INVITATION TO TENDER

Size: px
Start display at page:

Download "INVITATION TO TENDER"

Transcription

1 INVITATION TO TENDER To undertake an ex-ante assessment of the case for ERDF investment by Cheshire and Warrington and Stoke-on-Trent and Staffordshire LEPs into a new Urban Development Fund established under the EC s JESSICA initiative 1. INTRODUCTION 1.1 Background The Joint European Support for Sustainable Investment in City Areas (JESSICA) is a European funding mechanism to promote investment in urban development projects. A North West JESSICA Holding Fund was established by the Northwest Development Agency in 2009, utilising European Regional Development Fund (ERDF) resources from the North West Operational Programme. This North West Urban Investment Fund (the NWUIF) oversaw the investment of the ERDF and matched resources in projects in the region via two urban development funds (UDFs); one established for Merseyside and the other for the rest of the North West (RONW) i.e. Cheshire, Cumbria, Greater Manchester and Lancashire. The RONW UDF, branded as the Evergreen Fund, was launched in 2011 and since that time has progressed 11 investments involving over 70m of ERDF resources. Of the 11 investments, eight are located in Greater Manchester and three in Cheshire. Greater Manchester has worked with DCLG, as Managing Authority, on development of a call to support the creation of a new UDF for Greater Manchester for the ERDF programme. The intention was that this new UDF, once established, would also be the bidding vehicle for the ERDF allocations of Cheshire and Warrington and Lancashire LEPs, subject to these areas being able to justify the case for investing resources through such an instrument. Following the conclusions of the Ex-ante assessment to justify investment in a new UDF Lancashire decided that it would wish to make alternative arrangements for the deployment of their ERDF funds. Cheshire and Warrington therefore now wish to update the Ex-ante assessment in partnership with Stoke-on-Trent and Staffordshire LEP to include their investment pipeline of projects in place of Lancashire s potential investments to provide a suitable level of investment propositions to establish a viable new Urban Development Fund.

2 1.2 Summary of Requirements The areas of Cheshire and Warrington and Stoke-on-Trent and Staffordshire need to evidence, to satisfy ERDF regulations, include the case for distributing ERDF through a UDF in accordance with the minimum allocations identified in their European Structural and Investment Fund (ESIF) Strategies and within their investment plans for their Enterprise Zones, areas of focus and common priorities across the Constellation Partnership - (formally the Northern Gateway Development Zone). They therefore need to up-date the ex-ante assessment to consider, firstly, the question of whether there is a market failure in the investment priorities that is sufficient to justify the commitment of ERDF funds and, secondly, the nature of the products required to address that market failure (e.g. debt, equity etc) and if the investment opportunities are of the scale required to justify such a fund. Finally, there is a requirement for advice on the creation of new structures for the fund and proposed appropriate management structures and resources required to manage, deliver and oversee the proposed Urban Development Fund. 2. DETAILED REQUIREMENTS 2.1 Specification The ex-ante assessment must be in accordance with the European Commission s methodologies which have drafted by the European Investment Bank (EIB) 1 and meet the requirements of DCLG as Managing Authority. The ex-ante assessment is not intended to replicate extensive consultation process and site visits already undertaken by LEPs but to assess projects through a desk-top process to scope out the pipeline of potential investments within current EZs and areas of strategic focus that a UDF could help unlock across the LEP areas. The Ex-ante for both the Cheshire and Warrington and Stoke-on-Trent and Staffordshire areas should include; Analysis of proposed development activity, across the investment priorities set out within the ESIF strategies and LEP Strategic Economic Plans including the Cheshire and Warrington EZ, Ceramic Valley Enterprise Zone, the Constellation Partnership and key areas of focus such as the Mersey Dee Alliance, Warrington New City, and to include Stoke-on-Trent and Staffordshire Strategic Sites set out within the SEP to update current investment propositions included within the current Ex-Ante appraisal. 1

3 Alignment of proposed development activity with the investment priorities of the English Operational Programme 2014 to 2020; Analysis to identify market failures or suboptimal investment situations; evidencing the particular markets and targets affected; and analysis of the estimated level and scope of public investment needs that could be supported through a UDF. Assessment of the value added that a UDF would achieve and commentary on the appropriateness of such a vehicle given other forms of public intervention accessible to the affected targets and markets, noting any possible State aid implications; An estimate of the additional public and private resources that could be generated by the UDF, including an assessment of any preferential terms and remuneration that would be required to secure this; and Identification and incorporation of lessons learnt recommendations arising from similar instruments e.g. Evergreen 1 particularly with regard to project origination and governance arrangements. Recommendation of on the creation of new structures for the fund and the appropriate management structures required to manage, deliver and oversee the proposed Urban Development Fund. The ex-ante assessment provides the evidence-based decision making in the design and implementation of the Financial Instrument (FI). The ex-ante assessment must be completed before the Managing Authority decides to contribute programme resources to a FI. The ex-ante assessment must be submitted to the programme monitoring committee for information and its summary findings and conclusions must be published. All information provided will be shared with the MA, PMC and published. The appraisal must make clear recommendations, in response to the update assessment work per above, as to an appropriate investment strategy for ERDF funding deployed through the UDF, specifically identifying the; Overall viable size of ERDF investment target markets potential ERDF relevant outputs target beneficiaries; financial products that would meet the needs of the target beneficiaries; and

4 any changes to project origination and governance and support arrangements required that would enhance the number and quality of projects brought forward for investment consideration and associated potential costs. 2.2 Delivery Approach The Appointed Consultants will be expected to: Engage with the LEP Executives of both Cheshire and Warrington and Stoke-on-Trent and Staffordshire LEPs, and DCLG Adhere to the proposed time table and performance management arrangements. Provide a detailed assessment of development pipelines in both Cheshire and Warrington and Stoke-on-Trent and Staffordshire and desk top analysis and supplement this information through use of; o EZ and strategic site investment plans o Industry journals and media releases o LEP Strategic Economic Plans o Enquiries with relevant property agents, business park owners and developers and LEP staff 2.3 Programme Management Arrangements Day to day project management will be provided by Philip Cox and Peter Davenport. The successful consultant will be expected to attend regular (fortnightly) progress meetings during the course of the commission and weekly liaison via telephone and with officers and key stakeholders as necessary. Any clarifications to information contained in this document must be submitted by to Philip and Peter no later than 17:00 on 20th October Any additional information provided will be made available to all potential Tenderers via the LEP website after this date Francis.lee@871candwep.co.uk 2.4 Timescales The key dates for this procurement (Timetable) are currently anticipated to be as follows: Event Date Deadline for receipt of clarifications th October 2017

5 Deadline for receipt of Tenders th October 2017 Evaluation of Tenders w/c 23 rd October 2017 Approvals and Contract Agreement w/c 30 th October 2017 Contract start date Upon contract agreement Final Report 30 th November RESPONDING TO THIS SPECIFICATION Tenders must address all the requirements and be in the format requested below. Tenders not in this format will not be considered. Tenderers are requested to provide core information in summary form with detail in appendices. The following must be supplied: 3.1 General i. Organisation identity including name, address, telephone number, address, company registration number, VAT registration number and website address (if applicable). ii. Details of the main point of contact within the organisation for this tender. iii. Name, address, telephone number and address of any third parties involved in this tender. iv. Response to Schedule 1 v. Completed and signed Schedule Pricing The cost associated with delivering this commission should be presented as shown in the table below.

6 Market Assessment &UDF Investment Strategy (ERDF) Block 1 UDF Management And Delivery Structures Block 2 Total ( ) Cheshire and Warrington Stoke-on-Trent and Staffordshire Total ( ) c.10k c.10k c.20k All prices must be fixed and firm, quoted in pounds sterling and exclusive of VAT. Tenderers should detail any ancillary costs and expenses included in the price. Note that the total budget for this work is in the region of 20k (plus VAT if applicable). 3.3 Submission Instructions The LEP will only accept tender submissions made via to: philip.cox@871candwep.co.uk peter.davenport@staffordshire.gov.uk The deadline for submission of completed tenders is th October The completed tender submission must be submitted by no later than the time and date specified above. Bidders are advised to allow adequate time for uploading documents and to dispatch the electronic response well in advance of the closing time to avoid any last minute problems. Failure to submit the tender submission as required will result in the relevant Bidder being excluded from any further participation in this procurement. Any tender submitted and or received after the time specified above will not be considered and the Bidder will be advised of this. Please note that submissions not received via the means identified in the ITT will not be accepted or considered. Bidders are also welcome to provide hard copies of their tender following submission of their bid in accordance with above. Any hard copies should be addressed as follows: Name: Address: Name: Address: Philip Cox, Chief Executive Cheshire and Warrington Local Enterprise Partnership 1 st Floor, Wyvern House, The Drumber, Winsford, CW7 1AH Peter Davenport, Economic Partnership Manager Stoke-on-Trent and Staffordshire Local Enterprise Partnership Judges Chambers, County Buildings, Martin Street Stafford, ST16 2LH

7 4 EXAMINATION AND EVALUATION OF TENDERS 4.1 Award Criteria Tenders will be assessed initially by reference to the following pass / fail criteria: (i) Completeness of proposals and tender documentation as specified in Section 3 (Responding to this Specification); (ii) Stated ability of the Tenderer to meet all of the requirements specified in Section 2 of this document; The Bidder which passes the pass/fail criteria above and is awarded the highest combined mark in the Price and Quality sections will be awarded the contract. In the Price section, the LEP is evaluating how the Bidder cost compares against the cost of other submitted tenders. There are 30 points available for Price and the lowest cost bid will be awarded 100% of these with the other bids receiving a proportion based on the following formula: Bid's Score = 30 x (lowest total cost / bid cost) In the Quality section, the LEP is evaluating how the Bidder will ensure it delivers the services in a way which complies with the LEP s requirements in relation to the Specification (Section 2.1) and the Delivery Approach (Section 2.2). Schedule 1 sets out six questions which explore these aspects and the responses will be scored using the pre-determined scoring system set out below. Excellent % A comprehensive response which provides information that is highly relevant and fully answers the question. Good 51-75% A detailed response which provides information that is relevant and substantially answers the question. Satisfactory 26-50% A response which provides information that is generally relevant and answers the majority of the question. Poor 1-25% A response which provides information which is only partially relevant and/ or answers only a small proportion of the question. Unsatisfactory 0% A response which does not provide information which is relevant and does not answer the question or no response is provided.

8 There are 70 points available for Quality. 4.2 Clarification During the evaluation period, clarification may be sought via from Tenderers. Responses to requests for clarification may not materially change any of the elements of the tenders submitted. The LEP may choose to invite bidders to make presentations on their proposals for the purpose of elaboration, clarification and / or aiding mutual understanding. 5 GENERAL INFORMATION 5.1 Financial Arrangements Payments for services covered by this invitation to tender will be on submission of appropriate invoices, subject to Cheshire and Warrington LEP s standard payment terms, and which will be based on agreed deliverables. Invoicing arrangements will be agreed with the successful provider, following the award of contract. 5.2 Contract A contract will be awarded to the Tenderer whose proposal is deemed to be the most economically advantageous subject to agreement on conditions of that contract. Please note that the LEP reserves the right to cancel the Tender process at any time prior to a contract being entered into. The LEP is not bound to accept the lowest price, or any tender submitted.

9 Schedule 1 Information Requirements 1. Please set out your experience of undertaking ex-ante appraisals of relevance to this assignment, detailing the nature of the commissions and identifying the personnel involved and their roles. 2. Please provide the names and CVs of the team that you would deploy on this assignment along with a description of their respective roles, particularly highlighting their specific experience of EU final instruments and urban development funds. 3. Please provide a method statement that details how you will deliver this commission, particularly addressing how you will secure the necessary information and evidence to support the required market assessments and management and delivery recommendations. The statement should reference the key information sources you intend to rely upon. The response should be structured such that it clearly identifies the separate requirements of the two assessments in respect of; ERDF investment by Stoke-on-Trent and Staffordshire LEP ERDF investment by Cheshire and Warrington LEP 4. Please provide a project delivery plan with supporting narrative that aligns to your method statement, illustrates the tasks and dependencies involved and explains the project management approach that will be deployed. 5. Please provide a risk register that features your assessment of the key risks associated with the delivery of this commission and appropriate management and mitigation steps. 6. Please describe how you will quality assure the delivery of your work.

10 Schedule 2 Declaration I/We the undersigned, hereby quote to supply the goods / service / products detailed in this tender, at the respective prices quoted. (Prices must not include VAT). I certify that as far as I know, the information I have supplied is accurate. I/We agree that this tender shall remain open to be accepted or not by the LEP for a period of six months from the closing date for the receipt of tenders. I/We agree that the LEP may discontinue the tendering arrangements at any time before a tender has been accepted. I/We accept the specification and terms and conditions accompanying the request for tender and undertake to be bound by them if my/our tender is accepted by the LEP. I/We certify that I/we have not now or will in the future, canvassed or solicited any representative or employee of the LEP and any other companies in the group of which the LEP forms part, in connection with this tender and that to the best of our knowledge and belief no person employed by me/us or acting on my/our behalf has done such an act. I/We understand that the LEP is not bound to accept any tender and will not be liable under any circumstances whatsoever for the costs I/we have incurred in preparing the tender. The tender submitted herewith is a bona fide tender intended to be competitive. We have not fixed or adjusted the amount of the tender by or under or in accordance with any collusive agreement or arrangement with any other person. NAME OF CONTACT: DESIGNATION: COMPANY NAME: ADDRESS (including postcode) TELEPHONE: FAX: SIGNATURE: DATE:

11 This Page is intentionally blank

Cheshire & Warrington Local Enterprise Partnership Annual Financial Report Year ended 31 st March 2018

Cheshire & Warrington Local Enterprise Partnership Annual Financial Report Year ended 31 st March 2018 Cheshire & Warrington Local Enterprise Partnership Annual Financial Report Year ended 31 st March 2018 Company Information Directors as at 31/3/18 Christine Gaskell (Chair) Rachel Bailey Ged Barlow Graeme

More information

State of play of Financial Instruments in the ERDF programmes. David Read DCLG (Managing Authority), England

State of play of Financial Instruments in the ERDF programmes. David Read DCLG (Managing Authority), England State of play of Financial Instruments in the ERDF 2014-2020 programmes David Read DCLG (Managing Authority), England Background Whilst the UK has significant experience of setting up and implementing

More information

JESSICA Scotland Selection of Regeneration Urban Development Fund KB/VP 946

JESSICA Scotland Selection of Regeneration Urban Development Fund KB/VP 946 JESSICA Scotland Selection of Regeneration Urban Development Fund KB/VP 946 Summary of Questions and s from JESSICA information event Thursday 16 December 2010 Further questions asked in writing by 10

More information

Financial instruments for urban development and public infrastructure Frank Lee Vilnius 17 March 2016

Financial instruments for urban development and public infrastructure Frank Lee Vilnius 17 March 2016 Financial instruments for urban development and public infrastructure Frank Lee Vilnius 17 March 2016 The use of financial instruments in the energy and waste sectors in the Programming Period 2014-2020

More information

Cornwall & Isles of Scilly Investment Fund

Cornwall & Isles of Scilly Investment Fund 1 Cornwall & Isles of Scilly Investment Fund Q&A Respondents are invited to direct questions in advance of submitting a response to sally-ann.rogerson@british-business-bank.co.uk. Questions (posted anonymously)

More information

Financial instruments for SME support in practice Case study demonstrating the use of equity instruments Charles HAMILTON, Invest Northern Ireland

Financial instruments for SME support in practice Case study demonstrating the use of equity instruments Charles HAMILTON, Invest Northern Ireland Financial instruments for SME support in practice Case study demonstrating the use of equity instruments Charles HAMILTON, Invest Northern Ireland Presentation Content Section 1 - Strategic Context Section

More information

UNIVERSITY OF YORK INVITATION TO TENDER (ITT) FOR THE PROVISION OF XYZ GOODS AND SERVICES REFERENCE UY/PROC/XXX

UNIVERSITY OF YORK INVITATION TO TENDER (ITT) FOR THE PROVISION OF XYZ GOODS AND SERVICES REFERENCE UY/PROC/XXX UNIVERSITY OF YORK INVITATION TO TENDER (ITT) FOR THE PROVISION OF XYZ GOODS AND SERVICES REFERENCE UY/PROC/XXX Tenders to be submitted by noon on XX th Month 2015 to: https://in-tendhost.co.uk/york/aspx/home

More information

As part of the BEIS Local Energy programme, BEIS has allocated 2.7m in this financial year to support the capacity of LEPs and local authorities to:

As part of the BEIS Local Energy programme, BEIS has allocated 2.7m in this financial year to support the capacity of LEPs and local authorities to: Department for Business, Energy & Industrial Strategy 1 Victoria Street, London SW1A 2AW T: +44 (0)300 068 8377 E: Samantha.kennedy@beis.gov.uk www.gov.uk/beis Dear Sir/Madam Local Energy capacity support

More information

Stoke-on-Trent and Staffordshire ESI Funds Sub-Committee. Minutes of meeting held 15/01/2018 Drawing Room, County Buildings, Stafford

Stoke-on-Trent and Staffordshire ESI Funds Sub-Committee. Minutes of meeting held 15/01/2018 Drawing Room, County Buildings, Stafford 20180115SSLEP European Structural and Investment Funds 2014-2020 Growth Programme for England Stoke-on-Trent and Staffordshire ESI Funds Sub-Committee Minutes of meeting held 15/01/2018 Drawing Room, County

More information

First JESSICA decisions: approach and implications

First JESSICA decisions: approach and implications Competition Policy Newsletter First JESSICA decisions: approach and implications by Eglė Striungytė ( 1 ) 1. Introduction The Commission has made increasing use of financial engineering instruments ( 2

More information

European Structural Investment Funds update

European Structural Investment Funds update 11 Date: 26 August 2016 Subject: Report of: European Structural Investment Funds update Cllr Kieran Quinn, Portfolio Lead for Investment and Finance and Eamonn Boylan, Portfolio Lead Chief Executive for

More information

Cumbria Local Enterprise Partnership CENTRAL ASSURANCE FRAMEWORK

Cumbria Local Enterprise Partnership CENTRAL ASSURANCE FRAMEWORK Cumbria Local Enterprise Partnership CENTRAL ASSURANCE FRAMEWORK February 2017 PART ONE: LEP GOVERNANCE AND DECISION MAKING 1.1 Name The purpose of the Cumbria LEP Central Assurance Framework is to put

More information

Financial Instruments in Energy Efficiency in Lithuania Agnė KAZLAUSKAITĖ, Ministry of Finance Junona BUMELYTĖ, EIB

Financial Instruments in Energy Efficiency in Lithuania Agnė KAZLAUSKAITĖ, Ministry of Finance Junona BUMELYTĖ, EIB Financial Instruments in Energy Efficiency in Lithuania Agnė KAZLAUSKAITĖ, Ministry of Finance Junona BUMELYTĖ, EIB Strategic context: EU funds investment over 2 PP 2007 2013 EUR 6,775.5m 2014 2020 EUR

More information

North West Evergreen Limited Partnership. A JESSICA Case Study in Brownfield Regeneration

North West Evergreen Limited Partnership. A JESSICA Case Study in Brownfield Regeneration North West Evergreen Limited Partnership A JESSICA Case Study in Brownfield Regeneration Evergreen Presentation 1. The Holding Fund NWUIF 2. The Partnership 3. Investment Strategy 4. Project Appraisal

More information

Subject: Jessica II Fund of Funds Lithuania. Selection of Financial Intermediaries

Subject: Jessica II Fund of Funds Lithuania. Selection of Financial Intermediaries Call for Expression of Interest: Ref.: MHA-1281 Subject: Jessica II Fund of Funds Lithuania Selection of Financial Intermediaries The European Investment Bank ( EIB ) in its capacity as manager of the

More information

Financial Instruments supported by the European Structural and Investment (ESI) Funds in CSI-Europe towards FIs for Cities

Financial Instruments supported by the European Structural and Investment (ESI) Funds in CSI-Europe towards FIs for Cities Financial Instruments supported by the European Structural and Investment (ESI) Funds in 2014-2020 CSI-Europe towards 2014-2020 FIs for Cities EIB Luxembourg, 30 January 2014 Financial instruments and

More information

ECMWF Copernicus Procurement

ECMWF Copernicus Procurement ECMWF Copernicus Procurement Invitation to Tender CLARIFICATIONS Clarifications issued 28 November 2017 ITT Ref: COP_031 ISSUED BY: ECMWF Administration Department Procurement Section We are pleased to

More information

EU Programme

EU Programme EU Programme 2014-2020 22 January 2015 Alan Welby, Executive Director, Liverpool City Region LEP (alan.welby@liverpoollep.org) 42& Background Significant EU Programmes in Merseyside since 1994 Two dedicated

More information

JESSICA. UDF Handbook

JESSICA. UDF Handbook JESSICA JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS UDF Handbook HORIZONTAL STUDY Final Report July 2012 DISCLAIMER: This document has been produced with the financial assistance of

More information

AUDIT (EXTERNAL AND INTERNAL) POLICY

AUDIT (EXTERNAL AND INTERNAL) POLICY CATHCART AND DISTRICT HOUSING ASSOCIATION LIMITED AUDIT (EXTERNAL AND INTERNAL) POLICY 1. INTRODUCTION This Policy paper takes account of The Scottish Housing Regulator (Scottish Homes) Guidance Notes

More information

European Union Regional Policy Employment, Social Affairs and Inclusion. EU Cohesion Policy Proposals from the European Commission

European Union Regional Policy Employment, Social Affairs and Inclusion. EU Cohesion Policy Proposals from the European Commission EU Cohesion Policy 2014-2020 Proposals from the European Commission 1 Legislative package The General Regulation Common provisions for cohesion policy, the rural development policy and the maritime and

More information

JESSICA JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS JESSICA INSTRUMENTS FOR ENERGY EFFICIENCY IN LITHUANIA FINAL REPORT

JESSICA JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS JESSICA INSTRUMENTS FOR ENERGY EFFICIENCY IN LITHUANIA FINAL REPORT JESSICA JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS JESSICA INSTRUMENTS FOR ENERGY EFFICIENCY IN LITHUANIA FINAL REPORT 17 April 2009 This document has been produced with the financial

More information

European Funding Joy Holland West Midlands European Service

European Funding Joy Holland West Midlands European Service European Funding 2014-2020 Joy Holland West Midlands European Service Europe 2020 Targets Employment 75% of the 20-64 year-olds to be employed R&D / Innovation 3% of the EU's GDP invested in RDI Climate

More information

3 rd Call for Project Proposals

3 rd Call for Project Proposals IPA CROSS-BORDER PROGRAMME "GREECE THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA 2007-2013" 3 rd Call for Project Proposals Project Selection Criteria CCI: 2007 CB 16 I PO 009 The following Project Selection

More information

European Structural and Investment Funds East Dunbartonshire Council

European Structural and Investment Funds East Dunbartonshire Council European Structural and Investment Funds East Dunbartonshire Council INTRODUCTION East Dunbartonshire Council (EDC) welcomes the opportunity to contribute to the Committee s inquiry into the European Structural

More information

THE NATIONAL CREDIT REGULATOR SEPTEMBER 2017 TERMS OF REFERENCE FOR THE APPOINTMENT OF AN ADVERTISING AND MEDIA BUYING AGENCY RFP NUMBER: NCR445/09/17

THE NATIONAL CREDIT REGULATOR SEPTEMBER 2017 TERMS OF REFERENCE FOR THE APPOINTMENT OF AN ADVERTISING AND MEDIA BUYING AGENCY RFP NUMBER: NCR445/09/17 THE NATIONAL CREDIT REGULATOR SEPTEMBER 2017 TERMS OF REFERENCE FOR THE APPOINTMENT OF AN ADVERTISING AND MEDIA BUYING AGENCY RFP NUMBER: NCR445/09/17 DUE DATE: 3 OCTOBER 2017 1 SECTION 1 GENERAL TERMS

More information

Financial Instruments supported by the European Structural and Investment (ESI) Funds in

Financial Instruments supported by the European Structural and Investment (ESI) Funds in Regional Financial Instruments supported by the European Structural and Investment (ESI) Funds in 2014-2020 REGIO B3, DG Regional and Urban European Commission Regional 2 ERDF support through financial

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL RFP NUMBER: RFP 00/04/2018 DESCRIPTION: THE PROVISION OF EVENTS MANAGEMENT SERVICES PUBLICATION DATE: 08 April 2018 VALIDIY PERIOD: CLOSING DATE: 02 May 2018 CLOSING TIME: DELIVERY

More information

Department for Communities and Local Government Fry Building 2 Marsham Street London SW1P 4DF.

Department for Communities and Local Government Fry Building 2 Marsham Street London SW1P 4DF. Department for Communities and Local Government Fry Building 2 Marsham Street London SW1P 4DF LGPSReform@Communities.gsi.gov.uk Local Government Pension Scheme: Investment Reform Criteria and Guidance

More information

Call for Tender - External Evaluation of the EPF 2017 Work Programme 16/03/2017

Call for Tender - External Evaluation of the EPF 2017 Work Programme 16/03/2017 Call for Tender - External Evaluation of the EPF 2017 Work Programme 16/03/2017 Contents 1. Purpose of the tender... 3 2. Tasks... 4 3. EPF - General Information... 4 4. Description of services... 5 5.

More information

BIRMINGHAM CITY COUNCIL

BIRMINGHAM CITY COUNCIL BIRMINGHAM CITY COUNCIL PUBLIC REPORT Report to: CABINET Report of: Strategic Director of Economy Date of Decision: 22 nd March 2016 SUBJECT: BCC ACTING AS THE ACCOUNTABLE BODY FOR THE LOCAL GROWTH FUND

More information

Annex 8. Project Assurance Recommendations

Annex 8. Project Assurance Recommendations Annex 8 Project Assurance Recommendations Contents 1. Project Review Report 2. Recommendations and actions Taken 3. Project Board Roles and Responsibilities This page is intentionally blank BRT North -

More information

Report To: GREATER MANCHESTER PENSION FUND LOCAL PENSIONS BOARD

Report To: GREATER MANCHESTER PENSION FUND LOCAL PENSIONS BOARD Report To: GREATER MANCHESTER PENSION FUND LOCAL PENSIONS BOARD Date: 14 December 2017 Reporting Officer: Subject: Report Summary Recommendations: Policy Implications: Financial Implications: (Authorised

More information

Generating successful projects, developing and managing the project pipeline Trainer: Robin Smail Independent Consultant & Visiting Expert EIPA

Generating successful projects, developing and managing the project pipeline Trainer: Robin Smail Independent Consultant & Visiting Expert EIPA Generating successful projects, developing and managing the project pipeline Trainer: Robin Smail Independent Consultant & Visiting Expert EIPA Successful projects: Operations that contribute to specific

More information

Financial instruments in ESIF programmes

Financial instruments in ESIF programmes EUROPEAN COMMISSION Financial instruments in ESIF programmes 2014 2020 A short reference guide for Managing Authorities This short reference guide is designed to provide an overview of the main elements

More information

Revised 1 Guidance Note on Financial Engineering Instruments under Article 44 of Council Regulation (EC) No 1083/2006

Revised 1 Guidance Note on Financial Engineering Instruments under Article 44 of Council Regulation (EC) No 1083/2006 REVISED VERSION 08/02/2012 COCOF_10-0014-05-EN EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL POLICY Revised 1 Guidance Note on Financial Engineering Instruments under Article 44 of Council Regulation

More information

Implementing options and selection of financial intermediaries. Eugenio Saba European Investment Bank

Implementing options and selection of financial intermediaries. Eugenio Saba European Investment Bank Implementing options and selection of financial intermediaries Eugenio Saba European Investment Bank What are the implementing and governance options? 2 Central management EaSI Erasmus+ Innovfin COSME

More information

Creation of a Pan Scotland Local Authority Business Loan Fund Progress Update

Creation of a Pan Scotland Local Authority Business Loan Fund Progress Update Cabinet Tuesday 22 November 2016 Item No 6.1 Creation of a Pan Scotland Local Authority Business Loan Fund Progress Update Report by Ian Johnson, Head of Communities and Economy 1 Purpose of Report 1.1

More information

European Structural application: and Investment Funds

European Structural application: and Investment Funds Quick appraisal of major project European Structural application: and Investment Funds Guidance for Member States on Article 38(4) CPR - Implementation options for financial instruments by or under the

More information

GOVERNMENT OF GUYANA STANDARD REQUEST FOR PROPOSAL. SELECTION OF CONSULTANTS- Individual

GOVERNMENT OF GUYANA STANDARD REQUEST FOR PROPOSAL. SELECTION OF CONSULTANTS- Individual GOVERNMENT OF GUYANA STANDARD REQUEST FOR PROPOSAL SELECTION OF CONSULTANTS- Individual Introduction This Standard Procurement Documentation has been prepared by the NPTA for use by the Procuring Entities

More information

Greater Bristol Bus Network Major Scheme Business Case. Chapter 1. Developing the Full Approval Major Scheme Business Case

Greater Bristol Bus Network Major Scheme Business Case. Chapter 1. Developing the Full Approval Major Scheme Business Case Greater Bristol Bus Network Major Scheme Business Case Chapter 1 Developing the Full Approval Major Scheme Business Case i ii 1. The Case for Full Approval INTRODUCTION 1.1.1 Bath and North East Somerset,

More information

Factsheet N 6 Project implementation: delivering project outputs, achieving project objectives and bringing about the desired change

Factsheet N 6 Project implementation: delivering project outputs, achieving project objectives and bringing about the desired change Project implementation: delivering project outputs, achieving project objectives and bringing about the desired change Version No 13 of 23 November 2018 Table of contents I. GETTING STARTED: THE INITIATION

More information

Chief Executives Group North Yorkshire and York 8 September 2016 LEP update

Chief Executives Group North Yorkshire and York 8 September 2016 LEP update Agenda item 2 Chief Executives Group North Yorkshire and York 8 September 2016 LEP update 1 Purpose of the report 1.1 The purpose of the report is to update the Chief Executives Group on; Post Brexit EU

More information

thinking: BRIEFING 21 Transnational EU Programmes RELEASE DATE: APRIL 2012 Please direct any questions or comments regarding this paper to:

thinking: BRIEFING 21 Transnational EU Programmes RELEASE DATE: APRIL 2012 Please direct any questions or comments regarding this paper to: thinking: BRIEFING 21 Transnational EU Programmes 2014-2020 RELEASE DATE: APRIL 2012 Please direct any questions or comments regarding this paper to: New Economy Tel: 0161 237 4031 E-mail: maria.gonzalez@neweconomymanchester.com

More information

Invitation to tender External Audit Services

Invitation to tender External Audit Services Invitation to tender External Audit Services Leasehold Advisory Service Registered in England no 3296985 Registered address Fleetbank House 2-6 Salisbury Square London EC4Y 8JX Lease Conferences Ltd Registered

More information

%202020/Pages/Programming-Period aspx. 1

%202020/Pages/Programming-Period aspx. 1 SME INITIATIVE IN MALTA: UNCAPPED GUARANTEE INSTRUMENT OPEN CALL FOR EXPRESSION OF INTEREST TO SELECT FINANCIAL INTERMEDIARIES (Published on 15.07.2015) The objective of this Open Call for Expression of

More information

Official Journal of the European Union

Official Journal of the European Union 13.5.2014 L 138/5 COMMISSION DELEGATED REGULATION (EU) No 480/2014 of 3 March 2014 supplementing Regulation (EU) No 1303/2013 of the European Parliament and of the Council laying down common provisions

More information

PROCEDURES MANUAL. for. The technical and financial Due Diligence assessment under the NER 300 process

PROCEDURES MANUAL. for. The technical and financial Due Diligence assessment under the NER 300 process EUROPEAN COMMISSION PROCEDURES MANUAL for The technical and financial Due Diligence assessment under the NER 300 process Disclaimer This Manual has been developed by the Commission in consultation with

More information

Selection Criteria European Regional Development Fund and European Social Fund

Selection Criteria European Regional Development Fund and European Social Fund Selection Criteria 2014-2020 European Regional Development Fund and European Social Fund March 2015 Selection of projects 1. The Managing Authorities will assess an application for funding against the

More information

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA)

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) 2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) TECHNICAL SPECIFICATIONS 15 July 2016 1 1) Title of the contract The title of the contract is 2nd External

More information

Service Level Agreement

Service Level Agreement Service Level Agreement Period : XXXX(Insert) 2017 to 29 September 2017 Reference : OPCC/SPACE2017/ (Insert) Activity : Space Programme 1 Space 2017 Space is a voluntary programme of positive diversionary

More information

Subject: JESSICA Holding Fund in Lithuania Selection of Financial Intermediaries

Subject: JESSICA Holding Fund in Lithuania Selection of Financial Intermediaries Call for Expression of Interest: Ref.: VP-1117 Subject: JESSICA Holding Fund in Lithuania Selection of Financial Intermediaries The European Investment Bank ( EIB ) is launching a Call for Expressions

More information

NCF 7 Project Implementation Manual

NCF 7 Project Implementation Manual NCF 7 Project Implementation Manual November 2017 Table of Contents 1 INTRODUCTION... 4 2 GRANTEES RESPONSIBILITIES... 4 3 PROGRESS REPORTING... 4 3.1 Progress report... 4 3.2 Project completion report...

More information

Overview of the Northern Ireland Ireland - Scotland VA Programme. Electric Vehicles Call Workshop

Overview of the Northern Ireland Ireland - Scotland VA Programme. Electric Vehicles Call Workshop Overview of the Northern Ireland Ireland - Scotland VA Programme Electric Vehicles Call Workshop Welcome MARK FEENEY, MA DIRECTOR Introduction and Outline of Workshop Programme Priorities Policy Context

More information

Glossary Section 1 - Acronyms (at a glance)

Glossary Section 1 - Acronyms (at a glance) Glossary Section 1 - Acronyms (at a glance) Acronym AA AIR BIS CA CAP CCT CLLD COESIF CPR CSF DCLG DEFRA DA DG DWP EAFRD EC ECA EIB EIF EMFF EPSCO ERDF ESF ESIF EU FA FI FLAG GBER GDT GLA GPB HMG IB ITI

More information

SME INITIATIVE BULGARIA: THE UNCAPPED GUARANTEE INSTRUMENT OPEN CALL FOR EXPRESSION OF INTEREST TO SELECT FINANCIAL INTERMEDIARIES

SME INITIATIVE BULGARIA: THE UNCAPPED GUARANTEE INSTRUMENT OPEN CALL FOR EXPRESSION OF INTEREST TO SELECT FINANCIAL INTERMEDIARIES SME INITIATIVE BULGARIA: THE UNCAPPED GUARANTEE INSTRUMENT OPEN CALL FOR EXPRESSION OF INTEREST TO SELECT FINANCIAL INTERMEDIARIES (Published on 17 th May 2016) The objective of this Open Call for Expression

More information

TERMS OF REFERENCE Ref: PN/FJI Taxpayer Onboarding Digitization of the tax system in the Solomon Islands

TERMS OF REFERENCE Ref: PN/FJI Taxpayer Onboarding Digitization of the tax system in the Solomon Islands Title Location Application deadline Type of Contract Languages required: Duration of Initial Contract: TERMS OF REFERENCE Ref: PN/FJI-27-18 Taxpayer Onboarding Digitization of the tax system in the Solomon

More information

INFRASTRUCTURE INVESTMENT

INFRASTRUCTURE INVESTMENT ANNEX MAJOR PROJECT 1 NOTIFICATION TO THE COMMISSION OF THE SELECTED MAJOR PROJECT UNDER ARTICLE 92.1. OF COMMON PROVISIONS REGULATION (CPR) (EC) NO ( ) 2 EUROPEAN REGIONAL DEVELOPMENT FUND / COHESION

More information

Appointment of a First Level Controller - Statement of Requirements (SOR)

Appointment of a First Level Controller - Statement of Requirements (SOR) Territorial Co-operation Programmes 2014-2020 Appointment of a First Level Controller - Statement of Requirements (SOR) Introduction Beneficiaries participating in Territorial Co-operation Programmes are

More information

The Audit Plan for Greater Manchester Pension Fund

The Audit Plan for Greater Manchester Pension Fund The Audit Plan for Greater Manchester Pension Fund Year ended 31 March 2017 23rd February 2017 Mike Thomas Director T 0161 214 6368 E mike.thomas@uk.gt.com Marianne Dixon Manager T 0113 200 2699 E marianne.dixon@uk.gt.com

More information

ESF contribution to EaSI under article 38.1(a) Guadalupe de la Mata, European Investment Fund

ESF contribution to EaSI under article 38.1(a) Guadalupe de la Mata, European Investment Fund ESF contribution to EaSI under article 38.1(a) Guadalupe de la Mata, European Investment Fund Agenda Potential ESIF contributions to EU Level instruments: legal basis and scope ESF-EaSI contribution case

More information

Financial instruments - Commission guidance notes. Paris, 22 March 2016

Financial instruments - Commission guidance notes. Paris, 22 March 2016 Financial instruments - Commission guidance notes Paris, 22 March 2016 FIs life cycle - guidance private co-investor Ex-ante assessment grant Managing Authority Funding agreement Fund of Fund (FoF) Funding

More information

EU Cohesion Policy and Microfinance

EU Cohesion Policy and Microfinance OPEN 2 EU Cohesion Policy and Microfinance Giorgio Centurelli, Pasqualina Porretta and Fabrizio Santoboni 2.1 Cohesion policy, EU structural funds and financial engineering instruments: regulatory framework

More information

Local Transport Body contacts

Local Transport Body contacts Local Transport Body contacts Stephen Fidler Head of Local Transport Funding, Growth & Delivery Division Department for Transport Zone 2/14 Great Minster House 33 Horseferry Road London SW1P 4DR Direct

More information

THE UNCAPPED GUARANTEE AND COUNTER-GUARANTEE INSTRUMENT UNDER THE SME INITIATIVE IN SPAIN

THE UNCAPPED GUARANTEE AND COUNTER-GUARANTEE INSTRUMENT UNDER THE SME INITIATIVE IN SPAIN THE UNCAPPED GUARANTEE AND COUNTER-GUARANTEE INSTRUMENT UNDER THE SME INITIATIVE IN SPAIN OPEN CALL FOR EXPRESSION OF INTEREST TO SELECT FINANCIAL INTERMEDIARIES (Published on 14 th October 2015) The objective

More information

Please respond by 12.00hrs 27 March 2018

Please respond by 12.00hrs 27 March 2018 Page 1 of 16 RFQ FY18 21 PROVISION OF Labelling Tool Extension- Data sets (Revised) Please respond by 12.00hrs 27 March Page 2 of 16 1. Introduction The Satellite Applications Catapult, is a not for profit

More information

SOUTH EAST LOCAL ENTERPRISE PARTNERSHIP ASSURANCE FRAMEWORK

SOUTH EAST LOCAL ENTERPRISE PARTNERSHIP ASSURANCE FRAMEWORK SOUTH EAST LOCAL ENTERPRISE PARTNERSHIP ASSURANCE FRAMEWORK Last Date Approved: Friday 17 th February 2017 Revised date: 1 Contents Description Page no: 1. Overview 4 2. Governance and Decision Making

More information

Specifications to invitation to tender COMP/2012/06

Specifications to invitation to tender COMP/2012/06 Specifications to invitation to tender COMP/2012/06 ANNEX II 1. Title of contract Customer Survey at Paris airports and Rome airport for DG Competition. 2. Purpose and context of the contract The contract

More information

Financial instruments - Commission guidance notes (and new off the shelf instruments) Warsaw, 8 March 2016

Financial instruments - Commission guidance notes (and new off the shelf instruments) Warsaw, 8 March 2016 Financial instruments - Commission guidance notes (and new off the shelf instruments) Warsaw, 8 March 2016 Hanna Dudka, Robert Pernetta European Commission, DG REGIO FIs life cycle - guidance private co-investor

More information

ANNEX. DAC code Sector Economic and Development Planning

ANNEX. DAC code Sector Economic and Development Planning ANNEX 1. IDTIFICATION Title Total cost Aid method management mode Technical Cooperation Facility 1.5M (2.4% of NIP) Project approach partially decentralised management DAC code 15010 Sector Economic and

More information

NDPHS Strategy Working Group 2014 Third Meeting Riga, Latvia 10 June 2014

NDPHS Strategy Working Group 2014 Third Meeting Riga, Latvia 10 June 2014 NDPHS Strategy Working Group 2014 Third Meeting Riga, Latvia 10 June 2014 Reference Annex 4 to the SWG2014 3 meeting minutes Title Call for tender for the Strategy Consultant and the Consultant s Terms

More information

Financial Instruments in Cohesion Policy

Financial Instruments in Cohesion Policy Financial Instruments in Cohesion State of play, lessons learned and outlook 2014-2020 Directorate General for and Urban Unit B3 : Financial Instruments and IFI Relations Workshop on Financial Instruments

More information

Financial instruments - Commission guidance notes. Commission guidance Lisbon, 18 January 2016

Financial instruments - Commission guidance notes. Commission guidance Lisbon, 18 January 2016 Financial instruments - Commission guidance notes Commission guidance Lisbon, 18 January 2016 Guidance notes complementary to short guidance covering all issues relevant to MA/fund managers developed systematically

More information

12 April, Introduction

12 April, Introduction INVITATION FOR EXPRESSION OF INTEREST TO ACT AS A FINANCIAL ADVISER TO THE HELLENIC REPUBLIC ASSET DEVELOPMENT FUND FOR THE PROVISION OF SERVICES REGARDING THE EXPLOITATION OF ITS SHAREHOLDING STAKES IN

More information

Fiji Electricity Authority

Fiji Electricity Authority Fiji Electricity Authority Tender Specifications for Environmental Impact Assessment (EIA) Study for 33/11kV Zone Substation at Naikabula, Lautoka MR46-2018 February 2018 1 Background The Fiji Electricity

More information

REQUEST FOR QUOTATION (RFQ)

REQUEST FOR QUOTATION (RFQ) 23 July 2018 RFQ No.11440 REQUEST FOR QUOTATION (RFQ) RFQ Description Closing Date and Time Briefing Session Date and Time Site Inspection : Data Model to analyse Sasria 3 year claims : 30 July 2018 at

More information

SINGLE STAGE OPEN COMPETITIVE SELECTION REQUEST FOR PROPOSALS

SINGLE STAGE OPEN COMPETITIVE SELECTION REQUEST FOR PROPOSALS SELECTION OF CONSULTANTS SINGLE STAGE OPEN COMPETITIVE SELECTION REQUEST FOR PROPOSALS Reference No.: 842/60811 Selection of Consulting Services for: Tbilisi Solid Waste Project Tbilisi Municipal Solid

More information

Annex I to the Open Call for Expression of Interest to select Financial Intermediaries under the SME Initiative Malta

Annex I to the Open Call for Expression of Interest to select Financial Intermediaries under the SME Initiative Malta To: European Investment Fund Re: SME Attention: SME Initiative Team Expression of Interest Guarantees and Securitisation 37B, avenue J.F. Kennedy L-2968 Luxembourg EXPRESSION OF INTEREST Applicant submitting

More information

Ex-ante assessment process of financial instruments. Eugenio Saba European Investment Bank

Ex-ante assessment process of financial instruments. Eugenio Saba European Investment Bank Ex-ante assessment process of financial instruments Eugenio Saba European Investment Bank Objectives of the ex-ante assessment: 1. Is mandatory Legislative framework: Title IV of the Common Provisions

More information

Ref.:MHA Introduction

Ref.:MHA Introduction Call for Expression of Interest to select financial intermediaries that will receive resources from a fund of funds established under the cooperation of the Ministry of Economy and Development of the Hellenic

More information

Cross Border Co-operation between Bulgaria & Romania Multi-annual Programme Project Fiche for Programme Support

Cross Border Co-operation between Bulgaria & Romania Multi-annual Programme Project Fiche for Programme Support Cross Border Co-operation between Bulgaria & Romania Multi-annual Programme 2003 2006 2005 Project Fiche for Programme Support 1. Basic Information 1.1 CRIS Number: BG 2005/017-455.01;04 1.2 1.2 Title:

More information

HEQCO REQUEST FOR PROPOSAL (RFP) INSTRUCTIONS PROPOSAL SUBMISSION INSTRUCTIONS

HEQCO REQUEST FOR PROPOSAL (RFP) INSTRUCTIONS PROPOSAL SUBMISSION INSTRUCTIONS HEQCO REQUEST FOR PROPOSAL (RFP) INSTRUCTIONS PROPOSAL SUBMISSION INSTRUCTIONS Proposals are to be submitted according to the following method: 1. Proposal submission must contain one (1) electronic copy

More information

Guidelines for the AF DSP call for proposals

Guidelines for the AF DSP call for proposals Guidelines for the AF DSP call for proposals A stream of cooperation edited by the Managing Authority/Joint Secretariat Budapest, Hungary, 2018 Programme co-funded by the European Union Table of content

More information

URBACT III Programme Manual

URBACT III Programme Manual URBACT III Programme Manual Fact Sheet 4B National URBACT Points Section 1. National URBACT Points in the URBACT III Operational programme: context and objective Section 2. Role of National URBACT Points

More information

Sectoral Operational Programme Competitiveness and Entrepreneurship. Improvement of entrepreneurship. Regional Operational Programme Macedonia-Thrace

Sectoral Operational Programme Competitiveness and Entrepreneurship. Improvement of entrepreneurship. Regional Operational Programme Macedonia-Thrace Call for Expressions of Interest ( EoI ) to select Financial Intermediaries that will receive resources from the European Investment Fund acting through the JEREMIE Holding Fund for Greece to implement

More information

HINDUSTAN AERONAUTICS LIMITED. Accessories Complex, Lucknow

HINDUSTAN AERONAUTICS LIMITED. Accessories Complex, Lucknow HINDUSTAN AERONAUTICS LIMITED Accessories Complex, Lucknow HAL-AC/EOI/Auditor/1/2015-17 Dt. 01/06/2015 INVITATION FOR EXPRESSION OF INTEREST (EOI) (Appointment of Internal Auditors for HAL Accessories

More information

Request for Proposal Kelowna Office Renovation. Request for Proposals (RFP)

Request for Proposal Kelowna Office Renovation. Request for Proposals (RFP) Request for Proposals (RFP) Scope of Service RFP # RFP issued by Kelowna Office Renovation 2018RFP-25 First Nations Health Authority (FNHA) Issue date October 20, 2017 Closing date/time FNHA Contact Information

More information

WHAT S NEW AND WHAT WORKS IN THE EU COHESION POLICY : DISCOVERIES AND LESSONS FOR Call for papers

WHAT S NEW AND WHAT WORKS IN THE EU COHESION POLICY : DISCOVERIES AND LESSONS FOR Call for papers International Evaluation Conference WHAT S NEW AND WHAT WORKS IN THE EU COHESION POLICY 2007 2013: DISCOVERIES AND LESSONS FOR 2014 2020 3-4 March 2011, Vilnius, Lithuania Call for papers CALL FOR PAPERS

More information

Financial instruments - opportunities offered by the framework. Key novelties and Commission guidance Riga, 30 October 2015

Financial instruments - opportunities offered by the framework. Key novelties and Commission guidance Riga, 30 October 2015 Financial instruments - opportunities offered by the 2014-2020 framework Key novelties and Commission guidance Riga, 30 October 2015 2014-2020 framework Performance oriented legal framework to promote

More information

ANNUAL IMPLEMENTATION REPORT. The URBACT II Programme YEAR Objective concerned: Objective 3: European Territorial Cooperation

ANNUAL IMPLEMENTATION REPORT. The URBACT II Programme YEAR Objective concerned: Objective 3: European Territorial Cooperation The URBACT II Programme 2007-2013 ANNUAL IMPLEMENTATION REPORT YEAR 2007 OPERATIONNAL PROGRAMME: Objective concerned: Objective 3: European Territorial Cooperation Eligible area concerned: UE Member States

More information

IPP TRANSACTION ADVISOR TERMS OF REFERENCE

IPP TRANSACTION ADVISOR TERMS OF REFERENCE IPP TRANSACTION ADVISOR TERMS OF REFERENCE Terms of reference for transaction advisor services to the Government of [ ] for the [insert description of the project] (the Project ). Contents 1. Introduction

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS BANK Of ZAMBIA REQUEST FOR PROPOSALS GRAPHIC DESIGN FOR THE ZAMBIA INTERNATIONAL TRADE FAIR (ZITF) AND ZAMBIA AGRICULTURE AND COMMERCIAL SHOW (ZACS) STANDS BANK OF ZAMBIA RFP NO. IFB NO. BOZ/PMS/ONB/09/2017

More information

This annexure should be completed and signed by the Bidder s authorised personnel as indicated below:

This annexure should be completed and signed by the Bidder s authorised personnel as indicated below: ANNEXURE I: PRICING SCHEDULE This annexure should be completed and signed by the Bidder s authorised personnel as indicated below: 1 Please indicate your total bid price in Table 1.1 below (compulsory)

More information

Education Funding Agency

Education Funding Agency Education Funding Agency Pre-Qualification Questionnaire Funding Advisory Services to provide advice on the structuring of a capital markets or other financing solution to support the delivery of the Priority

More information

REPUBLIC OF KENYA MINISTRY OF TRANSPORT, INFRASTRUCTURE, HOUSING AND URBAN DEVELOPMENT

REPUBLIC OF KENYA MINISTRY OF TRANSPORT, INFRASTRUCTURE, HOUSING AND URBAN DEVELOPMENT REPUBLIC OF KENYA MINISTRY OF TRANSPORT, INFRASTRUCTURE, HOUSING AND URBAN DEVELOPMENT STATE DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT PROPOSED CIVIL SERVANTS HOUSING SCHEME AT EMBU TOWN, EMBU COUNTY

More information

SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS

SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS Incorporating amendments by Scottish Futures Trust (Proposals for Decision Points 2 5 Only) Executive summary... 1 Section 1: Introduction

More information

Ministry of Physical Infrastructure and Transport BIDDING DOCUMENT. For. Construction of Railway Track Bed

Ministry of Physical Infrastructure and Transport BIDDING DOCUMENT. For. Construction of Railway Track Bed Government of Nepal Ministry of Physical Infrastructure and Transport Department of Railways Rail and Metro Development Project Battisputali, Kathmandu BIDDING DOCUMENT For Construction of Railway Track

More information

Reporting on financial instruments (FI) in the annual implementation report for the programming period

Reporting on financial instruments (FI) in the annual implementation report for the programming period Reporting on financial instruments (FI) in the annual implementation report for the programming period 2014-2020 Online learning on financial instruments June 2017 Jörg Lackenbauer and Ieva Zalite European

More information

Manchester Health and Care Commissioning. Finance Committee. Terms of Reference

Manchester Health and Care Commissioning. Finance Committee. Terms of Reference Manchester Health and Care Commissioning Finance Committee Terms of Reference 1.0 Name The Committee shall be known as the Finance Committee. 2.0 Overview The Finance Committee forms a key element of the

More information

Single Investment Fund (SIF) Assurance Framework

Single Investment Fund (SIF) Assurance Framework Single Investment Fund (SIF) Assurance Framework Contents 1 Purpose of the document... 1 1.1 Context... 1 1.2 Scope of the assurance framework... 1 1.3 What is an assurance framework and who it is for?...

More information