REGULATORY NEWS 2. MERC issues Suo-Moto order on RPO verification and compliance for Captive (CPP) and Open Access (OA) consumers

Size: px
Start display at page:

Download "REGULATORY NEWS 2. MERC issues Suo-Moto order on RPO verification and compliance for Captive (CPP) and Open Access (OA) consumers"

Transcription

1 AUGUST 2013, ISSUE 67 Bulletin News and Information In this Issue REGULATORY NEWS 2 CSERC issues tariff order for CSPGCL, CSPTCL & CSPDCL for FY DERC issues tariff order for BRPL, BYPL, TPDDL, NDMC and DTL CERC issues second amendment to the REC regulations HERC issues draft amendment to the Open Access regulations MERC issues Suo-Moto order on RPO verification and compliance for Captive (CPP) and Open Access (OA) consumers APERC issues draft proposal for determining the methodology of cross subsidy APERC lifts R & C measure w.e.f 1 st August, 2013 INDUSTRY NEWS 5 Power Market Update July 13 49% FDI approved in power exchanges through automatic route FOCUS OF THE MONTH 7 Deviation Settlement Mechanism RENEWABLE NEWS 8 REC Market Update July 13 Wind Power generators files petition in Delhi high court against CERC order on RRF mechanism INTERNATIONAL NEWS 8 FTR Auctions market commences in New Zealand IEX TRADE INFO JULY 13 9

2 REGULATORY NEWS CSERC issues tariff order for CSPGCL, CSPTCL & CSPDCL for FY On 12 th July, 2013, CSERC issued joint tariff orders for CSPGCL, CSPTCL & CSPDCL for FY The key highlights of the order are as follows: HT Industrial Tariff: No change in the tariff structure from the previous orders. The tariff for HT consumer category is as below: HT Consumer category HT 1.1 & 3.1 Steel Industries and other industries at 33 KV HV-1.2 & 3.2 Steel Industries and other industries at 11 KV HV-2.1: Mines and Cement Industries at 33 KV HV-2.2: Mines and Cement Industries at 11 KV Demand Charge (`/kva/month) Demand Charge (`/kwh) Short-Term Open Access Charges (Transmission): ` per kwh Energy losses for transmission: 4.40% Source: CSERC Website DERC issues tariff order for BRPL, BYPL, TPDDL, NDMC and DTL On 31 st July, 2013, DERC issued a tariff order for FY for Discoms in its area. The key highlights of the order are as below: HT Tariff: Tariff increased by 5% for all DISCOM consumers Tariff Non-Domestic High Tension (NDHT)* For supply at 11 kv and above (for load greater than 108 kva) Fixed Charges (`/kva/ month) Energy Charges (Paisa/ kvah) Large Industrial Power (LIP) (Supply at 11 kv and above) Fixed Charges (`/kva/ month) Energy Charges (Paisa/ kvah) BRPL BYPL TPDDL NDMC Losses and Charges DTL - intra-state transmission losses : 1.21% Wheeling Losses and Charges -- Above 66kV: Zero for all except TPDDL i.e. ` 0.67/kWh -- At 33kV/66kV: Wheeling charge Ranges from ` 0.61/unit to ` 0.68/unit Wheeling loss Ranges from 0.90% % -- At 11kV: Wheeling charge Ranges from ` 0.63/ unit to ` 0.71/unit Wheeling loss Ranges from 2.00% % Power Purchase through Short Term: The Commission has directed BRPL, BYPL and TPDDL to restrict the cost of power procured through short term contracts at ` 5 per kwh The Commission has also directed BRPL and BYPL to become a Trading Member of IEX and purchases on exchange shall not be made through any related party / trader 2

3 Approved power purchase for RPO: Non-Solar Power (MU) Non- Solar RECs (MU) Solar Power (MU) Solar RECs (MU) Time Period Time period for issuances of certificate is increased to 6 months from the date of generation Validity period for certificates issued is seven hundred and thirty days from the date of issuance BRPL BYPL TPDDL NDMC Source: DERC Website The word preferential tariff is removed from the regulations and hence procurement through competitive bidding is also recognized Source: CERC Website CERC issues second amendment to the REC regulations On 10 th July, 2013, CERC notified the 2 nd amendment to the CERC (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, Some of the key amendments are summarized below: Eligibility: Selling of electricity component by Renewable Energy (RE) Generator to discom should be at the pooled cost of power purchase instead of price not exceeding pooled cost of power purchase Electricity Duty (ED) has been withdrawn as a promotional benefit in the provision A CGP (Captive Generating Plant) will become eligible for participation in the REC scheme after 3 years of forgoing the benefits of concessional transmission and wheeling charges/ or banking facility RE generator is eligible for REC if it does not sell electricity generated from the plant, either directly or through trader, to an obligated entity for compliance of the RPO by such entity Self Consumption/Retention of RECs RE generator including CGP is now permitted to retain the certificates for offsetting its own RPO as a consumer, subject to certification and verification by the concerned State Agency but this exemption does not exist for its group companies HERC issues draft amendment to Open Access regulations HERC has proposed draft amendments to its Terms and Conditions for grant of connectivity and open access for intra-state transmission and distribution system Regulations, The key highlights of the proposed amendment are as follows: Eligibility to avail Open Access (OA): Power availed through OA shall not be less than 20% of the contract demand of the consumer or 500 kw whichever is higher Conditions for Day-Ahead Transactions by Embedded consumer through Exchange: Consumer to submit schedule of power through OA to Discom for all slots at 10:00 AM of D-1 (Delivery-1) The submitted schedule will be considered as a confirmed schedule for working out the slot-wise admissible drawl of the consumer from the licensee with reference to his sanctioned contract demand (Contract demand Schedule through O.A = Admissible drawl from Discom) Deviation Settlement Over drawl: if recorded drawl > 5% of admissible drawl, pay 25% of the consumption charges for the total energy drawl during the month including the energy drawl through open access Under Injection by Generator: UI charges or highest tariff including FSA and PLEC, whichever is higher 3

4 Under drawl by Consumer / Over Injection by Generator: -- Charge paid to consumer only in case of nonavailability of network or unscheduled load shedding -- No charges paid to generator beyond 10% of scheduled injection in a time-slot or beyond 3% of scheduled injection on aggregate basis for all the 96 time - slots in a day -- OA consumer / Generator paid by Discom, whichever is the lowest out of the three: UI charges; lowest tariff for the relevant FY for any consumer category (excluding agriculture power supply); or power purchase/sale price contracted by the consumer/generator Source: HERC Website MERC issues Suo-Moto order on RPO verification and compliance for Captive (CPP) and Open Access (OA) consumers On 22 nd July, 2013, MERC issued suo-moto order suggesting good practices on RPO Monitoring, Reporting and Verification (MRV) to be followed in Maharashtra for tracking RPO Compliance by CPP and OA Consumers in the State. As per the order, MERC has directed: Constitution of a Working Committee to formulate the mechanism for monitoring, verification and compliance of RPO for OA & CPP and MEDA to report its formation and further developments thereon before 30 th September, 2013 In view of the difficulties faced owing to lack of appropriate mechanism, no regulatory charges shall be applicable on CPP and OA Consumers for nonfulfillment of RPO targets during FY 11, FY 12 and FY 13, provided that the same shall be fulfilled on a cumulative basis before 31 st March, 2014 MEDA to submit quarterly status to the Commission in respect of compliance monitoring of RPO by the Obligated Entities Source: MERC Website APERC issues draft proposal for determining the methodology of cross subsidy APERC proposed draft methodology of Cross Subsidy and levy of cross subsidy surcharge for the year vide its public notice dated Due to concerns expressed by various stakeholders against the embedded cost methodology adopted for determination of cross-subsidy, the Commission considered that there is a need for extensive public process of hearing on two available methodologies (a) National Tariff Policy and (b) Embedded Cost Method. However DISCOMs in their ARRs, have requested for determination of cross-subsidy surcharge based on the National Tariff Policy guidelines. The proposal provisionally determines CSS on both methodologies and seeks comments from stakeholders. Source: APERC Website APERC lifts R & C measure w.e.f 1 st August, 2013 In its order dated 31 st July, 2013, APERC removed the existing order on Restriction and Control measures with effect from , considering representation of APPCC that an additional power of 1100 MW from hydel station is available from 31 st July, Source: APERC Website 4

5 INDUSTRY NEWS Power Market Update July 13 With the advancement of monsoons, the overall power supply and demand condition eased in the country. However, the exchange experienced increased demand vis-à-vis last month in terms of purchase bids received in the Day-Ahead Market. The prices on the other hand remained attractive owing to the excessive supply at the exchange. Notably, the price for power on a few occasions even dropped to as low as ` 0.99 per unit with an exception of the Southern region and the State of Punjab. On an average, the prices in the Southern Region remained below ` 5.00/unit and below ` 2.00/unit for rest of India except Punjab where the average price hovered around ` 7.54/unit. The total cleared volume for the month of July was 2264 MUs, higher than last month when around 2114 MUs were cleared. Around 500 MUs were lost due to congestion in the transmission network which restricts the flow of electricity from one region to another. The average participation at the exchange for the month of July was 1306 participants. VOLUMES: Total purchase bids received in the DAM for the month of July 13 was at 2925 MUs, whereas the sell bids were at 4771 MUs indicating 63% more supply at the exchange. The average daily cleared volume was 73 MUs, higher than 70 MUs in the month of June 13. Area wise total cleared sell and buy volume in the DAM is represented in the table below: Evidently, for the month of July, the regions of North-East, East and North were the net sellers of electricity whereas Western and Southern region were the net buyers. This trend has reversed for the regions of North and West as compared to last month where Northern region was the net buyer and west was the net seller of power. The volumes traded through Punjab have declined greatly owing to the absence of corridor available for short term transaction via the exchanges as the state has tied its short term capacity in bilateral agreements leaving limited network for transactions through the exchange. PRICES: The prices at the exchange continued to remain low as a result of excessive supply. However, as compared to last month the average prices have risen slightly with the average unconstrained market clearing price for July 13 Average Prices (`/kwh) Bid Area Change July'13 June'13 (%) North-East (A1,A2) % East (E1,E2) % North (N1,N2) % Punjab (N3) % South (S1) % South (S2) % West (W1,W2,W3) % MCP* % * MCP: Market clearing price refers to the price discovered before accounting for any congestion in the transmission corridor Area wise total cleared sell and buy volume in the DAM REGION BUY (MU) SELL (MU) July '13 June '13 Change (%) July '13 June '13 Change (%) NET North East % % SELL East % % SELL North % % SELL Punjab % % BUY West % % BUY South % % BUY 5

6 at ` 2.28/unit, 2.4% higher than last month. There was no change in the average prices for North-East from last month although the prices in South (S2) showed an increase of 17% with average price touching ` 5.19/unit. The prices in Punjab showed steep rise as a result of unavailability of transmission network required to facilitate inter-state trade. Therefore, the trade during the month was majorly intra-state in nature i.e. within Punjab. 49% FDI approved in power exchange through automatic route On 16 th July, 2013, in a high-level meeting, chaired by the Prime Minister, FDI limit in Power Exchanges has been raised to 49% and with approvals through Automatic route, which was earlier to be approved by the Foreign Investment Promotion Board (FIPB). Automatic approval is available through Reserve Bank of India, a company is only required to report to RBI within 30 days of receipt of foreign equity or allotment of shares. For more details: EVENTS Confederation of Indian Industry National Committee on Power 25 th June, New Delhi Mr. Rajesh K. Mediratta, Director (BD) attended the conference Confederation of Indian Industry 12 th Green Power, th -28 th June, Hyderabad Ms. Shruti Bhatia, Vice President (Policy and Communications) delivered a presentation on Renewable Energy Certificate Market Evolving Thought Leadership On Green CSR Interventions 9 th July, New Delhi Mr. Rajesh K. Mediratta, Director (BD) attended the conference and delivered a presentation on CSR through Voluntary REC Market Managing Cost of Energy 25 th July, New Delhi Mr. Rajesh K. Mediratta, Director (BD) attended the conference and delivered a presentation on Options in the Energy Trading Market Round Table on Power 26 th July, Baroda Mr. Rajesh K Mediratta attended the conference as a panelist on Accessing cheaper power through open access 6

7 FOCUS OF THE MONTH Deviation Settlement Mechanism Deviations from the scheduled generation and drawl of electricity lead to large fluctuations in frequency and thereby impact the whole grid. In India, before the introduction of Availability Based Tariff regime (ABT), these fluctuations in the frequency and voltage were common due to absence of checks on the generators who pumped in electricity in the grid irrespective of the grid frequency which resulted in frequent grid disturbances. With the introduction of ABT mechanism, a three part tariff structure was introduced wherein apart from fixed and energy charges, charges for deviations from the commitment (schedule) was included in the form of an Unscheduled Interchange (UI) Mechanism. The IEGC regulations specifies the operating band of grid frequency and CERC in the past has narrowed down this permissible frequency range from time to time to further improve grid stability and strengthen the security. Different UI charges are applicable on deviations from the schedule based on the prevailing system frequency within and beyond the specified frequency range. These rates are higher when the frequency is lower and low when the frequency is high. The rationale is to reward or penalize the grid connected entities in case of deviations from schedule based on the frequency of the grid. This mechanism was conceived as a real-time balancing mechanism to improve grid discipline and introduce accountability on various grid connected participants. The two major grid disturbances on 30 th and 31 st July, 2012 forced the Central Commission to take steps to further improve the grid security. As a result, on 20 th June, 2013, CERC issued notification on draft CERC (Deviation settlement mechanism and related matters) regulations, In the proposed regulations, CERC has plans to further narrow down the frequency band to Hz Hz so that the system operates close to 50 Hz. The key features of the draft are highlighted below: The draft regulation proposes to adopt this new regulation and repeal CERC (Unscheduled Interchange charges and related matters) Regulation, 2009 DEVIATION CHARGES: Charges for deviation shall be worked out on the average frequency of a timeblock at the rates specified below: Average Frequency of the time block(hz) Charges for Deviation Below Not Below Paise/kWh DEVIATION CAP RATES: The draft proposes cap rate on charges for deviation which should not exceed Paise/kWh for all generating stations using coal/lignite/gas supplied under APM as fuel and unscheduled interchange for under-drawl and overinjection. VOLUME DEVIATIONS: The draft also proposes to put strict volume limits on over/under drawl and over/ under injection irrespective of the grid frequency as per the following: Additional Charges for Frequency Deviation at Hz and above Additional charge will be the specified percentage of deviation charge corresponding to frequency below Hz on crossing the volume limit as specified below Deviation Volume In a time block Additional Deviation Charge 20% 40% 100% > 12% - > 15 % - > 20 % or 15% or 20% or >150 MW MW > 200 MW MW > 250 MW Over the day > 3% - 4% > 4% - 5% > 5% Additional charges for Frequency deviation below Hz Additional charge equivalent to 100% of the charge for deviation of Paise /kwh corresponding to the grid frequency of below Hz will be applicable. 7

8 RENEWABLE NEWS REC Market Update: July 13 The fourth Renewable Energy Certificate (REC) trading session of FY 14 held on 31 st July, 2013, at IEX featured trade of 72,321 N-Solar and 1,983 Solar RECs. This trading session witnessed increased volumes of traded RECs over the previous months, however the demandsupply imbalance still remains with supply far exceeding demand. For non-solar RECs, buy bids of 72,321 RECs and sell bids of 16, 76,875 RECs were received against which 72,321 were cleared at ` 1,500 per REC. For solar RECs, buy bids of 1,983 RECs and sell bids of 12,486 RECs were received against which 1,983 RECs were cleared at ` 9,300 per REC. This trading session featured 770 market participants of which 610 participated in non-solar segment while 160 participated in the solar segment. On an overall basis, a total of 1877 participants are registered in REC segment at IEX. Of this, 467 are eligible entities (RE generators) 1397 are obligated entities (Discoms, Open access consumers & Captive generators) and 13 are registered as voluntary entities. Non-solar REC Solar REC Trade Volume (REC) 72,321 1,983 Sale bid (REC) 16,76,875 12,486 Purchase Bid (REC) 72,321 1,983 Price discovered (Rs/REC) 1,500 9,300 No. of participants An overview of participation in the REC Market at IEX as on 31 st July 13: Total number of registered participants 1,880 Obligated Entity 1,397 DISCOMs 26 Open Access consumers 1301 Captive Consumer 70 Voluntary 13 Eligible Entity (Private Generators) 467 Highest participation in a session (March 13) 1,135 Wind Power generators files petition in Delhi High Court against CERC order on RRF mechanism The Wind Independent Power Producers Association has filed a petition with the Delhi High Court against the CERC, over the Commission s recent scheduling and forecasting order. The order asks wind power generators to forecast their generation for the next day, for every 15 minute interval and face penalty if the actual generation is 30 percent more or less than the submitted forecast. Some wind generators fear that the penalties beyond +/- 30% would eat away 12-15% of the companies profits, while some other in the industry feel that the impact will not be that severe, as the mechanism allows power producers to change their schedule as many as eight times during the day. international NEWS FTR Auctions market commences in New Zealand The Electricity Authority of New Zealand has finally given a go ahead to introduce FTR (Financial Transmission Rights) in New Zealand. The Authority s objective in introducing a market in FTRs is to promote competition in the electricity industry for the long term benefit of consumers. FTRs are believed to provide all participants in the energy market, a tool for managing exposure to the price impact of transmission constraints. The Energy Market Services (EMS) has been appointed by the Electricity Authority as the FTR Manager Service Provider with the NZX acting as the clearing agent. The initial project involved implementing a system to auction Financial Transmission Rights for the electricity market. The market system went live on 23 rd May, 2013, with the first FTR auction on 12 th June, 2013 with eight companies bidding for cover over the price difference between Otahuhu in Auckland and Benmore in the South Island over one calendar month. For more details: 8

9 IEX TRADE INFO - JULY 2013 DAY-AHEAD MARKET MONTHLY PRICE SNAPSHOT MAXIMUM MCP ` 2.97/kWh MINIMUM MCP ` 1.7/kWh AVERAGE MCP ` 2.28/kWh Prices (`/kwh) Area Min Max RTC* (0-24 hr) Peak* (18-23 hr) Non Peak* (1-17 & 24 hr) Night* (1-6 & 24 hr) East North East North(N1/N2) North(N3) West South(S1) South(S2) * Simple Average of Area Clearing Prices for specified duration of time MONTHLY VOLUME SNAPSHOT VOLUMES Unconstrained Volume Cleared Volume Purchase Bids Sell Bids Average Daily Volume Cumulative Cleared Volume (MU) Total Volume (MUs) Average Daily (MW) 2,720 3,656 2,264 2,925 4,771 3,043 3,932 6, MUs 9,393 For the FY 14 PARTICIPATION SNAPSHOT (as on 31 st July 13) TOTAL REGISTERED PARTICIPANTS OPEN ACCESS CONSUMERS PRIVATE GENERATORS HIGHEST PARTICIPATION 2,258 2, , nd June,'13 9

10 Daily Price & Volume Trend Average Hourly Market Clearing Volume and Price for the month CONGESTION PROFILE - JULY 2013 Price Difference (` /kwh) Corridor revised due to shutdown of Balipara-Bongaigaon I 01/07/13 02/07/13 03/07/13 04/07/13 05/07/13 06/07/13 07/07/13 08/07/13 09/07/13 10/07/13 11/07/13 12/07/13 13/07/13 14/07/13 15/07/13 16/07/13 17/07/13 18/07/13 19/07/13 20/07/13 21/07/13 22/07/13 23/07/13 24/07/13 25/07/13 E NE 26/07/13 27/07/13 28/07/13 29/07/13 30/07/13 31/07/13 Price Difference (` /kwh) 0.25 E N /07/13 02/07/13 03/07/13 04/07/13 05/07/13 06/07/13 07/07/13 08/07/13 09/07/13 10/07/13 11/07/13 12/07/13 13/07/13 14/07/13 15/07/13 16/07/13 17/07/13 18/07/13 19/07/13 20/07/13 21/07/13 22/07/13 23/07/13 24/07/13 25/07/13 26/07/13 27/07/13 28/07/13 29/07/13 30/07/13 31/07/13 Price Difference (`/kwh) 0.45 South Import /07/13 02/07/13 03/07/13 04/07/13 05/07/13 06/07/13 07/07/13 08/07/13 09/07/13 10/07/13 11/07/13 12/07/13 13/07/13 14/07/13 15/07/13 16/07/13 17/07/13 18/07/13 19/07/13 20/07/13 21/07/13 22/07/13 23/07/13 24/07/13 25/07/13 26/07/13 27/07/13 28/07/13 29/07/13 30/07/13 31/07/13 Price Difference (`/kwh) 7 S1 S /07/13 02/07/13 03/07/13 04/07/13 05/07/13 06/07/13 07/07/13 08/07/13 09/07/13 10/07/13 11/07/13 12/07/13 13/07/13 14/07/13 15/07/13 16/07/13 17/07/13 18/07/13 19/07/13 20/07/13 21/07/13 22/07/13 23/07/13 24/07/13 25/07/13 26/07/13 27/07/13 28/07/13 29/07/13 30/07/13 31/07/

11 TERM AHEAD MARKET SNAPSHOT CONTRACTS TOTAL VOLUME (MWh) MAX PRICE (`/kwh) MIN PRICE (`/kwh) Weekly Intraday 15, Day-Ahead Contingency 2, Daily REC MARKET SNAPSHOT Trade Session on 31 st July, 2013 REC PURCHASE BIDS SELL BIDS CLEARED (REC) PRICE (`/REC) Non Solar 72,321 16,76,875 72,321 1,500 Solar 1,983 12,486 1,983 9,300 Source wise RE capacity (MW) State wise RE capacity (MW) Wind Biomass Solar PV Bio-fuel cogeneration Small Hydro Others Tamil Nadu Uttar Pradesh Karnataka Andhra Pradesh Maharashtra Gujarat Rajasthan Madhya Pradesh Chhattisgarh Punjab Others 11

12 FEEDBACK FOR THE MONTH IEX team is doing a commendable job.your bulletin keeps me updated. My all good wishes! S M Sahay Former Chairman & Member, BERC Dear IEX Team, Thanks for providing the updates of power sector on regular basis, it always proves to be very useful. Regards, Amit Joshi Asst. Manager Commercial Department, Greenko Group Dear Readers, We thank you for your encouraging response and support towards the IEX bulletin. In our effort to make this bulletin even more informative, we request you to kindly mail us your suggestions and valuable feedback on: shilpy.dewan@iexindia.com or alternately you could also write in to us at our corporate address given below. Warm regards, Team IEX RENEWABLE ENERGY CERTIFICATES For details iex-bd@iexindia.com Free registration for voluntary buyers Buy RECs - Be Green 12 in this bulletin. Indian Energy Exchange Ltd. Corporate Office: 100A/1 Ground Floor, Capital Court, Olof Palme Marg, Munirka, New Delhi , India. Tel No.: Fax No.: Registered Office: 1st Floor, Malkani Chamber, Off Nehru Road, Vile Parle (E), Mumbai Disclaimer The information featured in this bulletin has been compiled from sources deemed reliable and to the best of our knowledge. Whilst every effort has been made to ensure the accuracy of the information, IEX will not be held responsible for any errors or omissions neither will it be liable for damages nor losses suffered, personal or otherwise, due to the information contained

Case No. 85 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd.

Case No. 85 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd. Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

Draft MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

Draft MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION Draft MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION No. / /2017/MPERC.- In exercise of the powers conferred under Section 181of the Electricity Act, 2003 (36 of 2003), and all other powers enabling

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION (CERC) 3rd & 4th Floor, Chandralok Building, 36, Janpath, New Delhi : /

CENTRAL ELECTRICITY REGULATORY COMMISSION (CERC) 3rd & 4th Floor, Chandralok Building, 36, Janpath, New Delhi : / CENTRAL ELECTRICITY REGULATORY COMMISSION (CERC) 3rd & 4th Floor, Chandralok Building, 36, Janpath, New Delhi 110 001 : 011-23353503/23752958 Public Notice No. : L-1/94/CERC/2011 Dated: 26 th June, 2015

More information

REC Market. Business Development March 14

REC Market. Business Development   March 14 REC Market Business Development Email: info@iexindia.com March 14 In this presentation Renewable Energy in India Introduction to REC Mechanism Market snapshot Voluntary REC Market Trading @ IEX Installed

More information

PORTFOLIO OPTIMIZATION FOR OPEN ACCESS CONSUMERS/DISCOMS

PORTFOLIO OPTIMIZATION FOR OPEN ACCESS CONSUMERS/DISCOMS PORTFOLIO OPTIMIZATION FOR OPEN ACCESS CONSUMERS/DISCOMS By Dr. PARUL MATHURIA POST DOCTORAL FELLOW DEPARTMENT OF INDUSTRIAL AND MANAGEMENT ENGINEERING INDIAN INSTITUTE OF TECHNOLOGY KANPUR 2017 15-05-2017

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION (DRAFT)

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION (DRAFT) CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI New Delhi, the 20 th of June 2013 NOTIFICATION (DRAFT) No.L-1/132/2013/CERC.- In exercise of the powers conferred under Section 178 of the Electricity

More information

Rajasthan Electricity Regulatory Commission

Rajasthan Electricity Regulatory Commission Rajasthan Electricity Regulatory Commission Vidyut Viniyamak Bhawan, Near State Motor Garage, Sahkar Marg, JAIPUR -302001 Phone: EPBX 0141-2741299, Fax: 0141-2741018 Website: www.rerc.rajasthan.gov.in

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MUMBAI

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MUMBAI MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MUMBAI MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (RENEWABLE PURCHASE OBLIGATION, ITS COMPLIANCE AND IMPLEMENTATION OF RENEWABLE ENERGY CERTIFICATE FRAMEWORK)

More information

BRIEF ANALYSIS ON NEW OPEN ACCESS REGULATIONS IN THE STATE OF MAHARASHTRA

BRIEF ANALYSIS ON NEW OPEN ACCESS REGULATIONS IN THE STATE OF MAHARASHTRA BRIEF ANALYSIS ON NEW OPEN ACCESS REGULATIONS IN THE STATE OF MAHARASHTRA ETERNITY LEGAL 1207, Dalamal Tower, Free Press Journal Road, Nariman Point, Mumbai 400021 Tel: +91 22 6747 9001 Email: legalupdates@eternitylegal.com

More information

Power Procurement Strategy

Power Procurement Strategy Power Procurement Strategy 01.03.16 IIT-Kanpur For Public Use POWER SECTOR OVERVIEW Source: Executive Summary of October 2015, CEA *including renewable generation Installed Capacity (All) Category Installed

More information

REC Genesis: Separating green attribute from electricity

REC Genesis: Separating green attribute from electricity Renewable Power Purchase Obligation and REC Trading in India Devesh Singh Regional Head (SR) Email: devesh.singh@iexindia.com Oct 14 Schemes to promote RE in the country Mid 1990s Focused on capacity addition

More information

Electricity Market. July 15.

Electricity Market.   July 15. Electricity Market Email: info@iexindia.com July 15 www.iexindia.com In this presentation Introduction to Indian Power Market Product Portfolio Trading Mechanism Market Snapshot Participation Volume Price

More information

Indian Power Market: An Overview JULY 2018

Indian Power Market: An Overview JULY 2018 Indian Power Market: An Overview JULY 2018 For Public Use 1 In this presentation Introduction to Indian Power Market Product Portfolio Trading Mechanism Market snapshot Participation Volume Price Trade

More information

Trading at Power Exchange - IEX

Trading at Power Exchange - IEX Trading at Power Exchange - IEX February 2016 Prasanna Rao Market Operations In this presentation Product Portfolio Trading Mechanism & Process Flow- Day-Ahead Market Trading Mechanism-Term-Ahead Market

More information

Scanned by CamScanner

Scanned by CamScanner Scanned by CamScanner Maharashtra Electricity Regulatory Commission intends to enact MERC (Forecasting, Scheduling and Deviation. Accordingly, the Hon ble Commission has circulated the draft of the proposedmerc

More information

1.1 These regulations shall extend to whole of the State of Punjab.

1.1 These regulations shall extend to whole of the State of Punjab. THE PUNJAB STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION The, 2018 No.PSERC/Secy/Regu. - In exercise of the powers conferred under Section 181of the Electricity Act, 2003 (36 of 2003), and all other

More information

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION. No. UPERC/Secy/Regulation/ Lucknow : Dated, 17 th August, 2010

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION. No. UPERC/Secy/Regulation/ Lucknow : Dated, 17 th August, 2010 UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION No. UPERC/Secy/Regulation/10-787 Lucknow : Dated, 17 th August, 2010 In exercise of powers conferred under sections 61, 66, 86(1)(e) and 181 of the Electricity

More information

Electricity Market. August 18

Electricity Market. August 18 Electricity Market August 18 In this presentation Introduction to Indian Power Market Product Portfolio Trading Mechanism Market snapshot Participation Volume Price Trade @ IEX Capacity (GW) Installed

More information

Power Purchase Obligation (Compliance by purchase of Renewable Energy/Renewable Energy Certificates) Regulations, 2012 (Regulation No. 1 of 2012).

Power Purchase Obligation (Compliance by purchase of Renewable Energy/Renewable Energy Certificates) Regulations, 2012 (Regulation No. 1 of 2012). ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION RENEWABLE POWER PURCHASE OBLIGATION (COMPLIANCE BY PURCHASE OF RENEWABLE ENERGY/RENEWABLE ENERGY CERTIFICATES) REGULATIONS, 2012 Regulation No. 1 of 2012

More information

Green Day Ahead Market (Petition no. 187/MP/2016) CERC Hearing I December 1, 2016

Green Day Ahead Market (Petition no. 187/MP/2016) CERC Hearing I December 1, 2016 Green Day Ahead Market (Petition no. 187/MP/2016) CERC Hearing I December 1, 2016 Brief Introduction IEX since last 8 years has been successfully operating markets in: Day Ahead Market (DAM) [based on

More information

Meghalaya State Electricity Regulatory Commission

Meghalaya State Electricity Regulatory Commission Meghalaya State Electricity Regulatory Commission SHILLONG Notification Dated: 12 th March, 2015 No.MSERC/RPO/2015/02: In exercise of power conferred under section 61, 66, 86(1)(e) and 181 of the Electricity

More information

Chhattisgarh State Electricity Regulatory Commission

Chhattisgarh State Electricity Regulatory Commission Øekad 62] jk;iqj]] 'kqøokj] fnukad 4 ekpz 2011 & QkYxqu 13] 'kd 1932 Chhattisgarh State Electricity Regulatory Commission Irrigation Colony, Shanti Nagar, Raipur Raipur, Dated March 04, 2011 No. 36/CSERC/2011

More information

Maharashtra Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018

Maharashtra Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018 MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website: www.mercindia.org.in;

More information

GUJARAT ELECTRICITY REGULATORY COMMISSION. Notification No. 13 of 2005

GUJARAT ELECTRICITY REGULATORY COMMISSION. Notification No. 13 of 2005 GUJARAT ELECTRICITY REGULATORY COMMISSION OPEN ACCESS REGULATION Notification No. 13 of 2005 In exercise of the powers conferred on it by Section 181 read with Sections 39(2)(d), 40(c), 42 (2)(3)(4), 86(1)(c)

More information

Uttar Pradesh Electricity Regulatory Commission

Uttar Pradesh Electricity Regulatory Commission Uttar Pradesh Electricity Regulatory Commission Notification no. UPERC / Secy / CNCE Regulation, 2009/ 696 Dated: 22.3.2010 In exercise of powers conferred under section 181 read with section 9, 61, 86

More information

March 8, Power Exchange India Limited

March 8, Power Exchange India Limited INTEGRATION OF GREEN ENERGY Role of Power Markets in Developing Green Energy in India March 8, 2011 Power Exchange India Limited Agenda Renewable Energy Certificate An Introduction Regulatory Aspect of

More information

Renewable Energy Certificates: Inches Away From Implementation

Renewable Energy Certificates: Inches Away From Implementation Renewable Energy Certificates: Inches Away From Implementation September saw a flurry of legislative activity, including the First Amendment of the Terms & Conditions for REC Recognition and Issuance by

More information

KErala StatE ElECtriCity regulatory CommiSSion (Renewable Energy) Regulations, 2015.

KErala StatE ElECtriCity regulatory CommiSSion (Renewable Energy) Regulations, 2015. Compendium of Regulations & Orders Issued by Regulatory Commissions for Sources in India 279 KErala StatE ElECtriCity regulatory CommiSSion () Regulations, 2015. Sl. Description No. 1. Title, Extent and

More information

THE JHARKHAND GAZETTE EXTRAORDINARY PUBLISHED BY AUTHORITY

THE JHARKHAND GAZETTE EXTRAORDINARY PUBLISHED BY AUTHORITY THE JHARKHAND GAZETTE EXTRAORDINARY PUBLISHED BY AUTHORITY No. 419 9 Shrawan, 1932(s) Ranchi, Saturday 31th July, 2010 JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION, RANCHI (RENEWABLE PURCHASE OBLIGATION

More information

M.P. Electricity Regulatory Commission Bhopal

M.P. Electricity Regulatory Commission Bhopal SMP-20/2010 M.P. Electricity Regulatory Commission Bhopal Tariff Order for procurement of power from Wind Electric Generators 1. LEGISLATIVE PROVISIONS 1.1 Section 86(1) (e) of the Electricity Act 2003

More information

Key Processes in Power Exchange Presented By: Prasanna Rao Shalabh Shrivastava

Key Processes in Power Exchange Presented By: Prasanna Rao Shalabh Shrivastava Key Processes in Power Exchange Presented By: Prasanna Rao Shalabh Shrivastava www.iexindia.com Day Ahead Market-Collective Transaction Features A closed double-sided anonymous auction for each 15-min

More information

Uttar Pradesh Electricity Regulatory Commission

Uttar Pradesh Electricity Regulatory Commission Uttar Pradesh Electricity Regulatory Commission In exercise of the powers conferred under Section 181 of the Electricity Act, 2003 and all powers enabling it in this behalf, the Uttar Pradesh Electricity

More information

Case No. 56 of In the matter of

Case No. 56 of In the matter of Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 22163964/ 65/ 69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI Maharashtra Electricity Regulatory Commission (Fees and Charges) Regulations, 2017

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI Maharashtra Electricity Regulatory Commission (Fees and Charges) Regulations, 2017 MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI Maharashtra Electricity Regulatory Commission (Fees and Charges) Regulations, 2017 ELECTRICITY ACT, 2003 No. MERC/Legal/2017/1771 - In exercise of

More information

GUJARAT ELECTRICITY REGULATORY COMMISSION No. ---/---/---/GERC Dated: 13/01/2017. NOTIFICATION No. of 2017

GUJARAT ELECTRICITY REGULATORY COMMISSION No. ---/---/---/GERC Dated: 13/01/2017. NOTIFICATION No. of 2017 GUJARAT ELECTRICITY REGULATORY COMMISSION -------- No. ---/---/---/GERC Dated: 13/01/2017 NOTIFICATION No. of 2017 In exercise of the powers conferred under Section 181 of the Electricity Act, 2003 (36

More information

Draft Consultative Paper on. Captive Generating Plants

Draft Consultative Paper on. Captive Generating Plants Draft Consultative Paper on Captive Generating Plants 1.0 Preamble Tamil Nadu Electricity Regulatory Commission Consultative Paper on Captive Generating Plants 1.1 Generating Capacity in Tamil Nadu The

More information

Power Market, Power Trading and Power Exchange

Power Market, Power Trading and Power Exchange Power Market, Power Trading and Power Exchange National Seminar Challenges & Opportunities in Power Generation, Transmission & Distribution 23-03-12 Power System Operation Corporation Ltd. Eastern Regional

More information

Leading Renewable Energy Generation Company

Leading Renewable Energy Generation Company Leading Renewable Energy Generation Company Disclaimer Certain statements in this presentation concerning our future growth prospects are forward looking statements, which involve a number of risks and

More information

OPEN ACCESS. Wind Facilitator of the Year & REC Facilitator of the Year March 2016 Volume - 60

OPEN ACCESS. Wind Facilitator of the Year & REC Facilitator of the Year March 2016 Volume - 60 OPEN ACCESS Wind Facilitator of the Year & REC Facilitator of March 20 Volume - 60 CONTENT From Management s Desk FY 2015- was a very important one for the REC markets the Supreme Court gave its decision

More information

SOLAR ENERGY CORPORATION OF INDIA LIMITED DRAFT 1000 MW GRID CONNECTED ROOF TOP SOLAR PV SCHEME FOR GOVERNMENT BUILDINGS UNDER CAPEX AND RESCO MODELS

SOLAR ENERGY CORPORATION OF INDIA LIMITED DRAFT 1000 MW GRID CONNECTED ROOF TOP SOLAR PV SCHEME FOR GOVERNMENT BUILDINGS UNDER CAPEX AND RESCO MODELS SOLAR ENERGY CORPORATION OF INDIA LIMITED DRAFT 1000 MW GRID CONNECTED ROOF TOP SOLAR PV SCHEME FOR GOVERNMENT BUILDINGS UNDER CAPEX AND RESCO MODELS 1000 MW GRID CONNECTED ROOF TOP SOLAR PV SYSTEM SCHEME

More information

OPEN ACCESS. Forecasting Company of the Year & REC Trader of the Year September 2016 Volume - 65

OPEN ACCESS. Forecasting Company of the Year & REC Trader of the Year September 2016 Volume - 65 OPEN ACCESS Forecasting the Year & of the Year 20 September 20 Volume - 65 CONTENT From Management s Desk The main article this month discusses in detail the Draft Amendment to the 2005 released by the

More information

Trading of ESCerts on IEX

Trading of ESCerts on IEX Trading of ESCerts on IEX Akhilesh Awasthy Director (Market Operations) Workshop by BEE on ESCerts Trading and PATNet Portal 16 th Dec 2015, IIC New Delhi Company Snapshot 96% Market Share ~80,000MWh average

More information

Bhopal: Dated 5 th May 2006

Bhopal: Dated 5 th May 2006 Bhopal: Dated 5 th May 2006 No. 1192/MPERC/2006. In exercise of the powers conferred by section 181 (g) read with section 32(3) of the Electricity Act, 2003 enacted by the parliament, the Madhya Pradesh

More information

Bhopal, Dated:

Bhopal, Dated: Bhopal, Dated: 08.12.2015 No. /MPERC /2015 - In exercise of powers conferred under sub-section zp of Section 181 of the Electricity Act, 2003 (36 of 2003), and all other powers enabling it in this behalf,

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM. PRESENT: Sri.T.M. Manoharan, Chairman

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM. PRESENT: Sri.T.M. Manoharan, Chairman KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM PRESENT: Sri.T.M. Manoharan, Chairman Petition No. 1893/DD (T)/Jhabua/2016/KSERC in OP No. 13/2015 In the matter of Procurement of 865

More information

Comments on proposed amendments in Electricity Rules (with respect to Captive Power Plants) issued by Ministry of Power on 22 nd May 2018

Comments on proposed amendments in Electricity Rules (with respect to Captive Power Plants) issued by Ministry of Power on 22 nd May 2018 Comments on proposed amendments in Electricity Rules (with respect to Captive Power Plants) issued by Ministry of Power on 22 nd May 2018 S No. Existing provision/ Draft amended proposed Modified proposed

More information

Introduction to Power Exchanges

Introduction to Power Exchanges For Public Use Introduction to Power Exchanges Presented by: Mr. S.K. Ray on behalf of IEX In this presentation Introduction to Indian Power Markets Power Exchange functioning and Market Snapshot International

More information

Uttarakhand Electricity Regulatory Commission

Uttarakhand Electricity Regulatory Commission Uttarakhand Electricity Regulatory Commission Institution of Engineers (I) Building, 1 st Floor, Near ISBT, Majra, Dehradun Notification Dated: 03.11.2010 No.F-9(21)/RG/UERC/2010/1422 : In exercise of

More information

Perspective on Financing Wind Energy Projects. June 16, 2016

Perspective on Financing Wind Energy Projects. June 16, 2016 Perspective on Financing Wind Energy Projects June 16, 2016 Agenda 2 1 Risk Matrix 3 Context Setting Way Forward KEY SEGMENTS IN THIS PRESENTATION 3 Indian Energy Sector Landscape Bank Lending Sector wise

More information

TARIFF ORDER of CSPDCL for FY and Final True-up for Previous Years of CSPGCL, CSPTCL, SLDC & CSPDCL

TARIFF ORDER of CSPDCL for FY and Final True-up for Previous Years of CSPGCL, CSPTCL, SLDC & CSPDCL TARIFF ORDER of CSPDCL for FY 2014-15 and Final True-up for Previous Years of CSPGCL, CSPTCL, SLDC & CSPDCL Chhattisgarh State Power Generation Company Limited [Petition No. 05 of 2014] Chhattisgarh State

More information

2 EXECUTIVE SUMMARY. 1. This Licence may be called the Distribution Licence for The Tata Power Company Ltd. (Distribution Licence No.

2 EXECUTIVE SUMMARY. 1. This Licence may be called the Distribution Licence for The Tata Power Company Ltd. (Distribution Licence No. 2 EXECUTIVE SUMMARY The Tata Power Company Limited ( Tata Power ) is a company established in 1919. On April 1, 2000, The Tata Hydro-Electric Power Supply Company Limited (established in 1910) and The

More information

2 EXECUTIVE SUMMARY. 2.1 Distribution Business in Mumbai Area

2 EXECUTIVE SUMMARY. 2.1 Distribution Business in Mumbai Area 2 EXECUTIVE SUMMARY The Tata Power Company Limited ( Tata Power ) is a company established in 1919. On April 1, 2000, The Tata Hydro-Electric Power Supply Company Limited (established in 1910) and The

More information

(Website: ORDER. Case No. 55 and 56 of 2003

(Website:  ORDER. Case No. 55 and 56 of 2003 MAHARASHTRA ELECTRICITY REGULATORY COMMISSION 13 th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai 400 005 (Tel: 22163964/65/69 Fax: 22163976) (Email: mercindia@mercindia.com) (Website: www.mercindia.com)

More information

Leading Diversified Renewable Energy Generation Company

Leading Diversified Renewable Energy Generation Company Leading Diversified Renewable Energy Generation Company Disclaimer Certain statements in this presentation concerning our future growth prospects areforward looking statements, which involve a number of

More information

SMP-10/2016 M.P. Electricity Regulatory Commission Bhopal

SMP-10/2016 M.P. Electricity Regulatory Commission Bhopal SMP-10/2016 M.P. Electricity Regulatory Commission Bhopal Tariff Order for procurement of power from Municipal Solid Waste based power generating plants in Madhya Pradesh June 2016 1. LEGISLATIVE PROVISIONS

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION 13th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai- 400 005 Tel: 22163964/65/69 Fax: 22163976 E-mail: mercindia@merc.gov.in Website:

More information

2. APPLICABILITY AND SCOPE

2. APPLICABILITY AND SCOPE ANNEXURE- I MODEL PROCEDURE / GUIDELINES FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT OR DISTRIBUTION LICENSEE, AS THE CASE MAY BE, UNDER REC MECHANISM BY STATE AGENCY 1. OBJECTIVE 1.1. This

More information

Procedure for Scheduling

Procedure for Scheduling Short-Term Open Access in Inter-State Transmission (Bilateral Transaction) Procedure for Scheduling (As per CERC Open Access Regulations, 2008 (dated 25.01.2008) & subsequent (Amendment) Regulations, 2009

More information

F. No. 53/15/2016 -WE Ministry of New & Renewable Energy. Evaluation of Generation Based Incentives Scheme for Wind Power Projects

F. No. 53/15/2016 -WE Ministry of New & Renewable Energy. Evaluation of Generation Based Incentives Scheme for Wind Power Projects F. No. 53/15/2016 -WE Ministry of New & Renewable Energy Evaluation of Generation Based Incentives Scheme for Wind Power Projects The GBI scheme was initially introduced in 11th Plan on 17.12.2009 with

More information

GUJARAT ELECTRICITY REGULATORY COMMISSION AHMEDABAD. CORAM Dr. P.K. Mishra, Chairman Shri Pravinbhai Patel, Member. Order No.

GUJARAT ELECTRICITY REGULATORY COMMISSION AHMEDABAD. CORAM Dr. P.K. Mishra, Chairman Shri Pravinbhai Patel, Member. Order No. GUJARAT ELECTRICITY REGULATORY COMMISSION AHMEDABAD CORAM Dr. P.K. Mishra, Chairman Shri Pravinbhai Patel, Member Order No. 3 of 2010 Amendment to Order No.3 of 2006 dated 11 th August, 2006 in the matter

More information

Development of Power Markets and Market Monitoring

Development of Power Markets and Market Monitoring Department of Industrial and Management Engineering Indian Institute of Technology Kanpur 3 rd Capacity Building Programme for Officers of Electricity Regulatory Commissions 23 28 August, 2010 Development

More information

Balancing and Settlement Code (BSC)

Balancing and Settlement Code (BSC) Bhopal, 23 rd day of October 2009 No.2299/MPERC/2009 - In exercise of the powers conferred by Section 181 read with Sections 39(2)(d)(i), 40(c)(i), 66, 86(1)(c) and 86(2)(i) of the Electricity Act 2003,

More information

OERC KEEPS RETAIL ELECTRICITY TARIFF UNCHANGED FOR

OERC KEEPS RETAIL ELECTRICITY TARIFF UNCHANGED FOR OERC KEEPS RETAIL ELECTRICITY TARIFF UNCHANGED FOR 2007-08 The Orissa Electricity Regulatory Commission approved the Retail Supply Tariff orders for the four distribution companies of Orissa for 2007-08.

More information

AGREEMENT FOR SYNCHRONOUS OPERATION OF CAPTIVE POWER PLANTS OF.. WITH JHARKHAND STATE ELECTRICITY BOARD SYSTEM

AGREEMENT FOR SYNCHRONOUS OPERATION OF CAPTIVE POWER PLANTS OF.. WITH JHARKHAND STATE ELECTRICITY BOARD SYSTEM AGREEMENT FOR SYNCHRONOUS OPERATION OF CAPTIVE POWER PLANTS OF.. WITH JHARKHAND STATE ELECTRICITY BOARD SYSTEM AN AGREEMENT FOR SYNCHRONOUS OPERATION OF Captive Power Plant of M/s.. of.. MW is made on

More information

Dynamics of Day-Ahead Trading of Electricity in India

Dynamics of Day-Ahead Trading of Electricity in India MPRA Munich Personal RePEc Archive Dynamics of Day-Ahead Trading of Electricity in India Kritika Mathur and Pankaj Sinha Faculty of Management Studies, University of Delhi 15. November 214 Online at http://mpra.ub.uni-muenchen.de/59934/

More information

ORIENT GREEN POWER Leading Diversified Renewable Energy Generator

ORIENT GREEN POWER Leading Diversified Renewable Energy Generator ORIENT GREEN POWER Leading Diversified Renewable Energy Generator Investor Presentation Q1 FY13 Results Biomass Wind Small Hydel Disclaimer This presentation is strictly confidential and may not be copied,

More information

Case No. 52 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Mahati Hydro Power Projects Pvt. Ltd.

Case No. 52 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Mahati Hydro Power Projects Pvt. Ltd. Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

9M FY16 Results. Leading Diversified Renewable Energy Generation Company

9M FY16 Results. Leading Diversified Renewable Energy Generation Company 9M FY16 Results Leading Diversified Renewable Energy Generation Company Disclaimer Certain statements in this presentation concerning our future growth prospects are forward looking statements, which involve

More information

BIHAR ELECTRICITY REGULATORY COMMISSION

BIHAR ELECTRICITY REGULATORY COMMISSION BIHAR ELECTRICITY REGULATORY COMMISSION Bihar Electricity Regulatory Commission (Renewable Purchase Obligation, its Compliance and REC Framework Implementation) Regulations, 2010. NOTIFICATION The 16 th

More information

Maharashtra Electricity Regulatory Commission (Uniform Recording, Maintenance and Reporting of Information) Regulations, 2009

Maharashtra Electricity Regulatory Commission (Uniform Recording, Maintenance and Reporting of Information) Regulations, 2009 Maharashtra Electricity Regulatory Commission (Uniform Recording, Maintenance and Reporting of Information) Regulations, 2009 1 TABLE OF CONTENTS 1. Short Title, Extent and Commencement 4 2. Definitions

More information

Torrent Power Limited Distribution Dahej

Torrent Power Limited Distribution Dahej g- GUJARAT ELECTRICITY REGULATORY COMMISSION Tariff Order Truing up for FY and Determination of Tariff for FY 2018-19 For Torrent Power Limited Distribution Dahej Case No. 1698 of 2018 4 th April, 2018

More information

PTC INDIA LIMITED NEW DELHI

PTC INDIA LIMITED NEW DELHI PTC INDIA LIMITED NEW DELHI Notice Inviting Tenders Date: 18 th May 2017 Tender ref. No. PTC/MTFG/NDMC/Tender/Banking/1195 Name of Work: Intra-Day Energy Banking Arrangement Date of release of Tender:

More information

The REC Mechanism Viability of solar projects in India

The REC Mechanism Viability of solar projects in India The REC Mechanism Viability of solar projects in India CONTENTS 1. Overview 01 2. The Renewable Energy Certificate 02 (REC) Mechanism 2.1. Background 02 2.2. Solar RECs 02 2.3. Lessons from the non-solar

More information

BIHAR ELECTRICITY REGULATORY COMMISSION PATNA

BIHAR ELECTRICITY REGULATORY COMMISSION PATNA BIHAR ELECTRICITY REGULATORY COMMISSION PATNA NOTIFICATION 2 nd August, 2010 No. BERC-Regl/Solar-2/2010-03 In exercise of powers conferred under Section 61 read with Section 181(2)(zd) of the Electricity

More information

Form IV-A Short -term Inter-State Transactions Of Electricity by Trading Licensees ( RTC* )

Form IV-A Short -term Inter-State Transactions Of Electricity by Trading Licensees ( RTC* ) Form IV-A Short -term Inter- Transactions Of Electricity by Licensees ( RTC* ) Period of Power Time of Power Start Date End Date Start Time End Time the Seller Purchased from A Inter Tansactions 1 01-May-17

More information

Rakesh Jha. Role of Credit Risk Guarantee Facility in Result Based Incentive model for Distributed Generation Projects

Rakesh Jha. Role of Credit Risk Guarantee Facility in Result Based Incentive model for Distributed Generation Projects Meghraj Capital Advisors Private Limited Infrastructure Consulting I Mergers & Acquisitions I Private Equity I Capital Markets Role of Credit Risk Guarantee Facility in Result Based Incentive model for

More information

And. ORDER (Hearing dated February 24, 2016)

And. ORDER (Hearing dated February 24, 2016) BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW Suo-Moto Proceeding PRESENT: 1. ShriDesh Deepak Verma, Chairman 2. Shri I. B. Pandey, Member 3. Shri Suresh Kumar Agarwal, Member IN

More information

M.P. Electricity Regulatory Commission Bhopal

M.P. Electricity Regulatory Commission Bhopal SMP-12/2013 M.P. Electricity Regulatory Commission Bhopal Tariff Order for procurement of power from Wind Electric Generators 1. LEGISLATIVE PROVISIONS 1.1 Section 86(1) (e) of the Electricity Act 2003

More information

Press Release. OPGS Power Gujarat Private Limited (OPGS) 28 September, Rating Assigned

Press Release. OPGS Power Gujarat Private Limited (OPGS) 28 September, Rating Assigned Press Release OPGS Power Gujarat Private Limited (OPGS) 28 September, 2017 Rating Assigned Total Bank Facilities Rated* Long Term Rating Short Term Rating Rs. 2059.00 Cr (Assigned) (Assigned) *Refer Annexure

More information

SOUTH BIHAR POWER DISTRIBUTION COMPANY LIMITED

SOUTH BIHAR POWER DISTRIBUTION COMPANY LIMITED SOUTH BIHAR POWER DISTRIBUTION COMPANY LIMITED Vidyut Bhawan-I, Jawahar Lal Nehru Marg, Patna 800021 ----------------------------------------------------------------------------------------------------------------------------------------------

More information

Gujarat Energy Transmission Corporation Limited (GETCO)

Gujarat Energy Transmission Corporation Limited (GETCO) GUJARAT ELECTRICITY REGULATORY COMMISSION Tariff Order Truing up for FY 2014-15, Approval of Provisional ARR for FY 2016-17 For Gujarat Energy Transmission Corporation Limited (GETCO) Case No. 1545 of

More information

Notified on : 22 January 2010 Bhopal, Dated: 9 th December, 2009

Notified on : 22 January 2010 Bhopal, Dated: 9 th December, 2009 Notified on : 22 January 2010 Bhopal, Dated: 9 th December, 2009 No. 2734/MPERC/2009. In exercise of powers conferred under Section 181(2) (zd) read with Section 45 and 61 of the Electricity Act, 2003

More information

IN THE JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION AT RANCHI. Case No. 12 of 2018, 13 of 2018, 14 of 2018 & 15 of 2018

IN THE JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION AT RANCHI. Case No. 12 of 2018, 13 of 2018, 14 of 2018 & 15 of 2018 IN THE JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION AT RANCHI Case No. 12 of 2018, 13 of 2018, 14 of 2018 & 15 of 2018 Jharkhand Bijli Vitran Nigam Limited...... Petitioner CORAM: HON BLE MR. (DR)

More information

M.P. Electricity Regulatory Commission Bhopal

M.P. Electricity Regulatory Commission Bhopal SMP-74/2015 M.P. Electricity Regulatory Commission Bhopal Tariff Order for procurement of power from Wind Electric Generators 1. LEGISLATIVE PROVISIONS Section 86(1) (e) of the Electricity Act 2003 mandates

More information

Electricity (Development of Small Power Projects) GN. No. 77 (contd.) THE ELECTRICITY ACT (CAP.131) RULES. (Made under sections 18(5), 45 and 46))

Electricity (Development of Small Power Projects) GN. No. 77 (contd.) THE ELECTRICITY ACT (CAP.131) RULES. (Made under sections 18(5), 45 and 46)) GOVERNMENT NOTICE NO. 77 published on 02/03/2018 THE ELECTRICITY ACT (CAP.131) RULES (Made under sections 18(5), 45 and 46)) THE ELECTRICITY (DEVELOPMENT OF SMALL POWER PROJECTS) RULES, 2018 1. Citation

More information

2. APPLICABILITY AND SCOPE

2. APPLICABILITY AND SCOPE ANNEXURE- I MODEL PROCEDURE / GUIDELINES FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT OR DISTRIBUTION LICENSEE, AS THE CASE MAY BE, UNDER REC MECHANISM BY STATE AGENCY 1. OBJECTIVE 1.1. This

More information

GOVERNMENT OF MADHYA PRADESH

GOVERNMENT OF MADHYA PRADESH 206 Compendium of State Government Policies on Renewable Energy Sector in India GOVERNMENT OF MADHYA PRADESH Wind Power Project Policy of Madhya Pradesh, 2012 (As Amended on 21 st February 2013) 1. Order

More information

KARNATAKA ELECTRICITY REGULATORY COMMISSION, BENGALURU

KARNATAKA ELECTRICITY REGULATORY COMMISSION, BENGALURU No.: S/03/2017 KARNATAKA ELECTRICITY REGULATORY COMMISSION, BENGALURU Dated : 14 th May, 2018 Present: 1. Sri M.K. Shankaralinge Gowda - Chairman 2. Sri H.D. Arun Kumar - Member 3. Sri D.B. Manival Raju

More information

SOUTHERN REGIONAL POWER COMMITTEE BANGALORE MINUTES OF THE 22 ND MEETING OF COMMERCIAL SUB-COMMITTEE OF SRPC HELD AT BANGALORE ON

SOUTHERN REGIONAL POWER COMMITTEE BANGALORE MINUTES OF THE 22 ND MEETING OF COMMERCIAL SUB-COMMITTEE OF SRPC HELD AT BANGALORE ON SOUTHERN REGIONAL POWER COMMITTEE BANGALORE MINUTES OF THE 22 ND MEETING OF COMMERCIAL SUB-COMMITTEE OF SRPC HELD AT BANGALORE ON 31.07.2013 1. INTRODUCTION 1.1 The 22 nd Meeting of the Commercial Sub-

More information

USER DOCUMENTATION Version 1.0.1

USER DOCUMENTATION Version 1.0.1 February, 2018 USER DOCUMENTATION Version 1.0.1 Revenue and Tariff Analysis for Electric Utilities of Andhra Pradesh (RATE-AP) Model Revenue and Tariff Analysis for Electric Utilities of Andhra Pradesh

More information

CASE No. 73 of hours for a period of six months from 1 April, 2019 to 30 September, Coram. I. M. Bohari, Member Mukesh Khullar, Member

CASE No. 73 of hours for a period of six months from 1 April, 2019 to 30 September, Coram. I. M. Bohari, Member Mukesh Khullar, Member Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

CHAPTER I: PRELIMINARY Short title, commencement and interpretation

CHAPTER I: PRELIMINARY Short title, commencement and interpretation Notification dated 20.2.2009 Bhopal: dated 31 st January, 2009 No. 254-MPERC-2009. In exercise of the powers conferred by Section 181 read with Subsection (b) of Section 86 of the Electricity Act 2003

More information

FILED BY MEGHALAYA POWER DISTRIBUTION CORPORATION LIMITED. Lum Jingshai, Short Round Road, Shillong

FILED BY MEGHALAYA POWER DISTRIBUTION CORPORATION LIMITED. Lum Jingshai, Short Round Road, Shillong BEFORE MEGHALAYA STATE ELECTRICITY REGULATORY COMMISSION, SHILLONG PETITION FOR APPROVAL OF DISTRIBUTION OPEN ACCESS CHARGES FOR FY 2015-16 FILED BY MEGHALAYA POWER DISTRIBUTION CORPORATION LIMITED Lum

More information

Expression of Interest. Procurement of Renewable Energy Under Short Term basis. Reliance Industries Limited In Gujarat and Maharashtra

Expression of Interest. Procurement of Renewable Energy Under Short Term basis. Reliance Industries Limited In Gujarat and Maharashtra Expression of Interest for Procurement of Renewable Energy Under Short Term basis To Reliance Industries Limited In Gujarat and Maharashtra Reliance Industries Limited Reliance Corporate Park, Thane-Belapur

More information

EXTRA ORDINARY 13 SHRAVANA (S) BIHAR ELECTRICITY REGULATORY COMMISSION

EXTRA ORDINARY 13 SHRAVANA (S) BIHAR ELECTRICITY REGULATORY COMMISSION REGISTERED NO. PT.-40 The B Bihar Gazett te EXTRA ORDINARY PUBLISHED BY AUTHORITY 13 SHRAVANA (S) (NO.PATNA 541) PATNA, WEDNESDAY, 4TH AUGUST 2010 BIHAR ELECTRICITY REGULATORY COMMISSION NOTIFICATION The

More information

Leading Diversified Renewable Energy Generation Company

Leading Diversified Renewable Energy Generation Company Leading Diversified Renewable Energy Generation Company Disclaimer Certain statements in this presentation concerning our future growth prospects are forward looking statements, which involve a number

More information

Through & Hard Copy TANGEDCO ACCOUNTS BRANCH 144, ANNA SALAI, CHENNAI Circular.Memo.No.CFC/FC/REV/AS.3/D.325 /17, dated

Through  & Hard Copy TANGEDCO ACCOUNTS BRANCH 144, ANNA SALAI, CHENNAI Circular.Memo.No.CFC/FC/REV/AS.3/D.325 /17, dated Through Email & Hard Copy TANGEDCO ACCOUNTS BRANCH 144, ANNA SALAI, CHENNAI-600002. Circular.Memo.No.CFC/FC/REV/AS.3/D.325 /17, dated.15.03.2017 Sub: Electricity- Clarification for verification of Captive

More information

Himachal Pradesh Budget Analysis

Himachal Pradesh Budget Analysis -4.9% -3.2% 3.9% 9. 10.4% 7.2% 10.2% 10. 10.8% 7.5% 9.1% 6.9% Himachal Pradesh Budget Analysis The Finance Minister of Himachal Pradesh, Mr. Jai Ram Thakur, presented the Budget for financial year on March

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Proposal of Government of Maharashtra Consultant s detailed note on Power Purchase Rate etc. of Small Hydro Power Projects Abbreviations BEST BOT CERC CPP

More information

The Brihan Mumbai Electric Supply & Transport Undertaking

The Brihan Mumbai Electric Supply & Transport Undertaking The Brihan Mumbai Electric Supply & Transport Undertaking Divisional Engineer Power Management 1 st Flr, Multistoried Annex Building, BEST Marg, Colaba, MUMBAI 400 001 (OF THE BRIHANMUMBAI MAHANAGARPALIKA)

More information