1 Press conference 5 May results and outlook 1 16 mai 2011 Title of the presentation
2 CONTENTS : a rapidly expanding business 2 Very solid financial results 3 A new development phase: towards a single exchange zone in France 4 Integration of markets in Europe 5 3 rd Gas Directive: adaptation underway 2 16 mai 2011 Title of the presentation
3 Transmission operator GRTgaz operates the longest high-pressure natural gas transmission network in Europe, across most of the French territory. Its missions: Transmitting the natural gas provided by its customers under the best safety, cost and reliability conditions; Supplying the natural gas to over 4500 substations: large industrial consumers, power stations, public distribution networks, adjacent transmission networks; Expanding transmission capacities to meet market needs and improve security of supply in France and in Europe. 3 8 February 2011
4 4 10 May 2011 Title of the presentation
5 2010: a rapidly expanding business 5 16 mai 2011 Title of the presentation
6 2010: buoyant sales Increase in sales of delivery capacities: +8% in volume for industrial customers and power stations Sharp upturn in energy trading on the markets (North Zone and South Zone): +23% (313 TWh) 76 shippers (including 15 industrial customers) end of 2010 (compared to 60 end of 2009) 6 16 mai 2011 Title of the presentation
7 2010: a respected industrial programme Sustained programme of infrastructure protection: 3105 km inspected, 2375 km overhauled Mâconnais pipeline (85 kilometres between Génelard and Etrez) A new compressor station (Saint-Victor) commissioned Ten stations connected to the transmission network and consuming gas 7 16 mai 2011 Title of the presentation
8 2010: a more comprehensive and flexible offer Adapted balancing rules More information provided to shippers On target for a balancing system by 2013 More effective information system Launch of the TRANS@ctions secure portal Launch of Smart GRTgaz (March 2011) Service dedicated to customers with highly modulated consumption (deliberation of the Energy Regulatory Commission on 28 October 2010) Mainly to meet the needs of the CCGs Marketing of the capacities provided by GDFSUEZ under the "France Access" commitments 8 16 mai 2011 Title of the presentation
9 Very solid financial results 9 10 May 2011 Title of the presentation
10 Key figures: strong growth in income En M /09 Comments Sales % Transmission income ( 1386 M, 91% of sales), up +4.7% Operational profit % Sharp increase in the operating margin linked to: - an increase in sales; - increase in self-constructed assets; - decrease in energy costs; - reduction in metering discrepancies; Net income excluding nonrecurring items* % - Increase in operating income - Increase in financial income (fall in rates on the variable portion of the debt) Investments % Maintenance of investment expenditure at a high level despite the 2012 time-lag of certain projects: - 2/3 maintenance expenses - 1/3 development expenses Percentage of debt (debt/equity) 53% 62 % Very solid balance sheet marked by low level of debt * Total net income for 2010 totalled 176 M: it includes the provision write-back for dismantling GRTgaz works at the end of the exploitation of global gas reserves May 2010 General Management
11 Buoyant activity driven by transmission income 2% 3% 2010 sales 1520 M: +3% compared to % Transmission: 1386 M Industrial customer connections and public distributions: 36 M Balancing sales: 39 M +5% in transmission income 1,479 M Transmissio n income + 63 M + 5 % Connection services - 3 M -7 % Other income - 19 M - 16% 1,520 M 91% Others: 59 M 2009 sales 2010 sales The increase in activity (+3%) is explained by the increase in transmission income (+4%), effect of the pricing increase as a consequence of the development of the regulated assets base and an increase in subscription volumes. 11 April 2010 Sales Division
12 Sharp growth in operational profit OP 2010: 800 M, +10.5% Sales Capitalised production and other income 22 M +22% 47 M -37% Raw material purchases (mainly energy costs) - 27 M +6% Other purchases External costs* Other costs - 7 M +2% 41 M +3% OP M OP M Operating income (excl. write-backs): 1623 M; + 63 M; +4% Operating expenses (excl. allowances): 823 M; - 13 M; -15% Improvement in operating margin results mainly from the increase in activity and the control of operating expenses, particularly motive power costs. * External costs include TIGF fees, odorisation services contracts,compression, storage and rent. 12 April 2010 Sales Division
13 Net income of 127 M 1 up 15% compared to 2009 OP Net allowances - 12 M Financial profit + 8 M Non-recurring loss - 40 M + 76M Tax Profit-sharing - 12 M - 4 M 110 M 127 M NI 2010 NI Operating income 550 M The 15% rise in net income shows the improvement in the operating margin and increase in financial income. 1 Excluding provision write-back for dismantling 13 April 2010 Sales Division
14 Continuation of the investment programme: 554 M Investments (in M ) Maintenance Development Total Investment expenditure continues at high levels despite the postponement to 2012 of several projects (2 nd part of the compressor overhaul programme and certain fluidification projects) 14 April 2010 Sales Division
15 A solid balance sheet, low debt A capital-intense activity Net debt of 1,991 M, i.e. 53% of equity Equity 3746 M Fixed assets 5,994 M Provisions for liabilities and charges 38 M Borrowings and debt 2658 M Current assets 448 M 15 April 2010 Sales Division
16 A new development phase May 2011 Title of the presentation
17 TWh Growth in volumes traded, Price convergence between European markets 300 Volumes traded on wholesale market mai 2011 Title of the presentation
18 FID taken in 2010 by GRTgaz for the creation of a compressor station in Chazelles Chazelles compressor station Features New compressor station, with power of 3 x 12.5 MW (electric motors) Commissioned mid-2013 Enables the Guyenne pipeline to transport its full capacity Total cost of 98 M Market benefits Follows the France/Spain Open Season, carried out in coordination with TIGF and ENAGAS Increases the transmission capacity between TIGF and GRTgaz by 175 GWh/d For GRTgaz it completes the "Western corridor" between France and Spain Financing European priority: subsidy of 40 M New income: capacity subscriptions between the TIGF network and the GRTgaz network Investment approval by the Energy Regulatory Commission in 2010 Chazelles 18
19 FID taken by GRTgaz in February 2011 for the ERIDAN project Eridan Features New 220 km pipeline between Saint-Martin-de-Crau (Bouches-du- Rhône) and Saint-Avit (Drôme), with a 1200 mm diameter, operational by end of 2015 Doubles the 600 mm established pipeline of the Rhone Valley Total cost 484 M Market benefits Strengthens Fos as a LNG "port of entry" in France and in Europe GWh/d, i.e. 4 Gm3/year, on entry from Fos, available when operational GWh/d in final development if the pipelines to the north are strengthened Stock volume to manage the flexibility required to 8 CCG, i.e MWe Essential step towards the merger of PEG North and GRTgaz South (single GRTgaz market zone) Financing European priority: subsidy of 74 M Savings: flexibility costs, cost of reconstructing the Bégude station avoided, compressor costs and CO2 New income: capacity subscriptions at Fos Investment approval by the Energy Regulatory Commission (19 April 2011) Eridan 19
20 Developments of the network resulting from the Dunkirk terminal decision Dunkirk LNG Terminal EDF press release of 3 May 2011 "EDF, through its subsidiary Dunkirk LNG, confirmed its investment project in the Dunkirk LNG terminal, situated on the Clipon site at Loon Plage. This announcement follows the Grand Port Maritime of Dunkirk s decision to approve this project in May The Dunkirk LNG terminal, due to be operational by the end of 2015, will have an annual regasification capacity of 13 billion m3 of gas (Gm3) and will increase the importation capacities of natural gas in France by around 20%." Pitgam Cuvilly Dierrey Arc de Dierrey Consequences for the transmission network Voisines Connection of the new terminal and strengthening of the network core, by doubling the network between Pitgam (North) and Cuvilly (Oise), then the construction of a new pipeline between Cuvilly and Voisines (Yonne): "Arc-de-Dierrey". Total projected cost 1250 M. Creation of a new interconnection by pipeline between France and Belgium to ensure an outlet from the new terminal towards Belgium as well as an interconnection between PEG North and Belgium. Development coordinated with FLUXYS in Belgium. Estimated cost of 100 M. Operational: end of
21 Developments of the network resulting from the Dunkirk terminal decision Dunkirk LNG Terminal (continued) Market benefits Market benefits result not only from the new terminal in Dunkirk, but also transport works as a result of the terminal which brings flexibility to the entire French and European gas system Positions Dunkirk as an LNG "port of entry" in France and in Europe Enables non-odorised gas to be sent to Belgium Creates # 300 GWh/d on entry of LNG to France Creates # 200 GWh/d on entry of LNG to Belgium Development of the stock volume to manage the necessary flexibility to around 15 CCG, i.e MWe L Arc-de-Dierrey is an essential step towards the merger of PEG North and GRTgaz South (single GRTgaz market zone) Pitgam Cuvilly Dierrey Arc de Dierrey Voisines Financing European priority: application for a subsidy underway Savings: flexibility costs Income: Capacity subscription on entry into France and on the interconnection with Belgium Investment approval by the Energy Regulatory Commission in December 2010 (subject to the FID on the terminal) 21
22 Other developments Following the market consultation carried out in 2010 to develop the capacity of Belgium towards France, decision to increase capacity by 50 GWh by Luxembourg Two consultations on the future market France Luxembourg (consultation planned for the second half year 2011) Switzerland France (consultation planned for the second half year 2011) 22
23 Coupling of the North and South PEGs, under an agreement between POWERNEXT and GRTgaz Powernext and GRTgaz plan to launch a coupling experiment of the gas markets in order for the PEG South to benefit from the higher liquidity of the PEG North. This model has been presented and finalised in consultation with market players. It has been approved by the Energy Regulatory Commission (19 April 2011). In May 2011, Powernext will launch spread products. The purchase of a spread results in a purchase in the South and a simultaneous sale in the North, and the sale of a spread, the reverse (geographic swap). Coupling PEG North PEG South From the summer 2011 GRTgaz will directly intervene by purchasing the spread product in the direction which favours a tightening of the North and South prices. This intervention requires putting aside a fraction of the capacity available to the link between the two PEGs (10 GWh/d out of 230 GWh/d in total). 23
24 Towards the merger of the North and South Zones? In 2016 The improvements following the Dunkirk LNG terminal decision will have made the north zone more fluid, without internal congestion The decision to carry out the ERIDAN project will have made the south zone very fluid, without internal congestion The stock volume generated by the new infrastructure will guarantee the necessary flexibility for the functioning of the combined cycle gas power stations A merger of the north and south zones then becomes possible: either by additional investments to remove the residual congestion in the centre of France or by market mechanisms to avoid situations leading to this residual congestion PEG North Merger? PEG South Eridan Arc de Dierrey GRTgaz is committed to conducting a study of the merger conditions by the end of
25 10-year prospective study 25 8 February 2011
26 Integration of markets in Europe May 2011 Title of the presentation
27 In the future, GRTgaz point of entry of LNG into Europe NBP TTF LNG ZEE PEG France NCG Gaspool CEGH PEG TIGF PSV MS ATR LNG 27
28 The 3 rd Gas Directive May 2011 Title of the presentation
29 Adaptation of the Directive Key dates 5 January 2011 Related events The enabling legislation has authorised the French Government to adapt the European Directive of 13 July 2009 by a decree. 4 May 2011 The draft decree was examined in the Cabinet March March 2013 The bill on the ratification of this decree must go before the Parliament on the last day of the third month from publication of the decree at the latest. After publication of the decree, the Energy Regulatory Commission must put forward an order setting out the certification procedure of the transmission network operators. This procedure links the departments of the European Commission, and possibly ACER. The decision granting or refusing certification must be made on this date at the latest. The European Commission must publish a specific detailed report on the assessment of the ITO model chosen by France and Germany mai 2011 Title of the presentation
30 The "independent transmission network operator" model The principle: Act in full independence regarding other entities of the vertically integrated company which carries out a production or gas supply activity. Certification issued on 3 March 2012 at the latest by the Energy Regulatory Commission after the opinion of the European Commission Award conditions: Be the owner of the network; Possess all the human, technical, material and financial resources required to carry out the obligations incumbent upon it; Be equipped with "all company services", and in the future no longer share any systems or computer hardware with the vertically integrated company; Employ the personnel required for its activity; Annually draw up a ten-year development plan to expand the gas transmission network, to be submitted to the Energy Regulatory Commission. 30
Open seasons between France and neighboring countries
1 Open seasons between France and neighboring countries Content Assessment of the market needs ERGEG guidelines related to Open Seasons Open Seasons & improvements France Germany France Belgium France
More informationTrading at French PEGs. EFET workshop on Spanish Gas Hub - 23 July 2008
Trading at French PEGs EFET workshop on Spanish Gas Hub - 23 July 2008 Agenda GRTgaz project for the French market At the heart of the European market How can TSOs make a difference? The Basics Latest
More informationPresent: Philippe de LADOUCETTE, président, Olivier CHALLAN BELVAL, Catherine Edwige et Jean- Pierre SOTURA, commissioners.
Deliberation Deliberation of the Commission de régulation de l énergie of 10 April 2014 taking decision on the request for crossborder cost allocation between France and Spain for the project of common
More informationGas Exchange in France. EFET Workshop Madrid 23rd July 2008
Gas Exchange in France EFET Workshop Madrid 23rd July 2008 1 Outline Steps to the Project Powernext Balancing GRTgaz New liquidity factors Comparaison with the other markets Expectation of the market players
More informationPresent: Philippe de LADOUCETTE, President, Olivier CHALLAN BELVAL, Hélène GASSIN and Jean- Pierre SOTURA, Commissioners.
Deliberation Deliberation of the French Energy Regulatory Commission (CRE) of 27 th June 2013 deciding on the rules for the implementation of the Annex I to Regulation (EC) n 715/2009 on the Congestion
More information1 st Jul st Sept 2018 Unitary amount for distribution of annual auction premium North to. 1 st Jan st Mar 2018
Distribution of auction premiums on the North to South link and the VIP Pirineos from October 1 st 2017 to September 30 th 2018 Communication of the unitary amounts Following the deliberation of CRE dated
More informationStrategy & Targets
2013 2016 Strategy & Targets March 13 th, 2013 snam.it Playing a Leading Role in Integrating the European Gas Market Carlo Malacarne Chief Executive Officer 2 Key Priorities of a Sustainable Growth Strategy
More informationHow to get connected to our natural gas transmission system. LNG terminals and underground storage facilities
How to get connected to our natural gas transmission system LNG terminals and underground storage facilities Page 2 of 10 Contents 1 INTRODUCTION... 3 2 COMMERCIAL AND CONTRACTUAL PROCEDURE FOR CONNECTING
More informationGRTgaz services. A new take off. Bernard Prost MARKETING AND SALES
GRTgaz services A new take off Bernard Prost MARKETING AND SALES What makes a market attractive? Significant gas volumes Diversified sources Gas exchange Setting a strong & stable regulatory framework
More informationCentral European Gas Hub
Central European Gas Hub 12 th CEGH Feedback Workshop Vienna, 30 June 2016 1 1 12 th CEGH Feedback Workshop Agenda Welcome, Opening Words Update CEGH OTC Market Update CEGH Gas Exchange AT, CZ CEGH Powernext
More informationPosition paper on the further development of the German gas market areas in the light of the Gas Target Model II
Position paper on the further development of the German gas market areas in the light of the Gas Target Model II Leipzig/Paris, 22 nd of November 2016 Introduction The PEGAS platform, operated by the French
More informationFunctioning of European Gas Wholesale Markets
Functioning of European Gas Wholesale Markets Quantitative Study Vienna, July 2014 Dr. Albrecht Wagner Wagner, Elbling & Company Management Advisors Seilerstätte 18-20, 3. OG A-1010 Wien office: +43 664-849
More informationINFORMATION MEMORANDUM
OPEN SEASON FOR THE DEVELOPMENT OF SOUTH-NORTH GAS INTERCONNECTION CAPACITY SWITZERLAND-FRANCE In association with CONTENTS 1. EXECUTIVE SUMMARY... 3 2. FLUXSWISS and GRTGAZ... 6 3. PROJECT DESCRIPTION...
More informationPresent: Olivier CHALLAN BELVAL, Jean-Pierre SOTURA, and Michel THIOLLIERE, Commissioners.
Deliberation Deliberation of the French Energy Regulatory Commission dated 12 March 2014 approving amendments to capacity allocation rules for the France - Spain interconnection Present: Olivier CHALLAN
More informationHub-Based Gas Sourcing for Market Liquidity and Continuity of Supply
Hub-Based Gas Sourcing for Market Liquidity and Continuity of Supply 1 st AIEE Energy Symposium Current and Future Challenges to Energy Security Bicocca University, Milano November 30 December 2, 2016
More informationPowernext Derivatives - Market Notices - September 28 th 2018
Powernext Derivatives - Market Notices - September 28 th 2018 CONTENTS TABLE OF MARKET NOTICES... 2 POWERNEXT DERIVATIVES MARKET NOTICES... 7 APPLICATION DOCUMENTS... 8 PRICE COMMITTEE... 9 RULES OF CONDUCT
More informationTranslated from the French: only the original in French is authentic
Deliberation of the Energy Regulatory Commission of 22 March 2018 deciding on tariff for using the underground natural gas storage infrastructures owned by Storengy, TIGF and Géométhane, with effect from
More informationPress release. Memorandum of Understanding ( MoU ) regarding the combination of CEGEDEL, SOTEG and Saar Ferngas. 23 July 2008
Press release Memorandum of Understanding ( MoU ) regarding the combination of CEGEDEL, SOTEG and Saar Ferngas 23 July 2008 The Minister of Economy and Foreign Trade of the Grand Duchy of Luxembourg is
More informationPublic consultation. 6 October 2015
Public consultation 6 October 2015 Public consultation by the French Energy Regulatory Commission of 6 October 2015 on the introduction of 30-minute power trading products in the organised market and at
More informationAppendix A: Scale of Charges
Natural gas transport contract Appendix A: Scale of Charges Version of 1st January 2016 Contents 1. SUBJECT... 3 2. SCALE OF CHARGES... 3 2.1 Imbalance price... 3 2.1.1 Purchase Sale, Average price, Marginal
More informationGDF SUEZ Energy France Business line. Henri Ducré
GDF SUEZ Energy France Business line Henri Ducré Key business figures * Leading positions in gas and electricity in France 1 st gas supplier 2 nd producer and supplier of electricity 1 st player in the
More informationKey Data First Half Year 2008
Key Data First Half Year 2008 100 million invested during the first half of the year, of which 60% for transmission in Belgium Capacity doubled at Zeebrugge LNG terminal since April 2008 Increase in consolidated
More informationWe appreciate your feedback
Publishing date: 05/09/2012 Document title: We appreciate your feedback Please click on the icon to take a 5 online survey and provide your feedback about this document Draft Framework Guidelines on rules
More informationRoadmap to the French Balancing Target System
Roadmap to the French Balancing Target System Vincent de Laharpe 1 Agenda 1 2 3 Regulatory context Roadmap to the target Information provided to the market 2 Regulatory context 3 Timeline for European
More informationDÁNIEL PALOTAI PÉTER GÁBRIEL 5+1 CHARTS ON HUNGARY S CONVERGENCE TO THE BENELUX STATES
DÁNIEL PALOTAI PÉTER GÁBRIEL 5+1 CHARTS ON HUNGARY S CONVERGENCE TO THE BENELUX STATES In past years, the level of Hungary s economic development rose dynamically, and the lag behind the more advanced
More informationGTE+ workshop 3 April 2009, Brussels
European Federation of Energy Traders Market-based balancing Colin Lyle, EFET Gas Committee Chairman GTE+ workshop 3 April 2009, Brussels Brussels, 3 rd April 2009 1 Structure The Madrid Forum Objective
More information3 rd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes
3 rd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes Regulatory Framework & Incentives for Infrastructure Development Sergio Ascari VIS Consultants Gas Advisor, Florence School
More information2009 HALF-YEAR RESULTS
2009 HALF-YEAR RESULTS SUMMARY Group profile and strategic plan Satisfactory results in the current climate A solid financial position Key highlights as of August 31 st Outlook and conclusion 2 GROUP PROFILE
More informationGas Natural Fenosa posts net profit of 793 million euros and EBITDA of 3.14 billion euros up until September
Press Room Spain Press releases Home / News / Press releases / Content in detail Gas Natural Fenosa posts net profit of 793 million euros and EBITDA of 3.14 billion euros up until September The annual
More informationEuropean Gas Trading 2018
15 th edition This document includes a report summary, a table of contents, report format and price information, and an order form. Report Summary This 178 page report offers a comprehensive analysis of
More informationGas Natural Fenosa delivers on the objectives of its Strategic Plan, recording net profit of billion euros (+2,7%)
Press Room Spain Press releases Home / News / Press releases / Content in detail Gas Natural Fenosa delivers on the objectives of its 2013 2015 Strategic Plan, recording net profit of 1.502 billion euros
More informationInterim Financial Report
Interim Financial Report For the period ended 30 June 2016 TABLE OF CONTENTS I. 2016 INTERIM MANAGEMENT REPORT... 3 1. REVIEW OF THE GROUP'S BUSINESS IN THE FIRST HALF-YEAR 2016... 3 1.1. HIGHLIGHTS OF
More informationEFET Proposal on Regional Independent System Operator (R_ISO) A CEER Response Paper
EFET Proposal on Regional Independent System Operator (R_ISO) A CEER Response Paper Ref. C08-GWG-42-03 6 February 2008 Council of European Energy Regulators ASBL 28 rue le Titien, 1000 Bruxelles Arrondissement
More informationEUROPEAN GAS TARGET MODEL SELF-EVALUATION BY DERA AND EI
SELF-EVALUATION REPORT, JUNE 2017 EUROPEAN GAS TARGET MODEL SELF-EVALUATION BY DERA AND EI TABLE OF CONTENTS 1. INTRODUCTION AND CONCLUSIONS... 3 INTRODUCTION... 3 SUMMARY AND CONCLUSIONS... 5 PUBLIC CONSULTATION...
More informationCompany Profile March 2017
Company Profile March 2017 ENOI AT A GLANCE We are an independent energy company operating in trading, wholesale and supply of natural gas and electricity at pan-european level. Founded in 2000, we grew
More informationREVENUE AND RESULTS at end-september up in international zones and French overseas (+24%) down in Mainland France (-8%) As of 30/09/2014
PRESS RELEASE Boulogne, November 14, 2014 REVENUE AND RESULTS at end-september 2014 o Revenue: 9.2 B (-3%) o Operating income: 173 M (- 28 M) o Net profit attributable to the Group: 515 M (+ 328 M) including
More informationPublishing date: 09/10/2017. We appreciate your feedback. Share this document
Publishing date: 09/10/2017 Document title: AGTM metrics 2016 - statistical compendium We appreciate your feedback Please click on the icon to take a 5 online survey and provide your feedback about this
More informationSecurity of Supply. Walter Boltz. 8 th EU/US Roundtable. CEER Vice President, Gas Working Group Chair October 2010, Berlin
Security of Supply Walter Boltz CEER Vice President, Gas Working Group Chair 8 th EU/US Roundtable 25-27 October 2010, Berlin Agenda Framework for Investment Planning and Security of Supply in the European
More informationFOCUS ON EDF EN Analyst Group Lunch Meeting - 6 July 2017
FOCUS ON EDF EN Analyst Group Lunch Meeting - 6 July 2017 Antoine Cahuzac - Group Senior Executive VP of Renewable Energies and CEO of EDF Énergies Nouvelles Bruno Fyot COO of EDF EN Denis Rouhier CFO
More informationContinental Gas Snapshot Methodology
Continental Gas Snapshot Methodology ESGM Price Assessments - General Definitions 01 Heren Volatility Index 04 The Heren Index - General Definition 04 ESGM Trades Tables - General and Country-specific
More informationECC Clearing Circular 11/
ECC Clearing Circular 11/2014 2014-06-02 News Introduction of PEGAS Belgian Gas products and extension to 24/7 Services for French PEGs Summary From July 9 th 2014 ECC will offer spot and futures clearing
More information1.4. In accordance with paragraph 4 of Article 17, the decision is made on a case by case basis by the NRAs of the concerned Member States.
Final Joint Opinion of the Commission de regulation de l énergie (France) and the Gas and Electricity Markets Authority (Great Britain) on ElecLink s exemption request under article 17 of Regulation EC
More informationColas: Financial Year 2016
PRESS RELEASE Boulogne, February 23, 2017 Colas: Financial Year 2016 Revenue: 11.0 B (-8% and -4% at constant scope and exchange rates) Current operating income: 386 M (+ 42 M) Operating income: 324 M
More informationFirst-class gas trading in the heart of Europe
First-class gas trading in the heart of Europe First-class gas trading Central European Gas Hub gas trading in the heart of Europe Central European Gas Hub AG (CEGH), located in Vienna, Austria, is the
More informationCreation of gas market European perspective. Jean-Marc Leroy GIE President
Creation of gas market European perspective Jean-Marc Leroy GIE President Gas Infrastructure Europe (GIE) is a European non-profit lobbying association established in 2005. GIE represents the sole interest
More information1.1. Trading on the MIBEL: energy, economic volume and types of technology Purchases on the MIBEL of the energy traded on the Daily
Index Market Report 2015 2 1 Evolution of the electricity market in Spain and on the MIBEL... 6 1.1. Trading on the MIBEL: energy, economic volume and types of technology 1.1.1. Purchases on the MIBEL
More informationANNUAL RESULTS. March 14, 2012
ANNUAL RESULTS 2011 New Developments Rubis Terminal Rubis Energie Acquisition : Turkey Extensions : Rotterdam and Antwerp Integrations - Chevron West Indies and French Antilles - Guiana and SARA refinery
More informationRECORD OF THE CONSULTATION WITH STAKEHOLDERS ON THE PROPOSED MECHANISM FOR SETTING ASIDE TRANSMISSION CAPACITY AT EVERY INTERCONNECTION POINT
NEWS FOR SHIPPERS RECORD OF THE CONSULTATION WITH STAKEHOLDERS ON THE PROPOSED MECHANISM FOR SETTING ASIDE TRANSMISSION CAPACITY AT EVERY INTERCONNECTION POINT Further to a demand to rectify the reasons
More informationANNUAL REPORT OF THE STATUTORY ACCOUNTS TIGF SA
ANNUAL REPORT OF THE STATUTORY ACCOUNTS TIGF SA 2014 FINANCIAL YEAR 1 1 TIGF - Assets... 4 2 TIGF - Liabilities... 5 3 TIGF Income statement... 6 4 Notes to the annual financial statements... 7 4.1 Significant
More informationFluxys Belgium Half-yearly financial report June 2017
Fluxys Belgium Half-yearly financial report 2017 30 June 2017 Contents 1 Interim report 5 1.1 Key events in the first half of 2017 6 1.2 Key financial figures 6 1.3 Key events 8 1.4 Main risks and uncertainties
More information2017 Management report and Annual consolidated financial statements
2017 Management report and Annual consolidated financial statements CONTENTS 01 MANAGEMENT REPORT 1 SUMMARY OF THE GROUP'S RESULTS...7 2 OUTLOOK...9 3 CONSOLIDATED REVENUES AND EARNINGS... 10 4 REPORTABLE
More informationInterim Financial Report at March 31, 2018
Interim Financial Report at March 31, 2018 Contents Our mission... 3 Foreword... 4 > Enel organizational model... 7 Summary of results... 8 Results by business area... 19 > Italy... 22 > Iberia... 27 >
More informationFirst-half 2018 results
Press release Paris La Défense, 25 July 2018 First-half 2018 results Growth in EBITDA (5%) and net income, Group share (28%) Albioma s Board of Directors, which met on 25 July 2018, approved the Group
More informationGaspoint Nordic A/S. Nordic Gas Exchange. Introduction to the. Updated Q1 2016
Gaspoint Nordic A/S Introduction to the Nordic Gas Exchange Updated Q1 2016 Introducing Gaspoint Nordic The slide package contain info on the following topics Introduction to the Nordic Gas Exchange slides
More informationInvestor Overview November 2016
Investor Overview November 2016 1 About This Presentation This presentation contains certain forward-looking statements that management believes to be reasonable as of today s date only. Actual results
More informationCongestion Management Procedures Guidelines
Congestion Management Procedures Guidelines Implementation and Effect Monitoring Report 2017 ENTSOG A FAIR PARTNER TO ALL! Table of Contents PART I IMPLEMENTATION MONITORING OF CMP GUIDELINES 2017 3 Introduction
More informationEuropean Federation of Energy Traders. European Gas Hub Development
European Federation of Energy Traders European Gas Hub Development 1 Disclaimer The results here are based on the views of EFET members, exercising all reasonable care to determine the best practice model
More informationTrans-European Energy Networks
Trans-European Energy Networks 1 st TEN-E Information Day Brussels, 30 th March 2007 Mr. Edgar Thielmann Dr. Wolfgang Kerner Mr. Mark Vangampelaere Mr. Patrick Bourrel Mr. Jean-Claude Merciol Acting Director
More informationDraft Outline of the 2019 Work Programme
Draft Outline of the 2019 Work Programme This document presents an outline of the tasks the Agency plans to perform in 2019. As such, it focuses primarily on the external deliverables the Agency expects
More informationCOMMISSION DECISION. of XXX
EUROPEAN COMMISSION Brussels, XXX [ ](2013) XXX draft COMMISSION DECISION of XXX on the exemption of the Slovakian-Hungarian natural gas interconnector from ownership unbundling rules in Article 9 of Directive
More informationMONITORING REPORT. CMP Monitoring Report ENTSOG A FAIR PARTNER TO ALL!
MONITORING REPORT CMP Monitoring Report 2016 ENTSOG A FAIR PARTNER TO ALL! Contents CONTENT PART I Annual Report 2016 on Implementation Monitoring of CMP 1 Introduction...4 2 Overview of Implementation
More informationGRTGAZ NETWORK TRANSMISSION CONTRACT
Disclaimer The present translation is not binding and is provided by GRTgaz exclusively for information purposes. GRTgaz disclaims any warranty of any kind as to the accuracy and completeness of the present
More informationFirst-Half 2010 Results
First-Half 2010 Results Analyst-Investor meeting July 30, 2010 Contents 1 Highlights 2 Group Results 3 Outlook for H2-2010 First-Half 2010 Highlights First-half 2010 key figures: sharp upswing in results
More informationCENTRAL EUROPEAN GAS HUB First-class gas trading in the heart of Europe
CENTRAL EUROPEAN GAS HUB First-class gas trading in the heart of Europe First-class gas trading Central European Gas Hub gas trading in the heart of Europe Central European Gas Hub AG (CEGH), located in
More information2012 Results Outlook th February 2013
2012 Results Outlook 2013-2015 www.enagas.es 20 th February 2013 Summary 1.- 2012 Results 2.- Strategic View 3.- Outlook 2013-2015 4.- 2013 Targets 5.- Conclusions 2 Key figures ( mill) Jan-Dic 2011 Jan-Dic
More informationPresent: Philippe de LADOUCETTE, Chairman, Olivier CHALLAN BELVAL, Hélène GASSIN, Jean-Pierre SOTURA and Michel THIOLLIERE, Commissioners.
Deliberation Deliberation of the French Energy Regulatory Commission (CRE) dated 2 October 2013 approving the implicit Day-Ahead allocation method for interconnection capacity within the North- West Europe
More information2011 Results and Outlook. Paris, February 17, 2012
2011 Results and Outlook Paris, February 17, 2012 Contents 1. 2011 Highlights 2. 2011 Results 3. Strategy C O N T E N T S 4. Outlook and Objectives for 2012 1. 2011 Highlights 2011 key figures Amounts
More informationGas quality conversion: KONNi Gas ruling, new conversion fee/neutrality charge
Gas quality conversion: KONNi Gas ruling, new conversion fee/neutrality charge Lea Nieschmidt Berlin, 19 September 2017 Agenda 1. Amended KONNi Gas ruling 2. Quantity trends under the conversion mechanism
More informationPEGAS Trader Workshop Germany Market Developments and Product Initiatives
PEGAS Trader Workshop Germany Market Developments and Product Initiatives Roman Zyuzev, Sirko Beidatsch 16/11/217, Berlin Legal disclaimer This presentation does not provide or substitute legal advice.
More informationRevenue As a % of revenue Operating profit Profit attributable to equity holders of the parent
PRESS RELEASE Paris, 12 September 2007 In the first half of 2007, GFI Informatique recorded organic growth of 6.7%, an operating margin on ordinary activities of 6.3% and a strong 51% increase in net profit
More informationThe Agency s Work Programme Outline for 2019
The Agency s Work Programme Outline for 2019 Alberto Pototschnig Director Presentation for stakeholders, 25 October 2017 TITRE Presentation outline ACER s Work Programme 2019 WP consultation process Basis:
More informationTrayport Euro Commodities Report
Trayport Euro Commodities Report Trayport Analysis Team July 2017 Legal disclaimer DISCLAIMER The content may not be copied, reprinted, published, transmitted, transferred, disseminated or distributed
More informationName of the Products PEGAS Spot PEG Nord PEGAS Spot TRS. Delivery(virtual points) PEG Nord (GRTgaz) TRS (GRTgaz)
on the French delivery areas Segment Name of the Products PEGAS Spot PEG Nord PEGAS Spot TRS (virtual points) PEG Nord (GRTgaz) TRS (GRTgaz) DA (Day-Ahead) WE (Week-End) SAT (Saturday) SUN (Sunday) BH
More informationCOMMISSION OPINION. of XXX
EUROPEAN COMMISSION Brussels, XXX [ ](2015) XXX draft COMMISSION OPINION of XXX pursuant to Article 3(1) of Regulation (EC) No 715/2009 and Article 10(6) and 11(6) of Directive 2009/73/EC - Poland - Certification
More informationDesign of the gas hubs & exchanges and evolution on the example of the Central European Gas Hub
Design of the gas hubs & exchanges and evolution on the example of the Central European Gas Hub Stefan PHILIPP Dipl.-Wirt.-ing. (FH) Central European Gas Hub AG This presentation including its content
More informationInvestor Conference Call. Financial Year April 2014
Investor Conference Call Financial Year 2013 24 April 2014 Agenda Presenter 1 2 Business Profile Regulatory Developments Dr. Jörg Bergmann Chief Financial Officer Open Grid Europe GmbH 3 Refinancing 4
More information16 th edition of this popular report
European European Power Power Trading Trading 2017 2017 16 th edition of this popular report This document includes a report summary, a table of contents, report format and price information, and an order
More information1. HALF-YEARLY FINANCIAL REPORTS
Further transposition of the Transparency Directive: The AMF launches a public consultation on its proposed General Regulation transposing Directive 2007/14/EC of 8 March 2007 The Transparency Directive
More informationINVESTING IN LONG-TERM EUROPE:
INVESTING IN LONG-TERM EUROPE: RE-LAUNCHING FIXED, NETWORK AND SOCIAL INFRASTRUCTURE Conference Organized In Association With The Italian EU Presidency ROMA, 12 Dicembre 2014 Italian Energy Price Evolution
More informationQuarterly financial information
Quarterly financial information First quarter 2013 sales: Relevance of EDF s integrated and diversified business model Sales up 12.1%, of which 4.7% in organic terms 2013 targets reiterated Change in EDF
More informationFind out more about. The Optiflow service
Find out more about The Optiflow service + The Optiflow service allows more flexibility during maintenance periods when there are works on the core of GRTgaz transmission network. Superpoint Thanks to
More informationGRTGAZ NETWORK TRANSMISSION CONTRACT
Disclaimer The present translation is not binding and is provided by GRTgaz exclusively for information purposes. GRTgaz disclaims any warranty of any kind as to the accuracy and completeness of the present
More informationFinancial Results 2013 Press Conference
Financial Results 2013 Press Conference Amsterdam March 19, 2014 Presented by Han Fennema, CEO René Oudejans, CFO 2 Annual Report 2013 3 Disclaimer The consolidated financial statements have been prepared
More informationProposed methodology for the assessment of candidate projects for the 3rd PCI list. Electricity transmission and storage projects
Proposed methodology for the assessment of candidate projects for the 3rd PCI list Electricity transmission and storage projects 1 INTRODUCTION This document describes a methodology of evaluating benefits,
More informationThird Quarter 2017 Results: Europcar delivers strong revenue growth, notably in the leisure segment, and closes the acquisition of Buchbinder
Note: This press release contains unaudited consolidated financial figures established under IFRS by Europcar Group s Management Board and reviewed by the Supervisory Board. Third Quarter 2017 Results:
More informationInfo Workshop Central European Gas Hub. General Presentation of ECC
Info Workshop Central European Gas Hub General Presentation of ECC Vienna, 6 th November 2012 AGENDA 1. About ECC 2. Clearing Process - Spot market 3. Connectivity, Software and Reporting 4. Risk Management
More informationShareholder. the Snam. Snam Regulation and strategy. Snam 10 years on the Stock Exchange. Snam The shareholders return
December 2011 the Snam Shareholder The Guide to run through the 10 years of SNAM Snam Regulation and strategy Snam 10 years on the Stock Exchange Snam The shareholders return The Snam of tomorrow The implementation
More informationEUROPEAN COMMUNITY EUROPEAN ATOMIC ENERGY COMMUNITY FINANCIAL INFORMATION ON THE EUROPEAN DEVELOPMENT FUNDS
EUROPEAN COMMUNITY EUROPEAN ATOMIC ERGY COMMUNITY FINANCIAL INFORMATION ON THE EUROPEAN DEVELOPMT FUNDS Document annexed to the draft budget for 2006 11187/05 BUDGET 56 1 Introduction This document is
More informationKey data for the first half of 2005
Key data for the first half of 2005 Consolidated net result (IFRS): decrease of around 6 million in line with the prospects announced for 2005 Prospects for the 2005 dividend remain in place Buyout by
More information2015 ANNUAL RESULTS AND OUTLOOK. Presentation of 2015 annual results 1
2015 ANNUAL RESULTS AND OUTLOOK Presentation of 2015 annual results 1 SUMMARY Presentation of 2015 annual results 2 2015 TARGETS AND FORECASTS EXCEEDED + 2% Acquisition of customer sites in France Revenue
More informationInvestor Conference Call. Financial Year April 2016
Investor Conference Call Financial Year 2015 20 April 2016 Agenda Presenter 1 2 Business Profile Regulatory Developments Dr. Jörg Bergmann Chief Financial Officer Open Grid Europe GmbH 3 Group Structure
More informationAnalysis of Cross Border Transmission Gas Tariffs between Portugal and Spain. - Public Hearing -
Analysis of Cross Border Transmission Gas Tariffs between Portugal and Spain - Public Hearing - - EDP Gás and Naturgas Energia Comercializadora Comments EDP Gás and Naturgás Energia, both shipper companies
More informationColas: Financial Year 2014
PRESS RELEASE Boulogne, February 25, 2015 Revenue: 12.4 B (-3%) Colas: Financial Year 2014 Net profit attributable to the Group: 604 M ( 312 M in 2013) o including net after tax capital gain of 385 M from
More informationConvention on Nuclear Safety 7 th Review Meeting 2017
Convention on Nuclear Safety 7 th Review Meeting 2017 International Atomic Energy Agency IAEA, Vienna Country Review Report for Luxembourg Drafted by Country Group 6 Republic of Korea, United Kingdom,
More informationNATURAL GAS MARKET LAW (LAW ON THE NATURAL GAS MARKET AND AMENDING THE LAW ON ELECTRICITY MARKET) Law No Adoption Date: 18.4.
NATURAL GAS MARKET LAW (LAW ON THE NATURAL GAS MARKET AND AMENDING THE LAW ON ELECTRICITY MARKET) Law No. 4646 Adoption Date: 18.4.2001 PART ONE General Provisions SECTION ONE Objective, Scope, Definitions
More informationSustainable domestic investment plan with potential upside in international development
OCTOBER 2016 EQUITY STORY Top of the industry TSO in efficiency and service quality Solid domestic business with stable regulation Sustainable domestic investment plan with potential upside in international
More informationMETHODOLOGY DETERMINING PRICES FOR ACCESS AND TRANSMISSION OF NATURAL GAS THROUGH THE GAS TRANSMISSION NETWORKS OWNED BY BULGARTRANSGAZ EAD
METHODOLOGY DETERMINING PRICES FOR ACCESS AND TRANSMISSION OF NATURAL GAS THROUGH THE GAS TRANSMISSION NETWORKS OWNED BY BULGARTRANSGAZ EAD Issued by State Energy and Water Regulatory Commission, promulgated
More informationFISHERIES MEASURES FOR MARINE NATURA 2000 SITES A consistent approach to requests for fisheries management measures under the Common Fisheries Policy
FISHERIES MEASURES FOR MARINE NATURA 2000 SITES A consistent approach to requests for fisheries management measures under the Common Fisheries Policy It is the responsibility of Member States to designate
More informationSoutheast Europe is growing economically and the gas market is expected to grow by bcm by 2025 (60%-80% increase)
PUBLIC GAS CORPORATION (DEPA) S.A. Business Opportunities with DEPA December er 2010 Harry Sachinis, Chairman & CEO, DEPA S.A. Business Opportunities with DEPA Southeast Europe is growing economically
More informationInvesting in European Gas Markets: a Banker s Perspective
Investing in European Gas Markets: a Banker s Perspective Julian Mylchreest Global Co-Head of Energy & Power, Investment Banking, Bank of America Merrill Lynch 23 th May 213 Financing Markets Dynamics
More information