National Electric Power Regulatory Authority Registrar Office

Size: px
Start display at page:

Download "National Electric Power Regulatory Authority Registrar Office"

Transcription

1 National Electric Power Regulatory Authority Registrar Office *** No. NEPRA/TRF-100 / 2 35,2 _1/ 2013 Subject: Gazette Notifications The following notifications have been secured from Printing Corporation of Pakistan Press (PCPP). The same to all the heads of Divisions/Sections have been forwarded through dated (copy enclosed) for information and record: Sr. No. SRO No. Dated In respect of Companies I. 684(1)/2012 to 692(1)/ Engro, Nishat Power, Saif Power, Orient Power, Nishat Chunian Power, Liberty Power, Halmore Power, Hub Power, Attock Gen KESCL (1)/2012 to 567(1)/ (1)/ XWDISCOs (1)/ Foundation Wind Energy (1)/ KESCL?,S1(1),12012 to !2 NPC,C1. 883(1)/ (1)/2012 to KESCL 910(1)/ (1)/ SEPCO (1)/ KESCL (1)/ XWDISCOs (1)/ XWDISCOs (1)/2012 to 1466(1)/2012 NPGCL (1)/ KESCL (1)/2013 to 40(1)/ (1)/2013 to 238(1)/ (1)/2013 to 383(1)/ Atlas Power, Attock Gen, Halmore Power, Liberty Power, Nishat Chunian Power, Nishat Power, Saif Power, Sail Power, Sapphire Electric, JPCL, Liberty Power, Atlas Power, Foundation Power, Sapphire Electric NPGCL, Attock Gen, JPCL, Nishat Chunian, Nishat Power, Saif Power, Halmore Power, Liberty Power, Sapphire Power, CPGCL, NPGCL, Attock Gen, JPCL, Atlas Power, Nishat Chunian Power, Nishat Power, Saif Power, Halmore Power, Liberty Power XWDISCOs (1)/2013 to 397(1)/ (1)/2013 to KESCL 459(I) / (1)/ XWDISOCs (1)/ Halmore Power (1)/ NPGCL (1)/ Nishat Power (1)/ JPCL, Contd... P/2

2 (1)/ (1)/ (1)/ (1)/ (1)/ (1)/ (1)/ (1)/ (1)/2013 to 753(1)/ Atlas Power Nishat Chunian Power Liberty Power Saif Power Sapphire Electric XWDISCOs XWDISCOs KESCL NPGCL, Attock Gen. JPCL, Atlas Power, Nishat Chunian Power, Nishat Power, Saif Power, Halniore Power, Liberty Power (1)/ ( 0/ (1)/2013 to (1)/2013 XWDISCOs XWDISCOs Atlas Power, Attock Gen, Foundation Power, Liberty Power Tech, Nishat Chunian Power, Nishat Power, Saif Power, Sapphire Electric, JPCL, NPGCL. 2. The hard copy of above mentioned notifications can also be obtaine 1 Office, if required - om the Registrar Encl: As above Distribution: I / ( Iftfkhar All Khan ) Deputy Registrar I I ( 1. D.G. (Technical) 2. D. G. (Tariff) 3. Senior Advisor (Tariff) 4. Director (Tariff) 5. Director (Licensing) 6. Director (CAD) 7. Director (M&E) Generation 8. Deputy Director (I.T). CC (for information please): (Hard copies also enclosed) [to place the notifications on NEPRA's website} 1. Vice Chairman / Member (Tariff) 2. Member (M&E & Licensing) 3. Member (CA) 4. Registrar

3 REGISTERED No. M L /left of Sialtbitan Et 0111 EXTRAORDINARY PUBLISHED BY AUTHORITY ISLAMABAD, MONDAY, JUNE 4, 2012 PART II Statutory Notifications (S. R. 0.) GOVERNMENT OF PAKISTAN MINISTRY OF WATER AND POWER 'NOTIFICATIONS Islamabad, the 4th June, 2012 S. R (I)/2012. In pursuance of sub-section (4) of section 31 of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997 (XL of 1997), the Federal Government is pleased to direct that the following further amendment shall be made in its Notification No S.R.O. 09(1)/2011. dated the 3rd January, 2011, namely: In the aforesaid Notification, after Annex-IV, the following new Annexure shall be added, namely: "Annex-V ENGRO POWERGENERATION QADIRPUR LIMITED (Formerly Engro Energy Limited) Quarterly Indexation/Adjustment qf Tariff Reference Revised Jan-Mar Quarter Tariff Components GAS HSD GAS I-ISD Capacity Charge (Rs./kW/Hour) Fixed O&M - Foreign Fixed O&M - Local (3521) [2608 (2012)/Ex. Gaz.] Price : Rs

4 3522 THE GAZETTE OF PAKISTAN, EXTRA., JUNE 4, 2012 'NKr 11 Reference Revised Jan-Mar 2012 Quarter Tariff Components GAS HSD GAS I-18D Insurance Cost of Working Capital ROE ROEDC Debt Servicing Total Capacity Charge Variable O&M (Rs./kWh) Variable O&M - Foreign Variable O&M - Local Total Variable O&M Indexation Values Exchange Rate (Rs./USD) US CPI (All Urban Consumers) *WPI (Manufactures) - Local Monthly LIBOR 0.29% 0.58% 3 Monthly KIBOR 12.36% 11.98% Hours in the quarter 2184 * For the purpose of indexation of local O&M for January-March 2012 quarter, WPI (Manufactures) for November 2011 was required to be used. However, with the revision of base values of WPI from to by Federal Bureau of Statistics, the commodity group of WPI (Manufactures) has now ceased to exist and the latest available WPI (Manufactures) pertaining to July 2011 has been used for the indexation. The local O&M component will be revised, if required, in terms of Para 12.3 of Part V of Schedule 1 of the PPA on determination of new index by the Authority". [No. P-II. 02(12)/2007.] S.R.O /2012.-In pursuance of sub-section (4) of section 31 of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997 (XL of 1997), the Federal Government is pleased to direct that the following amendment shall be made in its Notification No. S.R.O. 82(1)/2012, dated the 1st February, 2012, namely:- In the aforesaid Notification, after Annex-III, the following new Annexure shall be added, namely:-

5 Pima 111 THE GAZETTE OF PAKISTAN, EXTRA., JUNE 4, NISHAT POWER LIMITED Quarterly Indexation/Adjustment of Tariff "Annexure-I V Tariff Components Reference Revised Jan-Mar. 12 Quarter Capacity Charge (Rs./kW/Hour) Fixed O&M - Foreign I Fixed O&M - Local Insurance Cost of Working Capital ROE ROEDC Debt Servicing Total Capacity Charge Variable O&M (Rs./kWh) Variable O&M - Foreign Variable O&M - Local Total Variable O&M Indexation Values Exchange Rate (Rs./USD) US CPI (All Urban Consumers) *WPI (Manufactures) - Local Monthly KIBOR 12.34% 11.98% Hours in the quarter 2184 * For the purpose of indexation of local O&M for January-March 2012 quarter, WPI (Manufactures) for November 2011 was required to be used. However, with the revision of base values of WPI from to by Federal Bureau of Statistics, the commodity group of WPI (Manufactures) has now ceased to exist and the latest available WPI (Manufactures) pertaining to July 201 I has been used for the indexation. The local O&M component will be revised, if required. in terms of Para 12.3 of Part V of Schedule 1 of the PPA on determination of new index by the Authority". [P11-05(03)/2010.]

6 3524 THE GAZETTE OF PAKISTAN, EXTRA., JUNE 4, 2012 I PAR r II S.R.O 686 (I)/2012. In pursuance of sub-section (4) of section 31 of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997 (XL of 1997), the Federal Government is pleased to direct that the following further amendment shall be made in its Notification No.S.R.O. 883(1)/2011, dated the 19th September, 2011, namely: In the aforesaid Notification, after Annexure- IX, the following new Annexure shall be added, namely: Annexure-X Saif Power Limited Quarterly Indexation/Adjustment of Tariff Tariff Components Reference COD Decision 20 June 2011 Revised Jan-Mar Quarter Capacity Ch a rge(rs./kw/hour) Fixed O&M Local Fixed O&M - Foreign Insurance Cost of Working Capital-Gas I 3 Cost of Working Capital-HSD Return on Equity Return on Equity During Construction Debt Servicing Total Capacity Charge (Gas) Total Capacity Charge (HSD) Variable O&M (Rs./kWh) Variable O&M Foreign -Gas Variable O&M Foreign -HSD Indexation Values WPI (Manufactures) US CPI Exchange Rate KIBOR 12.34% 11.98% Hours in the Quarter 2184 *For the purpose of indexation of local O&M for January-,March 2012 quarter, WPI (Manufactures) for November 2011 was required to be used. However, with the revision of base values of WPI from to by Federal Bureau of Statistics, the commodity group of WPI (Manufactures) has now ceased to exist and the latest available WPI (Manufactures) pertaining to July 2011 has been used for the indexation. The local O&M component will be revised, if required, in terms of Para 12.3 of Part V of Schedule 1 of the PPA on determination of new index by the Authority". IP-II-03(120)/2006j

7 PART 11] THE GAZETTE OF PAKISTAN, EXTRA., JUNE 4, S.R.O /2012. In pursuance of sub-section (4) of section 31 of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997 (XL of 1997), the Federal Government is pleased to direct that the following further amendment shall be made in its Notification No.S.R.O. 295(1)/2012, dated the 19th March, 2012, namely: In the aforesaid Notification, after Annex-I-A, the following shall be added, namely: Annex-I1 Orient Power Company (Pvt.)Limited Adjustment on Account of Quarterly Indexations Tariff Components Reference COD Decision 01 Jun. 201 I Revised Jan-Mar Quarter Capacity Charge (Rs./kW/Hour) Fixed O&M Local Fixed O&M - Foreign Insurance Cost of Working Capital-Gas Cost of Working Capital-HSD Return on Equity Return on Equity During Construction Debt Servicing Total Capacity Charge (Gas) Total Capacity Charge (HSD) Variable O&M (Rs./kWh) Variable O&M Foreign Indexation Values WPI (Manufactures) US CPI Exchange Rate KIBOR 13.39% 11.98% Hours in the Quarter 2184 *For the purpose of indexation of local O&M for January-March 2012 quarter, WPI (Manufactures) for November 2011 was required to be used. However, with the revision of base values of WPI from to by Federal Bureau of Statistics, the commodity group of WPI (Manufactures) has now ceased to exist and the latest available WPI (Manufactures) pertaining to July 2011 has been used for the indexation. The local O&M component will be revised, if required, in terms of Para 12.3 of Part V of Schedule 1 of the PPA on determination of new index by the Authority". I P-I I- I4(6)/2008.1

8 3526 THE GAZETTE OF PAKISTAN, EXTRA., JUNE 4, 2012 l PArrr11 S.R.O 688 (1)/2012. In pursuance of sub-section (4) of section 31 of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997 (XL of 1997), the Federal Government is pleased to direct that the following further amendment shall be made in its Notification No S.R.0.594(1)/2011,dated the 9th June, 2011, namely: In the aforesaid Notification, after Annex-XIII, the following shall be added, namely: "Annexure-XIV NISHAT CHUNIAN POWER LIMITED Quarterly Indexation/Adjustment of Tariff Tariff Components Reference COD Decision 31 Dec Revised Jan-Mar Quarter Capacity Charge (Rs./kW/Hour) Fixed O&M - Foreign Fixed O&M - Local Insurance Cost of Working Capital ROE ROEDC Debt Servicing Total Capacity Charge Variable O&M (Rs./kWh) Variable O&M - Foreign Variable O&M - Local Total Variable O&M Indexation Values Exchange Rate (Rs./USD) US CPI (All Urban Consumers) *WPI (Manufactures) - Local Monthly KIBOR 12.29% 11.98% Hours in the quarter 2184 For the purpose of indexation of local O&M for January-March 2012 quarter, WPI (Manufactures) for November 2011 was required to be used. However, with the revision of base values of WPI from to by Federal Bureau of Statistics, the commodity group of WPI (Manufactures) has now ceased to exist and the latest available WPI (Manufactures) pertaining to July 2011 has been used for the indexation. The local O&M component will be revised, if required, in terms of Para 12.3 of Part V of Schedule 1 of the PPA on determination of new index by the Authority". [F. No. PII-2(08)/2007.]

9 PART Ill THE GAZETTE OF PAKISTAN, EXTRA., JUNE 4, S.R.O 689 (1)/2012. In pursuance of sub-section (4) of section 31 of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997 (XL of 1997), the Federal Government is pleased to direct that the following. further amendment shall be made in its Notification No S.R (1)/2011, dated the 10th November, 2011, namely: In the aforesaid Notification, after Annex-VII, the following new Annexure shall be added, namely: Liberty Power Tech. Ltd. Quarterly Indexation/Adjustment of Tariff "Annexure-VHI Tariff Components Reference COD Decision 17 Aug Revised Jan-Mar Quarter Capacity Charge (Rs./kW/Hour) Fixed O&M - Foreign Fixed O&M - Local Insurance Cost of Working Capital ROE ROEDC Debt Servicing Total Capacity Charge Variable O&M (Rs./kWh) Variable O&M - Foreign Variable O&M - Local Total Variable O&M Indexation values Exchange Rate (Rs./USD) US CPI (All Urban Consumers) *WPI (Manufactures) - Local Monthly KIBOR 13.46% 11.98% Hours in the quarter 2184 *For the purpose of indexation of local O&M for January-March 2012 quarter, WPI (Manufactures) for November 2011 was required to be used. However, with the revision of base values of WPI from to by Federal Bureau of Statistics, the commodity group of WPI (Manufactures) has now ceased to exist and the latest available WPI (Manufactures) pertaining to July 2011 has been used for the indexation. The local O&M component will be revised, if required, in terms of Para 12.3 of Part V of Schedule 1 of the PPA on determination of new index by the Authority". 1No.P11-7(53)/96.1

10 3528 THE GAZETTE OF PAKISTAN, EXTRA., JUNE 4, 2012 [PAirr II S.R.O. 690 (I)2012. In pursuance of sub-section (4) of section 31 of the Regulation of Generatiori, Transmission and Distribution of Electric Power Act, 1997 (XL of 1997), the Federal Government is pleased to direct that the following further amendment shall be made in its Notification No S.R.0.669(1)/2008, dated the 21st June, 2008, namely: In the aforesaid Notification, after Annex-IX, the following shall be added, namely: HALMORE POWER GENERATION COMPANY LIMITED Quarterly Indexation/Adjustment of Tariff "Annex X Tariff Components Reference Revised Oct-Dec Quarter Revised Jan-Mar Quarter Fixed O&M - Foreign (Rs./kW/Hour) Fixed O&M - Local (Rs./kW/Hour) Variable O&M Gas - Foreign (Rs./kWh) Variable O&M HSD - Foreign (Rs./kWh) Indexation Values WPI (Manufactures) US CPI Exchange Rate (X) IF. No.PII-7(01)/891 S.R.O. 691 (1)/2012. In pursuance of sub-section (4) of section 31 of the Regulation of Generation, Transmission and Distribution of Electric Power Act, (XL of 1997), the Federal Government is pleased to direct that the following further amendment shall be made in its Notification No S.R (1)/2008, dated the 26th September, 2008, namely: In the aforesaid Notification, after Annexure - X, the following shall be added, namely:

11 PART III THE GAZETTE OF PAKISTAN, EXTRA., JUNE 4, THE HUB POWER COMPANY LIMITED Quarterly Indexation/Adjustment of Tariff "Annexure XI Tariff Components Reference Revised Jan-Mar Quarter Fixed O&M - Foreign (Rs./kW/Hour) Fixed O&M - Local (Rs./kW/Hour) Variable O&M - Foreign (Rs./kWh)* Variable O&M - Local (Rs./kWh)* Indexation Values **WPI (Manufactures) US CPI Exchange Rate *Reference tariff has been adjusted on the basis of net capacity of MW established at the time of COD as a result of Initial Dependable Capacity (IDC) Test * For the purpose of indexation of local O&M for January-March 2012 quarter, WPI (Manufactures) for November 2011 was required to be used. However, with the revision of base values of WPI from to by Federal Bureau of Statistics, the commodity group of WPI (Manufactures) has now ceased to exist and the latest available WPI (Manufactures) pertaining to July 2011 has been used for the indexation. The local O&M component will be revised, if required, in terms of Para 12.3 of Part V of Schedule I of the PPA on determination of new index by the Authority". [F. No.PII-7(01)189.] S.R.O. 692 (I)/2012. In pursuance of sub-section (4) of section 31 of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997 (XL of 1997), the Federal Government is pleased to direct that the following further amendment shall be made in its Notification No S.R.O. 1092(1)/2009, dated the 10th December, 2009, namely: In the aforesaid Notification, after Appendix-I the following new Appendix shall be added, namely:

12 3530 THE GAZETTE OF PAKISTAN, EXTRA., JUNE 4, 2012 I PARr II ATTOCK GEN. LIMITED Quarterly Indexation/Adjustment of Tariff "Appendix-.1 Tariff Components Reference COD Decision Review 24 May 2010 Revised Jan-Mar Quarter Capacity Charge (Rs./kW/Hour) Fixed O&M - Foreign Fixed O&M - Local Insurance Cost of Working Capital ROE ROEDC Debt Servicing Total Capacity Charge Variable O&M (Rs./kWh). Variable O&M - Foreign Variable O&M - Local Total Variable O&M Indexation Values Exchange Rate (Rs./USD) US CP1 (All Urban Consumers) *WPI (Manufactures) - Local Monthly KIBOR 12.02% 11.98% Hours in a quarter 2,184 s. * For the purpose of indexation of local O&M for January-March 2012 quarter, WPI (Manufactures) for November 2011 was required to be used. However, with the revision of base values of WPI from to by Federal Bureau of Statistics, the commodity group of WPI (Manufactures) has now ceased to exist and the latest available WPI (Manufactures) pertaining, to July 2011 has been used for the indexation. The local O&M component will be revised, if required, in terms of Para 12.3 of Part V of Schedule 1 of the PPA on determination of new index by the Authority". [F-No.P-II-3(121)/2006.] AFTAB AHMED NADEEM, Deputy Secretary (Power). PRINTED BY THE MANAGER, PRINTING CORPORATION OF PAKISTAN PRESS, ISLAMABAD. PUBLISHED BY THE DEPUTY CONTROLLER, STATIONERY AND FORMS, UNIVERSITY ROAD, KARACHI.

13 l 'irtveregd. EXTRAORDINARY PUBLISHED BY AUTHORITY REGISTERED No. M L of AIMMalan ISLAMABAD, SATURDAY, MAY 26, 2012 PART II Statutory Notifications (S. R. 0.) GOVERNMENT OF PAKISTAN NATIONAL ELECTRIC POWER REGULATORY AUTHORITY NOTIFICATIONS Islamabad, the 26th May, 2012 S. R (1)/2012. Pursuant to Section 31(4) of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997 as amended through Regulation of Generation, Transmission and Distribution of Electric Power (Amendment) Act, 2011 and as per the mechanism for monthly fuel price adjustment prescribed and determined by the Authority vide Determination dated December 23, 2009 for Karachi Electric Supply Company Ltd. (KESCL), as notified vide SRO 11(1)/2010 dated January 01, 2010, National Electric Power Regulatory Authority (NEPRA) makes and notifies the following adjustment in the approved tariff on account of variation in fuel charge for the month of October 2011 in respect of KESCL. Fuel Charges Adjustment to be Calculated on the basis of billing for the Month of Fuel Charges Adjustment (I's/kWh) Charged in Consumer Bills to be Issued in the Month of October 2011 (12) June 2012 (2129) [2579 (2012)/Ex. Gaz.] Price : Rs. 3.00

14 2130 THE GAZETTE OF PAKISTAN, EXTRA., MAY 26, 2012 [PART Il 2. The above adjustment of plus Ps /kWh shall be applicable to all the consumer categories except lifeline consumers of KESCL. The said adjustment shall be shown separately on the basis of units billed in the month of October 2011 by the KESCL - and recovered from the consumers in the billing month of June S. R (1) Pursuant to Section 31(4) of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997 as amended through Regulation of Generation, Transmission and Distribution of Electric Power (Amendment) Act, 2011 and as per the mechanism for monthly fuel price adjustment prescribed and determined by the Authority vide. Determination dated December 23, 2009 for Karachi Electric Supply Company Ltd. (KESCL), as notified vide SRO 11(1)/2010 dated January OL 2010, National Electric Power Regulatory Authority (NEPRA) makes and notifies the following adjustment in the approved tariff on account of variation in fuel charge for the month of November 2011 in respect of KESCL. Fuel Charges Adjustment to be Calculated on the basis of billing for the Month of November 2011 Fuel Charges Adjustment (Ps/kWh) (21) Charged in Consumer Bills to be Issued in the Month of June The above adjustment of minus Ps.21.00/kWli shall be applicable to all the consumer categories except lifeline and agriculture consumers of KESCL. The said adjustment shall he shown separately on the basis of units billed in the month of November 2011 by the KESCL and recovered from the consumers in the billing month of June S. R (1)/2012. Pursuant to Section 31(4) of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997 as amended through Regulation of Generation, Transmission and Distribution of Electric Power (Amendment) Act, 2011 and as per the mechanism for monthly fuel price adjustment prescribed and determined by the Authority vide Determination dated December 23, 2009 for Karachi Electric Supply Company Ltd. (KESCL), as notified vide SRO 11(1)/2010 dated January 01, 2010, National Electric Power Regulatory Authority (NEPRA) makes and notifies the following adjustment in the approved tariff on account of variation in fuel charge for the month of December 2011 in respect of KESCL.

15 PART II] THE GAZETTE OF PAKISTAN, EXTRA., MAY 26, ( Fuel Charges Adjustment to be Calculated on the basis of billing for the Month of December 2011 Fuel Charges Adjustment (Ps/kWh) 32 Charged in Consumer Bills to be Issued in the Month of July The above adjustment of plus Ps.32.00/kWh shall be applicable to all the consumer categories except lifeline consumers of KESCL. The said adjustment. shall be shown -separately on the basis of units billed in the month of December 2011 by the. KESCL and recovered from the consumers in the billing month of July [Case No. NEPRA/TRF-133/KESCL-2009(6).] SYED &NITER HUSSAIN, Registrar. PRINTED BY THE MANAGER, PRINTING CORPORATION OF PAKISTAN PRESS, ISLAMABAD. PUBLISHED BY THE DEPUTY CONTROLLER, STATIONERY AND FORMS, UNIVERSITY ROAD, KARACHI..

16 REGISTERED No. M 302 L aptte Saltisitan EXTRAORDINARY PUBLISHED BY AUTHORITY ISLAMABAD, WEDNESDAY, JUNE 6, 2012 PART II Statutory Notifications (S. R. 0.) GOVERNMENT OF PAKISTAN NATIONAL ELECTRIC POWER REGULATORY AUTHORITY NOTIFICATION Islamabad, the 6th June, 2012 S. R (I)/2012. Pursuant to Section 31(4) of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997 as amended through Regulation of Generation, Transmission and Distribution of Electric Power (Amendment) Act 2011, the National Electric Power Regulatory Authority makes and notifies the following adjustment in the approved tariff on account of variation in fuel charge for the month of April 2012 in respect of Ex-WAPDA Distribution Companies (X WDISCOs): Actual Fuel Charges Component for April 2012 Corresponding Reference Fuel Charges Component (Determined) Fuel Charges Variation for the month of April 2012 (Increase) Rs /kWh Rs /kWh Rs.I.9830/kWh Note: The assessed fuel charges adjustment of Rs.I.9830/kWh for the month of April 2012 is higher by Rs /kWh than the adjustment of Rs /kWh for the month of March 2012: therefore, effectively there will be an increase of Rs /kWh in the bill of the consumers on account of fuel charges adjustment as compared to the month of March (3533) [2613 (2012)/Ex. Gaz.] Price: Rs. 2.00

17 3534 THE GAZETTE OF PAKISTAN, EXTRA., JUNE 6, 2012 [PART II 2. The above adjustment of Rs /kWh shall be applicable to all the consumer categories except lifeline consumers of all the XWDISCOs. The said adjustment shall be shown separately in the consumers' bills on the basis of units billed to the consumers in the month of April 2012 by the XWDISCOs. XWDISCOs shall recover the fuel charges adjustment in respect of April 2012 in the billing month of November While affecting the recovery of Fuel Adjustment Charges, the concerned DISCOs shall keep in view and strictly comply with the orders of the courts notwithstanding this order. [No. NEPRA/R/TRF-100/MFPA-5305.] SYED SAFEER HUSSAIN, Registrar. PRINTED BY THE MANAGER, PRINTING CORPORATION OF PAKISTAN PRESS. ISLAMABAD. PUBLISHED BY THE DEPUTY CONTROLLER, STATIONERY & FORMS. UNIVERSITY ROAD, KARACHI..

18 Int ieette 161tAmtelgrA EXTRAORDINARY PUBLISHED BY AUTHORITY ISLAMABAD, TUESDAY, JUNE 12, 2012 PART II Statutory Notifications (S. R. 0.) GOVERNMENT OF PAKISTAN MINISTRY OF WATER AND POWER NOTIFICATION Islamabad, the 7th June, 2012 REGISTERED No. M L of lialtiotatt S. R (I)/2012. In pursuance of sub-section (4) of section 31 of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997 (XL of 1997), the Federal Government is pleased to notify the National Electric Power Regulatory Authority's approved up front tariff whereby Foundation Wind Energy II (Pvt) Limited is allowed to charge the following_ specified/approved tariff for delivery of electricity to the Power Purchaser: Tariff Components Year 1-2 Rs./kWh. Year 3-5 Rs./kWh. Year 6-10 Rs./kWh. Year Rs./kWh. Indexation Fixed O&M Local WPI Foreign PKR/US$ & US CPI Insurance PKR/US$ Return on equity PKR/US$ (3635) [2642(2012)/Ex. Gaz.] Price: Rs. 3.00

19 3636 THE GAZETTE OF PAKISTAN, EXTRA., JUNE 12, 2012 [PART I1 Tariff Components Year Year Year Year Rs./kWh. Rs./kWh. Rs./kWh. Rs./kWh. Return on equity during construction Debt service Indexation PKR/US$ PKR/US$ & LIBOR for foreign loan and KIBOR for local loan. (i) The reference tariff has been calculated on the basis of net annual benchmark energy generation of GWh at annual net plant capacity factor of 32.81% for installed capacity of 50 MW. (ii) The above charges will be limited to the extent of net annual energy generation of GWh. Net annual generation supplied to the power purchaser in a year, in excess of benchmark energy of GWh will be charged at 10% of the prevalent approved tariff. (iii) In the above tariff no adjustment for carbon emission reduction receipts, has been accounted for. However, upon actual realization of carbon emission reduction receipts, the same shall be distributed between the power purchaser and the petitioner in accordance with the approved mechanism given in the GoP Policy for Development of Renewable Energy for Power Generation 2006, as amended from time to time. (iv) The reference PKR/dollar rate has been taken as (v) The above tariff is applicable for a period of twenty (20) years commencing from the commercial operations date. (vi) The monthly benchmark energy table along with monthly power curves should be verified by the Alternative Energy Development Board (AEDB)/power purchaser before finalization of energy purchase agreement. (vii) The petitioner is entitled to payment of wind speed risk by the power purchaser in accordance with the GoP Policy for Development of Renewable Energy for Power Generation 2006, as amended from time to time and the mechanism approved by the AEDB. (viii) The component wise tariff is indicated at Annex-I. (ix) Debt Servicing Schedule is attached as Annex-11.

20 PART II] THE GAZETTE OF PAKISTAN, EXTRA., JUNE 12, I. One Time Adjustments tariff: The following onetime adjustments shall be applicable to the reference a. Confirmation charges for the letter of credit to be opened in favor of the EPC contractor will be adjusted at COD on actual basis, not exceeding the maximum ceiling of US $ million, upon production of verifiable documentary evidence to the satisfaction of the Authority. b. Duties and/or taxes, not being of refundable nature, imposed on the petitioner upto the commencement of its commercial operations will be subject to adjustment at actual on COD, as against US $ million allowed now, upon production of verifiable documentary evidence to the satisfaction of the Authority. c. Insurance will be adjusted as per actually incurred prudent costs, subject to maximum limit of 1.35% of the approved EPC cost, on production of authentic documentary evidence at the time of COD. d. Financial charges will be adjusted at COD on the basis of actual expense, up to a maximum of 3% of the total debt allowed (excluding the impact of interest during construction and financial charges), on production of authentic documentary evidence. e. The interest during construction will be adjusted at COD on the basis of actual debt draw downs (within the overall debt allowed by the Authority at COD), actual PKR/US$ exchange rate variation for foreign loan denominated in US $ and actual interest rates not exceeding the limit of 6 months KIBOR plus 2.95% for local financing and 6 months LIBOR per annum plus 4.50% for foreign financing, during the project construction period allowed by the Authority. Further, benefit of savings in spread on local financing of 0.02% per annum allowed, will be passed on to the petitioner. f. The return on equity during construction will be adjusted at COD on the basis of actual equity injections (within the overall equity allowed by the Authority at COD) during the project construction period allowed by the Authority. g. The return on equity (including return on equity during construction) will be adjusted at COD on the basis of PKR/US$ exchange rate variation.

21 3638 THE GAZETTE OF PAKISTAN, EXTRA., JUNE 12, 2012 (PART II h. All project costs i.e. costs incurred prior to commercial operations date (COD) have been allowed in the determination in US$ as the exact currency of payment is not known yet. The EPC contract cost will be adjusted at COD on account of variation in US$/PKR and Euro/PKR parity, on production of authentic documentary evidences to the satisfaction of the Authority. At the COD for all project costs payable in PKR, the amounts allowed in US $ will be converted into PKR using the reference PKR/dollar rate of i. Any liquidated damages, penalties, etc. (by whatever name called), actually recovered/recoverable by the petitioner from the EPC contractor, pertaining to the construction period allowed by the Authority, will be adjusted in the project cost. J. The reference tariff table shall be revised at COD while taking into account the above adjustments. The petitioner shall submit its request to the Authority within 90 days of COD for necessary adjustments in tariff. II. Pass-Through Items No provision for income tax has been accounted for in the tariff. If any tax is imposed on the petitioner, the exact amount paid by the petitioner shall be reimbursed by the power purchaser to the petitioner on production of original receipts. This payment will be considered as a pass-through payment spread over a 12 months period. Furthermore, in such a scenario, the petitioner shall also submit to the power purchaser details of any tax shield savings and the power purchaser shall deduct the amount of these savings from its payment to the petitioner on account of taxation. Withholding tax on dividends is also a pass through item just like other taxes as indicated in the government guidelines for determination of tariff for new IPPs. The power purchaser shall make payment on account of withholding tax at the time of actual payment of dividend, subject to maximum of 7.5% of 17% return on equity (including return on equity during construction). In case the petitioner does not declare a dividend in a particular year or only declares a partial dividend, then the difference in the withholding tax amount (between what is paid in that year and the total entitlement as per the net return on equity) would be carried forward and accumulated so that the petitioner is able to recover the same as a pass through from the power purchaser in future on the basis of the total dividend payout. III. Indexations: The following indexation shall be applicable to the reference tariff:

22 PARTIII THE GAZETTE OF PAKISTAN, EXTRA., JUNE Emissions Trading/ Carbon Credits: The petitioner shall process and obtain emissions/carbon credits expeditiously and credit the proceeds to the power purchaser as per the GoP Policy for Development of Renewable Energy for Power Generation 2006, as amended from time. Other: The Authority has allowed/approved only those cost(s), term(s), condi,tion(s), provision(s), etc. which have been specifically approved in this tariff deterrnination. Any cost(s), term(s), condition(s), provision(s), etc. contained in the tariff petition or any other document which are not specifically allowed/approved in this tariff determination, should not be implied to be approved, if not adjudicated upon in this tariff determination.

23 FOUNDATION WINO ENERGY - II (PRIVATE) LIMITED REFERENCE TARIFF TABLE Annex - I Year O&M Insurance Return on equity Return on equity during construction Withholding Loan repayment Interest charges Local Foreign Rs. / kwh Rs. / kwh Rs. / kwh Rs. / kwh Rs. / kwh Rs. / kwh Rs. / kwh Rs. / kwh Rs. / kwh , t Levelized Reference Values: Tariff THE GAZETTE OF PAKISTAN, EXTRA., JUNE 12, The reference tariff has been calculated on the basis of net annual benchmark energy generation of GWh. Net annual generation supplied to the power purchaser in a year, in excess of benchmark energy of GWh will be charged at 10% of the prevalent approved tariff Exchange rate 1 US $ = PKR Levelized 10% works out to be US cents

24 FOUNDATION WIND ENERGY - II (PRIVATE) LIMITED DEBT SERVICING SCHEDULE Annex - II a. 0 Local Debt Foreign Debt Annual Principal Interest Balance Total Principal Interest Balance Total Annual Principal Annual Debt Repayme Debt Repayme Debt Repayme Interest servicing Million million Million Service Million Million Million service nt Million nt Million nt RsJkWh Million Million Re./kWh Re./kWh US$ US$ US$ US$ US$ US$ US$ US$ US$ (LS! _ x _ TPIII-12(17 / AFTAB AHMED NADEEM, Deputy Secretary (Power). THE GAZETTE OF PAKISTAN, EXTRA., JUNE 12, 2012 PRINTED BY THE MANAGER, PRINTING CORPORATION OF PAKISTAN PRESS, ISLAMABAD. PUBLISHED BY THE DEPUTY CONTROLLER, STATIONERY AND FORMS, UNIVERSITY ROAD. KARACHI.

25 PART III THE GAZETTE OF PAKISTAN, EXTRA., JUNE 12, (i) Indexation applicable to O&M The local part of O&M cost will be adjusted on account of local inflation and O&M foreign component will be adjusted on account of variation in dollar/ rupee exchange rate and US CPI. Quarterly adjustments for inflation and exchange rate variation will be made on 1st July, 1st October, 1st January and 1st April respectively on the basis of latest available information with respect to WPI (notified by the Federal Bureau of Statistics)/alternative index determined by the Authority, US CPI (notified by US bureau of labor statistics) and revised TT & OD selling rate of US Dollar as notified by the National Bank of Pakistan. The mode of indexation will be as follows: F O&M (LREV) = O&M (LREF) * WPI (REV) / F O&M (FREV) = O&M (FREE) * US CPI (REV)/ * ER (REV) /86.20 Where: F O&M (LREV) F O&M (FREV) O&M (LREF) O&M (FREE) = The revised applicable fixed O&M local component of tariff = The revised applicable fixed O&M foreign component of tariff indexed with US CPI and exchange rate variation = The reference fixed O&M local component of tariff for the relevant period. = The reference fixed O&M foreign component of tariff for the relevant period. WPI (REV) WPI (REF) = The revised wholesale price index (manufactures)/ alternative index determined by the Authority. = wholesale price index (manufactures) of July 2011 notified by the Federal Bureau of Statistics/ alternative index determined by the Authority (refer to proceeding note). US CPI (REV) US CPI (REF) = The revised US CPI (all urban consumers). = US CPI (all urban consumers) for the month of September 2011 as notified by the US Bureau of Labor Statistics.

26 3640 THE GAZETTE OF PAKISTAN, EXTRA., JUNE 12, 2012 [PART IT ER (REV) = the revised Ti' & OD selling rate of US dollar as notified by the National Bank of Pakistan Note. At the time of this determination, the Authority is still in the process of establishing an alternative index for WPI (manufactures) which has been discontinued by the Federal Bureau of Statistics since August Pending the determination of alternative index by the Autticrity the last available WPI (Manufactures) for the month of July 2011 has been used as reference. Upon determination of alternative index by the Authority, reference indexation value shall be revised with the alternative index value for the month of September (ii) Adjustment of insurance component In case of insurance denominated in US $, insurance cost component of tariff will be adjusted on account of US$/PKR exchange rate variation on annual basis. Further, insurance component of the reference tariff will be adjusted as per actually incurred prudent costs, subject to maximum of 1.35% of the EPC cost, on annual basis upon production of authentic documentary evidence by the petitioner. (iii) Return on equity The return on equity component of tariff will be adjusted on the basis of revised Ti' & OD selling rate of US Dollar as notified by the National Bank of Pakistan according to the following formula: ROE (REV) ROE (REF) x ER (REV) /ER(REF) Where: ROE (REV) = Revised return on equity component of tariff expressed in Rs/kWh. ROE (REF) = Reference return on equity component of tariff expressed in Rs/kWh. ER(REV) ER (REF) = The revised Ti' & OD selling rate of US dollar as notified by the National Bank of Pakistan = The reference TT & OD selling rate of US dollar

27 PART 111 THE GAZETTE OF PAKISTAN, EXTRA., JUNE 12, (iv) Return on equity during construction The return on equity during construction component of tariff will be adjusted on the basis of revised 71' & OD selling rate of US Dollar as notified by the National Bank of Pakistan according to the following formula: ROEDC(REV) = ROEDC (REF) X ER (REV) / ER (REF) Where: ROEDC (REV) ROEDC(REF) ER (REV) ER (REF) = Revised return on equity during construction component of tariff expressed in Rs/kWh. = Reference return on equity during construction component of tariff expressed in Rs/kWh. = The revised TT & OD selling rate of US dollar as notified by the National Bank of Pakistan = The reference Ti' & OD selling rate of US dollar (v) Adjustment for LIBOR/KIBOR variation The interest part of fixed charge component will remain unchanged throughout the term except for the adjustment due to variation in 6 months LIBOR/ KIBOR, while spread of 4.50% on 6 months LIBOR and 2.95% on 6 months KIBOR remaining the same, according to the following formula: For foreign financing I = P (REV) * (LIBOR (REV) %) / 2 Where: A I = the variation in interest charges applicable corresponding to variation in 6 months LIBOR. AI can be positive or negativedepending upon whether 6 months LIBOR (Rev) per annum > or < 0.79%. The interest payment obligation will be enhanced or reduced to the extent of AI for each half year under adjustment. P(REV) = is the outstanding principal (as indicated in the attached debt service schedule to this order at Annex-II) on a biannual basis at the relevant six monthly calculations date.

28 3642 THE GAZETTE OF PAKISTAN, EXTRA., JUNE 12, 2012 [PART11 For local financing Al = P (REV) * (KIBOR (REV) %) / 2 Where: A I = the variation in interest charges applicable corresponding to variation in 6 months KIBOR. AI can be positive or negative depending upon whether 6 months KIBOR (Rev) per annum > or < 11.93%. The interest payment obligation will be enhanced or reduced to the extent of AI for each half year under adjustment. P (REV) = is the outstanding principal (as indicated in the attached debt service schedule to this order at Annex-II) on a biannual basis at the relevant six monthly calculations date. Foreign debt and its interest will also be adjusted on bi-annual basis on account of actual variation in PKR/US $ over the applicable reference exchange rate. Note: Adjustments on account of inflation, foreign exchange rate variation, LIBOR/ KIBOR variation and actual insurance will be approved and announced by the Authority within fifteen working days after receipt of the petitioner's request for adjustment in tariff in accordance with the requisite indexation mechanism stipulated herein. IV. Terms and Conditions of Tariff: Design & Manufacturing Standards: Wind turbine generation system shall be designed, manufactured and tested in accordance with the latest IEC standards or other equivalent standards. All plant and equipment shall be new. Wind Power Plant's Performance Data: The petitioner shall install monitoring masts with properly calibrated automatic computerized wind speed recording meters at the same height as that of the wind turbine generators and a compatible communication/scada system both at the wind farm and power purchaser's control room for transmission of wind speed and power output data to the power purchaser's control room.

29 REGISTERED No. M L I 4 of VabisStati 6112aernegji EXTRAORDINARY PUBLISHED BY AUTHORITY ISLAMABAD, TUESDAY, AUGUST 7, 2012 PART II Statutory Notifications (S. IL O.) GOVERNMENT OF PAKISTAN NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA) NOTIFICATION Islamabad, the 7th August, 2012 S. R (I)/2012. Pursuant to Section 31(4) of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997 as amended through Regulation of Generation, Transmission and Distribution of Electric Power (Amendment) Act 2011 and as per the mechanism for monthly fuel price adjustment prescribed and determined by the Authority vide Determination dated December 23, 2009 for Karachi Electric Supply Company Ltd. (KESCL), as notified vide S.R.O 11(1)12010 dated January 01, 2010, National Electric Power Regulatory Authority (NEPRA) makes and notifies the following adjustment in the approved tariff on account of variation in fuel charge for the month of May 2012 in respect of KESCL. Fuel Charges Adjustment to Fuel Charges Be Charged in Consumer be Calculated on the basis of Adjustment Bills torte Issued billing for ithe Month of (Ps/kWh) for the Month of May November 2012 (4707) [2868 (2012)/Ex:. Gaz.] Price : Rs. 2.00

30 4708 THE GAZETTE OF PAKISTAN, EXTRA., AUGUST 7, 2012 [PART II 2. The above adjustment of plus Ps /kWh shall be applicable to all the consumer categories except lifeline consumers of KESCL. The said adjustment shall be shown separately in the consumer bills of November, 2012 on the basis of units billed for the month of May, [Case No. NEPRA/TRF-133/KESCL-2009(6).] SYED SAFEER HUSSAIN, Registrar. PRINTED BY TIIE MANAGER, PRINTING CORPORATION OF PAKISTAN PRESS, ISLAMABAD. PUBLISHED BY THE DEPUTY CONTROLLER, STATIONERY AND FORMS, UNIVERSITY ROAD, KARACHI.

31 REGISTERED _No L: 7646 tebt galette EXTRAORDINARY PUBLISHED BY AUTHORITY ISLAMABAD, TUESDAY, JULY 17, 2012 PART II Statutory Notifications (S.R.O.) GOVERNMENT OF PAKISTAN MINISTRY OF WATER AND POWER NOTIFICATIONS Islamabad, the 13th July, 2012 S.R.O. 881(I)/2012. In pursuance of sub-section (4) of section 31 of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997 (XL of 1997), the Federal Government is pleased to direct that the following further amendments shall be made in its Notification No.S.R.O.997 (1)/2006, dated the 21st September, 2006, namely: In the aforesaid Notification, (a) after Annexure-CXXI, the following new annexures shall be added, namely: (4035) [2801(2012)/Ex. Gaz.] Price : Rs

32 4036 THE GAZETTE OF PAKISTAN, EXTRA., JULY 17, 2012 [PART II NORTHERN POWER GENERATION COMPANY LTD. "Annexure-CXXII Adjustment on account of fuel price variation for furnace with effect from 15th June, uel Price Unit Reference kimace Oil Rs. /M. Ton Current Revised uzaffargarh 20, , , Blocks Description Reference Fuel Current Revised Fuel Cost Fuel Cost Cost. Component Component Component Rs./kWh Rs./kWh. Rs./kWh 1 Furnace Oil Furnace Oil Furnace Oil Muzaffargarh Units 1,2, II Muzaffargarh Unit III Muzaffargarh Units 5, NORTHERN POWER GENERATION COMPANY LTD. Annexure-CXX III Adjustment on account of fuel price variation for firrnace with effect from 30th June, 2011 Fuel Price Unit Furnace Oil Rs. /M. Ton Reference Current Revised Muzaffargarh 20, , , Blocks Description Reference Fuel Current Revised Fuel Cost Fuel Cost Cost Component Component Component Rs./kWh Rs./kWh Rs./kWh I Furnace Oil Furnace Oil Furnace Oil Muzaffargarh Units 1,2, H Muzaffargarh Unit III Muzaffargarh Units 5, and

33 PART II] THE GAZETTE OF PAKISTAN, EXTRA., JULY 17, 2012 (b) after table XIX, the following new table shall be added namely: TABLE-XX NORTHERN POWER GENERATION COMPANY LIMITED Tariff adjustment for variation in CPI with effect from the 1st July, 2011 A 13 Capacity Purchase Price scalable com onent CPP dministration & stablishment Cost nsurance and Regulatiory ost ther income otal Escalable CPP on- Escalable CPP otal Capacity purchase rice (A +B) Reference Rs./kw/Month Current s./kw/month ( ) CPP Payable only for the month of 1st Jul, 2011 Rs./kw/Month ( ) ". S.R.O. 882(I)/2012. In pursuance of sub-section (4) of section 31 of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997 (XL of 1997), the Federal Government isleased p to direct that the following further amendments shall be made in its Notification No.S.R.0.997, (1)/2006, dated the 21st September, 2006 namely:, In the aforesaid Notification, after Annexure-CXXIII, the following new annexures shall be added, namely:

34 4038 THE GAZETTE OF PAKISTAN, EXTRA., JULY 17, 2012 [PART II "Annexure-CXXIV NORTHERN POWER GENERATION COMPANY LTD Adjustment on account of fitel price variation for furnace w.ef July 15, Fuel Price urnace Oil uzaffargarh Taisalabad 3locks Rs. /M. Ton Description uzaffargarh nits 1,2,3 uzaffargarh nit 4 uzaffargarh nits 5,6 PS Faisalabad nits 1,2 Reference 20, , eference Fuel Cost Component Rs./kWh Furnace Oil , , Current Fuel Cost Component Rs./kWh Furnace Oil Revised 64, , Revised Fuel Cost Component Rs./kWh Furnace Oil Annexure-CXXV NORTIIERN POWER GENERATION COMPANY LTD. Adjustment on account of fuel price variation for furnace w.e.f July 31, 2011

35 PART M THE GAZETTE OF PAKISTAN, EX'TRA., JULY 17, \Mocks Description uzaffargarh nits 1,2,3 uzaffargarh Unit u zaffargarh nits 5,6 PS Faisalabad nits 1,2 Reference Fuel Cost Component Rs./kWh Furnace Oil Current Fuel Cost Component Rs./kWh Furnace Oil evised Fuel Component Rs./kWh Furnace Oil pursuance of sub-section (4) of S.R.O. 883(I)/2012. In Transmission and section 31 of the Regulation of Generation, Distribution of Electric Power Act, 1997 (XL of 1997), the Federal Government is pleased to direct that the following further amendments shall be made in its Notification No.S.R (I)/2006, dated the 21st September, 2006, namely: In the aforesaid Notification, after Annexure-CXXV,the following new annexures shall be (a) added, namely: Annexure-CXX VI (b) NORTHERN POWER GENERATION COMPANY LTD. Charge Revised Schedule of Fuel Cost Part of Energ Adjustment on accotmt of tel ftrice p variation for gas on August 07, 2011 Adjustment

36 NORTHERN POWER GENERATION COMPANY LTD. Adjustment on account of ft price variation for fizrnace we]. August 15, 2011

37 PART II] THE GAZETTE OF PAKISTAN, EXTRA., JULY 17, Annexure-CXXVIII NORTHERN POWER GENERATION COMPANY LTD. Adjustment on account offuel price variation for furnace w. of August 31, 2011 Fuel Price Unit Reference Previous Revised Furnace Oil Rs. /M. Ton Muzaffargarh 20, , , Faisalabad 20, , , It locks Description Reference Fuel Cost Component Rs./kWh I Muzaffargarh Units 1,2,3 Perivous Fuel Cost Component Rs./kW11 Revised Fuel Cost Component Rs./kWh Furnace Oil Furnace Oil Furnace Oil II Muzaffargarh Unit III Mu zaffargarh Units V SPSFaisalabad Units 1, Annexure-CXXIX NORTHERN POWER GENERATION COMPANY LTD. Adjustment on account of fuel price variation for furnace w.e.f September 15, 2011 Fuel Price Unit Reference Previous Revised Furnace Oil Muzaffargarh Rs. /M. Ton 20, , , , , ,216.80

38 4042 THE GAZETTE OF PAKISTAN, EXTRA., JULY 17, 2012 [PART II Blocks Description Reference Fuel Cost Component Rs./kWh Previous Fuel Cost Component Rs./kWh Revised Fuel Cost Component Rs./kWh Furnace Oil Furnace Oil Furnace Oil 1 Muzaffargarh Units 1,2, II Muzaffargarh Unit III Muzaffargarh Units 5,6 v SPS Faisalabad Units 1, NORTHERN POWER GENERATION COMPANY LTD. Adjustment on account offiiel price variation for furnace w. of September 30, 2011 Annexure-CXXX Fuel Price Unit Reference Current Revised Furnace Oil Rs. /M. Ton Muzaffargarh 20, , , Blocks Description Reference Fuel Current Fuel Revised Fuel Cost Component Rs./kWh Cost Component Rs./kWh Cost Component Rs./kWh Furnace Oil Furnace Oil Furnace Oil I Muzaffargarh Units 1,2, II Muzaffargarh Unit ; an III Muzaffargarh Units 5, " (b) after table XX, the following new table shall be added namely:

39 PART II] THE GAZETTE OF PAKISTAN, EXTRA., JULY 17, TABLE-XX I Capacity Purchase price Reference Current CPP Payable only for the month of August, 2011 Rs./kw/Month Rs./kw/Month Rs./kw/Month A Escalable component Non- Escalable component (CPP) Depreciation Interest Payment for long term loan Return on Equity Tax B Total Non-Escalable Component (CPP) Total Capacity purchase Price (A+B) ". [No. P1-4(4)/2004.] CORRIGENDA To the Gazette of Pakistan Extra- Ordinary Part II; (i) In S.R.O. No. 952 (I)/2010 dated October 11, 2010, having Annexures-XLVIII, XLIX, LLI and LII may be read as Annexures- IIIC, IIC, IC, C and CI, respectively. (ii) In S.R.O. No. 695 (I)/2011 dated July 11, 2011, having Annexures LIII, LW, LV and LVI may be read as Annexures- CII, CIII, CIV and CV, respectively. (iii) In S.R.O. No. 31 (I)/2011 dated January 07, 2011, having Annexure-LVII may be read as Annexure-CVI. (iv) In S.R.O. No. 584 (I)/2011 dated June 06, 2011, having Annexure-LVIII may be read as Annexure-CVII. (v) In S.R.O. No. 745 (I)/2011 dated August 08, 2011 having Annexures-LIX, LX and LXI may be read as Annexures-CVIII, CIX and CX, respectively.

40 4044 (vi) THE GAZETTE OF PAKISTAN, EXTRA., JULY 17, 2012 [PART II In S.R.O. No. 738 (I)/2011 dated August 06, 2011, having Annexures-LXII, and LXIII may be read as Annexures-CXI and CXII, respectively. (vii) (viii) (ix) (x) In S.R.O. No. 585 (D/2011 dated June 06, 2011, having Annexure -LXIV may be read as Annexure-CXIII. In S.R.O. No. 403 (I)/2011 dated May 14, 2011, having Annexure, LXIV may be read as Annexure-CXIV. In S.R.O. No. 586 (I)/2011 dated June 06, 2011, having Annexure - LXVI may be read as Annexure-CXV. In S.R.O. No. 694 (I)/2011 dated July 11, 2011, having Annexure-LXVIII may be read as Annexure-CXVI. (xi) In S.R.O. No. 855(1)/2011 dated September 19, 2011 having Annexures-LXVIII and LXIX may be read as Annexures-CXVII and CXVIII, respectively. (xii) In S.R.O. No. 856 (I)/2011 dated September 19, 2011, having Annexure-LXX may be read as Annexure- CXIX. (xiii) In S.R.O. No. 984 (I)/2011 dated October 19, 2011, having Annexures-LXXI and LXXII may be read as Annexures-CXX and CXXI, respectively. [F. No. PI-4(4)/ CORRIGENDUM Islamabad, the 25th June, 2012 To the Gazette of Pakistan Extra- Ordinary Part II, dated the 15th March, 2011 containing Notifications No. S.R.O. 233(1)/2011, S.R.O. 234(1)/2011, S.R.O. 236(1)/2011, S.R.O. 237(1)/2011 and S.R.O. 238(1)/2011. In Schedule-I, under the heading "A-I General Supply Tariff- Residential", the following sentence may be added after the table of Tariff rates and prior to the footnote:

41 PART II] THE GAZETTE OF PAKISTAN, EXTRA., JULY 17, "As per Authority's decision residential consumers will be given the benefit of only one previous slab" [P-I 4(18)/2011.] AFTAB AHMED NADEEM, Deputy Secretary (Power). PRINTED BY THE MANAGER, PRINTING CORPORATION OF PAKISTAN PRESS, ISLAMABAD. PUBLISHED BY THE DEPUTY CONTROLLER, STATIONERY AND FORMS, UNIVERSITY ROAD, KARACHI.

42 I go, 4. ebt agtte 6:11r#23ke 11 EXTRAORDINARY PUBLISHED BY AUTHORITY REGISTERED No. M L of Siaititaan ISLAMABAD, THURSDAY, JULY 26, 2012 PART II Statutory Notifications (S. R. 0.) NATIONAL ELECTRIC POWER REGULATORY AUTHRITY NOTIFICATIONS Islanzubud, the 26th July, 2012 S.R.O. 908(I)/2012. Pursuant to Section 31(4) of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997 as amended through Regulation of Generation, Transmission and Distribution of Electric Power (Amendment) Act 2011 and as per the mechanism for monthly fuel price adjustment prescribed and determined by the Authority vide Determination dated December 23, 2009 for Karachi Electric Supply Company Ltd. (KESCL), as notified vide S.R.O. 11(1)/2010 dated January 01, 2010, National Electric Power Regulatory Authority (NEPRA) makes and notifies the following adjustment in the approved tariff on account of variation in fuel charge for the month of January 2012 in respect of KESCL. Fuel Charges Adjustment to Fuel Charges Charged in Consumer Bills be Calculated on the basis of Adjustment to be Issued billing for the Month of (Ps/kWh) in the Month of January August 2012 (4191) [2829(2012)/Ex. Gaz.] Price : Rs. 3.00

43 4192 THE GAZETTE OF PAKISTAN, EXTRA., JULY 26, 2012 [PART II 2. The above adjustment of plus Ps /kWh shall be applicable to all the consumer categories except lifeline consumers of KESCL. The said adjustment shall be shown separately in the consumer bills of August, 2012 on the basis of units billed for the month of January, S.R.O. 909(1)/2012. Pursuant to Section 31(4) of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997 as amended through Regulation of Generation, Transmission and Distribution of Electric Power (Amendment) Act 2011 and as per the mechanism for monthly fuel price adjustment prescribed and determined by the Authority vide Determination dated December 23, 2009 for Karachi Electric Supply Company Ltd. (KESCL), as notified vide S.R.O. 11(1)/2010 dated January 01, 2010, National Electric Power Regulatory Authority (NEPRA) makes and notifies the following adjustment in the approved tariff on account of variation in fuel charge for the month of February 2012 in respect of KESCL. Fuel Charges Adjustment to Fuel Charges Charged in Consumer Bills be Calculated on the basis of Adjustment to be Issued billing for the Month of (Ps/kWh) in the Month of February August The above adjustment of plus Ps.4.00/kWh shall be applicable to all the consumer categories except lifeline consumers of KESCL. The said adjustment shall be shown separately in the consumer bills of August, 2012 on the basis of units billed for the month of February, S.R.O. 910(1)/2012. Pursuant to Section 31(4) of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997 as amended through Regulation of Generation, Transmission and Distribution of Electric Power (Amendment) Act 2011 and as per the mechanism for monthly fuel price adjustment prescribed and determined by the Authority vide Determination dated December 23, 2009 for Karach Electric Supply Company Ltd. (KESCL), as notified vide S.R.O. 11(1)/2010 dated January 01, 2010, National Electric Power Regulatory Authority (NEPRA) makes and notifies the following adjustment in the approved tariff on account of variation in fuel charge for the month of March 2012 in respect of KESCL.

44 PART II] THE GAZETTE OF PAKISTAN, EXTRA., JULY 26, Fuel Charges Adjustment to Fuel Charges Charged i,consumer Bills be Calculated on the basis of Adjustment to he Issued billing for the Month of (Ps/kWh) in the Month of March September The above adjustment of plus Ps.160/kWh shall be applicable to all the consumer categories except lifeline consumers of KESCL. The said adjustment shall be shown separately in the consumer bills of September, 2012 on the basis of units billed for the month of March, [ Case No. NEPRA/TRF-133/KESCL-2009(6).] SYED SAFEER HUSSAIN, Registrar. PRINTED BY THE MANAGER, PRINTING CORPORATION OF PAKISTAN PRESS, ISLAMABAD. PUBLISHED BY THE DEPUTY CONTROLLER, STATIONERY & FOR MS, UNIVERSITY ROAD, KARACHI.

45 REGISTERED No. M L I 4b meta VitittOtan 62"'"Pme2g4 EXTRAORDINARY PUBLISHED BY AUTHORITY ISLAMABAD, FRIDAY, AUGUST 3, 2012 PART II Statutory Notifications (S. R. 0.) GOVERNMENT OF PAKISTAN MINISTRY OF WATER AND POWER NOTIFICATIONS Islamabad, the 30th July, 2012 S. R (1) / In pursuance of sub-section (4) of section 31 of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997 (XL of 1997), and in supersession of its Notifications No. S.R.O. 491(1)/2012, dated May, 9, 2012, and 512(1)/2012, dated 16, 2012, the Federal Government is pleased to notify the National Electric Power Regulatory Authority's determination as per Schedule-I to this notification for the FY with effect from the 1 March, 2012 and applicable tariff as per Schedule-II to this notification, in respect of the SEPCO, and it is notified that SEPCO shall receive payments from its consumers at the rates as per Schedule-II. The difference between the relevant rates determined by NEPRA as per Schedule-I and the rates charged from the consumers as per Schedule-II shall be paid to SEPCO by the Federal Government: Provided that consumer of domestic category "Residential Al" shall be billed and given benefit of all previous slabs of the tariff as per existing procedure: (4659) (2863(12)/Ex. Gaz.] Price : Rs

46 4660 THE GAZETTE OF PAKISTAN, EXTRA., AUGUST 3, 2012 [PART II Provided further that there shall be levied till the 31" December, 2015, an additional charge at the rate of Rs. 0.10/kwh on the consumption of electricity by every category of electricity consumer mentioned in Schedule-II except the lifeline domestic consumers of the category "Residential A-1" and such additional charges (c) shall not form a part while calculating the difference between the relevant rates of schedule-i and Schedule-II; and (d) Shall be deposited in a Fund called the "Neelum-Jhelum Hydro Power Development Fund" to be kept in the Escrow Account of the Neelum-Jhelum Company for exclusive use for the Neelum-Jhelum Hydro Power Project. 2. The Order of the Authority is placed at Annex-I Fuel Price Adjustment Mechanism at Annex-II, SEPCO Power Purchase Price at Annex-III and the Terms and Conditions at Annex-IV to this notification. SCHEDULE OF ELECTRICITY TARIFFS FOR SUKKUR. ELECTRIC POWER COMPANY SEPCO Schedule-I A-1 GENERAL SUPPLY Y.. ;SIDENTIAL Sr. No. TARIFF CATEGORY I PARTICULARS FIXED CHARGES Rs/kW/M VARIABLE CHARGES Rs/kWh (a) For Sanctioned load less than 5 kw i Up to 50 Units For Consumption exceeding 50 Units ii Units iii Units Iv Units v Above 700 Units (b) For Sanctioned load 5 kw & above Peak Off-Peak Time of Use As per the utho ty's decision residential consumers will be given the benefits of only one previous slab. Under tariff A-1, there shall be minimum monthly charges at the following rates even if no energy is consumed. (a) Single Phase Connections: (b) Three Phase Connections: Rs. 75/- per consumer per month Rs. 150/- per consumer per month

47 PART II] THE GAZETTE OF PAKISTAN, EXTRA., AUGUST 3, Sr. No. TARIFF CATEGORY / PARTICULARS FIXED VARIABLE CHARGES CHARGES Rs/kWh Rs/kW/M (a) For Sanctioned load less than 5 kw (b) For Sanctioned load 5 kw & above Peak Off-Peak (c) Time Of Use Under tariff A-2, there shall be minimum monthly charges at the following rates even if no energy is consumed. (a) Single Phase Connections; (b) Three Phase Connections: Rs. 175/- per consumer per month Rs. 350/- per consumer per month 8 INDUSTRIAL SUPPLY TARIFFS Sr. No. TARIFF CATEGORY / PARTICULARS FIXED VARIABLE CHARGES CHARGES Rs/kWh Rs/kW/M B1 Upto 25 kw (at 400/230 Volts) B2(a) exceeding kw (at 400 Volts) Time Of Use Peak Off Peak B1 ( b) Up to 25 KW B2(b) exceeding kw (at 400 Volts) B3 For All Loads up to 5000 kw (at 11,33 kv) B4 For All Loads (at 66,132 kv & above) For B1 consumers there shall be a fixed minimum charge of Rs. 350 per month. For B2 consumers there shall be a fixed minimum charge of Rs. 2,000 per month. For B3 consumers there shall be a fixed minimum charge of Rs. 50,000 per month. For B4 consumers there shall be a fixed minimum charge of Rs. 500,000 per month. A C SINGLE-POINT SUPPLY FOR PURCHAZt IN BULK BY A DISTR1 N LICENSEE WED LOAD CONSUMERS NOT FALLING IN ANY OTHER CONSUMER CLASS' Sr. No. TARIFF CATEGORY / PARTICULARS FIXED CHARGES Rs/kW/M VARIABLE CHARGES Rs/kWh C -1 C -2(a) C -3(a) For supply at 400/230 Volts (a) Sanctioned load less than 5 kw (b) Sanctioned load 5 kw & up to 500 kw For supply at 11,33 kv up to and including 5000 kw For supply at 66 kv & above and sanctioned load above 5000 kw

48 4662 THE GAZETTE OF PAKISTAN, EXTRA., AUGUST 3, 2012 [PART II Sr. No. C -1(c) C -2(b) C -3(b) TARIFF CATEGORY / PARTICULARS FIXED CHARGES Rs/kW/M VARIABLE CHARGES Rs/kWh Sr. No. Time Of Use Peak Off-Peak For supply at 400/230 Volts 5 kw & up to 500 kw For supply at 11,33 kv up to and including 5000 kw For supply at 66 kv & above and sanctioned load above 5000 kw Sr. No. TARIFF CATEGORY / PARTICULARS FIXED VARIABLE CHARGES CHARGES Rs/kWh Rs/kW/M D-1(a) SCARP less than 5 kw D-2 Agricultural Tube Wells Peak Off-Peak D-1(b) SCARP and Agricultural 5 kw & above Under this tariff, there shall be minimum monthly charges of Rs.350/- per consumer per month, even if no energy is consumed. Note:- The consumers havin sanctioned load less than 5 kw can opt for TOU metering. TEMPORARY S Sr. No. TARIFF CATEGORY! PARTICULARS FIXED CHARGES Rs/kW/M VARIABLE CHARGES Rs/kWh E-1(i) Residential Supply E-1(ii) Commercial Supply E-2 Industrial Supply For the categories of E-1(i&ii) above, the minimum bill of the consumers shall be Rs. 50/- per day subject to a minimum of Rs.500/- for the entire period of supply, even if no energy is consumed. Note: 125% of relevant industrial tariff Tariff-F consumers will have the option to convert to Regular Tariff and vice versa. This option can be exercised at the time of a new connection or at the beginning of the season. Once exercised, the option remains in force for at least one year. Sr. No. TARIFF CATEGORY / PARTICULARS FIXED CHARGES Rs/kW/M VARIABLE CHARGES Rs/kWh Street Lighting Under Tariff G, there shall be a minimum monthly charge of Rs.500/- per month per kw of lamp capacity installed.

49 PART III THE GAZETTE OF PAKISTAN, EXTRA., AUGUST 3, IES ATTA,CIiip TO INDUSTRIAL PREMISES. Sr. No. TARIFF CATEGORY / PARTICULARS FIXED CHARGES Rs/kW/M VARIABLE CHARGES Rs/kWh Residential Colonies attached to industrial premises Schedule-II tr Sr. No. TARIFF CATEGORY / PARTICULARS FIXED CHARGES Rs/kW/M VARIABLE CHARGES Rs/kWh (a) For Sanctioned load less than 5 kw i Up to 50 Units For Consumption exceeding 50 Units ii Units iii Units iv Units v Above 700 Units (b) For Sanctioned load 5 kw & above Peak Off-Peak Time Of Use Under tariff A-1, there shall be minimum monthly charges at the following rates even if no energy is consumed. (a) Single Phase Connections: (b) Three Phase Connections: PLY.T Rs. 75/- per consumer per month Rs. 150/- per consumer per month Sr. No. TARIFF CATEGORY / PARTICULARS FIXED VARIABLE CHARGES CHARGES Rs/kWh Rs/kW/M (a) For Sanctioned load less than 5 kw (b) For Sanctioned load 5 kw & above Peak Off-Peak (c) Time Of Use Under tariff A-2, there shall be minimum monthly charges at the following rates even if no energy is consumed. (a) Single Phase Connections; (b) Three Phase Connections: Rs. 175/- per consumer per month Rs. 350/- per consumer per month

50 4664 THE GAZETTE OF PAKISTAN, EXTRA., AUGUST 3, 2012.[PART II Sr. No. TARIFF CATEGORY / PARTICULARS FIXED CHARGES Rs/kW/M VARIABLE CHARGES Rs/kWh B1 Upto 25 kw (at 400/230 Volts) B2(a) exceeding kw (at 400 Volts) Time Of Use Peak Off-Peak B1 ( b) Up to 25 KW B2(b) exceeding kw (at 400 Volts) B3 For All Loads up to 5000 kw (at 11,33 kv) B4 For All Loads (at 66,132 kv & above) For B1 consumers there shall be a fixed minimum charge of Rs. 350 per month. For B2 consumers there shall be a fixed minimum charge of Rs. 2,000 per month. For B3 consumers there shall be a fixed minimum charge of Rs. 50,000 per month. For B4 consumers there shall be a fixed minimum charge of Rs. 500,000 per month. Sr. No. C - SINGLE-POINT SUPPLY FOR PURCHASE IN BULK BY A DISTRIBUTION LICENSEE AND MIXED LOAD CONSUMERS NOT FALLING IN ANY OTHER CONSUMER CLASS TARIFF CATEGORY / PARTICULARS FIXED CHARGES Rs/kW/M VARIABLE CHARGES Rs/kWh C -1 For supply at 400/230 Volts a) Sanctioned load less than 5 kw b) Sanctioned load 5 kw & up to 500 kw C -2(a) For supply at 11,33 kv up to and including 5000 kw C -3(a) For supply at 66 kv & above and sanctioned load above 5000 kw Time Of Use Peak Off-Peak C -1(c) For supply at 400/230 Volts 5 kw & up to 500 kw C -2(b) For supply at 11,33 kv up to and including 5000 kw C -3(b) For supply at 66 kv & above and sanctioned load above 5000 kw Sr. No. TARIFF CATEGORY / PARTICULARS D - AGRICULTURE TARIFF FIXED CHARGES Rs/kW/M VARIABLE CHARGES Re/kWh D-1(a) SCARP less than 5 kw D-2 Agricultural Tube Wells Peak Off-Peak D-1(b) SCARP and Agricultural 5 kw & above Under th s tariff, there shall be minimum monthly charges of Rs.350/- per consumer per month, even if no energy Is consumed. Note:- The consumers having sanctioned load less than 5 kw can opt for TOU metering.

51 PART II] THE GAZETTE OF PAKISTAN, EXTRA., AUGUST 3, E - TEMPORARY SUPPLY TARIFFS Sr. No. TARIFF CATEGORY / PARTICULARS FIXED CHARGES Rs/IcW/M VARIABLE CHARGES Rs/kWh E-1(i) E-1(ii) E-2 Residential Supply Commercial Supply Industrial Supply For the categories of E-1(i&ii) above, the minimum bill of the consumers shall be Rs per day subject to a minimum of Rs.500/- for the entire period of supply, even if no energy is consumed. F - SEASONAL INDUSTRIAL SUPPLY TARIFF Note: 125% of relevant industrial tariff Tariff-F consumers will have the option to convert to Regular Tariff and vice versa. This option can be exercised at the time of a new connection or at the beginning of the season. Once exercised, the option remains in force for at least one year. G- PUBLIC LIGHTING Sr. No. TARIFF CATEGORY / PARTICULARS FIXED CHARGES Rs/kW/M VARIABLE CHARGES Rs/kWh Street Lighting Under Tariff G, there shall be a minimum monthly charge of Rs per month per kw of lamp capacity installed. IAL COLONIES ATTACHED TO INDUSTRIAL PREMISES Sr. No. TARIFF CATEGORY / PARTICULARS FIXED CHARGES RsIkW/M VARIABLE CHARGES RsAcWh Residential Colonies attached to industrial premises Annex-I ORDER OF THE AUTHORITY I. Sukkur Electric Supply Company (SEPCO) is allowed to charge its consumers such tariff as set out in the schedule of tariff for SEPCO. II. The actual variation in fuel cost component of power purchase price against the reference fuel cost component shall be adjusted on monthly

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Attaturk Avenue (East), G-5/1, Islamabad. Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue (East) G-5/1, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600021 Web: www.nepra.org.pk, E-mail:

More information

Please find enclosed herewith the subject Decision of the Authority along with Annexure-I (08 pages) in Case No. NEPRA/TRF-343/TBCCPL-A-2015.

Please find enclosed herewith the subject Decision of the Authority along with Annexure-I (08 pages) in Case No. NEPRA/TRF-343/TBCCPL-A-2015. Hera Registrar National Electric Power Regulatory Authority Islamic Republic of Pakistan NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue (East) G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600021 Web: www.nepra.org.pk, E-mail:

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue (East) G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600021 Web: www.nepra.org.pk, E-mail:

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue (East) G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600021 Web: www.nepra.org.pk, E-mail:

More information

Enclosure: As above t--t o-a ( Syed Safeer Hussain )

Enclosure: As above t--t o-a ( Syed Safeer Hussain ) 0, Ewa National Electric Power Regulatory Authority Islamic Republic of Pakistan 1,t etn9 Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph:+92-51.9206500, Fax: +92-51.2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan NEPRA Tower, Ataturk Avenue(East), G-5/1, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail: registrar@nepra.org.pk

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority 06;5; Registrar National Electric Power Regulatory Authority Islamic Republic of Pakistan NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph:+92.51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

Please find enclosed herewith the subject Approval of the Authority along with Annexure-I & II (08 pages) in Case No. NEPRA/TRF-363/0SPL-2016.

Please find enclosed herewith the subject Approval of the Authority along with Annexure-I & II (08 pages) in Case No. NEPRA/TRF-363/0SPL-2016. National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph:+92.51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail:

More information

National Electric Power Regulatory Authority (Registrar Office)

National Electric Power Regulatory Authority (Registrar Office) National Electric Power Regulatory Authority (Registrar Office) No. NEPRA/TRF/WPT-2015// 1.1;1 December 21, 2015 Subject: NOTIFICATION (SRO 1242(1)/2015 DATED 17-12-2015) IN THE MATTER OF MOTION FOR LEAVE

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan 'or VE4 * Registrar NEPRA Tower, Attaturk Avenue (East), G-5/1, Islamabad. Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph:+92.51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail:

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue (East) G-511, Islamabad, Ph: +92-51-9206500, Fax: +92-51-260002 tl Web: www.nepra.org.pk,

More information

2. Enclosed please find herewith the subject Decision of the Authority along; with Annex-1 and Annex-II (18 pages).

2. Enclosed please find herewith the subject Decision of the Authority along; with Annex-1 and Annex-II (18 pages). National Electric Power Regulatory Authority Islamic Republic of Pakistan NEPRA Tower, Attaturk Avenue (East), G-5/1, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail: registrar@nepra.org.pk

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar MEPRA Tower, Attaturk Avenue (East), 0.511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Attaturk Avenue (East), G-5/1, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue (East) G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600021 Web: www.nepra.org.pk, E-mail:

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue (East) G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600021 Web: www.nepra.org.pk, E-mail:

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority Registrar National Electric Power Regulatory Authority Islamic Republic of Pakistan 2nd Floor, OPF building, G-5/2, Islamabad Ph: 9206500,9207200, Fax : 9210215 E-mail: registrar@nepra.org.pk No. NEPRA/TRF-124/OPCL-2009/2663-2665

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority ,in National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue(East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Attaturk Avenue (East), G-5/1, Islamabad Ph: +92-51-9206500, Fax: +92-51-260002S Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad. Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue(East), G-5/1, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail:

More information

Islamic Republic of Pakistan

Islamic Republic of Pakistan nein Registrar National Electric Power Regulatory Authority Islamic Republic of Pakistan NEPRA Tower, Attaturk Avenue (East), G-5/1, Islamabad. Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan "`"Vt Asf"v 8 Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad. Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Attaturk Avenue (East), G-5/1, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan 4r6Lum'Arrs9 Registrar NEPRA Tower, Attaturk Avenue (East), G-5/1, Islamabad. Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue(East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail:

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan 4PilsE45d Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad. Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan N E P RA Tower, Ataturk Avenue(East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail: registrar@nepra.org.pk

More information

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (FEES PERTAINING TO TARIFF STANDARDS AND PROCEDURE) REGULATIONS, 2002

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (FEES PERTAINING TO TARIFF STANDARDS AND PROCEDURE) REGULATIONS, 2002 (FEES PERTAINING TO TARIFF STANDARDS AND PROCEDURE) REGULATIONS, 2002 NOTIFICATION Islamabad, the 17 th June, 2002 S.R.O. 385(I)/2002. ln exercise of the powers conferred by section 47 of the Regulation

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan 29Pamir4 Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad. Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority t?' ei National Electric Power Regulatory Authority Islamic Republic of Pakistan os "r, Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph:+92.51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail: registrar@nepra.org.pk

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan 16VErW'li Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph:+92.51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail: registrar@nepra.org.pk

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue (East) G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600021 Web: www.nepra.org.pk, E-mail:

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad. Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan l'!4pm fsd/ Registrar NEPRA Tower, Attaturk Avenue (East), G-5/1, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority 4 Islamic Republic of Pakistan.` _ NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Registrar Ph:+92.51.9206500, Fax: +92.51.2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan J mpg_ :,..,- 4,.., Registrar National Electric Power Regulatory Authority Islamic Republic of Pakistan NEPRA Tower, Attaturk Avenue (East), G-5/1, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web:

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan '44sgnmig 6 Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

TARIFF PETITION LAKHRA POWER GENERATION COMPANY LIMITED

TARIFF PETITION LAKHRA POWER GENERATION COMPANY LIMITED December 18, 2014 TARIFF PETITION FOR THE PERIOD FROM JULY 1, 2014 TO JUNE 30, 2015 ON BEHALF OF LAKHRA POWER GENERATION COMPANY LIMITED (GENCO-BULPGCL) (GOP/WAPDA owned entity) CONSULTANTS: Shajar Capital

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail: registrar@nepra.org.pk

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority oca National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar No.NEPRA/R/LAT-01// 5/// - /5160 NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph:+92-51-9206500, Fax: +92-51-2600026

More information

National Electric Power Regulatory Authority Islamic Rebublic of Pakistan

National Electric Power Regulatory Authority Islamic Rebublic of Pakistan National Electric Power Regulatory Authority Islamic Rebublic of Pakistan 2nd Floor, OPF Building, G-512, Islamabad Ph: 051-9206500, 9207200, Fax: 9210215 E-mail: registrar@nepra.org.pk No. NEPRA/PAR-71/213-215

More information

National Electric Power Regulatory Authority Islamic Rebublic of Pakistan

National Electric Power Regulatory Authority Islamic Rebublic of Pakistan National Electric Power Regulatory Authority Islamic Rebublic of Pakistan 2nd Floor, OPF Building, G-512, Islamabad Ph: 051-9206500, 9207200, Fax: 9210215 E-mail: registrar@nepra.org.pk No. NEPRA/PAR-75/227-229

More information

National Electric Power Regulatory Authority Islamic Rebublic of Pakistan

National Electric Power Regulatory Authority Islamic Rebublic of Pakistan National Electric Power Regulatory Authority Islamic Rebublic of Pakistan 2nd Floor, OPF Building, G-5/2, Islamabad Ph: 051-9206500, 9207200, Fax: 9210215 E-mail: registrar@nepra.org.pk No.NEPRA/TRF-206/KWSB-2012

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority f.r - Registrar National Electric Power Regulatory Authority Islamic Republic of Pakistan NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph:+92-51.9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA) *** No. NEPRA/TRF-70/NCPL-2007 March 5, 2007

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA) *** No. NEPRA/TRF-70/NCPL-2007 March 5, 2007 NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA) *** No. NEPRA/TRF-70/NCPL-2007 Determination of Tariff w.r.t Nishat Chunian Power Limited (NCPL) Authority Nasiruddin Ahmed Member Zafar Ali Khan Member

More information

Uttar Pradesh Electricity Regulatory Commission

Uttar Pradesh Electricity Regulatory Commission Uttar Pradesh Electricity Regulatory Commission Notification no. UPERC / Secy / CNCE Regulation, 2009/ 696 Dated: 22.3.2010 In exercise of powers conferred under section 181 read with section 9, 61, 86

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Rebublic of Pakistan 2nd Floor, OPF Building, G-5/2, Islamabad Ph: 051-9206500, 9207200, Fax: 9210215 E-mail: registrar@nepra.org.pk No. NEPRA/PAR-76/5204-5206

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph:+92.51-9206500, Fax: +92-51.2600026 Web: www.nepra.org.pk, E-mail:

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan 465Vem0E41 Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

F-NO.P-I1-2(12)/2007 Government of Pakistan Ministry of Water & Power <><><><><><>

F-NO.P-I1-2(12)/2007 Government of Pakistan Ministry of Water & Power <><><><><><> F-NO.P-I1-2(12)/2007 Government of Pakistan Ministry of Water & Power Islamabad, the IC February, 2013 Managing Director, PEPCO, WAPDA House Lahore. Government Inspector of Electricity, 0/o

More information

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY ELIGIBILITY CRITERIA FOR CONSUMERS OF DISTRIBUTION COMPANIES 2003

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY ELIGIBILITY CRITERIA FOR CONSUMERS OF DISTRIBUTION COMPANIES 2003 NATIONAL ELECTRIC POWER REGULATORY AUTHORITY ELIGIBILITY CRITERIA FOR CONSUMERS OF DISTRIBUTION COMPANIES 2003 NOTIFICATION Islamabad, the 26th July, 2003 S.R.O. 743 (I)/2003. Pursuant to Section 21 (2)

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue(East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail:

More information

Notice of Extra Ordinary General Meeting

Notice of Extra Ordinary General Meeting Notice of Extra Ordinary General Meeting To be held on Saturday, 30 th March 2019 at 10:00 a.m PSX Auditorium, Stock Exchange Building, Stock Exchange Road, Karachi NOTICE OF EXTRAORDINARY GENERAL MEETING

More information

Nishat Power Limited First Quarterly Report 2013 CONTENTS

Nishat Power Limited First Quarterly Report 2013 CONTENTS Nishat Power Limited First Quarterly Report 2013 CONTENTS Nishat Power Limited Page No. Corporate Profile 2 Directors Report 3 Condensed Interim Balance Sheet 4-5 Condensed Interim Profit and Loss Account

More information

The Tariff Petition (including its Annexures) is submitted in triplicate together with:

The Tariff Petition (including its Annexures) is submitted in triplicate together with: Ref No. BWEPL/NEPRA/308/2018 Date: 31s` May 2018 The Registrar National Electric Power Regulatory Authority NEPRA Tower Attaturk Avenue (East), Sector G-5/1, Islamabad. Subject: Submission of the Tariff

More information

REVISED MONTHLY FUEL COST ADJUSTMENT (FCA) DUE TO VARIATION IN FUEL AND POWER PURCHASE PRICE FOR THE MONTH OF JANUARY 2015

REVISED MONTHLY FUEL COST ADJUSTMENT (FCA) DUE TO VARIATION IN FUEL AND POWER PURCHASE PRICE FOR THE MONTH OF JANUARY 2015 Ref. No. RA&SP/NEPRA/071/ Dated: March 11, 2015 The Registrar N.E.P.R.A Islamabad Subject: REVISED MONTHLY FUEL COST ADJUSTMENT (FCA) DUE TO VARIATION IN FUEL AND POWER PURCHASE PRICE FOR THE MONTH OF

More information

GOVERNMENT OF PAKISTAN MINISTRY OF COMMERCE ****** O R D E R

GOVERNMENT OF PAKISTAN MINISTRY OF COMMERCE ****** O R D E R GOVERNMENT OF PAKISTAN MINISTRY OF COMMERCE ****** Islamabad, the1 st July, 2016 O R D E R S.R.O. 582(I)/2016.- In exercise of the powers conferred by sub-section (I) of section 3 of the Imports and Exports

More information

INDEPENDENT POWER PRODUCERS ADVISORY COUNCIL

INDEPENDENT POWER PRODUCERS ADVISORY COUNCIL INDEPENDENT POWER PRODUCERS ADVISORY COUNCIL House # 23, Street # 26 Sector F-8/1 Islamabad, PAKISTAN. Tel : +92 51 2287511-12 Fax : +92 51 2287513 E-mail: ippac@live.com August 05, 2015 Mr. If tikhar

More information

Government of Pakistan Revenue Division Federal Board of Revenue **** NOTIFICATION (Income Tax)

Government of Pakistan Revenue Division Federal Board of Revenue **** NOTIFICATION (Income Tax) Government of Pakistan Revenue Division Federal Board of Revenue **** Islamabad, the 24 th January, 2019. NOTIFICATION (Income Tax) S.R.O. 69(I)/2019.- In exercise of the powers conferred by sub-section

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad. Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

NOTICE OF THE TWENTY SECOND ANNUAL GENERAL MEETING

NOTICE OF THE TWENTY SECOND ANNUAL GENERAL MEETING NOTICE OF THE TWENTY SECOND ANNUAL GENERAL MEETING Notice is hereby given that the 22 nd Annual General Meeting of Faysal Bank Limited ( FBL ) will be held on March 29, 2017 at 9:00 a.m. at Marriott Hotel,

More information

Riali Hydro Power Company (Pvt.) Ltd

Riali Hydro Power Company (Pvt.) Ltd Riali Hydro Power Company (Pvt.) Ltd RHPCO Ref No: RHPCO/NEPRA/Riali-II HPP/TRF/18/056 Dated: June 22, 2018 The Registrar, National Electric Power Regulatory Authority NEPRA Tower, Ataturk Avenue (EAST)

More information

BEFORE THE HON BLE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (MPERC) BHOPAL

BEFORE THE HON BLE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (MPERC) BHOPAL BEFORE THE HON BLE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (MPERC) BHOPAL IN THE MATTER OF Provisional approval of Generation tariff of M.P. s 57% share of power in Sardar Sarovar Project (6x200+5x50

More information

1.2. The sponsors, to develop and implement the power project, established a Special Purpose Company called Fimcotex Industries Pvt) Ltd.

1.2. The sponsors, to develop and implement the power project, established a Special Purpose Company called Fimcotex Industries Pvt) Ltd. A Continuation Sheet No. 1 Tp Pi ICiYa K damr3d7sa (P t Ltd 1. INTRODUCTION 1.1. The Hyderabad Electric Supply Company Limited (HESCO) issued an LOI for setting up a new captive power plant in the premises

More information

CONTENTS. Nishat Power Limited

CONTENTS. Nishat Power Limited CONTENTS Nishat Power Limited Page No. Corporate Profile 2 Directors Report 3 Condensed Interim Balance Sheet 4-5 Condensed Interim Profit and Loss Account 6 Condensed Interim Statement of Comprehensive

More information

EXTRA ORDINARY 13 SHRAVANA (S) BIHAR ELECTRICITY REGULATORY COMMISSION

EXTRA ORDINARY 13 SHRAVANA (S) BIHAR ELECTRICITY REGULATORY COMMISSION REGISTERED NO. PT.-40 The B Bihar Gazett te EXTRA ORDINARY PUBLISHED BY AUTHORITY 13 SHRAVANA (S) (NO.PATNA 541) PATNA, WEDNESDAY, 4TH AUGUST 2010 BIHAR ELECTRICITY REGULATORY COMMISSION NOTIFICATION The

More information

PUBLIC DEBT MANAGEMENT QUARTERLY REPORT JANUARY-MARCH 2018

PUBLIC DEBT MANAGEMENT QUARTERLY REPORT JANUARY-MARCH 2018 PUBLIC DEBT MANAGEMENT QUARTERLY REPORT JANUARY-MARCH 2018 GOVERNMENT OF INDIA MINISTRY OF FINANCE BUDGET DIVISION DEPARTMENT OF ECONOMIC AFFAIRS JUNE 2018 www.dea.gov.in ii CONTENTS Section Page No. Introduction

More information

Company Information 02. Directors' Report on unaudited Condensed Interim Financial Information 04

Company Information 02. Directors' Report on unaudited Condensed Interim Financial Information 04 Financial Information for the Quarter and Nine Months ended September 30, 2014 CONTENTS Company Information 02 Directors' Report on unaudited Condensed Interim Financial Information 04 Unaudited Condensed

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue (East) G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600021 Web: www.nepra.org.pk, E-mail:

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Attaturk Avenue (East), G-5/1, Islamabad. Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue(East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail:

More information

Determination of the Authority in Case No. NEPRA/TRF-48/FPCDL-2006

Determination of the Authority in Case No. NEPRA/TRF-48/FPCDL-2006 Determination of the Authority in Case No. NEPRA/TRF-48/FPCDL-2006 Background Foundation Power Company (Daharki) Ltd. has been established for setting up a combined cycle thermal power plant based on low

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue(East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail:

More information

FY17A FY18E FY19F FY20F FY21F

FY17A FY18E FY19F FY20F FY21F Power Generation Research Nishat Power Limited (NPL) Declining yields but still attractive! BUY Company Name: Symbol June, 2018 Nishat Power Limited NPL Target Price PKR 34 Upside 21% Key Statistics Current

More information

Policy Framework for Private Sector Transmission Line Projects

Policy Framework for Private Sector Transmission Line Projects Policy Framework for Private Sector Transmission Line Projects 2015 Abbreviations BOOT CS EDB GS GOP ICB ITC kv kw LOS NEPRA NTDCL OHL PEPA PPIB PPP RFP Rs TSA TSC US$ Build-Own-Operate-Transfer Convertor

More information

Gazette Notification by the Government of Pakistan. Document Eight

Gazette Notification by the Government of Pakistan. Document Eight Gazette Notification by the Government of Pakistan Document Eight 8 REGISTERED No. M-302 The Gazette of Pakistan EXTRAORDINARY PUBLISHED BY AUTHORITY KARACHI, THURSDAY, DECEMBER 14, 1995 PART III Other

More information

Neelum Jhelum Hydropower Company (Private) Limited

Neelum Jhelum Hydropower Company (Private) Limited Rating Report RATING REPORT Neelum Jhelum Hydropower Company (Private) Limited REPORT DATE: January 11, 2019 RATING ANALYSTS: Maham Qasim maham.qasim@jcrvis.com.pk RATING DETAILS Instrument Rating Rating

More information

Electricity (Development of Small Power Projects) GN. No. 77 (contd.) THE ELECTRICITY ACT (CAP.131) RULES. (Made under sections 18(5), 45 and 46))

Electricity (Development of Small Power Projects) GN. No. 77 (contd.) THE ELECTRICITY ACT (CAP.131) RULES. (Made under sections 18(5), 45 and 46)) GOVERNMENT NOTICE NO. 77 published on 02/03/2018 THE ELECTRICITY ACT (CAP.131) RULES (Made under sections 18(5), 45 and 46)) THE ELECTRICITY (DEVELOPMENT OF SMALL POWER PROJECTS) RULES, 2018 1. Citation

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue(East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail:

More information

Acceptance of Deposits by Companies - CA.B. Kalyan Srinath,

Acceptance of Deposits by Companies - CA.B. Kalyan Srinath, Acceptance of Deposits by Companies - CA.B. Kalyan Srinath, sbkalyan@gmail.com 1. Introduction: The Companies Act, 2013 was assented by the President of India on 29, August 2013 and Published in the Official

More information

BIHAR ELECTRICITY REGULATORY COMMISSION PATNA

BIHAR ELECTRICITY REGULATORY COMMISSION PATNA BIHAR ELECTRICITY REGULATORY COMMISSION PATNA NOTIFICATION 2 nd August, 2010 No. BERC-Regl/Solar-2/2010-03 In exercise of powers conferred under Section 61 read with Section 181(2)(zd) of the Electricity

More information

Foundation Wind Energy-II (Pvt.) Limited (FWEL-II)

Foundation Wind Energy-II (Pvt.) Limited (FWEL-II) RATING REPORT Foundation Wind Energy-II (Pvt.) Limited (FWEL-II) REPORT DATE: February 16, 2018 RATING ANALYSTS: Maimoon Rasheed maimoon@jcrvis.com.pk Rating Details Rating Category Long-term Short-term

More information

1100 MW Kohala Hydropower Project Approval of Feasibility Stage Tariff Proposal

1100 MW Kohala Hydropower Project Approval of Feasibility Stage Tariff Proposal NATIONAL TRANSMISSION & DESPATCH COMPANY OWE) Telephone No. 99202111 PBX 99202211 / 2325 Fax No. 99202578 No. GM/WPPO/CE-IV/DH/ Office of the General Manager (WPPO) 325-Wapda House, Lahore Dated : 2014

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue(East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail:

More information

Portland General Electric Company Sheet No SCHEDULE 201 QUALIFYING FACILITY 10 MW or LESS AVOIDED COST POWER PURCHASE INFORMATION

Portland General Electric Company Sheet No SCHEDULE 201 QUALIFYING FACILITY 10 MW or LESS AVOIDED COST POWER PURCHASE INFORMATION Portland General Electric Company Sheet No. 201-1 PURPOSE SCHEDULE 201 QUALIFYING FACILITY 10 MW or LESS AVOIDED COST POWER PURCHASE INFORMATION To provide information about Standard Avoided Costs and

More information

HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA. (Date of Order: )

HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA. (Date of Order: ) HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA IN THE MATTER OF:- (Date of Order: 25.07.2018) Petition No.: 26/2018(Suo-Moto) CORAM Sh. S.K.B.S. Negi Chairman Sh. Bhanu Pratap Singh Member

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue (East) G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600021 Web: www.nepra.org.pk, E-mail:

More information

National Electric Power Regulatory Authority Islamic Rebublic of Pakistan

National Electric Power Regulatory Authority Islamic Rebublic of Pakistan National Electric Power Regulatory Authority Islamic Rebublic of Pakistan 2nd Floor, OPF Building, G-5/2, Islamabad 1".01Pmntie251$ Ph: 051-9206500, 9207200, Fax: 9210215 E-mail: registrar@nepra.org.pk

More information

Notice of Fourteenth Annual General Meeting

Notice of Fourteenth Annual General Meeting Notice of Fourteenth Annual General Meeting NOTICE IS HEREBY GIVEN THAT THE FOURTEENTH ANNUAL GENERAL MEETING OF ARIF HABIB LIMITED WILL BE HELD ON SEPTEMBER 15, 2018 AT 10:30 A.M. AT BEACH LUXURY HOTEL,

More information

THE HUB POWER COMPANY LIMITED NOTICE OF THE EXTRAORDINARY GENERAL MEETING

THE HUB POWER COMPANY LIMITED NOTICE OF THE EXTRAORDINARY GENERAL MEETING THE HUB POWER COMPANY LIMITED NOTICE OF THE EXTRAORDINARY GENERAL MEETING Notice is hereby given that the Extraordinary General Meeting of The Hub Power Company Limited (the Company ) will be held on May

More information