Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-73020) ON A LOAN IN THE AMOUNT OF US$ 75.

Size: px
Start display at page:

Download "Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-73020) ON A LOAN IN THE AMOUNT OF US$ 75."

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No:ICR IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-73020) ON A LOAN IN THE AMOUNT OF US$ MILLION TO THE REPUBLICA ORIENTAL DEL URUGUAY FOR A SOCIAL PROGRAM DEVELOPMENT POLICY LOAN February 26, 2007 Human Development Department Argentina, Chile, Paraguay and Uruguay Country Management Unit Latin America and the Caribbean Regional Office

2 CURRENCY EQUIVALENTS (Exchange Rate Effective 1/31/2007) Currency Unit = Uruguayan Pesos (U$) Uruguayan Pesos 1.00 = US$ US$ 1.00 = Uruguayan Pesos FISCAL YEAR January 1-December 31 ABBREVIATIONS AND ACRONYMS AAA Analytical and Advisory Activity ANEP Administración Nacional de la Educación Pública (National Administration of Public Education) ASSE Administración de los Servicios de Salud del Estado (Administration of State Health Services) BPS Banco Previsión Social (Social Security Fund) CAS Country Assistance Strategy CODICEN Consejo Directivo Central (Central Directive Council) DPL Development Policy Loan FNR Fondo Nacional de Recursos (National Resource Fund) FTS Full-Time Schools Model GDP Gross Domestic Product IADB Inter.-American Development Bank IAMC Instituciones de Asistencia Médica Colectiva (Collective Medical Aid Institutions) IBRD International Bank for Reconstruction and Development ICR Implementation Completion Report IMAE Institutos de Medicina Altamente Especializada (Institutes of Highly Specialized Medical Care) IMF International Monetary Fund INE Instituto Nacional de Estadística (National Statistics Institute) LAC Latin America and the Caribbean Regional Office M&E Monitoring and Evaluation MDGs Millennium Development Goals MIDES Ministerio de Desarrollo Social (Ministry of Social Development) MOE Ministerio de Educación (Ministry of Education) MOF Ministerio de Economía y Finanzas (Ministry of Finance) MSP Ministerio de Salud Pública (Ministry of Health) MTEF Medium -Term Expenditure Framework OECD Organization for Economic Co-operation and Development OPP Oficina de Planeamiento y Presupuesto de la Presidencia de la República (Office of Planning and Budget) PAC Programa de Actividades Comunitarias (Community Activities Program) PANES Plan de Asistencia Nacional a la Emergencia Social (Nacional Social Emergency Assistance Plan) PER Public Expenditure Review

3 PFM Public Financial Management PISA Program for International Student Assessment RUCAF Registro Único de Cobertura Asistencial Formal (Single Registry of Formal Health Assistance Coverage) SAL Structural Adjustment Loan SPDLP Social Program Development Program SSAL Special Structural Adjustment Loan UNDP United Nations Development Program UNESCO United Nations Educational, Scientific and Cultural Organization Vice President: Pamela Cox Country Director: Axel van Trotsenburg Sector Manager: Helena G. Ribe Task Team Leader: Rafael P. Rofman

4 Uruguay Uruguay Social Program Support Loan CONTENTS DATA SHEET... 2 A. Basic Information... 2 B. Key Dates... 2 C. Ratings Summary... 2 D. Sector and Theme Codes... 3 E. Bank Staff... 3 F. Results Framework Analysis... 4 G. Ratings of Program Performance in ISRs... 5 H. Restructuring (if any) Program Context, Development Objectives and Design Key Factors Affecting Implementation and Outcomes Assessment of Outcomes Assessment of Risk to Development Outcome Assessment of Bank and Borrower Performance Lessons Learned Comments on Issues Raised by Borrower/Implementing Agencies/Partners Annex 1 Bank Lending and Implementation Support/Supervision Processes Annex 4. Summary of Borrower's ICR and/or Comments on Draft ICR Annex 7. Map

5 DATA SHEET A. Basic Information Country: Uruguay Program Name: Uruguay Social Program Support Loan Program ID: P L/C/TF Number(s): IBRD ICR Date: 02/26/2007 ICR Type: Core ICR Lending Instrument: DPL Borrower: Original Total Commitment: Implementing Agencies: Ministry of Economy and Finances Cofinanciers and Other External Partners: B. Key Dates THE GOVERNMENT OF URUGUAY USD 75.4M Disbursed Amount: USD 75.4M Process Date Process Original Date Revised / Actual Date(s) Concept Review: 04/13/2005 Effectiveness: 07/01/ /01/2005 Appraisal: 05/04/2005 Restructuring(s): Approval: 06/09/2005 Mid-term Review: Closing: 06/30/ /30/2006 C. Ratings Summary C.1 Performance Rating by ICR Outcomes: Risk to Development Outcome: Bank Performance: Borrower Performance: Satisfactory Low or Negligible Satisfactory Satisfactory C.2 Detailed Ratings of Bank and Borrower Performance (by ICR) Bank Ratings Borrower Ratings Quality at Entry: Satisfactory Government: Not Applicable Quality of Supervision: Satisfactory Implementing Agency/Agencies: Not Applicable Overall Bank Performance: Satisfactory Overall Borrower Performance: Satisfactory 2

6 C.3 Quality at Entry and Implementation Performance Indicators Implementation QAG Assessments (if Indicators Performance any) Potential Problem Program at any time (Yes/No): Problem Program at any time (Yes/No): DO rating before Closing/Inactive status: No No Quality at Entry (QEA): Quality of Supervision (QSA): None None Rating: D. Sector and Theme Codes Original Actual Sector Code (as % of total Bank financing) Central government administration Compulsory health finance 9 General education sector 44 Health 30 Other social services 13 Theme Code (Primary/Secondary) Education for all Health system performance Improving labor markets Social analysis and monitoring Primary Primary Secondary Secondary Social safety nets Secondary Primary E. Bank Staff Positions At ICR At Approval Vice President: Pamela Cox Pamela Cox Country Director: Axel van Trotsenburg Axel van Trotsenburg Sector Manager: Helena G. Ribe Helena G. Ribe Program Team Leader: Rafael P. Rofman Rafael P. Rofman ICR Team Leader: ICR Primary Author: Rafael P. Rofman Cristina Flood 3

7 F. Results Framework Analysis Program Development Objectives (from Project Appraisal Document) The Social Program Development Policy Loan aimed at: (i) Supporting the maintenance of macroeconomic stability; (ii) Recognizing that Uruguay's social policy response to the economic crisis went considerably beyond actions supported by the Bank under the Second Special Structural Adjustment Loan; (iii) Supporting past and ongoing structural and administrative reforms in the education, health, and social protection sectors to further improve both efficiency and equity in service delivery; and (iv) Assisting the early activities of the new administration in various social policy areas, as a foundation for the Bank's support for the medium-term Government policies. Revised Program Development Objectives (if any, as approved by original approving authority) (a) PDO Indicator(s) Indicator Baseline Value Original Target Values (from approval documents) 4 Formally Revised Target Values Actual Value Achieved at Completion or Target Years Indicator : Proportion of insured and uninsured patients billed at public hospitals 90% of insured Value patients (quantitative or N/A 30% of uninsured Qualitative) patients Date achieved 12/31/2005 Due to changes in Government procedures, data on this indicator Comments became unavailable, as information on number of billed patients is no (incl. % achievement) longer centrally collected. Indicator : FNR financial result Value (quantitative or Qualitative) 10.6% surplus maintain surplus during % Date achieved 12/31/ /31/ /31/2005 Comments (incl. % achievement) Official data for 2006 is still unavailable, but expected to be positive. Indicator : Preschool coverage among 4-year old children Value (quantitative or Qualitative) 75% 80% 83% Date achieved 12/31/ /30/ /30/2006 Comments (incl. % achievement)

8 Indicator : Administration of National Assessment of Student Performance Value applied in New round applied round applied during (quantitative or 2004 in 2005/ Qualitative) Date achieved 12/31/ /31/ /31/2006 Comments (incl. % achievement) Indicator : Number of beneficiaries of non contributive family allowances beneficiaries Value (quantitative or Qualitative) Date achieved 12/31/ /31/ /30/2006 Comments (incl. % achievement) Indicator : Status of PANES monitoring system Value (quantitative or Qualitative) System Monitoring reports under design published Document on beneficiaries profile published Date achieved 06/30/ /31/ /31/2005 Further work by the Direction of Monitoring and Evaluation produced Comments several additional reports, on program's impact, social expenditures, et (incl. % achievement) cetera. These reports were completed and published during (b) Intermediate Outcome Indicator(s) Indicator Baseline Value Original Target Values (from approval documents) Formally Revised Target Values Actual Value Achieved at Completion or Target Years G. Ratings of Program Performance in ISRs No. Date ISR Archived DO IP Actual Disbursements (USD millions) H. Restructuring (if any) Not Applicable 5

9 1. Program Context, Development Objectives and Design 1.1 Context at Appraisal (brief summary of country macroeconomic and structural/sector background, rationale for Bank assistance) Macroeconomic and Social Context After several years of macroeconomic stability and steady growth, Uruguay suffered a sharp reversal in 1998 with a recession that persisted for more than three years before collapsing into a deep economic crisis in the second half of The country faced a sharp devaluation of its currency, and the lack of financing placed the economy on the verge of default on its sovereign debt, and GDP fell by 7.5% from 1998 to 2001, before suffering and additional drop of 11 percent in Several external factors contributed to explain Uruguay's recession, including the poor economic performance and crises of its neighboring countries; a deterioration in terms of trade (higher oil prices and lower prices of agricultural commodities); and worsening financial conditions in international capital markets. On the domestic front, persistently high fiscal deficits (around 4% of GDP), an appreciated real exchange rate, weak financial supervision and an outbreak of foot-and-mouth disease during 2001 contributed to the recession and financial difficulties. The 1998 recession and the subsequent economic crisis had a severe social impact, especially on unemployment and poverty. Unemployment increased from about 10 percent in 1998 to 17 percent in 2002/2003. During the period from 1998 to 2002, the proportion of self-employed and of those employed in the informal sector also grew and was accompanied by a reduction in real wages in the private sector. Household income started to decline in 1998 and fell by more than a fifth in the period from 1998 to the end of 2002, as it was negatively impacted by poor performance of the labor market in terms of job creation and wage behavior. As a result, poverty increased between 2000 and 2003/2004 from 17 percent to 31 percent of the population, while extreme poverty also doubled during the same period. Despite the impact on household income, extreme poverty remained low in Uruguay with respect to other Latin American countries and the recent economic recovery should reverse the increasing trend in poverty rates. After an improvement in the early 1990s, income distribution worsened during the 1990s, as the Gini coefficient increased from in 1990 to in The deterioration in social indicators in the early 2000s resulted in growing social exclusion, as many Uruguayans found themselves without a job, or a safety net to avoid poverty. The outcome of the crisis could have been much worse had it not been for an effective adjustment effort by the Uruguayan authorities and the consensual nature of the country's political system. The success with which Uruguay was able to weather the economic crisis of owes much to its prompt and purposeful response to events. Negotiations with creditors led to the successful conclusion of a sovereign debt exchange in May 2003, raising the average maturity of bonds by over 5 years without increasing interest rates and without a principal haircut. Fiscal adjustment resulted in a primary fiscal surplus of 3.8 percent of GDP in 2004 (a major turnaround from primary deficits through ). Prudent monetary management enabled the inflationary impact of the 2002 devaluation to be limited to only 19.4 percent that 6

10 year. Subsequently, inflation was brought down to single figures. The Government's response to the crisis was not limited to macroeconomic measures. A set of mitigating policies to limit the social impacts and prepare the stage for a more rapid recovery was adopted as the crisis developed. The main focus of Government social policies during the crisis was on protecting some critical social sector budgets and providing access to social services and protection to the most vulnerable population, including those who, due to the increased unemployment or decline in real wages, were forced to turn towards the public health system to obtain medical care, as they lost the coverage provided by social insurance and private providers. Economic and social recovery and political transition Efforts by the Uruguayan Government to recover from the crisis began to have an impact on economic and social indicators since mid Real GDP growth in 2003 became positive after four years of decline, reaching 11.9 percent in 2004 and 6.5 percent in Financial markets began to improve, and social indicators reversed the negative trends. Poverty incidence in 2005 declined by two percentage points, to less than 30 percent, unemployment fell back to pre-crisis levels (12.2 percent in 2005) and income distribution slightly improved, as the Gini coefficient declined to In addition, a significant tightening of spreads and successful renewed access to private markets indicated that the economic situation was returning to normal. The victory of the Frente Amplio-Encuentro Progresista - Nueva Mayoría coalition in the October 2004 elections ended 170 years of Uruguayan politics being dominated by the two traditional parties, the Partido Colorado and the Partido Nacional. The new Government took office on March 1, The political transition period was smooth with collaboration from outgoing authorities and continuation of critical policies by the new administration. Bank Assistance As the crisis hit in the early 2000s, Uruguay and the Bank agreed that structural adjustment lending would be the most appropriate tool to support the administration in its efforts to soften the impacts and recover. Two Structural Adjustment Loans (SAL I and SAL II 1 ) and two Special Structural Adjustment Loans (SSAL I and SSAL II 2 ) were approved between August 2002 and April Under the first SAL, the social protection system was to be strengthened by improving management and by safeguarding budget allocations. The program goals were all substantially achieved, and the loan was fully disbursed. The second Special SAL (SSAL II) was designed to be disbursed in three tranches. The operation aimed at improving the equity and efficiency of public expenditures and health and education by improving management and by giving budgetary protection to priority programs. Good progress was made towards those goals and, by 2004, the Government had complied with all conditions in the social sectors for release of the second and third tranches. However, tranche release was held up because the loan was linked with the SAL II program, which supported 1 SAL I: Report No UR / SAL II: Report No UR 2 SSAL I: Report No UR /SSAL II: Report No UR 7

11 reforms in the infrastructure sector. As advances in this area were slower than expected, tranche releases in both loans were delayed. The Special SAL was brought to closure in May 2005, when Uruguay's Government requested cancellation of the second and third tranches of SSAL II because it no longer required financial support on special terms. Under the new CAS, the Government requested a new DPL, which was to support reforms and measures that had been undertaken to overcome the crisis effects and to advance reforms in the social sectors to improve quality, efficiency and equity in service provision. The new operation would fit well within the overall strategy of the CAS and, in particular, within the objective of improving living standards. It was also to prepare the way for further lending, as the indicative lending program put forward in the CAS included additional operations in the social sectors to support for Uruguay's effort to strengthen its tradition as a highly equitable country and efficient social institutions, with a view to reduce poverty in the medium term. 1.2 Original Program Development Objectives (PDO) and Key Indicators (as approved) The Social Program Development Policy Loan aimed at (i) supporting the maintenance of macroeconomic stability; (ii) recognizing that Uruguay's social policy response to the economic crisis went considerably beyond actions supported by the Bank under the Second Special Structural Adjustment Loan; (iii) supporting past and ongoing structural and administrative reforms in the education, health, and social protection sectors to further improve both efficiency and equity in service delivery; and (iv) assisting the early activities of the new administration in various social policy areas, as a foundation for the Bank's support for the medium-term Government policies. Section V.5 of the Program Document identified a set of near and medium-term impact indicators for the operation, linking supported actions with the CAS overall objectives. The indicators, organized by sector, were: Health Near-Term Indicators (end of 2005) Billing system is used for billing at least 90 percent insured patients identified by the Single Registry of Formal Health Assistance Coverage (RUCAF) at hospitals and at least 30 percent uninsured patients FNR in surplus during 2005 Medium-term Impact Indicators (end of CAS period) Equity and Sustainability - Fiscal transfers to BPS reduced in line with mediumterm macro framework - National Health insurance regulation completed and implemented Equity and Access - Share of health sector expenditure directed towards primary and preventative care increases from 0.4 percent in 2003 to 4 percent in

12 Education Social Protection Preschool coverage among 4-year olds increases to 80 percent by the end of 2005 National assessment of student performance is successfully administered The number of family allowances beneficiaries from the informal sector increases by 10 percent by the end of 2005 Monitoring reports for PANES published by the end of 2005 Coverage: - School enrollment rate of 4 year olds reaches at least 95 percent by June 2010 Quality and Equity: - Percentage of students achieving proficiency levels in math and language increases by 15 percentage points by June Achievement gap between students from low and high income backgrounds is reduced - Performance of 15 year old students in PISA 2006 is higher than in PISA 2003 Efficiency and Equity: - First grade repetition rates fall to less than 10 percent by June Secondary school dropout rates decrease to 25 percent by June 2010 Equity and Access: - Family allowance program has at least 60 percent of take-up among the poor by Pension coverage of people in old age increases to at least 90 percent. Sustainability - Pension system becomes more sustainable financially with more flexibility to include workers. Pension spending not to exceed 17 percent of GDP by Efficiency and Equity - Social emergency program (PANES) implemented, reaches 200,000 beneficiaries by 2006, and is largely phased out by Revised PDO (as approved by original approving authority) and Key Indicators, and Reasons/Justification 1.4 Original Policy Areas Supported by the Program (as approved) The SPDPL supported actions taken to overcome different structural problems in the different social sectors, as well as others aiming at overcoming the direct impact of the economic crisis. Some of these actions had been initiated before the loan was prepared, and their inclusion in the policy matrix served as a recognition of their contribution to improve the situation, while others were defined as part of the new government program. In general, the goal was to achieve higher efficiency, less inequities and better incentives for participants and beneficiaries of the different programs. While recognizing previous actions, SPDPL support was always linked to the medium term government strategy, as a way to engage and support current and future efforts to advance the necessary reforms. 9

13 The four areas supported by SPDPL were macroeconomic policy; health; education; and social protection: The Macroeconomic Policy As part of the efforts to reduce impacts and recover from the effects of the crisis, the Government of Uruguay adopted a rigorous macroeconomic policy, which ensured fiscal sustainability of public policies and programs, including those from the social sectors. The SPDPL recognized these efforts as a critical contribution to a faster and less traumatic recovery process. The Health Sector The health sector in Uruguay is organized through a complex array of public and private providers and financiers. Nearly 97 percent of the population have access to health care services, either through the public health system, private insurers (organized as cooperatives) that cover formal workers and voluntary participants, and a few commercial insurers. While coverage has been traditionally high, excessive costs and inefficiencies have affected the sector, a problem that worsened during the crisis, when many Uruguayans formerly protected by the private providers were forced to turn towards the public hospitals for health care services. The main issues that demanded actions in the sector were: Inefficient allocation of health care resources across public hospitals and facilities, due to lack of incentives and inadequate budgeting criteria Duplication of coverage for individuals paying health insurance through their jobs but using public facilities to receive health care, with no systems for cost recovery, which results in high cross-subsidies between public and private providers Inadequate management and regulation of the catastrophic insurance scheme, resulting in increasing deficits and additional subsidies to private insurance schemes. The SPDPL supported several actions taken to overcome these issues. First, changes in the budgeting and fund allocation process for public hospitals were introduced, to benefit betterperforming hospitals and improve the incentives structure in the sector. The second action was the development of a beneficiaries database and its use to start billing patients in public hospitals. This action was to allow the reduction of the incidence of cross-subsidies with the private sector, improving the overall efficiency of the sector. Finally, the third action supported by SPDPL in the health sector was the improvement in management of the catastrophic insurance scheme, which resulted in the reduction and elimination of financial deficits. The Education Sector Uruguay has had one of the strongest education systems in the region for most of the 20th Century, and this had an important role in explaining the high levels of social and economic equity. By 2003, 95 percent of children were enrolled in preschool at age five, and 90 percent remained in school to complete the primary cycle. However, progress in some areas of the education system until the early 2000s had been slower than in other countries in the region. Among those, access and quality of education for pre-school children and teenagers in secondary schools were below expectations. The causes of these problems could be traced to administrative inefficiencies, lack of incentives and insufficient evaluation of policies and programs. The 10

14 SPDPL supported actions that, as part of the Government strategy, ensured financing to critical programs in the aftermath of the crisis, deepened reforms that provide the central administration with more adequate tools to plan and adjust operations of the system, and advanced in the expansion of coverage as well as improvements in education quality and equity. The main issues in the sector were: Funding for critical education programs was at risk due to the fiscal impact of the crisis. As the economic crisis created growing fiscal restrictions, the risk that funding for critical educational programs would be cut was high. Continued investment in these program was critical to maintain and improve education access, especially in poor neighborhoods, making it necessary to adopt budgetary protection measures; Information management systems at central institutions were inefficient and impaired advances in system reforms. The central administrative structure of the education system had significant shortcomings with regards to transparency, results monitoring, and auditing systems; Coverage among pre-school children (especially 4 year olds) in Uruguay was below expected levels, affecting these children future opportunities; and The sector lacked a standard evaluation system, including a system to maintain regular students' performance assessments. Uruguay had a limited history regarding student performance evaluations. While investment in the sector was needed, the lack of consistent information to track performance changes hampered the Government's ability to design strategies and policies to improve educational quality The SPDPL supported several actions taken to overcome these issues. First, the efforts made by the Government to protect the budget of three critical education programs (basic school supplies, bilingual education and books and teaching materials) in the aftermath of the crisis was recognized. Second, several new information management systems were introduced at ANEP, the central education management institution. They include a system to file legal documents, a human resources administration database, and school-based information systems for primary and secondary levels. Also, the creation of an internal auditing unit at ANEP was supported by the operation. Third, the efforts to continue expansion of 4-year olds coverage were recognized by SPDPL and, finally, the adoption of a permanent system of student performance evaluation (through national and international testing) was also supported by SPDPL. The Social Protection Sector The social protection sector in Uruguay has been one of the strongest in the region for many decades. Coverage among active workers and the elderly was very high, compared with other countries in the region or even some countries members of OECD. However, the system was almost exclusively focused on the contributory pension system, as more than 90% of expenditures were explained by this program. Social Security expenditures reached as much as 15 percent of GDP in 2000, crowding out other programs. The impact of the crisis on the labor market made evident the need to develop strategies to provide protection to those outside of the formal sector, since they represented a growing number of workers. Recognizing this need, the Government introduced in 2000 an important reform, providing access to family allowances to low income families, even if they were not contributing to the social security system. The system was expanded again in early 2004, aiming at a universal coverage among poor households. Also, 11

15 immediately after taking office, the new administration in 2005 created a Ministry of Social Development (MIDES), that was responsible for the design and implementation of an emergency social program and for the coordination and monitoring of all social policies. The main issues in the sector were: Poor families lacked access to family allowances benefits when parents had no formal employment. This problem was correctly addressed by the innovative reforms of 2000/2004, but actual expansion of coverage was insufficient and a renewed effort and commitment by authorities was necessary to fully implement these laws. BPS management of social insurance programs was efficient, but given their size (the aggregate budget of BPS reached between 15 and 20 percent of GDP), further efforts to increase transparency and accountability were necessary, in particular with regards to public access to normative and statistical information produced at the institution. The creation of MIDES represented an important step in Uruguay s effort to redirect part of its effort in social protection to include the poorest and most vulnerable in the system. While MIDES immediately focused on the design and implementation of the emergency program, it was also necessary to develop a reliable monitoring and evaluation system to assess different social policies and support strategic decisions in this area. The SPDPL supported several actions to overcome these issues. First, the loan recognized the previous Government's efforts to expand coverage of the family allowances program through the 2000 and 2004 legislation, as well as the continuous effort to expand actual coverage and reach those legally entitled to receive benefits. Second, the SPDPL supported a decision by the BPS Board to publish all resolutions and statistics produced by the institution. Finally, the loan supported the design of a monitoring and evaluation plan for PANES and other social programs in MIDES. 1.5 Revised Policy Areas (if applicable) 1.6 Other significant changes (in design, scope and scale, implementation arrangements and schedule, and funding allocations) 2. Key Factors Affecting Implementation and Outcomes 2.1 Program Performance (supported by a table derived from a policy matrix) Number of 1 tranches: Tranche Amount: Expected Actual Release Release Release Date: Date: Floating Restructured 1 75,380, /30/ /01/2005 Regular No No Tranche Release binding Conditions Tranche Condition Text of Condition Status: 12

16 (a) MSP has issued Directive (Circular) No. 12, dated April 27,2005, authorizing a system for the allocation of budget amounts to its executing agencies based on per capita and production criteria, and Met started the application of such system. (b) ASSE is operating a budget administration system, satisfactory to the Bank, in its health facilities. (a) MSP is operating a program of database maintenance which includes an identification of its beneficiaries, and enables MSP to identify coverage duplications. (b) ASSE has been implementing since January 2002 a billing system for insured in-patients satisfactory Met to the Bank, and has authorized through the Borrower s Decree dated February 13, 2003 the utilization by the public health providers of the proceeds of the fees charged by such providers. (a) FNR has maintained a financial equilibrium (regular revenues, not including any amounts attributable to the increase in contribution rates mandated by a decree of the Executive, have been equal to or greater than regular expenditures any extraordinary, not operationally-related revenues and expenditures excluded) in its 2003 and 2004 financial statements. (b) FNR s Board of Directors approved on April 14, 2005 reforms in its administration procedures which Met include: (i) setting of unitary costs for medical procedures and utilization rates of principal medical procedures satisfactory to the Bank; and (ii) validation of service authorizations made by FNR against RUCAF s and ASSE s consolidated beneficiary databases. (c) FNR s Board of Directors approved on May 30, 2002 reforms in its administration procedures setting forth adjustment of tariffs for medical procedures based on variations of unitary costs. The Borrower has, as needed to protect critical education programs: (a) executed budgets for the calendar years 2003 and 2004 at the following minimum yearly amounts: (i) $900,000 for basic school supplies; (ii) $250,000 for bilingual education; and (iii) $300,000 for Met books and materials; and (b) approved a budget for calendar year 2005 at least in the yearly amounts mentioned in paragraph 1 (a) above, for each of the three programs mentioned therein. ANEP has implemented a series of management information systems, satisfactory to the Bank and described in the annexes to the letter from ANEP to the Bank dated April 29, 2005, which include: (a) a file management system; (b) a filing system for CODICEN s resolutions; Met (c) an information management system each for the primary and secondary education systems; and (d) the incorporation of ANEP s human resource database into the central database of public servants of the Planning and Budgeting Office of the Borrower s Presidency. ANEP has: (a) through its resolution dated May 27, 2003 staffed its internal auditing unit; and (b) through its resolution dated October 9, Met 2003 approved the operational procedures of such unit. The Borrower has prepared a plan, satisfactory to the Bank, to expand to 80% school coverage of four-year-old students during the Met 2006 school year. 5. CODICEN has decided: (a) through its resolution dated August 24, 2004 to continue implementing national assessments of student Met learning; and (b) through its resolution dated November 16, 2004 to participate in 2006 in the Organization of Economic Cooperation and 13

17 Comments Development (OECD) Program for International Student Assessment (PISA 2006). BPS has delivered a report dated April 22, 2005 indicating that the number of beneficiaries of family allowances under Laws No and No published in the Official Gazette on July 29, 1999 and May 10, 2004 respectively, reached 184,252 in December BPS has issued Resolutions No. 8-5/2005, 8-6/2005 and 8-7/2005, all dated March 31, 2005, and Resolution No /2005, dated April 13, 2005, improving its disclosure policies, including access to statistical information, access of BPS directors to databases, authorization to regional managers to provide information to local media, and publication of general resolutions through the internet and the Official Gazette. The Borrower s Ministry of Social Development has created a Directorate for Programs Evaluation, named its director, and designed an impact evaluation and monitoring system for implementation by such Ministry. Met Met Met 2.2 Major Factors Affecting Implementation: Preparation of SPDPL began in April 2005, and was approved by the Bank's Board two months later. All tranche release conditions had been met by appraisal, and effectiveness and disbursement followed quickly, since no additional conditions were defined. A central factor in the successful implementation of SPDPL was the good overall relation between the Bank and Uruguay's Government. The operation was prepared at the same time the new CAS was being formulated, in a context of strategic partnership in all sectors. The Government counterparts, including MEF, OPP, and sector officials, showed a strong commitment with the operation and its implementation. While some of the actions supported by the SPDPL had been implemented before the operation was prepared, others were defined and implemented in a timely manner, in line with the agreements reached during the preparation process. Smooth implementation of the operation was facilitated by the strong background analysis that supported it, including policy notes, analyses conducted during the preparation of previous operations, and other AAA, such as a Poverty Assessment and a Public Expenditure Review. Knowing that the operation would be a single-tranche policy support loan with a rapid disbursement, the team aimed at designing a policy matrix that would not include too many actions, focusing on their relevance and feasibility. Risks identified at appraisal (political, economic, and managerial) were well managed in the context of the mitigating measures proposed at that time. Thus, the team concern with a possible lack of ownership of ongoing policy reforms by the new government was managed through very intense dialogue between Bank staff members and official counterparts, in the context of 14

18 preparation of new AAA and loan operations and supervision of existing ones. The economic risks identified at the time of appraisal originated in possible fiscal restrictions in continuing implementation of supported policies. However, the sound macroeconomic management, in a favorable international context, helped to control this risk. Finally the potential problems arising from managing risks (in particular, due to the inexperience of the new Ministry of Social Development staff) were also managed by the strong support that other agencies with stronger managing records (in particular, BPS) provided to MIDES. 2.3 Monitoring and Evaluation (M&E) Design, Implementation and Utilization: (a) M&E design: During the preparation of SPDPL, a set of indicators to monitor progress with regards to the PDOs were defined, as indicated in section 6.2 of this ICR. These indicators were selected in agreement with Government counterparts, considering availability of data at the time of appraisal, relevance to represent the trends in the different areas and issues included in the operation and expected availability in the future. (b) M&E implementation: Data availability for most indicators was adequate after appraisal, allowing the team and Government officials to follow up on the policy dialogue initiated during preparation of the loan. Being a single-tranche policy support operation, the program design for SPDPL did not include a formal strategy to continuously monitor the evolution of these indicators, but it was focused to ensure availability at the time of ICR preparation. Data on these indicators are included in Annex 1 of this ICR. 2.4 Expected Next Phase/Follow-up Operation (if any): Following the approval of SPDPL, the World Bank and the Government have had a very active policy dialogue to continue collaborating in the area of social policies through development policy and investment lending, and analytical and advisory services. This collaboration covers the three social sectors supported by SPDPL (health, education, and social protection), with a combination of instruments. In health, a Bank team is preparing, together with the Ministry of Public Health, a technical assistance loan to support ongoing and planned reforms and programs in the sector 3. This operation, planned to be submitted to the Bank's Board of Directors in mid 2007, would aim at: (i) Strengthening the Ministry to improve its monitoring capacity, to improve the quality of primary and secondary health prevention of non communicable diseases, developing epidemiological monitoring and surveillance systems; (ii) promoting further improvements in regulatory and supervisory systems for public and private health service providers; (iii) providing financing for key infrastructure and medical equipment acquisitions for the primary health care network; and (iv) strengthening the Ministry of Public Health capacity to implement public health promotion strategies in schools and municipalities, to increase 3 National Health Insurance and Social Security Loan (P050716) 15

19 prevention under a social inclusion strategy. These areas of action are directly linked to the policies supported by SPDPL in the sector, and represent a continuation of the same strategy. In education, an AAA on Equity and Quality of Education 4 is being prepared to help define the policy to improve these two critical areas. The report focuses on the issue of equity in access to quality education, indicating that the main problems are in the enrollment level of some specific age groups and on the quality of education received by part of the population. While the extension of coverage among pre-school children supported by SPDPL has been successful and continued beyond the original goal, the focus on the quality of that education and on the necessary strategies and tools to improve it are the next step in policy development for the sector. Also, the ongoing Third Basic Education Quality Improvement Project 5 has three basic objectives, supporting Government efforts to (i) increase equity in the provision of preschool and primary education, by expanding full time schools; (ii) improve the quality of preschool and primary education; and (iii), improve the efficiency of the preschool and primary education system, always with a focus on socio economically disadvantaged and very disadvantaged contexts. This program has provided substantial support to achieve the SPDPL goal of increasing preschool coverage. In social protection, an AAA on Income Transfer Policies 6 is being prepared to provide inputs to the Government for the design of the new "Plan de Equidad", the integrated social policy that should replace the emergency program "PANES" by the end of The study is focused on identifying and assessing policy options, considering the goals (high coverage with reasonable benefits), restrictions (limited fiscal resources and need to adapt institutional setting), and trying to reconvert existing programs to support the new policy. Also, a Non-lending Technical Assistance (P101152) to support the implementation of the monitoring and evaluation (M&E) system of MIDES and the preparation of a PSIA is currently being executed. A non-lending Technical Assistance project to support the development and institutionalization of the monitoring and evaluation system of social policy in Uruguay 7 is also under execution, as a follow up of the support provided in SPDPL to the development of the M&E system in MIDES. This TA focuses on the participatory monitoring system, to ensure that beneficiaries and other interested citizens are heard in the process of evaluating and redesigning social policies. Finally, a new programmatic development policy loan 8 is being prepared, with the goal of submitting it to the Bank's Board in early This operation has a wider scope than the SPDPL, as it also includes support for a tax reform and improvements in capital markets, but it includes a social protection component focused on the continued expansion of coverage by the family allowances program and its eventual role as a core component of the new program "Plan de Equidad". The PDPL will also support additional improvements in management and 4 Education Equity and Quality in Uruguay (P95503) 5 Third Basic Education Quality Improvement Project (P070937) 6 Income Transfer Policies in Uruguay (P095508) 7 Strengthening Participatory Monitoring and Evaluation of Social Policy (P101152) 8 First Programmatic Development Policy Loan (P083927) 16

20 transparency in BPS, resulting in higher coverage and collection among active workers. An accompanying technical assistance loan 9 will support the implementation of SIAAS, a system to identify social programs beneficiaries across the country. This system will include information from health, education, social protection, social insurance and other sectors, resulting in an unified data base extremely useful to advance in some of the reforms supported by SPDPL in the health sector (reducing the magnitude of cross-subsidies between public and private providers) improve targeting of same programs and limit the magnitude of gaps and overlapping in coverage. 3. Assessment of Outcomes 3.1 Relevance of Objectives, Design and Implementation (to current country and global priorities, and Bank assistance strategy) The SPDPL objectives were to " (i) support the maintenance of macroeconomic stability; (ii) recognize that Uruguay's social policy response to the economic crisis went considerably beyond actions supported by the Bank under the Second Special Structural Adjustment Loan; (iii) support past and ongoing structural and administrative reforms in the education, health, and social protection sectors to further improve both efficiency and equity in service delivery; and (iv) assist the early activities of the new administration in various social policy areas, as a foundation for the Bank's support for the medium-term Government policies." (from SPDPL PD, par. 63) These objectives were adopted considering that the country had already adopted important policies to protect the population from the crisis impacts, and continued its efforts to develop policy reforms to increase access, equity, efficiency and sustainability in the social sectors. The new Government early actions were clearly directed in the same direction, providing continuity and deepening several needed policies in health, education, and social protection. In that context, the SPDPL objectives were clearly relevant at the time of appraisal in regards to country priorities, and continue to be relevant at ICR preparation. Objectives were relevant to the Bank assistance strategy. The SPDPL objectives were aligned with the new CAS framework, which was submitted to the Board together with the SPDPL. The SPDPL fits well within the overall strategy of the CAS and, in particular, within the objective of improving living standards. Also, the SPDPL contributed directly to other objectives adopted by the CAS, such as state modernization, enhanced transparency, strengthening accountability, and increased operations efficiency. Being the first operation prepared and approved under the new CAS and with the new Government counterparts, the SPDPL had an important role in setting the tone and style of collaboration between the Bank and the new Government. The operation served as a bridge between past and future support, indicating that the Bank considered that many policies originally designed and implemented by the previous government were adequate and necessary, and that continuation and deepening of these policies would result in better social and economic conditions for the population. 9 Institutions Building Technical Assistance Loan (P097604) 17

21 The near-term Indicators (end 2005) of SPDPL are aligned with the Medium-Term Impact Indicators defined in the CAS, and advances in these indicators produced under the support of SPDPL can be already considered as significant steps towards the medium term goals for these indicators. The objectives of the SPDPL have contributed to increase the efficiency of reforms, as well as to promote careful analysis and evaluation in the implementation of social programs. Implementation of reforms that had started before SPDPL and those initiated as part of it have continued, in some cases with better results than expected. Thus, the relevance of objectives, design and implementation is considered satisfactory, based on: (i) the consistency of Program with Bank and Government priorities; (ii) quality of the design, with a clear focus in the protection of the most vulnerable; and (iii) adequate implementation, which resulted in increased sustainability of supported reforms. 3.2 Achievement of Program Development Objectives (including brief discussion of causal linkages between policy actions supported by operations and outcomes) Achievement of Program Development Objectives is considered satisfactory. The three core objectives of the program - (i) support Uruguay's efforts to maintain a stable macroeconomic framework; (ii) recognize Uruguay's social policy response to the economic crisis of 2001 and 2002; (iii) support past and ongoing structural and administrative reforms in the health, education, and social protection sectors; and (iv) assist the early activities of the new administration in various social policy areas- were achieved as expected, thanks to the results of each individual action. The macroeconomic policy in Uruguay achieved its overall objectives, with sustained growth in a stable context, progressive reductions in the public debt-to-gdp ratio, and positive fiscal results. Real GDP grew by 6.6 percent in 2005, with inflation at below 5 percent, and improvements in the exchange rate. Public sector debt (that had reached 104% of GDP in 2003) declined to 60% of GDP in 2005, and further declines were expected for Similarly, the primary balance of the non financial public sector reached a record surplus of 3.9% of GDP in In the health sector, the reforms in budgeting, advances in public hospitals billing systems and improvements in the financial and regulatory management of the catastrophic fund (FNR) were substantial to recognize past efforts (in particular, regarding the improvement in FNR), and set up the conditions for a longer term reform process in the health sector, increasing equity (by reducing cross-subsidies) and efficiency (by improving budgeting criteria and procedures). In education, the policy actions provided an explicit recognition to past policies by including the budget protection condition for years Also, the improvements in the information management systems in the central education system and at the schools resulted in higher efficiency in the sector, together with the improvement in control generated by the creation and implementation of an internal auditing unit at ANEP. The focus on equity was implemented through the expansion of preschool coverage, which resulted in sustained advances in the proportion of 4 year old children with access to the formal educational system. This action, initiated by the previous government and deepened by the new administration, represents a 18

22 significant improvement in equity of opportunities for children that previously entered the formal schooling system in a disadvantaged position. Also, the establishment of a regular program to measure students' performance will result in a more transparent process to design and implement policies in the sector. Finally, in social protection, the SPDPL included an action that recognizes previous efforts (the approval of the 2000 and 2004 laws providing access to family allowances to poor households) and continuing policies, as the new government successfully supported the goal of further expanding coverage in this program. Also, new measures, including the increased transparency in BPS operation by making public all resolutions of its board of directors and all statistics, and the design of an evaluation and monitoring plan for social policies were very important to improve efficiency and support the new administration first steps towards the design of a new social policy strategy. 3.3 Justification of Overall Outcome Rating (combining relevance, achievement of PDOs) Rating: Satisfactory The overall outcome rating for SPDPL is "satisfactory" since all planned reforms were implemented in full and they achieved their key objectives of maintaining and improving social service delivery. Further, in all areas the government continued developing its reform agenda. The satisfactory rating is considered justified since: (i) the education and health reforms were strengthened through better management, increased efficiency and the effective protection of socially-critical budget allocations, (ii) social service delivery indicators were maintained or improved during the lifetime of the operation; and (iii) the impact of social programs directed to the poorest population has improved. Advances in near-term indicators show the positive evaluation of SPDPL outcomes in quantitative terms. The recognition of past actions in response to the crisis was very effective as a signal to the new Government regarding the need to give continuity to some of these policies, which where initiated under the previous government, maintained within the context of SPDPL, and, in several cases, deepened and considered key components of the medium term strategy by the new authorities. While in some cases the impacts were indirect, in others it is clear that actions supported by SPDPL resulted in significant improvements in the near-term indicators proposed in the program document: 1. The financial result of FNR (the catastrophic health insurance fund) continued to be positive, at 6.8% of revenues. The decline from the previous year (10.6% in 2004) was caused by poor financial results, since the operational result (revenue minus cost of medical services) went from 10.2% in 2004 to 10.4% in Data for 2006 is not available at the time of ICR preparation (2006 balances for FNR will be available in mid 2007). However, initial estimates indicate that the balance was positive. 2. School coverage among 4 year old children exceeded the 80% goal set for 2005, reaching 83% in mid This indicator is highly relevant as it shows that not only the coverage recovered from the crisis impact, but it reached a new record level, indicating the positive trend in the medium term. 3. As planned, the national assessment of students' performance was applied during Results from the assessment will be available in early

23 4. Family allowances for children of informal workers continued to expand. The goal of an additional 10% increase during 2005 (reaching 200,000 beneficiaries at the end of the year) was obtained and exceeded, reaching by June Further improvements are expected, but at a slower pace, since officials at BPS estimate that a plateau may have been reached. 5. A monitoring report for PANES was published by the end of 2005, as expected. Furthermore, the Direction of Monitoring and Evaluation of MIDES, continued publishing analytical reports during 2006, including assessments of PANES impacts, beneficiaries profiles, a survey of social programs and, in December 2006, a report on Public Social Expenditures since Overarching Themes, Other Outcomes and Impacts (if any, where not previously covered or to amplify discussion above) (a) Poverty Impacts, Gender Aspects, and Social Development SPDPL supported a set of actions in the three social sectors that aimed, directly or indirectly, at reducing poverty and improving the overall welfare of Uruguayans. The loan was approved and implemented in 2005, as the worst stage of the crisis had passed and different socioeconomic indicators were recovering. Poverty and extreme poverty incidence reached record highs in 2004, with 31.8% and 3.1% of the population respectively. As the country recovered from the crisis effects, these indicators began to decline, and by early 2006 nearly 27% of the population was poor and 2% was affected by extreme poverty. Income distribution was also affected by the crisis, as the Gini coefficient went from in 2001 to 0.46 in The recovery in this case was limited, as the coefficient was around in early Other socioeconomic indicators show similar trends, with some worsening due to the onset of the crisis in the early 2000s and a recovery as mitigating measures such as those supported by SPDPL and overall economic improvement had an impact. For example, the infant mortality rate had grown from around 14 deaths per thousand births in the early 2000s to 15 per thousand in 2003, but recovered and, by 2005, was at 12.7 per thousand. The implementation of the SPDPL and further measures taken by the Government had an impact on the social development dimension. As one of the actions supported by the loan (the design of an M&E system for social policies) was implemented, the Ministry of Social Development included standard monitoring tools (such as definition of quantitative indicators) but also propose the adoption of a social monitoring model, which is being developed with support from the Bank. (b) Institutional Change/Strengthening (particularly with reference to impacts on longer-term capacity and institutional development) In spite of being a single-tranche project, the SPDPL had a substantial institutional development impact in the areas involved in the program (education, health and social protection). The program had an immediate impact in the different institutions, as it supported policies aiming at improving efficiency and transparency. Better management of FNR (the catastrophic health insurance scheme) or changes in the budgeting and incentive structure of public hospitals had a direct impact on these institutions that resulted in stronger and more sustainable policies. Similarly, the reforms introduced at ANEP (the education board) gave this institution a new 20

24 strength to manage the system, limiting previous abuses and lack of transparency. On social protection, the inclusion of an explicit action in the policy matrix to support the increase in transparency at BPS represented not only an important gesture of support for a new direction in the way this institution operates, but resulted in better than expected improvements in terms of institutional governance. BPS not only began to publish all resolutions and statistics, but it also made public on a regular basis the studies prepared by its Division of Studies, which produced analysis of the current status and trends of the system. BPS also collaborated actively in the organization and implementation of several open workshops. Finally, the development of an M&E plan at MIDES resulted in a much stronger policy making process. The Department of Monitoring and Evaluation at MIDES became a central component of the policy making process for the social sectors, providing analytical and technical inputs to the decision makers that were not available before. The compilation of a detailed database of PANES beneficiaries was not only a core element of the targeting and control systems at MIDES, but it was also extremely useful, together with other datasets managed by BPS, in the analysis of policy options for the future. (c) Other Unintended Outcomes and Impacts (positive or negative, if any) 3.5 Summary of Findings of Beneficiary Survey and/or Stakeholder Workshops (optional for Core ICR, required for ILI, details in annexes) 4. Assessment of Risk to Development Outcome Rating: Low or Neglible Risks identified at time of appraisal were considered to be low to moderate. Three categories of risks were identified at that point: Political, economic and financial and managerial. After closing the operation, Risk to Development Outcome is also considered to be negligible to low, since mitigating measures discussed in the PD are still in place. In particular: Political Risks: Potential problems were based on the fact that the SPDPL was started with a Government that was just taking office, while it supported some reforms initiated by the previous administration. Mitigating measures for this risk included continued dialogue with the Government through the supervision of an investment loan in education, the preparation of a new loan in the health sector, support to MIDES through the non lending TA operation, preparation of a AAA on income transfer policies, and, more recently, preparation of a new DPL and an accompanying TAL. Nearly 18 months after appraisal, commitment of the Government towards the reform program continues to be strong and focused. Economic and Financial Risks: The implementation of reforms required continued financing in a macroeconomic context of restrictions and high levels of indebtedness. Mitigating measures for this potential problem resided in the maintenance of a consistent macroeconomic and fiscal framework, which was achieved in 2005 and Managerial Risks: The implementation and consolidation of the reforms included in the SPDPL required strong managerial abilities. Components of the reform process could have failed if administrative capacity would have been inadequate. However, the agencies involved (ANEP, MSP, ASSE, BPS, MIDES, showed a strong commitment and towards achieving the goals of the program. 21

25 5. Assessment of Bank and Borrower Performance (relating to design, implementation and outcome issues) 5.1 Bank Performance (a) Bank Performance in Ensuring Quality at Entry (i.e., performance through lending phase) Rating: Satisfactory Bank lending performance is rated as satisfactory. As noted, loan identification and design were consistent with the CAS, built on the experience of previous operations (SAL and SSAL-II), and was consistent with the Government's development strategy. The Bank worked closely with the IDB and other donors on the design of the loan. Policy actions in the social sectors supported by the SPDPL program were well designed, with an expected positive impact on social outcomes. The focus on policies that would protect basic services in health, education and social protection in the wake of the economic crisis was appropriate, considering the social and economic emergency in the country at the time. The quality of the project design was satisfactory because it was targeted at key areas in the education and health sectors and social protection and had the virtue of mobilizing the debate on basic structural matters at the start of the new Government. The Program made a relevant contribution to Uruguay's return to stability, and triggered important changes in areas that were traditionally considered structural constraints. The assessment of the situation in the social sectors in Uruguay in early 2005 indicated that, while the crisis had affected some indicators, the Government had already adopted several policies to mitigate these impacts, and the Bank considered appropriate to recognize these efforts in this DPL policy matrix. The choice of specific objectives in the health, education and social protection areas reflects a thorough knowledge of the sectors in Uruguay, because they each play a key role in the systems. Resolving of the chronic deficit of the FNR, modifying the performance guidelines for ASSE, making the ANEP more efficient and incorporating an Internal Audit unit are all highly relevant, with potential for extension of their impact on the operation of the sectors. At the time the SPDPL Program was prepared, the Bank made an accurate diagnosis of the social situation. In particular, it identified the principal risks to which the most vulnerable sectors of the population were exposed. Working with the Government, the Bank ensured that the SPDPL Program would provide protection to the most vulnerable sectors of the population, and to improve the efficiency of the important health, education and social protection programs to improve and extend their services without incurring additional inefficiencies. The Program was targeted at key areas in the health, education and social protection sectors, and had the virtue of mobilizing the debate on basic structural matters in a complex situation. (b) Quality of Supervision (including M&E arrangements) Rating: Satisfactory 22

26 Bank supervisory performance is rated as satisfactory. Being a single-tranche project and having been disbursed very shortly after approval, full implementation of all actions supported by the program had been achieved early on. However, the team had frequent contacts with counterparts after the loan was fully disbursed, embedded in the larger program on social policies. Missions reviewing ongoing operations and preparing new loans or AAA in the three sectors (Education, Health, and Social Protection) visited Uruguay. Between July 2005, when the loan was declared effective and disbursed, and June 2006, when it closed, members of the team visited Montevideo more than 20 times to discuss different aspects of the social policies, to participate in public and closed seminars and workshops and to interact with official counterparts and independent analysts. The missions followed up progress on implementing agreed monitoring indicators and discussed results with MIDES, BPS, ANEP, OPP, MEF, and MSP. The supervision of this Loan helped ensure continued dialogue with the various authorities of the previous government, as well as building a bridge to the current administration. (c) Justification of Rating for Overall Bank Performance Rating: Satisfactory As both the Quality at Entry and the Quality of Supervision are considered satisfactory, the Overall Bank Performance is also considered satisfactory. Throughout the full life of the program, from identification to closing, the team was deeply involved in a policy dialogue process with authorities and independent counterparts, collaborating to ensure that the underlying goal of this operation (to provide support to Uruguay in its effort to develop and sustain an adequate and consistent social program) was achieved. The combination of policy actions supported in the SPDPL loan with continuous dialogue after the loan was approved and disbursed in the context of supervision and preparation of other operations resulted in an intense interaction with counterparts, providing additional sustainability to policies supported by SPDPL. 5.2 Borrower Performance (a) Government Performance Rating: Not applicable (b) Implementing Agency or Agencies Performance Rating: Not applicable Implementing Agency Ministry of Economy and Finances Performance (c) Justification of Rating for Overall Borrower Performance Rating: Satisfactory The borrower role in loan preparation is rated as satisfactory. The borrower participated actively in the preparation of the SPDPL, providing guidance to the Bank team regarding Government objectives and programs, and discussing specific actions and indicators to be included in the loan 23

27 documents. This included the preparation of interviews, information, research, surveys, contacts, meetings and discussions. During implementation, the borrower also maintained a proactive attitude, facilitating and coordinating actions with the Bank and the agencies that participated, ensuring prompt action, establishing compliance with the conditions laid down in the Program. This demonstrated the borrower's commitment to the social reforms that had already been begun and to the achieving of greater transparency and administrative efficiency. Several Government agencies, including MSP, ANEP, BPS, MIDES, MEF, and OPP participated during the preparation and implementation of the operation, all with clear commitment to implement reforms in their respective areas. 6. Lessons Learned (both operation-specific and of wide general application) The experience of SPDPL provides important lessons for future operations, as it was a well designed program, with necessary and feasible policy actions: (1) In Middle-Income Countries with highly skilled government staff, it is critical to adopt a social participatory and consultative process in the preparation of the operations. Continuous dialogue with official counterparts and independent analysts simplified the team's work during preparation, as the main sectors and policies to be supported were clearly identified. The topics and areas chosen for the SPDPL Program played key roles in modifying deep-rooted problems in those sectors, and in paving the way for structural reforms in the near future. (2) The institutional restrictions of a new administration must be taken into account when preparing an operation. The context in which policy reforms are designed and implemented at the time a new government takes office necessarily generates additional restrictions that must be taken in consideration when designing an operation. In the case of SPDPL, the program preparation started one month after the new administration - composed mostly by officials with little or no experience on negotiating with the Bank - took office. However, by working together on the process of preparing the documents, these problems were rapidly solved, and ownership of the program was clear. (3) A one-tranche DPL can be an effective instrument for the Bank to provide continuity to reform efforts and lay the foundations for programmatic sector dialogue when a new administration takes office. By working on the preparation of the DPL, the Bank team was able to engage the new officials in discussions about their medium term plans and possible areas of collaboration, a process that would have been much more difficult without the SPDPL. 7. Comments on Issues Raised by Borrower/Implementing Agencies/Partners (a) Borrower/Implementing agencies (b) Cofinanciers (c) Other partners and stakeholders (e.g. NGOs/private sector/civil society) 24

28 Annex 1 Bank Lending and Implementation Support/Supervision Processes (a) Task Team members Names Title Unit Responsibility/ Specialty Lending Evelina Bertranou Junior Professional Associate LCSHS- DPT Data preparation Antonio Leonardo Blasco Financial Management Specialist LCSFM Financial Management Francis J. Earwaker Consultant LCC7C Technical Advisor Sergio Espana Consultant LCSHE Education Alejandro Daniel Guerson Economist LCSPE Macroeconomics Febe Mackey Program Assistant LCSHD Assistant Marta Elena Molares-Halberg Lead Counsel LEGLA Legal Natalia Moncada Team Assistant LCSHH Assistant Claudia Nin Team Assistant LCC7C Assistant Luis Orlando Perez Sr Public Health Spec. LCSHH Health Sector Rafael P. Rofman Lead Social Protection Special LCSHS TTL- Social Protection Emiliana Vegas Senior Education Economist LCSHE TTL- Education Supervision Cristina Flood Consultant LCSHS Technical Advisor Febe Mackey Program Assistant LCSHD Assistant Sarah Ruth Bailey Program Assistant LCSHS Assistant Luis Orlando Perez Sr. Public Health Spec. LCSHH Health Rafael P. Rofman Lead Social Protection Special LCSHS TTL- Social Protection Emiliana Vegas Senior Education Economist LCSHE TTL- Education (b) Staff Time and Cost Staff Time and Cost (Bank Budget Only) Stage USD Thousands (including No. of staff weeks travel and consultant costs) Lending FY FY FY Total: Supervision/ICR FY FY FY Total:

29 Annex 4. Summary of Borrower's ICR and/or Comments on Draft ICR 26

30 27

31 Annex 7. Map 28

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INSTITUTIONS BUILDING TECHNICAL ASSISTANCE PROJECT (IBTAL)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INSTITUTIONS BUILDING TECHNICAL ASSISTANCE PROJECT (IBTAL) Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES18226 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-80480) ON A LOAN IN THE AMOUNT OF US$ 100 MILLION TO TO THE THE REPUBLIC OF EL SALVADOR FOR A

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-80480) ON A LOAN IN THE AMOUNT OF US$ 100 MILLION TO TO THE THE REPUBLIC OF EL SALVADOR FOR A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR2743 IMPLEMENTATION COMPLETION AND RESULTS REPORT

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD IBRD-74330) LOANS IN THE AMOUNTS OF US$86.

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD IBRD-74330) LOANS IN THE AMOUNTS OF US$86. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-73370 IBRD-74330)

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No. PID7125 Project Name Argentina-Special Structural Adjustment... Loan (SSAL)

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-80400) FOR A

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-80400) FOR A Public Disclosure Authorized Document of The World Bank Report No: ICR00003828 Public Disclosure Authorized Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-80400) FOR A

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-82210) ON A LOAN IN THE AMOUNT OF US$45.00 MILLION TO THE REPUBLIC OF PERU FOR A

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-82210) ON A LOAN IN THE AMOUNT OF US$45.00 MILLION TO THE REPUBLIC OF PERU FOR A Public Disclosure Authorized Document of The World Bank Public Disclosure Authorized Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-82210) ON A LOAN IN THE AMOUNT OF US$45.00

More information

Document of The World Bank. IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-71640) (Loan/Credit No. P078726) ON A STRUCTURAL ADJUSTMENT LOAN

Document of The World Bank. IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-71640) (Loan/Credit No. P078726) ON A STRUCTURAL ADJUSTMENT LOAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR0000489 IMPLEMENTATION COMPLETION AND RESULTS

More information

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4582 Paraguay

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-76220) ON A LOAN IN THE AMOUNT OF US$4.4 MILLION TO THE UNITED MEXICAN STATES FOR A

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-76220) ON A LOAN IN THE AMOUNT OF US$4.4 MILLION TO THE UNITED MEXICAN STATES FOR A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR00003027 IMPLEMENTATION COMPLETION AND RESULTS

More information

How many operations were planned for the

How many operations were planned for the Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted: 01/20/2016 Report Number: ICRR14887 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Document of The World Bank. IMPLEMENTATION COMPLETION AND RESULTS REPORT (Loan No AR) ON A LOAN IN THE AMOUNT OF US$303.

Document of The World Bank. IMPLEMENTATION COMPLETION AND RESULTS REPORT (Loan No AR) ON A LOAN IN THE AMOUNT OF US$303. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No:ICR0000000101 IMPLEMENTATION COMPLETION AND RESULTS

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-45980) ON A LOAN IN THE AMOUNT OF US$ 6.0 MILLION

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-45980) ON A LOAN IN THE AMOUNT OF US$ 6.0 MILLION Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR00001086 IMPLEMENTATION COMPLETION AND RESULTS

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Brazil Social Protection & Labor Global Practice IBRD/IDA Investment Project Financing FY 2011 Seq No: 14 ARCHIVED on 21-Dec-2017 ISR30624 Implementing

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020665 Public Disclosure Authorized Public Disclosure Authorized Project ID P117440 Country El Salvador

More information

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) TF-A Jun ,000,000.00

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) TF-A Jun ,000,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020814 Public Disclosure Authorized Public Disclosure Authorized Operation ID P156865 Country West Bank

More information

The World Bank Income Support and Employability Project (P117440)

The World Bank Income Support and Employability Project (P117440) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN El Salvador Social Protection & Labor Global Practice IBRD/IDA Specific Investment Loan FY 2010 Seq No: 12 ARCHIVED on 18-May-2016 ISR23512 Implementing

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-77000) ON A LOAN IN THE AMOUNT OF US$100 MILLION TO THE REPUBLIC OF PARAGUAY FOR A

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-77000) ON A LOAN IN THE AMOUNT OF US$100 MILLION TO THE REPUBLIC OF PARAGUAY FOR A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR00001966 IMPLEMENTATION COMPLETION AND RESULTS

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC14882 Project Name Improved

More information

The World Bank UY Non Communicable Diseases Prevention Project (P050716)

The World Bank UY Non Communicable Diseases Prevention Project (P050716) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Uruguay Health, Nutrition & Population Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 16 ARCHIVED on 22-Dec-2015 ISR22120 Implementing

More information

Cofinancing (US$M): c. Policy Areas: The policy areas included into the Program Document of the FIRM DPL were the following:

Cofinancing (US$M): c. Policy Areas: The policy areas included into the Program Document of the FIRM DPL were the following: Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted: 03/25/2015 Report Number: ICRR14675 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Document of the World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-78450) ON A LOAN IN THE AMOUNT OF US$500.

Document of the World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-78450) ON A LOAN IN THE AMOUNT OF US$500. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of the World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-78450)

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-7485) ON A LOAN IN THE AMOUNT OF US$24.8 MILLION TO THE REPUBLIC OF CHILE FOR A

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-7485) ON A LOAN IN THE AMOUNT OF US$24.8 MILLION TO THE REPUBLIC OF CHILE FOR A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR00002270 IMPLEMENTATION COMPLETION AND RESULTS

More information

The World Bank Income Support and Employability Project (P117440)

The World Bank Income Support and Employability Project (P117440) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN El Salvador Social Protection & Labor Global Practice IBRD/IDA Specific Investment Loan FY 2010 Seq No: 13 ARCHIVED on 25-Aug-2016 ISR24843 Implementing

More information

INTERNATIONAL DEVELOPMENT ASSOCIATION AND INTERNATIONAL MONETARY FUND REPUBLIC OF ARMENIA

INTERNATIONAL DEVELOPMENT ASSOCIATION AND INTERNATIONAL MONETARY FUND REPUBLIC OF ARMENIA INTERNATIONAL DEVELOPMENT ASSOCIATION AND INTERNATIONAL MONETARY FUND REPUBLIC OF ARMENIA Poverty Reduction Strategy Paper Second Progress Report Joint Staff Advisory Note Prepared by the Staffs of the

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC695 Project Name DO

More information

Jordan Country Brief 2011

Jordan Country Brief 2011 Jordan Country Brief 2011 CONTEXT The Hashemite Kingdom of Jordan is an upper middle income country with a population of 6 million and a per-capita GNI of US $4,390. Jordan s natural resources are potash

More information

Facing the need for a sustainable growth strategy, Moldova has

Facing the need for a sustainable growth strategy, Moldova has IDA at Work Moldova: A Country Ready to Make a Great Leap Forward Facing the need for a sustainable growth strategy, Moldova has been working with the International Development Association (IDA) to address

More information

Document of The World Bank

Document of The World Bank Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY IMPLEMENTATION COMPLETION REPORT (FSLT-71370)

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-46500; IBRD-71410)

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-46500; IBRD-71410) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR0000629 IMPLEMENTATION COMPLETION AND RESULTS

More information

2015 Development Policy Financing Retrospective: Preliminary Findings

2015 Development Policy Financing Retrospective: Preliminary Findings 2015 Development Policy Financing Retrospective: Preliminary Findings Purpose of this Consultation Meeting on the DPF Retrospective The 2015 Retrospective will focus on the Bank s experience with Development

More information

Document of The World Bank FOR OFFICIAL USE ONLY IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H4630 TF TF-96083) ON AN

Document of The World Bank FOR OFFICIAL USE ONLY IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H4630 TF TF-96083) ON AN Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: ICR00003680 Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H4630 TF-92396 TF-96083)

More information

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Jun ,000,000.00

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Jun ,000,000.00 Public Disclosure Authorized 1. Project Data Report Number : ICRR0021272 Public Disclosure Authorized Public Disclosure Authorized Operation ID P159774 Country Fiji Operation Name Fiji Post-Cyclone Winston

More information

Document of The World Bank FOR OFFICIAL USE ONLY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT COUNTRY ASSISTANCE STRATEGY PROGRESS REPORT FOR

Document of The World Bank FOR OFFICIAL USE ONLY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT COUNTRY ASSISTANCE STRATEGY PROGRESS REPORT FOR Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No. 42789 UY INTERNATIONAL BANK

More information

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments Annex 1. Identification Title/Number Trinidad and Tobago Annual Action Programme 2010 on Accompanying Measures on Sugar; CRIS reference: DCI- SUCRE/2009/21900 Total cost EU contribution : EUR 16 551 000

More information

Economy Report - Mexico

Economy Report - Mexico Economy Report - Mexico (Extracted from 2001 Economic Outlook) During the last quarter of 2000, the Mexican economy grew at an annual rate of 5.1 percent. Although more moderate than in the first three

More information

The Argentine Economy in the year 2006

The Argentine Economy in the year 2006 The Argentine Economy in the year 2006 ECONOMIC REPORT Year 2006 1. The Current Recovery from a Historical Perspective The Argentine economy has completed another year of significant growth with an 8.5%

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INCOME SUPPORT AND EMPLOYABILITY PROJECT LOAN 7811-SV

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INCOME SUPPORT AND EMPLOYABILITY PROJECT LOAN 7811-SV Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES20444 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure

More information

Public Disclosure Copy. Implementation Status & Results Report Costa Rica Catastrophe Deferred Draw Down Option (CAT DDO) (P111926)

Public Disclosure Copy. Implementation Status & Results Report Costa Rica Catastrophe Deferred Draw Down Option (CAT DDO) (P111926) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Costa Rica Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Development Policy Lending FY 2009 Seq No: 14 ARCHIVED on

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF056601) ON A MULTI DONOR TRUST FUND TF IN THE AMOUNT OF US$ MILLION EQUIVALENT TO THE

IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF056601) ON A MULTI DONOR TRUST FUND TF IN THE AMOUNT OF US$ MILLION EQUIVALENT TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF056601) ON

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-51970) ON A CREDIT IN THE AMOUNT OF SDR MILLION (US$ 440 MILLION EQUIVALENT) TO THE

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-51970) ON A CREDIT IN THE AMOUNT OF SDR MILLION (US$ 440 MILLION EQUIVALENT) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-51970) ON

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1.Name of the Project Country: Ukraine Project: Economic Reform Development Policy Loan (Ⅱ) Loan Agreement: December 4, 2015 Loan Amount: JPY

More information

PROJECT INFORMATION DOCUMENT

PROJECT INFORMATION DOCUMENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name: Region: Sector: Task Manager: Project ID Number: Borrower: Guarantor: Implementing

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD IDA-47520) ON A LOAN/CREDIT IN THE AMOUNT OF US$4 MILLION / US$8 MILLION ST.

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD IDA-47520) ON A LOAN/CREDIT IN THE AMOUNT OF US$4 MILLION / US$8 MILLION ST. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-79190 IDA-47520)

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) Sector Performance, Problems, and Opportunities Improving Public Expenditure Quality Program, SP1 (RRP VIE 50051-001) SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) 1 Sector Road Map 1. Sector Performance,

More information

IMPLEMENTATION COMPLETION RESULTS REPORT (IBRD 7199/AR) ON A SECTOR ADJUSTMENT LOAN IN THE AMOUNT OF US$750 MILLION DOLLARS THE ARGENTINE REPUBLIC

IMPLEMENTATION COMPLETION RESULTS REPORT (IBRD 7199/AR) ON A SECTOR ADJUSTMENT LOAN IN THE AMOUNT OF US$750 MILLION DOLLARS THE ARGENTINE REPUBLIC Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION RESULTS REPORT (IBRD 7199/AR) ON

More information

Document of The World Bank

Document of The World Bank Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-44000, TF-99140)

More information

INDEPENDENT EVALUATION GROUP UKRAINE COUNTRY ASSISTANCE EVALUATION (CAE) APPROACH PAPER

INDEPENDENT EVALUATION GROUP UKRAINE COUNTRY ASSISTANCE EVALUATION (CAE) APPROACH PAPER Country Background INDEPENDENT EVALUATION GROUP UKRAINE COUNTRY ASSISTANCE EVALUATION (CAE) APPROACH PAPER April 26, 2006 1. Ukraine re-established its independence in 1991, after more than 70 years of

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-47320) ON A LOAN IN THE AMOUNT OF US$ 9.

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-47320) ON A LOAN IN THE AMOUNT OF US$ 9. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR00002035 IMPLEMENTATION COMPLETION AND RESULTS

More information

Prepared by Reviewed by ICR Review Coordinator Group Paul Holden Robert Mark Lacey Malathi S. Jayawickrama IEGEC (Unit 1)

Prepared by Reviewed by ICR Review Coordinator Group Paul Holden Robert Mark Lacey Malathi S. Jayawickrama IEGEC (Unit 1) Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021301 Public Disclosure Authorized Public Disclosure Authorized Country Colombia Practice Area(Lead)

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H6200) ON A GRANT

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H6200) ON A GRANT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR00002334 IMPLEMENTATION COMPLETION AND RESULTS

More information

Document of The World Bank. IMPLEMENTATION COMPLETION AND RESULTS REPORT (Loan No AR) ON A LOAN IN THE AMOUNT OF US$70.

Document of The World Bank. IMPLEMENTATION COMPLETION AND RESULTS REPORT (Loan No AR) ON A LOAN IN THE AMOUNT OF US$70. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (Loan No. 4578-AR)

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-47910) ON A LOAN

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-47910) ON A LOAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-47910)

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES PROJECT Public Disclosure Authorized REPORT NO.: RES33563 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES

More information

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) TF Dec ,580,000.00

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) TF Dec ,580,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020620 Public Disclosure Authorized Public Disclosure Authorized Operation ID P147166 Country Haiti

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (Loan No BR) ON A LOAN IN THE AMOUNT OF US$14,460,000 FEDERATIVE REPUBLIC OF BRAZIL FOR A

IMPLEMENTATION COMPLETION AND RESULTS REPORT (Loan No BR) ON A LOAN IN THE AMOUNT OF US$14,460,000 FEDERATIVE REPUBLIC OF BRAZIL FOR A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (Loan No 4637

More information

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.:

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: 113653 Program

More information

Project Costs (US$M):

Project Costs (US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted: 10/05/2015 Report Number: ICRR14849 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Mongolia: Social Security Sector Development Program

Mongolia: Social Security Sector Development Program Validation Report Reference Number: PVR196 Project Number: 33335 Loan Numbers: 1836 and 1837(SF) November 2012 Mongolia: Social Security Sector Development Program Independent Evaluation Department ABBREVIATIONS

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-48290) ON A CREDIT IN THE AMOUNT OF SDR 49.6 MILLION (US$ 74.7 MILLION EQUIVALENT) TO THE

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-48290) ON A CREDIT IN THE AMOUNT OF SDR 49.6 MILLION (US$ 74.7 MILLION EQUIVALENT) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-48290) Poverty

More information

Central government administration (80%); Sub-national government administration (20%) Operation ID

Central government administration (80%); Sub-national government administration (20%) Operation ID Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE 31 March 2016 Report No.: AB7818 (The

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-43960) ON A CREDIT IN THE AMOUNT OF SDR 10.9 MILLION (US$17.0 MILLION EQUIVALENT) TO THE

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-43960) ON A CREDIT IN THE AMOUNT OF SDR 10.9 MILLION (US$17.0 MILLION EQUIVALENT) TO THE Public Disclosure Authorized Document of The World Bank Report No.: ICR00003516 Public Disclosure Authorized Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-43960) ON A CREDIT

More information

Colombia. 1. General trends. The Colombian economy grew by 2.5% in 2008, a lower rate than the sustained growth of

Colombia. 1. General trends. The Colombian economy grew by 2.5% in 2008, a lower rate than the sustained growth of Economic Survey of Latin America and the Caribbean 2008-2009 129 Colombia 1. General trends The Colombian economy grew by 2.5% in 2008, a lower rate than the sustained growth of recent years. Indicators

More information

Address: Avda de la Republica 154, Piso 11 Contact Person: Lic. Enrique Moreno Tel:

Address: Avda de la Republica 154, Piso 11 Contact Person: Lic. Enrique Moreno Tel: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Implementing Agency Environment Category Report

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jul ,330,316.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jul ,330,316.00 Public Disclosure Authorized 1. Project Data Report Number : ICRR0020321 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project ID P107840 Country Macedonia, former

More information

MANAGEMENT S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

MANAGEMENT S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS MANAGEMENT S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS The following discussion contains an analysis of our financial condition and results of operations for the nine months

More information

Public Disclosure Copy. Implementation Status & Results Report Costa Rica Catastrophe Deferred Draw Down Option (CAT DDO) (P111926)

Public Disclosure Copy. Implementation Status & Results Report Costa Rica Catastrophe Deferred Draw Down Option (CAT DDO) (P111926) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Costa Rica Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Development Policy Lending FY 2009 Seq No: 15 ARCHIVED on

More information

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE <October 4, 2013> Report No.: 86550

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE <October 4, 2013> Report No.: 86550 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Operation Name PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report

More information

Cofinancing (US$M): Monika Huppi Lourdes N. Pagaran IEGPS2

Cofinancing (US$M): Monika Huppi Lourdes N. Pagaran IEGPS2 Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number: ICRR14712 1. Project Data: Date Posted: 06/16/2015 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT THE PUBLIC EXPENDITURE POLICY BASED GUARANTEE OF EUR155 MILLION

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT THE PUBLIC EXPENDITURE POLICY BASED GUARANTEE OF EUR155 MILLION Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT ON Report No:

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-78120, TF-95841) ON A LOAN IN THE AMOUNT OF US$20 MILLION TO THE REPUBLIC OF EL SALVADOR FOR A

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-78120, TF-95841) ON A LOAN IN THE AMOUNT OF US$20 MILLION TO THE REPUBLIC OF EL SALVADOR FOR A Public Disclosure Authorized Document of The World Bank Report No: ICR00003947 Public Disclosure Authorized Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-78120, TF-95841)

More information

Implementation Status & Results Guatemala Second Fiscal and Institutional Development Policy (P114373)

Implementation Status & Results Guatemala Second Fiscal and Institutional Development Policy (P114373) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Project Name: Implementation Status & Results Guatemala Second Fiscal and Institutional

More information

Document of The World Bank. Report No: ICR IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-83840, IBRD-85220) ON A SERIES OF TWO LOANS

Document of The World Bank. Report No: ICR IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-83840, IBRD-85220) ON A SERIES OF TWO LOANS Public Disclosure Authorized Document of The World Bank Report No: ICR00004253 Public Disclosure Authorized Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-83840, IBRD-85220)

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Social Protection & Labor Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 14 ARCHIVED on 16-Jun-2016 ISR23892 Implementing

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF-92619) ON A FOOD CRISIS RESPONSE DEVELOPMENT POLICY GRANT

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF-92619) ON A FOOD CRISIS RESPONSE DEVELOPMENT POLICY GRANT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR00001189 IMPLEMENTATION COMPLETION AND RESULTS

More information

Viet Nam: Microfinance Development Program (Subprograms 1 and 2)

Viet Nam: Microfinance Development Program (Subprograms 1 and 2) Validation Report Reference Number: PVR-478 Project Numbers: 42235-013 and 42235-023 Loan Numbers: 2877 and 3213 December 2016 Viet Nam: Microfinance Development Program (Subprograms 1 and 2) Independent

More information

Document of The World Bank RESTRUCTURING PAPER

Document of The World Bank RESTRUCTURING PAPER Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER Report No: 71429-IQ ON A PROPOSED PROJECT

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY IMPLEMENTATION COMPLETION REPORT REPUBLIC

More information

For official use only IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-39490) ON A LOAN IN THE AMOUNT OF US$ 125 MILLION

For official use only IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-39490) ON A LOAN IN THE AMOUNT OF US$ 125 MILLION Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized For official use only IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-39490) ON A

More information

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL FINANCING LOAN TO THE WITH THE GUARANTEE OF

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL FINANCING LOAN TO THE WITH THE GUARANTEE OF Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

2012 Development Policy Lending Retrospective

2012 Development Policy Lending Retrospective 2012 Development Policy Lending Retrospective Emerging Findings and Issues Operational Policy and Quality Department The World Bank July 2012 Outline Content and Issues Key trends Contribution to country

More information

Vietnam: IMF-World Bank Relations *

Vietnam: IMF-World Bank Relations * -1- Vietnam: IMF-World Bank Relations * Partnership in Vietnam s Development Strategy The government of Vietnam s development strategy is set forth in its Comprehensive Poverty Reduction and Growth Strategy

More information

2016 ARTICLE IV CONSULTATION WITH CHILE. Concluding Statement of the IMF Mission. October 25, 2016

2016 ARTICLE IV CONSULTATION WITH CHILE. Concluding Statement of the IMF Mission. October 25, 2016 2016 ARTICLE IV CONSULTATION WITH CHILE Concluding Statement of the IMF Mission October 25, 2016 Chile s fundamentals and policy framework remain strong. However, economic prospects are being shaped by

More information

FILE COPY. Report. LJ- w R E S T R I C T E D

FILE COPY. Report. LJ- w R E S T R I C T E D Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized LJ- w FILE COPY R E S T R I C T E D Report This report was prepared for use within the

More information

Document of The World Bank

Document of The World Bank Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-35380 IDA-35381)

More information

Country Practice Area(Lead) Additional Financing Croatia Finance & Markets P129220

Country Practice Area(Lead) Additional Financing Croatia Finance & Markets P129220 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020731 Public Disclosure Authorized Public Disclosure Authorized Project ID P116080 Project Name EXPORT

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD TF-57202) ON A LOAN IN THE AMOUNT OF 20.0 MILLION US$ EQUIVALENT)

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD TF-57202) ON A LOAN IN THE AMOUNT OF 20.0 MILLION US$ EQUIVALENT) Public Disclosure Authorized Document of The World Bank Report No: ICR00002536 Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-48200 TF-57202) ON A LOAN IN THE AMOUNT OF

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H2620) (IDA-4520) (IDA-46610) (IDA-47750) ON A GRANT AND THREE CREDITS

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H2620) (IDA-4520) (IDA-46610) (IDA-47750) ON A GRANT AND THREE CREDITS Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H2620) (IDA-4520)

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD 7268; IBRD 7974) ON A LOAN IN THE AMOUNT OF USD 200.

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD 7268; IBRD 7974) ON A LOAN IN THE AMOUNT OF USD 200. Public Disclosure Authorized Document of The World Bank Report No: ICR00003656 Public Disclosure Authorized Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD 7268; IBRD 7974)

More information

Development Challenges in Jamaica

Development Challenges in Jamaica Development Challenges in Jamaica Country Department Caribbean Group Henry Mooney Juan Pedro Schmid POLICY BRIEF Nº IDB-PB-278 May 2018 Development Challenges in Jamaica Henry Mooney Juan Pedro Schmid

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-82060) ON A LOAN IN THE AMOUNT OF USD100 MILLION TO THE

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-82060) ON A LOAN IN THE AMOUNT OF USD100 MILLION TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR00003179 IMPLEMENTATION COMPLETION AND RESULTS

More information

Resolution adopted by the General Assembly. [on the report of the Second Committee (A/67/435/Add.3)]

Resolution adopted by the General Assembly. [on the report of the Second Committee (A/67/435/Add.3)] United Nations General Assembly Distr.: General 12 February 2013 Sixty-seventh session Agenda item 18 (c) Resolution adopted by the General Assembly [on the report of the Second Committee (A/67/435/Add.3)]

More information

SECTOR ASSESSMENT (SUMMARY): FINANCE

SECTOR ASSESSMENT (SUMMARY): FINANCE Country Partnership Strategy: Bhutan, 2014 2018 SECTOR ASSESSMENT (SUMMARY): FINANCE Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Bhutan s finance sector developed steadily during

More information

Action Fiche Trinidad and Tobago

Action Fiche Trinidad and Tobago Action Fiche Trinidad and Tobago 1. Identification Title/Number Accompanying Measures for Sugar Protocol Countries, Trinidad and Tobago 2011-2013 CRIS Number: 023-150 Total cost EU Contribution: EUR 31

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3376 Project Name Jamaica

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF-94240) ON A GRANT. IN THE AMOUNT OF US$ Million TO THE SOCIALIST REPUBLIC OF VIETNAM FOR A

IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF-94240) ON A GRANT. IN THE AMOUNT OF US$ Million TO THE SOCIALIST REPUBLIC OF VIETNAM FOR A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR00003046 IMPLEMENTATION COMPLETION AND RESULTS

More information

Questions may be referred to Ms. Fichera, APD (ext ).

Questions may be referred to Ms. Fichera, APD (ext ). To: Members of the Executive Board April 22, 2005 From: The Secretary Subject: Timor-Leste Statement by the IMF Staff Representative at the Donors Meeting Attached for the information of the Executive

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-79160) ON A LOAN IN THE AMOUNT OF US$80 MILLION TO THE FOR A. June 27, 2017

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-79160) ON A LOAN IN THE AMOUNT OF US$80 MILLION TO THE FOR A. June 27, 2017 Public Disclosure Authorized Document of The World Bank Report No: ICR00004118 Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-79160) ON A LOAN Public Disclosure Authorized

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:CAM 36593 TECHNICAL ASSISTANCE TO THE KINGDOM OF CAMBODIA FOR IMPROVING INSURANCE SUPERVISION December 2002 CURRENCY EQUIVALENTS (as of 3 December 2002) Currency Unit riel (KR)

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-48650) ON A LOAN IN THE AMOUNT OF EURO 90.0 MILLION (US$ MILLION EQUIVALENT) TO THE

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-48650) ON A LOAN IN THE AMOUNT OF EURO 90.0 MILLION (US$ MILLION EQUIVALENT) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-48650)

More information

Public Disclosure Copy. Implementation Status & Results Report Costa Rica Catastrophe Deferred Draw Down Option (CAT DDO) (P111926)

Public Disclosure Copy. Implementation Status & Results Report Costa Rica Catastrophe Deferred Draw Down Option (CAT DDO) (P111926) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Costa Rica Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Development Policy Lending FY 2009 Seq No: 13 ARCHIVED on

More information