1 DOCUMENT ADDENDUM PROJECT INFORMATION A. Project Name: Water System Automated Meter Reading Program B. Owner: City of Florence Alabama Water & Wastewater Department C. Project Number: FL-1330 D. Engineer: Engineers of the South E. Date of Addendum: March 13, NOTICE TO BIDDERS A. This Addendum is issued to all registered plan holders pursuant to the Conditions of the Contract. This Addendum serves to clarify, revise, and supersede information in the Project Manual, Drawings, and previously issued Addenda. Portions of the Addendum affecting the Contract Documents will be incorporated into the Contract by enumeration of the Addendum in the Owner/Contractor Agreement. B. The Bidder shall acknowledge receipt of this Addendum in the appropriate space on the Bid Form. Bidders must also acknowledge receipt by to Craig@EngineersoftheSouth.com before the Bid Opening. C. The date for receipt of bids is unchanged by this Addendum, at same time and location. 1.3 REVISIONS TO DIVISION 00 PROCUREMENT REQUIREMENTS AND CONTRACTING REQUIREMENTS A. Section Advertisement for Bids 1. Paragraph 5, Last sentence Delete and replace with the following: A MANDATORY Pre-Bid Conference for this Project is scheduled for 1:30 p.m., February 27, 2014, at the City Municipal Auditorium, 110 West College Street, Florence, Alabama. B. Section Unit Prices Form 1. Item 14 3/4 Copper Service Lateral Replacement Delete in its entirety. Contractors shall write in zero (0) dollars for this item in the Unit Prices Form. 2. Item 15 1 Copper Service Lateral Replacement Delete in its entirety. Contractors shall write in zero (0) dollars for this item in the Unit Prices Form. C. Section Basis of Payment 1. Item 10 Handheld Collection Systems Add the following at the end: This bid item shall include one multi-dock for Ethernet connectivity and charging for 5 units. 2. Item 11 Mobile Data Collection Systems Add the following at the end: March 13, 2014 Page 1 of 4 Section FL-1330 Water System AMR Program Addendum 1

2 This item shall include one handheld collector per each and be in addition to the handhelds listed in Bid Item Item 13 Meter Box Replacement, second sentence Delete and replace with the following: This bid item shall be used in conjunction with Bid Items 2 and 3 to completely replace a 5/8 x 3/4 meter and meter box assembly when field conditions warrant the need and it is approved in advance by the Owner and/or Engineer. 4. Item 14 3/4 Copper Service Lateral Replacement Delete in its entirety. 5. Item 15 1 Copper Service Lateral Replacement Delete in its entirety. D. Section General Conditions 1. Article 12 Taxes, Add the following to the end: B. The CONTRACTOR S attention is directed to the recent changes in the Alabama Department of Revenue Sales and Use Tax Division Administrative Code, Chapter , Section 77 entitled Exemption For Certain Purchases By Contractors and Subcontractors In Conjunction With Construction Contracts With Certain Governmental Entities. Contractors shall bid the project accordingly and plan to submit the required applications (Sales and Use Tax Certificate of Exemption Form ST.EXC-01 1/14). 2. Article 15 Warranty and Guarantee, Part 15.1.B: Clarification is being provided that the One Year Contractor s Warranty on individual meters, MIU s, and meter box assemblies shall become effective upon their incorporation into the AMR System and acceptance by the Owner. 3. Article 16.1 Add the following to the end: H. The amount of the payment due to the Contractor shall be based upon the total value of work completed to date plus the value of materials suitably stored onsite (or offsite if insured and approved in advance) less previous payment and five percent (5%) for retainage. After the project is fifty percent (50%) complete, no additional retainage shall be withheld provided that the Contractor is making satisfactory progress and there is no specific cause for greater withholdings. E. Appendix A Supplemental General Conditions for SRF Assisted Public Drinking Water and Wastewater Facilities Construction Contracts 1. Page 1 Cover Sheet Add the following after SRF Project Number: FS Under Section XV Davis-Bacon and Related Acts: Add the following attached files: a. Davis-Bacon Wage Determination General Decision Number: AL b. Davis-Bacon Wage Determination General Decision Number: AL REVISIONS TO DIVISIONS SPECIFICATION SECTIONS A. Specification Section Product Requirements 1. Part 1.05.C Clarification is being provided that submittals for Alternate Bid Items as provided for in the Unit Prices Form are not required twenty one (21) days prior to bid opening. The Owner will evaluate these alternatives after opening bids and prior to award of the Contract. B. Specification Section Operation & Maintenance Data 1. Part 1.07 Delete in its entirety. March 13, 2014 Page 2 of 4 Section FL-1330 Water System AMR Program Addendum 1

3 C. Specification Section Demolition 1. Part 3.01.A Clarification provided that 72 hour notice prior to turning off affected services would not apply to individual services during meter replacement. 2. Part 3.06 Delete in its entirety. D. Specification Section Water Meters, AMR System, and Appurtenances 1. Part 1.09.C Clarification is being provided that the One Year Contractor s Warranty on individual meters, MIU s, and meter box assemblies shall become effective upon their incorporation into the AMR System and acceptance by the Owner. 2. Part 1.09.C Replace second sentence with the following: Furthermore, if any batteries fail within one (1) year following installation and acceptance by the Owner, the replacement guarantee of the Bidder shall include the labor to completely replace the MIU as well as the cost of the MIU. 3. Part 2.01.A.1 Delete the last sentence. 4. Part 2.01.B.2.b&c Clarification is provided that this documentation is not required at bid time. It shall be furnished after bid opening by the Contractor if requested by the Owner. 5. Part 2.01.B.2.e Delete in its entirety. 6. Part 2.01.B.3.f Delete in its entirety. 7. Part 2.01.B.3 Add the following at the end: p. All 3/4 meters shall have 9 laying length. 8. Part 2.01.B.4.f Delete in its entirety. 9. Part 2.01.B.4.g Delete in its entirety. 10. Part 2.01.B.4 Add the following at the end: o. All 3/4 meters shall have 9 laying length. 11. Part 2.01.B.5.b Replace with the following: b. 5/8 x 3/4 Composite: Mueller 420 Series; Badger Recordall Series, or equal. 12. Part 2.01.C.1.h Delete the last sentence. 13. Part 2.01.C.1.i Delete in its entirety. 14. Part 2.01.C.1.j Delete in its entirety. 15. Part 2.01.C.1.m Delete the second sentence. 16. Part 2.01.C.2.a Delete the first sentence. 17. Part 2.02.D Add the following at the end: 17. Handhelds shall be provided with one Mulit-dock for Ethernet connectivity and charging for 5 units. 18. Part 3.02.G.2.b. second sentence Delete and replace with the following two sentences: At least one (1) week prior to commencement of installations on a particular route, the Contractor shall send notices (letters, post cards, door hangers, etc.) to the customers on that route indicating the day during which that customer s installation is anticipated to occur. Installers shall check meters for usage prior to removing from service and employ a door knock policy to advise the customer that their service will be temporarily disrupted. 19. Part 3.02.G.2.b. Delete the fourth sentence. 20. Part 3.02.G.2.c Delete in its entirety. 21. Part 3.02.G.4 Delete and replace with the following: At the end of each day or at other intervals acceptable to the Owner, the Installation Manager shall transmit electronically to the Owner and Engineer, in an approved format, information on completed work orders and a listing of installation locations anticipated for the following reporting period. 22. Part 3.02.H.2 Delete the last sentence. 23. Part 3.02.I Revise the last sentence as follows: March 13, 2014 Page 3 of 4 Section FL-1330 Water System AMR Program Addendum 1

4 The Contractor shall not attempt. 24. Part 3.02.J Delete and replace with the following: Prior to starting the site installation, the installer shall determine if additional plumbing work is required beyond the specified scope of this contract. If needed and approved by the Owner in advance, the work may be conducted under bid item for meter box replacement on 5/8 x3/4 meters which shall include the piping within two (2) feet of the meter box. If any additional plumbing work outside the scope of line items for meter and meter box replacement is needed, the Contractor shall notify the Owner to have that work completed. 25. Part 3.02.L.4 Delete requirement for sub-meter accuracy. 26. Part 3.02.L.5.b Delete in its entirety. 27. Part 3.02.L.5.d Delete in its entirety. END OF DOCUMENT March 13, 2014 Page 4 of 4 Section FL-1330 Water System AMR Program Addendum 1

5 2/20/ General Decision Number: AL /07/2014 AL151 Superseded General Decision Number: AL State: Alabama Construction Type: Heavy Including Water and Sewer Line Construction Counties: Colbert and Lauderdale Counties in Alabama. Modification Number Publication Date 0 01/03/ /07/2014 * ELEC /01/2013 ELECTRICIAN...$ %+9.60 ENGI /01/2010 Power equipment operators: Cherry Picker (Hydraulic Crane Uner 100 Ton), Backhoe, Hoist, Mechanic and Roller...$ Crane (Hydraulic & Conventional 100 Ton and over)...$ Oiler...$ IRON /01/2013 IRONWORKER, STRUCTURAL...$ PLAS /01/2011 CEMENT MASON/CONCRETE FINISHER...$ SUAL /28/2007 CARPENTER, Includes Form Work...$ LABORER: Common or General...$ LABORER: Pipelayer...$ /5

6 2/20/ OPERATOR: Asphalt Spreader...$ OPERATOR: Bulldozer...$ OPERATOR: Excavator...$ OPERATOR: Forklift...$ OPERATOR: Grader/Blade...$ OPERATOR: Loader (Front End)...$ OPERATOR: Trackhoe...$ TRUCK DRIVER...$ WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union. Union Identifiers An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM /01/2011. The first four letters, PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable, i.e., Plumbers Local The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example. 2/5

7 2/20/ Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates. 0000/9999: weighted union wage rates will be published annually each January. Non-Union Identifiers Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA /13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date. Survey wage rates will remain in effect and will not change until a new survey is conducted. WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC /5

8 2/20/ ) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC ) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION 4/5

9 2/20/ General Decision Number: AL /07/2014 AL51 Superseded General Decision Number: AL State: Alabama Construction Type: Building County: Lauderdale County in Alabama. BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories). Modification Number Publication Date 0 01/03/ /07/2014 * ELEC /01/2013 ELECTRICIAN...$ %+9.60 ENGI /01/2010 Power equipment operators: Cherry Picker (Hydraulic Crane Under 100 Ton), Forklift, and Front End Loader...$ Crane (Hydraulic & Conventional Cranes 100 Ton and Over)...$ Oiler...$ IRON /01/2013 IRONWORKER, STRUCTURAL...$ * PAIN /01/2014 PAINTER: Spray...$ SUAL /02/2007 BRICKLAYER...$ /5

10 2/20/ CARPENTER, Includes Form Work...$ CEMENT MASON/CONCRETE FINISHER...$ IRONWORKER, REINFORCING...$ LABORER: Common/General, Including Landscaping...$ LABORER: Pipelayer...$ OPERATOR: Backhoe...$ OPERATOR: Bulldozer...$ OPERATOR: Excavator...$ OPERATOR: Grader/Blade...$ PAINTER: Brush and Roller...$ PIPEFITTER...$ PLUMBER...$ ROOFER, Includes Built Up, Polyurethan Foam, Shake & Shingle, Single Ply, and Metal Roofs...$ SHEET METAL WORKER...$ TILE SETTER...$ TRUCK DRIVER...$ WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular 2/5

11 2/20/ rate is union or non-union. Union Identifiers An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM /01/2011. The first four letters, PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable, i.e., Plumbers Local The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example. Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates. 0000/9999: weighted union wage rates will be published annually each January. Non-Union Identifiers Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA /13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date. Survey wage rates will remain in effect and will not change until a new survey is conducted. WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling 3/5

12 2/20/ On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC ) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC ) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION 4/5

Solicitation FA441718R0003 Attachment 3

Solicitation FA441718R0003 Attachment 3 Solicitation FA441718R0003 Attachment 3 General Decision Number: FL180262 01/12/2018 FL262 Superseded General Decision Number: FL20170262 State: Florida Construction Type: Building County: Okaloosa County

More information

DAVIS-BACON ACT WAGE DETERMINATION PER ADDENDUM NO. 1

DAVIS-BACON ACT WAGE DETERMINATION PER ADDENDUM NO. 1 DAVIS-BACON ACT WAGE DETERMINATION PER ADDENDUM NO. 1 General Decision Number: GA160129 02/26/2016 GA129 Superseded General Decision Number: GA20150129 State: Georgia Construction Type: Building County:

More information

Prevailing Wage Rates (No Fringes)

Prevailing Wage Rates (No Fringes) Prevailing Wage (No Fringes) General Decision Number: TX150302 07/31/2015 TX302 Superseded General Decision Number: TX20140302 State: Texas Construction Type: Building County: Hardin County in Texas. BUILDING

More information

https://www.wdol.gov/wdol/scafiles/davisbacon/fl263.dvb?v=0

https://www.wdol.gov/wdol/scafiles/davisbacon/fl263.dvb?v=0 Page 1 of 6 General Decision Number: FL180263 01/05/2018 FL263 Superseded General Decision Number: FL20170263 State: Florida Construction Type: Building County: Orange County in Florida. BUILDING CONSTRUCTION

More information

Alabama State Port Authority. Description

Alabama State Port Authority. Description Project Name Location Alabama State Port Authority Addendum to Specification Booklet Automotive RO/RO Terminal Site Demolition Package Mobile, AL Project # 10615 TASK # 2 Addendum #3 Date: January 7, 2019

More information

ATTACHMENT E INSURANCE REQUIREMENTS

ATTACHMENT E INSURANCE REQUIREMENTS ATTACHMENT E INSURANCE REQUIREMENTS Professional Liability LHA and its affiliates must be named as an Additional Insured and be a Certificate Holder. This is required for vendors who render observational

More information

DOCUMENT 00050 GENERAL 1.1 Introduction. Pursuant to Government Code Chapter 2267, subchapter D the City of Conroe hereby solicits Competitive Sealed Bids for approximately 12,000 linear feet of clearing

More information

San Juan County, New Mexico

San Juan County, New Mexico San Juan County, New Mexico General Decision Number: NM170015 02/24/2017 NM15 Superseded General Decision Number: NM20160015 State: New Mexico Construction Type: Heavy County: San Juan County in New Mexico.

More information

Construction Types: Heavy (Heavy and Sewer and Water Line) HEAVY CONSTRUCTION PROJECTS (Including Sewer and Water Lines)

Construction Types: Heavy (Heavy and Sewer and Water Line) HEAVY CONSTRUCTION PROJECTS (Including Sewer and Water Lines) General Decision Number: VA170046 01/06/2017 VA46 Superseded General Decision Number: VA20160046 State: Virginia Construction Types: Heavy (Heavy and Sewer and Water Line) County: Franklin County in Virginia.

More information

Delete Davis Bacon Wage Decision TX dated 9/25/2009. Add Davis Bacon Wage Decision TX dated 3/12/2010 (attached)

Delete Davis Bacon Wage Decision TX dated 9/25/2009. Add Davis Bacon Wage Decision TX dated 3/12/2010 (attached) 818 S. FLORES ST. SAN ANTONIO, TEXAS 78204 www.saha.org Procurement Department ADDENDUM #1 To: 1003-910-13-3138 RFP for Modernization of Elevators at Various Locations Delete Davis Bacon Wage Decision

More information

wage determination 2018 General Decision Number: PA /07/2018 PA33 Superseded General Decision Number: PA State: Pennsylvania

wage determination 2018 General Decision Number: PA /07/2018 PA33 Superseded General Decision Number: PA State: Pennsylvania General Decision Number: PA180033 09/07/2018 PA33 Superseded General Decision Number: PA20170033 State: Pennsylvania Construction Type: Residential County: Allegheny County in Pennsylvania. RESIDENTIAL

More information

SECTION DAVIS BACON PREVAILING RESIDENTIAL WAGE RATES

SECTION DAVIS BACON PREVAILING RESIDENTIAL WAGE RATES September 2015 Heritage Point Apartments SECTION 000009 DAVIS BACON PREVAILING RESIDENTIAL WAGE RATES NOTE: Project shall be constructed using the Davis Bacon Residential Prevailing Wage Rate for Luzern

More information

Winnebago County Housing Authority

Winnebago County Housing Authority Oshkosh/Winnebago County Housing Authority Cumberland Court Housing Commission P.O. BOX 397, OSHKOSH, WI 54903-0397 OSHKOSH: (920) 424-1450 FAX: (920) 424-1474 June 1, 2016 County REQUEST FOR PROPOSAL:

More information

Construction Types: Heavy (Heavy and Sewer and Water Line) Counties: Accomack, Essex, King George, Lancaster, Middlesex,

Construction Types: Heavy (Heavy and Sewer and Water Line) Counties: Accomack, Essex, King George, Lancaster, Middlesex, General Decision Number: VA180023 01/05/2018 VA23 Superseded General Decision Number: VA20170023 State: Virginia Construction Types: Heavy (Heavy and Sewer and Water Line) Counties: Accomack, Essex, King

More information

Construction Types: Heavy (Heavy and Sewer and Water Line) Counties: Alexandria*, Arlington, Clarke, Culpeper,

Construction Types: Heavy (Heavy and Sewer and Water Line) Counties: Alexandria*, Arlington, Clarke, Culpeper, General Decision Number: VA180035 06/15/2018 VA35 Superseded General Decision Number: VA20170035 State: Virginia Construction Types: Heavy (Heavy and Sewer and Water Line) Counties: Alexandria*, Arlington,

More information

2018 Pipelines Water and Sewer Construction Contract Pkg I

2018 Pipelines Water and Sewer Construction Contract Pkg I INVITATION FOR BID 2018 Pipelines Water and Sewer Construction Contract Pkg I Solicitation No.: CO-00157 Addendum 2 January 30, 2018 MODIFICATIONS TO THE SPECIFICATIONS 1. Bid Proposal, Page BP-1 is deleted

More information

Invitation to Bid Hogan House Historic Painting Project

Invitation to Bid Hogan House Historic Painting Project Invitation to Bid Hogan House Historic Painting Project This project is funded with Community Development Block Grant (CDBG) funds. All estimates must reflect Davis-Bacon prevailing wages. This invitation

More information

BID PROPOSAL Mobilization for Non-Emergency Work Orders; 200 EA $ $ Mobilization for Emergency Work Orders; 2 EA $ $

BID PROPOSAL Mobilization for Non-Emergency Work Orders; 200 EA $ $ Mobilization for Emergency Work Orders; 2 EA $ $ 2018 Annual Water Distribution Leak Repairs Contract, Package 1 SAWS Job Nos. 18-0103 (O&M) and 18-1401 (CIP) Solicitation No. B-18-001-JG BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting

More information

General Decision Number: CO /26/2013 CO13. Superseded General Decision Number: CO State: Colorado. Construction Type: Heavy

General Decision Number: CO /26/2013 CO13. Superseded General Decision Number: CO State: Colorado. Construction Type: Heavy General Decision Number: CO130013 07/26/2013 CO13 Superseded General Decision Number: CO20120013 State: Colorado Construction Type: Heavy Counties: Alamosa, Archuleta, Baca, Bent, Chaffee, Cheyenne, Clear

More information

Pierre City Hall Conference Room 222 E. Dakota Avenue, Pierre, South Dakota, 57501

Pierre City Hall Conference Room 222 E. Dakota Avenue, Pierre, South Dakota, 57501 ADDENDUM No. 3 PROJECT Pierre WWTF Improvements Project - 2017 BID DATE Time 1:30 PM, CST July 24, 2017 BID LOCATION Pierre City Hall Conference Room 222 E. Dakota Avenue, Pierre, South Dakota, 57501 ISSUE

More information

Request for Proposal for the Installation of 90 Smoke Detectors at Michaels J. Day Apartments For the Watervliet Housing Authority

Request for Proposal for the Installation of 90 Smoke Detectors at Michaels J. Day Apartments For the Watervliet Housing Authority Sandra J. Beston Chairwoman Charles A. Jeseo Vice Chairman Harry J. Cushing Jeffery Czarnecki Jane Hayes Roberta Gilson Regina Warner Watervliet Housing Authority Administration Office 2400 Second Avenue

More information

Greater Dayton Regional Transit Authority 4 S. Main Street Dayton, OH 45402

Greater Dayton Regional Transit Authority 4 S. Main Street Dayton, OH 45402 CONSTRUCTION Greater Dayton Regional Transit Authority 4 S. Main Street Dayton, OH 45402 August 24, 2017 DEAR PROSPECTIVE BIDDERS: Re: RFQ (Request for Quotation) 2017 RFQ New Garage Door for 901 South

More information

March 11, C. In Part C of the IFB, delete Paragraph 9B, Reciprocal Local Preference, in its entirety.

March 11, C. In Part C of the IFB, delete Paragraph 9B, Reciprocal Local Preference, in its entirety. March 11, 2016 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA IFB Y16-746-CC / ADDENDUM NO. 3 ORANGE COUNTY FIRE RESCUE-STATIONS VEHICLE EXHAUST REMOVAL SYSTEM Revised Bid Opening Date: March 24,

More information

B. Instructions for Bidders:

B. Instructions for Bidders: Klamath Tribes Department of Natural Resources Research Station Invitation for Bids (IFB) IFB Number: 05-KTNRRS16 Roof Repair and Upgrade Buildings 5671 Sprague River Hwy, Chiloquin Oregon A. General Information:

More information

NOTICE TO BIDDER / REQUEST FOR CONSTRUCTION BID / INSTRUCTIONS TO BIDDERS. [SEPTIC to SEWER]

NOTICE TO BIDDER / REQUEST FOR CONSTRUCTION BID / INSTRUCTIONS TO BIDDERS. [SEPTIC to SEWER] NOTICE TO BIDDER / REQUEST FOR CONSTRUCTION BID / INSTRUCTIONS TO BIDDERS [SEPTIC to SEWER] Jewish Family Services (JFS) is seeking sealed bids for the project scope located at their address of 2100 Lee

More information

NOTICE TO BIDDER / REQUEST FOR CONSTRUCTION BID / INSTRUCTIONS TO BIDDERS. [SEPTIC to SEWER]

NOTICE TO BIDDER / REQUEST FOR CONSTRUCTION BID / INSTRUCTIONS TO BIDDERS. [SEPTIC to SEWER] NOTICE TO BIDDER / REQUEST FOR CONSTRUCTION BID / INSTRUCTIONS TO BIDDERS [SEPTIC to SEWER] Jewish Family Services (JFS) is seeking sealed bids for the project scope located at their address of 2100 Lee

More information

Greater Dayton Regional Transit Authority 4 S. Main Street Dayton, OH 45402

Greater Dayton Regional Transit Authority 4 S. Main Street Dayton, OH 45402 CONSTRUCTION Greater Dayton Regional Transit Authority 4 S. Main Street Dayton, OH 45402 September 6, 2017 DEAR PROSPECTIVE BIDDERS: Re: RFQ (Request for Quotation) High Speed Commercial Garage Doors RFQ

More information

PHASE ONE - SELECTIVE DEMOLITION DOCUMENTS

PHASE ONE - SELECTIVE DEMOLITION DOCUMENTS PROJECT MANUAL Central Carolina Technical College Advanced Manufacturing Technology Training Center Sumter, SC SC# H59-6059-CA EDA AWARD NO. 04-01-06716 LS3P COMMISSION NUMBER: 3202-123910 PHASE ONE -

More information

The City of Johnson City, Mayor Dawn Capra (date) November 17, 2016

The City of Johnson City, Mayor Dawn Capra (date) November 17, 2016 ADVERTISEMENT AND INVITATION FOR BIDS City of Johnson City Skateboard Park Texas Parks and Wildlife Department (TPWD) Small Community Skateboard Park Project # 54-000160 The City of Johnson City will receive

More information

Klamath Tribes Housing Department Invitation for Bids (IFB) IFB Number: KTHD Congregate Fire Rehab, 502 Charley Ave.

Klamath Tribes Housing Department Invitation for Bids (IFB) IFB Number: KTHD Congregate Fire Rehab, 502 Charley Ave. Klamath Tribes Housing Department Invitation for Bids (IFB) IFB Number: 18-03-KTHD Congregate Fire Rehab, 502 Charley Ave. Chiloquin Oregon A. General Information: The Klamath Tribes Housing Department

More information

FIRE STATION 35 CONTRACT NO ADDENDUM NUMBER TWO. Scope of this Addendum

FIRE STATION 35 CONTRACT NO ADDENDUM NUMBER TWO. Scope of this Addendum D ENVER I NTERNATIONAL A IRPORT FIRE STATION 35 CONTRACT NO. 201314429 ADDENDUM NUMBER TWO Scope of this Addendum Addendum Number Two includes modifications to the following: - RFP Documents, dated February

More information

Competitive Quotes Request (Construction)

Competitive Quotes Request (Construction) Competitive Quotes Request (Construction) PROJECT: Replace & Replace Trash Compactor at Alliance Towers OH018 04262016-FHC Competitive Quotes for a Contractor to remove and replace one (1) trash compactor,

More information

INVITATION FOR BIDS FOR UNITED CEREBRAL PALSY OF CENTRAL FLORIDA, INC. HVAC REPLACEMENT FOR DOWNTOWN/BETA CAMPUS

INVITATION FOR BIDS FOR UNITED CEREBRAL PALSY OF CENTRAL FLORIDA, INC. HVAC REPLACEMENT FOR DOWNTOWN/BETA CAMPUS IFB No. UCP2018-0108 ISSUED: January 12, 2018 INVITATION FOR BIDS FOR UNITED CEREBRAL PALSY OF CENTRAL FLORIDA, INC. HVAC REPLACEMENT FOR DOWNTOWN/BETA CAMPUS 1. Introduction United Cerebral Palsy of Central

More information

Walnut Avenue Homes BID NOTIFICATION PACKAGE BUILDING SECURITY TABLE OF CONTENTS

Walnut Avenue Homes BID NOTIFICATION PACKAGE BUILDING SECURITY TABLE OF CONTENTS Walnut Avenue Homes BID NOTIFICATION PACKAGE BUILDING SECURITY TABLE OF CONTENTS SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS 001116 Invitation to Bid 002113 Instructions to Bidders 002413 Scope of

More information

DAYTON METROPOLITAN HOUSING AUTHORITY dba GREATER DAYTON PREMIER MANAGEMENT

DAYTON METROPOLITAN HOUSING AUTHORITY dba GREATER DAYTON PREMIER MANAGEMENT DAYTON METROPOLITAN HOUSING AUTHORITY dba GREATER DAYTON PREMIER MANAGEMENT 400 WAYNE AVENUE, P O BOX 8750 DAYTON, OHIO 45401-8750 PHONE: 937-910-7657 QUOTATION REQUEST THIS IS NOT AN ORDER RFQ: # 17-38

More information

Overview of Davis-Bacon Wages

Overview of Davis-Bacon Wages Overview of Davis-Bacon Wages Why Davis-Bacon? How does DOL determine wages? How does Davis-Bacon apply to projects? Are Davis-Bacon wages all union rates? When are Davis-Bacon rates changed? How much

More information

NOTICE TO CONTRACTORS INVITATION TO BID TREE REMOVAL/PLANTING

NOTICE TO CONTRACTORS INVITATION TO BID TREE REMOVAL/PLANTING NOTICE TO CONTRACTORS INVITATION TO BID TREE REMOVAL/PLANTING Date: December 17, 2017 Tree Removal/Planting Property Addresses: 500-600 Blocks of 22 nd St., 2300 Block of Quincy, 800-900 Blocks of 24 th

More information

SECTION SIX DAVIS-BACON WAGE RATES REQUIRED CONTRACT PROVISIONS FOR FEDERAL AID CONSTRUCTION CONTRACTS FEDERAL AID / DBE GOALS AND REQUIREMENTS

SECTION SIX DAVIS-BACON WAGE RATES REQUIRED CONTRACT PROVISIONS FOR FEDERAL AID CONSTRUCTION CONTRACTS FEDERAL AID / DBE GOALS AND REQUIREMENTS SECTION SIX DAVIS-BACON WAGE RATES REQUIRED CONTRACT PROVISIONS FOR FEDERAL AID CONSTRUCTION CONTRACTS FEDERAL AID / DBE GOALS AND REQUIREMENTS file:///c:/users/merced/appdata/local/temp/bbagkfh2.htm Page

More information

415 E. INDEPENDENCE TULSA, OK (918) PROJECT MANUAL FOR IFB # DRAINAGE REMEDIATION

415 E. INDEPENDENCE TULSA, OK (918) PROJECT MANUAL FOR IFB # DRAINAGE REMEDIATION 1 415 E. INDEPENDENCE TULSA, OK 74106 (918) 582-0021 PROJECT MANUAL FOR IFB #17-099 DRAINAGE REMEDIATION AT PARKVIEW TERRACE 1615 W 59 TH STREET SOUTH TULSA, OK 74107 PRE-BID CONFERENCE: OCTOBER 12, 2017

More information

San Angelo Regional Airport Baggage Handler Maintenance

San Angelo Regional Airport Baggage Handler Maintenance $5.00 CITY OF SAN ANGELO REQUEST FOR BIDS RFB No: AP-03-15 San Angelo Regional Airport Baggage Handler Maintenance Contract Documents Specifications City of San Angelo 72 West College Avenue San Angelo,

More information

FEDERAL GRANT DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT (HUD) A COMMUNITY DEVELOPMENT BLOCK GRANT PROJECT (CDBG) A BOILER PLATE (GUIDE) FOR

FEDERAL GRANT DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT (HUD) A COMMUNITY DEVELOPMENT BLOCK GRANT PROJECT (CDBG) A BOILER PLATE (GUIDE) FOR EXHIBIT A FEDERAL GRANT DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT (HUD) A COMMUNITY DEVELOPMENT BLOCK GRANT PROJECT (CDBG) A BOILER PLATE (GUIDE) FOR City of Hallandale Beach - Public Works Improvements

More information

Walnut Avenue Homes PRIME SUBCONTRACTOR FOR 607 WALNUT AVE CONTRACT BID NOTIFICATION PACKAGE TABLE OF CONTENTS

Walnut Avenue Homes PRIME SUBCONTRACTOR FOR 607 WALNUT AVE CONTRACT BID NOTIFICATION PACKAGE TABLE OF CONTENTS Walnut Avenue Homes PRIME SUBCONTRACTOR FOR 607 WALNUT AVE CONTRACT BID NOTIFICATION PACKAGE TABLE OF CONTENTS SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS 001116 Invitation to Bid 002113 Instructions

More information

NOTICE TO CONTRACTORS INVITATION TO BID TREE REMOVAL

NOTICE TO CONTRACTORS INVITATION TO BID TREE REMOVAL NOTICE TO CONTRACTORS INVITATION TO BID TREE REMOVAL Date: January 14 th, 2018 Tree Removal/Planting Property Addresses: 500-600 Blocks of 22 nd St., 2300 Block of Quincy, 800-900 Blocks of 24 th St.,

More information

Norfolk Naval Shipyard, Portsmouth, Virginia Specification Work Order

Norfolk Naval Shipyard, Portsmouth, Virginia Specification Work Order NAVAL FACILITIES ENGINEERING COMMAND, MID-ATLANTIC 9324 VIRGINIA AVENUE NORFOLK, VIRGINIA 23511-3095 POC: LAURA LATHROP, laura.lathrop@navy.mil, (757) 396-3384 DESIGN-BUILD (DB)/DESIGN-BID-BUILD (DBB),

More information

415 E. INDEPENDENCE TULSA, OK (918) PROJECT MANUAL FOR IFB ROOF REPLACEMENT PHASE VIII

415 E. INDEPENDENCE TULSA, OK (918) PROJECT MANUAL FOR IFB ROOF REPLACEMENT PHASE VIII 415 E. INDEPENDENCE TULSA, OK 74106 (918) 582-0021 PROJECT MANUAL FOR IFB 18-006 ROOF REPLACEMENT PHASE VIII AT PARKVIEW TERRACE (73-12) 1615 WEST 59 TH STREET SOUTH TULSA, OK 74107 PRE-BID CONFERENCE:

More information

ADDENDUM No. 1 LRT MPOT RFP NUMBER: POTHOLING SERVICES FOR MESA EXTENSION. ADDENDUM NO: 1 DATE: July 28, 2010

ADDENDUM No. 1 LRT MPOT RFP NUMBER: POTHOLING SERVICES FOR MESA EXTENSION. ADDENDUM NO: 1 DATE: July 28, 2010 ADDENDUM No. 1 RFP NUMBER: RFP TITLE: LRT-11-157-MPOT POTHOLING SERVICES FOR MESA EXTENSION ADDENDUM NO: 1 DATE: July 28, 2010 CLARIFICATIONS / CORRECTIONS The following clarifications and/or corrections

More information

ADDENDUM NO. 3 to the PREQUALIFICATION DOCUMENTS AUGUST 26, 2011

ADDENDUM NO. 3 to the PREQUALIFICATION DOCUMENTS AUGUST 26, 2011 ADDENDUM NO. 3 to the PREQUALIFICATION DOCUMENTS AUGUST 26, 2011 HOUSING 4: THE SUMMITS PROJECT NO. 906270 CAMPUS, MERCED CALIFORNIA A. BID SUBMISSION DEADLINE: [The deadline for submitting prequalification

More information

ADDENDUM TO CONTRACT DOCUMENTS AND SPECIFICATIONS Tete Bayou Equalization Basin Levee Repairs for the City of New Iberia & IPSD #1

ADDENDUM TO CONTRACT DOCUMENTS AND SPECIFICATIONS Tete Bayou Equalization Basin Levee Repairs for the City of New Iberia & IPSD #1 ADDENDUM TO CONTRACT DOCUMENTS AND SPECIFICATIONS Tete Bayou Equalization Basin Levee Repairs for the City of New Iberia & IPSD #1 ADDENDUM NO. 1 APRIL 4, 2019 The following items shall take precedence

More information

Wage and Fringe Benefits Settlements Analysis

Wage and Fringe Benefits Settlements Analysis Wage and Fringe Benefits Settlements Analysis September 2012 Many people are asking for benchmark data on how collectively bargained increases in the construction industry are being distributed. In other

More information

NAVAL FACILITIES ENGINEERING COMMAND, MID - ATLANTIC

NAVAL FACILITIES ENGINEERING COMMAND, MID - ATLANTIC NAVAL FACILITIES ENGINEERING COMMAND, MID - ATLANTIC DESIGN-BUILD (DB)/DESIGN-BID-BUILD (DBB), INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR NEW CONSTRUCTION,

More information

CITY OF BATTLE CREEK PURCHASING REQUEST FOR PROPOSALS NO R PAGE 1

CITY OF BATTLE CREEK PURCHASING REQUEST FOR PROPOSALS NO R PAGE 1 REQUEST FOR PROPOSALS NO. 2018-029R PAGE 1 CITY OF BATTLE CREEK NOTICE OF REQUEST FOR PROPOSALS RFP#: 2018-029R TITLE: INTERIOR SURVEILLANCE CAMERAS AT TRANSIT ISSUE DATE: TBD PROPOSAL DUE DATE: TBD but

More information

REQUEST FOR BID- (RFB) - Quest, Inc.

REQUEST FOR BID- (RFB) - Quest, Inc. FOR IMMEDIATE RELEASE Media Contact: Tikisha S. Ousley Phone: 407.218.4366 Email: tousley@questinc.org REQUEST FOR BID- (RFB) - Quest, Inc. Apopka, Florida (February 25, 2019) Life Concepts, Inc. dba Quest,

More information

Maryland Apprenticeship Training Fund Law

Maryland Apprenticeship Training Fund Law Maryland Apprenticeship Training Fund Law ELECTRONIC SUBMISSION AND COMPLIANCE GUIDELINES Courtesy of Associated Builders and Contractors Baltimore Metro Chapter Chesapeake Shores Chapter Cumberland Valley

More information

.z:> By: Dan Tadic, P.E. Acting Public Works Director

.z:> By: Dan Tadic, P.E. Acting Public Works Director REQUEST FOR PROPOSALS SUPPLY OF HEAVY EQUIPMENT & OPERA TORS The City and Borough of Sitka will receive sealed proposals no later than 2:00:00 p.m. local time, Thursday, May 24, 2018 at the office of Public

More information

County of Ingham. Invitation for Bids (IFB) Packet # Shift Door Replacements in the Feline & Primate House at Potter Park Zoo

County of Ingham. Invitation for Bids (IFB) Packet # Shift Door Replacements in the Feline & Primate House at Potter Park Zoo County of Ingham Invitation for Bids (IFB) Packet #47-11 Shift Door Replacements in the Feline & Primate House at Potter Park Zoo Sealed Bids Due: August 24, 2011 @ 11:00 A.M. Sealed Bids shall be delivered

More information

HVAC REPACEMENT. Construction Documents. Quitman County Schools Quitman County, Mississippi. Project Manual For. Project No

HVAC REPACEMENT. Construction Documents. Quitman County Schools Quitman County, Mississippi. Project Manual For. Project No Project Manual For HVAC REPACEMENT Quitman County Schools Project No. 16030 Construction Documents 28 April 2016 One Jackson Place, Suite 250 188 East Capitol Street Jackson, Mississippi 39201 D B PN

More information

SECTION NOTICE INVITING BIDS

SECTION NOTICE INVITING BIDS SECTION 00020 NOTICE INVITING BIDS NOTICE IS HEREBY GIVEN that the City of Yuba City, hereafter referred to as Owner, will receive SEALED BIDS at the City Hall, City Clerk s Office, 1201 Civic Center Blvd.,

More information

FLORIDA DEPARTMENT OF TRANSPORTATION

FLORIDA DEPARTMENT OF TRANSPORTATION FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO. 2 DATE: March 16, 2016 RE: BID/RFP #: BID/RFP TITLE: ITB-DOT-15/16-4013JR Districtwide Right of Way Asbestos Abatement Services for the Florida Department

More information

UNIVERSITY OF MASSACHUSETTS BUILDING AUTHORITY

UNIVERSITY OF MASSACHUSETTS BUILDING AUTHORITY UNIVERSITY OF MASSACHUSETTS BUILDING AUTHORITY ADDENDUM NO. 01 TO INVITATION TO BID Life Science Laboratories Building #694 Data Center University of Massachusetts Amherst PROJECT NO. UMBA 14-A6 May 29,

More information

DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VIRGINIA

DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VIRGINIA Charles A. Kilpatrick, P.E. Commissioner February 8, 2017 DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VIRGINIA 23219-2000 Order No.: L56 Project: SM03-963-363,N501;SM03-963-364,N501 FHWA:

More information

FEDERALLY FUNDED ONLY CONSTRUCTION CONTRACTS SPECIAL PROVISIONS DIVISION A - LABOR May 17, 2006

FEDERALLY FUNDED ONLY CONSTRUCTION CONTRACTS SPECIAL PROVISIONS DIVISION A - LABOR May 17, 2006 FEDERALLY FUNDED ONLY CONSTRUCTION CONTRACTS SPECIAL PROVISIONS DIVISION A - LABOR May 17, 2006 I. PREAMBLE It is in the public interest that public buildings and other public works projects be constructed

More information

TERRITORY ENTIRE STATE NEW JERSEY DEPARTMENT OF LABOR AND WORKFORCE DEVELOPMENT PREVAILING WAGE RATE DETERMINATION

TERRITORY ENTIRE STATE NEW JERSEY DEPARTMENT OF LABOR AND WORKFORCE DEVELOPMENT PREVAILING WAGE RATE DETERMINATION TERRITORY ENTIRE STATE NEW JERSEY DEPARTMENT OF LABOR AND WORKFORCE DEVELOPMENT PREVAILING WAGE RATE DETERMINATION E RICIAN- UTILITY WORK (SOUTH) Rates Expiration Date: 11/30/2010 Effective Date: 11/15/2010

More information

AGENDA. PRE-BID / SITE VISIT MEETING November 29, :00 PM. Project Number: Project Name: DeLand NGA Roof and Waterproofing DeLand, Florida

AGENDA. PRE-BID / SITE VISIT MEETING November 29, :00 PM. Project Number: Project Name: DeLand NGA Roof and Waterproofing DeLand, Florida AGENDA PRE-BID / SITE VISIT MEETING November 29, 2017 2:00 PM Project Number: 217061 Project Name: DeLand NGA Roof and Waterproofing DeLand, Florida 1. SIGN-IN OF ALL ATTENDEES: 2. INTRODUCTIONS: 3. GENERAL

More information

TABLE OF CONTENTS - ADDENDUM NO. 3

TABLE OF CONTENTS - ADDENDUM NO. 3 TABLE OF CONTENTS - ADDENDUM NO. 3 TABLE OF CONTENTS Addendum No. 3 SUPPLEMENTAL INSTRUCTIONS TO BIDDERS SIB-1 SIB-2 SIB-3 Article I-2.4 - Contract Completion Time Article I-14.4 - Participation by SBE

More information

ITB-PW-U Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2

ITB-PW-U Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2 Page 1 of 16 ITB-PW-U-15-02 Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2 ISSUE DATE: January 7, 2015 DUE DATE: January 15, 2015 at 2:00 p.m. SUBJECT: Miscellaneous Changes INTENT: This

More information

Please make the following changes in your copy of the bid proposal for the captioned project:

Please make the following changes in your copy of the bid proposal for the captioned project: Charles A. Kilpatrick, P.E. Commissioner DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VIRGINIA 23219-2000 January 12, 2017 Order No.: L45 Routes: 626, 056, & 635 Project: (NFO)BRDG-963-406,B608,B609,B610

More information

LAFAYETTE, LOUISIANA, AS SHOWN ON THESE SPECIFICATIONS...

LAFAYETTE, LOUISIANA, AS SHOWN ON THESE SPECIFICATIONS... DEPARTMENT: Physical Plant/Campus REQUISITION NO. M FURNISH ALL LABOR, MATERIALS, EQUIPMENT, TRANSPORTATION, SUPERVISION, PERMITS, ETC. NECESSARY TO, LOCATED ON THE CAMPUS OF THE UNIVERSITY OF LOUISIANA

More information

ADDENDUM 1. Bid# , Bosque Bonito Units 1 and 2 Sewer System Improvement Project

ADDENDUM 1. Bid# , Bosque Bonito Units 1 and 2 Sewer System Improvement Project County of El Paso Purchasing Department 500 East San Antonio, Room 500 El Paso, Texas 79901 (915) 546-2048 / Fax: (915) 546-8180 ADDENDUM 1 To: From: All Interested Proposers Claudia Sepulveda, Bid Clerk/Buyer

More information

AIA Document A101 TM 2007

AIA Document A101 TM 2007 AIA Document A101 TM 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the day of in the year (In words, indicate day, month

More information

AGENDA. PRE-BID / SITE VISIT MEETING Tuesday, 2/13/2018, 9:00 am EST. Project # NG Armory Roof Replacement Sarasota, FL

AGENDA. PRE-BID / SITE VISIT MEETING Tuesday, 2/13/2018, 9:00 am EST. Project # NG Armory Roof Replacement Sarasota, FL AGENDA PRE-BID / SITE VISIT MEETING Tuesday, 2/13/2018, 9:00 am EST Project # 217071 NG Armory Roof Replacement Sarasota, FL 1. SIGN-IN OF ALL ATTENDEES: 2. INTRODUCTIONS: Brad, Rachel, MSG Jonathan Croteau,

More information

PRICE PROPOSAL. DESIGN-BUILD PRICE PROPOSAL SUBMISSION to NEW JERSEY SCHOOLS DEVELOPMENT AUTHORITY

PRICE PROPOSAL. DESIGN-BUILD PRICE PROPOSAL SUBMISSION to NEW JERSEY SCHOOLS DEVELOPMENT AUTHORITY PRICE PROPOSAL DESIGN-BUILD PRICE PROPOSAL SUBMISSION to NEW JERSEY SCHOOLS DEVELOPMENT AUTHORITY For the following Package: Contract Number: ET-0056-B01 Contract Name/Description: A. Chester Redshaw Elementary

More information

COUNTY OF SAN MATEO STATE OF CALIFORNIA NOTICE TO CONTRACTORS

COUNTY OF SAN MATEO STATE OF CALIFORNIA NOTICE TO CONTRACTORS COUNTY OF SAN MATEO STATE OF CALIFORNIA NOTICE TO CONTRACTORS NOTICE IS HEREBY GIVEN, that Sealed bids will be received at the office of the County Manager/Clerk of the Board of Supervisors, Hall of Justice

More information

P360 Electrical Substation SOW #0025, Work Order # SC & GA MACC N D-1779/80/81/82/09-D-1760 REQUEST FOR PROPOSAL NUMBER SOW #0025

P360 Electrical Substation SOW #0025, Work Order # SC & GA MACC N D-1779/80/81/82/09-D-1760 REQUEST FOR PROPOSAL NUMBER SOW #0025 SC & GA MACC N69450-08-D-1779/80/81/82/09-D-1760 REQUEST FOR PROPOSAL NUMBER SOW #0025 P360 ELECTRICAL SUBSTATION MARINE CORPS RECRUIT DEPOT, PARRIS ISLAND SC TABLE OF CONTENTS PART 1 PROPOSAL DOCUMENTS

More information

OWNER/PROFESSIONAL SERVICES CONSULTANT AGREEMENT PROJECT TITLE UNIVERSITY OF ILLINOIS

OWNER/PROFESSIONAL SERVICES CONSULTANT AGREEMENT PROJECT TITLE UNIVERSITY OF ILLINOIS PROJECT TITLE UNIVERSITY OF ILLINOIS THIS AGREEMENT, made and entered into in the City of, State of Illinois, as of the date of the last signature of the parties hereto by and between THE BOARD OF TRUSTEES

More information

2. A Hygienist will be hired by the Housing Authority to perform monitoring of the work and to verify that the abatement is being done correctly.

2. A Hygienist will be hired by the Housing Authority to perform monitoring of the work and to verify that the abatement is being done correctly. HOUSING AUTHORITY OF THE COUNTY OF SAN BERNARDINO PROCUREMENT & CONTRACTS DEPARTMENT 715 E. BRIER DRIVE, SAN BERNARDINO, CA 92408-2841 (909) 890-0644 FAX (909) 890-2349 INVITATION FOR BIDS Project Number:

More information

AGENDA. MANDATORY PRE-BID/ SITE VISIT MEETING July 24, 2018 (10:00 AM)

AGENDA. MANDATORY PRE-BID/ SITE VISIT MEETING July 24, 2018 (10:00 AM) AGENDA MANDATORY PRE-BID/ SITE VISIT MEETING July 24, 2018 (10:00 AM) Project Number: 219003 Project Name: Miami FMS #1 Renovation Project Location: Miami, Florida 1. SIGN-IN OF ALL ATTENDEES: 2. INTRODUCTIONS:

More information

Circle B Farms Septic System and Driveway Bid Documents August 13, 2014 CONTENTS SECTION I INSTRUCTIONS TO BIDDERS

Circle B Farms Septic System and Driveway Bid Documents August 13, 2014 CONTENTS SECTION I INSTRUCTIONS TO BIDDERS SECTION 1 Instructions to Bidders SECTION 2 Bid Proposal Contract Agreement SECTION 3 General Conditions of the Contract SECTION 4 Construction Specifications SECTION 5 Construction Plans SECTION 6 Attached

More information

General Contract Conditions for Small Construction/Development Contracts

General Contract Conditions for Small Construction/Development Contracts General Contract Conditions for Small Construction/Development Contracts U.S. Department of Housing and Urban Development Office of Public and Indian Housing OMB Approval No. 2577-0157 (exp. 3/31/2020)

More information

DEPARTMENT OF HOUSING & ECONOMIC SUSTAINABILITY REQUIREMENTS FOR FEDERALLY FUNDED PROJECTS

DEPARTMENT OF HOUSING & ECONOMIC SUSTAINABILITY REQUIREMENTS FOR FEDERALLY FUNDED PROJECTS PALM BEACH COUNTY DEPARTMENT OF HOUSING & ECONOMIC SUSTAINABILITY REQUIREMENTS FOR FEDERALLY FUNDED PROJECTS PROJECT NAME: COX PARK/TANNER PARK RENOVATIONS This project is funded in part, or in whole,

More information

Merritt College Science Building Site Paving

Merritt College Science Building Site Paving PROJECT NO. 2353, BID NO. 14-15/20 Peralta Community College District 333 East 8th Street, Oakland, CA 94606 March 17, 2015 ADDENDUM No. 1 This addendum supersedes items of the original contract documents

More information

GENERAL SPECIFICIATIONS TABLE OF CONTENTS

GENERAL SPECIFICIATIONS TABLE OF CONTENTS GENERAL SPECIFICIATIONS TABLE OF CONTENTS GS.1 CONTROL OF WORK 2 GS.2 CONTRACT DRAWINGS AND SPECIFICATIONS 2 GS.3 BID SCHEDULE FORM 2 GS.4 AWARD OF CONTRACT 2 GS.5 PERMITS AND RIGHTS-OF-WAY 3 GS.6 PROSECUTION

More information

City of Detroit Detroit, Oregon

City of Detroit Detroit, Oregon City of Detroit Detroit, Oregon CONTRACT DOCUMENTS BID DOCUMENTS, FORMS, AND CONTRACT DOCUMENTS FOR THE CONSTRUCTION OF THE WATER SYSTEM IMPROVEMENTS PHASE 2A Work under this contract is funded by the

More information

PRICE PROPOSAL. DESIGN-BUILD PRICE PROPOSAL SUBMISSION to NEW JERSEY SCHOOLS DEVELOPMENT AUTHORITY

PRICE PROPOSAL. DESIGN-BUILD PRICE PROPOSAL SUBMISSION to NEW JERSEY SCHOOLS DEVELOPMENT AUTHORITY PRICE PROPOSAL DESIGN-BUILD PRICE PROPOSAL SUBMISSION to NEW JERSEY SCHOOLS DEVELOPMENT AUTHORITY For the following Package: Contract Number: ET-0061-B01 Contract Name/Description: New Joseph C. Caruso

More information

CONSTRUCTION CONTRACT RIDER

CONSTRUCTION CONTRACT RIDER CONSTRUCTION CONTRACT RIDER In connection with the work at, Massachusetts (the Development ) to be performed by (the Contractor ) pursuant to the Construction Contract dated, 20 between the Contractor

More information

Domestic Water Meter Installations at Campus Perimeter Washington State University Pullman, WA Project Manual

Domestic Water Meter Installations at Campus Perimeter Washington State University Pullman, WA Project Manual Domestic Water Meter Installations at Campus Perimeter Washington State University Pullman, WA Project Manual Project No. 9353-2017 Issued 7/21/18 Washington State University Facilies Services, Capital

More information

Facility Services Planning, Design and Construction Condensate Line Replacement Near Reilly Hall NAU PROJECT #

Facility Services Planning, Design and Construction Condensate Line Replacement Near Reilly Hall NAU PROJECT # Facility Services Planning, Design and Construction 928.523.4227 PO Box 5637 928.523.9441 fax Flagstaff, AZ 86011 www.nau.edu/fs Condensate Line Replacement Near Reilly Hall NAU PROJECT # 10.010.168 April

More information

ADDENDUM NO. 1. Date: March 7, Accessible Ramp at Saddleback College. Bid No South Orange County Community College District

ADDENDUM NO. 1. Date: March 7, Accessible Ramp at Saddleback College. Bid No South Orange County Community College District ADDENDUM NO. 1 Date: March 7, 2018 Accessible Ramp at Saddleback College Bid. 2071 South Orange County Community College District General-All project documents including contract documents, drawings, and

More information

ADVERTISEMENT FOR BIDS

ADVERTISEMENT FOR BIDS CITY OF NORTH KANSAS CITY, MO Department of Public Works 2010 Howell Street North Kansas City, Missouri 64116 Telephone: (816) 274-6004 ADVERTISEMENT FOR BIDS Sealed bids for: Construction of a New Parks

More information

Labor Compliance Certification Program Audit Process I Presented by Elvis Tran & Cynthia Hernandez

Labor Compliance Certification Program Audit Process I Presented by Elvis Tran & Cynthia Hernandez Labor Compliance Certification Program Audit Process I Presented by Elvis Tran & Cynthia Hernandez Follow Up of On-Site Visits Review forms and pictures for discrepancies Classification Check Apprentice

More information

SOLICITATION, OFFER AND AWARD (Construction, Alteration, or Repair)

SOLICITATION, OFFER AND AWARD (Construction, Alteration, or Repair) SOLICITATION, OFFER AND AWARD (Construction, Alteration, or Repair) 1. SOLICITATION NO. 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES SEALED BID (IFB) 01 of 089 VA-101-10-RP-0130 09/10/2010 X NEGOTIATED

More information

Document A101 TM. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

Document A101 TM. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum Document A101 TM 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the day of in the year (In words, indicate day, month and

More information

ADDENDUM No. 1. ITB No LED Video Wall. Due: May 25, 2017 at 10:00 A.M. (Local Time)

ADDENDUM No. 1. ITB No LED Video Wall. Due: May 25, 2017 at 10:00 A.M. (Local Time) ADDENDUM No. 1 ITB No. 4501 LED Video Wall Due: May 25, 2017 at 10:00 A.M. (Local Time) The following changes, additions, and/or deletions shall be made to the Invitation to Bid for LED Video Wall, ITB

More information

AGENDA. PRE-BID/ SITE VISIT MEETING Tuesday, June 26, 2017, 10:00 am. Project# UTES Life Cycle Maintenance Avon Park, FL

AGENDA. PRE-BID/ SITE VISIT MEETING Tuesday, June 26, 2017, 10:00 am. Project# UTES Life Cycle Maintenance Avon Park, FL AGENDA PRE-BID/ SITE VISIT MEETING Tuesday, June 26, 2017, 10:00 am Project# 214003 UTES Life Cycle Maintenance Avon Park, FL 1. SIGN-IN OF ALL ATTENDEES: 2. INTRODUCTIONS: 3. PROJECT DESCRIPTION/ SCOPE

More information

26 CFR : Reimbursements and other expense allowance arrangements. (Also Part I, 62.) Rev. Proc

26 CFR : Reimbursements and other expense allowance arrangements. (Also Part I, 62.) Rev. Proc 26 CFR 1.62 2: Reimbursements and other expense allowance arrangements. (Also Part I, 62.) Rev. Proc. 2002 41 The purpose of this revenue procedure is to provide an optional expense substantiation rule

More information

C 051 Engr s Letter to Owner Concerning Bonds and Insurance. Provisions added for the use of a Warranty Bond

C 051 Engr s Letter to Owner Concerning Bonds and Insurance. Provisions added for the use of a Warranty Bond The Engineers Joint Cintract Documents Committee (EJCDC ) has updated the EJCDC Construction Series Documents for 2018. Below is a summary of the revisions that were made to the 2018 edition of the EJCDC

More information

Mt. Diablo Unified School District Purchasing Department 2326 Bisso Lane Concord, CA (925) , ext (925) fax

Mt. Diablo Unified School District Purchasing Department 2326 Bisso Lane Concord, CA (925) , ext (925) fax Mt. Diablo Unified School District Purchasing Department 2326 Bisso Lane Concord, CA 94520 (925) 825-7440, ext. 3740 (925) 687-5044 fax ADDENDUM NO.: 1 DATE: March 19, 2019 PROJECT: Painting Summer 2019

More information

Standard Form of Agreement Between Design-Builder and Contractor. The Design-Builder has entered into a Design-Build Contract with the Owner dated:

Standard Form of Agreement Between Design-Builder and Contractor. The Design-Builder has entered into a Design-Build Contract with the Owner dated: Document A142 2014 Standard Form of Agreement Between Design-Builder and Contractor AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN the Design-Builder: (Name,

More information

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 5/16/2013 Project 130251 Addendum No. 5 PID No. 80695 LUC IR 475

More information

AIA Document A101 TM 2007

AIA Document A101 TM 2007 AIA Document A101 TM 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AS MODIFIED BY OWNER AGREEMENT made as of the day of in the year (In words,

More information

Fair Wage Policy for ICI Contracts

Fair Wage Policy for ICI Contracts Fair Wage Policy for ICI Contracts POLICY STATEMENT On all Industrial Commercial Institutional Construction Contracts with the Municipality, every Contractor and Sub-Contractor shall pay or provide wages,

More information