1 REQUEST FOR PROPOSALS ARCHITECTURAL/ENGINEERING SERVICES Proposals Due by: Tuesday, April 5, 2016 at 10:00 AM Secaucus Housing Authority 700 County Avenue Secaucus, New Jersey
2 REQUEST FOR PROPOSALS The Housing Authority of the Town of Secaucus, New Jersey is seeking a multi-disciplined Architectural and Engineering firm to provide professional services for the implementation of work items as follows: Assessment of Kroll Heights Heating Management System at 700 County Avenue, Secaucus, NJ. It is the Housing Authority's desire to retain and employ a duly qualified architectural/engineering (A/E) firm to prepare public bidding documents to evaluate Kroll Height s building heating infrastructure including boilers and boiler control system. All services must be in accordance with the existing rules, orders, directives and regulations promulgated by the United States Department of Housing and Urban Development and all applicable building codes. The services that are requested will be as follows and will include a written report as listed below and the preparation of public bidding documents: 1. Prepare a written report that includes the following: a. An evaluation of the replacement of the boiler control system. Replacement must be compatible with existing equipment and flexible for future upgrades to heating equipment. The replacement equipment should be a generic brand that does not require service by a specific vendor. Parts should be readily available to any HVAC vendor. The new control system should allow for adjustments by an HVAC vendor and maintenance staff on-site (i.e., temperature settings, etc.). b. An evaluation of the current boiler conditions and recommend options for extending life and use of your boiler assets. c. Preparation of cost estimates for replacing the control system & boilers. Indicate the cost per boiler unit and the feasibility of phasing the replacement of each unit over a 3 to 5 year period. 2. The architect must comply with the following schedule: a. Written recommendations within 15 days of A/E contract execution b. Schematic design documents within 30 days of A/E contract execution c. Completed public bidding documents within 45 days of A/E contract execution
3 3. Field Investigation: a. Locate and evaluate existing documentation that exists for the projects. b. Document and evaluate field conditions. c. Interview Authority personnel. d. Meet with Authority staff; tenants, local officials, and other regulatory personnel, as necessary. e. Coordinate surveys, testing and other professionals involved in the project(s). 4. Develop project work items, including detailed schedule. 5. Develop preliminary contract documents. 6. Develop construction cost estimates. 7. Develop complete construction document bid package. 8. Obtain Authority review and approval of documents prior to release for bid. 9. Obtain prevailing wage rate decision for the project(s) from the Department of Labor, from HUD Labor Relations Specialist. 10. Prepare advertisements for bid and provide to SHA executive director for distribution. 11. Prepare bidder log and bid tabulation form and assist in developing a prospective bidder list. 12. Answer inquiries of bidders during the bidding period and compose/distribute the results. 13. Attend bid opening(s). 14. Check references and qualifications of low bidders and documents, and distribute the results. 15. The A/E must evaluate all bids received in response to the public bidding notice and make a recommendation regarding contract award. 16. Organize and conduct pre-construction meetings and prepare and distribute minutes. Check shop drawings and submittal. 17. The A/E shall perform a minimum weekly inspection to ensure that all work is proceeding in accordance with the project specifications. 18. The A/E shall review and approve all contractor requisitions prior to payment. 19. The A/E shall review and make recommendations regarding recommended change-orders. 20. The A/E shall meet with the Housing Authority staff as requested to discuss the status of the projects.
4 21. The A/E shall review and approve all close-out documents prior to making final payment to the contractor. 22. Conduct periodic employee interviews to insure contractor s compliance with wage rate requirements. 23. Process all contractor paperwork, including the following: a. Insurance certification b. Bonding documentation c. Subcontractor listings d. Project schedule e. Affirmative action plan f. Wage rate and payroll records 24. Formulate, process and administer any change orders necessary to complete the project. 25. Review and approve all contractor requisitions. 26. Prepare final punch list, followed by final inspection. 27. Process all close-out documentation including: a. Contractor s Certificate of Substantial Completion (AIA-#G-704). b. Contractor s Certificate and Release (Form CHNA). c. Contractor s Affidavit of Payments of Debts and Claims (AIA-#G-705). d. Contractor s Final Payment Application (AIA-#G-7O2). e. Contractor s Consent of Surety to Final Payment (AIA-#G-707). f. Contractor s Release of Liens (AIA-#G-705-A). g. Architect or Engineers Certificate of Completion-Consolidated. h. Architect or Engineers Final Schedule of Change Orders (Form HUD-51002). i. Release of Retainage. 28. All services shall include complete interface with the SHA, HUD, Tenants and the Contractor. Qualifications: 1) Must be a licensed by the State of New Jersey to provide these services. 2) Must have previous experience in designing ventilation systems in comparable buildings 3) Must be approvable by the United States Department of Housing and Urban Development. Proposal Submission: All persons interested in submitting a proposal for A/E services should submit a proposal based
5 upon a lump-sum fee (Payment schedule to be established by the Authority). Two (2) copies should be delivered to the office of the Housing Authority of the Town of Secaucus, 700 County Avenue, Secaucus, New Jersey on or before Tuesday, April 5, 2016 by 10:00 A.M. Proposals will be evaluated according to the Housing Authority's "Competitive Evaluation System." A copy of the evaluation system has been attached to the RFP for review by those persons interested in submitting a proposal. All persons submitting a proposal are encouraged to attend a pre-proposal meeting scheduled for Wednesday, March 23, 2016 at 10:00 a.m. at 700 County Avenue, Secaucus, NJ. The following items must be submitted with the proposal: This envelope shall include the following: 1. Evidence of experience with the administration of construction projects involving HUD public housing authorities, CFP programs, and the public bidding process. 2. Evidence of experience and resources to deal with administration and inspection. 3. Listing of similar projects that the firm has previously completed; 4. Proof of knowledge of personnel who shall be actively involved with the projects. 5. Name and title of personnel who shall be actively involved with the projects. 6. List of outside consultants to be used for this work, if any. 7. Proof of professional licenses from the State of New Jersey. 8. Proof of Professional Liability Insurance. 9. Proof that the firm has Worker s Compensation and Employer s Liability insurance in accordance with New Jersey law. 10. Valid New Jersey Business Registration Form 11. Statement that the firm is not disbarred, suspended, or otherwise prohibited from professional practice by any Federal, State, or Local government agency. 12. Non-Collusion Affidavit (enclosed). 13. Statement of Corporate Ownership (enclosed). 14. Affirmative Action Affidavit (enclosed), 15. Description of the firm s affirmative action plan and/or minority hiring practices. 16. Completed forms SF-330 (updated within the last six (6) months (enclosed). 17. Completed form HUD-253O/USDA FmHA (9-81) HUD Previous Participation Certificate (enclosed). 16. The firm s breakdown of both direct and indirect costs. 18. Hourly rates for each job title involved in the project(s) and estimated hours each discipline will work on project. 19. The firm s fee proposal in the form of a guaranteed lump sum to complete the work. The fee shall be broken down into field investigation and research, contract document preparation, contract award supervision, contract administration, and miscellaneous reimbursable expenses. The fee shall be all-inclusive and give
6 estimates of the number of person-hours to be spent on each phase. CHRISTOPHER MARRA Executive Director
7 EVALUATION AND SELECTION PROCESS: Upon receipt of the above information, the Authority will evaluate all responses to the invitation. The following criteria and rating table will be used in the selection process. 1. The firm s past experience in work with HUD, PHA s, CFP programs and their execution. (Max/Mm Points =20) 2. Professional and Technical competence of the firm and its personnel in work of the same or similar nature. This includes the firm s qualifications, experience and abilities and that of its principal staff and facilities. (Max/Mm Points = 20) 3. Past performance in terms of cost control, quality and thoroughness of work, performance, schedules, and timely response. (Max/Mm Points = 20) 4. Capability to provide professional services within the time limits, taking into consideration the firm s current and planned work. (Max/Mm Points = 10) 5. Familiarity of the firm with Federal, State, Local and HUD regulations and codes, especially as they relate to this project and CFP programs. (Max/Mm Points = 10) 6. Reasonableness of fee proposal. (Max/Mm Points = 20) Total Points 100
8 Secaucus Housing Authority 700 County Avenue Secaucus, New Jersey Architectural/Engineering Services Kroll Heights Heating Management System PROPOSAL SUBMISSION SHEET 1) Name/Address of Firm: 2) Telephone Number: 3) Contact Person: 4) Amount of Fee: 5) Amount of any expected reimbursables: 6) Other:
9 Legal Advertisement REQUEST FOR PROPOSALS The Housing Authority of the Town of Secaucus, New Jersey will accept proposals for architectural/engineering Services to Evaluate the replacement of Kroll Height s boiler control system. Evaluate the current boiler conditions and recommend options for extending life and use of your boiler assets. Prepare cost estimates for replacing the control system & boilers. The Request for Proposals (RFP) may be obtained at the Housing Authority office 700 County Avenue, Secaucus, New Jersey or downloaded from the Authority s website at All proposals are due by Tuesday, April 5, 2016 by 10:00 AM. This solicitation is being undertaken in accordance with NJSA 19:44.4 et seq. as a Fair and Open competitive process and in accordance with the rules and restrictions set forth by the State s Local Unit Pay-to-Play law. CHRISTOPHER MARRA Executive Director
Legal Advertisement REQUEST FOR PROPOSALS. to retain and employ a duly qualified, licensed electrician. All services must be in accordance with
Legal Advertisement REQUEST FOR PROPOSALS The Housing Authority of the Town of Secaucus, New Jersey will accept proposals for electrician services. The services will be for a two year period. It is the
More informationTRAVERSE CITY HOUSING COMMISSION REQUEST FOR PROPOSALS FOR ARCHITECTURAL/ENGINEERING SERVICES
TRAVERSE CITY HOUSING COMMISSION REQUEST FOR PROPOSALS FOR ARCHITECTURAL/ENGINEERING SERVICES PROPOSALS MUST BE SUBMITTED BY 4:00 PM DECEMBER 29, 2016 TO: MR. TONY LENTYCH EXECUTIVE DIRECTOR TRAVERSE CITY
More informationRequest For Proposal. For Construction Management Services. For The. Benton County Jail and Sheriff s Office
For For The Issue Date: June 1, 2018 Due Date: June 25, 2018 by 10:00 a.m. Central Time Submit RFP to: Benton County Commission c/o Michelle McLerran Kreisler P.O. Box 1238 316 Van Buren Warsaw, Missouri
More informationThe Housing Authority of the Township of Middletown
The Housing Authority of the Township of Middletown 2 Oakdale Drive, Middletown, NJ 07748 Telephone: (732) 671-2990 Fax: (732) 671-4828 Susan Thomas, Executive Director Request for Proposals Special RAD
More informationHOUSING AUTHORITY OF THE TOWN OF MORRISTOWN REQUEST FOR PROPOSALS FEE ACCOUNTING SERVICES
HOUSING AUTHORITY OF THE TOWN OF MORRISTOWN REQUEST FOR PROPOSALS FEE ACCOUNTING SERVICES Under a Fair and Open Process in Accordance with N.J.S.A. 19:44A-20.4 et seq. PROPOSALS MUST BE SUBMITTED BY 11:00
More informationCHARLOTTE PUBLIC SCHOOLS CONSTRUCTION MANAGEMENT SERVICES REQUEST FOR PROPOSALS ("RFP")
CHARLOTTE PUBLIC SCHOOLS CONSTRUCTION MANAGEMENT SERVICES REQUEST FOR PROPOSALS ("RFP") May 12, 2017 CHARLOTTE PUBLIC SCHOOLS A. Instructions REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES PART
More informationREQUEST FOR PROPOSALS
702 KAR 4:160 KENTUCKY DEPARTMENT OF EDUCATION REQUEST FOR PROPOSALS for CONSTRUCTION MANAGEMENT SERVICES School District: Project: Boyle County Boyle County Middle School RFP Date: June 20 30, 2016 CONTENTS
More informationEnergy Resilience Bank Program (ERB) Procurement, Contract, and Construction Standards
Subrecipient Administrative Training Meeting NJEDA Office, Trenton, NJ March 3, 2016 Energy Resilience Bank Program (ERB) Procurement, Contract, and Construction Standards NJEDA ERB Program Contacts Liza
More informationGUTTENBERG HOUSING AUTHORITY
GUTTENBERG HOUSING AUTHORITY REQUEST FOR PROPOSALS FOR FEE ACCOUNTING SERVICES Under a Fair and Open Process in Accordance with N.J.S.A. 19:44A-20.4 et. seq. PROPOSALS MUST BE SUBMITTED BY Wednesday March
More informationHOUSING AUTHORITY OF THE TOWN OF MORRISTOWN REQUEST FOR PROPOSALS ORDINARY LEGAL SERVICES
HOUSING AUTHORITY OF THE TOWN OF MORRISTOWN REQUEST FOR PROPOSALS ORDINARY LEGAL SERVICES Under a Fair and Open Process in Accordance with N.J.S.A. 19:44A-20.4 et seq. PROPOSALS MUST BE SUBMITTED BY 11:00
More informationMIDDLESEX COUNTY UTILITIES AUTHORITY
MIDDLESEX COUNTY UTILITIES AUTHORITY REQUEST FOR QUALIFICATIONS FOR FINANCIAL INVESTMENT AND ADVISORY SERVICES FOR THE AUTHORITY S SOLID WASTE AND WASTEWATER DIVISIONS DEADLINE: 12:00 NOON ON FRIDAY, FEBRUARY
More informationREQUEST FOR QUALIFICATIONS FOR GENERAL CONTRACTOR/CONSTRUCTION MANAGER SERVICES FOR ALTERNATIVE PROJECT DELIVERY FOR THE CONSTRUCTION OF A NEW LIBRARY
Missoula Public Library P a g e 1 REQUEST FOR QUALIFICATIONS FOR GENERAL CONTRACTOR/CONSTRUCTION MANAGER SERVICES FOR ALTERNATIVE PROJECT DELIVERY FOR THE CONSTRUCTION OF A NEW LIBRARY September 2015 Missoula
More informationWILLIAMS COUNTY HIGHWAY COMPLEX REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER AT-RISK. January 2nd, PO Box E.
WILLIAMS COUNTY HIGHWAY COMPLEX REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER AT-RISK January 2nd, 2014 PO Box 2047 205 E. Broadway Williston, ND 58802 1 TABLE OF CONTENTS INSTRUCTIONS TO RESPONDENTS
More informationLINCOLN PARK BOARD OF EDUCATION REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES
LINCOLN PARK BOARD OF EDUCATION REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES Submission Date: June 9, 2015 By: Adrian Pollio School Business Administrator/ Board Secretary Page 1 of 19 Lincoln Park
More informationTax Credit Consultant
Housing Authority of the Borough of Keansburg 1 Church Street, Keansburg, NJ 07734 Telephone: # 732-787-6151 / Fax: # 732-787-5204 JUDY FERRARO Chairperson MARY FOLEY Vice-Chairperson YOLANDA ANN COMMARATO
More informationRequest for Qualifications for Owner s Program Management Services For Wilton Police Headquarters Renovation and Expansion
Page 1 of 11 Request for Qualifications for Owner s Program Management Services For Wilton Police Headquarters Renovation and Expansion The Town of Wilton (the Town) will receive sealed qualifications
More informationChapter 3.24 PURCHASING PROCEDURES
Page 1/8 Chapter 3.24 PURCHASING PROCEDURES Sections: 3.24.003 Definitions. 3.24.005 Types of contracts. 3.24.010 Service contracts. 3.24.020 Guidelines for service contracts. 3.24.030 Repealed. 3.24.040
More informationOWNER/PROFESSIONAL SERVICES CONSULTANT AGREEMENT PROJECT TITLE UNIVERSITY OF ILLINOIS
PROJECT TITLE UNIVERSITY OF ILLINOIS THIS AGREEMENT, made and entered into in the City of, State of Illinois, as of the date of the last signature of the parties hereto by and between THE BOARD OF TRUSTEES
More informationMONROE TOWNSHIP SCHOOL DISTRICT REQUEST FOR PROPOSAL FOR: Insurance Brokerage Services Property & Casualty and Workers Compensation
MONROE TOWNSHIP SCHOOL DISTRICT REQUEST FOR PROPOSAL FOR: Insurance Brokerage Services Property & Casualty and Workers Compensation Lisa Schulz School Business Administrator/ Board Secretary 1 MONROE TOWNSHIP
More informationRequest for Proposals
Request for Proposals Notice is given that the Borough of Hightstown is soliciting a Request for Proposals (RFP) utilizing the "Fair and Open" Process pursuant to N.J.S.A. 19:44-20.4 et seq. in consideration
More informationREQUEST FOR QUALIFICATIONS
REQUEST FOR QUALIFICATIONS Neighborhood Housing & Public Facilities Improvements Programs Community Development Block Grant (CDBG) Program May 6, 2016 Page 1 of 12 REQUEST FOR QUALIFICATIONS (RFQ) GENERAL,
More informationOCEANPORT BOARD OF EDUCATION REQUEST FOR PROPOSALS FOR ARCHITECTURAL AND ENGINEERING SERVICES SCHOOL REFERENDUM
OCEANPORT BOARD OF EDUCATION REQUEST FOR PROPOSALS FOR ARCHITECTURAL AND ENGINEERING SERVICES SCHOOL REFERENDUM Dated: February 28, 2018 By: Denise Friedmann Interim School Business Administrator NOTICE
More informationREQUEST FOR QUALIFICATIONS: RFQ # Professional Consultant for Animal Shelter Architectural Services
REQUEST FOR QUALIFICATIONS: RFQ # 2018-020 Professional Consultant for Animal Shelter Architectural Services DEADLINE: Thursday, June 21, 2018 at 2:00 pm City of Weatherford Municipal and Community Services
More informationNew Jersey LFN Packet Check List
New Jersey LFN 2012-10 Packet Check List Contract Documents Screenshot Page from solicitation that indicates Lead Agency and issuance of solicitation on behalf of themselves, U.S. Communities and agencies
More informationRequest for Proposals For: Legal Services. From April 1, March 31, 2021 for the HIGHLAND PARK HOUSING AUTHORITY.
Borough of Highland Park Housing Authority 242 South 6 th Avenue Highland Park, NJ 08904 Phone: (732) 572-4420 Fax: (732) 985-6485 Donna Brightman, Executive Director Request for Proposals For: Legal Services
More informationconstruction plans must be approved for construction by the City PBZ department.
City of Forest Park Request for Proposals Architectural Services for the Forest Park Public Works Department Mandatory Pre-Proposal Conference April 13, 2016 at 10:00 am Bid Deadline May 20, 2016 at 2:00
More informationCAMDEN COUNTY EDUCATIONAL SERVICES COMMISSION 225 White Horse Avenue Clementon, New Jersey 08021
CAMDEN COUNTY EDUCATIONAL SERVICES COMMISSION 225 White Horse Avenue Clementon, New Jersey 08021 REQUESTS FOR PROPOSALS NOTICE OF SOLICITATION FOR PROFESSIONAL SERVICES FOR THE 2018-2019 SCHOOL YEAR Notice
More informationARTICLE 8: BASIC SERVICES
THE SCOPE OF SERVICES ADDED BY THIS AMENDMENT IS FOR A CM AT RISK PROJECT ONLY. THE SCOPE OF SERVICES SPECIFIED BELOW INCLUDES ARTICLES 8.1, 8.3, 8.4, 8.5, 8.6, 8.7 AND 8.8. THE SERVICES SPECIFIED IN ARTICLE
More informationRenville County Purchasing Procedures (Procurement Policy)
Renville County Purchasing Procedures (Procurement Policy) Board approved 11-15-2016 1 RENVILLE COUNTY PURCHASING PROCEDURES I. Purchasing/Procurement Approval Requirements All employees authorized to
More informationCHEROKEE NATION BUSINESSES, L.L.C. REQUEST FOR PROPOSAL ( RFP ) PROJECT NAME: CNE Ad Agency RFP NUMBER: DATED: TABLE OF CONTENTS
CHEROKEE NATION BUSINESSES, L.L.C. REQUEST FOR PROPOSAL ( RFP ) PROJECT NAME: CNE Ad Agency RFP NUMBER: 16619 DATED: 11.15.17 TABLE OF CONTENTS I. SOLICITATION TO BID II. III. IV. INSTRUCTIONS TO BIDDER
More informationREQUEST FOR PROPOSAL: 8/25/2012 NUMBER OF COPIES TO SUBMIT: TWO (2) Page 1
A REQUEST TO SUBMIT PROPOSALS FOR DEMOLITION CONTRACTORS FOR DEMOLITION OF PROPERTIES WITH COMMUNITY DEVELOPMENT BLOCK GRANT ( CDBG ) FUNDS FOR THE CITY OF PONTIAC This is a Federally Funded project. The
More informationProposal Response Date: March 18, 2019, at 1:00p.m.
CONSULTANT SERVICES Architectural & Engineering Design Services Tracey Elementary & West Rocks Middle School Cafeteria and Kitchen Improvements Norwalk Public Schools REQUEST FOR PROPOSAL Proposal Response
More informationRequest for Qualifications for General Contractors. 8th & Cooper Multi-use Project
Request for Qualifications for General Contractors The 8 th & Cooper Ownership Group is seeking qualifications from General Contractors to provide both preconstruction and construction services for the
More informationThis Webcast Will Begin Shortly
This Webcast Will Begin Shortly If you have any technical problems with the Webcast or the streaming audio, please contact us via email at: splemoderator@smartpros.com Thank You! 1 KEY ISSUES IN NEGOTIATING
More informationRandolph County Schools. Renovations to Third Ward Elementary School
Randolph County Schools Pre-Bid Meeting Notes August 8, 2011; 11:00 a.m. Third Ward Elementary School, 111 Nathan St., Elkins, WV, 26241 This meeting was mandatory for General Contractors, optional for
More informationMT. EPHRAIM BOARD OF EDUCATION Mt. Ephraim, New Jersey REQUESTS FOR PROPOSALS NOTICE OF SOLICITATION
MT. EPHRAIM BOARD OF EDUCATION Mt. Ephraim, New Jersey 08069 REQUESTS FOR PROPOSALS NOTICE OF SOLICITATION PHYSICAL THERAPY SERVICES OCCUPATIONAL THERAPY SERVICES SPEECH THERAPY SERVICES Notice is hereby
More informationRequest for Proposals For: HQS Inspection Services From June 1, 2017 May 31, April 2017
Borough of Highland Park Housing Authority 242 South 6 th Avenue Highland Park, NJ 08904 Phone: (732) 572-4420 Fax: (732) 985-6485 Donna Brightman, Executive Director Request for Proposals For: HQS Inspection
More informationREQUEST FOR PROPOSAL (RFP) OWNER S REPRESENTATION/PROJECT MANAGER. New Combined Court Facility In Montezuma County
REQUEST FOR PROPOSAL (RFP) OWNER S REPRESENTATION/PROJECT MANAGER New Combined Court Facility In Montezuma County 12/11/2015 Prepared by: Montezuma County 109 W. Main, Room 302 Cortez, CO 81321 Melissa
More informationFAYETTE COUNTY SCHOOL DISTRICT REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT AT RISK SERVICES
FAYETTE COUNTY SCHOOL DISTRICT REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT AT RISK SERVICES The Fayette County School District (FCSD) desires to retain the services of a professional Construction
More informationMIDDLETOWN TOWNSHIP PUBLIC SCHOOLS REQUEST FOR QUALIFICATIONS. School District Board, Labor and Negotiations Legal Services SPECIFICATIONS
MIDDLETOWN TOWNSHIP PUBLIC SCHOOLS REQUEST FOR QUALIFICATIONS School District Board, Labor and Negotiations Legal Services SPECIFICATIONS PROPOSALS DUE: June 10, 2016 3:00 p.m.. MIDDLETOWN TOWNSHIP PUBLIC
More informationGregory J. Somjen, AIA Parette Somjen Architects LLC 439 Route 46 East Rockaway, New Jersey Phone: x201
ADVERTISEMENT OF PUBLIC NOTICE August 16, 2013 Request for Proposals Notice is hereby given that the Board of Education of the Township of Parsippany-Troy Hills in the County of Morris, New Jersey ( the
More informationMANTUA TOWNSHIP MUA FEE ACCOUNTING SERVICES
REQUEST FOR SEALED QUALIFICATIONS FOR PROFESSIONAL SERVICES UNDER A FAIR AND OPEN PROCESS MANTUA TOWNSHIP MUA FEE ACCOUNTING SERVICES Contract Term February 1, 2017 through January 31, 2018 SUBMISSION
More informationREQUEST FOR PROPOSAL (RFP) FOR CONSTRUCTION MANAGEMENT SERVICES FOR SIGNAL HILL LIBRARY CONSTRUCTION, 1770 E. HILL STREET, SIGNAL HILL, CA 90755
Attachment A REQUEST FOR PROPOSAL (RFP) FOR CONSTRUCTION MANAGEMENT SERVICES FOR SIGNAL HILL LIBRARY CONSTRUCTION, 1770 E. HILL STREET, SIGNAL HILL, CA 90755 Proposals Due: September 19, 2016, 4:00 PM
More informationRequest for Bid/Proposal
Request for Bid/Proposal Hall of Science Lab Renovations Bids/Proposals Due: April 24, 2018 Mark Mehler Director of Procurement Services Drew University 36 Madison Ave, Madison, NJ 07940 973-408-3309 mmehler@drew.edu
More informationPRICE PROPOSAL. DESIGN-BUILD PRICE PROPOSAL SUBMISSION to NEW JERSEY SCHOOLS DEVELOPMENT AUTHORITY
PRICE PROPOSAL DESIGN-BUILD PRICE PROPOSAL SUBMISSION to NEW JERSEY SCHOOLS DEVELOPMENT AUTHORITY For the following Package: Contract Number: ET-0056-B01 Contract Name/Description: A. Chester Redshaw Elementary
More informationAPPLICATION FOR PAYMENT PROCEDURE SUBCONTRACT EXHIBIT F
Subcontract No.: Enter Number Cost Code: Enter Code TOCCI BUILDING CORPORATION Vendor No.: Enter Number APPLICATION FOR PAYMENT PROCEDURE SUBCONTRACT EXHIBIT F To standardize the Application for Payment
More informationPLEASANTVILLE HOUSING AUTHORITY
PLEASANTVILLE HOUSING AUTHORITY REQUEST FOR PROPOSALS/QUOTES - PROFESSIONAL SERVICES FEE ACCOUNTANT SUBMISSION DATE: Insert Date PUBLIC NOTICE FOR REQUEST FOR PROPOSALS/QOUTE - PROFESSIONAL SERVICE CONTRACT
More informationTOWNSHIP OF WOOLWICH 120 VILLAGE GREEN DRIVE WOOLWICH TOWNSHIP, NJ SPECIFICATIONS AND RFP FORMS FOR PROFESSIONAL SERVICES CONTRACTS YEAR 2019
Bidders Name: Address: City and State: Phone: Fax: E-Mail: TOWNSHIP OF WOOLWICH 120 VILLAGE GREEN DRIVE WOOLWICH TOWNSHIP, NJ 08085 SPECIFICATIONS AND RFP FORMS FOR PROFESSIONAL SERVICES CONTRACTS YEAR
More informationREQUEST FOR PROPOSALS:
NOTICE TO BIDDERS Request for Proposals for Electric Generation Service and Government Energy Aggregation Services for the Plumsted Community Energy Aggregation Program PLEASE TAKE NOTICE that the Plumsted
More informationREQUEST TO SUBMIT PROPOSALS FOR ASBESTOS SURVEYOR FOR THE CITY OF PONTIAC
REQUEST TO SUBMIT PROPOSALS FOR ASBESTOS SURVEYOR FOR THE CITY OF PONTIAC This is a Federally Funded project. The Surveyor and Subcontractors on this project must comply with HUD contract provisions 24CFR
More informationTown of Manchester, Connecticut General Services Department
Town of Manchester, Connecticut General Services Department Request for Qualifications/Proposal Architectural and Related Consultant Services For Elementary Schools Facilities Study RFP 17/18-67 Proposals
More informationPROFESSIONAL SERVICES CONSULTANT TYPE OF RETAINER AGREEMENT UNIVERSITY OF ILLINOIS
PROFESSIONAL SERVICES CONSULTANT TYPE OF RETAINER AGREEMENT UNIVERSITY OF ILLINOIS THIS AGREEMENT, made and entered into in the City of, State of Illinois, as of the date of the last signature of the parties
More informationEnglewood Housing Authority REQUEST FOR PROPOSALS RFP AE ARCHITECTURAL/ENGINEERING SERVICES INDEFINITE DELIVERY-INDEFINITE QUANTITY
Englewood Housing Authority REQUEST FOR PROPOSALS RFP 6-2016-AE ARCHITECTURAL/ENGINEERING SERVICES INDEFINITE DELIVERY-INDEFINITE QUANTITY SUBMISSION DATE Tuesday, July 12, 2016 By 3:00PM Domingo Senande
More informationManalapan Township. Request for Proposals for Renewable Energy Power Purchase Agreement (PPA)
Manalapan Township Request for Proposals for Renewable Energy Power Purchase Agreement (PPA) Section 1: General Terms 1.1 Purpose and Response Date Manalapan Township hereby issues this Request for Proposals
More informationPRICE PROPOSAL. DESIGN-BUILD PRICE PROPOSAL SUBMISSION to NEW JERSEY SCHOOLS DEVELOPMENT AUTHORITY
PRICE PROPOSAL DESIGN-BUILD PRICE PROPOSAL SUBMISSION to NEW JERSEY SCHOOLS DEVELOPMENT AUTHORITY For the following Package: Contract Number: ET-0061-B01 Contract Name/Description: New Joseph C. Caruso
More informationMIDDLETOWN TOWNSHIP PUBLIC SCHOOLS REQUEST FOR PROPOSALS. School District Labor Negotiations Legal Services SPECIFICATIONS
MIDDLETOWN TOWNSHIP PUBLIC SCHOOLS REQUEST FOR PROPOSALS School District Labor Negotiations Legal Services SPECIFICATIONS PROPOSALS DUE: June 16, 2014 3:00 p.m.. MIDDLETOWN TOWNSHIP PUBLIC SCHOOLS OFFICE
More informationDocument A101 TM. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum
Document A101 TM 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the day of in the year (In words, indicate day, month and
More informationFinance & Technology Administrator (815) ext 223
2017 Boiler Replacement BID PACKET Due: Location: October 2, 2017 by 10:00 am Blackhawk Center 1101 Jefferson Drive Oregon, IL 61061 Bid Proposal: 2017 Boiler Replacement Administrative Contact: Dan Griffin,
More informationGUTTENBERG HOUSING AUTHORITY
GUTTENBERG HOUSING AUTHORITY REQUEST FOR PROPOSALS FOR GENERAL LEGAL SERVICES Under a Fair and Open Process in Accordance with N.J.S.A. 19:44A-20.4 et. seq. PROPOSALS MUST BE SUBMITTED BY Wednesday March
More informationStandard Form of Agreement Between Owner and Architect for a Federally Funded or Federally Insured Project
Document B108 2009 Standard Form of Agreement Between Owner and Architect for a Federally Funded or Federally Insured Project AGREEMENT made as of the in the year (In words, indicate day, month and year.)
More informationHousing Authority of the Borough of Keansburg
Housing Authority of the Borough of Keansburg 1 Church Street, Keansburg, NJ 07734 Telephone: # 732-787-6151 / Fax: # 732-787-5204 JUDY FERRARO Chairperson MARY FOLEY Vice-Chairperson YOLANDA ANN COMMARATO
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS FOR LEGAL SERVICES 750 Commerce Drive, Suite 110 Decatur, Georgia 30030 TABLE OF CONTENTS PART I INTRODUCTION... PAGE 1.1 Definitions...3 1.2 Profile of the...3 PART II STATEMENT
More informationTHE TOWNSHIP OF LYNDHURST REQUEST FOR QUALIFICATIONS
THE TOWNSHIP OF LYNDHURST REQUEST FOR QUALIFICATIONS The Township of Lyndhurst is soliciting Qualification Statements from interested persons and/or firms for the provision of the professional services
More informationHelena Public Schools. Helena, MONTANA REQUEST FOR QUALIFICATIONS FOR GENERAL CONTRACTOR/CONSTRUCTION MANAGER SERVICES FOR
Helena Public Schools P a g e 1 Helena Public Schools Helena, MONTANA REQUEST FOR QUALIFICATIONS FOR GENERAL CONTRACTOR/CONSTRUCTION MANAGER SERVICES FOR ALTERNATIVE PROJECT DELIVERY FOR NEW CENTRAL ELEMENTARY
More informationMontgomery Housing Authority 525 South Lawrence Street Montgomery, Alabama 36104
Montgomery Housing Authority 525 South Lawrence Street Montgomery, Alabama 36104 REQUEST FOR PROPOSAL (RFP) 2018-02 LEGAL REPRESENTATION IN ACTIONS FOR UNLAWFUL DETAINER DATE ISSUED: Thursday, January
More informationREQUEST FOR QUALIFICATIONS
REQUEST FOR QUALIFICATIONS The Lorain County Board of Commissioners is seeking proposals from qualified interested parties to serve as CONSTRUCTION MANAGER for the review of bidding documents, contract
More informationLEAF VACUUM CURBSIDE COLLECTION INCLUDING EQUIPMENT AND OPERATOR
MANALAPAN TOWNSHIP MONMOUTH COUNTY, NEW JERSEY Notice is hereby given that sealed proposals addressed to Rose LaFergola, RPPO/QPA, will be received on or before Friday, August 3, 2012 at 11:00 am at which
More informationBHP Project IFB #
BOULDER HOUSING PARTNERS INVITATION FOR BIDS Capital Improvement Program BHP Arapahoe East Apartments Exterior Envelope Renovation including Siding Replacement, Window and Trim Replacement, Stair Tower
More informationCONSTRUCTION MANAGER AGREEMENT BETWEEN THE UNIVERSITY OF ROCHESTER AND. Insert CM Firm. Insert Name of Project. Insert Project Number
CONSTRUCTION MANAGER AGREEMENT BETWEEN THE UNIVERSITY OF ROCHESTER AND Insert CM Firm Insert Name of Project Insert Project Number University of Rochester Planning and Project Management 271 East River
More information2017 HUD Sidewalk and ADA Ramp Project, Phase II start construction 09/2017 and be completed by 12/2017.
Request for Proposals RFP2M17-9 Labor Compliance Services for the 2017 HUD Sidewalk and ADA Ramp Project, Phase II and 2017 HUD Street Improvement Project GENERAL INFORMATION Award of contract by the City
More informationSAN DIEGO CONVENTION CENTER CORPORATION
SAN DIEGO CONVENTION CENTER CORPORATION REQUEST FOR PROPOSALS FOR CONSTRUCTION PROJECT MANAGEMENT RFP # 19-1159 Issue Date: Friday, October 5, 2018 Pre-Bid Conference: Pre-Bid Question Deadline: Bid Deadline:
More informationTOWN OF GUTTENBERG COUNTY OF HUDSON, STATE OF NEW JERSEY
TOWN OF GUTTENBERG COUNTY OF HUDSON, STATE OF NEW JERSEY SEEKS PROPOSALS FOR FINANCIAL ADVISORY CONSULTANT SERVICES FOR THE PERIOD JANUARY 1, 2018 TO DECEMBER 31, 2018 Introduction Pursuant to the Fair
More informationHADDON TOWNSHIP BOARD OF EDUCATION 500 RHOADS AVENUE WESTMONT, NJ REQUEST FOR PROPOSAL
A. PURPOSE: HADDON TOWNSHIP BOARD OF EDUCATION 500 RHOADS AVENUE WESTMONT, NJ 08108 REQUEST FOR PROPOSAL The Haddon Township Board of Education is seeking proposals from qualified respondents as follows:
More informationNATOMAS UNIFIED SCHOOL DISTRICT CONTRACT FOR ARCHITECTURAL SERVICES FOR ( )
NATOMAS UNIFIED SCHOOL DISTRICT CONTRACT FOR ARCHITECTURAL SERVICES FOR ( ) THIS AGREEMENT is entered into this day of, 2014, between the, NATOMAS UNIFIED SCHOOL DISTRICT of the County of Sacramento, California,
More informationPaul McDevitt Verona School District 121 Fairview Avenue Verona, NJ (973)
ADVERTISEMENT OF PUBLIC NOTICE Request for Proposals Notice is hereby given that Verona School District( School ) is seeking Proposals from qualified Energy Service Companies for the planning, development
More informationX General Construction Structural Steel X HVAC
BID PROPOSAL FORM STOCKTON UNIVERSITY 101 Vera King Farris Drive Purchasing Department Upper N Wing GALLOWAY, NEW JERSEY 08205 This bid proposal shall be returned in a sealed envelope and will be accepted
More informationRequest for Qualifications #9709RFQ. Architectural Services for Dawson County Fire Station #9
Dawson County Board of Commissioners Dawson County, GA Request for Qualifications #9709RFQ Architectural Services for Dawson County Fire Station #9 Schedule of Events This Request for Qualifications will
More informationALPINE SCHOOL DISTRICT 490 North State Street, Lindon, Utah Office (801) Fax Number (801)
ALPINE SCHOOL DISTRICT 490 North State Street, Lindon, Utah 84042 Office (801) 717-4760 Fax Number (801) 785-8782 July 12, 2011 Notice to Contractors: Alpine School District is requesting Bids for Construction
More informationCITY OF BARTLESVILLE. Notice to Bidders. AUDIT SERVICE CONTRACT Request for Proposal (RFP)
CITY OF BARTLESVILLE Notice to Bidders AUDIT SERVICE CONTRACT Request for Proposal (RFP) The City of Bartlesville will be accepting sealed Proposals for the purpose of obtaining a qualified Certified Public
More informationThe Liberia Annual Conference Monrovia, Liberia. REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT and GENERAL CONTRACTOR SERVICES FOR
The Liberia Annual Conference Monrovia, Liberia REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT and GENERAL CONTRACTOR SERVICES FOR NEW RESIDENTIAL TWO-STORY CLASSROOM BUILDING AND VOCATIONAL SCHOOL
More informationREQUEST FOR PROPOSALS SELECT AN ENERGY SERVICES COMPANY TO DEVELOP AND IMPLEMENT AN ENERGY SAVINGS PLAN THROUGH AN ENERGY SAVINGS IMPROVEMENT PROGRAM
REQUEST FOR PROPOSALS TO SELECT AN ENERGY SERVICES COMPANY TO DEVELOP AND IMPLEMENT AN ENERGY SAVINGS PLAN THROUGH AN ENERGY SAVINGS IMPROVEMENT PROGRAM FOR THE STATE OF NEW JERSEY DPMC PROJECT # A1232-00
More informationPUBLIC NOTICE BRICK TOWNSHIP MUNICIPAL UTILITIES AUTHORITY 1551 HIGHWAY 88 WEST, BRICK, NJ NOTICE OF SOLICITATION FOR RFQs
PUBLIC NOTICE BRICK TOWNSHIP MUNICIPAL UTILITIES AUTHORITY 1551 HIGHWAY 88 WEST, BRICK, NJ 08724 NOTICE OF SOLICITATION FOR RFQs Notice is hereby given that pursuant to the provisions of N.J.S.A. 19:44A-20.5
More informationBergen County Board of Social Service
Bergen County Board of Social Service REQUEST FOR QUALIFICATIONS The Bergen County Board of Social Services (the Board ) is soliciting Qualification Statements from interested persons and/or firms for
More informationPLAINFIELD BOARD OF EDUCATION 1200 Myrtle Avenue Plainfield, New Jersey 07063
PLAINFIELD BOARD OF EDUCATION 1200 Myrtle Avenue Plainfield, New Jersey 07063 REQUEST FOR PROPOSAL (RFP) LEGAL SERVICES WORKER COMPENSATION Submission Date: Tuesday, December 9, 2014 9:00 a.m. PLAINFIELD
More informationCity of Forest Park Request for Proposals. Landscape Installation, 803 & 785 Forest Parkway, Forest Park Ga
City of Forest Park Request for Proposals Landscape Installation, 803 & 785 Forest Parkway, Forest Park Ga. 30297 Mandatory Pre-Proposal Conference at August 19, 2014 at 10:00 am Proposal Deadline September
More informationMCR Health Services Inc. Request for Qualifications For Construction Manager/General Contractor Services RFQ GC 2015
MCR Health Services Inc. Request for Qualifications For Construction Manager/General Contractor Services RFP GC 2015 Instruction to Proposers Invitation to Propose: MCR Health Services invites your firm
More informationARCHITECTURAL/DESIGN SERVICES LAKEVILLE POLICE STATION BUILDING PROJECT LAKEVILLE, MASSACHUSETTS
TOWN OF LAKEVILLE REQUEST FOR QUALIFICATIONS (RFQ) FOR ARCHITECTURAL/DESIGN SERVICES FOR THE LAKEVILLE POLICE STATION BUILDING PROJECT LAKEVILLE, MASSACHUSETTS Proposals Due: 11/30/16 @ 2:00 PM Late Proposals
More informationREQUEST FOR QUALIFICATIONS (RFQ) Central Valley Opportunity Center Winton Vocational Training Center Project Proposals Due: February 21, 2014
REQUEST FOR QUALIFICATIONS (RFQ) Central Valley Opportunity Center Winton Vocational Training Center Project Proposals Due: February 21, 2014 The Central Valley Opportunity Center ( CVOC ) is soliciting
More informationREQUEST FOR PROPOSALS FOR VALUATION SERVICE PROVIDER
REQUEST FOR PROPOSALS FOR VALUATION SERVICE PROVIDER Appointment to the Office of Public Finance Valuation Service Provider April 2017 Delegated Purchase Authority by the State of New Jersey, Department
More informationCITY OF DUBLIN PURCHASING DEPARTMENT REQUEST FOR PROPOSAL LARGE FORMAT ALL-IN-ONE MULTIFUNCTION SYSTEM ENGINEERING COPIER RFP #
CITY OF DUBLIN PURCHASING DEPARTMENT REQUEST FOR PROPOSAL LARGE FORMAT ALL-IN-ONE MULTIFUNCTION SYSTEM ENGINEERING COPIER RFP #13-09-001 The City of Dublin is accepting proposals for the purchase of a
More informationBOROUGH OF TOTOWA NOTICE AND SOLICITATION OF PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES FOR THE BOROUGH OF TOTOWA
BOROUGH OF TOTOWA NOTICE AND SOLICITATION OF PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES FOR THE BOROUGH OF TOTOWA The Borough of Totowa is soliciting proposals from professional engineering firms
More informationSTANDARD FORM OF CONTRACT FOR CONSTRUCTION MANAGEMENT SERVICES INCLUDING CONSTRUCTION FOR A GUARANTEED MAXIMUM PRICE BETWEEN
STANDARD FORM OF CONTRACT FOR CONSTRUCTION MANAGEMENT SERVICES INCLUDING CONSTRUCTION FOR A GUARANTEED MAXIMUM PRICE BETWEEN THE DEKALB COUNTY BOARD OF EDUCATION AND THE CONSTRUCTION MANAGER Construction
More informationADVERTISEMENT: REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES FOR THE HOUSING AUTHORITY OF THE CITY OF MCKINNEY, TEXAS
ADVERTISEMENT: REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES FOR THE HOUSING AUTHORITY OF THE CITY OF MCKINNEY, TEXAS The Housing Authority of the City of McKinney, Texas ("MHA") is soliciting
More information5/16/2016. Procurement 101 OIG Findings TDEM Conference Texas Department of Public Safety. Procurement 101
Procurement 101 OIG Findings TDEM Conference - 2016 Procurement 101 Topics for Discussion Governing Regulations Methods of Procurement Procurement Requirements Contracts (Types) Required Written Procedures
More informationOXNARD UNION HIGH SCHOOL DISTRICT. Request for Qualifications and Proposals (RFQ/P) #559 for Architectural Services
OXNARD UNION HIGH SCHOOL DISTRICT Request for Qualifications and Proposals (RFQ/P) #559 for Architectural Services The Oxnard Union High School District ( District ) is seeking Statements of Qualifications
More informationSTATE OF COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAM
STATE OF COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAM ARCHITECT/ENGINEER AGREEMENT CONSTRUCTION MANAGER/GENERAL CONTRACTOR (STATE FORM ) DEPARTMENT ID: CONTRACT ID #: PROJECT #: PROJECT
More informationCITY OF DUNDAS, MINNESOTA CITY ENGINEER REQUEST FOR PROPOSALS (RFP)
CITY OF DUNDAS, MINNESOTA CITY ENGINEER REQUEST FOR PROPOSALS (RFP) The is requesting written proposals from professional engineering firms to provide consulting services as a City Engineer. The City expects
More informationWest Ridge Park Ballfield Light Pole Structural Assessment
Request for Proposal Professional Services October 3, 2017 West Ridge Park Ballfield Light Pole Structural Assessment West Ridge Park 636 Ridge Rd. Highland Park, IL 60035 Submission Deadline: Tuesday,
More informationCANOPY REPAIRS AT THE. C.B. LAMB ELEMENTARY SCHOOL 46 Schoolhouse Road Wrightstown, NJ 08562
CANOPY REPAIRS AT THE C.B. LAMB ELEMENTARY SCHOOL 46 Schoolhouse Road Wrightstown, NJ 08562 NORTH HANOVER TOWNSHIP BOARD OF EDUCATION 331 Monmouth Road Wrightstown, New Jersey 08562 CONSTRUCTION MANAGER:
More informationStandard Form of Agreement Between OWNER AND CONSTRUCTION MANAGER Construction Manager At-Risk
CMAA Document CMAR-1 Standard Form of Agreement Between OWNER AND CONSTRUCTION MANAGER Construction Manager At-Risk 2004 EDITION This document is to be used in connection with CMAA Standard Form of Contract
More information