Consortium and Partnership Agreements NCP Academy training Prague 27 September 2017

Size: px
Start display at page:

Download "Consortium and Partnership Agreements NCP Academy training Prague 27 September 2017"

Transcription

1 Consortium and Partnership Agreements NCP Academy training Prague 27 September 2017 Poul Petersen Senior Executive Officer Research & Innovation EU Office Universitetsparken Copenhagen Ø Pope@adm.ku.dk

2 What is a Consortium Agreement? An agreement between beneficiaries in a project (action) Which regulates the rights and obligations of the beneficiaries and/or partners in a project. Which provides a frame for: how to make decisions how to avoid/solve conflicts how to terminate participation of a beneficiary

3 Why do you need a Consortium Agreement? Because it is mandatory according to the Grant Agreement To fill in gaps in the Grant Agreement To avoid complicated discussions or even court cases To provide a secure frame for the collaboration between the beneficiaries

4 Challenges in a Consortium Agreement Topic Not good Better Publication versus confidentiality Start of confidentiality period No or very long timeline before results can be published Date of disclosure (+ 5 years) Short and precise timeline for publication, often 30 days + 60 days The whole Project Period + 2 years after the end of the project Special rules for Ph.D. thesis Voting rights in the Consortium Access to background: Industry/Universities Secret Ph.D. thesis not accepted according to national law in some countries Voting rights accord. to budget size (large budget = more votes) Acces to Ph.D. thesis should follow the same publication rules as for other researchers in the project. 1 partner = 1 vote Acces needed to

5 Terminology changes from FP5 to H2020 FP5 FP6 FP7 H2020 Up Stream Pre-existing Know-How Background Background Down Stream Knowledge (results of the Project) Foreground Results

6 6. ACCESS RIGHTS - rights to use results or background a participant must grant access to its background a participant must grant access to its results if needed by another participant to implement project Royalty-free unless otherwise agreed before accession to the grant agreement Royalty-free if needed by another participant to exploit own results [ * ] Fair and reasonable conditions (to be agreed and may be royalty-free)

7 2. OWNERSHIP General rule: each participant owns the results it generates. Joint ownership: only if results are jointly generated results and it is impossible to determine the respective share of the work or to separate them for protection: Joint owners must reach an agreement, Each joint owner may grant non-exclusive licences to third parties, without the right to sub-license, if other joints owners are given prior notice & fair and reasonable compensation. Rights of employees & third parties.

8 Consortium agreement Regulates the internal organisation of consortium, including potential IPR issues (patent rights) Compulsory except otherwise mentioned in the call for proposal May not conflict with the contract Not signed nor approved by the Commission After or (preferably) before signing the contract Some decisions on IPR issues must be made by the participants if at all before signature of contract Non-binding guidelines published by the Commission

9 Marie Sklodowska Curie grants come in two forms Mono Grant Individual fellowship (IF) Multi Grant Innovative Training Network (e.g. ITN) Consortium Agreement is not compulsory IF often have a secondment phase Consortium Agreement is always compulsory ITN always have one or more secondment phases

10

11

12

13

14

15

16

17 A special MSCA - Consortium Agreement template (based on DESCA) Adapted terminology Adapted Governance structure Includes attachments with good templates

18

19

20

21

22

23

24

25 The University of Copenhagen does not always agree with DESCA og LERU

26 The objection has to include a precise request for necessary modifications If an objection has been raised the involved Parties shall discuss how to overcome the justified grounds for the objection on a timely basis (for example by amendment to the planned publication and/or by protecting information before publication) and the objecting Party shall not unreasonably continue the opposition if appropriate measures are taken following the discussion. The objecting Party can request a publication delay of not more than 90 calendar days from the time it raises such an objection. After 90 calendar days the publication is permitted, provided that Confidential Information of the objecting Party has been removed from the Publication as indicated by the objecting Party.

27

28 Global Fellowships have special challenges IARU template for secondments to American an other universities Special focus on Ownership, Inventorship, Liability, Responsibility of the Parties etc.

29

30

31

32

33

34 Some good advice Be careful. IPR issues mentioned in Annex I will overrule the Consortium Agreement. DESCA is a good template, but there are several other templates, e.g. LERU, IARU. Do not try to combine different templates. They might have a completely different structure. If in doubt use the IPR helpdesk:

35 Different challenges for CA negotiations Try to understand your opponent Some lawers think very differently than scientists and administrators

36 Different challenges for CA negotiations Some coordinators think they are dictators. Always refer to AMGA and Definitions. In FP7, Definitions are listed in Annex II (General Conditions). In H2020, Definitions are now part of Rules for Participation.

37 Different challenges for CA (2) Don t be afraid of joint ownership Both parties can sell licences but in praxis they have to negotiate and reach an agreement (IARU template)

38 IARU template for secondments to American an other universities Special focus on Inventorship, Ownership, Liability etc.

39 Summary Start early. It can take a long time to agree upon a Consortium Agreement Always try to have the CA signed before the GA

40 Never send money to a beneficiary before they have signed the CA even if they have already signed the GA. Don t be afraid to collaborate with big companies, but don t be naive either

41 Thank you for your attention

Employment Contract in MSCA

Employment Contract in MSCA Employment Contract in MSCA NCP Academy training on Legal and Financial Aspects of Marie Skłodowska-Curie Actions 7th October 2016, Prague Jana Kratěnová, L&F NCP H2020, TC CAS MSCA MGA MSCA-ITN/RISE/IF

More information

Financial Reporting What s new?

Financial Reporting What s new? Financial Reporting What s new? EARMA Luleå Financial reporting in H2020-what s new? 21 June 2016 Poul Petersen Senior Executive Officer Research & Innovation, EU Office Universitetsparken 1 2100 Copenhagen

More information

Belarus, 28 February 2008

Belarus, 28 February 2008 National Documentation Center (EKT/NHRF) FP7 Rules of Participation Funding schemes Financial issues Evaluation Criteria Implementation Submission Maria Samara, Administrative project officer Maria Koutrokoi,,

More information

Administrative, Financial and Operational Aspects of Project Management

Administrative, Financial and Operational Aspects of Project Management Administrative, Financial and Operational Aspects of Project Management European Commission Directorate General Environmental Technologies Unit Presentation 1. General overview of Grant Agreement 2. Duties

More information

Reporting and Monitoring, Participant Portal and SESAM

Reporting and Monitoring, Participant Portal and SESAM Reporting and Monitoring, Participant Portal and SESAM Research Executive Agency Marie Curie Host-Driven actions Mika Levonen ITN Coordinators briefing meeting Brussels, November 2013 Overview Project

More information

Financial management of H2020 projects: Tips & Tricks

Financial management of H2020 projects: Tips & Tricks Financial management of H2020 projects: Tips & Tricks BESTPRAC Training School: "Finance for Beginners" Per Inge Andresen Senior adviser NTNU Norwegian University of Science and Technology Agenda General

More information

Legal and Financial Issues in H2020

Legal and Financial Issues in H2020 Legal and Financial Issues in H2020 BESTPRAC Training School September 27, 2016 Katarina Rohsmann, FFG OVERVIEW ü Minimum requirements for participation ü Funding instruments and funding rates ü Grant

More information

MARIE CURIE INITIAL TRAINING NETWORK

MARIE CURIE INITIAL TRAINING NETWORK ANNEX III SPECIFIC PROVISIONS MARIE CURIE INITIAL TRAINING NETWORK [MULTI BENEFICIARY] III. 1 Definitions In addition to the definitions in Article II.1, the following definitions apply to this grant agreement:

More information

FCH JU GRANT AGREEMENT

FCH JU GRANT AGREEMENT FCH JU GRANT AGREEMENT COORDINATORS DAY Brussels, September 23 rd 2016 Georgiana Buznosu Legal framework of a H2020 project EU Financial Regulation 1. H2020 Rules for Participation Applicable Work Plan

More information

WELCOME TO THE DESCA 2020 LAUNCH! Brussels, March 24th, 2014 DESCA 2020 Launch March 2014 DESCA

WELCOME TO THE DESCA 2020 LAUNCH! Brussels, March 24th, 2014 DESCA 2020 Launch March 2014 DESCA WELCOME TO THE DESCA 2020 LAUNCH! Brussels, March 24th, 2014 Agenda 15:00 Welcome Rainer Steffens, Director, Representation of the State of North Rhine Westphalia to the European Union DESCA Core Group,

More information

EARMA Malta Financial reporting in H2020 and the latest amendments in the Model Grant Agreement 25 May 2017

EARMA Malta Financial reporting in H2020 and the latest amendments in the Model Grant Agreement 25 May 2017 EARMA Malta Financial reporting in H2020 and the latest amendments in the Model Grant Agreement 25 May 2017 Poul Petersen Senior Executive Officer Research & Innovation, EU Office Universitetsparken 1

More information

WORKSHOP ON THE HORIZON 2020 MODEL GRANT AGREEMENT

WORKSHOP ON THE HORIZON 2020 MODEL GRANT AGREEMENT WORKSHOP ON THE HORIZON 2020 MODEL GRANT AGREEMENT Brussels April 2013 Research and Innovation Workshops and consultations with NCPs' and stakeholders on the Horizon 2020 A first NCPs workshop on 15 November

More information

Consortium agreement and IPR issues Maria Habicht Estonian Research Council

Consortium agreement and IPR issues Maria Habicht Estonian Research Council Consortium agreement and IPR issues Maria Habicht Estonian Research Council May 28, 2013 Kaunas Letter of Commitment Memorandum of understanding Confidentiality or non-disclosure agreement Consortium agreement

More information

CONSORTIUM AGREEMENT

CONSORTIUM AGREEMENT Seventh Framework Programme (FP7) Call Reference N : FP7-ICT-2013-10 Grant Agreement N : 610425 PROJECT TITLE: Regional Anaesthesia Simulator and Assistant ACRONYM: RASimAs Collaborative Project CONSORTIUM

More information

CERTIFICATES ISSUED BY EXTERNAL AUDITORS FREQUENTLY ASKED QUESTIONS

CERTIFICATES ISSUED BY EXTERNAL AUDITORS FREQUENTLY ASKED QUESTIONS CERTIFICATES ISSUED BY EXTERNAL AUDITORS FREQUENTLY ASKED QUESTIONS VERSION MAY 2011 Disclaimer This document is aimed at assisting beneficiaries and auditors. It is provided for information purposes only

More information

IP Exploitation. Get your ticket to innovation. Video-conference Academy of Sciences of Moldova, 4 September European IPR Helpdesk

IP Exploitation. Get your ticket to innovation. Video-conference Academy of Sciences of Moldova, 4 September European IPR Helpdesk IP Exploitation Video-conference Academy of Sciences of Moldova, 4 September 2013 Get your ticket to innovation. Roadmap What is IP exploitation? Business scenarios for IP exploitation Focus on : Licensing

More information

Charles University Prague November 19-20, 2015

Charles University Prague November 19-20, 2015 Research & Innovation 10 th UNICA EU Research Liaison Officers Meeting Session III Financial Issues: MSCA Experiences with Financial Management and Eligible Costs Dos and Don ts Charles University Prague

More information

ITN 2010 Finance and Budget

ITN 2010 Finance and Budget Brussels, February 2011 ITN Coordinators meeting ITN 2010 Finance and Budget Research Executive Agency Marie Curie host-driven actions Financial Management of ITN Projects 1. The EU contribution The cost

More information

Model Grant Agreement LUMP SUM PILOT S2R JU

Model Grant Agreement LUMP SUM PILOT S2R JU HORIZON HORIZON 2020 2020 Model Grant Agreement LUMP SUM PILOT S2R JU Lump sum grant: introduction The grant agreement will set out the lump sum (EU funding) corresponding to the full accomplishment of

More information

H2020-ITN-2015 Info Day. Finance. Francisca CUESTA SÁNCHEZ. Research Executive Agency Unit REA-A1

H2020-ITN-2015 Info Day. Finance. Francisca CUESTA SÁNCHEZ. Research Executive Agency Unit REA-A1 H2020-ITN-2015 Info Day Finance Francisca CUESTA SÁNCHEZ Research Executive Agency Unit REA-A1 Overview 1. EU contribution 2. Eligible & ineligible costs 3. Funding mechanism 4. Cost categories 5. Records

More information

SESAR Joint Undertaking H2020 Legal Aspects

SESAR Joint Undertaking H2020 Legal Aspects SESAR Joint Undertaking H2020 Legal Aspects Call ref. H2020-SESAR-2016-2 Mrs. Edita Barauskaitė Legal and Procurement Officer Brussels, 22 March 2017 Overview 1. Who & under which conditions can participate?

More information

Administrative and financial aspects: recommendations for the preparation of proposals

Administrative and financial aspects: recommendations for the preparation of proposals Environment (including climate change) Theme 2012 Calls 17 June 2011 Administrative and financial aspects: recommendations for the preparation of proposals Vincent Favrel Deputy Head of Unit Unit I.6 Administration

More information

Partnership Agreements

Partnership Agreements LIFE+ Guidelines for Partnership Agreements LIFE+ Programme (European Commission) rev. July 2013 1 Grant agreements concluded under the LIFE+ programme can be implemented by more than one participant.

More information

Tips on Administrative issues and Financial Reporting KOM ANYWHERE Soraya Hidalgo European Projects Office - UPC

Tips on Administrative issues and Financial Reporting KOM ANYWHERE Soraya Hidalgo European Projects Office - UPC Tips on Administrative issues and Financial Reporting Soraya Hidalgo European Projects Office - UPC Outline H2020 Main changes Grant Agreement Structure Financial reporting Elegibility criteriai Do s and

More information

FCH 2 JU Grant Agreement.

FCH 2 JU Grant Agreement. FCH 2 JU Grant Agreement Nicolas.brahy@fch.europa.eu Why should I care about the GA at this stage? Time to Grant reduced 5 months for evaluation 3 months for signature no time for real negotiation! no

More information

FCH 2 JU GRANT AGREEMENT

FCH 2 JU GRANT AGREEMENT FCH 2 JU GRANT AGREEMENT Georgiana Buznosu - Legal Officer http://www.fch.europa.eu/ LEGAL FRAMEWORK OF A H2020 PROJECT EU Financial Regulation 1. H2020 Rules for Participation Applicable Work Plan 2.

More information

FINANCE AND BUDGET. Research Executive Agency Marie Curie host-driven actions. ITN Coordinators Meeting Brussels, September 2012

FINANCE AND BUDGET. Research Executive Agency Marie Curie host-driven actions. ITN Coordinators Meeting Brussels, September 2012 FINANCE AND BUDGET Research Executive Agency Marie Curie host-driven actions ITN Coordinators Meeting Brussels, September 2012 Financial Management of ITN Projects 1. EU contribution - cost categories,

More information

Legal and financial issues in Horizon Bonn,

Legal and financial issues in Horizon Bonn, Legal and financial issues in Horizon 2020 Bonn, 01.02.2017 www.nks-ruf.de National Contact Point Legal & Financial Issues Located in the EU-Bureau of the BMBF in Bonn and Berlin Advice on legal and financial

More information

BESTPRAC FAQs: Version TN1302: BESTPRAC

BESTPRAC FAQs: Version TN1302: BESTPRAC BESTPRAC FAQs: Administrative, financial and legal questions resulting from the provisions of the Model Grant Agreement / Consortium Agreement in Horizon 2020 Ellen Schenk (WG1 Administration leader, e.schenk-braat@erasmusmc.nl)

More information

Amendment Request Form National Authorities for Apprenticeships

Amendment Request Form National Authorities for Apprenticeships Executive Agency, Education Audiovisual and Culture ERASMUS + PROGRAMME Amendment Request Form National Authorities for Apprenticeships Agreement number: Proposal number: Title: Coordinator: DECLARATION

More information

MARIE CURIE INTRA-EUROPEAN FELLOWSHIP FOR CAREER DEVELOPMENT

MARIE CURIE INTRA-EUROPEAN FELLOWSHIP FOR CAREER DEVELOPMENT ANNEX III SPECIFIC PROVISIONS MARIE CURIE INTRA-EUROPEAN FELLOWSHIP FOR CAREER DEVELOPMENT III. 1 Definitions In addition to the definitions in Article II.1, the following definitions apply to this grant

More information

DG Justice & Consumers. Project Management.General Principles

DG Justice & Consumers. Project Management.General Principles DG Justice & Consumers Project Management.General Principles Project Life-Cycle Start Eligibility Monitoring End Eligibility Closing of Project A M E N D M E N T S Proposal Grant Agreement Progress report

More information

Why? Disclaimer: Information not legally binding

Why? Disclaimer: Information not legally binding LUMP SUM PILOT Why? Why? Simplification: No financial reporting, no time sheets, no financial audit. Payment exclusively based on completion of activity. Pilot scheme to evaluate results view to FP9 Start

More information

Katerina Tzitzinou, FP7 Legal & Financial NCP A practical guide for understanding EC funding and rules of participation

Katerina Tzitzinou, FP7 Legal & Financial NCP A practical guide for understanding EC funding and rules of participation Katerina Tzitzinou, FP7 Legal & Financial NCP katerina@help-forward.gr A practical guide for understanding EC funding and rules of participation 1st training, Sochi, 20-21 January 2010 Presentation Content

More information

H2020 General Model Grant Agreement Multi (H2020 General MGA Multi)

H2020 General Model Grant Agreement Multi (H2020 General MGA Multi) H2020 General Model Grant Agreement Multi (H2020 General MGA Multi) Version 2.1 1 October 2015 Disclaimer This document is aimed at assisting applicants for Horizon 2020 funding. It shows the full range

More information

Consortium agreements in ERA COFUND Actions Model Consortium Agreement by ERA LEARN M-ERA.NET 2 practical experiences

Consortium agreements in ERA COFUND Actions Model Consortium Agreement by ERA LEARN M-ERA.NET 2 practical experiences Consortium agreements in ERA COFUND Actions Model Consortium Agreement by ERA LEARN M-ERA.NET 2 practical experiences Roland Brandenburg, FFG NCP academy 25 Jan 2017 1 Content Overview P2P ERA-NET Cofund

More information

Exploitation of research results

Exploitation of research results Exploitation of research results Dr Sabine Albrecht EU / Eurice GmbH (Saarbrücken) St. Kliment Ohridski University / Sofia 20 March 2013 Get your ticket to innovation. Roadmap What is IP exploitation?

More information

CERTIFICATES ISSUED BY EXTERNAL AUDITORS GUIDANCE NOTES FOR BENEFICIARIES AND AUDITORS

CERTIFICATES ISSUED BY EXTERNAL AUDITORS GUIDANCE NOTES FOR BENEFICIARIES AND AUDITORS CERTIFICATES ISSUED BY EXTERNAL AUDITORS GUIDANCE NOTES FOR BENEFICIARIES AND AUDITORS MATERIALS PREPARED BY THE WORKING GROUP ON CERTIFICATE ON THE METHODOLOGY UNDER FP7: DG RESEARCH AND INNOVATION DG

More information

Clean Sky 2 JU 8 th Call for Proposals (CfP08)

Clean Sky 2 JU 8 th Call for Proposals (CfP08) Clean Sky 2 JU 8 th Call for Proposals (CfP08) Legal and Financial Aspects of the Grant Agreement for Partners (GAP) Brussels, 30 May 2018 Innovation Takes Off 1 Before submitting a project proposal: 1.

More information

P Periodic project report Please remove this front page when using the template

P Periodic project report Please remove this front page when using the template P Periodic project report Please remove this front page when using the template IMI1 programme Template for periodic project report Recommendations for project coordinators When preparing a periodic report,

More information

Potential Advantages of Mediation and Arbitration for Resolving IP and Technology Disputes

Potential Advantages of Mediation and Arbitration for Resolving IP and Technology Disputes Potential Advantages of Mediation and Arbitration for Resolving IP and Technology Disputes Adam Rattray WIPO Arbitration and Mediation Center Danube Initiative Summer School Budapest, Hungary September

More information

Webinar on Introduction to Lump Sum funding in Horizon Martin Baumgartner (FFG Austria) Morten Gylling (DAFSHE Denmark)

Webinar on Introduction to Lump Sum funding in Horizon Martin Baumgartner (FFG Austria) Morten Gylling (DAFSHE Denmark) Webinar on Introduction to Lump Sum funding in Horizon 2020 Martin Baumgartner (FFG Austria) Morten Gylling (DAFSHE Denmark) Who are we? A key objective of the NCP Academy project is to provide harmonised

More information

CSJU-Procedure 2.5. Guidelines for Members and Partners on Subcontracting

CSJU-Procedure 2.5. Guidelines for Members and Partners on Subcontracting CSJU-Procedure 2.5 Guidelines for Members and Partners on Subcontracting 03 October 2013 Revision History Table Version n Issue Date V. 01 19 November 2009 V. 02 03 October 2013 Clean Sky JU 2013 Please

More information

SME Participation in Horizon 2020 Including SME Instrument Phase 1

SME Participation in Horizon 2020 Including SME Instrument Phase 1 SME Participation in Horizon 2020 Including SME Instrument Phase 1 DG Research and Innovation, Unit B.3 SMEs, Financial Instruments and State Aid @ NCP Training October 7, 2014 Horizon 2020 for SMEs 20

More information

Guide to Financial Issues relating to ICT PSP Grant Agreements

Guide to Financial Issues relating to ICT PSP Grant Agreements DG COMMUNICATIONS NETWORKS, CONTENT AND TECHNOLOGY ICT Policy Support Programme Competitiveness and Innovation Framework Programme Guide to Financial Issues relating to ICT PSP Grant Agreements Version

More information

ERA-NET COFUND Financial Aspects General Principles. An overview and practical examples October 2016

ERA-NET COFUND Financial Aspects General Principles. An overview and practical examples October 2016 ERA-NET COFUND Financial Aspects General Principles An overview and practical examples October 2016 1 Content general financial aspects ERA-NET Cofund eligible costs and EC contribution calculation of

More information

European Joint Programme and ERA-NET Co-fund Actions under Horizon 2020 a primer

European Joint Programme and ERA-NET Co-fund Actions under Horizon 2020 a primer European Joint Programme and ERA-NET Co-fund Actions under Horizon 2020 a primer Alexandros IATROU Deputy Head of Administration and Finance Unit, Directorate for Energy DG Research and Innovation JOPRAD

More information

Multi-beneficiary Model Grant Agreement

Multi-beneficiary Model Grant Agreement Partnership for Research and Innovation in the Mediterranean Area Programme (PRIMA) Multi-beneficiary Model Grant Agreement Version 5.0 30 January 2018 Disclaimer This document is aimed at assisting applicants

More information

FP6 Contract and Financial Reporting. The Basics for EC Consortia. Linda Polik Research Services

FP6 Contract and Financial Reporting. The Basics for EC Consortia. Linda Polik Research Services FP6 Contract and Financial Reporting The Basics for EC Consortia Linda Polik Research Services linda.polik@admin.ox.ac.uk Overview of Presentation 1) Contractual Issues 2) Financial Issues 3) Reporting

More information

Guide to Financial Issues relating to FP7 Indirect Actions

Guide to Financial Issues relating to FP7 Indirect Actions Guide to Financial Issues relating to FP7 Indirect Actions Version 18/03/2013 Disclaimer This guide is aimed at assisting beneficiaries. It is provided for information purposes only and its contents are

More information

FP7 Specific Programme. «People» Policies and Marie Curie Actions. Dr. Barbara Rhode

FP7 Specific Programme. «People» Policies and Marie Curie Actions. Dr. Barbara Rhode FP7 Specific Programme «People» Policies and Marie Curie Actions Dr. Barbara Rhode Adviser to the Director of Directorate T Directorate General Research 1 Structure of the presentation Introduction: Policy

More information

SPONSORED RESEARCH AND COLLABORATION AGREEMENT

SPONSORED RESEARCH AND COLLABORATION AGREEMENT SPONSORED RESEARCH AND COLLABORATION AGREEMENT This agreement (the Agreement ) is made effective < insert date > (the Effective Date ). BETWEEN: THE GOVERNING COUNCIL OF THE UNIVERSITY OF TORONTO (the

More information

CLARIN-PLUS WP1 - Management. Hetty Winkel, Franciska de Jong Utrecht, 9 September 2015

CLARIN-PLUS WP1 - Management. Hetty Winkel, Franciska de Jong Utrecht, 9 September 2015 CLARIN-PLUS WP1 - Management Hetty Winkel, Franciska de Jong Utrecht, 9 September 2015 WP1 Objectives To take care of the financial, administrative and legal execution of the project in accordance with

More information

The Marie Curie Actions FP7 Financial Guidelines

The Marie Curie Actions FP7 Financial Guidelines The Marie Curie Actions FP7 Financial Guidelines SPECIFIC PROVISIONS RELATED TO MARIE CURIE ACTIONS FINANCED UNDER THE FP7 "PEOPLE" PROGRAMME Part 3: Projects funded in the PEOPLE Work Programmes calls

More information

Management of the projects in FP6. (the non-scientific side of ambitious research)

Management of the projects in FP6. (the non-scientific side of ambitious research) Management of the projects in FP6 (the non-scientific side of ambitious research) 1 Management: Key definitions What is management? The act, manner, or practice of managing; handling, supervision, or control.

More information

Project costs have to be actually incurred due to the project implementation, in order to be considered as eligible costs.

Project costs have to be actually incurred due to the project implementation, in order to be considered as eligible costs. Financial issues Extract from the guide for BONUS applicants 1 8. How to prepare project budget? Only the real costs required for the implementation should be indicated in the planned budget for the project.

More information

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1 AGREEMENT NUMBER

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1 AGREEMENT NUMBER GfNA-II-B-Erasmus+ Grant agreement multi beneficiary 2015 Agreement number: [complete] Standard grant agreement (multi beneficiaries): GRANT AGREEMENT for a: Project with multiple beneficiaries under the

More information

National Documentation Center (EKT/NHRF) Introduction to FP7

National Documentation Center (EKT/NHRF) Introduction to FP7 National Documentation Center (EKT/NHRF) Introduction to FP7 Maria Samara, Hellenic Alternate NCP for SSH Maria Koutrokoi,, Hellenic NCP for ICT, Research Infrastructures and Ideas Programme of FP7 Technical

More information

Working procedure for active substance approval

Working procedure for active substance approval Working procedure for active substance approval Version 6.0 The purpose of this document is to establish principles to be applied by participants in the work of the Biocidal Products Committee (BPC) and

More information

Brussels, 11 May FP7 Audit. DG RTD Unit M2

Brussels, 11 May FP7 Audit. DG RTD Unit M2 Brussels, 11 May 2011 FP7 Audit DG RTD Unit M2 1 Contents 1. Purpose of the audits 2. When, by whom and how selected 3. Phases of the audit 4. Common Mistakes 5. Systemic errors 6. Questions 2 Purpose

More information

Multi-Beneficiary Model Grant Agreement

Multi-Beneficiary Model Grant Agreement H2020 Programme Multi-Beneficiary Model Grant Agreement Pre-Commercial Procurement (PCP) and Procurement of Innovative Solutions (PPI) (H2020 MGA PCP/PPI Multi) Version 5.0 18 October 2017 Disclaimer This

More information

Questions & Answers Call for proposals 2018 H2020-S2RJU Date of publication: 19/02/2018

Questions & Answers Call for proposals 2018 H2020-S2RJU Date of publication: 19/02/2018 Questions & Answers Call for proposals 2018 H2020-S2RJU-2018 Date of publication: 19/02/2018 Document history Revision Date Description 1 05/02/2018 First publication Questions 1 to 3 2 15/02/2018 Questions

More information

ARTICLE I (Scope of Collaboration)

ARTICLE I (Scope of Collaboration) MEMORANDUM OF UNDERSTANDING BETWEEN THE REGENTS OF THE UNIVERSITY OF CALIFORNIA, ON BEHALF OF ITS DAVIS CAMPUS One Shields Avenue Davis, CA 95616 UNITED STATES OF AMERICA AND [RESEARCH INSTITUTION] [CITY/COUNTRY]

More information

Financial Webinar. IMI 2 projects :00 CET

Financial Webinar. IMI 2 projects :00 CET Financial Webinar IMI 2 projects 12.05.2017 10:00 CET Agenda How to use GoToWebinar o Gaëlle Lanckmans, IMI Finance Cost Eligibility o Gaëlle Lanckmans, IMI Finance Reporting requirements and Migration

More information

Project Administration

Project Administration Co-funded by the European Union Project Administration Maria Grazia Bonanomi, UCSC Diverse Kick-off meeting - Milan, 22-24 January 2014 Outline: - Context - Key features - Final Reporting Package - Eligible

More information

H2020 Annotated Model Grant Agreement (AGA) v 5.0 ( ) track changes

H2020 Annotated Model Grant Agreement (AGA) v 5.0 ( ) track changes H2020 GENERAL MGA 17 third parties Participants roles should correspond to their real contribution to the project. Main actors should be the beneficiaries and third parties should perform secondary tasks.

More information

ANNEX III FINANCIAL and CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS

ANNEX III FINANCIAL and CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS ANNEX III FINANCIAL and CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS I.1 Conditions for eligibility of unit contributions Where the grant takes the form of a unit

More information

COMMISSION DECISION. of

COMMISSION DECISION. of EUROPEAN COMMISSION Brussels, 10.12.2013 C(2013) 8197 final COMMISSION DECISION of 10.12.2013 authorising the use of reimbursement on the basis of unit costs for the personnel costs of the owners of small

More information

European Metrology Programme for Innovation and Research (EMPIR) Multi-beneficiary Model Grant Agreement. (EMPIR MGA - Multi)

European Metrology Programme for Innovation and Research (EMPIR) Multi-beneficiary Model Grant Agreement. (EMPIR MGA - Multi) European Metrology Programme for Innovation and Research (EMPIR) Multi-beneficiary Model Grant Agreement (EMPIR MGA - Multi) Version 5.0 12 March 2018 Version Publication Date 1.0 16.07.2015 Initial version

More information

Reporting and Payments. Legal Basis

Reporting and Payments. Legal Basis HORIZON HORIZON 2020 2020 Reporting and Payments Legal Basis Types of payments (Article 21) One pre-financing One or several interim payments One payment of the balance Payments Payments will be made to

More information

Negotiation Guidance Notes for

Negotiation Guidance Notes for MCRTN Negotiation Guidance Notes, May 2006 European Commission Research Directorate General Human Resources and Mobility Negotiation Guidance Notes for MARIE CURIE RESEARCH TRAINING NETWORKS (MCRTN) This

More information

Call title: FP7-SCIENCE-IN-SOCIETY

Call title: FP7-SCIENCE-IN-SOCIETY Call title: FP7-SCIENCE-IN-SOCIETY-2010-1 Call identifier: FP7-SCIENCE-IN-SOCIETY-2010-1 Date of publication: Thursday 30 July 2009 Deadline 1 : Thursday 21 January 2010 at 17.00.00, Brussels local time.

More information

Mono-Beneficiary Model Grant Agreement

Mono-Beneficiary Model Grant Agreement European Research Council (ERC) Mono-Beneficiary Model Grant Agreement ERC Proof of Concept (H2020 ERC MGA PoC Mono) Version 5.0 18 October 2017 Disclaimer This document is aimed at assisting applicants

More information

Nuclear Fission, Safety and Radiation Protection. Deadline: 13 November 2012, at , Brussels local time 1

Nuclear Fission, Safety and Radiation Protection. Deadline: 13 November 2012, at , Brussels local time 1 Nuclear Fission, Safety and Radiation Protection Call Identifier: FP7-Fission-2013 Date of publication: 10 July 2012 Deadline: 13 November 2012, at 17.00.00, Brussels local time 1 Indicative budget: EUR

More information

Guidance Amendment types & supporting documents. Version November 2016

Guidance Amendment types & supporting documents. Version November 2016 Guidance Amendment types & supporting documents Version 1.0 25 vember 2016 COVERED PROGRAMMES Horizon 2020, 3rd Health Programme, Asylum, Migration and Integration Fund, Consumer Programme, COSME, Internal

More information

Multi-Beneficiary Model Grant Agreement

Multi-Beneficiary Model Grant Agreement European Research Council (ERC) Multi-Beneficiary Model Grant Agreement ERC Starting Grants, Consolidator Grants and Advanced Grants (H2020 ERC MGA Multi) Version 5.0 18 October 2017 Disclaimer This document

More information

FP7 Simplification Workshop

FP7 Simplification Workshop FP7 Simplification Workshop WG 1 Community financial contribution Report General Remarks Generally, WG participants supported the extended use of lump-sum and flat-rate financing as a major mode to simplify

More information

The Lump Sum Pilot Methodology

The Lump Sum Pilot Methodology HORIZON HORIZON 2020 2020 Stakeholders Workshop on Simplification The Lump Sum Pilot Methodology Brussels, 20 October 2017 Peter Haertwich Lump sum: Why? Huge simplification potential: Despite all simplification,

More information

Financial errors in FP7 How to improve the quality of financial statements?

Financial errors in FP7 How to improve the quality of financial statements? Financial errors in FP7 How to improve the quality of financial statements? Oslo, 26 April 2013 Doroteya PETROVA ERC Executive Agency Marcin BARAN European Commission Introduction This presentation is

More information

JUST/2015/RGEN/AG/ROLE JUST/2016/RGEN/AG/VAWA

JUST/2015/RGEN/AG/ROLE JUST/2016/RGEN/AG/VAWA Project Management JUST/2015/RDAP/AG/MULT JUST/2015/RGEN/AG/ROLE JUST/2016/RGEN/AG/VAWA Kick-off Meeting 14 March 2017 1 Who s who? different actors Beneficiaries (mono or multi) and other project partners

More information

FP7 Financial Rules, Project Reporting and Tools

FP7 Financial Rules, Project Reporting and Tools FP7 Financial Rules, Project Reporting and Tools Dita Mocova EGEE-II / EGEE-III Transition Meeting CERN, Geneva 6-7 May 2008 www.eu-egee.org EGEE-III INFSO-RI-222667 Introduction 1. FP7 Financial rules

More information

Fit for Health 2.0 Brussels 13 September Audits in H2020 Mr Vittorio Morelli Deputy Head of the CAS

Fit for Health 2.0 Brussels 13 September Audits in H2020 Mr Vittorio Morelli Deputy Head of the CAS HORIZON HORIZON 2020 2020 Fit for Health 2.0 Brussels 13 September 2017 Audits in H2020 Mr Vittorio Morelli Deputy Head of the CAS Table of Contents 1. What is this presentation about? 2. Why do we do

More information

Overview on the changed articles of H2020 MGAs with retroactive applicability

Overview on the changed articles of H2020 MGAs with retroactive applicability Overview on d articles of H2020 with retroactive applicability Change dictionary: In red new text added to the Articles Strikethrough text removed from the Articles Changes in version 4.0 In effect from

More information

Webinar on Other Direct Costs in Horizon 2020

Webinar on Other Direct Costs in Horizon 2020 Webinar on Other Direct Costs in Horizon 2020 Welcome! We will start the webinar 12:00 CET. The presentation slides and recording will be published on http://www.ncpacademy.eu/ after the webinar. Other

More information

in pilots in H2020 (June 2017)

in pilots in H2020 (June 2017) NCP Flanders November 2017 SUMMARY: HORIZON 2020 LUMP SUM FUNDING in multi beneficiary projects 1. Lump sum funding output based funding introduction NCP Flanders (May 2017) 2. Lump sum pilot, state of

More information

Fact Sheet Inventorship, Authorship and Ownership

Fact Sheet Inventorship, Authorship and Ownership European IPR Helpdesk Fact Sheet Inventorship, Authorship and Ownership March 2013 Introduction... 1 1 Ownership, Inventorship and Authorship... 2 2 The relevance of inventorship... 3 3 The relevance of

More information

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No.

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No. This document is the basic template for multi-beneficiaries grant agreements between the National Agency (NA) and the beneficiaries of a grant for a project under Erasmus+ Programme, where the beneficiaries

More information

How to Manage and Administer Integrated Projects and Networks of Excellence

How to Manage and Administer Integrated Projects and Networks of Excellence How to Manage and Administer Integrated Projects and Networks of Excellence EARMA Annual Conference Budapest 14th June 2002 ** Based on Information published by EC to June 2002** PRESENTER Sean McCarthy

More information

Education, Audiovisual and Culture Executive Agency GRANT AGREEMENT FOR AN ACTION WITH MULTIPLE BENEFICIARIES AGREEMENT NUMBER [ ]

Education, Audiovisual and Culture Executive Agency GRANT AGREEMENT FOR AN ACTION WITH MULTIPLE BENEFICIARIES AGREEMENT NUMBER [ ] Education, Audiovisual and Culture Executive Agency Erasmus+ : Prospective Initiatives, Policy Networks, Programme and Linguistic Support GRANT AGREEMENT FOR AN ACTION WITH MULTIPLE BENEFICIARIES AGREEMENT

More information

Università degli Studi di Trento H2020 CHECK LIST

Università degli Studi di Trento H2020 CHECK LIST H22 CHECK LIST FULL NAME OF THE BENEFICIARY AME OF THE UNIVERSITY DEPARTMENT OR RESEARCH CENT PROJECT ACRONYM the FINAL proposal submitted Copy of all the documents required by the European Commission

More information

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No.

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No. This document is the basic template for multi-beneficiaries grant agreements between the National Agency (NA) and the beneficiaries of a grant for a project under Erasmus+ Programme, where the beneficiaries

More information

EU-funded research. FP7 Tomorrow s answers start today. EUROPEAN COMMISSION - Research DG

EU-funded research. FP7 Tomorrow s answers start today. EUROPEAN COMMISSION - Research DG EU-funded research FP7 Tomorrow s answers start today Why research at European level? Pooling and leveraging resources Resources are pooled to achieve critical mass Leverage effect on private investments

More information

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No.

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No. 2018 Erasmus+ Grant agreement multi-beneficiary Special conditions Agreement number: [complete] Standard grant agreement (multi beneficiaries) GRANT AGREEMENT for a: Project with multiple beneficiaries

More information

EU framework programme processes

EU framework programme processes Briefing January 2018 Adoption, implementation, evaluation SUMMARY Over the past 35 years, the European Union ( EU) institutions have adopted eight framework programmes for research. The lifecycles of

More information

Priority Area 7 - Knowledge Society PA7 revised targets actions - milestones

Priority Area 7 - Knowledge Society PA7 revised targets actions - milestones Priority Area 7 - Knowledge Society PA7 revised targets actions - milestones 25 October 2016, Belgrade Targets Actions - Milestones 11 PA7 (+PA4) SG Meeting in Bratislava (25 May, 2016) SG did not have

More information

Guide for Applicants

Guide for Applicants EUROPEAN COMMISSION EUROSTAT Guide for Applicants Eurostat Grants Version 4.0 11 January 2018 1/55 IMPORTANT NOTICE The Guide for Applicants is a user guide that aims to explain to applicants and beneficiaries

More information

Identification, selection and contracting of Large Infrastructure Projects in ENI CBC programmes

Identification, selection and contracting of Large Infrastructure Projects in ENI CBC programmes Identification, selection and contracting of Large Infrastructure Projects in ENI CBC programmes (Practices and lessons learnt on Large Scale Projects 2007-2013) (INFORMATION PAPER August 2016) DISCLAIMER

More information

GENERA guidelines on reporting. Kick-off Meeting Brussels. Paula Mota Alves

GENERA guidelines on reporting. Kick-off Meeting Brussels. Paula Mota Alves GENERA guidelines on reporting Kick-off Meeting 17.09.2015 Brussels Paula Mota Alves Unit B5 Spreading Excellence, Widening Participation, Science with and for Society Outline of presentation o Horizon

More information

Ex-post audit Horizon 2020 Zagreb, 25 April Mr Ekke Van Vliet Common Audit Service (CAS)

Ex-post audit Horizon 2020 Zagreb, 25 April Mr Ekke Van Vliet Common Audit Service (CAS) HORIZON HORIZON 2020 2020 Ex-post audit Horizon 2020 Zagreb, 25 April 2018 Mr Ekke Van Vliet Common Audit Service (CAS) I AUDIT CYCLE 2 1.1. Why audits? I, the undersigned Director-General, in my capacity

More information

Version Three offer rules - modifications about beneficiaries asking for offers instead of collecting them.

Version Three offer rules - modifications about beneficiaries asking for offers instead of collecting them. - Tender procedures Valid from Valid to Main changes Version 2 27.04.15 23.05.18 Specified that the 5,000 threshold for the 3-offer rule is excluding VAT. Clarified the situation regarding use of existing