1 Investigation No.: Exhibit No.: SCE- Witnesses: Doug Bauder Rick Fisher (U 8-E) Errata to SCE-6: Testimony of Southern California Edison Company Responding to Certain Issues Identified in July 1, 01 ALJ Ruling Before the Public Utilities Commission of the State of California Rosemead, California July 1, 01

2 II. FERC ACCOUNTING FOR SONGS ASSETS This Chapter explains why SCE cannot accommodate the ALJ Ruling and explains the FERC accounting that SCE uses for SONGS fixed assets. SCE is unable to directly assign the net-investment dollars recorded on SCE s ledgers to the categories listed in Attachment 1 of the ALJ Ruling, because SCE maintains its plant and depreciation ledger consistent with FERC Uniform System of Accounts (USoA), which requires that SCE maintain its fixed asset records by FERC plant account. This accounting groups assets by type, not by system, which are comprised of many different types of assets. Table II-1 lists the Nuclear FERC plant accounts and account titles: Table II-1 Nuclear Production FERC Plant Accounts Account Title 0 Land and land rights 1 Structures and improvments Reactor plant equipment Turbogenerator units Accessory electric equipment 5 Miscellaneous power plant equipment In addition, SCE maintains its plant balances by retirement unit, a lower level of detail, but still by type of asset, not system. Plant account, Reactor Plant Equipment, includes over 60 different retirement units. Table II- shows a small sample of the retirement units in plant account. 18 CFR 101. Retirement units means those items of electric plant which, when retired, with or without replacement, are accounted for by crediting the book cost thereof to the electric plant account in which included 18 CFR 101, Definitions.

3 Table II- Sample of Retirement Units for Account, Reactor Plant Equipment Account Retirement Unit 100 STEAM GENERATOR 101 PRESSURIZER 110 REACTOR VESSEL 115 INTERNAL SYSTEM, REACTOR VESSEL 10 CONTROL ROD DRIVE SYSTEM 01 VALVES, TWO INCHES AND LARGER 00 MOTORS, 0 HORSEPOWER AND LARGER 05 TANKS, 0,000 GALLONS AND LARGER 05 FANS, 0 HORSEPOWER AND LARGER 08 FOUNDATIONS, MISCELLANEOUS 00 SUMPS, 0,000 GALLONS AND LARGER 05 STORAGE RACKS, SPENT FUEL Referring to these retirement unit categories, SCE is able to identify plant balances that will no longer be needed in operation, such as Retirement Unit 100, Steam Generator, and plant balances that will continue to be needed, such as Retirement Unit 05, Storage Racks, Spent Fuel (not shown). Other retirement units, however, identify components that are generic and in use throughout various systems at SONGS, such as Retirement Unit 01, Valves, Two Inches and Larger. These generic assets cannot be assigned directly to particular systems or system components, as outlined on Attachment 1 of the ALJ Ruling. SCE used the retirement unit categories in the analysis discussed in the next Chapter to determine the amount of SONGS capital assets that will continued to be used.

4 IV. SONGS NET INVESTMENT This Chapter will summarize the total balances and the portions that SCE has determined to be required during SONGS permanent retirement. SCE s net investment for SONGS fixed assets is $1.1 billion as of May 1, 01. This total represents a summation of accounting information for plant-in-service (plant), which is the cumulative balance of the original cost of construction and installation, offset by accumulated depreciation, which is the cumulative balance of depreciation expense charged in rates. These totals are presented in Appendix E, conforming to the format of Attachment of the ALJ Ruling. The net investment at October 1, 01 and May 1, as well as the amounts determined to continue to be needed is provided in Table IV-5. Category 5/1/01 Table IV-5 Net Investment Summary (SCE Share) Plant Accumulated Depreciation Net In ve stm e n t Allocation NI Required Not Required 1, % Staff Level % 6 Plant Condition,078, % 150 Still Required % 1 Total 5,119,878 1,0 % 81 10/1/01 Category Plant Accumulated Dep reciation Net In ve stm e n t Allocation NI Required Not Required Staff Level Plant Condition Still Required 5,190,81 1,50 100% 1,50 Total 5,190,81 1,50 100% 1,50 15 SCE is providing in Tables IV-5 and IV-6 the amount of assets as of October 1, 01 and May 1, 01 for illustrative purposes only, and not for the purpose of identifying the dates the Commission should use for removing certain amounts from rate base. For the reasons explained in this testimony, the Commission should not remove amounts from rate base for any period prior to when Unit has been defueled, systems laid up, and SONGS initial staffing reductions implemented. 1

5 Not included in the balances above are the net investment for Construction Work In Progress (CWIP), Marine Mitigation, Design Basis Documentation (DBD) and Deferred Debits (DD), Materials and Supplies (M&S), and Nuclear Fuel Inventory. SCE had a CWIP balance of $8 million as of October 1, 01, of which all was used and useful. The balance of CWIP as of May 1, 01, totaled $69 million, of which SCE has determined that $110 million continues to be needed for permanent retirement. SCE utilized an approach similar to that described in Chapter III for identifying what portion of CWIP will be still required with the retirement of SONGS. The ratemaking associated with these values will be submitted in SCE s August, 01 testimony. Marine Mitigation represents costs incurred to fulfill CCC requirements, including, among other things, constructing the reef and wetlands. The net balance of Marine Mitigation costs is $6 million as of October 1, 01 and May 1, 01. Nuclear DBD and DD for SONGS are regulatory assets recorded for FERC Account 18., Unrecovered Plant and Regulatory Study Costs. Although not specifically classified as Plant-In-Service, the recorded costs are included in rate base and depreciated. Nuclear DBD Study Costs represent expenditures required by the NRC to establish the nuclear design documentation system. Nuclear DD are plant-related regulatory assets that resolve accounting differences in capitalization policies between CPUC and FERC jurisdictions regarding the commercial operating dates of the units. The net balance of Nuclear DBD and DD costs was $ million as of October 1, 01 and May 1, 01. M&S includes such things as replacement repair parts and equipment used in the plant that are not currently included in capital assets. SCE had a balance of costs in M&S of $99 million (SCE Share) as of October 1, 01 and $100 million (SCE Share) as of May 1, 01. Nuclear fuel includes in-core and pre-core inventories. SCE had a balance of costs in nuclear fuel of $66 million (SCE Share) as of October 1, 01 and $71 million (SCE Share) as of May 1, 01. The ratemaking associated with these cost categories will be submitted in SCE s August, 01 testimony. Table IV-6 summarizes all of these balances. 1

6 Table IV-6 Total Net Investment by Category (SCE Share) Total N et Investment R equired N et Investment Category 10/1/1 05/1/1 10/1/1 05/1/1 Fixed Asset Net Investment 1,50 1,1 1,50 81 CW IP Marine Mitigation Nuclear DBD & DD M a te ria ls & S up p lie s N uclear Fuel Total,09,10,09 1,011 1

7 V. FORECAST OF REDUCED EMPLOYEE HEADCOUNT AT SONGS Based on SCE s announcement on June 7, 01, to permanently retire SONGS &, SONGS staffing levels 16 will be reduced to 575 employees by September, The reduction to 575 employees is possible because many of the functions that were required to support SONGS & operations are no longer required. SCE developed the SONGS permanent retirement staffing level of 575 by analyzing a combination of (1) staffing plans of other nuclear facilities that are decommissioning, and () the work required in a permanent retirement state. SCE then made adjustments to account for differences between those facilities and SONGS. For example, the sites SCE analyzed are each single unit sites, therefore it was necessary to adjust for two units. Another difference at SONGS is Security, which comprises approximately 50% of the SONGS retirement staff. The large Security staffing level is required because of the compact physical layout of the SONGS site, the close proximity to both the beach and public roads, as well as the need to meet applicable federal regulations. This organization is based upon NRC acceptance of 10 CFR 50.8 defueled certification and completion of required 10 CFR 50.5(q) Emergency Plan changes. Table V-7 below provides staffing by division. 16 No SCE Corporate positions that directly support SONGS are included in the 575 (e.g., Finance, Human Resources, and Communications). These positions are also being reduced to reflect SONGS permanent retirement. 17 SCE plans to further reduce staffing in 01 to 00 employees. 15

8 Table V-7 SONGS Staffing as of September 01 Site Management & Administration 9 Operations 71 Radiation Protection & Chemistry Maintenance & Work Control 65 Safety, Human Performance, PI 1 Oversight & Nuclear Safety Concerns 7 Initial Decommissioning Plan 1 Regulatory & Emergency Planning 16 Engineering 9 Security 00 Total SCE is not providing any non-labor O&M expense testimony as the analysis is currently in development. SCE reserves the right to submit testimony at a later date. 16

9 Appendix E Net Investments

10 Southern California Edison San Onofre Nuclear Generating Station Net Investment by Unit & Common as of October 1, 01 ($, SCE Share) DEPRECIATION DEPRECIABLE AVG GROSS PLANT EST. FUTURE NET SALVAGE RESERVE BALANCE SERV REM LIFE ANNUAL October 1, 01 % AMOUNT October 1, 01 October 1, 01 CURVE LIFE / RATE ACCRUAL UNIT 0 Easements - 0.0% License Structures & Improvements 5,8,55 0.0% - 6,89, 8,959,90 License , Reactor Plant Equipment 1,178,66, % - 687,711,9 90,65,8 License 9.0 5,517,05 Turbogenerator Units 01,11,09 0.0% - 6,10,700 7,98,9 License 8. 8,908,79 Accessory Electric Equipment 18,95,5 0.0% - 80,05,988 8,9,65 License 9.1,10,950 5 Misc. Power Plant Equipment 8,60,1 0.0% -,88,696,76,8 License ,5 x COR/RWIP - 0.0% (9,8,08) 9,8,08-5X GRT 8,509,08-7.1% (600,78) 7,885,050 1,,76 Various.8% 1,657 9X General / Intangibles,1 0.0% - (151,10) 185, Various 8.%,81 Total Fixed Assets,190,70,190 (600,78) 1,56,61,09 68,58,8 69,8,8 18 Nuclear DBD & DD 15,70,7 0.0% - 1,6,56.5 1,079,980 License , Marine Mitigation - 0.0% Total Deferred Debits 15,70,7-1,6,57 1,079, ,897 Total Unit,06,07,57 (600,78) 1,577,,51 69,8,81 69,57,180 UNIT 0 Easements - 0.0% License Structures & Improvements 1,9,6 0.0% - 00,11,1 1,18,1 License 9.1 1,51,5 Reactor Plant Equipment 981,19,95 0.0% - 668,08, 1,11,071 License 9.0,801,0 Turbogenerator Units,557,67 0.0% - 08,5,6,1,00 License 8.,05,10 Accessory Electric Equipment 69,086, % -,876,16 6,09,87 License 9.1,986,0 5 Misc. Power Plant Equipment 1,180,15 0.0% - 0,701,68 10,78,87 License 8.5 1,,76 x COR/RWIP - 0.0% (,95,9),95,9-5X GRT 7,856,81-7.1% (55,660) 7,79,8 1,11,80 Various.8%,11 9X General / Intangibles 170,86 0.0% - (100,) 70,709 Various 8.% 1,998 Total Fixed Assets 1,855,56,91 (55,660) 1,,559,99 1,559,10 5,76,87 18 Design Basis Documentation (DBD) 15,96,05 0.0% - 1,, 1,05,86 License ,0 Marine Mitigation - 0.0% Total Deferred Debits 15,96,05-1,, 1,05,86 116,0 Total Unit 1,870,860,596 (55,660) 1,57,80,91 1,61,965 5,878,89 COMMON 0 Easements 1,10, % - 59, ,5 License ,96 1 Structures & Improvements 556,701,8 0.0% -,907,715 1,79,768 License 9.1 1,518,580 Reactor Plant Equipment 170,71, % - 18,58,60,6,7 License 9.0,707,09 Turbogenerator Units 11,185, % - 8,67,06,558,95 License 8. 0,980 Accessory Electric Equipment 1,96,8 0.0% - 1,1,51 10,06,771 License 9.1 1,108,08 5 Misc. Power Plant Equipment 181,,87 0.0% - 176,889,8,,050 License ,65 x COR/RWIP - 0.0% 16,859,9 (16,859,9) - 5X GRT 0,06,8-7.1% (,119,895) 15,65,657 16,501,079 Various.8% 85,76 9X General / Intangibles 9,870, % -,96,8 5,9,781 Various 8.%,099,15 Total Fixed Assets 1,1,0,071 (,119,895) 98,159,56 08,90,710 5,167,67 18 Deferred Debits,1,50 0.0% - 1,11,51 1,010,51 License ,0 18 Marine Mitigation 6,890,71 0.0% - 16,67,59 6,, ,090,986 Total Deferred Debits 65,01,1-17,759,8 7,5,70 5,0,06 Total 1,09,,85 (,119,895) 955,919,100 55,5,080 0,69,878 TOTAL SONGS 0 Easements 1,10, % - 59, ,5 License ,96 1 Structures & Improvements 1,05,,60 0.0% - 1,060,509,70 1,95,70 License ,956,177 Reactor Plant Equipment,0,508,09 0.0% - 1,8,78,786 86,9,6 License 9.0 9,05,7 Turbogenerator Units 55,856,58 0.0% -,19,9 111,66,86 License 8. 1,66,875 Accessory Electric Equipment 70,777,77 0.0% - 66,5,66 8,5,07 License 9.1 9,05,0 5 Misc. Power Plant Equipment 71,107,11 0.0% - 51,0,157 19,676,985 License 8.5,1,99 COR/RWIP - 0.0%,568,68 (,568,68) - 5X GRT 6,9,60-7.1% (,75,9) 0,809,95 18,857,608 Various.8% 1,17,50 9X General / Intangibles 50,07, % -,69,596 6,79,91 Various 8.%,116,15 Total SONGS Production 5,190,6,65 (,75,9),9,1,00 1,9,08,66 10,58,88 18 Design Basis Documentation (DBD),11,0 0.0% - 9,976,99,1,09 License 9.1 6,19 Marine Mitigation 6,890,71 0.0% - 16,67,59 6,, ,090,986 Total SONGS DBD & Debit 96,011,755-6,6,5 9,87,1 5,7,1 Total SONGS 5,86,76,07 (,75,9),990,955,8 1,98,595,859 15,795, Construction Work In Progress 8,0, ,0,55 15 Materials & Supplies 99,59, ,59,05 10 Nuclear Fuel 66,09, ,09,8 Total SONGS Investment 6,079,66,70,091,98,7 E-1

11 Southern California Edison San Onofre Nuclear Generating Station Net Investment by Unit & Common as of May 1, 01 ($, SCE Share) DEPRECIATION DEPRECIABLE AVG GROSS PLANT EST. FUTURE NET SALVAGE RESERVE BALANCE SERV REM LIFE ANNUAL May 1, 01 % AMOUNT May 1, 01 May 1, 01 CURVE LIFE / RATE ACCRUAL UNIT 0 Easements - 0.0% License Structures & Improvements 5,87, % - 0,75,16 1,651,978 License 9.1 1,61,06 Reactor Plant Equipment 1,15,86,15 0.0% - 707,05,101 6,1,0 License 9.0 9,60,7 Turbogenerator Units 90,5,01 0.0% - 1,69,98 77,60,086 License 8. 9,,565 Accessory Electric Equipment 0,109, % - 81,510, 8,599,71 License 9.1,9,7 5 Misc. Power Plant Equipment 51,057, % -,508,69 6,59,7 License ,509 x COR/RWIP - 0.0% (19,0,85) 19,0,85-5X GRT 8,18, -7.1% (57,57) 7,60,99 1,07,08 Various.8% 86,56, 9X General / Intangibles,1 0.0% - (150,59) 18,57 Various 8.% 16, Total Fixed Assets,158,898,8 (57,57) 1,555,11,6 60,1,79 5,1, Nuclear DBD & DD 15,70,7 0.0% - 1,686,971 1,015,66 License ,78 18 Marine Mitigation - 0.0% Total Deferred Debits 15,70,7-1,686,971 1,015,66 111,78 Total Unit,17,600,818 (57,57) 1,569,88, 605,7,158 5,55,8 UNIT 0 Easements - 0.0% License Structures & Improvements 1,17,1 0.0% - 9,008,7 19,09,166 License 9.1,11,771 Reactor Plant Equipment 91,55,55 0.0% - 60,98,69 7,597,176 License 9.0 6,99,686 Turbogenerator Units,9,55 0.0% - 09,568,,76,1 License 8.,007,075 Accessory Electric Equipment 7,19,7 0.0% -,598,1 8,595,159 License 9.1,9,008 5 Misc. Power Plant Equipment 0,890, % -,575,77 7,1,8 License ,570 x COR/RWIP - 0.0% (,897,51),897,51-5X GRT 7,856,81-7.1% (55,660) 7,61,68 1,09,9 Various.8% 76,6,1 9X General / Intangibles 170,86 0.0% - (98,51) 68,87 Various 8.%,071,605 Total Fixed Assets 1,809,168,8 (55,660) 1,79,06,617 0,658,91 6,5,88 18 Nuclear DBD & DD 15,96,05 0.0% - 1,05,9 990,811 License , Marine Mitigation - 0.0% Total Deferred Debits 15,96,05-1,05,9 990, ,080 Total Unit 1,8,6,5 (55,660) 1,9,70,011 1,69,10 6,,918 COMMON 0 Easements 1,10, % - 6,09 80,69 License 9.1 5,916 1 Structures & Improvements 559,8, 0.0% - 5,07,819 10,876,1 License ,56,07 Reactor Plant Equipment 17,79,65 0.0% - 10,97,7 70,819,91 License 9.0 7,868,880 Turbogenerator Units 11,8, % - 11,659,8 (175,757) License 8. (0,88) Accessory Electric Equipment 1,887,00 0.0% - 1,518,80 10,68,6 License 9.1 1,11,56 5 Misc. Power Plant Equipment 180,59, % - 17,781,198 6,81,718 License ,61 x COR/RWIP - 0.0% 16,976,79 (16,976,79) - 5X GRT 8,89,50-7.1% (,09,881) 1,67,89 16,60,55 Various.8% 1,017,76,86 9X General / Intangibles 50,91,77 0.0% - 8,90,6 1,97,90 Various 8.% 619,88,57 Total Fixed Assets 1,150,955,69 (,09,881) 98,555,06 1,0,68 1,658,155,00 18 Nuclear DBD & DD,1,50 0.0% - 1,17,69 99,809 License , Marine Mitigation 65,0, % - 19,675,56 5,75, ,06,159 Total Deferred Debits 67,5,17-0,88,56 6,69,916 5,10,75 Total 1,18,98,86 (,09,881) 959,0,56 61,15,18 1,66,96,1 TOTAL SONGS 0 Easements 1,10, % - 6,09 80,69 License 9.1 5,916 1 Structures & Improvements 1,07,888, % - 1,069,151,0 18,77,559 License ,7,860 Reactor Plant Equipment,59,176,1 0.0% - 1,1,8,19 8,88,11 License 9.0 9,87,01 Turbogenerator Units 55,11,18 0.0% -,9, ,190,50 License 8. 1,10,757 Accessory Electric Equipment 77,190,97 0.0% - 69,67,50 87,56,757 License 9.1 9,69,97 5 Misc. Power Plant Equipment 7,5,8 0.0% - 51,865,9 0,677,890 License 8.5,,69 x COR/RWIP - 0.0% (5,1,170) 5,1,170-5X GRT,888,08-7.1% (,169,115) 9,675,7 18,81,975 Various.8% 1,580,57,09 9X General / Intangibles 51,118,6 0.0% - 8,691,57,6,690 Various 8.% 61,876,5 Total SONGS Production 5,119,0, (,169,115),87,761,186 1,9,0,50,6,9,79 18 Nuclear DBD & DD,11,0 0.0% - 0,165,057,955,986 License 9.1 5,0 18 Marine Mitigation 65,0, % - 19,675,56 5,75, ,06,159 Total Deferred Debits 98,51,71-9,80,60 8,701,09 5,61,588 Total SONGS 5,17,56,15 (,169,115),9,601,806 1,98,11,,,9,7 107 Construction Work In Progress 68,518, ,518, Materials & Supplies 100,5, ,5, Nuclear Fuel 71,077, ,077,55 Total SONGS Investment 6,057,85,066,17,95,75 E-

2015 General Rate Case

2015 General Rate Case Application No.: Exhibit No.: SCE-, Vol. 0, Revision 1 Witnesses: J. Carrillo M. Childs P. Wong R. Fisher P. Hunt D. Lee K. Shimmel R. Worden (U -E) 01 General Rate Case Public Version ERRATA Results of

More information

Exhibit No.: Witnesses: SCE-06 Paul Hunt 338-E) Before the. July 22, 2013

Exhibit No.: Witnesses: SCE-06 Paul Hunt 338-E) Before the. July 22, 2013 Application No.: Exhibit No.: Witnesses: A.1-1-01 SCE-0 Paul Hunt David H. Opitz Todd Cameron (U -E) SUPPLEMENTAL TESTIMONY: SONGS & EARLY DECOMMISSIONING SCENARIO Before the Public Utilities Commission

More information

Third Quarter 2017 Financial Results

Third Quarter 2017 Financial Results Third Quarter 2017 Financial Results October 30, 2017 Forward-Looking Statements Statements contained in this presentation about future performance, including, without limitation, operating results, capital

More information

2015 General Rate Case

2015 General Rate Case Application No.: Exhibit No.: SCE-0, Vol. 01, Pt. 1 Witnesses: A. Herrera G. Huckaby (U -E) 01 General Rate Case Financial, Legal, and Operational Services (FL&OS) Volume 1, Part 1 Financial Services Department

More information

2018 General Rate Case

2018 General Rate Case Application No.: A.1-0- Exhibit No.: SCE-0, Vol. 0 Witnesses: R. Ramos J. Smolk R. Swartz S. Tran A (U -E) 01 General Rate Case ERRATA Administrative & General (A&G) Volume 0 Legal (Law, Claims, and Workers

More information

2018 General Rate Case

2018 General Rate Case Application No.: Exhibit No.: Witnesses: A.16-09-001 SCE-60 M. Childs J. McCarson S. Menon D. Tessler (U 338-E) 2018 General Rate Case Tax Update Before the Public Utilities Commission of the State of

More information

SONGS OII Phase II Testimony Providing Ratemaking Proposal

SONGS OII Phase II Testimony Providing Ratemaking Proposal Investigation No.: Exhibit No.: Witnesses: I.1--01 SCE-0 P. Hunt D. Snow R. Worden (U -E) SONGS OII Phase II Testimony Providing Ratemaking Proposal Before the Public Utilities Commission of the State

More information

Table Of Contents. Section Page Witness DECOMMISSIONING COST CATEGORIZATION STRUCTURE...2

Table Of Contents. Section Page Witness DECOMMISSIONING COST CATEGORIZATION STRUCTURE...2 Application No.: Exhibit No.: Witnesses: A.14-12-007 SCE-04 Jose Perez (U 338-E) Supplemental Testimony of Southern California Edison Company Regarding Decommissioning Cost Categorization and Employee

More information

2015 General Rate Case

2015 General Rate Case Application No.: Exhibit No.: Witnesses: A.13-11-003 SCE-73 T. Cameron R. Fisher G. Henry C. Hu M. Marelli D. Snow P. Wong (U 338-E) 2015 General Rate Case PUBLIC VERSION Update Testimony Before the Public

More information

First Quarter 2018 Financial Results. May 1, 2018

First Quarter 2018 Financial Results. May 1, 2018 First Quarter 2018 Financial Results May 1, 2018 Forward-Looking Statements Statements contained in this presentation about future performance, including, without limitation, operating results, capital

More information

December 11, 2006 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

December 11, 2006 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Akbar Jazayeri Vice President, Revenue and Tariffs December 11, 2006 ADVICE 2072-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Revision to the Base Revenue

More information

2015 General Rate Case

2015 General Rate Case Application No.: Exhibit No.: Witnesses: A.--00 SCE-0, Vol. 0, Pt. 1 M. Bennett G. Henry J. Trapp R. Worden (U -E) 01 General Rate Case ERRATA Human Resources (HR) Volume, Part 1 Benefits and Other Compensation

More information

Fourth Quarter and Full Year 2018 Financial Results. February 28, 2019

Fourth Quarter and Full Year 2018 Financial Results. February 28, 2019 Fourth Quarter and Full Year 2018 Financial Results Forward-Looking Statements Statements contained in this presentation about future performance, including, without limitation, operating results, capital

More information

Second Quarter 2017 Financial Results

Second Quarter 2017 Financial Results Second Quarter 2017 Financial Results July 27, 2017 Forward-Looking Statements Statements contained in this presentation about future performance, including, without limitation, operating results, capital

More information

Exhibit A Affidavit of Alan Varvis

Exhibit A Affidavit of Alan Varvis Affidavit of Alan Varvis Page 1 of 9 UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Southern California Edison Company ) Docket No. ER16- -000 AFFIDAVIT OF ALAN VARVIS FOR SOUTHERN

More information

FOR IMMEDIATE RELEASE Media relations contact: Charles Coleman, (626) Investor relations contact: Scott Cunningham, (626)

FOR IMMEDIATE RELEASE Media relations contact: Charles Coleman, (626) Investor relations contact: Scott Cunningham, (626) NEWS FOR IMMEDIATE RELEASE Media relations contact: Charles Coleman, (626) 302-7982 Investor relations contact: Scott Cunningham, (626) 302-2540 Edison International Reports Second Quarter 2016 Results;

More information

PG&E Corporation. Fourth Quarter Earnings Call February 21, 2013

PG&E Corporation. Fourth Quarter Earnings Call February 21, 2013 1 PG&E Corporation Fourth Quarter Earnings Call February 21, 2013 This presentation is not complete without the accompanying statements made by management during the webcast conference call held on February

More information

Settlement Agreement Implementation. Status Report. January 26, 2018

Settlement Agreement Implementation. Status Report. January 26, 2018 Settlement Agreement Implementation Status Report January 26, 2018 Submitted in accordance with the August 2017 Settlement Agreement resolving the case Citizens Oversight, Inc. v. California Coastal Commission,

More information

Edison International Reports First Quarter 2018 Financial Results Page 3 of 9. Appendix. Use of Non-GAAP Financial Measures

Edison International Reports First Quarter 2018 Financial Results Page 3 of 9. Appendix. Use of Non-GAAP Financial Measures Page 3 of 9 Use of Non-GAAP Financial Measures Appendix Edison International s earnings are prepared in accordance with generally accepted accounting principles used in the United States and represent

More information

2018 General Rate Case

2018 General Rate Case Application No.: A.1-0- Exhibit No.: SCE-0, Vol. Witnesses: S. Kempsey (U -E) 01 General Rate Case PUBLIC VERSION Administrative & General (A&G) Volume - Property & Liability Insurance Before the Public

More information

FOR IMMEDIATE RELEASE Investor relations contact: Sam Ramraj, (626) Media relations contact: Charles Coleman, (626)

FOR IMMEDIATE RELEASE Investor relations contact: Sam Ramraj, (626) Media relations contact: Charles Coleman, (626) NEWS FOR IMMEDIATE RELEASE Investor relations contact: Sam Ramraj, (626) 302-2540 Media relations contact: Charles Coleman, (626) 302-7982 Edison International Reports Second Quarter 2018 Results ROSEMEAD,

More information

FOR IMMEDIATE RELEASE Investor relations contact: Sam Ramraj, (626) Media relations contact: Charles Coleman, (626)

FOR IMMEDIATE RELEASE Investor relations contact: Sam Ramraj, (626) Media relations contact: Charles Coleman, (626) NEWS FOR IMMEDIATE RELEASE Investor relations contact: Sam Ramraj, (626) 302-2540 Media relations contact: Charles Coleman, (626) 302-7982 Edison International Reports Fourth Quarter and Full-Year 2017

More information

Southern California Edison Company s Supplemental Exhibit in Response to Administrative Law Judge s May 6, Ruling

Southern California Edison Company s Supplemental Exhibit in Response to Administrative Law Judge s May 6, Ruling Application No.: Exhibit No.: Witnesses: A.1-11-00 SCE- Douglas Snow Melvin Stark (U -E) Southern California Edison Company s Supplemental Exhibit in Response to Administrative Law Judge s May, 01 Email

More information

SDG&E REBUTTAL TESTIMONY OF NORMA G. JASSO (REGULATORY ACCOUNTS) June 2015

SDG&E REBUTTAL TESTIMONY OF NORMA G. JASSO (REGULATORY ACCOUNTS) June 2015 Company: San Diego Gas & Electric Company (U0M) Proceeding: 01 General Rate Case Application: A.1--00 Exhibit: SDG&E- SDG&E REBUTTAL TESTIMONY OF NORMA G. JASSO (REGULATORY ACCOUNTS) June 01 BEFORE THE

More information

Southern California Edison Company s Tehachapi Renewable Transmission Project (TRTP) -- Application Appendices. Application Nos.: Exhibit No.

Southern California Edison Company s Tehachapi Renewable Transmission Project (TRTP) -- Application Appendices. Application Nos.: Exhibit No. Application Nos.: Exhibit No.: Witnesses: Various (U 338-E) Southern California Edison Company s Tehachapi Renewable Transmission Project (TRTP) -- Application Appendices Before the Public Utilities Commission

More information

Exhibit D-1 Page1 PACIFIC GAS AND ELECTRIC COMPANY CONDENSED CONSOLIDATED STATEMENTS OF INCOME

Exhibit D-1 Page1 PACIFIC GAS AND ELECTRIC COMPANY CONDENSED CONSOLIDATED STATEMENTS OF INCOME EXHIBIT D PACIFIC GAS AND ELECTRIC COMPANY CONDENSED CONSOLIDATED STATEMENTS OF INCOME Exhibit D-1 Page1 (Unaudited) Three Months Ended March 31, (in millions) 2010 2009 Operating Revenues Electric $ 2,510

More information

2018 General Rate Case

2018 General Rate Case Application No.: A.1-0- Exhibit No.: SCE-0, Vol. Witnesses: M. Childs D. Gunn P. Hunt D. Lee J. McCarson (U -E) 01 General Rate Case Public Version Before the Public Utilities Commission of the State of

More information

Business Update Supplement SCE 2015 General Rate Case Decision

Business Update Supplement SCE 2015 General Rate Case Decision Business Update Supplement SCE 2015 General Rate Case Decision November 9, 2015 Forward-Looking Statements Statements contained in this presentation about future performance, including, without limitation,

More information

Electric Utility System of Accounts

Electric Utility System of Accounts National Association of Regulatory Utility Commissioners 3rd Partnership Activity of the Energy Regulation Board of Zambia & Pennsylvania Public Utility Commission March 20-23, 2006 Electric Utility System

More information

Third Quarter 2018 Financial Results. October 30, 2018

Third Quarter 2018 Financial Results. October 30, 2018 Third Quarter 2018 Financial Results October 30, 2018 Forward-Looking Statements Statements contained in this presentation about future performance, including, without limitation, operating results, capital

More information

2018 General Rate Case. Power Supply (PS) Volume 01 Nuclear (Palo Verde)

2018 General Rate Case. Power Supply (PS) Volume 01 Nuclear (Palo Verde) Application No.: A.16-09- Exhibit No.: SCE-0, Vol. 01 Witnesses: T. Champ (U 8-E) 018 General Rate Case Power Supply (PS) Volume 01 Nuclear (Palo Verde) Before the Public Utilities Commission of the State

More information

October 26, 2017 Advice Letter 3665-E

October 26, 2017 Advice Letter 3665-E STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION SAN FRANCISCO, CA 94102-3298 Edmund G. Brown Jr., Governor October 26, 2017 Advice Letter 3665-E Russell G. Worden Director, Regulatory Operations Southern

More information

Fourth Quarter and Full Year 2017 Financial Results

Fourth Quarter and Full Year 2017 Financial Results Fourth Quarter and Full Year 2017 Financial Results February 22, 2018 Forward-Looking Statements Statements contained in this presentation about future performance, including, without limitation, operating

More information

September 1, Southern California Edison Company/ Docket No. ER

September 1, Southern California Edison Company/ Docket No. ER Anna J. Valdberg Senior Attorney anna.valdberg@sce.com September 1, 2011 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Re: Southern California

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION SAN DIEGO GAS & ELECTRIC COMPANY ) DOCKET NO.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION SAN DIEGO GAS & ELECTRIC COMPANY ) DOCKET NO. UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION SAN DIEGO GAS & ELECTRIC COMPANY ) DOCKET NO. ER13-941-000 TRANSMISSION OWNER TARIFF FOURTH RATE FORMULA VOLUME NO. 11 FEBRUARY

More information

First Quarter 2017 Financial Results

First Quarter 2017 Financial Results First Quarter 2017 Financial Results May 1, 2017 Forward-Looking Statements Statements contained in this presentation about future performance, including, without limitation, operating results, capital

More information

SOCALGAS DIRECT TESTIMONY OF GARRY G. YEE RATE BASE. November 2014

SOCALGAS DIRECT TESTIMONY OF GARRY G. YEE RATE BASE. November 2014 Company: Southern California Gas Company (U 0 G) Proceeding: 01 General Rate Case Application: A.1-- Exhibit: SCG- SOCALGAS DIRECT TESTIMONY OF GARRY G. YEE RATE BASE November 01 BEFORE THE PUBLIC UTILITIES

More information

2018 General Rate Case

2018 General Rate Case Application No.: Exhibit No.: Witnesses: A.16-09-001 SCE-59 B. Anderson D. Bernaudo T. Cameron M. Childs D. Gunn T. Guntrip G. Henry C. Jacobs D. Kempf S. Menon D. Tessler (U 338-E) 2018 General Rate Case

More information

2018 General Rate Case

2018 General Rate Case Application No.: A.-0- Exhibit No.: SCE-0, Vol. A Witnesses: M. Bennett G. Henry C. Hernandez J. Trapp R. Worden (U -E) 0 General Rate Case ERRATA Human Resources (HR) Volume Benefits And Other Compensation

More information

2018 General Rate Case Rebuttal Testimony

2018 General Rate Case Rebuttal Testimony Application No.: A.1-0-001 Exhibit No.: SCE-, Vol. 0 Witnesses: R. Ramos J. Smolk R. Swartz D. Tessler S. Tran (U -E) 01 General Rate Case Rebuttal Testimony Administrative & General (A&G) Volume 0 Legal

More information

RE: Southern California Edison Company s Formula Transmission Rate Annual Update Filing in Docket No. ER (TO11)

RE: Southern California Edison Company s Formula Transmission Rate Annual Update Filing in Docket No. ER (TO11) James A. Cuillier Director FERC Rates & Regulation Ms. Kimberly D. Bose, Secretary 888 First Street, N.E. Washington, DC 20426 RE: Southern California Edison Company s Formula Transmission Rate Annual

More information

(U 338-E) 2018 General Rate Case A Workpapers REVISED. RO- Rate Base SCE-09 Volume 02, Chapter IV, Book A

(U 338-E) 2018 General Rate Case A Workpapers REVISED. RO- Rate Base SCE-09 Volume 02, Chapter IV, Book A (U 338-E) 2018 General Rate Case A.16-09-001 Workpapers REVISED RO- Rate Base SCE-09 Volume 02, Chapter IV, Book A September 2016 1 SCE-9, VOLUME 2, CHAPTER IV Rate Base Overview Witness: David Gunn Adjustments

More information

Business Overview. Jim Scilacci Senior VP and CFO, Edison Mission Group. Lehman Brothers High Yield Bond and Syndicated Loan Conference

Business Overview. Jim Scilacci Senior VP and CFO, Edison Mission Group. Lehman Brothers High Yield Bond and Syndicated Loan Conference Business Overview Jim Scilacci Senior VP and CFO, Edison Mission Group Lehman Brothers High Yield Bond and Syndicated Loan Conference March 15, 2006 Forward-Looking Statement This presentation contains

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 56089-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 56203-E PRELIMINARY STATEMENT Sheet 2 N. MEMORANDUM ACCOUNTS 2. Definitions.

More information

PRELIMINARY STATEMENT Sheet 1. J. Pole Loading and Deteriorated Pole Programs Balancing Account

PRELIMINARY STATEMENT Sheet 1. J. Pole Loading and Deteriorated Pole Programs Balancing Account Southern California Edison Revised Cal. PUC Sheet No. 60654-E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 57949-E PRELIMINARY STATEMENT Sheet 1 J. Pole Loading and Deteriorated

More information

2018 General Rate Case Rebuttal Testimony

2018 General Rate Case Rebuttal Testimony Application No.: A.16-09-001 Exhibit No.: SCE-23, Vol. 01 Witnesses: D. Daigler D. McMullen T. Guntrip D. Neal P. Jeske S. Schuffels K. Landrith (U 338-E) 2018 General Rate Case Rebuttal Testimony Operational

More information

CITY OF ANAHEIM ELECTRIC UTILITY FUND. Financial Statements. June 30, 2017 and (With Independent Auditors Report Thereon)

CITY OF ANAHEIM ELECTRIC UTILITY FUND. Financial Statements. June 30, 2017 and (With Independent Auditors Report Thereon) Financial Statements (With Independent Auditors Report Thereon) Table of Contents Independent Auditors Report 1 Management s Discussion and Analysis (Unaudited) 3 Financial Statements: Page Statement of

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) )

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Joint Application of Southern California Edison Company (U 338-E and San Diego Gas & Electric Company (U 902-E For Cost Recovery Of The

More information

RE: Southern California Edison Company s Formula Transmission Rate Annual Update Filing in Docket No. ER (TO11)

RE: Southern California Edison Company s Formula Transmission Rate Annual Update Filing in Docket No. ER (TO11) Jeffrey L. Nelson Director FERC Rates & Market Integration Ms. Kimberly D. Bose, Secretary 888 First Street, N.E. Washington, DC 20426 RE: Southern California Edison Company s Formula Transmission Rate

More information

Dkt. No. ER Draft Informational Filing. Table of Contents

Dkt. No. ER Draft Informational Filing. Table of Contents Table of Contents Worksheet Name Schedule Purpose Overview Base TRR Components. BaseTRR 1 Full Development of Retail and Wholesale Base TRRs. IFPTRR 2 Calculation of the Incremental Forecast Period TRR

More information

Southern California Edison Company (U 338-E) San Diego Gas & Electric Company (U 902-E)

Southern California Edison Company (U 338-E) San Diego Gas & Electric Company (U 902-E) Application No.: Exhibit No.: SCE Witnesses: SDG&E Witnesses: A.09-04- Utilities-3 Jun Han Paul T. Hunt Alfred L. Lopez Michael J. Parise Yelena A. Schiminske Brian M. Nelson Randall G. Rose Michelle A.

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Order Instituting Investigation on the Commission s Own Motion into the Rates, Operations, Practices, Services and Facilities of Southern

More information

Dkt. No. ER Draft Informational Filing. Table of Contents

Dkt. No. ER Draft Informational Filing. Table of Contents Table of Contents Worksheet Name Schedule Purpose Overview Base TRR Components. BaseTRR 1 Full Development of Retail and Wholesale Base TRRs. IFPTRR 2 Calculation of the Incremental Forecast Period TRR

More information

Rebuttal Testimony of Southern California Edison for Phase 1 of the 2015 Nuclear Decommissioning Costs Triennial Proceeding PUBLIC VERSION

Rebuttal Testimony of Southern California Edison for Phase 1 of the 2015 Nuclear Decommissioning Costs Triennial Proceeding PUBLIC VERSION Application No.: Exhibit No.: Witnesses: A.1-0-00 SCE- R. Bledsoe S. Lelewer R. Worden (U -E) Rebuttal Testimony of Southern California Edison for Phase 1 of the 01 Nuclear Decommissioning Costs Triennial

More information

MAINE YANKEE LTP SECTION 7 UPDATE OF SITE- SPECIFIC DECOMMISSIONING COSTS

MAINE YANKEE LTP SECTION 7 UPDATE OF SITE- SPECIFIC DECOMMISSIONING COSTS MYAPC License Termination Plan MAINE YANKEE LTP SECTION 7 UPDATE OF SITE- SPECIFIC DECOMMISSIONING COSTS MYAPC License Termination Plan Page 7-i TABLE OF CONTENTS 7.0 UPDATE OF SITE- SPECIFIC DECOMMISSIONING

More information

SCE Trust VI. Southern California Edison Company

SCE Trust VI. Southern California Edison Company PROSPECTUS SCE Trust VI 19,000,000 5.00% Trust Preference Securities (Cumulative, Liquidation Amount $25 per Trust Preference Security) Fully and unconditionally guaranteed, to the extent described herein,

More information

APPENDIX IX ATTACHMENT 1 FORMULA RATE PROTOCOLS

APPENDIX IX ATTACHMENT 1 FORMULA RATE PROTOCOLS APPENDIX IX ATTACHMENT 1 FORMULA RATE PROTOCOLS 1. INTRODUCTION SCE shall calculate its Base Transmission Revenue Requirement ( Base TRR ), as defined in Section 3.6 of the main definitions section of

More information

UNIFORM SYSTEM OF ACCOUNTS ACCOUNT LISTING BALANCE SHEET CHART OF ACCOUNTS ASSETS AND OTHER DEBITS

UNIFORM SYSTEM OF ACCOUNTS ACCOUNT LISTING BALANCE SHEET CHART OF ACCOUNTS ASSETS AND OTHER DEBITS BALANCE SHEET CHART OF ACCOUNTS ASSETS AND OTHER DEBITS 1. UTILITY PLANT 101 Electric plant in service (Major only). 101.1 Property under capital leases. 102 Electric plant purchased or sold. 103 Experimental

More information

Workpapers General Rate Case APPLICATION

Workpapers General Rate Case APPLICATION An E D ISO N INTERNATIONAL Company (U 338-E) 2015 General Rate Case APPLICATION Workpapers Results of Operations (RO) Plant, Taxes, Depreciation Expense and Reserve, Rate Base, and Productivity SCE-10

More information

PG&E Corporation. First Quarter Earnings Call. May 2, 2013.

PG&E Corporation. First Quarter Earnings Call. May 2, 2013. PG&E Corporation First Quarter Earnings Call May 2, 2013 This presentation is not complete without the accompanying statements made by management during the webcast conference call held on May 2, 2013.

More information

November 22, 2002 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. Implementation of the Energy Resource Recovery Account

November 22, 2002 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. Implementation of the Energy Resource Recovery Account Akbar Jazayeri Director of Revenue and Tariffs November 22, 2002 ADVICE 1665-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Implementation of the Energy Resource

More information

REVISED SDG&E DIRECT TESTIMONY OF MATTHEW C. VANDERBILT (DEPRECIATION) DECEMBER 2017 BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

REVISED SDG&E DIRECT TESTIMONY OF MATTHEW C. VANDERBILT (DEPRECIATION) DECEMBER 2017 BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Company: San Diego Gas & Electric Company (U 0 M) Proceeding: 01 General Rate Case Application: A.1--00 Exhibit: SDG&E--R REVISED SDG&E DIRECT TESTIMONY OF MATTHEW C. VANDERBILT (DEPRECIATION) DECEMBER

More information

REVISED WORKPAPERS TO PREPARED DIRECT TESTIMONY OF RONALD M. VAN DER LEEDEN ON BEHALF OF SOUTHERN CALIFORNIA GAS COMPANY

REVISED WORKPAPERS TO PREPARED DIRECT TESTIMONY OF RONALD M. VAN DER LEEDEN ON BEHALF OF SOUTHERN CALIFORNIA GAS COMPANY Application of SOUTHERN CALIFORNIA GAS ) COMPANY for authority to update its gas revenue ) requirement and base rates ) effective January 1, 2016 (U 904-G) ) Application No. 14-11-004 Exhibit No.: (SCG-35-R-WP)

More information

STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY DOCKET NO

STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY DOCKET NO STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY DOCKET NO. 1-- APPLICATION OF THE CONNECTICUT LIGHT AND POWER COMPANY DBA EVERSOURCE ENERGY TO AMEND ITS RATE SCHEDULES TESTIMONY OF NED W. ALLIS

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION EXHIBIT SCE-4 EXHIBIT TO THE TESTIMONY OF MR. BERTON J.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION EXHIBIT SCE-4 EXHIBIT TO THE TESTIMONY OF MR. BERTON J. UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) Southern California Edison Company ) ) Dkt. No. ER18- -000 EXHIBIT SCE-4 EXHIBIT TO THE TESTIMONY OF MR. BERTON J. HANSEN ON BEHALF

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 62633-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 61381-E PRELIMINARY STATEMENT Sheet 2 N. MEMORANDUM ACCOUNTS 2. Definitions.

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) )

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Application of Southern California Edison Company (U 338-E for Authority to, Among Other Things, Increase its Authorized Revenues for Electric

More information

2015 General Rate Case

2015 General Rate Case Application No.: Exhibit No.: SCE-0, Vol. 0 Witnesses: D. Neal (U -E) 01 General Rate Case Safety, Security, & Compliance (SS&C) Volume Corporate EH&S Before the Public Utilities Commission of the State

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Joint Application of Southern California Edison Company (U 338-E) and San Diego Gas & Electric Company (U 902-E) For the 2018 Nuclear Decommissioning

More information

Michigan Public Service Commission The Detroit Edison Company Projected Net Operating Income "Total Electric" and "Jurisdictional Electric"

Michigan Public Service Commission The Detroit Edison Company Projected Net Operating Income Total Electric and Jurisdictional Electric Projected Net Operating Income Schedule: C1 "Total Electric" and "Jurisdictional Electric" Witness: T. M. Uzenski Projected 12 Month Period Ending March 31, 2012 Page: 1 of 1 ($000) (a) (b) (c) Historical

More information

SUBJECT: Establishment of the Distribution Resources Plan Demonstration Balancing Account (DRPDBA) Pursuant to Decision

SUBJECT: Establishment of the Distribution Resources Plan Demonstration Balancing Account (DRPDBA) Pursuant to Decision STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 June 2, 2017 Advice Letter 3579-E Russell G. Worden Director, State Regulatory

More information

Excerpt of D On Test Year 2012 General Rate Case For Southern California Edison Company (Pages 1-5, 13-14, , & )

Excerpt of D On Test Year 2012 General Rate Case For Southern California Edison Company (Pages 1-5, 13-14, , & ) Application No.: Exhibit No.: Witnesses: A.13-11-003 SCE-45 T. Godfrey (U 338-E) Excerpt of D.12-11-051 On Test Year 2012 General Rate Case For Southern California Edison Company (Pages 1-5, 13-14, 209-211,

More information

APPENDIX X FORMULA FOR CALCULATING THE ALLOCATED COSTS TO THE CITIZENS BORDER EAST LINE RATE UNDER SDG&E S TRANSMISSION OWNER TARIFF

APPENDIX X FORMULA FOR CALCULATING THE ALLOCATED COSTS TO THE CITIZENS BORDER EAST LINE RATE UNDER SDG&E S TRANSMISSION OWNER TARIFF APPENDIX X FORMULA FOR CALCULATING THE ALLOCATED COSTS TO THE CITIZENS BORDER EAST LINE RATE UNDER SDG&E S TRANSMISSION OWNER TARIFF Appendix X sets forth the formula for calculating the Citizens Border

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Application of Southern California Gas Company (U 904 G) and San Diego Gas & Electric Company (U 902 G) for Low Operational Flow Order

More information

Tariff Submitter: FERC Tariff Program: Tariff Title: Tariff Record Proposed Effective Date: Tariff Record Title: Option Code: AES Huntington Beach, L.L.C. FERC FPA Electric Tariff Service Agreements June

More information

Overview. Overview of SCE Retail Base TRR. SCE's retail Base Transmission Revenue Requirement is the sum of the following components:

Overview. Overview of SCE Retail Base TRR. SCE's retail Base Transmission Revenue Requirement is the sum of the following components: Table of Contents Worksheet Name Overview BaseTRR IFPTRR TrueUpAdjust TUTRR ROR PlantInService PlantStudy AccDep ADIT CWIP PHFU AbandonedPlant WorkCap IncentivePlant IncentiveAdder PlantAdditions Depreciation

More information

PG&E Corporation. Second Quarter Earnings Call. July 31, 2013

PG&E Corporation. Second Quarter Earnings Call. July 31, 2013 PG&E Corporation Second Quarter Earnings Call July 31, 2013 This presentation is not complete without the accompanying statements made by management during the webcast conference call held on July 31,

More information

Regulatory Authority Competences in Monitoring the Bookkeeping of the Regulated Companies. Robin Kliethermes Rachel Lewis

Regulatory Authority Competences in Monitoring the Bookkeeping of the Regulated Companies. Robin Kliethermes Rachel Lewis Regulatory Authority Competences in Monitoring the Bookkeeping of the Regulated Companies Commissioner Steve Stoll Robin Kliethermes Rachel Lewis May 17, 2013 1 Overview of Regulatory Accounting Regulatory

More information

Rainier, OR March 31, 2005 _ (503) VPN

Rainier, OR March 31, 2005 _ (503) VPN PG/N Portland General Electric Company Trojan Nuclear Plant 71760 Columbia River HMhy Rainier, OR 97048 March 31, 2005 _ (503) 556-3713 VPN-012-2005 U. S. Nuclear Regulatory Commission ATTN: Document Control

More information

Supplemental Information

Supplemental Information Application No: Exhibit No: Witnesses: A.1-0-01 SCE- P. T. Hunt D. Snow (U -E) Supplemental Information Before the Public Utilities Commission of the State of California Rosemead, California June, 01 01

More information

June 8, 2001 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. Restatement of the Transition Cost Balancing Account

June 8, 2001 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. Restatement of the Transition Cost Balancing Account Akbar Jazayeri Director of Revenue and Tariffs June 8, 2001 ADVICE 1535-E-A (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Restatement of the Transition Cost

More information

PG&E Corporation Consolidated Statements of Income

PG&E Corporation Consolidated Statements of Income PG&E Corporation Consolidated Statements of Income (Unaudited) Three Months Ended December 31, Twelve Months Ended December 31, 2005 2004 2005 2004 Operating Revenues Electric $ 2,380 $ 1,971 $ 7,927 $

More information

(U 338-E) 2018 General Rate Case A Workpapers. RO-Cost Escalation SCE-09 Volume 01, Chapter VII

(U 338-E) 2018 General Rate Case A Workpapers. RO-Cost Escalation SCE-09 Volume 01, Chapter VII (U 338-E) 208 General Rate Case A.6-09- Workpapers RO-Cost Escalation SCE-09 Volume 0, Chapter VII September 206 Workpaper Southern California Edison / 208 GRC 2 3 4 5 6 7 8 9 0 2 3 4 5 6 7 8 9 20 2 22

More information

Fiscal Year 2013 Budget and Long Range Plan Columbia Generating Station. Brad Sawatzke VP, Nuclear Generation/CNO March 20, 2012

Fiscal Year 2013 Budget and Long Range Plan Columbia Generating Station. Brad Sawatzke VP, Nuclear Generation/CNO March 20, 2012 Fiscal Year 2013 Budget and Long Range Plan Columbia Generating Station Brad Sawatzke VP, Nuclear Generation/CNO March 20, 2012 Introduction Our goal is to provide safe, reliable, cost effective power

More information

Financial Assurance for Decommissioning

Financial Assurance for Decommissioning Vermont Yankee Nuclear Power Station Financial Assurance for Decommissioning December 8, 2014 Agenda Background VY Decommissioning Periods & Cost Estimate Financial Assurance Under 10 CFR 50.75 Dry Fuel

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA. ADMINISTRATIVE LAW JUDGE MARIBETH A. BUSHEY, presiding

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA. ADMINISTRATIVE LAW JUDGE MARIBETH A. BUSHEY, presiding BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ADMINISTRATIVE LAW JUDGE MARIBETH A. BUSHEY, presiding Joint Application of Southern California Edison Company (UE) and San Diego Gas &

More information

Attachment 2 to Appendix IX Formula Rate Spreadsheet

Attachment 2 to Appendix IX Formula Rate Spreadsheet Attachment 2 to Appendix IX Formula Rate Spreadsheet Table of Contents Worksheet Name Schedule Purpose Overview Base TRR Components. BaseTRR 1 Full Development of Retail and Wholesale Base TRRs IFPTRR

More information

2018 General Rate Case. Tax Update Rebuttal

2018 General Rate Case. Tax Update Rebuttal Application No.: Exhibit No.: Witnesses: A.16-09-001 SCE-61 M. Childs J. McCarson S. Menon (U 338-E) 2018 General Rate Case Tax Update Rebuttal Before the Public Utilities Commission of the State of California

More information

2001 Financial and Statistical Report

2001 Financial and Statistical Report 2001 Financial and Statistical Report Contents Edison International (EIX) Year in Review 1 Security Ratings 1 Highlights 2 Consolidated Per-Share Data Common Stock 3 Consolidated Balance Sheets Total Assets

More information

Southern California Edison Company

Southern California Edison Company PROSPECTUS SUPPLEMENT (To Prospectus dated April 12, 2005) Southern California Edison Company 2,000,000 Shares Series C Preference Stock (Non-Cumulative, $100 Liquidation Value) We are offering 2,000,000

More information

2015 General Rate Case

2015 General Rate Case Application No.: Exhibit No.: SCE-0, Vol. Witnesses: E. Jennerson R. Ramos J. Smolk R. Swartz (U -E) 01 General Rate Case Financial, Legal, and Operational Services (FL&OS) Volume - Legal (Law, Claims,

More information

2018 General Rate Case

2018 General Rate Case Application No.: Exhibit No.: Witnesses: A.1-0-001 SCE-TURN-01 S. Menon (SCE) W. Marcus (TURN) (U -E) 01 General Rate Case SCE-TURN Joint Supplemental Testimony Regarding SPIDA Software Disallowance Scenarios

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 57965-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 52531-E PRELIMINARY STATEMENT Sheet 1 Safety and Reliability Investment

More information

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) DIRECT TESTIMONY MELISSA L. OSTROM.

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) DIRECT TESTIMONY MELISSA L. OSTROM. BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION IN THE MATTER OF SOUTHWESTERN PUBLIC SERVICE COMPANY S APPLICATION REQUESTING APPROVAL TO RETIRE AND ABANDON ITS PLANT X GENERATING STATION UNIT, PLANT

More information

Advice Letters 3072-E and 3072-E-A

Advice Letters 3072-E and 3072-E-A STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION SAN FRANCISCO, CA 94102-3298 Edmund G. Brown Jr., Governor August 19, 2014 Advice Letters 3072-E and 3072-E-A Megan Scott-Kakures Vice President, Regulatory

More information

FOR IMMEDIATE DISTRIBUTION May 2, 2013 PG&E CORPORATION REPORTS FIRST-QUARTER 2013 RESULTS

FOR IMMEDIATE DISTRIBUTION May 2, 2013 PG&E CORPORATION REPORTS FIRST-QUARTER 2013 RESULTS Corporate Affairs 77 Beale Street San Francisco, CA 94105 1-415-973-5930 FOR IMMEDIATE DISTRIBUTION May 2, 2013 CONTACT: PG&E External Communications - (415) 973-5930 PG&E CORPORATION REPORTS FIRST-QUARTER

More information

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) SUPPLEMENTAL DIRECT TESTIMONY MELISSA L. OSTROM.

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) SUPPLEMENTAL DIRECT TESTIMONY MELISSA L. OSTROM. BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION IN THE MATTER OF SOUTHWESTERN PUBLIC SERVICE COMPANY S APPLICATION REQUESTING APPROVAL TO RETIRE AND ABANDON ITS PLANT X GENERATING STATION UNIT, PLANT

More information

PREPARED DIRECT TESTIMONY OF RANDALL G. ROSE ON BEHALF OF SOUTHERN CALIFORNIA GAS COMPANY

PREPARED DIRECT TESTIMONY OF RANDALL G. ROSE ON BEHALF OF SOUTHERN CALIFORNIA GAS COMPANY Application of Southern California Gas Company (U0G) for authority to update its gas revenue requirement and base rates effective on January 1, 01. Application -1- Exhibit No.: (SCG-) PREPARED DIRECT TESTIMONY

More information

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION ) ) ) ) NON-PROTECTED SURREBUTTAL EXHIBITS JEFF HILTON DIRECTOR OF REVENUE REQUIREMENTS

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION ) ) ) ) NON-PROTECTED SURREBUTTAL EXHIBITS JEFF HILTON DIRECTOR OF REVENUE REQUIREMENTS APSC FILED Time: 11/24/2015 10:57:47 AM: Recvd 11/24/2015 10:46:36 AM: Docket 15-015-U-Doc. 312 BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION IN THE MATTER OF THE APPLICATION OF ENTERGY ARKANSAS, INC.

More information

Summary of Excess Liability Forecast

Summary of Excess Liability Forecast Application No.: Exhibit No.: Witnesses: A.13-11-003-36 M. Marelli (U 338-E) Summary of Excess Liability Forecast Before the Public Utilities Commission of the State of California 1 1 Leading the Way in

More information