Southwestern Public Service Company. Transmission. Formula Rate Template. and Supporting Worksheets. Schedule 1 Annual Revenue Requirement

Size: px
Start display at page:

Download "Southwestern Public Service Company. Transmission. Formula Rate Template. and Supporting Worksheets. Schedule 1 Annual Revenue Requirement"

Transcription

1 Transmission Formula Rate Template and Supporting Worksheets Schedule 1 Annual Revenue Requirement For the 2014 TrueUp For the Period January 1, 2014 through December 31, 2014

2 Rate Formula Template Table 1 Utilizing Projected Data 2014 ANNUAL UPDATE For rates effective 01/01/2014 SOUTHWESTERN PUBLIC SERVICE COMPANY (1) (2) (3) (4) (5) Line Transmission No. Amount 1 PROJECTED REVENUE REQUIREMENT (ln 45 ) $ 114,369,691 2 PRIOR YEAR TRUE UP ADJUSTMENT Input (4,686,840) 3 INTEREST ON PRIOR YEAR TRUE UP ADJUSTMENT Input (303,696) 4 PRIOR PERIOD CORRECTION TRUE UP ADJUSTMENT (Worksheet A.1 Ln 64) $182,189 5 INTEREST ON PRIOR PERIOD CORRECTION TRUE UP ADJUSTMENT (Worksheet A.1 Ln 65) $19,704 6 PROJECTED REVENUE REQUIREMENT WITH TRUE UP & PRIOR PERIOD CORRECTION (ln 1 + sum lines 2 through 5) $ 109,581,048 7 DIVISOR 8 Transmission Network Load (Worksheet C) 4,572,000 9 RATES 10 Annual Cost ($/kw/yr) (ln 6 / ln 8) Network & PtoP Rate ($/kw/mo) (ln 10 / 12) Peak OffPeak 12 Weekly PToP Rate ($/kw/wk) (ln 10 / 52; ln 10 / 52) Daily PToP Rate ($/kw/day) (ln 12 / 6; ln 12 / 7) Capped at weekly rate Hourly PToP Rate ($/MWh) (ln 13 / 16; ln 13 / 24 both x 1,000) Capped at weekly & daily rate METER CHARGE Charge 16 Revenue Requirement (Worksheet N) $234, Number of Delivery Points (Worksheet N) Annual Meter Charge ($ per delivery point) (ln 16 / ln 17) $1, Monthly Meter Charge ($ per delivery point) (ln 18 / 12) $93 20 RADIAL LINE CHARGE (Worksheet A.2) (Annual Charge) Monthly Charge 21 Big Country (Worksheet A.2, Ln 43, Col m) $125,996 $10, Central Valley (Worksheet A.2, Ln 44, Col m) $52,163 $4, Deaf Smith (Worksheet A.2, Ln 45, Col m) $252,031 $21,003 23a Green Belt (Worksheet A.2, Ln 46, Col m) $1,529 $127 23b Green Belt (Worksheet A.2, Ln 47, Col m) $51,518 $4,293 23c Lea County (Worksheet A.2, Ln 48, Col m) $148 $74 24 LPL (Worksheet A.2, Ln 49, Col m) $43,181 $3, Lyntegar (Worksheet A.2, Ln 50, Col m) $214,411 $17, Rita Blanca (Worksheet A.2, Ln 51, Col m) $21,578 $1, South Plains (Worksheet A.2, Ln 52, Col m) $12,064 $1,005 27a TriCounty (Worksheet A.2, Ln 53, Col m) $127 $11

3 2014 ANNUAL UPDATE Rate Formula Template Table 2 **PROJECTED** Utilizing Projected Data For the Billing Period 01/01/14 to 12/31/14 SOUTHWESTERN PUBLIC SERVICE COMPANY (1) (2) (3) (4) (5) Line Transmission No. Amount 28 PROJECTED REVENUE REQUIREMENT (w/o incentives) (ln 141) $ 203,276, REVENUE CREDITS (Note A) Total Allocator 30 Account No. 454 (Worksheet B) 1,103 DA $ 1, Account No (Worksheet B) 8,828,257 DA ,828, Total Revenue Credits $ 8,829, NET REVENUE REQUIREMENT (w/o incentives) (ln 28 less ln 32) $ 194,446, NET PLANT CARRYING CHARGE (w/o incentives) (Note B) 35 Annual Rate (ln 33 / ln 62 x 100) 15.11% 36 Monthly Rate (ln 35 / 12) 1.26% 37 GROSS PLANT CARRYING CHARGE (w/o incentives) (Note B) 38 Annual Rate (ln 33 / ln 48 x 100) 12.38% 39 NET PLANT CARRYING CHARGE, W/O DEPRECIATION (w/o incentives) (Note B) 40 Annual Rate ( (ln 33 ln 114 ) / ln 62 x 100) 12.74% 41 NET PLANT CARRYING CHARGE, W/O DEPRECIATION, INCOME TAXES AND RETURN (Note B) 42 Annual Rate ( (ln 33 ln 114 ln 138 ln 139) / ln 62 x 100) 2.76% 43 ADDITIONAL REVENUE REQUIREMENT (w/incentives) (Note C Worksheet R) $ 44 SPP Base Plan Upgrades Revenue Requirement (WsP BPU ln 56 col (c) and Note I) $ 81,210,416 44a SPP Base Plan Upgrades Revenue Requirement Prior Year Trueup Adjustment (Input) $ (1,064,464) 44b SPP Base Plan Upgrades Revenue Requirement Interest on Prior Year Trueup Adjustment (Input) $ (68,976) 44c SPP Base Plan Upgrades Revenue Requirement (Amount Provided to SPP for Next Billing Period) (sum lines 44, 44a, and 44b) $ 80,076, PROJECTED REVENUE REQUIREMENT (ln 33 + ln 43 ln 44c) (changed reference) $ 114,369,691

4 **PROJECTED** Rate Formula Template Table 3 Utilizing Projected Data For the Billing Period 01/01/14 to 12/31/14 SOUTHWESTERN PUBLIC SERVICE COMPANY Data Sources Total RATE BASE CALCULATION (See "General Notes") Total Allocator Transmission Line (1) (2) (3) (4) (5) No. 46 GROSS PLANT IN SERVICE 47 Production (WsD.1, Ln 6) 2,008,812,450 NA 48 Transmission (WsD.1, Ln 11) 1,676,804,025 TP ,570,310, Distribution (WsD.1, Ln 16) 1,000,498,252 NA 50 General Plant (WsD.1, Ln 21) 286,623,940 W/S ,384, Intangible Plant (WsD.1, Ln 23) 105,380,904 W/S ,744, TOTAL GROSS PLANT (sum lns 47 to 51) 5,078,119,571 GP= ,621,439, ACCUMULATED DEPRECIATION 54 Production (WsD.1, Ln 39) 1,307,328,630 NA 55 Transmission (WsD.1, Ln 44) 302,498,510 TP ,286, Distribution (WsD.1, Ln 49) 322,434,874 NA 57 General Plant (WsD.1, Ln 54) 134,915,135 W/S ,596, Intangible Plant (WsD.1, Ln 56) 67,554,057 W/S ,811, TOTAL ACCUMULATED DEPRECIATION (sum lns 54 to 58) 2,134,731, ,694, NET PLANT IN SERVICE 61 Production (ln 47 ln 54) 701,483,820 NA 62 Transmission (ln 48 ln 55) 1,374,305,515 1,287,023, Distribution (ln 49 ln 56) 678,063,378 NA 64 General Plant (ln 50 ln 57) 151,708,805 19,787, Intangible Plant (ln 51 ln 58) 37,826,847 4,933, TOTAL NET PLANT IN SERVICE (sum lns 61 to 65) 2,943,388,365 NP= ,311,744, ADJUSTMENTS TO RATE BASE (Note D) 68 Account No. 281 (enter negative) k (Worksheet E) (1,680,147) NA 69 Account No. 282 (enter negative) k (Worksheet E) (792,772,966) DA (325,604,668) 70 Account No. 283 (enter negative) k (Worksheet E) (78,750,301) DA (1,342,312) 71 Account No c (Worksheet E) 163,307,826 DA 49,015, Account No. 255 (enter negative) h DA 73 Account No. 107 (WsQ, Ln 15, Col C) TP Net PreFunded AFUDC on CWIP included in (Note E) (Worksheet Q, ln 30) TP Rate Base (enter negative) 75 Unamortized Balance of Abandoned Incentive Plant (Note E) (Worksheet E) TP Unamortized Balance of Extraordinary Property Loss (Note E) (Worksheet E) TP TOTAL ADJUSTMENTS (sum lns 68 to 76) (709,895,588) (277,931,349) 78 LAND HELD FOR FUTURE USE (Note F) (WsD, Ln 108, Col d) 18,629 TP , WORKING CAPITAL 80 CWC (Note G) 81 Materials & Supplies Transmission (WsF, Ln 76, Col d) 65,324 TP , Materials & Supplies Other (WsF, Ln 77, Col d) (369,196) GP (117,884) 83 Prepayments (Account 165) Plant Related (WsF, Ln 12, Col d) 5,300,623 GP ,692, Prepayments (Account 165) Labor Related (WsF, Ln 17, Col d) 16,756 W/S , Prepayments (Account 165) Transmission Related (WsF, Ln 22, Col d) TP Prepayments (Account 165) Other Not Allocated (WsF, Ln 32, Col d) 3,087,305 NA TOTAL WORKING CAPITAL (sum lns 80 to 86) 8,100,812 1,637, BALANCE OF NETWORK CREDITS (enter negative) (Note H) TP RATE BASE (sum lns 66, 77, 78, 87, 88) 2,241,612,218 1,035,468,567

5 **PROJECTED** Rate Formula Template Table 4 Utilizing Projected Data For the Billing Period 01/01/14 to 12/31/14 SOUTHWESTERN PUBLIC SERVICE COMPANY EXPENSE, TAXES, RETURN & REVENUE Data Sources Total REQUIREMENTS CALCULATION (See "General Notes") Total Allocator Transmission Line (1) (2) (3) (4) (5) No. 90 OPERATION & MAINTENANCE EXPENSE 91 Transmission (WsG, Ln 34, Col c) 164,876, Less Total Account 561 (WsG, Ln 36, Col c) 10,978, Add Back Account (WsG, Ln 37, Col c) 308, Add Back Account (WsG, Ln 38, Col c) 75, Less Total Account 565 (WsG, Ln 39, Col c) 136,628, Transmission O&M Expense Adjustment (WsG, Ln 40, Col c) (285,000) 97 Transmission Subtotal (ln 91 ln 92 + ln 93 + ln 94 ln 95 + ln 96 ) 17,367,213 TP ,264, Administrative and General (WsG, Ln 63, Col c) 100,515, Less: Acc. 928, Reg. Com. Exp. (WsG, Ln 53, Col c) 4,375, Acct , Gen. Advert. Exp. (WsG, Ln 55, Col c) 1,403, Acct , Miscellaneous Gen. Exp. (WsG, Ln 56, Col c) 1,256, Acc. 924, Property Insurance (WsG, Ln 50, Col c) 3,945, Balance of A & G (ln 98 sum ln 99 to ln 102) 89,534,741 W/S ,678, Plus: Acct. 924, Property Insurance (ln 102) 3,945,021 GP ,259, Acct. 928 Transmission Specific (Note K) (WsH ln 22, col D) DA Acct. 928 Transmission Allocated (Note K) (WsH ln 22, col E) TP Acct Transmission Specific (Note K) (WsH ln 34, col D) TP Acct Transmission Allocated (Note K) (WsH ln 34, col E) 563,742 W/S , Transmission Safety and Siting Advertising (Note K) (WsH ln 47, col B) TP Less: PBOP Expense in Acct 926 Adjustment (Note K) (WsH ln 9, col B) (3,128,276) W/S (408,021) 111 A & G Subtotal (sum lns 103 to 109 less ln 110) 97,171,780 13,419, TOTAL O & M EXPENSE (ln 97 + ln 111 ) 114,538,993 29,683, DEPRECIATION AND AMORTIZATION EXPENSE 114 Transmission (WsI, Ln 5, Col d) 32,512,768 TP ,447, Plus: PreFunded AFUDC Amortization (Note E) (Worksheet Q, ln 31) TP Plus: Recovery of Abandoned Incentive Plant (Note E) (Worksheet E) TP Plus: Recovery of Extraordinary Property Loss (Note E) (Worksheet E) TP General (WsI, Ln 9, Col d) 26,641,827 W/S ,474, Intangible (WsI, Ln 11, Col d) W/S TOTAL DEPRECIATION AND AMORTIZATION (sum lns 114 to 119) 59,154,595 33,922, TAXES OTHER THAN INCOME (Note L) 122 Labor Related 123 Payroll (Worksheet J) 263.i 8,078,000 W/S ,053, Plant Related 125 Property (Worksheet J) 263.i 31,639,000 GP ,102, Franchise & Gross Receipts (Worksheet J) 263.i 15,653,000 NA 127 Other Texas Use (Worksheet J) 263.i GP TOTAL OTHER TAXES (sum lns 123 to 127) 55,370,000 11,155, INCOME TAXES (Note M) 130 T=1 {[(1 SIT) * (1 FIT)] / (1 SIT * FIT * p)} = 35.99% 131 CIT=(T/1T) * (1(WCLTD/R)) = 37.84% 132 where WCLTD=(ln 160) and R= (ln 163) 133 and FIT, SIT & p are as given in Note M / (1 T) = (from ln 130) Amortized Investment Tax Credit (enter negative) (Worksheet J) f (327,000) 136 Income Tax Calculation (ln 131 * ln 139) 76,509,991 35,342, ITC adjustment (ln 134 * ln 135) (510,872) NP (227,675) 138 TOTAL INCOME TAXES (sum lns 136 to 137) 75,999,119 35,114, RETURN (Rate Base * Rate of Return) (ln 89 * ln 163) 202,193,422 93,399, INTEREST ON NETWORK CREDITS (Note H) TP REVENUE REQUIREMENT (sum lns 112, 120, 128, 138, 139, 140) 507,256, ,276,026

6 **PROJECTED** Rate Formula Template Table 5 Utilizing Projected Data For the Billing Period 01/01/14 to 12/31/14 SOUTHWESTERN PUBLIC SERVICE COMPANY SUPPORTING CALCULATIONS Line (1) (2) (3) (4) (5) No. 142 TRANSMISSION PLANT INCLUDED IN OATT Transmission Rate (Note N) 143 Total transmission plant (ln 48) 1,676,804, Less Generator Stepup facilities (WsD.1, Ln 147) 29,336, Less Radial Line facilities (Worksheet O) 77,163, Transmission plant included in OATT Trans Rate (ln 143 ln 144 ln 145) 1,570,304, Percent of transmission plant in OATT Trans Rate (ln 146 / ln 143) TP= WAGES & SALARY ALLOCATOR (W/S) (Note O) 149 Production (WsG, Ln 69, Col e) 47,183,321 NA 150 Transmission (WsG, Ln 70, Col e) 12,444,262 TP ,653, Regional Market (WsG, Ln 71, Col e) 270,312 NA 152 Distribution (WsG, Ln 72, Col e) 21,227,968 NA 153 Other (WsG, Ln 73, Col e) 8,221,591 NA 154 Total (sum lns 149 to 153) 89,347,453 11,653, W/S Allocator W/S= RETURN (R) $ 157 Long Term Interest (Worksheet K, Ln 51, Col d) 82,730, Preferred Dividends (Worksheet K, Ln 56, Col d) 159 $ % Cost Weighted 160 Long Term Debt (Worksheet K, Ln 17, Col o) 1,292,307, % Preferred Stock (Worksheet K, Ln 5, Col o) 0.00% Common Stock (Worksheet K, Ln 9, Col o) 1,510,325, % Total (sum lns 160 to 162) 2,802,633,176 R

7 **PROJECTED** Rate Formula Template Table 6 Utilizing Projected Data For the Billing Period 01/01/14 to 12/31/14 General Notes: a) References to data from FERC Form 1 are indicated as: page#.line#.col.# Note Letter A B C D E F G H SOUTHWESTERN PUBLIC SERVICE COMPANY The revenues credited shall include amounts received directly from the SPP for service under this tariff reflecting SPS's integrated transmission facilities. Revenues associated with FERC annual charges, gross receipts taxes, ancillary services or other facilities revenues shall be excluded from the definition of transmission facilities under this tariff shall not be included as revenue credits. Revenue from coincident peak loads included in the DIVISOR are also not included as revenue credits unless this revenue is offset by a corresponding expense. See Worksheet B for details. The annual and monthly net and gross plant carrying charges on page 2 are to be used to compute the revenue requirement for directly assigned facilities, any Base Plan Upgrades, distribution facilities, and radial lines. This additional revenue requirement is determined using a net plant carrying charge (fixed carrying charge or FCR) approach. Worksheet R shows the calculation of the additional revenue requirements for each project receiving incentive rate treatment, as accepted by FERC by a separate docket. These individual additional revenue requirements shall be summed, for the then current year, and included here. Reflects the transmission related portion of balances in Accounts 281, 282, 283, 190, and 255 as adjusted by any amounts in contra accounts identified as regulatory assets or liabilities related to FASB 106, 109, 133,158 or FASB Interpretation No. 48. Balance of Account 255 is reduced by prior flow throughs and completely excluded if the utility chose to utilize amortization of tax credits against taxable income as discussed in Note M. Includes any incentive Construction Work in Progress (CWIP), any related Allowance for Funds Used During Construction (AFUDC), any unamortized balances related to the recovery of abandoned incentive plant costs, any extraordinary property losses and any related depreciation and amortization expense amounts. Formula amounts for all of the foregoing items will remain at $0 until approved by FERC under a separate docket. Includes only transmission related or functionally booked as transmission land held for future use. Cash Working Capital will be set at and remain $0 until such time as SPS files and receives FERC approval for a lead/lag study. Equal to the balance of Network Facilities Upgrades Credits, net of accumulated depreciation, due transmission customers that made lumpsum payments towards the construction of Network Transmission Facilities consistent with Paragraph 657 of Order 2003A. Excludes interest since interest is added to the revenue requirement on line 140. I The base plan upgrade revenue requirement will be updated annually based on actual data for the prior billing period. The updated revenue requirement will be provided to the SPP no later than October 20 for billings effective January 1. J (Reserved for future use) K Includes all Regulatory Commission expense itemized in FERC Form 1 at 351.h. Show in Worksheet H how these expense items are assigned to transmission. FERC Assessment Fees, General Advertising, and Industry Association Dues and Research and Developments costs recorded in shall not be assigned to transmission. A & G expenses shall Include specific transmission safetyrelated advertising and transmission siting advertising costs. Absent a 205 filing with FERC, the PBOB base amount (2009 actual) will not change in subsequent years. NERC fees recorded in Acct. 928, Regulatory Commission Expenses, or in Acct. 165, Prepayments, shall be excluded from the formula. L Includes only FICA, unemployment, highway, property and other assessments charged in the current year. Gross receipts tax, taxes related to income, retail and nontransmission related taxes are excluded. M The currently effective income tax rate, where FIT is the Federal income tax rate; SIT is the State income tax rate, and p = "the percentage of federal income tax deductible for state income taxes". If the utility is taxed in more than one state, it must attach a work paper showing the name of each state and how the blended or composite SIT was developed. Furthermore, a utility that elected to utilize amortization of tax credits against taxable income, rather than book tax credits to Account No. 255 and reduce rate base, must reduce its income tax expense by the amount of the Amortized Investment Tax Credit (Form 1, f) (ln 135) multiplied by (1/1T). If the applicable tax rates are zero enter 0. Inputs Required: FIT = 35.00% SIT= (Worksheet L) 1.53% (State Income Tax Rate or Composite SIT) p = 0.00% (percent of FIT deductible for state purposes) N Removes the dollars of plant booked to transmission plant that is excluded from the Tariff because it does not meet the Tariff's definition of Transmission Facilities, or is booked to transmission (e.g. stepup transformers) that is included in the development of OATT ancillary service rates, or is otherwise not eligible to be recovered under this Tariff. O Enter dollar amounts. Includes service company labor. Does not include contract labor.

8 2014 ANNUAL UPDATE Rate Formula Template Table 7 **ACTUAL** Utilizing FERC Form 1 Actual Data For the Billing Period 01/01/14 to 12/31/14 SOUTHWESTERN PUBLIC SERVICE COMPANY (1) (2) (3) (4) (5) Line Transmission No. Amount 164 REVENUE REQUIREMENT (w/o incentives) (ln 277) $ 193,493, REVENUE CREDITS (Note A) Total Allocator 166 Account No. 454 (Worksheet B) 8,773 DA $ 8, Account No (Worksheet B) 15,591,491 DA ,591, Total Revenue Credits $ 15,600, NET REVENUE REQUIREMENT (w/o incentives) (ln 164 less ln 168) $ 177,892, NET PLANT CARRYING CHARGE (w/o incentives) (Note B) 171 Annual Rate (ln 169 / ln 198 x 100) 14.25% 172 Monthly Rate (ln 171 / 12) 1.19% 173 GROSS PLANT CARRYING CHARGE (w/o incentives) (Note B) 174 Annual Rate (ln 169 / ln 184 x 100) 11.76% 175 NET PLANT CARRYING CHARGE, W/O DEPRECIATION (w/o incentives) (Note B) 176 Annual Rate ( (ln 169 ln 250 ) / ln 198 x 100) 11.90% 177 NET PLANT CARRYING CHARGE, W/O DEPRECIATION, INCOME TAXES AND RETURN (Note B) 178 Annual Rate ( (ln 169 ln 250 ln 274 ln 275) / ln 198 x 100) 2.17% 179 ADDITIONAL REVENUE REQUIREMENT (w/incentives) (Note C Worksheet R) $ 180 LESS SPP Base Plan Upgrades Revenue Requirement (WsP BPU ln 56 col (d) and Note I) $ 56,277, ACTUAL REVENUE REQUIREMENT (ln ln 179 ln 180) $ 121,615,271

9 **ACTUAL** Rate Formula Template Table 8 Utilizing FERC Form 1 Actual Data For the Billing Period 01/01/14 to 12/31/14 SOUTHWESTERN PUBLIC SERVICE COMPANY Data Sources Total RATE BASE CALCULATION (See "General Notes") Total Allocator Transmission Line (1) (2) (3) (4) (5) No. 182 GROSS PLANT IN SERVICE 183 Production (WsD.1, Ln 78) 2,001,140,514 NA 184 Transmission (WsD.1, Ln 83) 1,614,813,363 TP ,512,918, Distribution (WsD.1, Ln 88) 1,003,034,216 NA 186 General Plant (WsD.1, Ln 93) 282,973,457 W/S ,659, Intangible Plant (WsD.1, Ln 95) 88,053,523 W/S ,407, TOTAL GROSS PLANT (sum lns 183 to 187) 4,990,015,073 GP= ,560,985, ACCUMULATED DEPRECIATION 190 Production (WsD.1, Ln 110) 1,286,315,581 NA 191 Transmission (WsD.1, Ln 115) 281,971,098 TP ,178, Distribution (WsD.1, Ln 120) 318,130,464 NA 193 General Plant (WsD.1, Ln 125) 130,992,557 W/S ,970, Intangible Plant (WsD.1, Ln 127) 63,907,230 W/S ,279, TOTAL ACCUMULATED DEPRECIATION (sum lns 190 to 194) 2,081,316, ,427, NET PLANT IN SERVICE 197 Production (ln 183 ln 190) 714,824,933 NA 198 Transmission (ln 184 ln 191) 1,332,842,265 1,248,739, Distribution (ln 185 ln 192) 684,903,752 NA 200 General Plant (ln 186 ln 193) 151,980,900 19,689, Intangible Plant (ln 187 ln 194) 24,146,293 3,128, TOTAL NET PLANT IN SERVICE (sum lns 197 to 201) 2,908,698,143 NP= ,271,557, ADJUSTMENTS TO RATE BASE (Note D) 204 Account No. 281 (enter negative) k (Worksheet E) (1,319,494) NA 205 Account No. 282 (enter negative) k (Worksheet E) (815,354,140) DA (334,409,017) 206 Account No. 283 (enter negative) k (Worksheet E) (84,197,907) DA (4,272,921) 207 Account No c (Worksheet E) 190,086,812 DA 51,946, Account No. 255 (enter negative) h DA 209 Account No. 107 (WsQ, Ln 46, Col C) TP Net PreFunded AFUDC on CWIP included in (Note E) (Worksheet Q, ln 61) TP Rate Base (enter negative) 211 Unamortized Balance of Abandoned Incentive Plant (Note E) (Worksheet E) TP Unamortized Balance of Extraordinary Property Loss (Note E) (Worksheet E) 213 TOTAL ADJUSTMENTS (sum lns 204 to 212) (710,784,729) (286,735,845) 214 LAND HELD FOR FUTURE USE (Note F) (WsD, Ln 108, Col h) 9,314 TP , WORKING CAPITAL 216 CWC (Note G) 217 Materials & Supplies Transmission (WsF, Ln 84, Col d) 91,511 TP , Materials & Supplies Other (WsF, Ln 85, Col d) (297,098) GP (92,938) 219 Prepayments (Account 165) Plant Related (WsF, Ln 43, Col d) 3,654,700 GP ,143, Prepayments (Account 165) Labor Related (WsF, Ln 48, Col d) 10,254 W/S , Prepayments (Account 165) Transmission Related (WsF, Ln 53, Col d) TP Prepayments (Account 165) Other Not Allocated (WsF, Ln 66, Col d) 6,113,932 NA TOTAL WORKING CAPITAL (sum lns 216 to 222) 9,573,299 1,137, BALANCE OF NETWORK CREDITS (enter negative) (Note H) TP RATE BASE (sum lns 202, 213, 214, 223, 224) 2,207,496, ,967,466

10 **ACTUAL** Rate Formula Template Table 9 Utilizing FERC Form 1 Actual Data For the Billing Period 01/01/14 to 12/31/14 SOUTHWESTERN PUBLIC SERVICE COMPANY EXPENSE, TAXES, RETURN & REVENUE Data Sources Total REQUIREMENTS CALCULATION (See "General Notes") Total Allocator Transmission Line (1) (2) (3) (4) (5) No. 226 OPERATION & MAINTENANCE EXPENSE 227 Transmission (WsG, Ln 34, Col e) 126,490, Less Total Account 561 (WsG, Ln 36, Col e) 11,000, Add Back Account (WsG, Ln 37, Col e) (5,213) 230 Add Back Account (WsG, Ln 38, Col e) 67, Less Total Account 565 (WsG, Ln 39, Col e) 97,026, Transmission O&M Expense Adjustment (WsG, Ln 40, Col e) (128,168) 233 Transmission Subtotal (ln 227 ln ln ln 230 ln ln 232 ) 18,397,413 TP ,236, Administrative and General (WsG, Ln 63, Col e) 96,996, Less: Acc. 928, Reg. Com. Exp. (WsG, Ln 53, Col e) 5,995, Acct , Gen. Advert. Exp. (WsG, Ln 55, Col e) 1,336, Acct , Miscellaneous Gen. Exp. (WsG, Ln 56, Col e) 1,157, Acc. 924, Property Insurance (WsG, Ln 50, Col e) 3,535, Balance of A & G (ln 234 sum ln 235 to ln 238) 84,969,806 W/S ,007, Plus: Acct. 924, Property Insurance (ln 238) 3,535,916 GP ,106, Acct. 928 Transmission Specific (Note K) (WsH, Ln 22, Col H) 37,061 DA , Acct. 928 Transmission Allocated (Note K) (WsH, Ln 22, Col I) TP Acct Transmission Specific (Note K) (WsH, Ln 34, Col H) TP Acct Transmission Allocated (Note K) (WsH, Ln 34, Col I) 487,310 W/S , Transmission Safety and Siting Advertising (Note K) (WsH, Ln 47, Col C) TP Less: PBOP Expense in Acct 926 Adjustment (Note K) (WsH, Ln 9, Col F) (3,542,296) W/S (458,904) 247 A & G Subtotal (sum lns 239 to 246) 92,572,390 12,673, TOTAL O & M EXPENSE (ln ln 247 ) 110,969,803 29,909, DEPRECIATION AND AMORTIZATION EXPENSE 250 Transmission (WsI, Ln 24, Col d) 31,302,195 TP ,327, Plus: PreFunded AFUDC Amortization (Note E) (Worksheet Q, ln 62) TP Plus: Recovery of Abandoned Incentive Plant (Note E) (Worksheet E) TP Plus: Recovery of Extraordinary Property Loss (Note E) (Worksheet E) TP General (WsI, Ln 28, Col d) 9,476,126 W/S ,227, Intangible (WsI, Ln 30, Col d) 8,915,440 W/S ,154, TOTAL DEPRECIATION AND AMORTIZATION (sum lns 250 to 255) 49,693,761 31,709, TAXES OTHER THAN INCOME (Note L) 258 Labor Related 259 Payroll (Worksheet J) 263.i 8,055,859 W/S ,043, Plant Related 261 Property (Worksheet J) 263.i 30,045,724 GP ,398, Franchise & Gross Receipts (Worksheet J) 263.i 6,362,890 NA 263 Other Texas Use (Worksheet J) 263.i 68,881 GP , TOTAL OTHER TAXES (sum lns 259 to 263) 44,533,354 10,464, INCOME TAXES (Note M) 266 T=1 {[(1 SIT) * (1 FIT)] / (1 SIT * FIT * p)} = 36.46% 267 CIT=(T/1T) * (1(WCLTD/R)) = 39.25% 268 where WCLTD=(ln 296) and R= (ln 299) 269 and FIT, SIT & p are as given in Note M / (1 T) = (from ln 266) Amortized Investment Tax Credit (266.8.f) (enter negative) (Worksheet J) f (340,664) 272 Income Tax Calculation (ln 267 * ln 275) 76,766,778 34,287, ITC adjustment (ln 270 * ln 271) (536,137) NP (234,378) 274 TOTAL INCOME TAXES (sum lns 272 to 273) 76,230,641 34,053, RETURN (Rate Base * Rate of Return) (ln 225 * ln 299) 195,584,148 87,356, INTEREST ON NETWORK CREDITS (Note H) TP REVENUE REQUIREMENT (sum lns 248, 256, 264, 274, 275, 276) 477,011, ,493,167

11 **ACTUAL** Rate Formula Template Table 10 Utilizing FERC Form 1 Actual Data For the Billing Period 01/01/14 to 12/31/14 SOUTHWESTERN PUBLIC SERVICE COMPANY SUPPORTING CALCULATIONS Line (1) (2) (3) (4) (5) No. 278 TRANSMISSION PLANT INCLUDED IN OATT Transmission Rate (Note N) 279 Total transmission plant (ln 184) 1,614,813, Less Generator Stepup facilities (WsD.1, Ln 149) 30,719, Less Radial Line facilities (Worksheet O) 72,416, a Plus Radial Line facilities trueup (Worksheet M) (1,233,184) 282 Transmission plant included in OATT Trans Rate (ln 279 ln 280 ln 281 ln 281.a) 1,512,910, Percent of transmission plant in OATT Trans Rate (ln 282 / ln 279) TP= WAGES & SALARY ALLOCATOR (W/S) (Note O) 285 Production (WsG, Ln 69, Col i) 47,567,712 NA 286 Transmission (WsG, Ln 70, Col i) 12,282,024 TP ,507, Regional Market (WsG, Ln 71, Col i) 263,619 NA 288 Distribution (WsG, Ln 72, Col i) 20,578,882 NA 289 Other (WsG, Ln 73, Col i) 8,128,354 NA 290 Total (sum lns 285 to 289) 88,820,591 11,507, W/S Allocator W/S= RETURN (R) $ 293 Long Term Interest (Worksheet K, Ln 51, Col h) 77,435, Preferred Dividends (Worksheet K, Ln 56, Col h) 295 $ % Cost Weighted 296 Long Term Debt (Worksheet K, Ln 36, Col o) 1,280,769, % Preferred Stock (Worksheet K, Ln 23, Col o) 0.00% Common Stock (Worksheet K, Ln 27, Col o) 1,488,573, % Total (sum lns 296 to 298) 2,769,343,084 R

12 **ACTUAL** Rate Formula Template Table 11 Utilizing FERC Form 1 Actual Data For the Billing Period 01/01/14 to 12/31/14 General Notes: a) References to data from FERC Form 1 are indicated as: page#.line#.col.# Note Letter A B C D E F G H SOUTHWESTERN PUBLIC SERVICE COMPANY The revenues credited shall include amounts received directly from the SPP for service under this tariff reflecting SPS's integrated transmission facilities. Revenues associated with FERC annual charges, gross receipts taxes, ancillary services or other facilities revenues shall be excluded from the definition of transmission facilities under this tariff shall not be included as revenue credits. Revenue from coincident peak loads included in the DIVISOR are also not included as revenue credits unless this revenue is offset by a corresponding expense. See Worksheet B for details. The annual and monthly net and gross plant carrying charges on page 7 are to be used to compute the revenue requirement for directly assigned facilities, any Base Plan Upgrades, distribution facilities, and radial lines. This additional revenue requirement is determined using a net plant carrying charge (fixed carrying charge or FCR) approach. Worksheet R shows the calculation of the additional revenue requirements for each project receiving incentive rate treatment, as accepted by FERC by a separate docket. These individual additional revenue requirements shall be summed, for the then current year, and included here. Reflects the transmission related portion of balances in Accounts 281, 282, 283, 190, and 255 as adjusted by any amounts in contra accounts identified as regulatory assets or liabilities related to FASB 106, 109, 133,158 or FASB Interpretation No. 48. Balance of Account 255 is reduced by prior flow throughs and completely excluded if the utility chose to utilize amortization of tax credits against taxable income as discussed in Note M. Includes any incentive Construction Work in Progress (CWIP), any related Allowance for Funds Used During Construction (AFUDC), any unamortized balances related to the recovery of abandoned incentive plant costs, any extraordinary property losses and any related depreciation and amortization expense amounts. Formula amounts for all of the foregoing items will remain at $0 until approved by FERC under a separate docket. Includes only transmission related or functionally booked as transmission land held for future use. Cash Working Capital will be set at and remain $0 until such time as SPS files and receives FERC approval for a lead/lag study. Equal to the balance of Network Facilities Upgrades Credits, net of accumulated depreciation, due transmission customers that made lumpsum payments towards the construction of Network Transmission Facilities consistent with Paragraph 657 of Order 2003A. Excludes interest since interest is added to the revenue requirement on line 276. I The base plan upgrade revenue requirement will be updated annually based on actual data for the prior billing period. The updated revenue requirement will be provided to the SPP no later than October 20 for billings effective January 1. J (Reserved for future use) K Includes all Regulatory Commission expense itemized in FERC Form 1 at 351.h. Show in Worksheet H how these expense items are assigned to transmission. FERC Assessment Fees, General Advertising, and Industry Association Dues and Research and Developments costs recorded in shall not be assigned to transmission. A & G expenses shall Include specific transmission safetyrelated advertising and transmission siting advertising costs. Absent a 205 filing with FERC, the PBOB base amount (2009 actual) will not change in subsequent years. NERC fees recorded in Acct. 928, Regulatory Commission Expenses, or in Acct. 165, Prepayments, shall be excluded from the formula. L Includes only FICA, unemployment, highway, property and other assessments charged in the current year. Gross receipts tax, taxes related to income, retail and nontransmission related taxes are excluded. M The currently effective income tax rate, where FIT is the Federal income tax rate; SIT is the State income tax rate, and p = "the percentage of federal income tax deductible for state income taxes". If the utility is taxed in more than one state, it must attach a work paper showing the name of each state and how the blended or composite SIT was developed. Furthermore, a utility that elected to utilize amortization of tax credits against taxable income, rather than book tax credits to Account No. 255 and reduce rate base, must reduce its income tax expense by the amount of the Amortized Investment Tax Credit (Form 1, f) (ln 271) multiplied by (1/1T). If the applicable tax rates are zero enter 0. Inputs Required: FIT = 35.00% SIT= (Worksheet L) 2.24% (State Income Tax Rate or Composite SIT) p = 0.00% (percent of FIT deductible for state purposes) N Removes the dollars of plant booked to transmission plant that is excluded from the Tariff because it does not meet the Tariff's definition of Transmission Facilities, or is booked to transmission (e.g. stepup transformers) that is included in the development of OATT ancillary service rates, or is otherwise not eligible to be recovered under this Tariff. O Enter dollar amounts. Includes service company labor. Does not include contract labor.

13 Schedule 1 Rate Formula Template Southwestern Public Service Company Table 12 A. Schedule 1 Projected ARR for Billing Period 01/01/2014 to 12/31/ Total Load Dispatch and Scheduling (Account 561) WsG OM WS $10,978,780 2 Less: Load Dispatch Scheduling, System Control and Dispatch Services WsG Acct $3,094,247 3 Less: Transmission Service Studies WsG Acct $308,101 4 Less: Generation Interconnection Studies WsG Acct $75,410 5 Less: Load Dispatch Reliability, Planning & Standards Development Services WsG Acct $2,664,415 6 Total 561 Costs for Projected Schedule 1 ARR (Ln 1 Sum of Lines 2 through 5) $4,836,607 7 Less: Schedule 1 Point to Point Projected Revenues WsB Rev Credits $308,358 8 Projected Schedule 1 ARR Without Trueup Adjustments (Ln 6 Ln 7) $4,528,249 9 Prior Year Trueup Adjustment Input from Prior Year Trueup $392, Interest On Prior Year Trueup Adjustment Input from Prior Year $25, Projected Schedule 1 ARR ( Ln 8 + Ln 9 + Ln 10) $4,946,697 B. Schedule 1 Rate Calculations 12 Projected Average 12Mo. Demand WsC Divisor 4,572,000 kw 13 Monthly Point to Point Rate in $/kw Month ((Line 11 /Line 12) /12) $0.090 kw 14 Weekly Point to Point Rate in $/kw Weekly ((Line 11 /Line 12) /52) $0.021 kw 15 Daily Point to Point Rate in $/kw Day ((Line 11 /Line 12) /365) $0.003 kw 16 Hourly Point to Point Rate in $/mw Hourly ((Line 11 /Line 12) /8760 * 1000) $0.124 mw 17 **SECTIONS C AND D USED ONLY FOR TRUEUP, ANNUAL UPDATE WILL BE BLANK** C. Schedule 1 Actual ARR for the Billing Period 01/01/2014 to 12/31/ Total Load Dispatch and Scheduling (Account 561) WsG OM WS $11,000, Less: Load Dispatch Scheduling, System Control and Dispatch Services WsG Acct $4,623, Less: Transmission Service Studies WsG Acct ($5,213) 21 Less: Generation Interconnection Studies WsG Acct $67, Less: Load Dispatch Reliability, Planning & Standards Development Services WsG Acct $2,509, Total 561 Costs for Actual Schedule 1 ARR (Ln 18 Sum of Lines 19 through 22) $3,803, Less: Schedule 1 Point to Point Actual Revenues Billed WsB Rev Credits $462, Actual Schedule 1 ARR (Ln 23 Ln 24) $3,341,708 True Up from Billing Period to be Included in Projected Schedule 1 ARR: 26 Revenue Requirement TrueUp: 27 Actual Schedule 1 ARR calculated above (Ln 25) $3,341, Projected Schedule 1 ARR calculated above (Ln 8) $4,528, ARR Trueup Amount (Over recovery = credit; under recovery = debit) (Ln 27 Ln 28) ($1,186,541) 30 Volume TrueUp: 31 Actual Divisor Load for the Billing Period WsC Divisor 4,657,000 kw 32 Projected Divisor Load for the Billing Period (Ln 12) 4,572,000 kw 33 Volume Adjustment (Ln 32 Ln 31) (85,000) 34 Projected Zonal Rate per kwyr for the Billing Period (Ln 28 / Ln 32) $ Actual Zonal Rate per kwyr for the Billing Period (Ln 27 / Ln 31) $ Volume Revenue Adjustment (Over recovery = credit; under recovery = debit) (Ln 33 * Ln 34) ($84,187) 37 Net Schedule 1 Trueup Adjustment (Over Recovery = credit; under recovery = debit) (Ln 29 + Ln 36) ($1,270,728) 38 Interest Trueup Amount (Ln 68) ($82,344) D. Interest Calculation: 39 FERC Monthly 40 Quarterly Interest 41 Months Interest Rates Rate 42 January Projected Yr % February 3.25% March 3.25% April 3.25% May 3.25% June 3.25% July 3.25% August 3.25% September 3.25% October 3.25% November 3.25% December 3.25% January Trueup Yr % February 3.25% March 3.25% April 3.25% May 3.25% June 3.25% July 3.25% August 3.25% September 3.25% Average Monthly Interest Rate Over/Under Recovery Amount (Line 37) ($1,270,728) 65 Average Monthly Interest Rate (Line 63) Monthly Interest Recovery Amount (Line 64 * Line 65) ($3,431) 67 Number of Months for Interest Recovery Amount Interest Recovery Amount (Line 67 * Line 66) ($82,344) 69 Note: 70 The interest is calculated using the interest rate posted on the FERC website. 71 See link to website below. 72

14 Worksheet A Worksheet A Projected Billing Year TrueUp Adjustment and Interest Calculation Table ANNUAL UPDATE Line No. 1 I. Revenue Requirement Trueup: 2 Projected Revenue Requirement for the Prior Rate Year (ARR Projected Data ln 33 + ln 43) $ 194,446,666 3 Actual Revenue Requirement for the Trueup Rate Year (ARR Actual Data ln ln 179) $ 177,892,903 4 Revenue Requirement Trueup Adjustment (Over Recovery is a Credit, Under Recovery is a Debit) $ (16,553,763) 5 II. SPP Base Plan Upgrades Revenue Requirement Trueup: 6 Projected Revenue Requirement for the Prior Rate Year (ARR Projected Data ln 44 col (5)) $ 81,210,416 7 Actual Revenue Requirement for the Trueup Rate Year (ARR Actual Data ln 180 col (5)) $ 56,277,632 8 SPP BPU Trueup (Over Recovery is a Credit, Under Recovery is a Debit) (ln 6 ln 7) $ 24,932,783 9 Net Revenue Requirement Trueup Adjustment (Over Recovery is a Credit, Under Recovery is a Debit) $ 8,379, III. Volume Trueup: 11 Projected Divisor Load for the Prior Rate Year, (WsC Divisor ln 14 * 1,000) 4,572,000 kw 12 Actual Divisor Load for the Prior Rate Year, (WsC Divisor ln 28 * 1,000) 4,657,000 kw 13 Volume Adjustment (line 11 line 12) (85,000) kw 14 Projected Zonal Rate per kwyr for the Prior Rate Year (Rate ln 10 col (3)) $ Actual Zonal Rate per kwyr for the Prior Rate Year ((ln 3 ln 7) / ln 12)) $ Volume Revenue Adjustment (Over Recovery is a Credit, Under Recovery is a Debit) (line 13 x line 14) ($2,037,280) 17 Net Trueup Adjustment (Over Recovery is a Credit, Under Recovery is a Debit) (sum lines ) $ 6,341, IV. Interest Calculation: was section III, now section IV Projected Billing Year 21 FERC Monthly 22 Quarterly Interest 23 Months Interest Rates Rate 24 January Projected Yr % February 3.25% March 3.25% April 3.25% May 3.25% June 3.25% July 3.25% August 3.25% September 3.25% October 3.25% November 3.25% December 3.25% January Trueup Yr % February 3.25% March 3.25% April 3.25% May 3.25% June 3.25% July 3.25% August 3.25% ATRR SPP BPU 44 September 3.25% Revenue Revenue 45 Average Monthly Interest Rate Requirement Requirement Trueup Trueup 46 Over/Under Recovery Amount (ARR from ln 4 & ln 16 BPU from ln 8 amount) line reference change $ (18,591,043) $ 24,932, Average Monthly Interest Rate (ln 45) Monthly Interest Recovery Amount (ln 46 x ln 47) ($50,196) $67, Number of Months for Interest Recovery Amount ATRR SPP BPU 50 Interest Recovery Amount (ln 49 times ln 48) Revenue Revenue ($1,204,704) $1,615,656 Requirement Requirement 51 Prior Year Trueup Adjustment (line 46) $ (18,591,043) $ 24,932,783 (Input to Annual Update) 52 Interest on Prior Year Trueup Adjustment (ln 50) ($1,204,704) $1,615,656 (Input to Annual Update) 53 Note: 54 The interest is calculated using the interest rate posted on the FERC website. 55 See link to website below. 56

15 Worksheet A.1 Worksheet A.1 Prior Period Correction TrueUp with Interest Calculation Table 14 Line No. 1 Explanation of Prior Period Correction: 2 3 Land Held For Future Use Correction During 2013, SPS found it had incorrectly included $8,535 of Distribution LHFU in the 2011 Trueup 4 Rate Year Prior Period Correction Applicable to (input year) Effective Trueup Year for Rate Year Prior Period Correction (line 4 year + 2 years) Year Prior Period Correction Settled/Agreed (input) Rate Year Prior Period Correction Will be Included in ATRR (line 6 year + 1 year) Number of Months Prior Period Correction Subject to Interest ((ln 7 year ln 4 year) * 12) 36 9 I. Revenue Requirement Trueup: 10 Revenue Requirement for Prior Period Correction Trueup Year without Prior Period Correction (input) $ 103,566, Revised Revenue Requirement for Trueup Year with Prior Period Correction (input) $ 103,565, Revenue Requirement Trueup Adjustment (Over Recovery is a Credit, Under Recovery is a Debit) (ln 11 ln 10) ($959) 13 II. Volume Trueup: 14 Divisor for Prior Period Correction Trueup Year without Prior Period Correction (input) kw 15 Divisor for Trueup Year with Prior Period Correction (input) kw 16 Volume Adjustment (line 14 line 15) 0 kw 17 Actual Zonal Rate (line 10 / line 14) $ Revised Zonal Rate (line 11 / line 15) $ Volume Revenue Adjustment (Over Recovery is a Credit, Under Recovery is a Debit) (line 16 x line 17) $0 20 Net Prior Period Correction Trueup Adjustment (Over Recovery is a Credit, Under Recovery is a Debit) (line 12 + line 19) ($959) 21 III. Interest Calculation: 22 FERC Number Monthly 23 Quarterly of Days Interest 24 Month/Year Interest Rates in Month Rate 25 January Trueup Yr Yr % February 3.25% March 3.25% April 3.25% May 3.25% June 3.25% July 3.25% August 3.25% September 3.25% October 3.25% November 3.25% December 3.25% January Trueup Yr Yr % February 3.25% March 3.25% April 3.25% May 3.25% June 3.25% July 3.25% August 3.25% September 3.25% October 3.25% November 3.25% December 3.25% January Trueup Yr % February 3.25% March 3.25% April 3.25% May 3.25% June 3.25% July 3.25% August 3.25% September 3.25% Average Monthly Interest Rate Over/Under Recovery Amount (ln 20 amount) ($959) 60 Average Monthly Interest Rate (ln 58) Monthly Interest Recovery Amount (ln 59 x ln 60) ($3) 62 Number of Months for Interest Recovery Amount (from line 8) Interest Recovery Amount (ln 62 times ln 61) ($108) 64 Prior Period Correction Adjustment (ln 20) ($959) (Input to Annual Update) 65 Interest on Prior Period Correction Adjustment (ln 63) ($108) (Input to Annual Update) 66 Note: 67 The interest is calculated using the interest rate posted on the FERC website. 68 See link to website below. 69

16 Worksheet A.1 Worksheet A.1 Prior Period Correction TrueUp with Interest Calculation Table 14 Line No. 1 Explanation of Prior Period Correction: 2 3 Amortization Expense Correction During 2013, SPS found the 2011 FERC Form No. 1 incorrectly reported the Financial blended depreciation rates for Amortization Expense, rather than the FERConly rates on page 336, footnote page Rate Year Prior Period Correction Applicable to (input year) Effective Trueup Year for Rate Year Prior Period Correction (line 4 year + 2 years) Year Prior Period Correction Settled/Agreed (input) Rate Year Prior Period Correction Will be Included in ATRR (line 6 year + 1 year) Number of Months Prior Period Correction Subject to Interest ((ln 7 year ln 4 year) * 12) 36 9 I. Revenue Requirement Trueup: 10 Revenue Requirement for Prior Period Correction Trueup Year without Prior Period Correction (input) $ 103,566, Revised Revenue Requirement for Trueup Year with Prior Period Correction (input) $ 103,731, Revenue Requirement Trueup Adjustment (Over Recovery is a Credit, Under Recovery is a Debit) (ln 11 ln 10) $164, II. Volume Trueup: 14 Divisor for Prior Period Correction Trueup Year without Prior Period Correction (input) kw 15 Divisor for Trueup Year with Prior Period Correction (input) kw 16 Volume Adjustment (line 14 line 15) 0 kw 17 Actual Zonal Rate (line 10 / line 14) $ Revised Zonal Rate (line 11 / line 15) $ Volume Revenue Adjustment (Over Recovery is a Credit, Under Recovery is a Debit) (line 16 x line 17) $0 20 Net Prior Period Correction Trueup Adjustment (Over Recovery is a Credit, Under Recovery is a Debit) (line 12 + line 19) $164, III. Interest Calculation: 22 FERC Number Monthly 23 Quarterly of Days Interest 24 Month/Year Interest Rates in Month Rate 25 January Trueup Yr Yr % February 3.25% March 3.25% April 3.25% May 3.25% June 3.25% July 3.25% August 3.25% September 3.25% October 3.25% November 3.25% December 3.25% January Trueup Yr Yr % February 3.25% March 3.25% April 3.25% May 3.25% June 3.25% July 3.25% August 3.25% September 3.25% October 3.25% November 3.25% December 3.25% January Trueup Yr % February 3.25% March 3.25% April 3.25% May 3.25% June 3.25% July 3.25% August 3.25% September 3.25% Average Monthly Interest Rate Over/Under Recovery Amount (ln 20 amount) $164, Average Monthly Interest Rate (ln 58) Monthly Interest Recovery Amount (ln 59 x ln 60) $ Number of Months for Interest Recovery Amount (from line 8) Interest Recovery Amount (ln 62 times ln 61) $16, Prior Period Correction Adjustment (ln 20) $164,699 (Input to Annual Update) 65 Interest on Prior Period Correction Adjustment (ln 63) $16,020 (Input to Annual Update) 66 Note: 67 The interest is calculated using the interest rate posted on the FERC website. 68 See link to website below. 69

17 Worksheet A.1 Worksheet A.1 Prior Period Correction TrueUp with Interest Calculation Table 14 Line No. 1 Explanation of Prior Period Correction: 2 Transmission O&M Expense Correction During 2013, SPS found it had not credited all of the costs associated with the Eddy County HVDC tie, only direct transmission O&M expenses were credited. SPS should have also credited laborrelated 3 overheads and allocated A&G costs. 4 Rate Year Prior Period Correction Applicable to (input year) Effective Trueup Year for Rate Year Prior Period Correction (line 4 year + 2 years) Year Prior Period Correction Settled/Agreed (input) Rate Year Prior Period Correction Will be Included in ATRR (line 6 year + 1 year) Number of Months Prior Period Correction Subject to Interest ((ln 7 year ln 4 year) * 12) 36 9 I. Revenue Requirement Trueup: 10 Revenue Requirement for Prior Period Correction Trueup Year without Prior Period Correction (input) $ 103,566, Revised Revenue Requirement for Trueup Year with Prior Period Correction (input) $ 103,553, Revenue Requirement Trueup Adjustment (Over Recovery is a Credit, Under Recovery is a Debit) (ln 11 ln 10) ($13,347) 13 II. Volume Trueup: 14 Divisor for Prior Period Correction Trueup Year without Prior Period Correction (input) kw 15 Divisor for Trueup Year with Prior Period Correction (input) kw 16 Volume Adjustment (line 14 line 15) 0 kw 17 Actual Zonal Rate (line 10 / line 14) $ Revised Zonal Rate (line 11 / line 15) $ Volume Revenue Adjustment (Over Recovery is a Credit, Under Recovery is a Debit) (line 16 x line 17) $0 20 Net Prior Period Correction Trueup Adjustment (Over Recovery is a Credit, Under Recovery is a Debit) (line 12 + line 19) ($13,347) 21 III. Interest Calculation: 22 FERC Number Monthly 23 Quarterly of Days Interest 24 Month/Year Interest Rates in Month Rate 25 January Trueup Yr Yr % February 3.25% March 3.25% April 3.25% May 3.25% June 3.25% July 3.25% August 3.25% September 3.25% October 3.25% November 3.25% December 3.25% January Trueup Yr Yr % February 3.25% March 3.25% April 3.25% May 3.25% June 3.25% July 3.25% August 3.25% September 3.25% October 3.25% November 3.25% December 3.25% January Trueup Yr % February 3.25% March 3.25% April 3.25% May 3.25% June 3.25% July 3.25% August 3.25% September 3.25% Average Monthly Interest Rate Over/Under Recovery Amount (ln 20 amount) ($13,347) 60 Average Monthly Interest Rate (ln 58) Monthly Interest Recovery Amount (ln 59 x ln 60) ($36) 62 Number of Months for Interest Recovery Amount (from line 8) Interest Recovery Amount (ln 62 times ln 61) ($1,296) 64 Prior Period Correction Adjustment (ln 20) ($13,347) (Input to Annual Update) 65 Interest on Prior Period Correction Adjustment (ln 63) ($1,296) (Input to Annual Update) 66 Note: 67 The interest is calculated using the interest rate posted on the FERC website. 68 See link to website below. 69

First Revised Sheet No. 2758L. Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/10 Utilizing FERC Form 1 Data VECTREN

First Revised Sheet No. 2758L. Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/10 Utilizing FERC Form 1 Data VECTREN Midwest ISO FERC Electric Tariff, Fourth Revised Volume No. 1 First Revised Sheet No. 2758L Superseding Original Sheet No. 2758L Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended

More information

AEPTCo - SPP Formula Rate Projected NITS Rates Page: 1 of 69

AEPTCo - SPP Formula Rate Projected NITS Rates Page: 1 of 69 Projected NITS Rates Page: 1 of 69 AEP Transmission Formula Rate Template Utilizing FERC Form 1 Data For rates effective July 1, 2016 SPP Zone 1 Projected AEP Revenue Requirements OKTCo Annual SWTCo Annual

More information

RE: Notice of 2015 Annual Formula Rate Update Posting and Customer Meeting

RE: Notice of 2015 Annual Formula Rate Update Posting and Customer Meeting September 2, 2014 TO: All Interested Parties RE: Notice of 2015 Annual Formula Rate Update Posting and Customer Meeting In accordance with Section 1.3(a) of the Oklahoma Gas and Electric Company ( OG&E

More information

AEPTCo - SPP Formula Rate Projected NITS Rates Page: 1 of 69

AEPTCo - SPP Formula Rate Projected NITS Rates Page: 1 of 69 AEPTCo SPP Formula Rate Projected NITS Rates Page: 1 of 69 AEP Transmission Formula Rate Template Utilizing FERC Form 1 Data.. For rates effective July 1, 2015 SPP Zone 1 Projected AEP Revenue Requirements

More information

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/15 Utilizing FERC Form 1 Data

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/15 Utilizing FERC Form 1 Data Attachment O Page 1 of 5 Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/15 Utilizing FERC Form 1 Data Northern Indiana Public Service Company Line Allocated No. Amount

More information

1 GROSS REVENUE REQUIREMENT (page 3, line 31, column 5) $ 121,165,696

1 GROSS REVENUE REQUIREMENT (page 3, line 31, column 5) $ 121,165,696 Attachment O Page 1 of 5 Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/14 Utilizing FERC Form 1 Data Line Allocated No. Amount 1 GROSS REVENUE REQUIREMENT (page 3, line

More information

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2016 Utilizing FERC Form 1 Data

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2016 Utilizing FERC Form 1 Data Attachment O Page 1 of 5 Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2016 Utilizing FERC Form 1 Data Northern Indiana Public Service Company Line Allocated No. Amount

More information

AEPTCo subsidiaries in PJM Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2013 and Projected Net Plant at Year-End 2014

AEPTCo subsidiaries in PJM Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2013 and Projected Net Plant at Year-End 2014 Transmission Cost of Service Utilizing Historic Cost Data for 2013 and Projected Net Plant at YearEnd 2014 Projected TCOS Page 1 of 37 Line Transmission No. Amount 1 REVENUE REQUIREMENT (w/o incentives)

More information

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/17 Utilizing FERC Form 1 Data

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/17 Utilizing FERC Form 1 Data Attachment O Page 1 of 5 Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/17 Utilizing FERC Form 1 Data Northern Indiana Public Service Company Line Allocated No. Amount

More information

AEPTCo subsidiaries in PJM Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2014 and Projected Net Plant at Year-End 2015

AEPTCo subsidiaries in PJM Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2014 and Projected Net Plant at Year-End 2015 AEPTCo subsidiaries in PJM Transmission Cost of Service Utilizing Historic Cost Data for 2014 and Projected Net Plant at YearEnd 2015 Projected TCOS Page 1 of 75 AEP OHIO TRANSMISSION COMPANY Line Transmission

More information

AEP East Companies Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2014 and Projected Net Plant at Year-End 2015

AEP East Companies Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2014 and Projected Net Plant at Year-End 2015 I & M Projected TCOS Page 1 of 48 AEP East Companies Transmission Cost of Service Utilizing Historic Cost Data for 2014 and Projected Net Plant at YearEnd 2015 Line Transmission No. Amount 1 REVENUE REQUIREMENT

More information

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2018 Utilizing FERC Form 1 Data

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2018 Utilizing FERC Form 1 Data page 1 of 5 Thirteen Monthly Balances Composite Depreciation Rates Line Allocated No. Amount 1 GROSS REVENUE REQUIREMENT (page 3, line 31) $ 601,791,927 REVENUE CREDITS (Note T) Total Allocator 2 Account

More information

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2015 Utilizing FERC Form 1 Data

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2015 Utilizing FERC Form 1 Data page 1 of 5 Thirteen Monthly Balances Composite Depreciation Rates Line Allocated No. Amount 1 GROSS REVENUE REQUIREMENT (page 3, line 31) $ 565,724,391 REVENUE CREDITS (Note T) Total Allocator 2 Account

More information

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2019 Utilizing FERC Form 1 Data

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2019 Utilizing FERC Form 1 Data Attachment O Page 1 of 5 Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2019 Utilizing FERC Form 1 Data Northern Indiana Public Service Company LLC Line Allocated No.

More information

AEP East Companies Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2014 and Projected Net Plant at Year-End 2015

AEP East Companies Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2014 and Projected Net Plant at Year-End 2015 KPCo Projected TCOS Page 1 of 34 AEP East Companies Transmission Cost of Service Utilizing Historic Cost Data for 2014 and Projected Net Plant at YearEnd 2015 Line Transmission No. Amount 1 REVENUE REQUIREMENT

More information

AEP East Companies Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2013 and Projected Net Plant at Year-End 2014

AEP East Companies Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2013 and Projected Net Plant at Year-End 2014 KPCo Projected TCOS Page 1 of 34 AEP East Companies Transmission Cost of Service Utilizing Historic Cost Data for 2013 and Projected Net Plant at YearEnd 2014 Line Transmission No. Amount 1 REVENUE REQUIREMENT

More information

AEP East Companies Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2012 and Projected Net Plant at Year-End 2013

AEP East Companies Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2012 and Projected Net Plant at Year-End 2013 Transmission Cost of Service Utilizing Historic Cost Data for 2012 and Projected Net Plant at YearEnd 2013 APCo Projected TCOS Page 1 of 36 Line Transmission No. Amount 1 REVENUE REQUIREMENT (w/o incentives)

More information

AEP East Companies Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2013 and Projected Net Plant at Year-End 2014

AEP East Companies Transmission Cost of Service Formula Rate Utilizing Historic Cost Data for 2013 and Projected Net Plant at Year-End 2014 KGPCo Projected TCOS Page 1 of 34 AEP East Companies Transmission Cost of Service Utilizing Historic Cost Data for 2013 and Projected Net Plant at YearEnd 2014 Line Transmission No. Amount 1 REVENUE REQUIREMENT

More information

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2019 Utilizing FERC Form 1 Data

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2019 Utilizing FERC Form 1 Data page 1 of 5 Thirteen Monthly Balances Composite Depreciation Rates Line Allocated No. Amount 1 GROSS REVENUE REQUIREMENT (page 3, line 31) $ 575,738,213 REVENUE CREDITS (Note T) Total Allocator 2 Account

More information

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/10 Utilizing FERC Form 1 Data

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/10 Utilizing FERC Form 1 Data Midwest ISO First Revised Sheet No. 2647 FERC Electric Tariff, Fourth Revised Volume No. 1 Superseding Original Sheet No. 2647 page 1 of 5 Thirteen Monthly Balances Composite Depreciation Rates Line Allocated

More information

Rate Formula Template Utilizing FERC Form 1 for the 12 months ended 12/31/2011. Oklahoma Gas and Electric Company. Index of Worksheets

Rate Formula Template Utilizing FERC Form 1 for the 12 months ended 12/31/2011. Oklahoma Gas and Electric Company. Index of Worksheets Rate Formula Template Utilizing FERC Form 1 for the 12 months ended 12/31/2011 (Enter whether "Projected Data" or "Actual Data") Projected Data Attachment H Addendum 2A Oklahoma Gas and Electric Company

More information

Total Network Revenue Requirement per Attachment O $ 463,230,109. Network Billings $ (462,862,216) True-up to be collected in 2011 $ 367,893

Total Network Revenue Requirement per Attachment O $ 463,230,109. Network Billings $ (462,862,216) True-up to be collected in 2011 $ 367,893 Estimated Network Revenue Requirement True-up For the Year Ended December 31, 2009 Total Network Revenue Requirement per $ 463,230,109 Network Billings $ (462,862,216) True-up to be collected in 2011 $

More information

ATTACHMENT A clean copy of the revised tariff sheets (Exhibit No. AEP102A) Exhibit No. AEP 102A Page 1 of 44 Southwest Power Pool pro forma Third Revised Sheet No. 94 FERC Electric Tariff Superseding Second

More information

Formula Rate - Non-Levelized For the 12 months ended 12/31/2015 Rate Formula Template Utilizing EKPC 2015 Form FF1 Data (ver.

Formula Rate - Non-Levelized For the 12 months ended 12/31/2015 Rate Formula Template Utilizing EKPC 2015 Form FF1 Data (ver. page 1 of 5 Line Allocated No. Amount 1 GROSS REVENUE REQUIREMENT (page 3, line 29) 72,070,265 REVENUE CREDITS Note A Total Allocator 2 Account No. 454 (page 4, line 34) 152,462 TP 1.00000 152,462 3 Account

More information

(1) (2) (3) (4) (5) 1 GROSS REVENUE REQUIREMENT (page 3, line 47) $

(1) (2) (3) (4) (5) 1 GROSS REVENUE REQUIREMENT (page 3, line 47) $ page 1 of 5 Attachment H Formula Rate NonLevelized Rate Formula Template For the 12 months ended 12/31/2018 Utilizing FERC Form 1 Data (1) (2) (3) (4) (5) Line Allocated No. Amount 1 GROSS REVENUE REQUIREMENT

More information

May 15, Duke Energy Ohio, Inc., and Duke Energy Kentucky, Inc. Formula Rate Annual Update Docket No. ER

May 15, Duke Energy Ohio, Inc., and Duke Energy Kentucky, Inc. Formula Rate Annual Update Docket No. ER Gary A. Morgans 202 429 6234 gmorgans@steptoe.com 1330 Connecticut Avenue, NW Washington, DC 20036-1795 202 429 3000 main www.steptoe.com The Hon. Kimberly D. Bose Secretary Federal Energy Regulatory Commission

More information

June 20, Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

June 20, Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C McGuireWoods LLP 2001 K Street N.W. Suite 400 Washington, DC 20006-1040 Phone: 202.857.1700 Fax: 202.857.1737 www.mcguirewoods.com Julia Dryden English Direct: 202.857.1706 jenglish@mcguirewoods.com Fax:

More information

GridLiance West Transco LLC (GWT) Formula Rate Index

GridLiance West Transco LLC (GWT) Formula Rate Index (GWT) Formula Rate Index Appendix III Main Body of the Formula Attachment 1 Revenue Credit Worksheet Attachment 2 Cost Support Attachment 2a Cost Support Attachment 2b Cost Support Attachment 3 Incentives

More information

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC 20004-1404 202-239-3300 Fax: 202-239-3333 www.alston.com September 1, 2016 To: Re: Parties to FERC Docket No. ER08-386-000 Potomac-Appalachian

More information

GridLiance West Transco LLC (GWT) Formula Rate Index

GridLiance West Transco LLC (GWT) Formula Rate Index (GWT) Formula Rate Index Appendix III Main Body of the Formula Attachment 1 Revenue Credit Worksheet Attachment 2 Cost Support Attachment 2a Cost Support Attachment 2b Cost Support Attachment 3 Incentives

More information

Index. Rate Formula Template. For the 12 months ended 12/31/18. New York Transco LLC

Index. Rate Formula Template. For the 12 months ended 12/31/18. New York Transco LLC Index Rate Formula Template Utilizing FERC Form 1 Data New York Transco LLC Projected Annual Transmission Revenue Requirement For the 12 months ended 12/31/18 Appendix A Main body of the Formula Rate Attachment

More information

Wages & Salary Allocation Factor 1 Transmission Wages Expense p b 18,901,839

Wages & Salary Allocation Factor 1 Transmission Wages Expense p b 18,901,839 Page 1 of 29 Arizona Public Service Company Formula Rate Appendix A Notes Instruction 2014 Shaded cells are input cells Allocators Wages & Salary Allocation Factor 1 Transmission Wages Expense p354.21.b

More information

In addition to this transmittal letter and associated records for the etariff database, this filing includes:

In addition to this transmittal letter and associated records for the etariff database, this filing includes: 1050 Thomas Jefferson Street, NW Seventh Floor Washington, DC 20007 (202) 298-1800 Phone (202) 338-2416 Fax SUBMITTED VIA E-TARIFF FILING January 4, 2017 Kimberly D. Bose Secretary Federal Energy Regulatory

More information

PPL Electric Utilities Corporation

PPL Electric Utilities Corporation Page 1 of 22 ATTACHMENT H8G PPL Electric Utilities Corporation Formula Rate Appendix A Notes FERC Form 1 Page # or Instruction 2014 Data Shaded cells are input cells Allocators Wages & Salary Allocation

More information

Index. Rate Formula Template. For the 12 months ended 12/31/ New York Transco LLC

Index. Rate Formula Template. For the 12 months ended 12/31/ New York Transco LLC Index Rate Formula Template Utilizing FERC Form 1 Data New York Transco LLC Projected Annual Transmission Revenue Requirement For the 12 months ended 12/31/ Appendix A Main body of the Formula Rate Attachment

More information

Calculate Net Annual Transmission Revenue Requirements (ATRR) and Rates for SPP Tariff. Total Transmission A. Zonal Net ATRR 1 Gross ATRR $60,516,589

Calculate Net Annual Transmission Revenue Requirements (ATRR) and Rates for SPP Tariff. Total Transmission A. Zonal Net ATRR 1 Gross ATRR $60,516,589 Page 1 Formula-based Rate Template Calculate Net Annual Transmission Revenue Requirements (ATRR) and Rates for SPP Tariff Line No. Acct Description Notes Total Transmission A. Zonal Net ATRR 1 Gross ATRR

More information

Calculate Net Annual Transmission Revenue Requirements (ATRR) and Rates for SPP Tariff. Total Transmission A. Zonal Net ATRR 1 Gross ATRR $48,861,618

Calculate Net Annual Transmission Revenue Requirements (ATRR) and Rates for SPP Tariff. Total Transmission A. Zonal Net ATRR 1 Gross ATRR $48,861,618 Page 1 Formula-based Rate Template Calculate Net Annual Transmission Revenue Requirements (ATRR) and Rates for SPP Tariff Line Acct Description Notes Total Transmission A. Zonal Net ATRR 1 Gross ATRR $48,861,618

More information

Rate Formula Template (A) (B) (C) (D) (E) (F)

Rate Formula Template (A) (B) (C) (D) (E) (F) Page 1 of 4 Rate Formula Template (A) (B) (C) (D) (E) (F) Line Allocated No. Reference Worksheet/Note Amount A. NETWORK SERVICE 1 GROSS REVENUE REQUIREMENT Page 2, line 26, col. (F) $ 116,851,990 REVENUE

More information

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC 20004-1404

More information

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC 20004-1404

More information

June 13, Informational Filing Public Service Electric and Gas Company, Annual True-Up Adjustment Docket No. ER

June 13, Informational Filing Public Service Electric and Gas Company, Annual True-Up Adjustment Docket No. ER Hesser G. McBride, Jr. Associate General Regulatory Counsel Law Department 80 Park Plaza, T5G, Newark, NJ 07102-4194 tel: 973.430.5333 fax: 973.430.5983 email: Hesser.McBride@pseg.com June 13, 2016 VIA

More information

Appendix 1 Duquesne Light Company Attachment H -17A Page 1 of 25 Formula Rate - Appendix A True-Up Notes FERC Form 1 Page # or Instruction 2017 Shaded cells are input cells Allocators 1 Transmission Wages

More information

AEP - SPP Formula Rate Projected NITS Rates Page: 1 of 69

AEP - SPP Formula Rate Projected NITS Rates Page: 1 of 69 AEP Transmission Formula Rate Template Utilizing FERC Form 1 Data.. For rates effective July 1, 2015 AEP SPP Formula Rate Projected NITS Rates Page: 1 of 69 SPP Zone 1 Projected AEP Revenue Requirements

More information

Southwestern Public Service Company. Attachment O - Transmission Formula Rate 2014 True-Up. Golden Spread Information Request No. 1.

Southwestern Public Service Company. Attachment O - Transmission Formula Rate 2014 True-Up. Golden Spread Information Request No. 1. The following questions pertain to the spreadsheet file 07-2015---Attachment_O- 2014_SPS_Transmission_Formula_Rate_True-Up_rv1 : GSEC 1-1. Refer to SPS s 2014 FERC Form 1 page 207, line 48 Account 350

More information

AEP - SPP Formula Rate Projected NITS Rates Page: 1 of 68

AEP - SPP Formula Rate Projected NITS Rates Page: 1 of 68 Projected NITS Rates Page: 1 of 68 AEP Transmission Formula Rate Template Utilizing FERC Form 1 Data.. For rates effective July 1, 2013 SPP Zone 1 Projected AEP Revenue Requirements AEP Annual PSO Annual

More information

May 11, Re: PPL Electric Utilities Corporation Docket No. ER Informational Filing of 2012 Formula Rate Annual Update

May 11, Re: PPL Electric Utilities Corporation Docket No. ER Informational Filing of 2012 Formula Rate Annual Update Donald A. Kaplan D 202.661.6266 F 202.778.9100 don.kaplan@klgates.com May 11, 2012 VIA ELECTRONIC FILING Hon. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC 20004-1404

More information

SCHEDULE FORMULA RATE FOR DETERMINATION OF ANNUAL TRANSMISSION REVENUE REQUIREMENT AND SCHEDULE 1 ANNUAL REVENUE REQUIREMENT

SCHEDULE FORMULA RATE FOR DETERMINATION OF ANNUAL TRANSMISSION REVENUE REQUIREMENT AND SCHEDULE 1 ANNUAL REVENUE REQUIREMENT SCHEDULE 10 FORMULA RATE FOR DETERMINATION OF ANNUAL TRANSMISSION REVENUE REQUIREMENT AND SCHEDULE 1 ANNUAL REVENUE REQUIREMENT This Schedule contains the Formula Rate that the Transmission Provider will

More information

Entergy Services, Inc., Docket No. ER Informational Filing of Annual Transmission Formula Rate Update

Entergy Services, Inc., Docket No. ER Informational Filing of Annual Transmission Formula Rate Update Entergy Services, Inc. 101 Constitution Ave., N.W. Suite 200 East Washington, DC 20001 Tel: 202 530 7323 Fax: 202 530 7350 E-mail: mgriffe@entergy.com Michael C. Griffen Assistant General Counsel Federal

More information

Formula Rate - Appendix A Estimate Notes FERC Form 1 Page # or Instruction 2015 Shaded cells are input cells Allocators

Formula Rate - Appendix A Estimate Notes FERC Form 1 Page # or Instruction 2015 Shaded cells are input cells Allocators Page 1 of 25 Formula Rate - Appendix A Estimate Notes FERC Form 1 Page # or Instruction 2015 Shaded cells are input cells Allocators 1 Transmission Wages Expense p354.21.b 5,926,573 2 Total Wages Expense

More information

N. Am. Elec. Reliability Corp., 119 FERC 61,060, order on reh g, 120 FERC 61,260 (2007).

N. Am. Elec. Reliability Corp., 119 FERC 61,060, order on reh g, 120 FERC 61,260 (2007). The Honorable Kimberly D. Bose Secretary November 7, 2008 Page 2 Arkansas. SPP currently has 50 Members, serving more than 4 million customers in a 255,000 square-mile area covering all or part of eight

More information

AEP - SPP Formula Rate Projected NITS Rates Page: 1 of 69

AEP - SPP Formula Rate Projected NITS Rates Page: 1 of 69 Projected NITS Rates Page: 1 of 69 AEP Transmission Formula Rate Template Utilizing FERC Form 1 Data.. For rates effective July 1, 2014 SPP Zone 1 Projected AEP Revenue Requirements AEP Annual PSO Annual

More information

Potomac Electric Power Company ( Pepco ), Docket No. ER Informational Filing of 2017 Formula Rate Annual Update; Notice of Annual Meeting

Potomac Electric Power Company ( Pepco ), Docket No. ER Informational Filing of 2017 Formula Rate Annual Update; Notice of Annual Meeting Amy L. Blauman Assistant General Counsel Edison Place 701 Ninth Street NW Washington, DC 20068-0001 Office 202.872.2122 Fax 202.331.6767 pepco.com alblauman@pepcoholdings.com May 12, 2017 Ms. Kimberly

More information

Office Fax pepco.com

Office Fax pepco.com Amy L. Blauman Assistant General Counsel EP1132 701 Ninth Street NW Washington, DC 20068-0001 Office 202.872.2122 Fax 202.331.6767 pepco.com alblauman@pepcoholdings.com May 16, 2016 Ms. Kimberly D. Bose

More information

Office Fax delmarva.com

Office Fax delmarva.com Amy L. Blauman Assistant General Counsel EP1132 701 Ninth Street NW Washington, DC 20068-0001 Office 202.872.2122 Fax 202.331.6767 delmarva.com alblauman@pepcoholdings.com May 16, 2016 Ms. Kimberly D.

More information

UGI Utilities, Inc., Docket Nos. ER and ER Formula Rate Informational Filing: 2015 Transmission Revenue Requirement

UGI Utilities, Inc., Docket Nos. ER and ER Formula Rate Informational Filing: 2015 Transmission Revenue Requirement Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004 Tel. 202.739.3000 Fax: 202.739.3001 www.morganlewis.com John D. McGrane Partner 202.739.5621 jmcgrane@morganlewis.com May 15,

More information

January 25, By Electronic Filing

January 25, By Electronic Filing Gary J. Newell P 202.370.0137 F 202.370.0143 gnewell@jsslaw.com Jennings, Strouss & Salmon, P.L.C. 1350 I Street, NW Suite 810 Washington, D.C. 200053305 jsslaw.com January 25, 2019 By Electronic Filing

More information

Attachment 1 Page 1 of 23

Attachment 1 Page 1 of 23 Attachment 1 Page 1 of 23 ATTACHMENT H13A Commonwealth Edison Company Formula Rate Appendix A Notes FERC Form 1 Page # or Instruction 2009 Forecast Shaded cells are input cells Allocators Wages & Salary

More information

AEP - SPP Formula Rate Projected NITS Rates Page: 1 of 69

AEP - SPP Formula Rate Projected NITS Rates Page: 1 of 69 Projected NITS Rates Page: 1 of 69 AEP Transmission Formula Rate Template Utilizing FERC Form 1 Data.. For rates effective July 1, 2015 SPP Zone 1 Projected AEP Revenue Requirements AEP Annual PSO Annual

More information

ATTACHMENT NO POPULATED FORMULA RATE

ATTACHMENT NO POPULATED FORMULA RATE ATTACHMENT NO. 1 2008 POPULATED FORMULA RATE Attachment No. 1 Page 1 of 27 ATTACHMENT H13A Commonwealth Edison Company Formula Rate Appendix A Notes FERC Form 1 Page # or Instruction Shaded cells are input

More information

UGI Utilities, Inc., Docket Nos. ER and ER Formula Rate Informational Filing: 2016 Transmission Revenue Requirement

UGI Utilities, Inc., Docket Nos. ER and ER Formula Rate Informational Filing: 2016 Transmission Revenue Requirement Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004 Tel. 202.739.3000 Fax: 202.739.3001 www.morganlewis.com John D. McGrane Partner 202.739.5621 jmcgrane@morganlewis.com May 16,

More information

May 18, Black Hills Power, Inc. Docket Nos. ER and EL Compliance Filing Revising Attachment H Formula Rate Protocols

May 18, Black Hills Power, Inc. Docket Nos. ER and EL Compliance Filing Revising Attachment H Formula Rate Protocols Texas New York Washington, DC Connecticut Seattle Dubai London Blake R. Urban Attorney 202.828.5868 Office 800.404.3970 Fax Blake.Urban@bgllp.com Bracewell & Giuliani LLP 2000 K Street NW Suite 500 Washington,

More information

post such Annual Update on PJM s Internet website via link to the Transmission Services page or a similar successor page; and

post such Annual Update on PJM s Internet website via link to the Transmission Services page or a similar successor page; and 701 Ninth Street, NW Suite 1100 Washington, DC 20068 Amy L. Blauman Associate General Counsel 202-872-2122 202-331-6767 Fax alblauman@pepcoholdings.com May 14, 2012 Ms. Kimberly D. Bose Secretary Federal

More information

ATTACHMENTS ATTACHMENT GG NETWORK UPGRADE CHARGE

ATTACHMENTS ATTACHMENT GG NETWORK UPGRADE CHARGE ATTACHMENT GG Network Upgrade Charge ATTACHMENTS 32.0.0 ATTACHMENT GG NETWORK UPGRADE CHARGE 1. Network Upgrade Cost Allocation: This Attachment GG sets forth the method for calculating and collecting

More information

Tab Schedule/Worksheet Designation Description Date to be Posted

Tab Schedule/Worksheet Designation Description Date to be Posted Westar Energy Inc. (Westar) Rate Formula Template Table of Contents Overview The formula is calculated in two steps. The first step is to fill out Tabs A1 thru A12, and the Actual Gross Rev. Req. tab with

More information

boardman (1 Richard A. Heinemann August 27, 2015

boardman (1 Richard A. Heinemann August 27, 2015 boardman & ci a r k up L A W F I R M Richard A. Heinemann, Attorney 1 SOUTH PINCKNEY STREET, STE. 410, P.O. BOX 927, MADISON, WI 53701-0927 Telephone 608-283-1706 Facsimile 608-283-1709 rheinemann@boardmanclark.com

More information

Transmission Formula Rate Annual Customer Meeting. June 2017

Transmission Formula Rate Annual Customer Meeting. June 2017 American Electric Power Transmission Formula Rate Annual Customer Meeting Public Service Company of Oklahoma Southwestern Electric Power Company June 2017 2017 Annual Update Internet Posting http://www.aep.com/about/codeofco

More information

April 16, Commonwealth Edison Ministerial Revisions to Formula Transmission Rate; Docket No. ER14-

April 16, Commonwealth Edison Ministerial Revisions to Formula Transmission Rate; Docket No. ER14- SIDLEY AUSTIN LLP 1501 K STREET, N.W. WASHINGTON, D.C. 20005 (202) 736 8000 (202) 736 8711 FAX BEIJING BRUSSELS CHICAGO DALLAS FRANKFURT GENEVA HONG KONG LONDON LOS ANGELES NEW YORK SAN FRANCISCO SHANGHAI

More information

January 22, Compliance Filing of Virginia Electric and Power Company Docket No. EL

January 22, Compliance Filing of Virginia Electric and Power Company Docket No. EL Troutman Sanders LLP 401 9th Street, N. W., Suite 1000 Washington, D.C. 200042134 troutman.com Anne K. Dailey anne.dailey@troutman.com January 22, 2019 The Honorable Kimberly D. Bose, Secretary Federal

More information

Public Service Company of New Mexico Attachment H 1 Current Year Formula Rate

Public Service Company of New Mexico Attachment H 1 Current Year Formula Rate Attachment H 1 Formula Rate Allocators 1 Wages and Salary Allocation Factor 2 Transmission Wages Expense page 354, line 21, column b 5,229,728 3 4 Total Wages Expense page 354, line 28, column b 118,475,166

More information

BY ELECTRONIC FILING Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

BY ELECTRONIC FILING Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. ANDREW W. TUNNELL t: (205) 226-3439 f: (205) 488-5858 e: atunnell@balch.com BY ELECTRONIC FILING Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

Transmission Formula Rate 2018 Annual Update July 6, 2018 Minor corrections to slides 9, 18, and 19 shown in green

Transmission Formula Rate 2018 Annual Update July 6, 2018 Minor corrections to slides 9, 18, and 19 shown in green Transmission Formula Rate 2018 Annual Update July 6, 2018 Minor corrections to slides 9, 18, and 19 shown in green Topics Introductions Annual Update Overview FERC Form No. 1 page 106b Known errors 2017

More information

Attachment 2 to Appendix IX Formula Rate Spreadsheet

Attachment 2 to Appendix IX Formula Rate Spreadsheet Attachment 2 to Appendix IX Formula Rate Spreadsheet Table of Contents Worksheet Name Schedule Purpose Overview Base TRR Components. BaseTRR 1 Full Development of Retail and Wholesale Base TRRs IFPTRR

More information

Attachment 2 to Appendix IX Formula Rate Spreadsheet

Attachment 2 to Appendix IX Formula Rate Spreadsheet Attachment 2 to Appendix IX Formula Rate Spreadsheet Table of Contents Worksheet Name Schedule Purpose Overview Base TRR Components. BaseTRR 1 Full Development of Retail and Wholesale Base TRRs IFPTRR

More information

Attachment 2 to Appendix IX Formula Rate Spreadsheet

Attachment 2 to Appendix IX Formula Rate Spreadsheet Attachment 2 to Appendix IX Formula Rate Spreadsheet Table of Contents Worksheet Name Schedule Purpose Overview Base TRR Components. BaseTRR 1 Full Development of Retail and Wholesale Base TRRs IFPTRR

More information

March 15, Informational Filing UNS Electric, Inc., Formula Transmission Service Rates Docket No. ER17-

March 15, Informational Filing UNS Electric, Inc., Formula Transmission Service Rates Docket No. ER17- 88 E. Broadway Boulevard, Tucson, Arizona 85701 P.O. Box 711, Tucson, Arizona 85702 Amy Welander, Assistant General Counsel Telephone: 520-884-3655 Legal Department, HQE910 Fax: 520-884-3601 awelander@tep.com

More information

December 29, American Electric Power Service Corporation Docket No. ER

December 29, American Electric Power Service Corporation Docket No. ER American Electric Power 1 Riverside Plaza Columbus, OH 43215 AEP.com Honorable Kimberly D Bose Secretary Federal Energy Regulatory Commission 888 First St., N.E. Washington D.C. 20426 December 29, 2015

More information

Attachment 2 to Appendix IX Formula Rate Spreadsheet

Attachment 2 to Appendix IX Formula Rate Spreadsheet Attachment 2 to Appendix IX Formula Rate Spreadsheet Table of Contents Worksheet Name Schedule Purpose Overview Base TRR Components. BaseTRR 1 Full Development of Retail and Wholesale Base TRRs IFPTRR

More information

July 15, 2015 VIA ELECTRONIC FILING

July 15, 2015 VIA ELECTRONIC FILING July 15, 2015 VIA ELECTRONIC FILING The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20246 Re: Southwest Power Pool, Inc., Docket No.

More information

Attachment 2 to Appendix IX Formula Rate Spreadsheet

Attachment 2 to Appendix IX Formula Rate Spreadsheet Attachment 2 to Appendix IX Formula Rate Spreadsheet Table of Contents Worksheet Name Schedule Purpose Overview Base TRR Components. BaseTRR 1 Full Development of Retail and Wholesale Base TRRs IFPTRR

More information

Southwestern Public Service Company Attachment O SPS Transmission Formula Annual True-up for 2016 Material Accounting Changes since January 1, 2016

Southwestern Public Service Company Attachment O SPS Transmission Formula Annual True-up for 2016 Material Accounting Changes since January 1, 2016 1 The Company has listed below any material changes that have taken effect since January 1, 2016. For additional information, please refer to the Southwestern Public Service Company FERC Form 1 for Q4

More information

UNS Electric, Inc. Rates for Transmission Service For June 1, 2016 Through May 31, 2017 Data For Period Ending December 31, 2015

UNS Electric, Inc. Rates for Transmission Service For June 1, 2016 Through May 31, 2017 Data For Period Ending December 31, 2015 UNS Electric, Inc. Rates for Transmission Service For June 1, 2016 Through May 31, 2017 Data For Period Ending December 31, 2015 Mohave Total Line Division Division Company 1 2016 Revenue Requirements

More information

Dkt. No. ER Draft Informational Filing. Table of Contents

Dkt. No. ER Draft Informational Filing. Table of Contents Table of Contents Worksheet Name Schedule Purpose Overview Base TRR Components. BaseTRR 1 Full Development of Retail and Wholesale Base TRRs. IFPTRR 2 Calculation of the Incremental Forecast Period TRR

More information

Southwestern Public Service Company ( SPS ) Transmission Formula Rate 2015 Projection

Southwestern Public Service Company ( SPS ) Transmission Formula Rate 2015 Projection 1-1. With reference to the file Attachment O-SPS Variance Analysis Projected 2015vs2014 with explanations page 8 of 14, lines 23-24, please provide a description of the general criteria that SPS uses for

More information

Dkt. No. ER Draft Informational Filing. Table of Contents

Dkt. No. ER Draft Informational Filing. Table of Contents Table of Contents Worksheet Name Schedule Purpose Overview Base TRR Components. BaseTRR 1 Full Development of Retail and Wholesale Base TRRs. IFPTRR 2 Calculation of the Incremental Forecast Period TRR

More information

Southwestern Public Service Company Attachment O SPS Transmission Formula 2017 Projection Material Accounting Changes since January 1, 2016

Southwestern Public Service Company Attachment O SPS Transmission Formula 2017 Projection Material Accounting Changes since January 1, 2016 1 The Company has listed below any material changes that have taken effect since January 1, 2016. For additional information, please refer to the Southwestern Public Service Company FERC Form 1 for Q4

More information

UNS Electric, Inc. Rates for Transmission Service For June 1, 2017 Through May 31, 2018 For Period Ending December 31, 2016

UNS Electric, Inc. Rates for Transmission Service For June 1, 2017 Through May 31, 2018 For Period Ending December 31, 2016 UNS Electric, Inc. Rates for Transmission Service For June 1, 2017 Through May 31, 2018 For Period Ending December 31, 2016 Mohave Total Line Division Division Company 1 2017 Revenue Requirements $5,525,195

More information

PJM Interconnection, L.L.C., Dkt. No. ER (Related to Docket Nos. ER , -1997, -2034)

PJM Interconnection, L.L.C., Dkt. No. ER (Related to Docket Nos. ER , -1997, -2034) American Electric Power 801 Pennsylvania Avenue N.W. Suite 320 Washington, DC 20004 AEP.com November 24, 2010 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E., Room

More information

Tab Schedule/Worksheet Designation Description Date to be Posted

Tab Schedule/Worksheet Designation Description Date to be Posted Westar Energy Inc. (Westar) Rate Formula Template Table of Contents Overview The formula is calculated in two steps. The first step is to fill out Tabs A1 thru A12, and the Actual Gross Rev. Req. tab with

More information

Tab Schedule/Worksheet Designation Description Date to be Posted

Tab Schedule/Worksheet Designation Description Date to be Posted Westar Energy Inc. (Westar) Rate Formula Template Table of Contents Overview The formula is calculated in two steps. The first step is to fill out Tabs A1 thru A12, and the Actual Gross Rev. Req. tab with

More information

Attachment 2 to Appendix IX Formula Rate Spreadsheet

Attachment 2 to Appendix IX Formula Rate Spreadsheet Attachment 2 to Appendix IX Formula Rate Spreadsheet Table of Contents Worksheet Name Schedule Purpose Overview Base TRR Components. BaseTRR 1 Full Development of Retail and Wholesale Base TRRs IFPTRR

More information

Overview. Overview of SCE Retail Base TRR. SCE's retail Base Transmission Revenue Requirement is the sum of the following components:

Overview. Overview of SCE Retail Base TRR. SCE's retail Base Transmission Revenue Requirement is the sum of the following components: Table of Contents Worksheet Name Overview BaseTRR IFPTRR TrueUpAdjust TUTRR ROR PlantInService PlantStudy AccDep ADIT CWIP PHFU AbandonedPlant WorkCap IncentivePlant IncentiveAdder PlantAdditions Depreciation

More information

September 1, Southern California Edison Company/ Docket No. ER

September 1, Southern California Edison Company/ Docket No. ER Anna J. Valdberg Senior Attorney anna.valdberg@sce.com September 1, 2011 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Re: Southern California

More information

July 30, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms.

July 30, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms. Regulation James A. Cuillier Director FERC Rates & Regulation July 30, 2014 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Dear Ms. Bose:

More information

February 1, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms.

February 1, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms. Karen Koyano Principal Manager FERC Rates and Compliance February 1, 2017 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Dear Ms. Bose:

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION EXHIBIT SCE-4 EXHIBIT TO THE TESTIMONY OF MR. BERTON J.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION EXHIBIT SCE-4 EXHIBIT TO THE TESTIMONY OF MR. BERTON J. UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) Southern California Edison Company ) ) Dkt. No. ER18- -000 EXHIBIT SCE-4 EXHIBIT TO THE TESTIMONY OF MR. BERTON J. HANSEN ON BEHALF

More information

RR16 - Page 1 of

RR16 - Page 1 of DOCKET NO. APPLICATION OF SOUTHWESTERN PUBLIC SERVICE COMPANY FOR AUTHORITY TO CHANGE RATES PUBLIC UTILITY COMMISSION OF TEXAS DIRECT TESTIMONY of ARTHUR P. FREITAS on behalf of SOUTHWESTERN PUBLIC SERVICE

More information

American Electric Power Service Corporation Docket No. ER

American Electric Power Service Corporation Docket No. ER American Electric Power 801 Pennsylvania Ave NW, Suite 320 Washington, DC 200042615 AEP.com August 22, 2018 Honorable Kimberly D Bose Secretary Federal Energy Regulatory Commission 888 First St., N.E.

More information

July 21, Southwest Power Pool, Inc., Docket No. ER Submission of Response to Request for Additional Information

July 21, Southwest Power Pool, Inc., Docket No. ER Submission of Response to Request for Additional Information July 21, 2016 VIA ELECTRONIC FILING Penny Murrell Director, Division of Electric Power Regulation-Central Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Southwest

More information

Transmission Formula Rate 2017 Annual Update. June 23, 2017

Transmission Formula Rate 2017 Annual Update. June 23, 2017 Transmission Formula Rate 2017 Annual Update June 23, 2017 1 Topics Introductions Annual Update Overview 2017 Projection and 2016 True-Up Schedule 1 Additional Information Questions and Discussion 2 OASIS

More information