1 Periodic Financing Request Report Project Number: MFF Number: 0084 November 2016 Democratic Socialist Republic of Sri Lanka: Green Power Development and Energy Efficiency Improvement Investment Program (Tranche 2) and Minor Change to the Facility Distribution of this document is restricted until it has been approved by Management Following such approval, ADB will disclose the document to the public in accordance with ADB's Public Communications Policy 2011

2 CURRENCY EQUIVALENTS (as of 8 November 2016) Currency Unit Sri Lanka rupee/s (SLRe/SLRs) SLRe100 = $ $100 = SLRs14793 ABBREVIATIONS ADB Asian Development Bank ADF Asian Development Fund AFD Agence Française de Développement CEB Ceylon Electricity Board EIA environmental impact assessment EMP environmental management plan FBU functional business unit FFA framework financing agreement IEE initial environmental examination km kilometer kv kilovolt MFF multitranche financing facility MPRE Ministry of Power and Renewable Energy MW megawatt OCR ordinary capital resources PAM project administration manual SDR special drawing rights SPS Safeguard Policy Statement NOTE In this report, "$" refers to US dollars

3 Vice-President W Zhang, Operations 1 Director General H Kim, South Asia Department (SARD) Director M Khamudkhanov, Officer-in-Charge, Energy Division, SARD Team leader Team members Peer reviewer M Khamudkhanov, Principal Energy Specialist, SARD A Bernaldo, Associate Project Officer, SARD Y Jang, Social Development Specialist, SARD A Syed, Senior Counsel, Office of the General Counsel R Wimalasena, Senior Project Officer (Energy), SARD A Zhou, Senior Energy Specialist, SARD Y Zhou, Environment Specialist, SARD P Wijayatunga, Principal Energy Specialist, Sustainable Development and Climate Change Department In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area

4 TRANCHE AT A GLANCE MAP CONTENTS Page I BACKGROUND 1 II ASSESSMENT OF IMPLEMENTATION 2 III PERIODIC FINANCING REQUEST 3 A Impact and Outcome 3 B Outputs 3 C Investment and Financing Plans 4 D Implementation Arrangements 5 E Project Readiness 6 F Advance Contracting and Retroactive Financing 6 IV DUE DILIGENCE 7 A Technical 7 B Economic and Financial 7 C Governance 7 D Poverty, Social, and Gender Dimensions 8 E Safeguards 8 F Risks and Mitigating Measures 9 G Risk Categorization 10 V ASSURANCES 10 VI MINOR CHANGE OF MULTITRANCHE FINANCING FACILITY: EXTENSION OF THE MULTITRANCHE FINANCING FACILITY AVAILABILITY PERIOD 10 VII RECOMMENDATION 10 APPENDIXES 1 Design and Monitoring Framework for Project 2 2 Guarantee Agreement 3 Loan Agreement: Special Funds Resources 4 Loan Agreement: Ordinary Capital Resources 5 Updated Contribution to the ADB Results Framework 6 Project Administration Manual for Project 2 7 Economic Analysis for Project 2 8 Financial Analysis for Project 2 9 Updated Summary of Poverty Reduction and Social Strategy 10 Environmental Impact Assessment: 220-kilovolt Mannar Nadukuda Transmission Line 11 Initial Environmental Examination: Transmission Infrastructure Enhancement 12 Initial Environmental Examination: Medium-Voltage Network Efficiency Improvement 13 Resettlement Plan 14 Project Climate Risk Assessment and Management Report 15 Updated Risk Assessment and Risk Management Plan

5 Project Classification Information Status: Complete TRANCHE AT A GLANCE 1 Basic Data Project Number: Project Name Green Power Development and Energy Efficiency Improvement Investment Program - Tranche 2 Department /Division SARD/SAEN Country Sri Lanka Executing Agency Ceylon Electricity Board Borrower Ceylon Electricity Board 2 Sector Subsector(s) ADB Financing ($ million) Energy Electricity transmission and distribution Energy efficiency and conservation 900 Total Strategic Agenda Subcomponents Climate Change Information Inclusive economic Pillar 2: Access to economic opportunities, Adaptation ($ million) 1000 growth (IEG) including jobs, made more inclusive Mitigation ($ million) 3000 Environmentally Global and regional transboundary CO 2 reduction (tons per annum) 114,663 sustainable growth (ESG) environmental concerns Climate Change impact on the Project Medium 4 Drivers of Change Components Gender Equity and Mainstreaming Governance and Institutional development No gender elements (NGE) capacity development (GCD) Knowledge solutions Pilot-testing innovation and learning (KNS) Partnerships (PAR) Bilateral institutions (not client government) Official cofinancing 5 Poverty and SDG Targeting Location Impact Geographic Targeting Household Targeting SDG Targeting No No Yes Rural Urban SDG Goals SDG7, SDG13 6 Risk Categorization: Complex 7 Safeguard Categorization Environment: A Involuntary Resettlement: B Indigenous Peoples: C 8 Financing Modality and Sources Amount ($ million) ADB Sovereign MFF-Tranche (Loan): Asian Development Fund 5500 Sovereign MFF-Tranche (Loan): Ordinary capital resources 9500 Cofinancing 3000 Agence Francaise de Developpement - Loan 3000 Counterpart 8000 Government 8000 High Medium 9 Effective Development Cooperation Use of country procurement systems Use of country public financial management systems Total No Yes Source: Asian Development Bank This document must only be generated in eops Generated Date: 09-Nov :28:07 PM

6 TRANCHE AT A GLANCE Date of Receipt by ADB of PFR: 19 August 2016 Tranche Number: 2 10 Country Operations Business Plan CPS y COBP Tranche Summary Tranche 2 will finance investments in (i) transmission infrastructure enhancement; (ii) efficiency improvement of medium voltage network; and (iii) demand-side management improvement for energy efficiency including development of an innovative smart grid and metering pilot subproject Impact: The impact will be increased access to clean and reliable power supply Outcome: The outcome will be enhanced system efficiency and reliability Outputs: (i) Transmission infrastructure enhanced, (ii) efficiency of medium-voltage network improved, and (iii) demand-side management for energy efficiency improved Implementation Arrangements: Ceylon Electricity Board will be the executing agency Project Readiness: CEB appointed a project director and established project implementation units with full-time project managers and engineers for each output CEB submitted draft bidding documents for major transmission procurement packages to ADB during March-September 2016 Evaluation is ongoing for two procurement contracts CEB will issue the remaining bidding documents for the transmission and distribution procurement packages in the fourth quarter of 2016, and for the smart grid and metering pilot subproject in the second quarter of 2017 after consultant recruitment 12 Significant Developments in the MFF and Previous Tranches Tranche 1 (Loans 3146/3147 and Loan 8290 [administered by ADB]) approved in July 2014 for $180 million financed (i) construction of the 30-MW Moragolla hydropower plant and an associated 132 kv transmission line in Central Province; (ii) construction of four new grid substations and augmentation of existing three grid substations, construction of 10 km 132 kv associated transmission lines, and upgrading of Pannipitiya - Panadura 123 km 132 kv transmission line in Western, Eastern, and North Central provinces; (iii) erection of 87 km 33 kv lines and gantries around Vavunativu and Madampe in Eastern and North Western provinces; (iv) demand-side management pilot subprojects in Colombo; and (v) capacity building and project management for preparing future MFF investments and supervising implementation of capital investments of the first tranche As of 8 November 2016, the cumulative contract awards and disbursements were $56975 million (3165%) and $4679 million (260%), respectively Of the 20 loan covenants, 5 have been met, 13 are being met, and 2 are not yet due 13 Milestones Estimated Approval Estimated Completion a 29 November June Linked Documents - - (i) Environment Weblink: (ii) Involuntary resettlement Weblink: a For Tranches, this refers to the financial closing date Required Document IEE - Initial Environment Examination etwork-efficiency-improvement-jul-2016-iee IEE - Initial Environment Examination structure-enhancement-jul-2016-iee EIA - Environmental Impact Assessment RP - Resettlement Plan Disclosure Date 19-AUG AUG JUL AUG-2016 Source: Asian Development Bank This document must only be generated in eops Generated Date: 09-Nov :28:07 PM

7

8

9 I BACKGROUND 1 A framework financing agreement (FFA) for the Green Power Development and Energy Efficiency Improvement Investment Program was signed between the Asian Development Bank (ADB) and Sri Lanka on 19 May 2014 On 15 July 2014, ADB s Board of Directors approved the provision of a multitranche financing facility (MFF) to Sri Lanka, with an aggregate facility amount of up to $360 million 1 The MFF aims to support the Government of Sri Lanka in advancing sustainable power sector development and universal access to electricity services 2 Sri Lanka has improved its energy sector performance and achieved a national electrification ratio of 98% in 2014 compared with 29% in However, high dependence on expensive fossil fuel energy continues Sector challenges include meeting growing demand for electricity at a low cost and acceptable reliability, and attaining long-term sustainability The increase in the share of thermal oil-fired energy in power generation, from 6% in 1995 to 35% in 2014, creates a high cost base and is not a viable and sustainable solution for energy security and environment protection in the long term Diversification of the generation mix primarily to renewable energy sources, improved network efficiency, reduced technical losses, and supplyand demand-side management are required The transmission network needs to be expanded and modernized Improvement of the 33-kilovolt (kv) network is required to improve system reliability and expand power supply into the rural areas to serve poor households 3 Sri Lanka has a national investment program including sector investments that are based on the National Energy Policy and Strategies, which includes a sector road map, a longterm investment plan, and appropriate policy and reform measures 3 By 2020, the government objectives are to (i) increase power supply capacity to about 6,400 megawatts (MW) and reduce generation cost by adding aggregate base load capacity of about 2,000 MW from three coalfired plants, 4 (ii) increase the share of energy supply from nonconventional renewable energy sources to 20%, 5 and (iii) reduce total network losses to 10% While the government aims to increase supply capacity and replace expensive and inefficient oil-fired power plants by constructing low-cost coal-fired plants, the remaining supply capacity will come from renewable sources The 20% increase in power generation from nonconventional renewable sources will add to 29% (2014) of conventional hydropower generation and will ensure that in the future a substantial portion of electricity is produced by clean energy sources 4 The MFF is based on a development framework including a long-term energy sector investment program linked to the National Energy Policy and Strategies The MFF was designed to support the green power development and energy efficiency improvement portion of the government s energy sector investment program by (i) financing hydropower development; (ii) expanding transmission and medium-voltage infrastructure to improve network efficiency and enable power evacuation of renewable energy in the system; (iii) piloting innovative demandside management technologies for energy efficiency; and (iv) supporting institutional capacity building for power system development, and project management and supervision 5 The MFF is financing part of the government s energy sector investment program that was originally estimated at $48 billion for It has separate financing plans for the overall facility and for individual tranches The MFF supports green power development, 1 ADB 2014 Report and Recommendation of the President to the Board of Directors: Proposed Multitranche Financing Facility to the Democratic Socialist Republic of Sri Lanka for the Green Power Development and Energy Efficiency Improvement Investment Program Manila 2 Ceylon Electricity Board 2015 Statistical Digest 2014 Colombo 3 Government of Sri Lanka 2008 National Energy Policy and Strategies of Sri Lanka Colombo 4 The 900 MW Puttalam coal-fired power plant that was completed in 2014 is already operational 5 Nonconventional renewable energy sources include mini hydropower (up to 10 MW capacity), wind, solar, and biomass

10 2 including hydropower generation, and the proposed 375 MW wind power parks through the financing of relevant power evacuation transmission infrastructure 6 It helps to encourage and facilitate private sector investment in renewable power generation by improving transmission infrastructure The MFF aids an ongoing and essential dialogue with the government on pursuing power sector reforms in coordination with other development partners The MFF is consistent with ADB s interim country partnership strategy for Sri Lanka 7 6 ADB received the periodic financing request for tranche 2 (for $180 million) on 19 August 2016 The government and Ceylon Electricity Board (CEB) propose counterpart financing of $80 million The investments under tranche 2 will cover part of the government s investment plan The proposed tranche subprojects are consistent with the overall MFF outcome and outputs The tranche will focus on investments in transmission infrastructure enhancement, mediumvoltage network efficiency improvement, and development of a smart grid and metering pilot subproject for demand-side management II ASSESSMENT OF IMPLEMENTATION 7 On 29 July 2014, ADB management approved tranche 1 of the MFF in the amount of $180 million to finance the following: (i) construction of the 30 MW run-of-river hydropower plant at Moragolla and 05 kilometers (km) of a dedicated 132 kv transmission line in Central Province; (ii) construction of four new grid substations at Kerewalapitiya, Kappalturai, Kalutara, and Kesbewa and augmentation of the existing Katunayake, Trincomalee, and Anuradhapura grid substations; construction of 10 km of 132 kv associated transmission lines; and upgrading of the Pannipitiya Panadura 123 km 132 kv transmission line in Western Province, Eastern Province, and North Central Province; (iii) erection of 87 km of 33 kv lines and gantries around Vavunativu and Madampe in Eastern Province and North Western Province; and (iv) demandside management pilot subprojects in Colombo Nonphysical outputs included capacity building and project management for preparing future MFF investments and supervising implementation of capital investments of project 1 The relevant ADB ordinary capital resources (OCR) and Asian Development Fund (ADF) loan agreements and a project agreement were signed on 20 November 2014, and the loans became effective on 2 February 2015 The Agence Française de Développement (AFD) loan agreement was signed on 2 October 2015 Project 1 is envisaged to be completed by 30 September 2019 The loan closing date is 30 March 2020 The Ministry of Power and Renewable Energy (MPRE) 8 is the executing agency, and CEB is the implementing agency for the project Project 1 is currently on track As of 8 November 2016, the total awarded contract amount was $56975 million (3165% of the approved amount), and $4679 million (260% of the approved amount) had been disbursed 8 While all transmission and medium-voltage procurement contracts have been awarded and designs for the demand-side management pilot subprojects have been finalized for bidding within 2016, there were delays in implementing the 30 MW Moragolla hydropower plant relating to the recruitment of project supervision consultants The new management of MPRE and CEB appointed in 2015 wanted to (i) review the original arrangement of engaging an international firm through quality- and cost-based selection, and (ii) explore the option for CEB to handle construction management and supervision with the support of national consultants After several rounds of discussions with ADB that focused on ensuring the hydropower plant s construction quality and safety, MPRE and CEB reconfirmed that the original arrangement could continue In 6 This includes 300 MW on Mannar Island and 75 MW in Mannar District on the main island in Northern Province The first 100 MW wind park is expected to be established on Mannar Island in 2018, followed by additional wind power developments 7 ADB 2015 Interim Country Partnership Strategy: Sri Lanka, Manila 8 Formerly Ministry of Power and Energy

11 3 October 2016, CEB signed a contract with the first-ranked consulting firm; the bidding for civil works and electromechanical facilities for the hydropower plant will commence soon 9 The government and the executing and implementing agencies for tranche 1 are currently in compliance with most of the FFA undertakings and loan covenants set forth in the respective loan agreements 9 Fulfillment of certain undertakings and covenants has been delayed and is currently ongoing Although CEB s board of directors has not yet made a decision on the financial separation of its functionally unbundled licensed business units (para 26), the government is committed to complete this process with an implementation plan for such financial separation expected to be finalized by the end of 2016 To facilitate on-time invoicing and payments by licensees, CEB will set up an actual cash-based bulk supply transaction account by the end of 2016 In addition to the operational Distribution Code and Supply Services Code, the Public Utilities Commission of Sri Lanka will approve a new Grid Code by the end of 2016 to update the 2014 version III A Impact and Outcome PERIODIC FINANCING REQUEST 10 The impact of project 2 of the investment program will be increased access to clean and reliable power supply aligned with the National Energy Policy and Strategies of Sri Lanka (footnote 3) The outcome will be enhanced system efficiency and reliability The project s design and monitoring framework is in Appendix 1 B Outputs 11 The project includes the following three outputs: (i) Transmission infrastructure enhanced This includes (a) construction of the 144 km 220 kv New Polpitiya Hambantota, 291 km 220 kv Mannar Nadukuda, and 237 km 132 kv Padukka Horana transmission lines, and the single in-and-out 05 km 132 kv underground cable connection from the Colombo C grid substation to Kolonnawa grid substation; and stringing of the second circuit of the existing 100 km 132 kv Habarana Valaichchenai transmission line; (b) augmentation of the existing 220/132/33 kv Biyagama and Kotugoda; 220/33 kv Mannar, Colombo C, and Kolonnawa Stanley; and 132/33 kv Kolonnawa, Padukka, Horana, Dehiwala, and Madampe grid substations; and (c) construction of 220/132/33 kv Hambantota, 220/33 kv Nadukuda and Biyagama, and 132/11 kv Colombo B grid substations in the Central, Eastern, Northern, North Central, Western, Sabaragamuwa and Southern provinces to absorb the increased power demand and ensure stable system operation with intermittent wind generation (ii) Efficiency of medium-voltage network improved This includes (a) construction of 60 km of 33 kv lines in Mahailluppallama, Ethgala, Chinabay, Sooriyawewa, and Bentota areas, and gantries in Mahailuppallama, Ethgala, Chinabay, and Weniwelara areas; and (b) augmentation of 33/11 kv Ethulkotte and Beligaha primary substations, and construction of a 33/11 kv Rattanapitiya primary substation in the Central, Eastern, North Central, Southern, and Western provinces to address overloading of conductors and voltage drop in medium-voltage lines (iii) Demand-side management for energy efficiency improved This includes development of a smart grid and metering pilot subproject, including installation of 9 CEB s compliance with paragraph 6 of Schedule 5 to the Loan Agreement (Ordinary Operations) dated 20 November 2014 was delayed, as CEB initiated the fisheries surveys in April 2016 and water flow measurement in June 2016 (against the target date of December 2015) Prior to installation of water flow measurement equipment, CEB was collecting water flow data on the Mahaweli River from the Mahaweli Authority

12 4 10,000 smart meters, with the smart metering infrastructure and meter management system in the Katunayake Consumer Service Center Area in Western Province 12 Outputs 1 and 2 involve turnkey contracts for transmission and medium-voltage distribution subprojects Output 3 involves one turnkey contract and a consulting services contract to help CEB implement the smart grid and metering pilot subproject The updated contribution to the ADB results framework is in Appendix 5 C Investment and Financing Plans 13 The tranche is estimated to cost $260 million (Table 1) Table 1: Tranche Investment Plan ($ million) Item Amount a A Base Cost b 1 Transmission infrastructure enhancement Medium-voltage network efficiency improvement Smart grid and metering pilot subproject 111 Subtotal (A) 2414 B Contingencies c 130 C Financing Charges During Implementation d 56 Total (A+B+C) 2600 a In Q prices b Includes an incremental (land acquisition, environmental and social mitigation, and counterpart support) cost of $104 million to be financed by Ceylon Electricity Board Also includes taxes and duties of $510 million to be financed from government and Ceylon Electricity Board resources c Physical contingencies computed at 28% of base cost for the transmission infrastructure enhancement output, 40% of base cost for the medium-voltage network efficiency improvement output, and 50% of base cost for the smart grid and metering pilot subproject Price contingencies were computed using the Asian Development Bank s forecasts of international and domestic inflation Includes provision for potential exchange rate fluctuation under the assumption of a purchasing power parity exchange rate d Financing charges during implementation include interest from all financing sources For the ordinary capital resources funded subprojects, interest during implementation is computed using a base rate at the 5-year swap rate for the London interbank offered rate for United States dollars (119%) plus an effective contractual spread of 50 basis points and a maturity premium of 10 basis points Commitment charges for an ordinary capital resources loan are computed at 015% per year to be charged on the undisbursed loan amount For the Asian Development Fund financed subprojects, interest during construction has been computed at 200% For the Agence Française de Développement financed subprojects, interest during construction has been computed at 123% Sources: Asian Development Bank and Ceylon Electricity Board estimates 14 To finance project 2, the government requested the following loans to be provided to CEB with a sovereign guarantee from Sri Lanka: 10 (i) a $95 million loan from ADB s OCR; (ii) a loan in various currencies equivalent to SDR million from ADB s Special Funds resources (ADF); 11 and (iii) a $30 million equivalent loan from AFD to be partially administered by ADB 12 The financing plan is in Table 2 10 ADB approved a major change in the facility to enable a direct loan to CEB (ADB 2016 Major Change in Facility MFF 0084: Green Power Development and Energy Efficiency Improvement Investment Program (Sri Lanka) Manila) 11 Any ADF allocation will be subject to (i) the general availability of ADF resources from time to time; (ii) Sri Lanka s access to such resources pursuant to ADB s graduation policy, as amended from time to time, and the requirements of the ADF donors; and (iii) the availability of such resources to Sri Lanka pursuant to ADB s policy on performance-based allocation of ADF resources, as amended from time to time The requested loan is equivalent to $55 million (as of 27 October 2016, the date of the loan negotiations) 12 AFD will provide contractual parallel cofinancing where ADB may cover procurement and disbursement supervision through partial administration of cofinancing

13 5 Source Table 2: Financing Plan Amount ($ million) Share of Total (%) A Asian Development Bank Ordinary capital resources loan Special Funds resources loan Subtotal (A) B Cofinanciers Agence Française de Développement loan a Subtotal (B) C Government and Ceylon Electricity Board Total (A+B+C) a Agence Française de Développement confirmed that it will cofinance project 2 Sources: Asian Development Bank and Ceylon Electricity Board estimates 15 The OCR loan will have a 25-year term, including a grace period of 5 years; a straightline repayment method; an annual interest rate determined in accordance with ADB s London interbank offered rate-based lending facility; 13 a commitment charge of 015% per year; and such other terms and conditions set forth in the draft OCR loan agreement The ADF loan will have a 25-year term, including a grace period of 5 years; an interest rate of 2% per annum during the grace period and thereafter; and such other terms and conditions set forth in the draft ADF loan agreement The ADF loan will finance (i) the transmission infrastructure for evacuation of power from the future wind parks, (ii) the medium-voltage network efficiency improvement to enhance quality and reliability of the electricity supply to customers, and (iii) the smart grid and metering pilot subproject 16 The government and CEB will finance the interest during implementation, taxes and duties, contingencies, and incremental costs (land acquisition, environmental and social mitigation, and counterpart support) 14 Financing charges during implementation of $56 million include interest during construction to be paid by CEB to ADB and AFD for the provided loans D Implementation Arrangements 17 CEB will be the executing and implementing agency A steering committee, chaired by the MPRE secretary as originally envisaged under the MFF, will guide CEB and review progress and results CEB will set up project implementation units for each output, which will oversee procurement, disbursement, financial management and accounting, quality assurance, and social and environmental issues Full-time managers will supervise each project output 18 The government and CEB asked ADB to approve advance contracting for procurement of goods and civil works, including preparing bidding documents, inviting and receiving bids for project contracts, and retroactive financing under the project Retroactive financing will be allowed for up to 20% of the individual loan amount for expenditures incurred prior to loan effectiveness The government and CEB were advised that ADB's approval of advance contracting and retroactive financing does not commit ADB to finance any part of the project Given that the project will be jointly financed by ADB and AFD, universal procurement will apply to works, goods, and consulting services to be financed under the project The interest includes a maturity premium of 10 basis points payable to ADB since the OCR loan has an average loan maturity of 1525 years based on the above loan terms and CEB s choice of repayment option and dates 14 The government financing will be limited to any exemptions on taxes and duties 15 Universal procurement was approved under the MFF (footnote 1)

14 6 19 The implementation arrangements are summarized in Table 3 and described in detail in the project administration manual (PAM) in Appendix 6 Retroactive financing and/or advance contracting Disbursement Table 3: Implementation Arrangements Aspects Arrangements Implementation period January 2017 December 2021 Estimated completion date 31 December 2021 Estimated loan closing date 30 June 2022 Management (i) Oversight body Steering committee consisting the secretary, MPRE (chair) and representatives of MNPEA, MOF, MPRE, DWC, and CEB (members) (ii) Executing agency CEB (iii) Key implementing agencies CEB (iv) Project management unit Established in CEB Procurement International 6 procurement $17925 million competitive bidding packages Consulting services Quality- and cost- 34 person-months $075 million based selection Advance contracting, including preparation of bidding documents, inviting and receiving bids for contracts, and retroactive financing of up to 20% of the loan amount for expenditures incurred prior to loan effectiveness, but no earlier than 12 months before the signing of the loan agreement The loan proceeds will be disbursed in accordance with ADB s Loan Disbursement Handbook (2015, as amended from time to time) and detailed arrangements agreed with the government and CEB ADB = Asian Development Bank, CEB = Ceylon Electricity Board, DWC = Department of Wildlife Conservation, MOF = Ministry of Finance, MNPEA = Ministry of National Policies and Economic Affairs, MPRE = Ministry of Power and Renewable Energy Source: Asian Development Bank estimates E Project Readiness 20 CEB appointed a project director and established project implementation units with fulltime project managers and engineers for each output CEB submitted draft bidding documents for major transmission procurement packages to ADB during March September 2016 Evaluation is ongoing for two procurement contracts CEB will issue the remaining bidding documents for the transmission and distribution procurement packages in the fourth quarter of 2016, and for the smart grid and metering pilot subproject in the second quarter of 2017 after consultant recruitment 21 The draft environmental impact assessment (EIA) for the 220 kv Mannar Nadukuda transmission line was disclosed on ADB s website on 7 July 2016 The draft initial environmental examination (IEE) reports for other environmental category B subprojects were disclosed on 19 August 2016 Given the minimum environmental footprint of output 3, which involves installation of smart meters, it is categorized as environmental category C CEB received necessary clearances from the Central Environmental Authority and Department of Coastal Conservation The draft resettlement plan for project 2 was disclosed on 19 August 2016 F Advance Contracting and Retroactive Financing 22 ADB approved advance contracting for procurement of goods and turnkey contracts (including preparation of bidding documents; and inviting, receiving, and evaluating bids for

15 7 project contracts) under the MFF on 7 April 2014 that covers both tranches The advance contracting for project 2 was advertised on ADB s website on 2 June 2016 IV DUE DILIGENCE A Technical 23 CEB prepared technical studies on the transmission and distribution subprojects The due diligence focused on technology, nature and characteristics of investment plans, and the most appropriate electricity evacuation arrangements from the proposed wind power park ADB assessed the technical studies as acceptable Cost estimates are reasonable and unit costs compare favorably with similar recent projects in Sri Lanka B Economic and Financial 24 The project will benefit electricity consumers and the overall economy through improved supply reliability, reduced network losses, and incremental consumption The economic viability of the project has been examined through a cost benefit analysis, by comparing with- and without-project scenarios, conducted using ADB guidelines for the economic analysis of projects (Appendix 7) All project outputs have been confirmed as least-cost, with sound economic rationale for investment The aggregate economic internal rate of return is estimated at 223%, above the assumed hurdle rate of 120% and, on this basis, the overall project is economically viable A sensitivity and risk analysis demonstrates adequate economic performance for the project 25 Financial viability was examined by comparing the incremental costs and benefits on a with- and without-investment basis using ADB guidelines for financial analysis of projects (Appendix 8) The real weighted average cost of capital was calculated for each output and resulted in a 25% average cost for the overall project Financial viability was assessed by comparing the weighted average cost of capital with the financial internal rate of return for each output and for the overall project The aggregate financial internal rate of return is 44%, which is higher than the weighted average cost of capital of 25%, suggesting that the overall project is financially viable Sensitivity analysis shows that the estimated financial returns of output 3 are sensitive to variations to capital and operation costs and implementation delays However, considering the potential of smart metering to reduce future network and generation investment requirements, undertaking the pilot subproject appears to be a sound strategic investment C Governance 26 CEB is a vertically integrated utility comprising six functional business units (FBUs) The Sri Lanka Electricity Act, 2009 encourages efficiency improvements of CEB by regulating each FBU The act empowers the Public Utilities Commission of Sri Lanka, an independent regulator, to regulate the electricity supply industry The Public Utilities Commission of Sri Lanka issued individual licenses to FBUs in 2009 It established a tariff methodology and a road map for tariff reforms and rebalancing in 2011 Financial accounts are segregated to allow each FBU to operate as a profit center, and a transfer-pricing scheme between FBUs was developed However, the process of delegating day-to-day management and financial decision-making to FBU heads is not complete, and the transfer-pricing scheme is not fully functioning 27 CEB has the necessary capacity to undertake the project and has implemented ADB-financed projects in the past The financial management assessment of CEB concludes that it can fulfill ADB s fiduciary requirements for the project CEB regularly faces cash shortfalls

16 8 because of low tariffs, expensive power generation, and expensive short-term loans These shortcomings have to be corrected Under the Sri Lanka Electricity Act, 2009, all tariffs must reflect costs, and the treasury will bear the cost of any government-approved subsidy In March 2008, the government introduced a new tariff structure that increased average retail tariffs by 30% Further tariff increases followed in January 2011, February 2012, and April 2013 The government also converted CEB s long-term debt into equity The financial management capacity of CEB is assessed as acceptable for the project The overall risk is assessed as moderate and several risk mitigation measures will be implemented Details of the financial management assessment of CEB are in the PAM and in the assessment of CEB s financial performance and projections 16 CEB s financial performance improved to some extent during However, its ongoing financial sustainability will depend on the extent to which it is allowed to (i) charge its customers fully cost-reflective tariffs to service debt, and (ii) undertake a prudent capital and operating expenditure program 28 All procurement will be carried out in accordance with ADB s Procurement Guidelines (2015, as amended from time to time) Recruitment of consultants will follow ADB s Guidelines on the Use of Consultants (2013, as amended from time to time) CEB will maintain and regularly update a project website including procurement information ADB s Anticorruption Policy (1998, as amended to date) was explained to and discussed with the government and CEB The specific policy requirements and supplementary measures are described in the PAM D Poverty, Social, and Gender Dimensions 29 The project will contribute to sustainable economic development, poverty reduction, and social well-being through improvement in the reliability and quality of power supply (Appendix 9) Stable supply of electricity will promote business expansion and increase jobs, which will help reduce poverty The project is expected to generate jobs for skilled and unskilled laborers during construction Reliability improvement of the 33 kv network will enhance the quality and reliability of the electricity supply to 246,100 consumers and the living standards of rural households E Safeguards 30 Environment Tranche 2 is classified as environmental category A Following the environmental assessment and review framework of the investment program, 17 a full EIA for the 220 kv Mannar Nadukuda transmission line, including an environmental management plan (EMP), was prepared and disclosed on ADB s website on 7 July 2016 (Appendix 10) The IEE reports for other transmission and distribution lines and substations were prepared (Appendix 11 and Appendix 12) Any update in the EIA and IEE reports resulting from a change in project scope will be disclosed Mitigation measures are proposed in the EIA and EMP to minimize habitat and species disturbance as a result of construction, and potential bird collision with the overhead transmission line during operation Implementation of a biodiversity management plan will ensure no net loss of biodiversity Potential environmental impacts of other subprojects are site-specific; mostly temporary during construction; and readily mitigated by adherence to national and international environmental standards, design criteria, and management practices as set out in the EMP The project s environmental safeguards documents have been prepared in compliance with ADB s Safeguard Policy Statement (SPS) (2009), the environmental assessment and review framework for the MFF, and Sri Lankan environmental regulations Public consultations were conducted with local communities, government authorities and nongovernment organizations, including ornithological societies, and their feedback was taken 16 The summary of CEB s historical financial performance and projections is in the Financial Analysis (Appendix 8) 17 The environmental assessment and review framework were updated to include the second tranche subprojects

17 9 into account during project design Public concerns were identified in the EIA, and mitigation measures were incorporated into the EMP PMU has dedicated staff for monitoring environmental issues and implementing the EMP 31 CEB has implemented several ADB projects and has adequate institutional capacity and experience to manage environmental risks during pre-construction, construction, and operation The EMP will be incorporated into civil works contracts, giving contractors the primary responsibility for implementation during construction CEB will retain qualified and experienced external experts or qualified nongovernment organizations to verify monitoring information on the Mannar Nadukuda transmission line that will cross the Vankalai sanctuary 18 CEB will supervise construction and EMP implementation CEB will provide environmental monitoring reports to ADB quarterly while works are ongoing within the Vankalai sanctuary and semiannually thereafter Environmental monitoring reports on other subprojects will be submitted to ADB semiannually during construction and annually during operation A corrective action plan will be prepared and implemented for any non-compliance issues The contractors and CEB will adhere to the SPS and national environmental regulations In the event of any unanticipated environmental impacts during project implementation, CEB will update the EIA and IEE reports and revise the EMP, which will be disclosed on the ADB website 32 Involuntary resettlement The project is classified as category B for involuntary resettlement No physical displacement is envisaged Private land acquisition is required only for one substation and several gantries, involves 287 hectares with three affected people, and will be procured through negotiated settlement Transmission and distribution lines will mostly have temporary impacts in terms of loss of crops and trees The land affected due to the tower footing of the project is 1447 hectares No significant resettlement impact is expected due to the land acquisition and tower erection along the right-of-way Construction will be carried out avoiding intensive cropping seasons The project s social impacts have been adequately assessed, and compensation will be paid to the affected people commensurate to the impacts Budgetary provisions are in place to compensate affected people in a timely manner for the losses if and when they occur A resettlement plan was prepared for project 2 that is adequate to address the assessed risks (Appendix 13) CEB has implemented several ADB projects and is capable of conducting resettlement in accordance with the SPS Additional assistance will be given to vulnerable households, including those headed by women Social surveys and consultations were undertaken in accordance with the SPS and the resettlement framework CEB will monitor the implementation of the resettlement plan and submit monitoring reports to ADB semiannually Since no indigenous peoples will be affected by the project, it is classified as category C for indigenous peoples 33 Climate change impact The project s outputs will further reduce technical losses and improve network efficiency, resulting in 154 gigawatt-hours of energy savings per year, equivalent to avoiding about 114,663 tons of carbon dioxide emissions per year The climate change risk screening confirms that the project has medium climate change risks (Appendix 14) F Risks and Mitigating Measures 34 Major risks and mitigating measures are summarized in Table 4 and described in detail in the updated risk assessment and risk management plan (Appendix 15) The risks appear to be moderate and may be adequately mitigated Overall, the integrated benefits and impacts are expected to outweigh the mitigation costs 18 The proposed transmission line will pass through the wetland sanctuary area following the route of the old damaged 33 kv line that runs parallel to the existing operational railway that also crosses that area

18 10 Table 4: Summary of Risks and Mitigating Measures Risks Mitigating Measures Insufficient cash generation Progress on energy sector reforms, including (i) an independent energy by Ceylon Electricity Board to sector regulatory framework, tariff structure rationalization, and internal fund its operations structural reforms in Ceylon Electricity Board; (ii) improvement of Ceylon Electricity Board s financial management; and (iii) commissioning lowcost generation, including from hydropower and other renewable energy Potential difficulties in managing the grid due to instability as a result of integrating renewable wind generation Delays in generation and transmission investments Cost escalation including unexpected increase in prices of commodities and raw materials Source: Asian Development Bank G Risk Categorization Addressing of wind integration requirements under the renewable energy master plan and system stability studies prepared under Asian Development Bank technical assistance, investment for renewable energy integration proposed under the tranche, and changes proposed in regulatory codes and commercial arrangements Timely implementation of Ceylon Electricity Board s long-term generation and transmission investment plans Close supervision by the steering committee and the Asian Development Bank, open and transparent competitive bidding, proactive project implementation, advance contracting, and inclusion of physical and price contingencies in the cost estimates 35 Tranche 2 is categorized as complex due to its environmental category A V ASSURANCES 36 The government and CEB have assured ADB that implementation of the project shall conform to all applicable ADB policies, including those concerning anticorruption measures, safeguards, gender, procurement, consulting services, and disbursement as described in detail in the PAM and loan documents The government and CEB have agreed with ADB on certain covenants, including on financial management, for the project, which are set forth in the legal agreements VI MINOR CHANGE OF MULTITRANCHE FINANCING FACILITY: EXTENSION OF THE MULTITRANCHE FINANCING FACILITY AVAILABILITY PERIOD 37 Under the FFA, the current MFF availability period is until 31 March 2021, whereas the estimated loan closing date for tranche 2 is 30 June 2022 Accordingly, an extension of the MFF availability period is required to fully and properly implement tranche 2 An extension of the MFF availability period from 31 March 2021 to 13 July 2024 (which is within the permissible 10-year availability period for the MFF) is therefore requested VII RECOMMENDATION 38 On the basis of the approval by ADB s Board of Directors for the provision of loans under the multitranche financing facility in an aggregate principal amount not exceeding $360,000,000 to the Democratic Socialist Republic of Sri Lanka for the Green Power Development and Energy Efficiency Improvement Investment Program, it is recommended that the President approve the proposed tranche as described in para 14 and such other terms and conditions as are substantially in accordance with those set forth in the draft guarantee and loan agreements for the proposed tranche 39 It is further recommended that the President approve the minor change of the multitranche financing facility as described in para 37 to extend the availability period of the Green Power Development and Energy Efficiency Improvement Investment Program from 31 March 2021 to 13 July 2024

Periodic Financing Request Report. India: Assam Power Sector Investment Program (Tranche 2)

Periodic Financing Request Report. India: Assam Power Sector Investment Program (Tranche 2) Periodic Financing Request Report Project Number: 47101-003 MFF Number: 0083 November 2015 India: Assam Power Sector Investment Program (Tranche 2) This document is being disclosed to the public in accordance

More information

Facility Administration Manual

Facility Administration Manual Green Power Development and Energy Efficiency Improvement Investment Program (RRP SRI 47037) Facility Administration Manual Project Number: 47037 Loan Numbers: {LXXXX; LXXXX} May 2014 Democratic Socialist

More information

FINANCIAL ANALYSIS: PROJECT 1

FINANCIAL ANALYSIS: PROJECT 1 Green Power Development and Energy Efficiency Improvement Investment Program (RRP SRI 47037) A. Background and Rationale FINANCIAL ANALYSIS: PROJECT 1 1. Project 1 of the Green Power Development and Energy

More information

Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project

Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project Technical Assistance Report Project Number: 51107-001 Transaction Technical Assistance (TRTA) October 2017 Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project This

More information

Periodic Financing Request Report. India: Railway Sector Investment Program (Tranche 3)

Periodic Financing Request Report. India: Railway Sector Investment Program (Tranche 3) Periodic Financing Request Report Project Number: 36330-043 MFF Number: 0060 November 2017 India: Railway Sector Investment Program (Tranche 3) Distribution of this document is restricted until it has

More information

Additional Cofinancing

Additional Cofinancing Additional Cofinancing Sri Lanka Sri Lanka Project Number: 45148 Loan Number: 3029/3030-SRI May 2014 Proposed Administration of Loan Democratic Socialist Republic of Sri Lanka: Greater Colombo Water and

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Sri Lanka Project Number: 42378 November 2012 Proposed Multitranche Financing Facility and Administration of Grant People s Republic

More information

FRAMEWORK FINANCING AGREEMENT

FRAMEWORK FINANCING AGREEMENT FRAMEWORK FINANCING AGREEMENT FRAMEWORK FINANCING AGREEMENT (Second Power Transmission Enhancement Investment Program) Parties This Framework Financing Agreement ( FFA ) dated 15 July 2016 is between

More information

PROJECT PREPARATION TECHNICAL ASSISTANCE

PROJECT PREPARATION TECHNICAL ASSISTANCE 12 Appendix 4 A. Justification PROJECT PREPARATION TECHNICAL ASSISTANCE 1. A regional project preparatory technical assistance (R-PPTA) is required to prepare the Pacific Renewable Energy Investment Facility

More information

Technical Assistance Report

Technical Assistance Report Technical Assistance Report Project Number: 51360-002 Transaction Technical Assistance Facility (F-TRTA) April 2018 Turkmenistan: Preparing the Central Asia Regional Economic Cooperation Corridors 2, 3

More information

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones Technical Assistance Report Project Number: 50004-001 Policy and Advisory Technical Assistance (PATA) October 2016 People s Republic of China: Study on Natural Resource Asset Appraisal and Management System

More information

Pakistan: Second Power Transmission Enhancement Investment Program (Tranche 2)

Pakistan: Second Power Transmission Enhancement Investment Program (Tranche 2) Periodic Financing Request Report Project Number: 48078-004 MFF Number: 0092 September 2017 Pakistan: Second Power Transmission Enhancement Investment Program (Tranche 2) Distribution of this document

More information

Islamic Republic of Pakistan: Update on Energy Sector Plan

Islamic Republic of Pakistan: Update on Energy Sector Plan Technical Assistance Report Project Number: 50081-001 Knowledge and Support Technical Assistance (KSTA) August 2017 Islamic Republic of Pakistan: Update on Energy Sector Plan This The views document expressed

More information

Papua New Guinea: Town Electrification Investment Program, Tranche 2

Papua New Guinea: Town Electrification Investment Program, Tranche 2 Periodic Financing Request Report Project Number: 41504-025 MFF Number: 0051 June 2017 Papua New Guinea: Town Electrification Investment Program, Tranche 2 Distribution of this document is restricted until

More information

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project Project Design Advance Project Number: 47279-003 September 2016 Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project This document is being disclosed to the public in accordance with ADB's Public

More information

India: Enhancing Capacity of State Utilities in Preparing Energy Sector Projects

India: Enhancing Capacity of State Utilities in Preparing Energy Sector Projects Technical Assistance Report Project Number: 51308-002 Transaction Technical Assistance Facility (F-TRTA) December 2017 India: Enhancing Capacity of State Utilities in Preparing Energy Sector Projects Distribution

More information

Periodic Financing Request Report. People s Republic of China: Railway Energy Efficiency and Safety Enhancement Investment Program (MFF): Tranche 4

Periodic Financing Request Report. People s Republic of China: Railway Energy Efficiency and Safety Enhancement Investment Program (MFF): Tranche 4 Periodic Financing Request Report Project Number: 43332 December 2013 People s Republic of China: Railway Energy Efficiency and Safety Enhancement Investment Program (MFF): Tranche 4 CURRENCY EQUIVALENTS

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 50138-001 September 2017 Proposed Loan Walkers Colombo Shipyard (Private) Limited Shipyard Rehabilitation and Infrastructure

More information

Periodic Financing Request Report. Afghanistan: Energy Supply Improvement Investment Program (Tranche 3)

Periodic Financing Request Report. Afghanistan: Energy Supply Improvement Investment Program (Tranche 3) Periodic Financing Request Report Project Number: 47282 005 MFF Number: 0090 September 2017 Afghanistan: Energy Supply Improvement Investment Program (Tranche 3) Distribution of this document is restricted

More information

India: Preparing for the Ara Canal Water Productivity Improvement Project

India: Preparing for the Ara Canal Water Productivity Improvement Project Technical Assistance Report Project Number: 52153-002 Transaction Technical Assistance (TRTA) June 2018 India: Preparing for the Ara Canal Water Productivity Improvement Project This document is being

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Sri Lanka Project Number: 47381-001 June 2015 Proposed Multitranche Financing Facility Democratic Socialist Republic of Sri Lanka: Mahaweli

More information

Periodic Financing Request Report. People s Republic of Bangladesh: Secondary Education Sector Investment Program Tranche 2

Periodic Financing Request Report. People s Republic of Bangladesh: Secondary Education Sector Investment Program Tranche 2 Periodic Financing Request Report Project Number: 44213-017 November 2015 People s Republic of Bangladesh: Secondary Education Sector Investment Program Tranche 2 This document is being disclosed to the

More information

Section 3.06 is deleted and the following is substituted therefor:

Section 3.06 is deleted and the following is substituted therefor: 2 (c) Section 3.03 is deleted and the following is substituted therefor: Commitment Charge; Credit; Maturity Premium. (a) The Borrower shall pay a commitment charge on the unwithdrawn amount of the Loan

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 47926 April 2014 Proposed Equity Investment ReNew Power Ventures Private Limited ReNew Power Investment Project (India)

More information

People s Republic of Bangladesh: Secondary Education Sector Investment Program (Tranche 3)

People s Republic of Bangladesh: Secondary Education Sector Investment Program (Tranche 3) Periodic Financing Request Report Project Number: 44213-018 MFF Number: 0074 March 2018 People s Republic of Bangladesh: Secondary Education Sector Investment Program (Tranche 3) Distribution of this document

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Lanka Project Number: 46265 September 2013 Proposed Administration of Grant Socialist Republic of Viet Nam: Energy Efficiency for Ho

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 43309-015 Loan Number: 2839-CAM September 2016 Proposed Loan for Additional Financing Kingdom of Cambodia: Provincial

More information

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. OM Section H5/BP Page 1 of 4 BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction ADDITIONAL FINANCING 1. The

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 48452-004 November 2016 Proposed Loan People s Republic of China: Shaanxi Accelerated Energy Efficiency and Environment

More information

Afghanistan: Energy Supply Improvement Investment Program (Tranche 2)

Afghanistan: Energy Supply Improvement Investment Program (Tranche 2) Periodic Financing Request Report Project Number: 47282-004 MFF Number: 0090 November 2016 Afghanistan: Energy Supply Improvement Investment Program (Tranche 2) This document is being disclosed to the

More information

Republic of Azerbaijan: Water Supply and Sanitation Investment Program Tranche 4

Republic of Azerbaijan: Water Supply and Sanitation Investment Program Tranche 4 Periodic Financing Request Report Project Number: 42408-044 MFF Number: 0032 July 2016 Republic of Azerbaijan: Water Supply and Sanitation Investment Program Tranche 4 Distribution of this document is

More information

Republic of the Maldives: Preparing Business Strategy for Port Development

Republic of the Maldives: Preparing Business Strategy for Port Development Technical Assistance Report Project Number: 47283 Capacity Development Technical Assistance (CDTA) November 2013 Republic of the Maldives: Preparing Business Strategy for Port Development The views expressed

More information

Report and Recommendation of the President to the Board of Directors. Proposed Loan and Grant Kyrgyz Republic: Power Sector Rehabilitation Project

Report and Recommendation of the President to the Board of Directors. Proposed Loan and Grant Kyrgyz Republic: Power Sector Rehabilitation Project Report and Recommendation of the President to the Board of Directors Project Number: 44198 May 2012 Proposed Loan and Grant Kyrgyz Republic: Power Sector Rehabilitation Project CURRENCY EQUIVALENTS (as

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 42180-016 February 2017 Proposed Multitranche Financing Facility and Technical Assistance Grant People s Republic of

More information

MFF - Bihar Urban Development Investment Program (Facility Concept)

MFF - Bihar Urban Development Investment Program (Facility Concept) India: MFF - Bihar Urban Development Investment Program (Facility Concept) Project Name Project Number 41603-013 Country Project Status Project Type / Modality of Assistance Source of Funding / Amount

More information

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS Strengthening Public Financial Resource Management through Information and Communication Systems Technology Systems (TRTA MON 51084) OUTLINE TERMS OF REFERENCE FOR CONSULTANTS 1. The transaction technical

More information

Lao People s Democratic Republic: Preparing the Northern Cross-Border Power Trade and Distribution Project

Lao People s Democratic Republic: Preparing the Northern Cross-Border Power Trade and Distribution Project Appendix 3 11 Technical Assistance Report Project Number: 51329-002 Transaction Technical Assistance (TRTA) November 2017 Lao People s Democratic Republic: Preparing the Northern Cross-Border Power Trade

More information

Periodic Financing Request Report. India: Kolkata Environmental Improvement Investment Program (Tranche 2)

Periodic Financing Request Report. India: Kolkata Environmental Improvement Investment Program (Tranche 2) Periodic Financing Request Report Project Number: 42266-025 MFF Number: 0075 August 2016 India: Kolkata Environmental Improvement Investment Program (Tranche 2) Distribution of this document is restricted

More information

Periodic Financing Request Report. Armenia: Sustainable Urban Development Investment Program Tranche 2

Periodic Financing Request Report. Armenia: Sustainable Urban Development Investment Program Tranche 2 Periodic Financing Request Report Project Number: 42417-033 MFF Number: 0056 September 2015 Armenia: Sustainable Urban Development Investment Program Tranche 2 This document is being disclosed to the public

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE 8 Appendix 3 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The Government of the Republic of the Union of Myanmar has requested the Asian Development Bank (ADB) to provide a project preparatory

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program)

PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program) PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program) 1. A project preparatory technical assistance (PPTA) for $700,000 in grant funds is

More information

LOAN AGREEMENT (Special Operations) (Road Network Upgrading Project) between DEMOCRATIC REPUBLIC OF TIMOR-LESTE. and ASIAN DEVELOPMENT BANK

LOAN AGREEMENT (Special Operations) (Road Network Upgrading Project) between DEMOCRATIC REPUBLIC OF TIMOR-LESTE. and ASIAN DEVELOPMENT BANK LOAN NUMBER 2858-TIM (SF) LOAN AGREEMENT (Special Operations) (Road Network Upgrading Project) between DEMOCRATIC REPUBLIC OF TIMOR-LESTE and ASIAN DEVELOPMENT BANK DATED 2 MAY 2012 TIM 45094 LOAN AGREEMENT

More information

Periodic Financing Request Report. India: Karnataka Integrated Urban Water Management Investment Program (Tranche 2)

Periodic Financing Request Report. India: Karnataka Integrated Urban Water Management Investment Program (Tranche 2) Periodic Financing Request Report Project Number: 43253-027 MFF Number: 0080-IND October 2018 India: Karnataka Integrated Urban Water Management Investment Program (Tranche 2) Distribution of this document

More information

OPERATIONS MANUAL BANK POLICIES (BP)

OPERATIONS MANUAL BANK POLICIES (BP) BANK POLICIES (BP) OM Section F1/BP Page 1 of 2 These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. SAFEGUARD POLICY STATEMENT 1. The Asian Development

More information

Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project

Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project Technical Assistance Report Project Number: 51039-001 Transaction Technical Assistance (TRTA) September 2017 Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project

More information

Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project

Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project Validation Report Reference Number: PCV: PHI 2011-15 Project Number: 35379 Loan Number: 2012 July 2011 Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project Independent

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 13 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is required to help the government of Mongolia design the Regional Road Development

More information

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan Technical Assistance Report Project Number: 46539 Regional Capacity Development Technical Assistance (R CDTA) August 2014 Improving the Financial Management Capacity of Executing Agencies in Afghanistan

More information

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ).

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). WHEREAS (A) the Borrower has applied to ADB for a loan

More information

Periodic Financing Request Report. Islamic Republic of Pakistan: Punjab Irrigated Agriculture Investment Program (Tranche 4)

Periodic Financing Request Report. Islamic Republic of Pakistan: Punjab Irrigated Agriculture Investment Program (Tranche 4) Periodic Financing Request Report Project Number: 37231-044 MFF Number: 0009-PAK November 2015 Islamic Republic of Pakistan: Punjab Irrigated Agriculture Investment Program (Tranche 4) This document will

More information

PERIODIC FINANCING REQUEST. RE: Higher Education in the Pacific Investment Program: Periodic Financing Request #1

PERIODIC FINANCING REQUEST. RE: Higher Education in the Pacific Investment Program: Periodic Financing Request #1 PERIODIC FINANCING REQUEST Date: April 2012 To: Asian Development Bank 6 ADB Avenue Mandaluyong City, Metro Manila ATTENTION: Director General, Pacific Department Fax No. +632-632-6318 Sir: RE: Higher

More information

LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA. and ASIAN DEVELOPMENT BANK

LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA. and ASIAN DEVELOPMENT BANK LOAN NUMBER 2729-ARM LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA and ASIAN DEVELOPMENT BANK DATED 30 MAY 2011 ARM 42145 LOAN

More information

LOAN AGREEMENT (Ordinary Operations) (National Grid Improvement Project) between POWER GRID CORPORATION OF INDIA LIMITED. and ASIAN DEVELOPMENT BANK

LOAN AGREEMENT (Ordinary Operations) (National Grid Improvement Project) between POWER GRID CORPORATION OF INDIA LIMITED. and ASIAN DEVELOPMENT BANK LOAN NUMBER 2787-IND LOAN AGREEMENT (Ordinary Operations) (National Grid Improvement Project) between POWER GRID CORPORATION OF INDIA LIMITED and ASIAN DEVELOPMENT BANK DATED 30 MARCH 2012 IND 44426 LOAN

More information

Tuvalu: Outer Island Maritime Infrastructure Project

Tuvalu: Outer Island Maritime Infrastructure Project Project Design Advance Project Number: 48484-003 November 2015 Tuvalu: Outer Island Maritime Infrastructure Project This document is being disclosed to the public in accordance with ADB s Public Communications

More information

Country Operations Business Plan. Armenia October 2015

Country Operations Business Plan. Armenia October 2015 Country Operations Business Plan October 2015 Armenia 2016 2018 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 31

More information

Tanahu Hydropower Project (RRP NEP 43281) FINANCIAL ANALYSIS. A. Introduction

Tanahu Hydropower Project (RRP NEP 43281) FINANCIAL ANALYSIS. A. Introduction Tanahu Hydropower Project (RRP NEP 43281) FINANCIAL ANALYSIS A. Introduction 1. The financial analysis of the Tanahu Hydropower Project was carried out in accordance with Financial Management and Analysis

More information

Mongolia: Developing an Information System for Development Policy and Planning

Mongolia: Developing an Information System for Development Policy and Planning Technical Assistance Report Project Number: 51136-001 Knowledge and Support Technical Assistance (KSTA) September 2017 Mongolia: Developing an Information System for Development Policy and Planning This

More information

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT Himachal Pradesh Clean Energy Transmission Investment Program (RRP IND 43464) TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT A. INTRODUCTION 1. The

More information

Section 2.01(39) is deleted and the following is substituted therefor: Loan Account means:

Section 2.01(39) is deleted and the following is substituted therefor: Loan Account means: 2 Loan means each of OCR Loan 1 (as defined in Section 1.02(s) of the Loan Agreement) and OCR Loan 2 (as defined in Section 1.02(t) of the Loan Agreement). Section 2.01(39) is deleted and the following

More information

LOAN AGREEMENT (Ordinary Operations) (Himachal Pradesh Clean Energy Development Investment Program Project 4) between INDIA. and

LOAN AGREEMENT (Ordinary Operations) (Himachal Pradesh Clean Energy Development Investment Program Project 4) between INDIA. and LOAN NUMBER 2914-IND LOAN AGREEMENT (Ordinary Operations) (Himachal Pradesh Clean Energy Development Investment Program Project 4) between INDIA and ASIAN DEVELOPMENT BANK DATED 19 NOVEMBER 2012 IND 41627

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

Establishment of the High-Level Technology Fund

Establishment of the High-Level Technology Fund April 2017 Establishment of the High-Level Technology Fund Distribution of this document is restricted until it has been approved by Management. Following such approval, ADB will disclose the document

More information

Multitranche Financing Facility Annual Report 2017

Multitranche Financing Facility Annual Report 2017 May 2018 Multitranche Financing Facility Annual Report 2017 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. ABBREVIATIONS ADB Asian Development

More information

Environmental Safeguard Monitoring Report. FIJ: Transport Infrastructure Investment Sector Project

Environmental Safeguard Monitoring Report. FIJ: Transport Infrastructure Investment Sector Project Environmental Safeguard Monitoring Report Semi Annual Report July 2016 ADB Project Number: 48141-001 ADB Loan Number: 3210 FIJ: Transport Infrastructure Investment Sector Project Prepared by Fiji Roads

More information

Democratic Socialist Republic of Sri Lanka: Rooftop Solar Power Generation Project

Democratic Socialist Republic of Sri Lanka: Rooftop Solar Power Generation Project Rooftop Solar Power Generation Project (RRP SRI 50373-002) Project Administration Manual Project Number: 50373-002 Loan Number: LXXXX; TAXXXX September 2017 Democratic Socialist Republic of Sri Lanka:

More information

Georgia: Preparing the Second Domestic Resource Mobilization Program

Georgia: Preparing the Second Domestic Resource Mobilization Program Technical Assistance Report Project Number: 52161-002 Transaction Technical Assistance (TRTA) September 2018 Georgia: Preparing the Second Domestic Resource Mobilization Program This document is being

More information

LOAN AGREEMENT (Ordinary Operations) (National Power Grid Development Investment Program Tranche 2) between POWER GRID CORPORATION OF INDIA LIMITED

LOAN AGREEMENT (Ordinary Operations) (National Power Grid Development Investment Program Tranche 2) between POWER GRID CORPORATION OF INDIA LIMITED LOAN NUMBER 2510-IND LOAN AGREEMENT (Ordinary Operations) (National Power Grid Development Investment Program Tranche 2) between POWER GRID CORPORATION OF INDIA LIMITED and ASIAN DEVELOPMENT BANK DATED

More information

Bangladesh: Power System Expansion and Efficiency Improvement Investment Program

Bangladesh: Power System Expansion and Efficiency Improvement Investment Program Facility Administration Manual Power System Expansion and Efficiency Improvement Investment Program (RRP BAN 42378) Project Number: 42378-014 Loan Number: LXXXX October 2012 Bangladesh: Power System Expansion

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK . ASIAN DEVELOPMENT BANK TAR: BAN 35242 TECHNICAL ASSISTANCE TO THE PEOPLE S REPUBLIC OF BANGLADESH FOR PREPARING THE GAS SECTOR DEVELOPMENT PROJECT April 2004 CURRENCY EQUIVALENTS (as of 21 April 2004)

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 49128-002 November 2017 Proposed Loan, Administration of Grant, and Administration of Technical Assistance Grant Islamic

More information

Section 3.07 is deleted and the following is substituted therefor:

Section 3.07 is deleted and the following is substituted therefor: 2 outstanding Loan and the Fixed Spread that will be applied to new Loans (expressed as a percentage per annum), by (ii) the principal amount of the outstanding Loan on which the Borrower shall pay interest

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Sri Lanka Project Number: 48141-001 November 2014 Proposed Loan and Technical Assistance Grant Republic of Fiji: Transport Infrastructure

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Sri Lanka Project Number: 47083 September 2013 Proposed Multitranche Financing Facility India: Accelerating Infrastructure Investment

More information

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ).

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). WHEREAS (A) by a loan agreement of even date herewith

More information

Republic of Indonesia: Promoting Innovative Financial Inclusion (Financed by ADB Technical Assistance Special Fund)

Republic of Indonesia: Promoting Innovative Financial Inclusion (Financed by ADB Technical Assistance Special Fund) Technical Assistance Report Program Number: 48207-003 Transaction Technical Assistance (TRTA) June 2017 Republic of Indonesia: Promoting Innovative Financial Inclusion (Financed by ADB Technical Assistance

More information

Report and Recommendation of the President to the Board of Directors. Proposed Loan Republic of Uzbekistan: Solid Waste Management Improvement Project

Report and Recommendation of the President to the Board of Directors. Proposed Loan Republic of Uzbekistan: Solid Waste Management Improvement Project Report and Recommendation of the President to the Board of Directors Project Number: 45366 October 2013 Proposed Loan Republic of Uzbekistan: Solid Waste Management Improvement Project CURRENCY EQUIVALENTS

More information

Section 3.07 is deleted and the following is substituted therefor:

Section 3.07 is deleted and the following is substituted therefor: 3 outstanding Loan on which a higher Fixed Spread is applicable. The amount of the Rebate shall be determined by multiplying (i) the difference between the Fixed Spread applicable to the outstanding Loan

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 48025-003 March 2017 Proposed Loan Republic of Uzbekistan: Central Asia Regional Economic Cooperation Corridor 2 (Pap

More information

People s Republic of Bangladesh: Updating the Road Master Plan

People s Republic of Bangladesh: Updating the Road Master Plan South Asia Subregional Economic Cooperation Dhaka Northwest Corridor Road Project, Phase 2 (RRP BAN 40540) Technical Assistance Report Project Number: 40540-016 Transaction Technical Assistance (TRTA)

More information

LOAN AGREEMENT (Special Operations) (Climate Resilient Rice Commercialization Sector Development Project) between KINGDOM OF CAMBODIA.

LOAN AGREEMENT (Special Operations) (Climate Resilient Rice Commercialization Sector Development Project) between KINGDOM OF CAMBODIA. LOAN NUMBER 3007-CAM (SF) LOAN AGREEMENT (Special Operations) (Climate Resilient Rice Commercialization Sector Development Project) between KINGDOM OF CAMBODIA and ASIAN DEVELOPMENT BANK DATED 26 AUGUST

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 40540-016 September 2017 Proposed Multitranche Financing Facility and Technical Assistance Grant People s Republic of

More information

INDIA: Preparing the Rajasthan Secondary Towns Development Investment Program

INDIA: Preparing the Rajasthan Secondary Towns Development Investment Program Appendix 3 9 Technical Assistance Report Project Number: 42267-027 Transaction Technical Assistance (TRTA) June 2017 INDIA: Preparing the Rajasthan Secondary Towns Development Investment Program This document

More information

Policy Paper. March Establishing the Project Design Facility

Policy Paper. March Establishing the Project Design Facility Policy Paper March 2011 Establishing the Project Design Facility ABBREVIATIONS ADB Asian Development Bank ADF Asian Development Fund COBP country operations business plan DMC developing member country

More information

LOAN AGREEMENT (Ordinary Operations) (Energy Efficiency Investment Program Tranche 1, Investment Project) between ISLAMIC REPUBLIC OF PAKISTAN.

LOAN AGREEMENT (Ordinary Operations) (Energy Efficiency Investment Program Tranche 1, Investment Project) between ISLAMIC REPUBLIC OF PAKISTAN. LOAN NUMBER 2552-PAK LOAN AGREEMENT (Ordinary Operations) (Energy Efficiency Investment Program Tranche 1, Investment Project) between ISLAMIC REPUBLIC OF PAKISTAN and ASIAN DEVELOPMENT BANK DATED 29 APRIL

More information

Multitranche Financing Facility Republic of Uzbekistan: Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program

Multitranche Financing Facility Republic of Uzbekistan: Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program Facility Administration Manual Project Number: 42107 MFF Number: 0042-UZB Loan Numbers: 2635-UZB (Project 1), 2746-UZB (Project 2), and 2868-UZB (Project 3) 21 August 2013 Multitranche Financing Facility

More information

(c) Section 3.07 is deleted and the following is substituted therefor:

(c) Section 3.07 is deleted and the following is substituted therefor: 2 outstanding Loan on which a higher Fixed Spread is applicable. The amount of the Rebate shall be determined by multiplying (i) the difference between the Fixed Spread applicable to the outstanding Loan

More information

FINANCIAL MANAGEMENT ASSESSMENT

FINANCIAL MANAGEMENT ASSESSMENT Greater Malé Environmental Improvement and Waste Management Project (RRP MLD 51077) EXECUTIVE SUMMARY FINANCIAL MANAGEMENT ASSESSMENT 1. The financial management assessment (FMA) was conducted for the

More information

Validation Report. India: North Karnataka Urban Sector Investment Program, Tranche 1. Independent Evaluation Department

Validation Report. India: North Karnataka Urban Sector Investment Program, Tranche 1. Independent Evaluation Department Validation Report Reference Number: PVR-451 Project Number: 38254-033 Loan Number: 2312 August 2016 India: North Karnataka Urban Sector Investment Program, Tranche 1 Independent Evaluation Department ABBREVIATIONS

More information

Country Operations Business Plan. Afghanistan November 2017

Country Operations Business Plan. Afghanistan November 2017 Country Operations Business Plan November 2017 Afghanistan 2018 2020 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. 1 CURRENCY EQUIVALENTS (as

More information

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. OM Section F1/BP Page 1 of 3 OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction ENVIRONMENTAL

More information

Cambodia: Second Power Transmission and Distribution Project

Cambodia: Second Power Transmission and Distribution Project Validation Report Reference Number: PVR-464 Project Number: 37041-013 Loan Number: 2261 December 2016 Cambodia: Second Power Transmission and Distribution Project Independent Evaluation Department ABBREVIATIONS

More information

FINANCIAL ANALYSIS. A. Introduction

FINANCIAL ANALYSIS. A. Introduction A. Introduction Air Quality Improvement in the Greater Beijing Tianjin Hebei Region China National Investment and Guaranty Corporation s Green Financing Platform Project (RRP PRC 50096) FINANCIAL ANALYSIS

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 49107-003 September 2018 Proposed Multitranche Financing Facility, Technical Assistance Grant, and Administration of

More information

(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time);

(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time); 2 (f) Goods means equipment and materials to be financed out of the proceeds of the Loan, including related services such as transportation, insurance, installation, commissioning, training, and initial

More information

Philippines: Emergency Assistance for Relief And Recovery from Typhoon Yolanda

Philippines: Emergency Assistance for Relief And Recovery from Typhoon Yolanda Validation Report Reference Number: PVR-471 Project Number: 47337-001 Loan Number: 3080 December 2016 Philippines: Emergency Assistance for Relief And Recovery from Typhoon Yolanda Independent Evaluation

More information

Proposed Grants and Administration of Grants Independent State of Samoa: Renewable Energy Development and Power Sector Rehabilitation Project

Proposed Grants and Administration of Grants Independent State of Samoa: Renewable Energy Development and Power Sector Rehabilitation Project Project Administration Manual Project Number: 46044 October 2013 Proposed Grants and Administration of Grants Independent State of Samoa: Renewable Energy Development and Power Sector Rehabilitation Project

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 48031-001 November 2014 Proposed Technical Assistance Loan Islamic Republic of Pakistan: Public Sector Enterprise Reforms

More information

Viet Nam: Northern Power Transmission Expansion Sector Project

Viet Nam: Northern Power Transmission Expansion Sector Project Validation Report Reference Number: PVR-485 Project Number: 38196-013 Loan Number: 2225 December 2016 Viet Nam: Northern Power Transmission Expansion Sector Project Independent Evaluation Department ABBREVIATIONS

More information

Proposed Programmatic Approach, Policy-Based Loan, and Technical Assistance Loan Cambodia: Strengthening Public Financial Management Program

Proposed Programmatic Approach, Policy-Based Loan, and Technical Assistance Loan Cambodia: Strengthening Public Financial Management Program Concept Paper Project Number: 49041-002 January 2016 Proposed Programmatic Approach, Policy-Based Loan, and Technical Assistance Loan Cambodia: Strengthening Public Financial Management Program This document

More information

People s Republic of China: Supporting the Reform of the Role of the People s Bank of China

People s Republic of China: Supporting the Reform of the Role of the People s Bank of China Technical Assistance Report Project Number: 49401-001 Policy and Advisory Technical Assistance (PATA) April 2016 People s Republic of China: Supporting the Reform of the Role of the People s Bank of China

More information