1 City of Fridley Water and Sewer Rate Study Jessica Cook 9/25/17 1

2 Utility Funds They are Enterprise Funds 1. Should pay for Capital Outlays Operations Replacement Reserves Debt 2. Should be flush with cash 3. Have a minimum of: 6 months of operations (not including depreciation) Following year s bond/debt payments Funding for capital equipment 2

3 Utility Funds Adequate revenue and cash balances in utility funds are important: 1. Maintain the City s Aa2 rating 2. Avoid sudden rate increases in the future 3. Water and Sewer have insufficient cash balances 4. Water and Sewer Utilities are an $8.4 million enterprise of the City 3

4 Key Findings Water Utility Water Rates 1. Usage assumptions are not aligned with actual usage patterns Limited incentive in current rate structure to promote conservation Proposing new tiers based upon actual water usage patterns 2. Continued pressure on cash balances Ending cash 12/31/2017 projected to be $415,000 in water fund $14.7M estimated over capital projects from Take Away: 1. New rate structure is needed to match usage patterns and capital improvements are driving need for rate increases and bonding. 4

5 Existing Residential Rate Tiers June Single Family Residential Billing In Thousand Gallons 1200 Tier 1: 0-20,000 gallons Tier 2: 20,001-40,000 gallons Tier 3: 40,001 60,000 gallons Tier 4: over 60,0001 gallons 5

6 Proposed Residential Rate Tiers June Billing: Single Family Residential Usage In Thousand Gallons Tier 1: 0-8,000 gallons Tier 2: 8,001-16,000 gals Tier 3: 16,001 24,000 gals Tier 4: 0ver 24,000 gals

7 New Rate Structure Benefits Allows indoor essential use to remain as affordable as possible Larger tiers provided for commercial users to recognized their different usage patterns Equitably allocates cost of system to user classes Percent of Percent of Water Used Revenue Generated Residential 38.16% 36.38% Commercial 40.81% 42.09% Multifamily 16.40% 15.13% Irrigation 4.62% 6.40% 7

8 Capital Driving Need for Rate Increases 2016 Water Fund Expenses Capital and Debt 51% Operating 49% Operating Capital and Debt 8

9 Key Assumptions for Water Analysis Future capital costs average $1,130,000 per year $515,000 for street reconstruction projects $170,000 for water treatment plant improvements $120,000 for wells $85,000 for water towers $240,000 for vehicles and other improvements 3% inflation on City s operating expenses 5% reduction in irrigation meter consumption in 2018; steady consumption thereafter No revenue from future redevelopment 9

10 Proposed Residential Water Rates Base Fee $17.45 $18.00 Rate per 1,000 Gallons Rate per 1,000 Gallons Tier ,000 $ ,000 $2.25 Tier 2 20,001-40,000 $2.18 8,001-16,000 $2.59 Tier 3 40,001-60,000 $ ,001-24,000 $3.11 Tier 4 Over 60,000 $2.57 Over 24,000 $

11 Proposed Commercial Water Rates Base Fee Meters < 1 $17.45 Meters < 1 $18.00 Meters 1 and Greater Rate per 1,000 Gallons $17.45 Meters 1 and Greater $50.00 Rate per 1,000 Gallons Tier ,000 $ ,000 $2.25 Tier 2 40, ,000 $ , ,000 $ Tier 3 250, ,000 $ ,001-1,000,000 Tier 4 500,001-1,000,000 $2.98 $3.26 Over 1,000,000 $3.42 Tier 5 Over 1,000,000 $3.55 N/A N/A

12 Proposed Multifamily Water Rates Base Fee $17.45 $18.00 Rate per 1,000 Gallons Rate per 1,000 Gallons Tier ,000 $1.96 All Usage $2.59 Tier 2 20,001-40,000 $2.18 Tier 3 40,001-60,000 $2.39 Tier 4 Over 60,000 $

13 Proposed Irrigation Water Rates Base Fee $17.45 $18.00 Rate per 1,000 Gallons Rate per 1,000 Gallons Tier ,000 $1.96 All Usage $3.88 Tier 2 20,001-40,000 $2.18 Tier 3 40,001-60,000 $2.39 Tier 4 Over 60,000 $

14 Proposed Water Rates All charges increase 3.00% annually after 2018 Increased complexity of rate structure delivers more equity Residential customer using 12,000 gallons per quarter will have a $5.38 increase in their quarterly water bill in

15 Restores Health of Water Fund Bonds issued for Capital Projects 4,000,000 3,500,000 3,000,000 2,500,000 2,000,000 1,500,000 1,000, , Target minimum working capital Actual working capital-cash balance

16 Key Findings - Sewer Continued Pressure to Raise Sewer Rates Due to on-going utility improvements as part of road reconstruction projects, sewer lining, and lift stations $3.9M in capital projects estimated from % annual increases in MCES (Met Council) sewer charges expected over next 5 years Take Away: Future capital needs and MCES cost increases are driving future rate increases and bonding 16

17 2016 Sewer Expenses (excluding depreciation) Other Operating 18% Capital and Debt 2% MCES 80% MCES Other Operating Capital and Debt 17

18 Key Assumptions for Sewer Analysis 3% inflation on City s operating expenses 4% inflation on MCES disposal charges No revenue from future redevelopment Future capital costs average $420,000 per year $50,000 for street reconstruction projects $50,000 for lift station rehabilitation $225,000 for sewer pipe lining $95,000 for vehicles and other improvements 18

19 Proposed Sewer Rates Confirmed need for revenue increases in 2018 Recommending new rate structure in 2018 Variable base fee depending on customer class Base Fees Residential $12.27 $50.00 (includes 8,000 gallons) Multifamily 3 units or less $12.27 $ (includes 24,000 gallons) Multifamily 4 units or more $12.27 $20.00 (no usage included) 3.25% rate increases in 2019 and thereafter Commercial/Industrial $12.27 $20.00 (no usage included) Usage rate increases from $5.23 to $5.70 in

20 Proposed Sewer Rates All charges increase 3.25% annually after 2018 Increased complexity of rate structure delivers more equity Residential customer discharging 12,000 gallons per quarter will have a $2.23 decrease in their sewer bill in

21 Impact on Sewer Fund 6,000,000 5,000,000 Bonds Issued for Capital Projects 4,000,000 3,000,000 2,000,000 1,000, Target minimum working capital Actual working capital-cash balance Target working capital = 6 months operating expenses (excluding depreciation) plus next year s debt

22 Proposed Bond Issues Needed to fund capital projects Not expected to impact bond rating Proposed Bonding Water 1,250,000 1,300,000 1,400,000 0 Sewer 1,190, , ,200,000 Total 2,440,000 1,965,000 1,400,000 1,200,000 This study is not a bonding plan. Each proposed issue should be considered as needed 22

23 23 National Trends

24 Sample Bill Comparison $250 Comparison of 2017 Water and Sewer Charges Residential User (based on 15,000 gallons water and 10,000 gallons sewer per quarter) $200 $150 $100 $50 Sewer Water $0 24

25 Sample Bill Impact Typical Residential Residential Med user-gallons used 12,000 $ Inc % Inc Water Base $ $ usage $ $ Total water portion $ $ $ 5.38 Sewer Base $ $ usage $ $ Total sewer portion $ $ $ (2.23) Total Utility Bill $ $ $ % cents per day

26 Sample Bill Impact Low Volume Residential User Residential - Low Volume User Low user-gallons used 6,000 Water Base $ $ usage $ $ Total water bill $ $ $ 2.29 Sewer Base $ $ usage $ Total sewer portion $ $ $ 6.35 Total Utility Bill $ $ $ % cents per day

27 Sample Impact Small Business Very small commercial Commercial-gallons used 4,000 $ Inc % Inc Base $ $ usage $ 9.56 $ 9.00 Total water bill $ $ $ (0.01) Sewer Base $ $ usage $ $ Total sewer portion $ $ $ 9.61 Total Utility Bill $ $ $ % cents per day

28 28 Commercial Users Commercial Commercial-gallons used 90,000 $ Inc % Inc Base $ $ usage $ $ Total water bill $ $ $ 6.45 Sewer Base $ $ usage $ $ Total sewer portion $ $ $ Total Utility Bill $ $ $ % Commercial-gallons used 8,400, cents per day Base $ $ Usage $ 29, $ 28, Total water bill $ 29, $ 28, $ (1,241.89) Sewer Base $ $ $30 per day usage $ 43, $ 47, Total sewer portion $ 43, $ 47, $ 3, Total Utility Bill $ 73, $ 75, $ 2, %

29 Future Projected Rate Increases Year Water Sewer 2019 and beyond 3% 3.25% 29

30 Conclusions Self-supporting utilities will require revenue increases The City s prior rate increases allow future increases to be moderate, maintaining affordability New water rate structure will align rates with usage patterns New sewer rates will stabilize revenue with higher minimum charges Bonding will be required periodically to finance capital improvements Revisit rates every 3-5 years or prior to major capital investments 30

31 31

City of Buffalo Water and Sewer Rate Study. Nick Anhut Jessica Cook

City of Buffalo Water and Sewer Rate Study. Nick Anhut Jessica Cook City of Buffalo Water and Sewer Rate Study Nick Anhut Jessica Cook 09/05/2017 1 Topics Tonight Review Financial Snapshot of Water and Wastewater Utilities Key Assumptions Future Capital Needs Review Proposed

More information

Introduction to Water and Sewer Fund Needs August 11, 2017

Introduction to Water and Sewer Fund Needs August 11, 2017 Introduction to Water and Sewer Fund Needs August 11, 2017 A lot of good things are happening in Buffalo and we hope to make some exciting announcements in the months to come, especially about possible

More information

ORDINANCE NO AN ORDINANCE To Be Entitled:

ORDINANCE NO AN ORDINANCE To Be Entitled: AN ORDINANCE To Be Entitled: AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF FORT MYERS, FLORIDA, AMENDING THE CITY CODE, CHAPTER 90, UTILITIES, ARTICLE II WATER, SECTION 90-35 RATES AND CHARGES ESTABLISHED;

More information

Utility Billing Adjustment Policy

Utility Billing Adjustment Policy Utility Billing Adjustment Policy I. DEFINITIONS As used in this policy, the following terms shall have the meanings specified below: a. Customer means the person or entity under whose name a water account

More information

CITY OF TITUSVILLE ORDINANCE. Sec Schedule of water and sewer charges

CITY OF TITUSVILLE ORDINANCE. Sec Schedule of water and sewer charges CITY OF TITUSVILLE ORDINANCE Sec. 21-241. Schedule of water and sewer charges (1) No free service. No water or sewer service shall be furnished free of charge to any person whatsoever, and the city and

More information

RATE INFORMATION. A. The rates adopted by the Authority will be in accordance with of the Code of Virginia, as amended.

RATE INFORMATION. A. The rates adopted by the Authority will be in accordance with of the Code of Virginia, as amended. Page 1 of 8 Section 1. PURPOSE The purpose of this policy to explain how the Bedford Regional Water Authority ( Authority ) implements the adopted Rates policy and to provide explanation for each of the

More information

WATER, WASTEWATER, AND RECLAIMED WATER RATE STUDY Public Meeting to Review Study Results. January 5, 2016

WATER, WASTEWATER, AND RECLAIMED WATER RATE STUDY Public Meeting to Review Study Results. January 5, 2016 WATER, WASTEWATER, AND RECLAIMED WATER RATE STUDY Public Meeting to Review Study Results January 5, 2016. Public Resources Management Group, Inc. Utility, Rate, Financial and Management Consultants Utility

More information

Water Conservation Rates. January 26, 2010

Water Conservation Rates. January 26, 2010 Water Conservation Rates January 26, 2010 1 Purpose of Conservation Rates Why look at Conservation Rates Now? Southwest Florida Water Management District (SWFWMD) Requirement of PCU Consumptive Use Permit

More information

Infrastructure charges

Infrastructure charges Thames Water Utilities Limited (TWUL) Published date: 1 February 2018 Effective date: 1 April 2018 Infrastructure charges 2018-19 Infrastructure charges and network charges for the supply of water and

More information

CITY OF RIVIERA BEACH, FLORIDA UTILITY SPECIAL DISTRICT S SYSTEMS AND OPERATIONS FOR FISCAL YEAR ENDING SEPTEMBER 30, 2010.

CITY OF RIVIERA BEACH, FLORIDA UTILITY SPECIAL DISTRICT S SYSTEMS AND OPERATIONS FOR FISCAL YEAR ENDING SEPTEMBER 30, 2010. UTILITY SPECIAL DISTRICT S SYSTEMS AND OPERATIONS FOR FISCAL YEAR ENDING SEPTEMBER 30, 2010 Overview The service area of the Utility District s Water System includes the entire City of Riviera Beach (approximately

More information

City of San Carlos Sewer Financial Plan & Rate Update

City of San Carlos Sewer Financial Plan & Rate Update City of San Carlos Sewer Financial Plan & Rate Update Revised 06/13/16 1889 Alcatraz Avenue Berkeley, CA 94703 Tel: 510 653 3399 www.bartlewells.com June 13, 2016 City of San Carlos Department of Public

More information

CITY OF ANN ARBOR WATER & SEWER COST OF SERVICE STUDY

CITY OF ANN ARBOR WATER & SEWER COST OF SERVICE STUDY 1 CITY OF ANN ARBOR WATER & SEWER COST OF SERVICE STUDY 12.20.2017 Overview 1. Sufficiency 2. Rate Classification 3. to Serve 4. Rate Structures 5. Customer Impacts 6. Affordability Program Foundation

More information

COMPREHENSIVE WATER AND SEWER RATE AND FEE STUDY VILLAGE OF ALGONQUIN

COMPREHENSIVE WATER AND SEWER RATE AND FEE STUDY VILLAGE OF ALGONQUIN COMPREHENSIVE WATER AND SEWER PREPARED FOR VILLAGE OF ALGONQUIN PREPARED BY RHMG ENGINEERS, INC. CONSULTING ENGINEERS 975 CAMPUS DRIVE, MUNDELEIN, IL 60060 JANUARY, 2016 Section I Executive Summary General

More information

Town of Orange Park Water & Wastewater Rate Study. Town Council Meeting. March 19, 2019

Town of Orange Park Water & Wastewater Rate Study. Town Council Meeting. March 19, 2019 Town of Orange Park Water & Wastewater Rate Study Town Council Meeting March 19, 2019 Rate Setting Rate Setting Rate Making Process Revenue Requirements Cost Allocation Rate Design Communication Operating

More information

Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee. Residential Water

Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee. Residential Water Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee Residential Water $10.82 Minimum Bill 1,501 gallons through 8,000 gallons $ 2.86 per 1,000 gallons 8,001 gallons through

More information

Sewer Rates. General Information Sheet. July 18, 2017

Sewer Rates. General Information Sheet. July 18, 2017 Sewer Rates General Information Sheet July 18, 2017 Welcome to the City of O'Fallon's sewer rates public hearing. This meeting presents the preliminary findings to revise the sewer rates. In this public

More information

NOTICE OF PUBLIC HEARING ON PROPOSED NEW/INCREASED WATER RATES

NOTICE OF PUBLIC HEARING ON PROPOSED NEW/INCREASED WATER RATES NOTICE OF PUBLIC HEARING ON PROPOSED NEW/INCREASED WATER RATES WHERE: WHEN: PURPOSE: Rohnert Park City Hall Council Chamber 130 Avram Avenue Rohnert Park, California Tuesday, April 14, 2015 not before

More information

COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS

COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS Black & Veatch Holding Company 2011. All rights reserved. COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS San Antonio Water System PREPARED FOR San Antonio Water System 26 MAY 2015 B&V PROJECT NO.

More information

Squaw Valley PSD. Water & Sewer Rate and Connection Fee Study. Presented by: Shawn Koorn Associate Vice President HDR Engineering, Inc.

Squaw Valley PSD. Water & Sewer Rate and Connection Fee Study. Presented by: Shawn Koorn Associate Vice President HDR Engineering, Inc. Squaw Valley PSD Water & Sewer Rate and Connection Fee Study February 15, 2017 Presented by: Shawn Koorn Associate Vice President HDR Engineering, Inc. Purpose of the District s Study Provide sufficient

More information

Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee. Residential Water

Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee. Residential Water Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee Residential Water $11.14 Minimum Bill 1,501 gallons through 8,000 gallons $ 2.95 per 1,000 gallons 8,001 gallons through

More information

City of Cocoa FY 2010 Utility Rate Study. Final Report. Water, Sewer & Reclaimed Water Rates, Fees & Charges Study. Prepared by:

City of Cocoa FY 2010 Utility Rate Study. Final Report. Water, Sewer & Reclaimed Water Rates, Fees & Charges Study. Prepared by: p FY 2010 Utility Rate Study Water, Sewer & Reclaimed Water Rates, Fees & Charges Study June 29, 2010 Prepared by: June 29, 2010 W.E. Mack Finance Director 65 Stone Street Cocoa, FL 32922 Re: FY 2010

More information

City of Starkville Public Services Department Policy or Procedure

City of Starkville Public Services Department Policy or Procedure City of Starkville Public Services Department Policy or Procedure Procedure Number: WS-001-04 Policy/Procedure: Adjustments to Water and Sewer Bills Effective/Revision Date: May 6th, 2008 (Revision #4)

More information

Final Report COMPREHENSIVE WATER AND WASTEWATER COST OF SERVICE AND RATE STUDY

Final Report COMPREHENSIVE WATER AND WASTEWATER COST OF SERVICE AND RATE STUDY Final Report COMPREHENSIVE WATER AND WASTEWATER COST OF SERVICE AND RATE STUDY Phase 2 Cost of Service and Rate Design BLACK & VEATCH PROJECT NO. 192366 Black & Veatch Holding Company 2017. All rights

More information

Water and Sewer Fund. Maintenance ""'\. 61.2% \ Professional Services. I l 1 1.9% Fund Balance

Water and Sewer Fund. Maintenance '\. 61.2% \ Professional Services. I l 1 1.9% Fund Balance Water and Sewer Fund The Water and Sewer Fund, an enterprise fund and the City's second largest operating fund, provides for the administration, operation and maintenance of the City's water and wastewater

More information

YORK COUNTY, SOUTH CAROLINA

YORK COUNTY, SOUTH CAROLINA YORK COUNTY, SOUTH CAROLINA Water and Sewer Financial Planning and Rate Study Report October 25, 2017 1031 S. Caldwell Street Suite 100 Charlotte, NC 28203 Phone 704.373.1199 Fax 704.373.1113 www.raftelis.com

More information

DRAFT COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS. San Antonio Water System. San Antonio Water System 21 MAY 2015 PREPARED FOR

DRAFT COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS. San Antonio Water System. San Antonio Water System 21 MAY 2015 PREPARED FOR Black & Veatch Holding Company 2011. All rights reserved. DRAFT COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS San Antonio Water System PREPARED FOR San Antonio Water System 21 MAY 2015 B&V PROJECT

More information

An Integrated Water and Sewer Utility Planning and Rate Study for October 4 & 5, 2011

An Integrated Water and Sewer Utility Planning and Rate Study for October 4 & 5, 2011 An Integrated Water and Sewer Utility Planning and Rate Study for October 4 & 5, 2011 HID E 1 Integrated Study Scope of Study HID E 2 Scope of the Study Part 1: Capital Assets Inventory water & sewer system

More information

Glacial Lakes Sanitary Sewer & Water District Utility Rate Study. Shelly Eldridge Ehlers Jeanne Vogt - Ehlers

Glacial Lakes Sanitary Sewer & Water District Utility Rate Study. Shelly Eldridge Ehlers Jeanne Vogt - Ehlers Glacial Lakes Sanitary Sewer & Water District Utility Rate Study Shelly Eldridge Ehlers Jeanne Vogt - Ehlers 05/30/2017 1 Background What are Utility Funds Utility funds are used to pay for operations,

More information

ES.1 Findings and Recommendations... ES Overview Current Rates Rate Making Objectives

ES.1 Findings and Recommendations... ES Overview Current Rates Rate Making Objectives Table of Contents Executive Summary ES.1 Findings and Recommendations... ES-1 Chapter 1. Introduction 1.1 Overview... 1-1 1.2 Current Rates... 1-1 1.3 Rate Making Objectives... 1-1 Chapter 2. Revenue Requirement

More information

TOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009

TOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009 TOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009 EXECUTIVE SUMMARY The functions and duties of the Oro Valley Water Utility Commission include reviewing and developing

More information

The Utilities Fund is broken into two categories: a Capacity Expansion Fund and an Operating Fund.

The Utilities Fund is broken into two categories: a Capacity Expansion Fund and an Operating Fund. Attachment 1 O16-19 BACKGROUND REPORT The Utilities Fund is an enterprise fund. An enterprise fund establishes a separate accounting financial reporting mechanism for municipal services for which a fee

More information

SAN ANTONIO WATER SYSTEM (SAWS) RATE ADVISORY COMMITTEE: MEETING 3

SAN ANTONIO WATER SYSTEM (SAWS) RATE ADVISORY COMMITTEE: MEETING 3 01 April, 2014 SAN ANTONIO WATER SYSTEM (SAWS) RATE ADVISORY COMMITTEE: MEETING 3 Bill Zieburtz Richard Campbell Robert Chambers RATE SETTING PROCESS STUDY APPROACH RATE SETTING OBJECTIVES FINANCIAL PLAN

More information

Study Workshops are designed to be both educational and to seek broad direction from the Board

Study Workshops are designed to be both educational and to seek broad direction from the Board Study Workshops are designed to be both educational and to seek broad direction from the Board Workshop #1 Financial Forecast & Cost of Service Water, recycled water, & sewer services Revenue requirement

More information

ORDINANCE # NOW THEREFORE, The City Council of the City of Ferndale do ordain as follows:

ORDINANCE # NOW THEREFORE, The City Council of the City of Ferndale do ordain as follows: ORDINANCE # AN ORDINANCE OF THE CITY OF FERNDALE WASHINGTON, SETTING RATES AND FREQUENCY OF BILLINGS FOR WATER AND SEWER SERVICE AND REPEALING ALL PRIOR ORDINANCES IN CONFLICT HEREWITH. WHEREAS, it is

More information

Sonoma County Service Area #41(CSA #41) Water Rate Study

Sonoma County Service Area #41(CSA #41) Water Rate Study Sonoma County Service Area #41(CSA #41) Water Rate Study September 13, 2016 Prepared by Greg Clumpner, Director, NBS Carmen Narayanan, Consultant, NBS 1 CSA #41 Zones of Benefit 2 Overview of Presentation

More information

Revenue Plan. August 12, Dennis Davies Deputy Director of Public Works 200 Civic Center Way El Cajon, CA 92020

Revenue Plan. August 12, Dennis Davies Deputy Director of Public Works 200 Civic Center Way El Cajon, CA 92020 1925 Palomar Oaks Way, Suite 3 Carlsbad, California 928 tel: 76 438 7755 fax: 76 438 7411 Dennis Davies Deputy Director of Public Works 2 Civic Center Way El Cajon, CA 922 Subject: Six Year Revenue Plan

More information

Santa Ynez River Water Conservation District, ID No. 1. Water Rates & Finances. December 13, 2016

Santa Ynez River Water Conservation District, ID No. 1. Water Rates & Finances. December 13, 2016 Santa Ynez River Water Conservation District, ID No. 1 Water Rates & Finances December 13, 2016 Presentation Overview Objectives & Process District Finances Current & Projected Rates 2 Rate Study Objectives

More information

Water Rates Rate Restructure and Rate Adjustments

Water Rates Rate Restructure and Rate Adjustments Water Rates Rate Restructure and Rate Adjustments Community Outreach Meeting Questions We Will Address Why are water rates changing? Where does the water come from? Did the rain from last winter help?

More information

Water and Sewer Rate Study

Water and Sewer Rate Study Water and Sewer Rate Study Presentation to the Village Board April 26, 2016 Presented by: Eric Callocchia Manager Contents 1 2 3 4 5 6 7 8 Rate Study Background and Purpose Projected Expenses Projected

More information

Water and Sewer Utility Rate Studies

Water and Sewer Utility Rate Studies Final Report Water and Sewer Utility Rate Studies July 2012 Prepared by: HDR Engineering, Inc. July 27, 2012 Mr. Mark Brannigan Director of Utilities 591 Martin Street Lakeport, CA 95453 Subject: Comprehensive

More information

MARINA COAST WATER DISTRICT FINANCIAL PLAN AND RATE AND FEE STUDY FINAL REPORT. September 2013

MARINA COAST WATER DISTRICT FINANCIAL PLAN AND RATE AND FEE STUDY FINAL REPORT. September 2013 MARINA COAST WATER DISTRICT FINANCIAL PLAN AND RATE AND FEE STUDY FINAL REPORT September 2013 10540 TALBERT AVENUE, SUITE 200 EAST FOUNTAIN VALLEY, CALIFORNIA 92708 P. 714.593.5100 F. 714.593.5101 MARINA

More information

Water and Sewer Rates in the Carson River Watershed

Water and Sewer Rates in the Carson River Watershed Water and Sewer Rates in the Carson River Watershed April 20, 2016 Advisory Report prepared by: Contents Introduction... 4 Summary of Water Rate Changes... 6 Summary of Sewer Rate Changes... 7 Carson

More information

WATER AND SEWER UTILITIES RATE STUDY

WATER AND SEWER UTILITIES RATE STUDY WATER AND SEWER UTILITIES RATE STUDY RATE DESIGN WORKSHOP WITHCITYCOUNCIL / UTILITIES COMMISSION March 6, 2014 Agenda Overview of Rate Study Process Water / Sewer Developer Impact Fees Sewer Rates Water

More information

Maurice Kaufman, Director of Public Works / City Engineer Bartle Wells Associates DATE: September 7, 2016 MEMORANDUM

Maurice Kaufman, Director of Public Works / City Engineer Bartle Wells Associates DATE: September 7, 2016 MEMORANDUM TO: FROM: Maurice Kaufman, Director of Public Works / City Engineer Bartle Wells Associates DATE: September 7, 2016 SUBJECT: - MEMORANDUM Introduction The (City) provides sewer sanitary collection services

More information

Capital Region Water. Water and Wastewater Rate Study Report. November 22, Capital Region Water Water and Wastewater Rate Study

Capital Region Water. Water and Wastewater Rate Study Report. November 22, Capital Region Water Water and Wastewater Rate Study Capital Region Water Water and Wastewater Rate Study Report November 22, 2017 Capital Region Water Water and Wastewater Rate Study TABLE OF CONTENTS 1. INTRODUCTION...1 1.1 RATE STUDY SCOPE AND OBJECTIVES...1

More information

PARKERSBURG UTILITY BOARD, a municipality

PARKERSBURG UTILITY BOARD, a municipality P.S.C. W. Va. No. 18 Canceling P.S.C. W. Va. No. 17 PARKERSBURG UTILITY BOARD, a municipality OF PARKERSUBRG, WEST VIRGINIA RATES, RULES AND REGULATIONS FOR FURNISmG WATER at Parkersburg, Wood County,

More information

SCHEDULE OF RATES, FEES AND CHARGES

SCHEDULE OF RATES, FEES AND CHARGES FAIRFAX COUNTY WATER AUTHORITY SCHEDULE OF RATES, FEES AND CHARGES EFFECTIVE APRIL 1, 2016 Adopted December 17, 2015 FOR THE USE OF AND FOR THE SERVICES FURNISHED OR TO BE FURNISHED BY FAIRFAX WATER SCHEDULE

More information

RESOLUTION CONNECTION CHARGES, PLANT INVESTMENT FEES, AND UTILITY RATES FOR WATER AND SEWER SERVICE

RESOLUTION CONNECTION CHARGES, PLANT INVESTMENT FEES, AND UTILITY RATES FOR WATER AND SEWER SERVICE RESOLUTION 30-17 CONNECTION CHARGES, PLANT INVESTMENT FEES, AND UTILITY RATES FOR WATER AND SEWER SERVICE A RESOLUTION establishing and directing the levy, charge and collection of connection charges,

More information

SOUTH WALTON UTILITY COMPANY, INC. 369 Miramar Beach Drive Miramar Beach, FL Telephone: (850) Fax (850)

SOUTH WALTON UTILITY COMPANY, INC. 369 Miramar Beach Drive Miramar Beach, FL Telephone: (850) Fax (850) SOUTH WALTON UTILITY COMPANY, INC. 369 Miramar Beach Drive Miramar Beach, FL 32550 Telephone: (850) 837-2988 Fax (850) 837-7648 FEE SCHEDULE Fees and charges for water and sewer services provided by South

More information

UTILITY RATE STUDY. Public Hearing

UTILITY RATE STUDY. Public Hearing UTILITY RATE STUDY Public Hearing. Public January 23, 2018 Resources Management Group, Inc. Utility, Rate, Financial, and Management Consultants Rate Guiding Principles Recognized Revenues Should Be Sufficient

More information

SPRINGVILLE CITY CULINARY WATER IMPACT FEE ANALYSIS (IFA) MAY 2014

SPRINGVILLE CITY CULINARY WATER IMPACT FEE ANALYSIS (IFA) MAY 2014 SPRINGVILLE CITY CULINARY WATER IMPACT FEE ANALYSIS (IFA) MAY 2014 Adopted May 20, 2014 TABLE OF CONTENTS IMPACT FEE CERTIFICATION... 3 SECTION 1: EXECUTIVE SUMMARY... 4 PROPOSED CULINARY WATER IMPACT

More information

Cost Recovery Policy. Revised January Mount Pleasant Waterworks Cost Recovery Policy

Cost Recovery Policy. Revised January Mount Pleasant Waterworks Cost Recovery Policy Cost Recovery Policy Revised January 2016 VISION Through the unified and committed efforts of each and every employee, Mount Pleasant Waterworks will be a leader in our industry and community. MISSION

More information

Sewer Rate Study CRESCENT CITY CALIFORNIA

Sewer Rate Study CRESCENT CITY CALIFORNIA CRESCENT CITY CALIFORNIA Sewer Rate Study 27368 Via Industria, Suite 110, Temecula, California 925904856 T 951.587.3500 800.755.6864 F 888.326.6864 www.willdan.com Mr. Eugene Palazzo City Manager City

More information

WATER AND WASTEWATER FUND REVENUES

WATER AND WASTEWATER FUND REVENUES WATER AND WASTEWATER FUND REVENUES Water revenues comprise $12.11 million, or 70.6% of total revenues of the fund, while wastewater (sewer) charges comprise $4.25 million, or 24.7% of total revenues. Water

More information

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY DC Retail Water and Sewer Rates Committee - 1. Call to Order - Alan Roth, Chairman DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY Board of Directors DC Retail Water and Sewer Rates Committee Tuesday March

More information

WATER, WASTEWATER, STORMWATER, AND MUNICIPAL SOLID WASTE COST OF SERVICE AND RATE DESIGN STUDY

WATER, WASTEWATER, STORMWATER, AND MUNICIPAL SOLID WASTE COST OF SERVICE AND RATE DESIGN STUDY REPORT January 2017 WATER, WASTEWATER, STORMWATER, AND MUNICIPAL SOLID WASTE COST OF SERVICE AND RATE DESIGN STUDY PREPARED BY: ECONOMICS STRATEGY STAKEHOLDERS SUSTAINABILITY www.newgenstrategies.net 3420

More information

2016 Water and Recycled Water Rate Study WEBINAR WITH DISTRICT STAFF JUNE 29, 2016

2016 Water and Recycled Water Rate Study WEBINAR WITH DISTRICT STAFF JUNE 29, 2016 2016 Water and Recycled Water Rate Study WEBINAR WITH DISTRICT STAFF JUNE 29, 2016 Agenda Financial Policy & Financial Plan Capacity Fees Preliminary Results Tier Definitions Next Steps 2016 Water & RW

More information

Managing Financial Risk and Declining Demand. Presentation Outline

Managing Financial Risk and Declining Demand. Presentation Outline Managing Financial Risk and Declining Demand Washington Association of Sewer & Water Districts Spring Conference April 13, 2012 John Ghilarducci Presentation Outline 1. Why Consumption is Declining Potential

More information

From: Lex Warmath and Elaine Conti, Raftelis Financial Consultants, Inc.

From: Lex Warmath and Elaine Conti, Raftelis Financial Consultants, Inc. 227 West Trade Street Phone 704 373 1199 www.raftelis.com Suite 1400 Fax 704 373 1113 Charlotte, NC 28202 Date: June 21, 2016 To: Mr. Bob Walker, Executive Director From: Lex Warmath and Elaine Conti,

More information

RATE STUDY. Town of Midland. HEMSON C o n s u l t i n g L t d.

RATE STUDY. Town of Midland. HEMSON C o n s u l t i n g L t d. WATER AND WASTEWATER RATE STUDY Town of Midland C o n s u l t i n g L t d. December 2010 TABLE OF CONTENTS EXECUTIVE SUMMARY.........1 I BACKGROUND AND STUDY OBJECTIVES.........9 ll ASSOCIATED LEGISLATION.........13

More information

SAUSALITO-MARIN CITY SANITARY DISTRICT 1 EAST ROAD SAUSALITO, CALIFORNIA Telephone: (415) Fax: (415)

SAUSALITO-MARIN CITY SANITARY DISTRICT 1 EAST ROAD SAUSALITO, CALIFORNIA Telephone: (415) Fax: (415) 1 EAST ROAD SAUSALITO, CALIFORNIA Telephone: (415) 332-0244 Fax: (415) 332-0453 Budget FY 2017/18 Adopted by Board on June 5, 2017 BUDGET EXECUTIVE SUMMARY FISCAL YEAR 2017/18 DISTRICT OVERVIEW The Sausalito-Marin

More information

2012 Utility Rate Study Preliminary Results. City Council Public Works Committee

2012 Utility Rate Study Preliminary Results. City Council Public Works Committee 2012 Utility Rate Study Preliminary Results City Council Public Works Committee Agenda Background Summary of Special Issues System Development Charges (SOC) - Updated Charges - Options for Encouraging

More information

UERWA 2018 Rates. Outdoor Usage

UERWA 2018 Rates. Outdoor Usage UERWA 2018 Rates Water Service Base Charge/SFE Base Rate $ 17.29 Tier 1 (0-10) $ 3.62 Debt Service 2010 Bonds $ 3.05 Tier 2 (11-20) $ 5.43 Debt Service 2013 Bonds $ 2.54 Tier 3 (21-30) $ 8.14 Capital Replacement

More information

Water & Sewer Rate Study. Water & Sewer Cost of Service Rate Study. City of Norco, CA. Draft Report for

Water & Sewer Rate Study. Water & Sewer Cost of Service Rate Study. City of Norco, CA. Draft Report for Water & Sewer Cost of Service Rate Study for City of Norco, CA October 11, 2016 Table of Contents October 11, 2016 Chad Blais Director of Public Works City of Norco 2870 Clark Avenue Norco, CA 92860 Re:

More information

City of Snoqualmie. Water, Sewer and Storm Utilities Rate Study Update. Council Meeting. January 23, Sergey Tarasov, Project Manager

City of Snoqualmie. Water, Sewer and Storm Utilities Rate Study Update. Council Meeting. January 23, Sergey Tarasov, Project Manager City of Snoqualmie Water, Sewer and Storm Utilities Rate Study Update Council Meeting January 23, 2017 Sergey Tarasov, Project Manager Discussion Outline Revenue requirement Rate design New customer charges

More information

CITY OF ST. AUGUSTINE, FLORIDA

CITY OF ST. AUGUSTINE, FLORIDA CITY OF ST. AUGUSTINE, FLORIDA Water and Sewer Revenue Refunding Bonds, Series 2012, $15,930,000, Dated: December 11, 2012 Water and Sewer Revenue Refunding Bonds, Series 2005, $21,435,000, Dated: July

More information

Daytona Beach, FL, City of

Daytona Beach, FL, City of Daytona Beach, FL, City of 1 City of Daytona Beach, Florida General Obligation Refunding Bonds,, $18,810,000 Dated: May 15, 2012 2 City of Daytona Beach, Florida Capital Improvement Revenue Bonds, Series

More information

FORT COLLINS- LOVELAND WATER DISTRICT

FORT COLLINS- LOVELAND WATER DISTRICT FORT COLLINS- LOVELAND WATER DISTRICT Water Financial Planning and Rate Study Report March 16, 2018 District of Thousand Oaks Water and Wastewater Financial Plan Study Report March 16, 2018 Board of Directors

More information

Frequently Asked Questions (FAQs) About Chatham Borough s Water and Sewer Revenue Systems

Frequently Asked Questions (FAQs) About Chatham Borough s Water and Sewer Revenue Systems Frequently Asked Questions (FAQs) About Chatham Borough s Water and Sewer Revenue Systems 1) How much revenue does Chatham Borough need to collect to operate and maintain its water and sewer systems? A:

More information

Designing Rate Structures that Support Your Objectives: Guidelines for NC Water Systems

Designing Rate Structures that Support Your Objectives: Guidelines for NC Water Systems that Support Your Objectives: Guidelines for NC Water Systems June 2009 Funding support for these guidelines provided by the Public Water Supply Section of the North Carolina Department of Environment

More information

PARKVILLE WATER DISTRICT

PARKVILLE WATER DISTRICT PARKVILLE WATER DISTRICT WATER RATE STUDY DECEMBER 2017 RPI Consulting LLC Durango, Colorado TABLE OF CONTENTS Table of Contents 2 Summary of Findings 3 Water Rate Analysis 6 Usage patterns and existing

More information

CITY OF SANTA CRUZ WATER DEPARTMENT LONG RANGE FINANCIAL PLAN

CITY OF SANTA CRUZ WATER DEPARTMENT LONG RANGE FINANCIAL PLAN CITY OF SANTA CRUZ WATER DEPARTMENT LONG RANGE FINANCIAL PLAN JUNE 2016 1 LONG RANGE FINANCIAL PLAN TABLE OF CONTENTS Table of Contents... 2 Executive Summary... 4 1. Introduction... 6 2. Background...

More information

Rate Schedule. Fiscal Year-2015 (July 1, 2014 June 30, 2015) Amended July 22, 2014 Amended August 26, 2014

Rate Schedule. Fiscal Year-2015 (July 1, 2014 June 30, 2015) Amended July 22, 2014 Amended August 26, 2014 Rate Schedule Fiscal Year-2015 (July 1, 2014 June 30, 2015) Amended July 22, 2014 Amended August 26, 2014 P.O. Box 5911 Virginia Beach, Virginia 23471-0911 757.460.2491 www.hrsd.com HRSD Rate Schedule

More information

WATER USER RATES & FEE STUDY

WATER USER RATES & FEE STUDY WATER USER RATES & FEE STUDY FINAL REPORT February 2016 BARTLE WELLS ASSOCIATES Independent Public Finance Consultants 1889 Alcatraz Avenue Berkeley, California 94703 www.bartlewells.com Tel: 510/653-3399

More information

Utility Rate Public Hearing City Council Meeting

Utility Rate Public Hearing City Council Meeting Utility Rate Public Hearing City Council Meeting January 19, 2016 1 Utility Services Recommendation 1. Adopt utility financial policy resolution 2. Provide direction on ratepayer assistance program 3.

More information

CITY OF CITY OF SONOMA FULLERTON. Pricing Objectives Discussion Water Rate Study 2018 Water Rate Study

CITY OF CITY OF SONOMA FULLERTON. Pricing Objectives Discussion Water Rate Study 2018 Water Rate Study CITY OF CITY OF FULLERTON SONOMA Pricing Objectives Discussion Water Rate Study 2018 Water Rate Study Interview / September 21, 2017 City Council Meeting / January 17, 2018 Agenda 1. Introduction 2. City

More information

BODEGA BAY PUBLIC UTILITY DISTRICT Water and Wastewater Rate Study

BODEGA BAY PUBLIC UTILITY DISTRICT Water and Wastewater Rate Study BODEGA BAY PUBLIC UTILITY DISTRICT Water and Wastewater Rate Study FINAL REPORT March 22, 2018 BARTLE WELLS ASSOCIATES Independent Public Finance Advisors 1889 Alcatraz Avenue Berkeley, CA 94703-2714 Tel.

More information

Rate Schedule. Fiscal Year-2018 (July 1, 2017 June 30, 2018) P.O. Box 5911 Virginia Beach, Virginia

Rate Schedule. Fiscal Year-2018 (July 1, 2017 June 30, 2018) P.O. Box 5911 Virginia Beach, Virginia Rate Schedule Fiscal Year-2018 (July 1, 2017 June 30, 2018) P.O. Box 5911 Virginia Beach, Virginia 23471-0911 757.460.2491 www.hrsd.com HRSD Rate Schedule Fiscal Year-2018 (July 1, 2017 June 30, 2018)

More information

WASTEWATER FINANCIAL PLAN STUDY REPORT

WASTEWATER FINANCIAL PLAN STUDY REPORT WASTEWATER FINANCIAL PLAN STUDY REPORT FINAL October 7, 2013 Prepared by: Page 1 201 S. Lake Avenue Suite 301 Pasadena, CA 91101 Phone 626.583. 1894 Fax 626.583. 1411 www.raftelis.com October 7, 2013 Mr.

More information

Louisville Water Company. Utility and Public Works Advisory Group Bond Covenants/Finance/Rates February 8, 2012

Louisville Water Company. Utility and Public Works Advisory Group Bond Covenants/Finance/Rates February 8, 2012 Louisville Water Company Utility and Public Works Advisory Group Bond Covenants/Finance/Rates February 8, 2012 2 2009 Bond Issue New money and advance refunding of $200 million in December 2009. Modernized

More information

Los Angeles 4th Regional Investors Conference March 19-20, Los Angeles Wastewater System

Los Angeles 4th Regional Investors Conference March 19-20, Los Angeles Wastewater System City of Los Angeles Los Angeles 4th Regional Investors Conference March 19-20, 2018 Los Angeles Wastewater System Presented by: Lisa Mowery, Chief Financial Officer LA Sanitation Disclaimer This Investor

More information

March 25, To the Honorable, the City Council: RECOMMENDATIONS

March 25, To the Honorable, the City Council: RECOMMENDATIONS To the Honorable, the City Council: March 25, 2019 RECOMMENDATIONS The City administration and City Council continue to recognize the importance of minimizing increases in water and sewer rates. I recommend

More information

MONROE CITY COUNCIL. Agenda Bill No

MONROE CITY COUNCIL. Agenda Bill No MONROE CITY COUNCIL Agenda Bill No. 15149 TITLE: Discussion: Impact Fees DATE: DEPT: CONTACT: PRESENTER: ITEM: 08/25/2015 Public Works Brad Feilberg Brad Feilberg Discussion: 08/25/2015 Attachments: 1.

More information

WATER SUPPLY GENERALLY.

WATER SUPPLY GENERALLY. 1042.01 WATER SUPPLY GENERALLY. (a) Because variable conditions may arise in the operation and maintenance of the water system, the supply of water to customers is without guarantee of a fixed quantity,

More information

Council Bill No WATER RATES General Ordinance 6318 Sheet No. 3 (Page 1 of 6)

Council Bill No WATER RATES General Ordinance 6318 Sheet No. 3 (Page 1 of 6) (Page 1 of 6) This rate is applicable during Stage One Water Shortage, Stage Two Water Emergency, and Stage Three Water Crisis of the Emergency Water Conservation Plan. Section A. Availability Available

More information

WATER/SEWER RATE ANALYSIS PROCESS

WATER/SEWER RATE ANALYSIS PROCESS WATER/SEWER RATE ANALYSIS PROCESS SELECTED BLACK & VEATCH AS CONSULTING FIRM NOVEMBER 2017 DATA COLLECTION FOR ANALYSIS NOVEMBER 2017-JANUARY 2018 IDENTIFY CUSTOMER BASE COUNTS AND TYPES COMPILE BUDGET

More information

Capital Finance Overview: Dealing with the New Normal

Capital Finance Overview: Dealing with the New Normal Capital Finance Overview: Dealing with the New Normal Jeff Hughes Director Environmental Finance Center at the University of North Carolina efc.unc.edu jhughes@sog.unc.edu (919) 843-4956 www.efc.unc.edu

More information

WATER UTILITY FINANCIAL PLAN AND RATE STUDY CITY OF WHITEFISH, MT MARCH 2016

WATER UTILITY FINANCIAL PLAN AND RATE STUDY CITY OF WHITEFISH, MT MARCH 2016 WATER UTILITY FINANCIAL PLAN AND RATE STUDY CITY OF WHITEFISH, MT MARCH 2016 The Financial Link Executive Summary - Water In May 2015, the City of Whitefish (City) retained AE2S to complete a Water and

More information

The City of Sierra Madre

The City of Sierra Madre The City of Sierra Madre Comprehensive Water and Wastewater Cost of Service Study Report / December 24, 2018 24640 Jefferson Avenue Suite 207 Murrieta, CA 92562 Phone 951.698.0145 www.raftelis.com December

More information

LONDON GROVE TOWNSHIP MUNICIPAL AUTHORITY RESOLUTION NO

LONDON GROVE TOWNSHIP MUNICIPAL AUTHORITY RESOLUTION NO LONDON GROVE TOWNSHIP MUNICIPAL AUTHORITY RESOLUTION NO 2019-02 A RESOLUTION OF THE AUTHORITY BOARD ESTABLISHING WASTERWATER SYSTEM TAPPING FEES IN ACCORDANCE WITH ACT 57 OF 2003 WHEREAS, London Grove

More information

& Fees. Rates. Charge (water) Rate. Meter Size. Total. Water Sewer ¾ 1 1 ½ $9.84 $4.92 $9.84 $7.38 $60 $7.98. Footnotes. base fee in addition

& Fees. Rates. Charge (water) Rate. Meter Size. Total. Water Sewer ¾ 1 1 ½ $9.84 $4.92 $9.84 $7.38 $60 $7.98. Footnotes. base fee in addition Calendar Year Meter Size ¾ 1 1 ½ Initial Charges (Residential Accounts) Account Activation Fee Total 3 Base Charge (water) New Construction or Irrigation 2 System Development 1 Meter Fee Charges Sewer

More information

Sanitation Rate Study Final Report

Sanitation Rate Study Final Report Sanitation Rate Study Final Report City of Simi Valley April 24, 2015 Prepared by: Page 1 201 S. Lake Avenue Suite 301 Pasadena, CA 91101 Phone 626.583.1894 Fax 626.583.1411 www.raftelis.com April 24,

More information

WHEATON SANITARY DISTRICT [Wheaton, Illinois] Audited Financial Statements And Supplementary Financial Information

WHEATON SANITARY DISTRICT [Wheaton, Illinois] Audited Financial Statements And Supplementary Financial Information [Wheaton, Illinois] Audited Financial Statements And Supplementary Financial Information For The Years Ended April 30, 2016 and 2015 TABLE OF CONTENTS PAGE Principal Officials i Independent Auditors' Report

More information

LEGEND Bridges Parks Fire Stations Project Locations Libraries Schools A

LEGEND Bridges Parks Fire Stations Project Locations Libraries Schools A LEGEND Bridges Parks Fire Stations Project Locations Libraries Schools A Aid to Construction Fund The Aid to Construction Fund (Water) are funds received from customers for requested water service and

More information

Charges. Retail. Charge (water) & Builder. Account Activation Fee. Meter Size. Meter Fee. Water Sewer. Total $7.485 $4.99 $9.98 $9.

Charges. Retail. Charge (water) & Builder. Account Activation Fee. Meter Size. Meter Fee. Water Sewer. Total $7.485 $4.99 $9.98 $9. Residential Accounts Rates & Fees Calendar Year Meter Size ¾ 1 1 ½ Initial Charges (Single-Family Residential Accounts) Account Activation Fee Total 3 Base Charge New Construction or Irrigation (water)

More information

Water Rates Adjustments Phase 2

Water Rates Adjustments Phase 2 Water Rates Adjustments Phase 2 Presented by Shana E. Epstein Director of Public Works, City of Beverly Hills Background Phase 1-Effective January 18, 2018 5-year revenue requirement 3% annual increase

More information

Town of Derry, NH Water Rates and Fees

Town of Derry, NH Water Rates and Fees 1. Meter Retail Service Rates (all customer classes) These rates are for metered retail service. CONSUMPTION RATE: 2.55 per 100 Cu. Ft. (748 gals.) (Revised 2/7/17, Eff. 9/1/17) MINIMUM BASE CHARGES (Revised

More information

The purpose and subject of the proposed local law is to adopt revised sewer rates per the report prepared and submitted by BST & Company, CPA s LLP.

The purpose and subject of the proposed local law is to adopt revised sewer rates per the report prepared and submitted by BST & Company, CPA s LLP. BOARD OF TRUSTEES VILLAGE OF GREENPORT NOTICE OF PUBLIC HEARING ON A PROPOSED LOCAL LAW OF 2017 AMENDING CHAPTER 105 (SEWERS) OF THE VILLAGE OF GREENPORT CODE PLEASE TAKE NOTICE that the Board of Trustees

More information

OPERATING POLICY MANUAL

OPERATING POLICY MANUAL Page 1 of 5 Section 1. The purpose of this policy is to state the procedure and requirements for water and wastewater adjustments that the Bedford Regional Water Authority ( Authority ) has for its customers.

More information

The Village has had Village. age of. repair. were were 10,000 9,000. 8,000 Gallons 7,000 6,000 5,000 4, Even with the.

The Village has had Village. age of. repair. were were 10,000 9,000. 8,000 Gallons 7,000 6,000 5,000 4, Even with the. VILLAGE OF BUFFALO GROVE TO: Dane C. Bragg, Village Manager FROM: Scott D. Anderson, Finance Director DATE: September 14, 2011 RE: Water Fund 20 Year Pro Forma / Rate Recommendations History of Water and