Overview of the 2016 Proposed Budget

Similar documents
CITY OF INVER GROVE HEIGHTS A G E N D A CITY COUNCIL WORK SESSION September 3, :00 PM INVER GROVE HEIGHTS CITY HALL LOWER LEVEL TRAINING ROOM

GOVERNMENTAL CAPITAL

FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary

CIP. February,

City of Des Moines. Citizen Engagement Capital Improvement Program. November 29, 2016

CAPITAL IMPROVEMENT ELEMENT Inventory Analysis

Stephanie Smith, Project EngineerW

November Financing Plan for the Capital Improvement Plan. City of Inver Grove Heights, Minnesota. Prepared By: City Staff And Ehlers

FY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary

City of Anoka 2019 Proposed Budget

Memorandum City of Lawrence City Manager s Office

Pinellas County Capital Improvement Program, FY2011 Through FY2016 INTRODUCTION AND BACKGROUND

GOVERNMENTAL CAPITAL

CITY OF JOPLIN FY 2018 PROPOSED BUDGET

Year 2014 Engineer s Report regarding the Status of ownership, Working order and Condition of the Public Infrastructure.

Village of Shorewood Long Range Financial Plan In Preparation for the 2015 Budget Process

City of Mountlake Terrace. Fourth Quarter 2014 Financial Report April 2, 2015

2019 Adopted Budget. August 2019

Balanced Financial Plan Projected Changes and Assumptions

LEGEND Bridges Parks Fire Stations Project Locations Libraries Schools A

FISCAL YEAR RECOMMENDED BUDGET

FINANCE COMMITTEE: Chairman Turk, Councilman Gerl, and Councilman Hug

CAPITAL IMPROVEMENTS ELEMENT:

City of Mountlake Terrace. Second Quarter 2016 Financial Report September 19, 2016

FIVE-YEAR FINANCIAL PLAN, CAPITAL IMPROVEMENTS PROGRAM AND MAINTENANCE PROGRAM

Village of Bensenville Proposed Annual Budget and Community Investment Plan

2018 Tax Levy and Budget December 4, :00pm

TABLE OF CONTENTS LIST OF TABLES

MAINTENANCE DEPARTMENT

Municipality of ANCHORAGE. MAYOR DAN SULLIVAN 2014 Municipal Bonds

COUNTY ADMINISTRATOR PUBLIC WORKS

2019 Operating & Capital Budget. November 26, 2018 City Council Meeting

CAPITAL IMPROVEMENT PROGRAM (CIP) POLICY AND STRUCTURE

EVANSTON. FY 2017 Proposed Budget Presentation. Martin Lyons, Assistant City Manger / CFO Lara Biggs, City Engineer.

QUALITY TRANSPORTATION SUMMARY

Infrastructure Asset Management. Southwest Chula Vista Civic Association April 26, 2007

CAPITAL PROJECTS Department Expenditures By Cost Center FY03 Actual FY04 Budget FY05 Request

Presentation by: City Manager, Murray Totland *check against delivery

Projects Receiving New Funding by. Funding Source and Project Number

Elected Officials & Citywide Administration Engineering Department Police Department Fire Department...

Carroll County Maryland. Community Investment Plan Request Fiscal Years

Ten-Year Capital Improvement Program (CIP)

The City uses a 7-point prioritization scale that is represented as follows: 1. Critical Significant Important 6. 7.

PUBLIC WORKS CIP SUPPORT

rall The City of Red Wing is dedicated to creating, preserving and enhancing the quality of life for all."

Capital Investment Program (CIP) About CIP

Borough of Ebensburg FY 2018 Budget Operating Fund Budget

CITY OF WAUSAU TAX INCREMENT DISTRICT NUMBER THREE

SPECIAL REVENUE FUNDS

CAPITAL IMPROVEMENT PROGRAM K-1

Prepared by: Minneapolis Park and Recreation Board Finance Department 2117 West River Road Minneapolis, Minnesota

City of Chino Five-Year Capital Improvement Program Budget Fiscal Years through

CAPITAL IMPROVEMENT PROGRAM K-1

Town of Smithfield Rhode Island 2019 Operating Budget

July 25, Members of City Council City of League City, Texas

CITY OF ROSEBURG, OREGON TABLE OF CONTENTS ENTERPRISE FUNDS

CITY OF PORT MOODY 2011 CAPITAL BUDGET SUMMARY

City of Ocoee Quarterly Report First Quarter Fiscal Year

2017 Draft Budget Presentation

Long Lake Ranch Community Development District

TOWN OF CARY CAPITAL IMPROVEMENTS BUDGET OVERVIEW FOR FISCAL YEAR 2015

Total Current Revenue: $450 million Current need: $1.12 Billion Funding Deficiency: 60%

The City of Arden Hills Truth-In-Taxation Hearing:

City of Orono, Minnesota Annual Budget

CITY OF ROSEBURG, OREGON TABLE OF CONTENTS SPECIAL REVENUE FUNDS

City of Cornwall 2014 Capital Report First Quarter

City Council Budget Work Session. City of McKinney August 4, 2017

Bylaw No The Capital Reserve Bylaw. Codified to Bylaw No (December 18, 2017)

Budget Public Hearing 6/16/2015

Capital Improvement Plan City of Rye, New York

2018 Five Year Financial Plan

This page intentionally left blank

CITY OF PORT MOODY 2009 CAPITAL BUDGET SUMMARY

City of Apple Valley Popular Annual Financial Report

CAPITAL IMPROVEMENT PROGRAM

Wastewater Rate Study. Villa Park, Illinois


Budget Overview. Section 2 BUDGET SUMMARIES

CITY OF HAILEY REVENUES WITH COMPARISON TO BUDGET FOR THE 1 MONTHS ENDING OCTOBER 01, 2017 GENERAL FUND

Reserves and Reserve Funds

Chapter Ten, Capital Improvements Element City of St. Petersburg Comprehensive Plan

Guelph/Eramosa 2016 Budget Presentation. Thursday, February 18, 2016

DATE: 11/21/2014 VILLAGE OF GERMANTOWN PAGE: 2 TIME: 09:48:29 FUND: GENERAL FUND TOTAL LICENSES 63,136 57,688 51,800 52,839 70,448 54,000 BUILDING INS

2018 CAPITAL BUDGET CAPITAL PLAN

Ada Township Capital Improvements Plan Adopted February 28, 2011

Wells Branch Municipal Utility District. Accounting Report. July 17, 2018

ID: BP WOW FUND: GENERAL FUND

VILLAGE OF MARSHALL TAX INCREMENTAL DISTRICT NO. 1 Marshall, Wisconsin

UNINCORPORATED CAPITAL

DESCRIPTIONS OF BUDGET TERMS

Proud Heritage, Exciting Future ASSET MANAGEMENT PLAN

Governmental Capital Projects Organization Department Summary

Special Revenue Funds

The 2018 Budget Table of Contents

Fiscal Year Proposed Budget

FIVE-YEAR FINANCIAL PLAN, CAPITAL IMPROVEMENT PLAN AND MAINTENANCE PROGRAM

EVANSTON. FY 2019 Proposed Budget Presentation. October 22, City Manager s Office

City of Des Moines. Budget Workshop. December 7, 2015

510 Green Bay Road, Winnetka, Illinois Administration and Finance (847) or

STORMWATER MANAGEMENT FUND Department of Environmental Services

Transcription:

Overview of the 2016 Proposed Budget City of Burnsville November 24, 2015

2016 Budget Process Meeting Dates June 9 July 14 August 11 September 8 October 20 October 27 Discussion Topics Financial Management Plan Review Budget Pressures Council Worksession on Revenue and Fees Council Gives Direction to Staff to Prepare Maximum Tax Levy Council Adopts Maximum Tax Levy Virtual Open House Video Release Department Budget Presentations at Worksession November 10 November 24 December 8 Council Worksessions on the Budget: General Fund & Other Property Tax Supported Funds Capital Projects, CIP, & Enterprise Funds Council Adopts Tax Levies and Budget

Summary of Budget Process to Date June estimated 3.7% for current service level & adopted plans + facilities plan September - approved 4.9% max tax 3.5% for current service level & adopted plans 1.4% facilities plan debt service Proposed lowered to 4.5% 3.1% for current service level & adopted plans 1.4% facilities plan capital levy

Meeting Agendas November 10 Overview of budget General Fund Special Revenue Funds Tax Increment Finance (TIF) Funds November 24 Capital Improvement Program Debt Service Funds Enterprise Funds Follow up Information on Fee Proposals 4

Capital Improvement Program (CIP) 2016-2020 A Long-term Plan for the City s Capital Assets Page 119-145

Public Works Capital Improvement Program (CIP) Street Projects Collector / Thoroughfare Intersection Improvements Street Lights Water System Sanitary Sewer System Storm Water Management 6

Capital Improvement Program Other Capital Plans Parks Vehicles and Equipment Facilities Information Technology (IT) Ice Center Golf Ames Center 7

Public Works Streets & Utilities CIP $75.2 million Over 5 Years $25.2 in 2016 8

Public Works CIP $75.2 million Over 5 Years 2020 Streets Utilities 2019 Streets Utilities 2018 Streets Utilities 2017 Streets Utilities 2016 Streets Utilities $0 $5 $10 $15 $20 $25 $30 Street Project Intersection Impr Collector/Thoroughfare Exp Water & Sanitary Sewer Storm Water 9

Streets

Street Projects $41.5 million Over 5 Years 2020 Recon/Rehab $7.6 2019 Recon/Rehab $7.1 2018 Recon/Rehab $8.6 2017 Recon/Rehab $4.2 2016 Recon/Rehab $8.1 $0 $2 $4 $6 $8 $10 $12 $14 $16 Millions Recon/Rehab Overlays Intersection/Lights Collector/Thoroughfare 11

Street Projects Funding Sources 2020 S/A ITF & MSAS Utilities 2019 S/A ITF & MSAS Utilities 2018 S/A ITF & MSAS Utilities 2017 S/A ITF & MSAS Utilities 2016 S/A ITF & MSAS Utilities Other $0 $2 $4 $6 $8 $10 $12 Millions S/A ITF & MSAS Utilities Other 12

2016 Street Projects Annual Street Rehabilitation - $930,000 $160,000 from utility funds Annual Street Reconstruction - $7.2 million $2.5 million from utility funds 13

Collector/Thoroughfare $1.3 million in 2016 Dupont Ave/126 th St/Cliff Road Improvements $885,000 Trail Extension on County Roads $400,000 14

Intersection Improvement City and County Traffic Signal Replacement $430,000 (2016) $1.2 million 2017-2020 15

Street Un-programmed Projects Burnsville Parkway / 35W Bridge Element Rehab TH 13 / 35W Bridge Element Removal Cliff Road Trail (East of TH 13) 16

Utilities CIP Water & Sanitary Sewer Storm Water

Water System $12.8 million in 2016 Meter/AMI Replacement Project $8.7 million (2016) System Rehabilitation $1.5 million (2016) Storz Hydrant Nozzle $200,000 (2016) $475,000 (2017-18) Ground Water Plant Rehab $6.3 million (2016-18) Street Recon & Rehab - Water $1,800,000 (2016) $5,570,000 (2017-2020) 18

Sanitary Sewer System Management $1.9 million in 2016 Lift station rehabilitation $1.7 million (2016) $520,000 (2017-2020) Sanitary sewer rehabilitation $165,000 (2016) $880,000 (2016-2020) Street Recon & Rehab Sanitary Sewer $340,000 (2016) $1,180,000 (2017-2020) 19

Storm Water Management Annual Capital Programs Lateral Drainage Modifications (LDM) $80,000 (2016) $350,000 (2017-2020) Pond Cleanout/Outfall Improvement $315,000 (2016) $1.3 million (2017-2020) Street Recon & Rehab Storm Water $550,000 (2016) $2,150,000 (2016-19) 20

Storm Water Management Lift Station Rehab $100,000 (2016) $750,000 (2017-2020) Black Dog Outfall Replace - $660,000 (2017) Crystal Beach Park & Keller Lake Water Quality Improvements $850,000 (2016) 21

Storm Water Management Other Future Project Highlights Ravine Restoration $1,000,000 (2018-2020) 27 th /Hayes Storm Water Basin $445,000 (2017-18) Future Water Quality Pond Improvements $1,000,000 (2019) 22

5-Year Financial Plans Capital Project Funds

Improvement Construction Fund Purpose is accounting for the portion of capital costs related to revenues from sources other than MSAS & ITF Other funding sources Intergovernmental Special Assessments Bonding Transfers Zero Balance Fund

Improvement Construction Fund Sources & Uses Millions $2.5 $2.0 $1.5 $1.0 $0.5 $0.0 2016 2017 2018 2019 2020 Sources Uses Ending Fund Balance

Infrastructure Trust Fund Purpose is maintenance of infrastructure Two funding sources ITF levy & MSAS $50,000 additional tax levy in 2016 MSAS revenue varies with the state-aid streets in the recon & rehab areas Fund Balance sufficient to provide cash flow and project contingency at a target goal of approximately $2 million

Infrastructure Trust Fund Sources and Uses of Funds Millions $7.0 $6.0 $5.0 $4.0 $3.0 $2.0 $1.0 $0.0 Ending Fund Balance ITF Levy MSAS Streets, Parks & Debt ITF Levy MSAS Streets, Parks & Debt ITF Levy MSAS Streets, Parks & Debt ITF Levy MSAS Streets, Parks & Debt ITF Levy MSAS Streets, Parks & Debt 2015 2016 2017 2018 2019 2020 27

Street Maintenance Fund Street maintenance projects that extend the life of the existing street system and smaller roadway improvements and traffic control issues Roadway Preventative Maintenance Pavement marking Right of Way Maintenance Monuments

Street Maintenance Fund Sources & Uses Millions $0.9 $0.8 $0.7 $0.6 $0.5 $0.4 $0.3 $0.2 $0.1 $0.0 2016 2017 2018 2019 2020 Sources Uses Ending Fund Balance

Parks Capital Fund Capital Improvement Projects in the City s Park & Trail System

Parks Capital Fund General Fund support assumes annual increases $825,000 ($100,000 increase) in 2016 Transfers of $925,000 - $1,000,000 (2017-20) Infrastructure Trust Fund 10% of the ITF levy Development fees estimated at $100,000 annually (Fees updated based on recently completed appraisal) 31

Parks Capital Source of Funds $6.4 million over 5 years (page 73) 2020 General Fund, $1,000,000 ITF Levy $340,000 Dev Fee $100,000 2019 General Fund, $975,000 ITF Levy $335,000 Dev Fee $100,000 2018 General Fund, $950,000 ITF Levy $330,000 Dev Fee $100,000 2017 General Fund, $925,000 ITF Levy $325,000 Dev Fee $100,000 2016 General Fund, $825,000 ITF Levy $320,000 Dev Fee $150,000 $0 $200,000 $400,000 $600,000 $800,000 $1,000,000 $1,200,000 $1,400,000 General Fund ITF Levy Dev Fee 32

Parks Capital Expenditures Projects in the next 5 years are mainly renovations 2016 Highlights Lac Lavon Building Skate Park Phase II Bicentennial Gardens Black Dog Regional Trail Park System Master Plan Park Entrance Signs $1.7 million in projects waiting for funding (see page 71 for list of projects) 33

Parks CIP Use of Funds $6.9 million over 5 years 2020 2019 Renovations Renovations 2018 Renovations 2017 2016 Renovations Renovations $0.0 $0.2 $0.4 $0.6 $0.8 $1.0 $1.2 $1.4 Millions Renovations New - Improvements New - Trails (net of grant funding) 34

Parks Capital Fund Sources & Uses Millions $4.5 $4.0 $3.5 $3.0 $2.5 $2.0 $1.5 $1.0 $0.5 $0.0 2016 2017 2018 2019 2020 Sources Uses Ending Fund Balance

Equipment, Vehicle & Facilities Capital Funds Funds Split into two separate funds Equipment & Vehicle Fleet Facilities capital repairs & renovations Provides flexibility for timing of major replacements

Equipment & Vehicle Highlights 2015 Fleet Software Upgrade Will allow for more efficient use of vehicles, fleet rightsizing and proactive preventative maintenance Facility Improvement Plan Identified facility needs and options to meet long-term needs of aging facilities Plan shows a negative fund balance in the future years Future plans will need to address Reprioritize uses with results of facilities study Additional funding / one-time funds / LGA balance

Equipment & Vehicle Fund Sources & Uses Millions $2.5 $2.0 $1.5 $1.0 $0.5 $0.0 -$0.5 2016 2017 2018 2019 2020 Sources Uses Ending Fund Balance

Equipment & Vehicle Fund Source of Funds $9.7 million over 5 Years 2020 General Fund Transfer $1.6 2019 General Fund Transfer $1.5 2018 General Fund Transfer $1.4 2017 General Fund Transfer $1.4 2016 General Fund Transfer $1.3 $0.0 $0.5 $1.0 $1.5 $2.0 Millions General Fund Transfer LGA Dedicated to Capital Utility Fund Transfers Sale of property & interest 39

Equipment & Vehicle Fund $9.7 million over 5 years 2019 Vehicles and equipment $1.9 2018 Vehicles and equipment $1.4 2017 Vehicles and equipment $2.1 2016 Vehicles and equipment $1.0 $0.0 $0.5 $1.0 $1.5 $2.0 $2.5 millions 40

Facility Fund Sources & Uses Millions $9.5 $9.0 $8.5 $8.0 $7.5 $7.0 $6.5 $6.0 $5.5 $5.0 $4.5 $4.0 $3.5 $3.0 $2.5 $2.0 $1.5 $1.0 $0.5 $0.0 2016 2017 2018 2019 2020 Sources Uses Ending Fund Balance

I.T. Capital Fund Information Technology Capital Equipment Hardware & Software

I.T. Capital Plan Highlights Hosted Services Moved to operating in General Fund 43

I.T. Capital Equipment Plan $2.8 million over 5 years 2019 Computers and Infrastructure Software Dev. Public Safety $179,250 $9,000 $117,300 Other $52,800 2018 Computers and InfrastructureSoftware Dev. Public Safety $218,750 $9,000 $94,700 Other $70,800 2017 Computers and Infrastructure $225,750 Software Dev. $14,040 Public Safety $168,800 Other $127,600 2016 Computers and Infrastructure $354,000 Software Dev. $14,000 Public Safety $136,345 Other $236,300 $0 $100,000 $200,000 $300,000 $400,000 $500,000 $600,000 $700,000 $800,000 44

I.T. Capital Fund Sources & Uses Millions $0.8 $0.6 $0.4 $0.2 $0.0 2016 2017 2018 2019 2020 Sources Uses Ending Fund Balance

Enterprise Funds Business-Type Activities Revenues are User Fees & Charges

Enterprise Funds $35.9 million Water and Sewer 74.3% Storm Sewer 14.5% Ice Center 2.6% Golf Course 0.7% Street Lighting 1.4% Ames Center 6.4% Sidewalk Snow Plowing 0.2% 47

Water & Sewer Fund $30.1 million Ground & Surface Water Treatment Plants Water Distribution Wells Waste Water Collection & Conveyance

Water & Sanitary Sewer Fund Proposed 2016 Water Rates Three tiered rate to comply with State Statute to encourage water conservation $2.77 per 1,000 gallons 4.5% increase $3.46 per 1,000 gallons 4.5% increase No change to base rate 49

Water & Sanitary Sewer Fund Proposed 2016 Sanitary Sewer Rates Net increase of 4.5% annually in the five year plan 8.6% increase in Met Council environmental services charge absorbed. City sewer rate was decreased to offset. Future Met Council environmental services rate increases will not be able to be offset by City sewer decreases. 50

Water & Sewer Fund Proposed Capital Projects Aging water production and revenue collection infrastructure Improvements needed at 30+ year old plant Meter replacements critical for revenue collection Capital Improvement Funding Proposed a combination of bonding and use of fund balance in each year of the 5-year plan Future rate increases are proposed to remain steady at 4.5% annually 51

Water Meter Replacement Meter replacement charge is based on meter size Funding dedicated to repayment of project cost for replacement of meters and radio units. Funding plan includes future revenues recaptured by new meters.

Storm Water Fund $5.9 million Fund system maintenance Preserve water quality Support improvements in the Water Resource Management Plan 53

Storm Water Fund Rate Overview Based on property s land use and size Amount of storm water run-off a property generates (residential equivalent units) Commercial/industrial properties are generally larger and have more impervious surface 1% increase is proposed for 2016 Future rate increases projected to be 1% annually Fund replacement of aging system Fund City s adopted Water Resources Management Plan 54

Street Lighting Fund $557,000 Provide continuous and major roadway lighting Fund replacement of existing lights Provide funding mechanism for lighting improvements 55

Street Lighting Fund Fee Overview No increases proposed for 2016 Future increases projected at 3% Fee structure Continuous Major Roadway (flat rate) Street Light Replacement $170,000 in 2016 $680,000 (2017-2020) 56

Street Lighting Fund Sources & Uses Millions $0.8 $0.7 $0.6 $0.5 $0.4 $0.3 $0.2 $0.1 $0.0 2016 2017 2018 2019 2020 Sources Uses Ending Fund Balance

Sidewalk Snow Plowing Fund $91,000 Snow Plowing of City Sidewalks & Trails 58

Sidewalk Snow Plowing Fund Rate Overview Rates increase proposed for 2016 Rates increased to reflect new three-year agreement rebid for 2016-2018 Increases of $0.028/month for residential and $0.0031/foot for all others in 2016 Rates to remain flat for three years and a 5% increase for 2019 in the five-year plan Rates for residential are flat charge Rates for commercial are per lineal foot Contract service will be rebid for 2019

Sidewalk Snow Plowing Fund Sources & Uses $120,000 $100,000 $80,000 $60,000 $40,000 $20,000 $0 2016 2017 2018 2019 2020 Sources Uses Ending Fund Balance

Ice Center Fund $1.0 million No General Fund support for operations projected Significant capital expenditures anticipated in 5-year plan Roof Replacement $900,000 (2018) City will likely need to bond for the roof replacement 61

Ice Center Sources & Uses (including capital replacement) Millions $2.5 $2.0 Roof Replacement $1.5 $1.0 $0.5 $0.0 2016 2017 2018 2019 2020 Sources Uses Cash Balance

Golf Course Fund $270,000 Fees are at the top of the market no changes are proposed for 2016 Fund stable next 5 years / sufficient cash for capital improvements Parking lot replacement in 2020 2015 good year due to favorable weather conditions Projections are based on average weather 63

Golf Course Sources & Uses (including capital replacement) Millions $0.4 Parking Lot Replacement $0.2 $0.0 2016 2017 2018 2019 2020 Sources Uses Cash Balance

Ames Center $2.4 million Naming rights projected $100,000 annually Annual capital to maintain facility is included in the 5-year plan Projected to annually reduce the operating loss and the advance from the General Fund 65

Ames Center Operations $2,000,000 $1,500,000 $1,000,000 $500,000 $0 -$500,000 -$253,000 -$179,000 -$79,000 -$112,000 -$98,000 -$97,000 -$96,000 -$95,000 -$95,000 2012 Actual 2013 Actual 2014 Actual 2015 est. 2016 2017 2018 2019 2020 Operating Revenue Operating Expense Net Operating Loss

Millions Ames Center All Sources & Uses Includes: Transfers in/out & Host Fee Revenue $3.5 $3.0 $2.5 $2.0 $1.5 $1.0 $0.5 $0.0 $0.00 2012 Actual $0.14 2013 Actual $0.23 2014 Actual $0.11 $0.09 $0.08 $0.09 $0.13 $0.16 2015 est 2016 2017 2018 2019 2020 Operating Revenue Operating Expense Total Income (loss)

Debt

Outstanding Debt $54.7 million Year ended 2015 Special Assmt Impr Projects 24.5% Tax Increment 9.0% Utility Funds 30.9% Ice Center Renovation 8.2% Maint Facility 0.7% Ames Center 26.7%

Debt Balances Historical and Projected $80 $70 $60 $50 $40 $30 $20 $10 $0 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 Proj 2017 Proj 2018 Proj 2019 Proj 2020 Proj millions Spec Assmt Improvements Tax Increment Utility Funds Other Facilities & Equip Ames Ctr

2016 Debt Service $1,200,000 $1,169,350 $1,000,000 $800,000 $600,000 $400,000 $200,000 $0 Debt Service Fund Levy ITF Fund Levy Use of General Fund Balance Ice Center $274,334 $140,000 Ames Center $68,000 Maintenance Facility $111,930 Street Improvements $672,410 $363,491

Debt Ratio Comparisons 250 200 150 100 50 0 Outstanding Debt to Tax Capacity Annual Debt Service to Tax Capacity

Proposed Plans for Issuance of Debt Debt to be issued to fund special assessment portion of projects annually Property Tax Supported Proposed 2017 bonding for Facilities Study Improvements No plans for any other issuance of property tax supported debt based upon the proposed CIP in 2016 Revenue (Utility) Supported Water and sanitary sewer utility, $13.6 million in 2016 $8.7 million for meter replacement Future years plan for bonding a portion of utility capital projects $1.8 $4.7 million annually 73

Proposed Bonding Millions $16 $14 $12 $10 $8 $6 $4 Facilities Improvements Bonds Water & Sewer Utility Bonds New Assessment Debt $2 $0 2016 2017 2018 2019 2020

Debt Analysis 5 Year Projection 80,000,000 70,000,000 60,000,000 50,000,000 40,000,000 30,000,000 20,000,000 10,000,000 Facilities Improvements Bonds Water & Sewer Utility Bonds New Assmt Debt New Debt from prior years Existing Debt - 2015 2016 2017 2018 2019 2020

Financial Management Plan Continuing disclosure addition

Fees & Charges Page 141-182

Criteria for Adjusting Fees Financial Management Plan Market comparison Fees set at upper quartile of the market Maximum set by external source Fees set by legislation or International Building Code Entrepreneurial approach Fees set at the top of the market Recover the cost of service Fees for the programs will be self-supporting where possible Utility fees Fees based on annual rate study 78

Proposed Utility Fee Adjustments for 2016 4.5% increase for Water and Sanitary Sewer projected to increase 4.5% annually in the five-year plan 1% increase for Storm Water projected to increase 1% in 2016 and 1.0% annually in all other years in the five-year plan No increase for Street Light Utility projected to increase 0% in 2015 and 3.0% annually in all other years in the five-year plan Increase for Sidewalk snowplowing in 2016, projected to increase approximately $3.32 per year for residential customers and approximately $.02 per foot each year for commercial customers projected to increase 5.0% in 2019 and 0% in all other years in the five-year plan Utility fee schedule can be found on pages 194-197 in the proposed budget materials 79

New Revenue Considerations Discussed Nov 10 How would Council like to proceed with the following new revenue sources? Franchise Fees - Council consensus was to proceed Lawful Gambling Fees - No More info needed on the following: Massage License Fee Increases Resellers Fees Liquor on-sale comparable cities

Fees & Charges Information Requests Massage Fees Liquor License Comparable Cities Reseller Reporting

Massage Fee Structure Alternative Annual License: Enterprise Annual License $200 (includes 1 person) Individual Annual License $75 Initial Application: Enterprise Investigation Fee $300 (includes 1 person) Individual Investigation Fee $200 Reduce investigation fee by $100 if applicant can provide a current background report from approved 3 rd party

Investigation Procedures Reviewed the suggested 3 rd party information Staff recommends accepting approved 3 rd party background check to partially reduce work involved

Liquor License $12,000 2015 On-Sale Liquor License $10,000 $8,000 $6,000 $5,250 $6,300 $7,000 $7,300 $7,500 $7,700 $8,000 $8,240 $8,600 $8,750 $8,775 $9,350 $9,600 $10,000 $4,000 $2,000 $0 Proposed 2016 Fee $7,875

Reseller APS Reporting Current Categories as determined in 2010 Electronic audio or video equipment Firearms Power tools Computers & related equipment Jewelry, coins, precious metals 62 Agencies report to APS Categories are consistent Upon review found no Goodwill, Salvation Army, consignment clothing that were reporting

2016 Budget Revenue Change Results Massage License $200 enterprise/$75 individual $25,000 Reseller Fees Delay implementation to April 2016 $15,000 Liquor License No change Total property tax increase $40,000

Summary of Budget Process to Date September - approved 4.9% max tax 3.5% for current service level & adopted plans 1.4% facilities plan debt service Proposed lowered to 4.5% 3.1% for current service level & adopted plans 1.4% facilities plan capital levy Revised Proposal - 4.7% 3.3% for current service level & adopted plans 1.4% facilities plan capital levy

Council Discussion Items Items to Consider Proposed for Discussion at the Nov. 10 Meeting Does the Council have any direction to give staff regarding the magnitude of the future General Fund tax levies as detailed in the five-year plan or reductions to pursue at this time? Council consensus was to proceed as proposed. Does the Council support uses of Fund Balance as proposed? Council consensus was to use fund balance as proposed. 88

Council Discussion Items Items to Consider Proposed for Discussion at the Nov. 24 Meeting Does the Council support the proposed Capital Improvements Plan as presented? The Five Year Plan for the Parks Capital Fund includes an increase of $100,000 in the tax levy support from the General Fund, for planning purposes, to maintain the present size of the park system. Does the Council support this increase? 89

Council Discussion Items Items to Consider Proposed for Discussion at the Nov. 24 Meeting The budget recommends committing Local Government Aid received over $50,000 be dedicated to Equipment & Facilities fund. Does the Council agree with this use? Does the Council agree with the planned increase in fees in 2016? Utility fees Revised New fees presented this evening Other fees as per fee schedule Other Discussion Items? 90

2016 Budget Process Meeting Dates June 9 July 14 August 11 September 8 October 20 October 27 Discussion Topics Financial Management Plan Review Budget Pressures Council Worksession on Revenue and Fees Council Gives Direction to Staff to Prepare Maximum Tax Levy Council Adopts Maximum Tax Levy Virtual Open House Video Release Department Budget Presentations at Worksession November 10 November 24 December 8 Council Worksessions on the Budget: General Fund & Other Property Tax Supported Funds Capital Projects, CIP, & Enterprise Funds Council Adopts Tax Levies and Budget

Remaining Key 2016 Budget Process Dates December 8 - Budget Adoption at 6:30 p.m. Virtual budget open house video can be viewed at /budget For more information on the City s budget, including these dates and other frequently asked questions, as well as staff contact information, citizens may go to the City s website 92