materials being used. Equipment could affect people moving about Floor(s) to be inspected each day for loose materials and other items before work commences. All loose materials to be placed in bins as provided and floor integrity to be confirmed Attention must be paid to any persons entering worksite. Warning signs to be in place if specific materials used. All MSDS and TDS are to be available at all times Safety barriers to remain until all equipment and materials have been removed. Measures to be taken to reduce dust during cleanup, and all rubbish to be placed in appropriate bins as provided Worksite supervisor to control situation. All persons are to be evacuated from the worksite immediately. All electrical equipment will be shut down and unplugged from power sources. Emergency Services will be advised of any hazardous material being used. ACCREDITED EPOXY APPLICATORS PTY LTD 2007 Page 8

PART 2 CONTRACTOR INFORMATION PERSONAL QUALIFICATIONS AND EXPERIENCE Operations Manager Thirty (30) years experience and qualified in Project Management, Business Management and processes, Workplace Safety Management Systems, Human Resources and Workplace Training and Assessment. Technical Manager Twelve (12) years experience and qualified in Project Management, Epoxy Systems Applications, Workplace Safety systems, Equipment maintenance and MSDS and TDS for products and materials used. The staff of AEA (QLD) have extensive experience with, and are fully trained in the operation of specific-to-task equipment. They are experienced in the use of and competent in handling and applying all products and materials pertaining to their industry. PERSONNEL, DUTIES AND RESPONSABILITIES The AEA (QLD) worksite Supervisors and staff are fully trained in the processes involving preparation and application of the various systems being applied. They are also trained in the use of all necessary equipment and materials used. TRAINING REQUIRED TO COMPLETE WORK As required depending on identified skills training The workplace supervisors of AEA (QLD) are fully trained in the operation of safety management systems, including environmental protection systems, OH&S legislation and reaction to emergency procedures.. REQUIRED ENGINEERING DETAILS/CERTIFICATES/WORKCOVER APPROVALS AEA (QLD) is covered by liability insurance and Work Cover if required. LIST ALL PLANT AND EQUIPMENT TO BE USED Three-head diamond grinding equipment. Electric hand grinders. Industrial vacuum cleaners. Air compressors and associated accessories. Sprayer for sealing surfaces All AEA (QLD) worksite supervisors are responsible for the safety management systems applicable to a worksite and for the wellbeing of all staff on a worksite and during an emergency evacuation. As required depending on identified skills training APPLICABLE CODE OF PRACTICE/AUSTRALIAN STANDARD, LEGISLATION Building and Construction Industry Payments Act 2004 Building and Construction Industry Payments Regulation Domestic Building Contracts Act 2000 Domestic Building Contracts Regulation 2000 Queensland Building Services Authority Act 1991 Queensland Building Services Authority Regulation 2003 Subcontractors Charges Act 1974 EVIDENCE OF MAINTENANCE CHECKS ACCREDITED EPOXY APPLICATORS PTY LTD 2007 Page 9