ASPEC Engineering HSE Management System Work Instruction

Similar documents
ASPEC Engineering HSE Management System Work Instruction

Contract HSE Management/Part I

Policy for Occupational Health, Safety and Environment Requirements for Contracted Construction and Maintenance Work

Occupational Safety & Health Policy & Guidelines for Contractors

WEST VALLEY SANITATION DISTRICT

The contract period will run from January 1, 2018 through December 31, 2020.

This document is meant to be a starting point for any company wanting to implement the safety passport scheme for their contractors on site.

SCHEDULE D TENANT TECHNICAL PROPOSAL

Common Safety Methods CSM

STANDARD TENDER DOCUMENTS FOR PROCUREMENT OF WORKS (MINOR CONTRACTS)

REQUEST FOR PROPOSALS

Notice Type: Request for Proposal

NEW YORK LIQUIDATION BUREAU REQUEST FOR PROPOSAL

a. Proposals shall be submitted in a sealed envelope and addressed as follows:

CONTRACTOR S RESPONSIBILITIES

ARTICLE 8: BASIC SERVICES

Request for Bid/Proposal

REQUEST FOR PROPOSALS

Request for Proposals (RFP): Process/Outcome/Cost Benefit Evaluation

Request for Proposal Records Management and Storage September 1, 2017

SUPPLIER EVALUATION QUESTIONNAIRE

REQUEST FOR PROPOSAL (RFP) For Auditing Service

Construction Project Manager TERMS OF REFERENCE

Contractor Safety Management Element November 2018

Request for Proposal. Broker and Risk Management Services For Redlands Christian Migrant Association, Inc. Combined Insurance Program

Request for Proposal. Property & Casualty Broker and Risk Management Services For Good Wheels, Inc. Mach 30, 2018

Control of Contractors Policy

Performance audit report. Inland Revenue Department: Performance of taxpayer audit follow-up audit

linked to the Australian National University s Work health and safety policy and is one of the procedures within the WHS Management System.

Contractor Health and Safety Code of Practice. Updated June 4, 2018

INSTRUCTIONS TO BIDDERS

Request for Fee Proposals (RFFP) Progressive Design-Build Services. New High School

REQUEST FOR PROPOSAL

Request for Proposal. Fabrication and Installation of Municipal Way-finding Signage Town of Orangeville. June 15, 2015

Air Partner plc (the Company ) Terms of reference for the Audit and Risk Committee (the Committee )

Pan-European VAT Compliance Co-ordination

Forsyth County Board of Education

Request for Proposals: Data Collection Services in Haiti

Z N Pearson (Member) Representative for the Appellant: Date of Decision: 8 June 2016 RESIDENCE DECISION

Implementation Planning

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Ohio Public Employees Retirement System. Request for Proposal. For: Actuarial Consulting Services. Date: October 21, 2016

Design and Construct Building Estimator. Career Development Program

ACCREDITATION OF BEE VERIFICATION AGENCIES

Technical Cooperation: Guidelines for Clients Managing Donor Funded Consultancy Assignments. October 2014

IPP TRANSACTION ADVISOR TERMS OF REFERENCE

FLORIDA DEPARTMENT OF FINANCIAL SERVICES DIVISION OF AGENT AND AGENCY SERVICES

Regulatory Policy. Licensing Banks

NAPA SANITATION DISTRICT Napa, California

REQUEST FOR QUALIFICATIONS FOR ON-CALL PROJECT MANAGEMENT AND TECHNICAL SUPPORT SERVICES

Guide to extension of enrolment

Worcestershire County Council: Use of External Consultants

Solar/ Renewable Energy - Alternative Power Source. Richmond, NH. Cheshire County Sheriff s Office. Request for Proposals

Information security policy

Transnet Freight Rail E.4E Transnet (August 2006) A Division of Transnet Ltd. TRANSNET LIMITED (Registration no. 1990/000900/06) PRIEVIEW COPY ONLY

REQUEST FOR SUPPLIER QUALIFICATION

PPP Regulation in Jordan

Request for Expression of Interest Pre-Qualification of Proponents

Proposals Directed To: Beach Cities Health District Proposal Contact: Monica Suua

CAMBRIDGESHIRE GUIDED BUSWAY OPERATIONS POLICY

BID SPECIFICATION VILLAGE OF OTTAWA HILLS revised ANNUAL TREE PRUNING Fall Spring 2021

REQUEST FOR PROPOSALS FOR CITY OF LAGUNA BEACH

CHARLOTTE PUBLIC SCHOOLS CONSTRUCTION MANAGEMENT SERVICES REQUEST FOR PROPOSALS ("RFP")

Request for Proposal for Actuarial Audit Services. March 20, 2017

(Insert Company Name and Logo at the Top) Project Name Abbreviated Project Definition

Santa Ana Unified School District

INVITATION FOR BIDS SUPERIOR COURT OF CALIFORNIA COUNTY OF STANISLAUS. REGARDING: IFB Title: Courthouse Signage IFB No

SUDBURY EAST PLANNING BOARD

Administrative Policy for Procurement, Bidding, Bid Specifications, Consulting, Request For Qualifications (RFQ), and Evaluation Criteria

Repair Authority - Terms of Authority

HALIFAX REGIONAL WATER COMMISSION PROCUREMENT POLICY. Edited May 22, 2012

EXPRESSION OF INTEREST EXTERNAL AUDIT SERVICES Tender No. AMREF/16/02/2018/001

UNICEF Moldova. Terms of Reference

REQUEST FOR PROPOSALS FOR INVESTMENT ADVISORY SERVICES

The City may choose to extend the contract one (1) additional year.

Request for Tender The Owners Corporation of Units Plan 2413 Landmark Strata and Building Management Services

Upon determination that liquidated damages are to be assessed, the Lottery shall notify the Contractor of the assessment in writing.

REQUEST FOR PROPOSALS

SAN DIEGO CONVENTION CENTER CORPORATION

TERMS OF REFERENCE FOR DRAFTING OF A BUSINESS CONTINUITY PLAN (BCP) FOR EBID

Risk Oversight Committee Charter

REQUEST FOR PROPOSAL FOR. Full Cost Allocation Plan and Citywide User Fee and Rate Study. Finance Department CITY OF HUNTINGTON BEACH

COMPLIANCE GUIDELINES

TOWN OF QUEEN CREEK S. ELLSWORTH ROAD QUEEN CREEK, AZ (480)

BUFFALO WILD WINGS, INC. GAMING COMPLIANCE PLAN ARTICLE I INTRODUCTION

REQUEST FOR QUOTES INFORMATION TECHNOLOGY SECURITY RISK ASSESSMENT SERVICES OFFICE OF THE STATE COURTS ADMINISTRATOR

December 30, Mr. Amis Lagzdins Senior Compliance Adviser Financial and Capital Market Commission Kungu Street 1. LV-1050 Riga, Latvia

Master Class: Construction Health and Safety: ISO 31000, Risk and Hazard Management - Standards

Procurement Department QUICK QUOTE. For

INTERIM CONTRACTOR PERFORMANCE EVALUATION

Risk Assessment Policy. (Whole School including EYFS)

Contractor Pre-qualification Questionnaire

REQUEST FOR EXPRESSION OF INTEREST

REQUEST FOR PROPOSAL Lake Ripley Management District (LRMD)

Request for Proposals (RFP)

INVITATION TO TENDER FOR THE CO-ORDINATION OF THE STUDENT ENTERPRISE AWARDS

REQUEST FOR PROPOSALS

HOUSING AUTHORITY OF THE CITY OF TULSA

County of Greene, New York REQUEST FOR PROPOSALS (RFP) TO PROVIDE INSURANCE BROKERAGE SERVICES FOR THE COUNTY OF GREENE

Quality Assurance Agreement (QAA)

Transcription:

1 Objective This work instruction outlines ASPEC s sub-contractor management process. The purpose of the process is to ensure that sub-contractors align with ASPEC/Clients Health, Safety and Environment (HSE) and quality standards. This work instruction applies to sub-contractors engaged for office or site based work involving one-off work, small crews and/or one person only. These contractors on-site must agree to abide by the Clients systems. For larger jobs, refer to AE-PMS-MA-0001 EPCM Project Manual for a more detailed contractor management procedure. This work instruction provides people with a guide to their responsibilities, in terms of managing contractors. It is recognised that contracted work varies in the size of the contract, the period/continuity of the presence on-site, and whether ASPEC employees or client representatives manage sub-contractor work on-site. 2 Accountabilities Role Project Leaders Project Controller Directors Employees/s Sub-contractors Accountability To engage sub-contractors To evaluate sub-contractors To supervise/ arrange client supervision of contractors on site To ensure that sub-contractors complete the ASPEC HSE induction To issue a purchase order to sub-contractors To issue invoices to sub-contractors To approve authority to commit funds when sub-contractor work exceeds 30K To abide by ASPEC/ the client s HSE and quality management systems To meet the project timeline and budget as specified in the proposal/ project plan Complete the ASPEC HSE induction Follow ASPEC and client procedures at all times Take the ASPEC site safety plans to site 1

3 ASPEC Sub-contractor Workflow Outlined below is the workflow of sub-contractor engagement for ASPEC project-based work. Identify subcontractor Requirements Potential subcontractors evaluated Write and submit proposal to client incorporating sub-contractor details ASPEC Pre- Qualificat ion of Supplier Kick-off meeting - Project plan, revise schedule Project work Evaluate performance Project improvements Sub-contractor engaged and write proposal Certificates of Currency, Signed Terms of Business received Contractors issue progress reports/ meetings Safety plans Issue purchase order Site work supervised by ASPEC Issue deliverables Subcontractor completes ASPEC induction 4 Sub-contractor Selection When ASPEC identifies an opportunity to submit a tender or proposal to a client, whereby the scope of work requires additional resources or skills to complete a job, ASPEC will identify the need to engage a sub-contractor for the duration of a project. 4.1 Sub-Contractor Evaluation Criteria 4.1.1 The ASPEC Directors have established a list of pre-approved subcontractors with whom ASPEC has previously worked with and have 2

already agreed upon ASPEC s commercial conditions. The benefits of using these contractors are that: They present a lower risk of product non-conformance as their performance has been previously evaluated on past projects They are familiar with ASPEC/ the clients quality and HSE standards They have already accepted the commercial conditions therefore there is minimal chance of a change in this respect They have already been accepted by the client. 4.1.2 ASPEC Project Leaders, in consultation with ASPEC Principals/Group Leaders may identify that there is a strategic advantage of using a particular contractor due to the expertise/ reputation/ relationship with the client they possess 4.2 Contractor engagement 4.2.1 After a contractor has been identified for use for a project, the ASPEC Project Leader will make telephone contact with the contactor to see their availability to perform the work. 4.2.2 The Project Leader will then provide ASPEC s commercial conditions, the Client s commercial conditions and a scope of work and ask the contractor to submit a proposal. 4.2.3 The Project Leader will evaluate the proposal using the criteria outlined below. Any comments amendments will then be negotiated with the contractor (cost, scope, methodology). Is the methodology appropriate for the project? Is the scope appropriate for the project? Do the proposed employees contain the necessary knowledge, skills and expertise to perform the project to meet ASPEC/ the clients standards? Does the proposed timeline meet the time requirements for the project? 3

4.2.4 The Project Leader will then incorporate the contractor scope of work, resources and cost into the ASPEC proposal submitted to the client. 4.2.5 If the ASPEC proposal is successful the contractor will be contacted and awarded the job. If the project is unsuccessful the contractor is contacted by telephone/ email and informed of the result. 4.2.6 ASPEC s Project Controller will invite the Sub-contractor to complete an online pre-qualification check. Following receipt of this, which includes a signed ASPEC Terms of Business, a purchase order is issued to the subcontractor detailing the scope of work and budget allocation. 4.2.7 The Project Leader will then arrange to issue the contractor with the link to the ASPEC Health, Safety and Environment (HSE) induction. This is used as a safeguard to ensure that sub-contractors abide by ASPEC protocols. 4.2.8 If there is a tight deadline for the project, or the Project Leader identifies that it is necessary that the sub-contractors/ ASPEC personnel commence work before the purchase order is received from the client, then an approval to commit funds must be sought. The Project Leader can approve funds for projects under 30K The Directors must approve funds for projects over 30K 4.3 Post award of contract 4.3.1 At the beginning of the project, the Project Leader will schedule a kick-off meeting with the relevant contractor representatives preferably using a face-to-face medium. The Project Leader will then assign responsibilities to the project team members The Project Leader will then facilitate project planning: revision of the timeline, assigning tasks, scheduling meetings, scheduling milestones The minutes of the meeting will be issued to the project team 4

4.3.2 The sub-contractor will produce interim progress reports and meetings as detailed in the contractor scope/proposal. 4.4 Site-based contractor work 4.4.1 The project team will complete a Site Safety Plan comprising a comprehensive risk assessment and site project plan for the project (refer to : Site Safety Plan). It is ensured that all ASPEC and contractor work, procedures, equipment, qualifications meet ASPEC and the client s safety requirements. The ASPEC supervisor will ensure that the contractor completes the JSA/ JHA as required using the ASPEC/ client form meeting the ASPEC HSE criteria (Refer to AE-HSE-PR-0003 Hazard Identification and Risk Management Procedure). 4.4.2 Whilst on site, the contractors must agree to conform to the clients site procedures. Any non-conformances/ incidents which occur however must be additionally reported in the ASPEC incident/ non-conformance systems. 4.4.3 The ASPEC Project Leader will then supervise the sub-contractor on site. However, if a long site visit is required, the project leader may arrange an appropriate client representative to supervise the contractor on site. It is essential that responsibility is clearly specified. Sub-contractors are required to take the completed and signed Site Safety Plan to site. Sub-contractors are required to inform both ASPEC and client representatives what dates/times they will be going on site and the specific activities they will be undertaking under supervision. 4.5 Sub-contractor evaluation 4.5.1 The Project Leader will evaluate the performance of the sub-contractor (the report and site work undertaken) against the following criteria: Meeting deadlines The quality of the work The cost-effectiveness Client satisfaction 5

4.5.2 If the Project Leader deems the sub-contractor as not conforming to ASPEC s Quality Management System, then a non-conformance will be lodged and an investigation will be undertaken (Refer to AE-QMS-WI- 0004). 5 Document Control Revision Completed on Author 0 22-11-2017 S Cardow Comments Conversion to new internal document numbering system for HSE. Update to be compliant with AS4801 and ISO14001. Modification to workflow referencing ASPEC Terms of Business be signed by sub-contractor and received by finance department prior to ASPEC purchase order is issued and payment of invoices. 6