1 Registrar National Electric Power Regulatory Authority Islamic Republic of Pakistan 2nd Floor, OPF building, G-5/2, Islamabad Ph: , , Fax : registrar@nepra.org.pk No. NEPRA/TRF-124/OPCL-2009/ April 13, 2011 Subject: Decision of the Authority in the Matter of Adjustments in Generation Tariff of Orient Power Company Ltd. at Commercial Operation Date (COD) [Case # NEPRA/TRF-124/OPCL -2009(2)] Intimation of Decision of Tariff Adjustment pursuant to Section 31(4) of the Regulation of Generation, Transmission and Distribution of Electric Power Act 1997 (XL of 1997) Dear Sir, Please find enclosed herewith the subject decision of the Authority along with Annex-I, IA & II ( 18 pages) in Case No. NEPRA/TRF-124/OPCL-2009(2). 2. The decision is being intimated to the Federal Government for the purpose of notification in the official gazette pursuant to Section 31(4) of the Regulation of Generation, Transmission and Distribution of Electric Power Act 1997 (XL of 1997) and Rule 16(11) of the National Electric Power Regulatory Authority Tariff ( Standards and Procedure) Rules, Please note that Order of the Authority at para 13 of the Decision relating to the reference tariff, adjustments, indexation and terms & conditions along with Annex-I, IA & II needs to be notified in the official Gazette. Enclosure: As above BL-1 y ( Syed Safeer Hussain ) Secretary Ministry of Water & Power `A' Block, Pak Secretariat Islamabad iwer RF cc: 1, Secretary, Cabinet Division, Cabinet Secretariat, Islamabad. 2, Secretary, Ministry o "inane, Islamabad.

2 Decision in them a tter of OPCL's tariff adjustments at COD No. NLPRAITRF CL-700 (?) DECISION OF THE AUTHORITY IN THE MATTER. OF ADJUSTMENTS IN GENERATION TARIFF OF ORIENT POWER COMPANY LIMITED AT COMMERCIAL OPERATIONS DATE CASE NO. NEPRA/TRF 124/OPCL-2009(2) 1. Introduction 1.1 Pursuant to the Authority's determination dated June 13, 2005 and subsequent determinations/reviews decisions dated July 20, 2005, August 31, 2005, December 16, 2005, September 18, 2007 and September 17, 2009, "true up" of the reference tariff components of Orient Power Company Limited (hereinafter "OPCL") were required to be adjusted at Commercial Operations Date (hereinafter "COD"). 1.2 OPCL through a letter dated August 19, 2010 received on August 20, 2010 submitted that it achieved Commercial Operations on May 24, 2010; the day as per the certification by Independent Engineer. OPCL along with its request also submitted copies of original invoices acid relevant documents in support thereof. 1.3 In order to adjust the reference tariff components on the basis of actual expenditur e, revised KI80R, US CPI, WPI, exchange rate and initial dependable capacity at COD the following methodology was adopted: i) Verification of the information provided by OPCL with the original determination; ii) Verification of the source documents i.e. invoices, general ledgers, copies of the pay orders, taxes & custom duty, challans etc; iii) Sought clarification and additional information for processing of the case; iv) Verification through independent sources i.e. financial statements, bank statements etc.; and v) Physical verification through visit of the generating facility. 2. Adjustment on account of Net Capacity at COD 2.1 OPCL's calculations were based on net capacity of 209 MW which was assessed in the original determination. OPCL contended that in the original determination no adjustment was provided in the unit rate of tariff on the basis of actual tested net capacity established et COD. OPCL pointed out that in the Power Purchase Agreement OPCL is required to pay liquidated damages if the tested capacity comes out less than the contract capacity whereas there was no adjustment in the unit rate in case of higher output. It was further stated that OPCL was not allowed to sell anything higher than the contract capacity. In this regard clause 5.3(e) of the PPA was referred, which according to OPCL put an upper limit of the company's declaration of daily capacity to the contract capacity. OPCL was of the view that effectively, what was achieved in later projects through tariff determination has been controlled through the PPA in the case of Orient. According to OPCL unlike later PPAs, which provided for time based degradation of output, it did not enjoy such benefit. OPCL stated that although its output start out at MW but it would degrade over time resulting in an expected 0

3 Decision in the matter of OPCL's taiiffadjustmenzs at C'OD ho. NEPRA/PRF1241/OPCG-2009(7/ lifetime average of 209 MW, approximately 2% less than the contract capacity and its tariff should, therefore, be based on life time numbers. 2.2 In order to verify the OPCL' s contention the PPAs of other comparable projects were examined. The said examination has revealed that some differences in provisions of PPAs did exist. The Authority, however, in order to maintain consistency among the tariff determination procedure, has decided to treat OPCL at par with other similar new projects in this context. Consequently, the net tested capacity of MW established at COD is being considered appropriate for adjustment in the relevant tariff components. In order to make OPCL's PPA consistent with the PPAs of other similar projects, the Power Purchaser needs to amend the PPA accordingly. In view thereof NTDC and OPCL are hereby directed to amend the PPA thus making it consistent and comparable with the PPAs of other IPPs 3. One Time Adjustments for Project Cost Engineering Procurement and Construction (EPC) Cost 3.1 OPCL claimed US$ million (Rs. 11, 786 million) on account of EPC Cost as against the determined US$ million at para 19 of the determination dated September 17, According to OPCL the cost overrun of US$ million occurred mainly due to the bankruptcy of EPC contractor M/s. SKODA. OPCL's petition vide Case No. NEPRA/TRI'- 124/OPCL in this regard was considered and decided by the Authority on llc' September In the said petition an increase of US$ million in EPC Cost was sought on the following ground; i) Exchange rate variation on account of Euro and CZK Crown; ii) Security situation in Pakistan; iii) Increase in the cost of raw material (primary metals) in the International Market; iv) Increase in Equipment Cost (due to market tightness); V) Increase in transportation, sea freight etc.; and vi) Additional cost of equipment required by WAPDA / NTDC. (Ref Para of the above determination) 3.2 After detailed scrutiny of the information and documentary evidence provided by OPCI, ill the said petition the Authority held that... increase in the EPC Cost based on the grounds ns sought by the Petitioner is notjustified and hence not allowed." 3.3 OPCL while justifying its request for increase in EPC cost argued that subsequent to contractor's bankruptcy most of the equipment suppliers/venders had been demobilized from Site due to non-payments and overdue receivables. As a result thereof, OPCL had no choice but to terminate the contract and complete the work with alternate means. In order to complete the project OPCL directly dealt with the equipment manufacturers and suppliers. It was stated that approximately US$42.29 million were either paid or were payable to dw vendors/suppliers, in addition to the US$ million paid to the EPC contractor prior to termination of EPC Contract. According to OPCL the increase of US$20.66 million in EPC cost v 9

4 Decision in the matter of OPMs tariff adjustments at COL) No. NEPRA/PRF-12410PC1-2009,_' was less than US$28 million asked by the EPC in early OPCL stated that the saving was because of the reason that it took on some risks itself. OPCL in support of its claim submitted various relevant documentary evidences such as EPC contract with the main EPC Contractor and assignments of contracts to subcontractors after bankruptcy of SKODA, Novation of existing agreements with some sub-contractors, Variation orders, IPCs, EPC invoices, bank statements evidencing the payments of invoices to contractors /sub-contractors etc. 3.4 After having considered OPCL's arguments the Authority is of the view that certain business risks invariably exist and it is the sponsor's responsibility to adopt measures to mitigate such risks through mutually agreed contracts. The Authority has carefully examined the information provided and evidence produced and noted that OPCL did cover its risks in the signed EPC Contract. In addition, it has been able to recover reasonable compensation from the EPC Contractor for not fulfilling contractual obligations which ultimately caused delay in achieving the RCOD as per the terms of Power Purchase Agreement. In view thereof the Authority considers that OPCL's request for accepting revised EPC cost of US$ million is not justified; therefore is not accepted to the extent of cost overruns. 3.5 The Authority while considering OPCL's request for adjustment in EPC Cost due to exchange rate variation noted that the allowed EPC cost was based on a firm EPC Contract and there was no mechanism of adjustment of EPC cost, (neither for Actual Cost nor due to variation in exchange rates,) in the original determination or any subsequent determinations. The following adjustment formula for the revision of project cost was prescribed as per the Original determination dated : Revised Project cost = ( million million) * Rs IDC 3.6 In the subsequent determinations the abovementioned adjustment mechanism was not revised or amended. However, Government of Pakistan (GoP) vide its ECC decision no. ECC- 6S/S/2007 dated provided a guidelines for adjustment of EPC cost for exchange rate variation. Para 2 of the said ECC decision is reproduced as under: "(i) To enable maximum competition from suppliers and contractors, the IPPs should not be exposed to the impact of exchange rate variation between US dollar, Euros, Pound Sterling and Japanese Yen up to Commercial Operation Date (COD). Consequences of this variation, whether resulting in Increase or decrease in tariff, should be reflected in final tariff to be fixed at COD, EPC contracts denominated in these currencies besides rupee should thus be accepted by NEPRA (ii) At the COD, the capital cost be fixed in US dollars based on actual currencies of EPC Contract accepted by NEPRA at the time of tariff determination, sources of financing, payments and actual exchange rates against rupee for the four currencies (US Dollar, Euro, Pound Sterling and Japanese Yen) on the relevant dates. Towards this end IPP should establish the relevant cost details to NEPRA with actual documents and proofs regarding EPC contract, sourcing of equipment and financing." I/ E RA i j AUTHORITY C Y tio^lyn * *1^0^

5 Decision in the matter of OPCL's tariff adjustments ar COD No. NEPRA1PRF-1241OPCL-2009(2) 3.7 The Authority considers that on the basis of formula in Para 3.5, the exchange rate parity adjustment in EPC between US$ to PKR cannot be given because EPC Cost as well as Non-EPC cost is to be converted in Pak Rupees at exchange rate of PKR 60/US$. The allowed EPC cost in the above mentioned formula in Para of the determination was US$ million whereas US$ million was on account of Non-EPC Cost. In the Authority's opinion OPCL was the first IPP under 2002 Power Policy and there were no clear guidelines for such an adjustment at that time ; therefore any different treatment if followed would be discriminatory when compared to other IPPs determination and subsequent COD adjustments. In view thereof the Authority, based on the principle of fairness, equity and justice and the above-mentioned ECC's decision, has decided to adjust the allowed EPC cost of US$ on account of PKR/US$ exchange rate variation at weighted average exchange rate of Rs on the basis of documentary evidence, resulting in EPC cost of Rs. 10, million. 4. Non-EPC 4.1 OPCL claimed US$ million or Rs. 1, million on account of project development, construction management, withholding taxes, insurance during construction, pre-operating 0&M and un-recovered fuel, spare parts and financial financing fee and charges. OPCL, however, in support of its claim provided the details of Non-EPC cost incurred US$ million thus claiming cost overruns of US$ million. 4.2 On the same principle as has been discussed under the head of EPC Cost, the Authority has decided to disregard the cost overruns in the Non-EPC Cost. 4.3 The Authority in its determination dated September 17, 2007 allowed US $22.70 million as Non-EPC Cost to cover the following: - Project Development cost/ Land / Overheads etc.; - Construction management/ Independent Engineer / Admin. etc.; - Insurance during construction; - Withholding Taxes; - Pre operations 0&M and unrecovered fuel cost; - Spare Parts; and - Financing fee. 4.4 The Authority in its determination dated July 20th, 2005 did not allow any adjustment for exchange rate variation in Non-EPC cost. The relevant extract of the Authority's decision in this regard as reproduced below indicates the reference exchange rate as Rs. 60 / US$: "The Authority has considered both the requests and is allowing the originally requested cost of US$ 170 million with the provision that /DC component of the cost will be updated for actual K/BOR at the time of the completion of the project at the following formula and the tariff table will be updated accordingly. e

6 Decision in the matter of OPCL's tariff adjustments at COD No. NEPRA/PRF CL-2009(2) Revised Project cost ( million million) * Rs A idc 4.5 Although the above formula does not provide any adjustment for exchange rate variation but the Authority while taking realistic view in other similar cases based on the verifiable documentary evidence allowed adjustment for exchange rate variation in those cost items of Non-EPC Cost, which were incurred in foreign currency and were verifiable from documentary evidence. In view thereof on the basis of available information and Authority's decisions in the cases of other comparable projects the item-wise adjustment is discussed as under: Project Development cost/ Land / Overheads etc. OPCL was allowed US$ 4.7 million on account of project development cost/land/overhead etc. Since the said cost was incurred in Pak Rupees therefore, no adjustment on account of exchange variation is required. In the cases of all the new IPPs the same principle has been adopted. Accordingly the project development cost/land/overhead etc in the instant case is converted in Pak Rupees million using the reference exchange rate of Rs. 60 per US$ Construction management/ Independent Engineer / Admin etc. OPCL was allowed cost of US$ million on account of Construction management/ Independent Engineer / Admin. etc., except cost of independent engineer remaining costs were incurred in Pak Rupees. In order to convert this cost in Pak Rupees the same principle has been adopted in the instant case as was adopted in the cases of other new IPPs whereby foreign currency payments were converted on the exchange rates prevailing on the dates of payments, whereas, local payments were converted at reference exchange rate of Rs. 60 per US$. Accordingly the cost of Construction Management/Independent Engineer/Admin. etc. at COD has been converted in Pak Rupees million on the basis of weighted average exchange rate of Rs per US$ in the instant case Insurance During Construction OPCL did not claim or request any adjustment on this account. OPCL was allowed US$ million on account of Insurance during Construction without any mechanism for adjustment. The examination of the documentary evidence provided by OPCL indicated that the actual amount paid was Rs million or US$ million Although no adjustment mechanism with respect to Insurance During Construction was provided in the OPCL's tariff determination but the Authority in its decisions with respect to other new IPPs established a maximum ceiling of 1.35% of EPC cost on account of insurance during construction. Since the Authority while allowing adjustment in EPC Cost in the instant case adopted consistent approach in line with other comparable IPPs; therefore similar approach is being adopted for adjusting Insurance during Construction. Accordingly based on actual expenditure up to RCOD, the Insurance Cost during 1.35% of the EPC cost of US$ million works out as Rs million or US$ million and the same has been adopted for the purpose of calculation of tariff.

7 Decision in the matter o! OPCL' tariff adjustments at COD No. NEPPAITRF-1241OPCL-2009(2) Withholdine Tax The Authority has considered the withholding tax as pass through item in all the similar cases. The Authority in its determination allowed US$ million on account of withholding tax. OPCL was requested to provide a complete detail of withholding tax related to EPC payments and it has provided the copies of statements of withholding tax filed with FBR. In view thereof, the Authority has decided to allow US$ million (Rs million) on account of withholding tax at reference exchange rate of Rs.60/US$ Snare Parts: OPCL was allowed US$ 5.5 million on account of spare parts in the determination without any adjustment mechanism. From the information and documentary evidence submitted by OPCL i.e. 0&M contract and proof of payments under LC, it was noted that the cost of spare parts was US$ 3.1 million instead of allowed US$ 5.5 million. Since the amount of spare parts was allowed as part of Non-EPC Cost component and the Authority has not allowed any cost overruns or adjusted any amount saved in Non-EPC cost while deciding other similar cases of new IPPs. The major consideration for not allowing such adjustment was that the exact assessment of each cost item could not be done at the time determination and there might be saving in some items and overruns in others. In Authority's opinion this provides an incentive for efficient use of the resources. In view of aforementioned reasons the Authority has decided to maintain the same amount of US$ 5.5 million as per the original determination; the amount in Pak Rupees thus works out as Rs. 330 million CUSTOM DUTIES OPCL was the first IPP under the Power policy 2002, and at the time of determination it was not clear whether IPPs under 2002 policy were exempt or not from the custom duties, therefore the custom duties were not considered as part of project cost. Subsequently the IPPs under 2002 Power Policy were also subjected to custom duties Qa 5%, which were accordingly treated as part of project cost in all the subsequent determinations. Since this was not considered in the determination therefore OPCL and NTDC agreed to treat this amount as a pass through item in the PPA. In this regard the relevant Para 11.3 of PPA pertaining to the custom duties is reproduced below: "The following items shall be pass-through: (a) (b)... (c) (d) Custom or import duty, if any levied on the company for import of equipment and material prior to the COD, for construction of plant, since the tariff approved by r

8 ^',^IVac Decision in the matter of OPCL 's tariff adjustments at COD No. NEPRA/TRF CL-2009(-1 NEPRA, as attached as Annex-1 herein does not assume any custom duty as a part of the capital cost of the plant..." NTDC in terms of its PPA has paid the custom duties to OPCL. Since this amount was not accounted for in the determined project cost and has already been paid to OPCL therefore is not made part of the project cost Financing; Fee and Charges: OPCL has claimed US$ million against US$ million as determined by die Authority in its determination on account of financing fee and charges. However, no adjustment on this account was provided in the determination. OPCL has not provided any evidence to substantiate its claim on this account. The allowed amount of US$3.813 million is about 3.43% of the borrowing. The Authority has fixed a maximum ceiling of 3% on account of financing fees and charges of borrowing less IDC and Financing fee. Since the Authority while adjusting the EPC Cost component and all those cost items where no adjustment was provided, has treated OPCL equally with other similar projects; therefore the similar treatment is being followed in this regard. Accordingly the financing fees and charges in the instant case are assessed as Rs million applying maximum ceiling of 3% to the: borrowing of Rs million (at the time of R-COD). 5. Interest during construction (IDQ 5.1 OPCL claimed Rs. 3, or US$ million at exchange rate of Rs per US$ (total debt availed was Rs. 11, million) on account of Interest During Construction based on construction period of about 40 months up to May 24, 2010 (actual date of COD). In order to substantiate its claim, OPCL submitted the copies of common term agreements with lenders, copies of bank statements to substantiate actual draw downs of debt along with bank advices evidencing the amount of interest charged by the lenders, data of KIBOK rates, etc. 5.2 OPCL's claim has been considered in the light of the Authority's determination dated , wherein the following adjustment of IDC has been provided: "The Authority has considered both the requests and is allowing the originally requested cost of US$ 170 million with the provision that IDC component of the cost will be updated for actual KIBOR at the time of the completion of the project at the following formula and the tariff table will be updated accordingly. Revised Project cost = ( million million) * Rs d IDC d IDC = Actual IDC - $ million (d IDC can be positive or negative)..." 5.3 The determination is silent on the construction period to be used for calculation of IDC. The above adjustment mechanism only provides adjustment to the extent of KIBOR variation and

9 Decision in the matter of OPCL's tariffadjusonems ar COD.%o. NEPRA/TRF-17d/OPCL-700)` does not mention about the adjustment on the basis of actual draw downs or variation in project cost. In the absence of such adjustment mechanism the Authority has decided to rely on the already decided cases. The Authority in all other similar cases has established :i principle to take the required COD as agreed in the Power Purchase Agreement (PPA) while calculating IDC. In the instant case the Required COD date as defined in the PPA is as follov,.,: "The date that is twenty-eight (28) months following the date on which financial closing occurs, as such date may be extended pursuant to section 6.5 or section 8.1 (b) or by reason of Force Majeure Event" (Annex-V) 5.4 According to the above definition given in the PPA, construction period in the instant case starts from December 16, 2006 and accordingly Required Commercial Operation D;rtc (RCOD) is April 17, The Authority considers that OPCL's request for allowing IDC beyond RCOD, i.e. April 17, 2009 is not within the scope of current adjustments at COD. The RCOD is fixed, in accordance with the terms and conditions of Power Purchase Agreement executed between the parties. The definition of RCOD clearly provides that it can be extended by the parties in terms of the Agreement. The Authority is not a party to the contract. It has no powers to change, amend, vary or alter the terms and condition of the agreement. Since no change or amendment in the PPA is made by the parties, the Authority shall restrain itself to the RCOD as given in the PPA. In view thereof the Authority has decided to accept OPCL's claim of IDC only upto RCOD i.e. April 17, e 5.6 In addition, the rational for not considering the financial impact after RCOD is that the liquidated damages recovered from the EPC contractor by OPCL are not considered by the Authority in its calculation. In Authority's opinion it is neither justified nor fair to pass on cost of such risks to the consumers. The Authority considers that any gain or loss resultin from recovery of liquidated damages from the EPC Contractor and cost overruns due to delay in achieving RCOD should be on OPCL 's account. 5.7 In the light of above and keeping in view the Authority 's decisions in the earlier COD adjustments of the IPPs, IDC in the instant case based on actual draw down and up to RCOD of April 17, 2009, has been assessed as Rs 1, million (total debt verified till RCOD was Rs. 8, million). Furthermore, OPCL's audited financial statement indicated an interest income of Rs million which is required to be proportioned till R-COD. Accordingly the net IDC has been worked out as Rs. 1, million after adjusting the proportionate interest income amounting to Rs million. 6. Overall Project Cost 6.1 OPCL claimed a total project cost of US$ million (PKR 15, million) against the determined project cost of US$ million (PKR 10, million). Based on the adjustments made in the preceding paragraphs in accordance with the Authority's determinations and in the light of ECC 's decision, OPCL's overall project cost has been assessed as PKR 13, million (US$ million) as against the claim of Rs

10 OP,y'tB r Decision in the matter of OPCL s tariff adjustments at COD tvo. NEPRA/TRF-179/OPCL-2009(2/ 15, million (US$ million). The Authority considers that its assessment of project cost being close to the audited figure of project cost Rs. 14, million is more realistic because OPCL has been reasonably compensated by EPC Contractor for cost overruns in EPC. 7. Debt Equity Ratio / Financing Structure 7.1 Subsequent to filing adjustment request, OPCL through its letter dated requested to allow equity up to Rs. 4, million (US$ million). The Authority while considering OPCL's request observed that on the basis of adjusted project cost of US$ million, debt/equity ratio works out as 69 : 31 against 75:25 as determined by the Authority. OPCL's request being legitimate and consistent with other similar cases is accepted. 8. Adjustment on account of Return on Equity (ROE) 8.1 Based on equity amount of Rs. 4, (US$ million) as requested by OPCL and annual ROE of 15%, the return in the instant case has been assessed as US$9.17 million (Rs million at exchange rate of Rs.80.50/US$). Accordingly the ROE component based on net capacity of MW has been revised as Rs /kW/h against the determined ROE component of Rs /kw/h. 9. Adjustment on account of Return on Equity During construction (ROEDCl 9.1 At the time of determination the Authority assessed ROEDC /kw/11) on assumed equity injections which were subject to adjustment as per the actual equity injections at COD. 92 Based on the total construction period of 28 months as per PPA (commencing from December 16, 2006 to RCOD in April 17, 2009 ) and keeping in view the relevant dates of equity injections and the Authority decision for calculating ROEDC, the annual ROEDC in the instant case works out as US$ million or Rs million at exchange rate of Rs.80.50/US$. Accordingly the ROEDC component on the basis of net capacity of M %V has been revised as Rs /kW/h against the determined ROEDC component of Rs /kw/h. 10. Insurance Component (Insurance subsequent to CODj 10.1 OPCL claimed Rs /kW/h against the determined component of insurance during the operations amounting to Rs /kW/h. OPCL in support thereof provided the documentary evidence, such as Insurance Policies, Insurance Invoices and acknowledgements of payment of insurance premiums amounting to Rs.74,544,969. Accordingly the reference tariff component determined by the Authority has been revised as Rs /kW/h at COD. I/

11 Decision in the matter of OPCL's ta^ig'adjasm^ents at CUl? 11. Working Capital Component 11.1 OPCL based on KIBOR + 3% requested working capital component of Rs /kw/h tnr gas based operation and Rs /kW/h for HSD based operation. In the original determination Cost of working capital component was not allowed ; OPCL was however allowed this cost in its determination dated September 17, The reference tariff component of cost of working capital was determined as Rs /kW/ii and R,; /1<W/h for 9 months gas operations and 3-months HSD operations at para 9-10 u! the determination dated September 17, The aforesaid reference tariff component was calculated on the basis of KIBOR + 2% Although no adjustment mechanism was provided in the determination on account of HSD price adjustment at the time of first fill but the Authority in all similar cases has allowed fuel price adjustment (one time) at the time of first fill. The Authority in all fairness considers that nondiscriminatory treatment in the instant case needs to be given. Based on the information provided by OPCL the reference tariff component as determined in the determination September 17, 2009 is being revised as Rs /kW/h for 9 months (for summer season on the basis of 7 days inventory) and /kW/h for 3-months (for winter season on the basis of 15 days inventory) on the basis of following parameters: 1-ISD Price (LHV) /Liter Net Capacity MW KIBOR 13.39% + 2% Margin Sales Tax 17% 12. Debt Servicing Component 12.1 OPCL requested Rs / kw/h as debt service component, which was calculated on th( basis of Rs. 11, million debt and 3 -months K1BOR 13.73%+3% spread In the determination debt service component was assessed as Rs /kW/h based on the following reference values: Total debt KIBOR Rs. 8, % of the total project cost 13.72% + 3% Margin Term of loan 10 years to be payable on 40 equal quarters Subsequent to the adjustments the overall project cost has been assessed as Rs 13, million (US$ million) out of which Rs. 4, million is financed through equity while the remaining amount of Rs.9, million through debt. Based on the debt of Rs. 9, million, net capacity of MW and 3 months KIBOR of % + 3 % p.a. margin, debt service component in the instant case works out as Rs /kW/1) as against the claim of Rs.1.32/kW/h.

12 Decision in the matter of OPMs tariff adjustments at COD No. NBPRA1 PRF-17910PCL-2009( 2,1 13. ORDER Pursuant to Rule 16 (11 ) of the NEPRA Tariff Standards & Procedures Rules, 1998 OPCL is allowed to charge, on the basis of revised net dependable capacity established on the basis of test jointly carried out by the Central Power Purchasing Agency (CPPA) of the National Transmission and Despatch Company Limited (NTDC) and OPCL at the timc of Commercial Operations Date (COD), the following tariff for delivery of electricity: REFERENCE TARIFF Tariff Components Year 1 to 10 Year 11 to 30 Indexation Capacity Charge (PKR/kW/Hour) Fixed O&M -Foreign US$/PKR & US CPI - Local WPI Insurance US$/PKR Cost of working capital - Gas KIBOR - HSD KIBOR Debt service KIBOR Return on equity US$/PKR Return on equity during Construction US$/ PKR Total Capacity Charge - Gas HSD Energy Charge Rs./kWh For Operation on Gas Fuel cost component Fuel price Variable O&M - Foreign US$/PKR & US CPI For Operation on HSD Fuel cost component Fuel price Variable O&M - Foreign US$/PKR & US CPI Note: i) Capacity Charge Rs./kW/hour is applicable to dependable capacity at the delivery point. ii) Dispatch criterion will be the Energy Charge. iii) The above tariff is applicable for a period of 30 years commencing from the date of the Commercial Operations. iv) Component wise tariff is indicated at Annex-I and Debt Service Schedule at Annex-11. Adjustment in Insurance Comvonent Insurance component of reference tariff shall be adjusted as per actual on yearly basis upon production of authentic documentary evidence by OPCL according to the following formula:

13 Decision in the matter of OPCL's tariff adjustments at COD No. NEPRA/TRF-1241OPCL-20090, Insurance Component (Revised) = Rs per kw per hour/ (1.35% x US$ million) x AP Where; AP = Actual Premium subject to maximum of 1.35% of the adjusted EPC I I) Pass-Through Items No provision for income tax has been accounted for in the tariff. If OPCL is obligated to pay any tax on its income, the exact amount paid by the company shall be reimbursed by NTDC to OPCL on production of original receipts. This payment will be considered as a pass-though (as Rs./kW/hour) hourly payment spread over a 12 months period in addition to the capacity purchase price given in the tariff. Furthermore, in such a scenario, OPCL shall also submit to NTDC details of any tax shield savings and NTDC shall deduct the amount of these savings from its payment to OPCL on account of taxation. Withholding tax is also a pass-through item just like other taxes as indicated in the government guidelines for the determination of tariff for new IPPs. In revised tariff table withholding tax number is indicated as reference and NTDC shall make payment on account of withholding tax at the time of actual payment of dividend subject to maximum of 7.5% of 15% of reference equity i.e. hourly payment (Rs./kW/hour) spread over 12 months. In case company does not declare a dividend in a particular year or only declares a partial dividend, then the difference in the withholding tax amount (between what is paid in that year and the total entitlement as per the net return on equity) would bc carried forward and accumulated so that the company is able to recover the same in hourly payments spread over 12 months period as a pass-through from the power purchaser in future on the basis of the total dividend payout. III) Indexations The following indexations shall be applicable to reference tariff. a) Indexation applicable to O&M In future fixed O&M part of capacity charge will be adjusted on account of local inflation (WPI) and variation in US CPI and dollar/rupee exchange rate parity. Quarterly adjustment for local inflation, foreign inflation and exchange rate variation will be made on 15t July, lsr October, hr January and hr April based on the latest available information with respect to WPI notified by the Federal Bureau of Statistics, US CPI notified by the US Bureau of Labor Statistics and revised TT & OD selling rate of US dollar notified by the National Bank of Pakistan. The mode of indexation will be as under: i

14 Decision in the matter of OPMs tariff adjustments at OOU No. NEPRA/TRF-l24/OPCL-?009(_ i) Fixed O&M F O&M (LREV) = Rs per kw per hour * WPI (REV) / F O&M (RREV) = Rs per kw per hour * US CPI (REV) / * ER (Rev) /Rs Where; I 0&Mp.izev) I O&M(rRCV) W Pl p;r.v) W Plp;eo) US CPI (rev) US CPI peee) = The revised applicable fixed O&M local component of the capacity charge indexed with WPI = The revised applicable fixed O&M foreign component of the capacity charge indexed with US CPI and exchange rate variations = The revised wholesale price index (manufacturers) = wholesale price index (manufacturers) of March 2009 notified by the Federal Bureau of Statistics = The revised US CPI ( all urban consumers) = US CPI (all urban consumers) for the month of March 2009 as notified by the US Bureau of Labor Statistics = The revised TT & OD selling rate of US dollar as notified by the National Bank of Pakistan ii) Variable O&M The formula of indexation for variable O & M component will be as under: V O&M (REV) = Rs per kwh* US CPI (REv) / * ER pzev) / Rs Where; V O&M(I;eV) US CPI (Rev) US CPI (R9e) The revised applicable variable O&M component of the energy charge indexed with US CPI and exchange rate variation. The revised US CPI (all urban consumers) US CPI (all urban consumers) for the month of March 2009 as notified by the US Bureau of Labor Statistics The revised TT & OD selling rate of US dollar as notified by the National Bank of Pakistan b) Adjustment for KIBOR variation The interest part of debt service component will remain unchanged throughout the term except for the quarterly adjustment due to variations in interest rate as a result of variation in 3-months KIBOR according to the following formula: Al (e) = P (LREV) * ( KIBOR (REV) %) / 4 Where;

15 fl2r, d: Decision in the matter of OL'CL's tariff adjustments at (.0P %},. NEPRA/TR/'-/Zl10PCL-100' i ' Al The variation in interest charges applicable corresponding to variation in KIBOR. A I (L) can be positive or negative depending upon whether KIBOR (REV) is > or < %. The interest payment obligation will be enhanced or reduced to the extent of A I (L) for each quarter under adjustment on quarterly basis. The outstanding principal (as indicated in the attached debt service schedule to this order ) on a quarterly basis on the relevant quarterly calculations date. C) Fuel Price Variation The variable charge part of the tariff relating to fuel cost shall be adjusted on account of the fuel price variations. In this regard, the variation in OPCL's allowed rate relating to fuel cost shall be revised according to the following formula: FC (aev) (Rs per kwh * FP (Rev)) / Rs per MMBTU Where; FC (Rev) FP (Rev) Revised fuel cost component of variable charge on Gas Revised fuel price d) Adjustment in Return on Equity (ROE). ROE component of tariff will be adjusted on account of exchange rate variation according to the following formula; ROE (i;ev) = Rs per kw per hour * ER (Rev)/ ER (Ref) Where; ROE(rev) = The revised ROE component of the capacity purchase price ER(ie,-v) = E R Ji 'tr = The revised TT & OD selling rate of US $ as notified by the National Bank of Pakistan The reference exchange rate of PKR = 1 US$. C) Adjustment on Return on Equity during Construction (ROEDC) ROEDC component of tariff will be adjusted on account of exchange rate variation according to the following formula; ROEDC (Rev) = Rs per kw per hour * ER (Rev)/ ER (Reo Where; Y

16 Decision in the matter of OPCL's tariff adjusiments at COD No. NEPRA/TRF-1241OPCL--Akk) Ji ROL-DCp;,, = The revised ROEDC component of the capacity purchase price = The revised TT & OD selling rate of US $ as notified by the National Bank of Pakistan GR(i;,.) = The reference exchanges rate of PKR 80.50=1 US$. Adjustments on account of variation in WPI, US CPI, exchange rate, KIBOR and fuel price will be approved and announced by the Authority for immediate application in accordance with the requisite indexation mechanism stipulated herein. IV) Terms and Conditions of Tariff: i) Use of Gas will be considered as primary fuel. ii) Dispatch criterion will be based on the energy charge. iii) General assumptions of OPCL, which are not covered in this and earlier determinations, may be dealt with in the PPA according to its standard terms. AUTHORITY (Zafar Ali Khan Member (Magbool Ahmad Khawaja) Member (Shaukat Ali Kundi) Vice Chairman /Member L!'cv.L 7't^jH^rc.Q,^,^- ^Pnvc..^ ^ /^-,^^ 3L ^7^ c ^ pe-v G+^we^^'S.feti,Q ^ r,tcsdsa.^ ^ ^ez.e ^^"" ^ La ^e std /c' rog ed ",A14. S'

17 Orient Power Company Ltd. Modified Tariff (GAS) Annex-I Variable Charge (PKR/kWh) Capacity Charge (PKR/kW/Hour) Return on Return on Withholding Loan Interest Working Total Year Variable Equity during Fuel Total Fixed O&M Fixed O&M Insurance Capital Equity Capacity O&M Construction (Foreign) (Local) Component Charge ROE R EDC Tax Repayment Charges lized Tariff 1.30 Years ) Net Capacity MW Reference Exchange Rate (PKR/ISS) Reference Fuel Price (Gas) LHV PKR per MMCFT Reference US CPI March 2009 Reference WPI (manufacturers) March 2009 KIBOR NcI Efficiency io Levelized Tariff ( at 5) p rnl fad r) I,c h.r k1'j1h 03x0 (U^ cc nldh` i

18 Orient Power Company Ltd. Modified Tariff (HSD) Annex- I A Variable Charge PKR/kWh Capacity Charge (PKR/kW/Hour) Return on Return on Withholding Loan Working Interest Year Variable Fixed Fuel Equity duri ng Total Total Fixed O&M Insurance Capital Equity O&M 0&M Construction Tariff (Local ) Component Forei n ROE R ED Tax Re payment Charg es Levelized Tariff 1-30 Years ) Net Capacity MW Reference Exchange Rate (PKR/ISS) Reference Fuel Price (HSD) per litre Reference US CPI March 2009 Reference WPI (manufaenwers) March 2009 KIBOR Net Fdeiencv 51.20%, I emllznd l n I ( 60 6 p f: ctor) Rs per SVJn 17 31)8,-, (t IS

19 Orinent Power Company Limited Debt Repayment Schedule Annex-11 1 Year Quarter Principal Amount Million Rs. Repayment Million Rs. Mark Up Million Rs. Debt Service Million Rs. Principal Amount Million Rs. Annual Principal Repayment Annual Interest Rs/kW/hr Annual Debt Serving I Rs/k N'/hr Rs/Kw/hr 1 9, , , , , ,01-4 9, , ), 1-5 8, , , , , , , , F 9 8, , , , , , , , , 13 7, , , , , , , , , , , , , , , , l 21 6, , , , , , , , Q536D u a , , , , , , , , t 0 ' , , ,160 _ _ 477 3, , _ , , , I U I,- 33 3, , , , , , , , ' I 37 1, , , tu7-i5

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue (East) G-511, Islamabad, Ph: +92-51-9206500, Fax: +92-51-260002 tl Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Attaturk Avenue (East), G-5/1, Islamabad. Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue (East) G-5/1, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600021 Web: www.nepra.org.pk, E-mail:

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority 06;5; Registrar National Electric Power Regulatory Authority Islamic Republic of Pakistan NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph:+92.51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue (East) G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600021 Web: www.nepra.org.pk, E-mail:

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue (East) G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600021 Web: www.nepra.org.pk, E-mail:

More information

Please find enclosed herewith the subject Decision of the Authority along with Annexure-I (08 pages) in Case No. NEPRA/TRF-343/TBCCPL-A-2015.

Please find enclosed herewith the subject Decision of the Authority along with Annexure-I (08 pages) in Case No. NEPRA/TRF-343/TBCCPL-A-2015. Hera Registrar National Electric Power Regulatory Authority Islamic Republic of Pakistan NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

Enclosure: As above t--t o-a ( Syed Safeer Hussain )

Enclosure: As above t--t o-a ( Syed Safeer Hussain ) 0, Ewa National Electric Power Regulatory Authority Islamic Republic of Pakistan 1,t etn9 Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph:+92-51.9206500, Fax: +92-51.2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan NEPRA Tower, Ataturk Avenue(East), G-5/1, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail: registrar@nepra.org.pk

More information

Please find enclosed herewith the subject Approval of the Authority along with Annexure-I & II (08 pages) in Case No. NEPRA/TRF-363/0SPL-2016.

Please find enclosed herewith the subject Approval of the Authority along with Annexure-I & II (08 pages) in Case No. NEPRA/TRF-363/0SPL-2016. National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph:+92.51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail:

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan 'or VE4 * Registrar NEPRA Tower, Attaturk Avenue (East), G-5/1, Islamabad. Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph:+92.51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail:

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue (East) G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600021 Web: www.nepra.org.pk, E-mail:

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar MEPRA Tower, Attaturk Avenue (East), 0.511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

2. Enclosed please find herewith the subject Decision of the Authority along; with Annex-1 and Annex-II (18 pages).

2. Enclosed please find herewith the subject Decision of the Authority along; with Annex-1 and Annex-II (18 pages). National Electric Power Regulatory Authority Islamic Republic of Pakistan NEPRA Tower, Attaturk Avenue (East), G-5/1, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail: registrar@nepra.org.pk

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue (East) G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600021 Web: www.nepra.org.pk, E-mail:

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue (East) G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600021 Web: www.nepra.org.pk, E-mail:

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Attaturk Avenue (East), G-5/1, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue(East), G-5/1, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail:

More information

National Electric Power Regulatory Authority Registrar Office

National Electric Power Regulatory Authority Registrar Office National Electric Power Regulatory Authority Registrar Office *** No. NEPRA/TRF-100 / 2 35,2 _1/ 2013 Subject: Gazette Notifications The following notifications have been secured from Printing Corporation

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue (East) G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600021 Web: www.nepra.org.pk, E-mail:

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail: registrar@nepra.org.pk

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority t?' ei National Electric Power Regulatory Authority Islamic Republic of Pakistan os "r, Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph:+92.51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan 4PilsE45d Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan N E P RA Tower, Ataturk Avenue(East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail: registrar@nepra.org.pk

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad. Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority ,in National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue(East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan 16VErW'li Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority (Registrar Office)

National Electric Power Regulatory Authority (Registrar Office) National Electric Power Regulatory Authority (Registrar Office) No. NEPRA/TRF/WPT-2015// 1.1;1 December 21, 2015 Subject: NOTIFICATION (SRO 1242(1)/2015 DATED 17-12-2015) IN THE MATTER OF MOTION FOR LEAVE

More information

Islamic Republic of Pakistan

Islamic Republic of Pakistan nein Registrar National Electric Power Regulatory Authority Islamic Republic of Pakistan NEPRA Tower, Attaturk Avenue (East), G-5/1, Islamabad. Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan "`"Vt Asf"v 8 Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad. Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA) *** No. NEPRA/TRF-70/NCPL-2007 March 5, 2007

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA) *** No. NEPRA/TRF-70/NCPL-2007 March 5, 2007 NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA) *** No. NEPRA/TRF-70/NCPL-2007 Determination of Tariff w.r.t Nishat Chunian Power Limited (NCPL) Authority Nasiruddin Ahmed Member Zafar Ali Khan Member

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan '44sgnmig 6 Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

1.2. The sponsors, to develop and implement the power project, established a Special Purpose Company called Fimcotex Industries Pvt) Ltd.

1.2. The sponsors, to develop and implement the power project, established a Special Purpose Company called Fimcotex Industries Pvt) Ltd. A Continuation Sheet No. 1 Tp Pi ICiYa K damr3d7sa (P t Ltd 1. INTRODUCTION 1.1. The Hyderabad Electric Supply Company Limited (HESCO) issued an LOI for setting up a new captive power plant in the premises

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority 4 Islamic Republic of Pakistan.` _ NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Registrar Ph:+92.51.9206500, Fax: +92.51.2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad. Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Attaturk Avenue (East), G-5/1, Islamabad Ph: +92-51-9206500, Fax: +92-51-260002S Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority Islamic Rebublic of Pakistan

National Electric Power Regulatory Authority Islamic Rebublic of Pakistan National Electric Power Regulatory Authority Islamic Rebublic of Pakistan 2nd Floor, OPF Building, G-512, Islamabad Ph: 051-9206500, 9207200, Fax: 9210215 E-mail: registrar@nepra.org.pk No. NEPRA/PAR-75/227-229

More information

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (FEES PERTAINING TO TARIFF STANDARDS AND PROCEDURE) REGULATIONS, 2002

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (FEES PERTAINING TO TARIFF STANDARDS AND PROCEDURE) REGULATIONS, 2002 (FEES PERTAINING TO TARIFF STANDARDS AND PROCEDURE) REGULATIONS, 2002 NOTIFICATION Islamabad, the 17 th June, 2002 S.R.O. 385(I)/2002. ln exercise of the powers conferred by section 47 of the Regulation

More information

INDEPENDENT POWER PRODUCERS ADVISORY COUNCIL

INDEPENDENT POWER PRODUCERS ADVISORY COUNCIL INDEPENDENT POWER PRODUCERS ADVISORY COUNCIL House # 23, Street # 26 Sector F-8/1 Islamabad, PAKISTAN. Tel : +92 51 2287511-12 Fax : +92 51 2287513 E-mail: ippac@live.com August 05, 2015 Mr. If tikhar

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan 4r6Lum'Arrs9 Registrar NEPRA Tower, Attaturk Avenue (East), G-5/1, Islamabad. Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan J mpg_ :,..,- 4,.., Registrar National Electric Power Regulatory Authority Islamic Republic of Pakistan NEPRA Tower, Attaturk Avenue (East), G-5/1, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web:

More information

National Electric Power Regulatory Authority Islamic Rebublic of Pakistan

National Electric Power Regulatory Authority Islamic Rebublic of Pakistan National Electric Power Regulatory Authority Islamic Rebublic of Pakistan 2nd Floor, OPF Building, G-512, Islamabad Ph: 051-9206500, 9207200, Fax: 9210215 E-mail: registrar@nepra.org.pk No. NEPRA/PAR-71/213-215

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan 29Pamir4 Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority f.r - Registrar National Electric Power Regulatory Authority Islamic Republic of Pakistan NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph:+92-51.9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad. Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority Islamic Rebublic of Pakistan

National Electric Power Regulatory Authority Islamic Rebublic of Pakistan National Electric Power Regulatory Authority Islamic Rebublic of Pakistan 2nd Floor, OPF Building, G-5/2, Islamabad Ph: 051-9206500, 9207200, Fax: 9210215 E-mail: registrar@nepra.org.pk No.NEPRA/TRF-206/KWSB-2012

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph:+92.51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail: registrar@nepra.org.pk

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue(East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail:

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Attaturk Avenue (East), G-5/1, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue(East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail:

More information

CONTENTS. Nishat Power Limited

CONTENTS. Nishat Power Limited CONTENTS Nishat Power Limited Page No. Corporate Profile 2 Directors Report 3 Condensed Interim Balance Sheet 4-5 Condensed Interim Profit and Loss Account 6 Condensed Interim Statement of Comprehensive

More information

Nishat Power Limited First Quarterly Report 2013 CONTENTS

Nishat Power Limited First Quarterly Report 2013 CONTENTS Nishat Power Limited First Quarterly Report 2013 CONTENTS Nishat Power Limited Page No. Corporate Profile 2 Directors Report 3 Condensed Interim Balance Sheet 4-5 Condensed Interim Profit and Loss Account

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan l'!4pm fsd/ Registrar NEPRA Tower, Attaturk Avenue (East), G-5/1, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad. Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

470 Megawatt Power Plant Karachi, Pakistan

470 Megawatt Power Plant Karachi, Pakistan 470 Megawatt Power Plant Karachi, Pakistan Information Memorandum Cavalier Energy Corporation has been awarded a 25 year contract by the Government of Pakistan to Build, Own and Operate a 470 Megawatt

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail: registrar@nepra.org.pk

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan 465Vem0E41 Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Rebublic of Pakistan 2nd Floor, OPF Building, G-5/2, Islamabad Ph: 051-9206500, 9207200, Fax: 9210215 E-mail: registrar@nepra.org.pk No. NEPRA/PAR-76/5204-5206

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue (East) G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600021 Web: www.nepra.org.pk, E-mail:

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph:+92.51-9206500, Fax: +92-51.2600026 Web: www.nepra.org.pk, E-mail:

More information

TARIFF PETITION LAKHRA POWER GENERATION COMPANY LIMITED

TARIFF PETITION LAKHRA POWER GENERATION COMPANY LIMITED December 18, 2014 TARIFF PETITION FOR THE PERIOD FROM JULY 1, 2014 TO JUNE 30, 2015 ON BEHALF OF LAKHRA POWER GENERATION COMPANY LIMITED (GENCO-BULPGCL) (GOP/WAPDA owned entity) CONSULTANTS: Shajar Capital

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue(East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail:

More information

$4ineffa *-4,soF. National Electric Power Regulatory Authority Islamic Republic of Pakistan. Registrar

$4ineffa *-4,soF. National Electric Power Regulatory Authority Islamic Republic of Pakistan. Registrar $4ineffa *4,soF Registrar National Electric Power Regulatory Authority Islamic Republic of Pakistan NEPRA Tower, Attaturk Avenue (East), G5/1, Islamabad Ph: +92519206500, Fax: +92512600026 Web: www.nepra.org.pk,

More information

Riali Hydro Power Company (Pvt.) Ltd

Riali Hydro Power Company (Pvt.) Ltd Riali Hydro Power Company (Pvt.) Ltd RHPCO Ref No: RHPCO/NEPRA/Riali-II HPP/TRF/18/056 Dated: June 22, 2018 The Registrar, National Electric Power Regulatory Authority NEPRA Tower, Ataturk Avenue (EAST)

More information

BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI JAIGAD POWERTRANSCO LIMITED (JPTL)

BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI JAIGAD POWERTRANSCO LIMITED (JPTL) BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI JAIGAD POWERTRANSCO LIMITED (JPTL) REVISED PETITION FOR APPROVAL OF TRUE UP OF FY 2015-16 & FY 2016 17 AND PROVISIONAL TRUE UP of FY 2017-18

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar 2nd Floor, OPF Building, G-5/2, Islamabad Ph: 9206500, 9207200, Fax: 9210215 E-mail: registrar@nepra.org.pk No. NEPRA/TRF-194/1CPCL-2011/4825-4827

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue(East), G-5/1, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail:

More information

INDEPENDENT POWER PRODUCERS

INDEPENDENT POWER PRODUCERS RATING METHODOLOGY INDEPENDENT POWER PRODUCERS An independent rating opinion on relative ability of an Independent Power Producer to honor financial obligations Content Scope Risk Analysis Completion Risk

More information

BIHAR ELECTRICITY REGULATORY COMMISSION PATNA

BIHAR ELECTRICITY REGULATORY COMMISSION PATNA BIHAR ELECTRICITY REGULATORY COMMISSION PATNA NOTIFICATION 2 nd August, 2010 No. BERC-Regl/Solar-2/2010-03 In exercise of powers conferred under Section 61 read with Section 181(2)(zd) of the Electricity

More information

Petition No. 05 of 2016

Petition No. 05 of 2016 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No. 05 of 2016 PRESENT: Dr. Dev Raj Birdi, Chairman A.B. Bajpai, Member Alok Gupta, Member

More information

Policy Framework for Private Sector Transmission Line Projects

Policy Framework for Private Sector Transmission Line Projects Policy Framework for Private Sector Transmission Line Projects 2015 Abbreviations BOOT CS EDB GS GOP ICB ITC kv kw LOS NEPRA NTDCL OHL PEPA PPIB PPP RFP Rs TSA TSC US$ Build-Own-Operate-Transfer Convertor

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue (East) G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600021 Web: www.nepra.org.pk, E-mail:

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Ataturk Avenue(East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail:

More information

EXTRA ORDINARY 13 SHRAVANA (S) BIHAR ELECTRICITY REGULATORY COMMISSION

EXTRA ORDINARY 13 SHRAVANA (S) BIHAR ELECTRICITY REGULATORY COMMISSION REGISTERED NO. PT.-40 The B Bihar Gazett te EXTRA ORDINARY PUBLISHED BY AUTHORITY 13 SHRAVANA (S) (NO.PATNA 541) PATNA, WEDNESDAY, 4TH AUGUST 2010 BIHAR ELECTRICITY REGULATORY COMMISSION NOTIFICATION The

More information

. National Electric Power Regulatory Authority

. National Electric Power Regulatory Authority . National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

F-NO.P-I1-2(12)/2007 Government of Pakistan Ministry of Water & Power <><><><><><>

F-NO.P-I1-2(12)/2007 Government of Pakistan Ministry of Water & Power <><><><><><> F-NO.P-I1-2(12)/2007 Government of Pakistan Ministry of Water & Power Islamabad, the IC February, 2013 Managing Director, PEPCO, WAPDA House Lahore. Government Inspector of Electricity, 0/o

More information

National Electric Power Regulatory Authority Islamic Rebublic of Pakistan

National Electric Power Regulatory Authority Islamic Rebublic of Pakistan National Electric Power Regulatory Authority Islamic Rebublic of Pakistan 2nd Floor, OPF Building, G-5/2, Islamabad 1".01Pmntie251$ Ph: 051-9206500, 9207200, Fax: 9210215 E-mail: registrar@nepra.org.pk

More information

Determination of the Authority in Case No. NEPRA/TRF-48/FPCDL-2006

Determination of the Authority in Case No. NEPRA/TRF-48/FPCDL-2006 Determination of the Authority in Case No. NEPRA/TRF-48/FPCDL-2006 Background Foundation Power Company (Daharki) Ltd. has been established for setting up a combined cycle thermal power plant based on low

More information

d) Price Break-up: The bidder shall provide break up of "Local component" and "ImportedComponent" along with their price bid.

d) Price Break-up: The bidder shall provide break up of Local component and ImportedComponent along with their price bid. Purchase preference policy (linked with Local Content)(PP-LC) is applicable to this tender and may refer to Annexure-I in this regard in addition to the clauses mentioned here under: a) Ministry of Petroleum

More information

CHAPTER I: PRELIMINARY Short title, commencement and interpretation

CHAPTER I: PRELIMINARY Short title, commencement and interpretation Notification dated 20.2.2009 Bhopal: dated 31 st January, 2009 No. 254-MPERC-2009. In exercise of the powers conferred by Section 181 read with Subsection (b) of Section 86 of the Electricity Act 2003

More information

Vidarbha Industries Power Limited - Transmission

Vidarbha Industries Power Limited - Transmission Vidarbha Industries Power Limited - Transmission Revised Petition towards: Approval of Capital Cost and Determination of Aggregate Revenue Requirement ( ARR ) for the period FY 14-15 to FY 15-16 Filed

More information

HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA. (Date of Order: )

HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA. (Date of Order: ) HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA IN THE MATTER OF:- (Date of Order: 25.07.2018) Petition No.: 26/2018(Suo-Moto) CORAM Sh. S.K.B.S. Negi Chairman Sh. Bhanu Pratap Singh Member

More information

GOVERNMENT OF PAKISTAN MINISTRY OF COMMERCE ****** O R D E R

GOVERNMENT OF PAKISTAN MINISTRY OF COMMERCE ****** O R D E R GOVERNMENT OF PAKISTAN MINISTRY OF COMMERCE ****** Islamabad, the1 st July, 2016 O R D E R S.R.O. 582(I)/2016.- In exercise of the powers conferred by sub-section (I) of section 3 of the Imports and Exports

More information

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY ELIGIBILITY CRITERIA FOR CONSUMERS OF DISTRIBUTION COMPANIES 2003

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY ELIGIBILITY CRITERIA FOR CONSUMERS OF DISTRIBUTION COMPANIES 2003 NATIONAL ELECTRIC POWER REGULATORY AUTHORITY ELIGIBILITY CRITERIA FOR CONSUMERS OF DISTRIBUTION COMPANIES 2003 NOTIFICATION Islamabad, the 26th July, 2003 S.R.O. 743 (I)/2003. Pursuant to Section 21 (2)

More information

The Tariff Petition (including its Annexures) is submitted in triplicate together with:

The Tariff Petition (including its Annexures) is submitted in triplicate together with: Ref No. BWEPL/NEPRA/308/2018 Date: 31s` May 2018 The Registrar National Electric Power Regulatory Authority NEPRA Tower Attaturk Avenue (East), Sector G-5/1, Islamabad. Subject: Submission of the Tariff

More information

growth through energy

growth through energy growth through energy UNAUDITED QUARTERLY FINANCIAL STATEMENTS FOR THE FIRST QUARTER ENDED SEPTEMBER 30, 2009 CONTENTS Company Information 3 Report of the Directors 5 Condensed Interim Unconsolidated Profit

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, Metro Plaza, Bittan Market, Bhopal MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No.16 of 2014 PRESENT: Dev Raj Birdi, Chairman A.B. Bajpai, Member Alok Gupta, Member

More information

National Electric Power Regulatory Authority Islamic Rebublic of Pakistan

National Electric Power Regulatory Authority Islamic Rebublic of Pakistan National Electric Power Regulatory Authority Islamic Rebublic of Pakistan 2nd Floor, OPF Building, G-512, Islamabad Ph: 051-9206500, 9207200, Fax: 9210215 E-mail: registrar@nepra.org.pk No. NEPRA/TRF-220/MEPCO-2012/4321-4323

More information

1100 MW Kohala Hydropower Project Approval of Feasibility Stage Tariff Proposal

1100 MW Kohala Hydropower Project Approval of Feasibility Stage Tariff Proposal NATIONAL TRANSMISSION & DESPATCH COMPANY OWE) Telephone No. 99202111 PBX 99202211 / 2325 Fax No. 99202578 No. GM/WPPO/CE-IV/DH/ Office of the General Manager (WPPO) 325-Wapda House, Lahore Dated : 2014

More information

Uttar Pradesh Electricity Regulatory Commission

Uttar Pradesh Electricity Regulatory Commission Uttar Pradesh Electricity Regulatory Commission Notification no. UPERC / Secy / CNCE Regulation, 2009/ 696 Dated: 22.3.2010 In exercise of powers conferred under section 181 read with section 9, 61, 86

More information

Condensed Interim Financial Information

Condensed Interim Financial Information Condensed Interim Financial Information for the Half Year Ended CONTENTS Company Information 1 Directors Review 2 Independent Auditors Report to the members 3 Condensed Interim Balance Sheet 4 Condensed

More information

Bhopal: Dated 5 th May 2006

Bhopal: Dated 5 th May 2006 Bhopal: Dated 5 th May 2006 No. 1192/MPERC/2006. In exercise of the powers conferred by section 181 (g) read with section 32(3) of the Electricity Act, 2003 enacted by the parliament, the Madhya Pradesh

More information

NOTICE OF THE TWENTY SECOND ANNUAL GENERAL MEETING

NOTICE OF THE TWENTY SECOND ANNUAL GENERAL MEETING NOTICE OF THE TWENTY SECOND ANNUAL GENERAL MEETING Notice is hereby given that the 22 nd Annual General Meeting of Faysal Bank Limited ( FBL ) will be held on March 29, 2017 at 9:00 a.m. at Marriott Hotel,

More information

National Electric Power Regulatory Authority Islamic Rebublic of Pakistan

National Electric Power Regulatory Authority Islamic Rebublic of Pakistan National Electric Power Regulatory Authority Islamic Rebublic of Pakistan 2nd Floor, OPF Building, G-5/2, Islamabad Ph: 051-9206500, 9207200, Fax: 9210215 E-mail: registrar@nepra.org.pk No. NEPRA/TRF-216/1ESCO-20

More information

DRAFT. National Electric Power Regulatory Authority Guidelines For Determination of Consumer-end Tariff (Methodology &Process)

DRAFT. National Electric Power Regulatory Authority Guidelines For Determination of Consumer-end Tariff (Methodology &Process) DRAFT National Electric Power Regulatory Authority Guidelines For Determination of Consumer-end Tariff (Methodology &Process) -------------------------:- In exercise of the powers conferred by section

More information

Company Information 02. Directors' Report on unaudited Condensed Interim Financial Information 04

Company Information 02. Directors' Report on unaudited Condensed Interim Financial Information 04 Financial Information for the Quarter and Nine Months ended September 30, 2014 CONTENTS Company Information 02 Directors' Report on unaudited Condensed Interim Financial Information 04 Unaudited Condensed

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority oca National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar No.NEPRA/R/LAT-01// 5/// - /5160 NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph:+92-51-9206500, Fax: +92-51-2600026

More information