1 Perth and Kinross Council Development Control Committee 28 May 2008 Recommendation by Development Quality Manager 4(4) 08/285 Alter the terms of Condition No 17 of planning consent 05/02389/REM to delete "Prior to the commencement of construction" and in addition to allow minor alterations to external elevations at Pitcairnie, Carnbo, Ref No: 08/00067/FUL Ward No: 8 Kinross-shire Summary This report recommends approval of this application for the amendment of this condition as the impact on visual and residential amenity is considered to be acceptable. Background and Description 1 The application relates to the small grouping of 4 dwellinghouses currently under construction on the site. Consent was granted in 2006 (ref:05/02389/rem) for the erection of the 4 houses with Condition 17 of this consent requiring details of the proposed re-engineering of the site/ floor levels to be submitted for prior approval of the Council before development commenced. Development subsequently commenced without submitting these details and the houses were built with finished floor levels higher than those in the approved drawings. 2 This application therefore seeks to alter the terms of condition 17 to remove the Prior to commencement of construction section and provides details of all the finished floor levels and site levels to allow this condition to be purified. The application also addresses some other minor alterations to the external elevations. National Policy and Guidance SPP3 Housing 3 New housing should make a positive contribution to the built and rural environment, and should be designed and laid out to provide lasting benefits. The planning system has an important role in promoting good design, specifying the requirements for landscaping and open space, and indicating where higher densities will be suitable
2 SPP15 Rural Development 4 This SPP advances policy in respect of small scale rural housing developments including clusters and groups in close proximity to settlements, replacement housing, plots on which to build individually designed houses, and holiday homes. SPP7 Planning and Flooding 5 New development should not take place if it would be at significant risk of flooding from any source or would materially increase the probability of flooding elsewhere. The storage capacity of functional floodplains should be safeguarded, and works to elevate the level of a site by land raising should not lead to a loss of flood water storage capacity. Development Plan 6 Structure Plan - Perth and Kinross Structure Plan (2003). 7 Environment and resources Policy 9 indicates that there will be a presumption against development in areas where there is a significant probability of flooding. 8 Local Plan Kinross Area Local Plan (2004) The principal policies of relevance are in summary: 9 Policy 1 Sustainable Development identifies guidelines by which all development should be considered in relation to sound principles of sustainable development. Policy 2 'Development Criteria' provides criteria by which all developments will be judged. In particular, that the development should have a landscape framework should have regard to the scale, form, colour and density of development. Policy 4 Flood Risk Development in areas liable to flood or where remedial measures would adversely affect flood risk elsewhere, will not normally be permitted. Policy 5 Landscape indicates that developments should conserve landscape features and sense of local identity. Policy 6 Design and Landscaping indicates that a high standard of design is sought across the entire plan area. Policy 94 Background Policies indicates that development should not adversely affect the density, character or amenity of the settlement Site History 10 An outline application (02/01440/OUT) for the erection of 4 houses on this site was refused in May 2003 principally as being contrary to the local plan on drainage grounds 2
3 and also lack of information as to how it would comply with policies relating to development criteria and landscaping /00987/FUL for a proposed new drainage scheme treatment plant and access road on land adjacent to the application site. The applicant indicated that this application be treated as a related matter within the appeal for application 04/00988/OUT /00988/OUT Proposed courtyard development of four houses: refused (principally through being contrary to local plan drainage policy), approved on appeal /02389/REM Reserved matters application for the erection of 4 houses within the site Consultations 14 SEPA Objection relating to flood risk. However, the issues of flood risk is discussed in the appraisal section of the report. Currently awaiting SEPA to withdraw their objection. 15 Fossoway Community Council Recommends deferral of the application until concerns from local residents are addressed. These concerns are listed below in the representations section. Representations letters of objection from separate households and 1 letter of objection from MSP relating to: Houses out of character with surrounding area Detrimental visual appearance of houses Increase in height of buildings overlooks neighbouring properties Increased flood risk to neighbouring properties Sets a precedent for non-compliance with conditions when the Council will purify them retrospectively Increased height reduces daylight to neighbouring houses Increased height has produced proportionate increase in road noise reflected into neighbouring properties. These issues are addressed in the appraisal section of the report. Appraisal 17 This application seeks an amendment to condition 17 and minor changes to the design. It is first worth noting that this application only represents an amendment to a consented development. Thus, it is assessing the variation between the two applications and is not to address principle issues with what is already consented. 3
4 Design / Visual Impact 18 The alterations to the design include minor changes to the external elevations such as altered fenestration. Also, the finished floor levels of the units have been increased by varying amounts across the site. The highest being 1.175m for the unit in the north-eastern corner of the site. These alterations are relatively minor and they do not significantly increase the visual impact of the development over and above what is consented. They houses appear traditionally designed and suitable for their rural context and the increased height does not make them appear incongruous in the surrounding area. Residential Amenity 19 Concerns have been raised over the impact on neighbouring amenity from the increased height increasing overlooking, overshadowing and further reflecting road traffic noise. The houses were considered an acceptable distance from neighbouring properties and it is not considered that this increase in height will have any further impact in terms of overlooking and overshadowing, particularly to the north-east of the site. 20 Road traffic noise was never an issue with this development and this minor amendment will not have any significant impact in this respect. Drainage and Flooding 21 Many concerns have been raised over the potential increase in flood risk to neighbouring properties. However, this amendment only includes minor recontouring of the access road, no changes to the site levels and an increase in finished floor levels. The increase in floor levels would not exacerbate flood risk to the site and the modifications to the road levels are minor and non-material (i.e. these changes in themselves would not require a new planning application). Moreover, the Council has granted Roads Construction consent for the road levels. As such, the variation between what was consented in the original application and what is proposed in this application is minor and non-material and thus increased flood risk is not an issue with this application. 22 In addition, SEPA have no objection to this proposal. Amendment to Condition Condition 17 reads: Prior to the commencement of construction, details shall be submitted for the approval of the planning authority of the proposed re-engineering of site levels (ie. to indicate existing site levels, proposed site levels and proposed finished floor levels) 4
5 throughout the site and the approved details shall then be implemented to the satisfaction of the planning authority. Reason: To ensure that the re-engineering of the sloping site does not adversely impact upon the visual amenity of the area or on the amenity of adjacent residential properties. 24 This proposal seeks to alter the terms of the condition by removing Prior to the commencement of construction. 25 The terms of this condition were breached in so far as construction commenced prior to these details being submitted. This consent now seeks to purify this condition by providing these levels and then amending this condition. Breaching suspensive conditions such as this is not uncommon for various reasons. However, the other requirements of these conditions must still be complied with regardless if the details have been submitted at the correct time or not. Moreover, consideration of the details of these conditions is not prejudiced by the fact they have been submitted at the incorrect time. 26 The discussion above indicates why these levels (to which the houses have been constructed) would be acceptable. Therefore, although these details were not submitted at the correct time, as requested by the condition, they are nonetheless acceptable and the development as a whole is acceptable in planning terms. Therefore amendment to the terms of Condition 17 to allow the condition to now be purified would also be acceptable. 27 Concerns have been raised that an amendment such as this sets a precedent for other developers to follow suit. However, the requirements of these conditions are still required regardless of whether they have been provided at the correct time. They are assessed without prejudice to whether development has commenced or not and any developer doing this runs the risk that the details submitted in respect of these conditions are not acceptable. In which case necessary and potentially significant enforcement action would follow. It is as much in the developer s interests as the Council s that any suspensive condition is purified at the correct time thus avoiding enforcement action and legitimising the development. Enforcement action 28 There have been two enforcement cases on this site which are both currently ongoing. The first relates to the construction of the houses with higher floor levels. After discussion with the applicant, it was decided that an application should be submitted for these changes, which is this application. No further enforcement action will be taken regarding this until the application is determined. 29 The second relates to the provision of a boundary wall on the eastern boundary of the site. Condition 15 of the original consent required a 2m high stone wall on the boundary. There are issues with the length and materiality of the wall. The wall has 5
6 not been included as part of the application and the enforcement action for this is separate from, and should have no bearing, on the determination of this application. Representations 30 All the issues raised have been addressed in the appraisals section of this report. Conclusion 31 The amendments to the original application are all acceptable in planning terms and because of this the amendment to the terms of condition 17 of the consent would also be acceptable. Recommendation A Approve the application subject to the following conditions: 1 Condition 17 of planning consent 05/02389/REM now reads Details shall be submitted for the approval of the planning authority of the proposed re-engineering of site levels (ie. to indicate existing site levels, proposed site levels and proposed finished floor levels) throughout the site and the approved details shall then be implemented to the satisfaction of the planning authority Reason 1 To ensure that the development is carried out in accordance with the plans approved. Notes There is still an outstanding objection from SEPA in relation to flood risk. No consent shall be issued until SEPA have lifted this objection. Background Papers: 11 letters of representation Contact Officer: Neil Williamson Ext Date: 15 May 2008 Nick Brian Development Quality Manager 6
7
8
an Inspector appointed by the Secretary of State for Communities and Local Government
Appeal Decision Hearing held on 9 September 2015 Site visit made on 9 September 2015 by G J Rollings BA(Hons) MA(UD) MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government
More informationSCOTTISH BORDERS COUNCIL PLANNING AND BUILDING STANDARDS COMMITTEE 5 SEPTEMBER 2016 APPLICATION FOR PLANNING PERMISSION
SCOTTISH BORDERS COUNCIL PLANNING AND BUILDING STANDARDS COMMITTEE 5 SEPTEMBER 2016 APPLICATION FOR PLANNING PERMISSION ITEM: OFFICER: WARD: PROPOSAL: SITE: APPLICANT: AGENT: REFERENCE NUMBER: 16/00317/FUL
More information2. The complaints from Mrs C which I investigated (and my conclusions) are:
Scottish Parliament Region: Mid Scotland and Fife Case 200400766: Fife Council Summary Planning - Objections to Development by Neighbours The complainants were 11 residents in a Fife village whose rear
More informationROYAL BOROUGH OF WINDSOR & MAIDENHEAD PLANNING COMMITTEE
ROYAL BOROUGH OF WINDSOR & MAIDENHEAD PLANNING COMMITTEE MAIDENHEAD DEVELOPMENT CONTROL PANEL 26 October 2016 Item: 1 Application 16/01449/FULL No.: Location: Kingfisher Cottage Spade Oak Reach Cookham
More informationan Inspector appointed by the Secretary of State for Communities and Local Government
Appeal Decision Site visit made on 6 December 2016 by D A Hainsworth LL.B(Hons) FRSA Solicitor an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 1 February
More informationan Inspector appointed by the Secretary of State for Communities and Local Government
Appeal Decision Site visit made on 29 November 2016 by David Cliff BA Hons MSc MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 22 nd December
More informationSPEAKERS PANEL (PLANNING) 16 December Member Subject Matter Type of Interest Nature of Interest
SPEAKERS PANEL (PLANNING) 16 December 2015 Commenced: 10.00am Terminated: 10.50am Present: Apologies for absence: Councillor McNally (Chair) Councillors Dickinson, P Fitzpatrick, Glover, D. Lane, J Lane,
More informationDecision by Richard Dent, a reporter appointed by the Scottish Ministers
Directorate for Planning and Environmental Appeals Appeal Decision Notice T: 01324 696 400 F: 01324 696 444 E: dpea@scotland.gsi.gov.uk Decision by Richard Dent, a reporter appointed by the Scottish Ministers
More informationWolverhampton City Council
Agenda Item No: 8 City Council OPEN INFORMATION ITEM Committee / Panel PLANNING COMMITTEE Date 5 th February 2013 Originating Service Group(s) Contact Officer(s)/ EDUCATION AND ENTERPRISE STEPHEN ALEXANDER
More informationDecision by Jo-Anne Garrick, a Reporter appointed by the Scottish Ministers
Appeal Decision Notice T: 01324 696 400 F: 01324 696 444 E: dpea@gov.scot Decision by Jo-Anne Garrick, a Reporter appointed by the Scottish Ministers Planning appeal reference: Site address: 7 Redhall
More informationDecision by Richard Dent, a reporter appointed by the Scottish Ministers
Appeal Decision Notice T: 01324 696 400 F: 01324 696 444 E: dpea@scotland.gsi.gov.uk Decision by Richard Dent, a reporter appointed by the Scottish Ministers Planning appeal reference: PPA-210-2047 Site
More informationPLANNING AND BUILDING STANDARDS COMMITTEE
PLANNING APPEALS & REVIEWS Briefing Note by Chief Planning Officer PLANNING AND BUILDING STANDARDS COMMITTEE 5 th February 2018 1 PURPOSE 1.1 The purpose of this briefing note is to give details of Appeals
More informationan Inspector appointed by the Secretary of State for Communities and Local Government
Appeal Decision Site visit made on 19 December 2016 by Geoff Underwood BA(Hons) PGDip(Urb Cons) MRTPI IHBC an Inspector appointed by the Secretary of State for Communities and Local Government Decision
More informationSOUTH NORTHAMPTONSHIRE COUNCIL STATEMENT OF CASE ON BEHALF OF THE LOCAL PLANNING AUTHORITY
SOUTH NORTHAMPTONSHIRE COUNCIL STATEMENT OF CASE ON BEHALF OF THE LOCAL PLANNING AUTHORITY Appeal by Mrs. S Biddle against the decision by South Northamptonshire Council to refuse planning permission for
More informationDEVELOPMENT GUIDANCE FOR THE ASHLEY PARK ESTATE. 1. Introduction and recommended key steps to secure APRA approval 2
Page 1 of 14 DEVELOPMENT GUIDANCE FOR THE ASHLEY PARK ESTATE INDEX Page 1. Introduction and recommended key steps to secure APRA approval 2 2. General Development Guidelines for Ashley Park Estate 4 3.
More information2A Alverstone Avenue Barnet EN4 8DS
Location 2A Alverstone Avenue Barnet EN4 8DS Reference: 17/6096/FUL Received: 26th September 2017 Accepted: 27th September 2017 Ward: East Barnet Expiry 22nd November 2017 Applicant: Mr KANESU ATHITHAN
More informationEnforcement Appeal Decision
Enforcement Appeal Decision Park House 87/91 Great Victoria Street BELFAST BT2 7AG T: 028 9024 4710 F: 028 9031 2536 E: info@pacni.gov.uk Appeal Reference: 2014/E0018 Appeal by: Reid Engineering (Cookstown)
More informationPlanning Committee. Thursday, 25 May 2017
Planning Committee Thursday, 25 May 2017 Attendees: Substitutes: Also Present: Councillor Lyn Barton, Councillor Helen Chuah, Councillor Pauline Hazell, Councillor Theresa Higgins, Councillor Brian Jarvis,
More informationI546. Warkworth 3 Precinct
I546. Warkworth 3 Precinct I546.1. Precinct Description The purpose of this precinct is to protect the character of the older parts of the Warkworth town centre by requiring new development to be of a
More informationOntario Municipal Board Commission des affaires municipales de l Ontario
Ontario Municipal Board Commission des affaires municipales de l Ontario ISSUE DATE: December 15, 2017 CASE NO(S).: PL150686 PROCEEDING COMMENCED UNDER subsection 34(19) of the Planning Act, R.S.O. 1990,
More informationRECOMMENDATION: Granted Subject to Conditions
CASE OFFICER RECOMMENDATION SHEET Reference: P13-00986PLA Location: 253, HIGH STREET, ENFIELD, EN3 4DX Proposal: Change of use from shop (A1) to Betting shop (A2). RECOMMENDATION: Granted Subject to Conditions
More informationRECENT LAND AND ENVIRONMENT COURT DECISIONS
RECENT LAND AND ENVIRONMENT COURT DECISIONS Paper given by Stephen Griffiths to Manly Council 29 June 2011 AFFORDABLE RENTAL HOUSING COMPATIBILITY WITH THE CHARACTER OF THE AREA Issue There has been considerable
More informationCITY OF WESTMINSTER. PLANNING APPLICATIONS SUB COMMITTEE Report of Director of Planning. Date. Classification For General Release.
CITY OF WESTMINSTER PLANNING APPLICATIONS SUB COMMITTEE Report of Director of Planning Subject of Report Proposal Agent On behalf of Date 27 June 2017 21 Berwick Street, London, W1F 0PZ Classification
More information1.2 It is intended to provide ongoing updates for future quarters to the first available Development Control Committee after each quarter.
ITEM 9 Planning Appeals Record for Quarters 1 & 2 2017-18 Author: Jeremy Lee, Senior Planning Officer Email: Jeremy.lee@milton-keynes.gov.uk Tel: 01908 252316 1.0 Introduction 1.1 This report sets out
More informationPlanning Committee. Yours faithfully. Elma Murray. Chief Executive
Cunninghame House, Irvine. 30 November 2017 Planning Committee You are requested to attend a Meeting of the above mentioned Committee of North Ayrshire Council to be held in the Council Chambers, Cunninghame
More informationan Inspector appointed by the Secretary of State for Communities and Local Government
Appeal Decision Hearing held on 25 August 2015 Site visit made on 25 August 2015 by Beverley Doward BSc BTP MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government Decision
More informationDEVELOPMENT CONTROL PANEL 22 MARCH 2018 COUNCILLORS ADDITIONAL PAPERS - INDEX OF DOCUMENTS CIRCULATED AFTER PUBLICATION OF THE AGENDA 1. Speaking Commitment (Page 2) 2. Application 01-18/00007/FUL Sofia
More informationI write on behalf of our residents association to object to the above planning application.
Please reply to: 34 Wellington Road Northfields Ealing W5 4UH James Egan Planning Services Ealing Council Perceval House 14-16 Uxbridge Road Ealing W5 2HL 15 th August 2014 Dear Mr Egan, Planning Application
More informationARTICLE IV. NON-CONFORMING USES, BUILDINGS, AND STRUCTURES
ARTICLE IV. NON-CONFORMING USES, BUILDINGS, AND STRUCTURES SECTION 401. DISCONTINUANCE A. No non-conforming use, building or structure may be reestablished after it has been discontinued or abandoned for
More informationHonorable Mayor and Members of the City Council. Elizabeth Corpuz, Director of Planning and Building Services Jason P. Clarke, Senior Planner
Page 1 of 16 14-L TO: ATTENTION: FROM: SUBJECT: Honorable Mayor and Members of the City Council Jeffrey L. Stewart, City Manager Elizabeth Corpuz, Director of Planning and Building Services Jason P. Clarke,
More informationFlood Risk. How do we manage flood risks? Built Form. Components of Flood Risk. Consequence of a flood. Chance of a flood
Built Form Managing flood risk can be delivered through both planning scheme and non-planning scheme measures. During Summer 2010/2011 we witnessed just how well our built form performed. It was evident
More informationan Inspector appointed by the Secretary of State for Communities and Local Government
Appeal Decision Hearing held on 8 April 2014 Site visit made on 8 April 2014 by Anthony Lyman BSc(Hons) DipTP MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government
More informationA COMMUNITY BOARD #2M ACTION OF THE BOARD
APPLICANT Barrry Mallin, Esq./Mallin & Cha, P.C., for 150 Charles Street Holdings LLC c/o Withroff Group, owners. SUBJECT Application December 21, 2012 Appeal challenging DOB's determination that developer
More informationConditions for the Hiring of Plant Updated 2012
1. DEFINITIONS a) The Owner is the Company, firm or person letting the plant on hire and includes their successors, assigns or personal representatives. b) The Hirer is the Company, firm, person, Corporation
More informationan Inspector appointed by the Secretary of State for Communities and Local Government
Appeal Decisions Site visit made on 25 November 2014 by R J Marshall LLB DipTP MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 23 January 2015
More informationan Inspector appointed by the Secretary of State for Communities and Local Government
Appeal Decision Hearing held on 8 November 2016 Site visit made on 8 November 2016 by Kevin Gleeson BA MCD MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government Decision
More informationNumber 63 of Planning and Development (Amendment) Act 2015
Number 63 of 2015 Planning and Development (Amendment) Act 2015 Number 63 of 2015 PLANNING AND DEVELOPMENT (AMENDMENT) ACT 2015 Section 1. Definition CONTENTS 2. Amendment of section 28 (Ministerial guidelines)
More informationCITY OF PISMO BEACH Planning Commission Meeting Tuesday, December 9, 2014 DRAFT MINUTES. Chair White, Vice-Chair Hamrick, Jewell, Overland, Woodhouse.
CITY OF PISMO BEACH Planning Commission Meeting Tuesday, December 9, 2014 DRAFT MINUTES Call to order: 6:30 p.m. 1. Roll Call: Commissioners present: Commissioners absent: Staff present: Chair White, Vice-Chair
More informationPLANNING AND ENVIRONMENT COURT OF QUEENSLAND
PLANNING AND ENVIRONMENT COURT OF QUEENSLAND CITATION: WOL Projects Pty Ltd v Gold Coast City Council [2018] QPEC 48 PARTIES: WOL PROJECTS PTY LTD ACN 107 403 654 (Appellant) FILE NO: 383 of 2018 DIVISION:
More informationInternational Real Estate Society Conference 99. Long Term Impact of Flood Affectation on Residential Property Prices
International Real Estate Society Conference 99 Co-sponcors: Pacific Rim Real Estate Society (PRRES) Asian Real Estate Society (AsRES) Khuala Lumpur, 26-30 January 1999 Long Term Impact of Flood Affectation
More informationNumber 21 of Housing (Miscellaneous Provisions) Act 2014
Number 21 of 14 Housing (Miscellaneous Provisions) Act 14 Number 21 of 14 Housing (Miscellaneous Provisions) Act 14 CONTENTS PART 1 PRELIMINARY AND GENERAL Section 1. Short title, collective citation
More informationEdmonton Subdivision and Development Appeal Board
Edmonton Subdivision and Development Appeal Board Churchill Building 10019-103 Avenue NW Edmonton, AB T5J 0G9 Phone: 780-496-6079 Fax: 780-577-3537 Email: sdab@edmonton.ca Web: www.edmontonsdab.ca Notice
More informationReport. on an investigation into complaint no 05/A/12836 against the London Borough of Hillingdon. 28 September 2006
Report on an investigation into complaint no against the London Borough of Hillingdon 28 September 2006 Millbank Tower, Millbank, London SW1P 4QP Investigation into complaint no against the London Borough
More informationSTATEMENT OF REBUTTAL EVIDENCE OF SAM BERNARD LE HERON
In the matter of the Resource Management Act 1991 And In the matter of the Ruakura Variation to the Hamilton Proposed District Plan STATEMENT OF REBUTTAL EVIDENCE OF SAM BERNARD LE HERON On behalf of Hamilton
More informationan Inspector appointed by the Secretary of State for Communities and Local Government
Appeal Decisions Hearing held on 22 April 2015 Site visit made on 22 April 2015 by Paul Dignan MSc PhD an Inspector appointed by the Secretary of State for Communities and Local Government Decision date:
More informationNOTICE TO MEMBERS November 1, ARCHITECTURAL REVIEW PROCEDURES Summary of Civil Code 4765
NOTICE TO MEMBERS November 1, 2017 ARCHITECTURAL REVIEW PROCEDURES Summary of Civil Code 4765 Section a) of Civil Code 4765 requires that this section applies if the association s governing documents require
More informationArticle 32 Special Events
Article 32 Special Events Sec. 32.00 Purpose and Intent. The purpose and intent of this Article Section is to: 1. Provide for the temporary use of land for special events in a manner consistent with its
More informationMID SUFFOLK DISTRICT COUNCIL
MID SUFFOLK DISTRICT COUNCIL Minutes of the meeting of the MID SUFFOLK DEVELOPMENT CONTROL COMMITTEE A held in the King Edmund Chamber - Endeavour House, 8 Russell Road, Ipswich on Wednesday, 11 April
More informationTest Valley Borough Council Cabinet 13 January 2016
ITEM 7 Test Valley Revised Local Plan Report of the Planning Policy & Transport Portfolio Holder Recommended: 1. To note the outcome of the Test Valley Revised Local Plan Inspector s report as shown in
More informationPeter Brett Associates. Assessing Flood Risk and River Modelling Doulton Brook Development, West Midlands
Peter Brett Associates Assessing Flood Risk and River Modelling Doulton Brook Development, West Midlands PLANNING POLICY INTRODUCTION For any proposed residential development close to a river or watercourse
More informationan Inspector appointed by the Secretary of State for Communities and Local Government
Appeal Decisions Inquiry held on 8 10 January 2013 Site visit made on 9 January 2013 by Paul Dignan MSc PhD an Inspector appointed by the Secretary of State for Communities and Local Government Decision
More informationJustification for Floodplain Regulatory Standards in Illinois
Justification for Floodplain Regulatory Standards in Illinois Office of Water Resources Issue Paper April, 2015 Proactive Illinois floodplain and floodway regulatory standards have prevented billions of
More informationCITY OF SASKATOON COUNCIL POLICY
ORIGIN/AUTHORITY Planning and Operations Committee Reports 2-2013 and 13-2013 ADOPTED BY: City Council CITY FILE NO. CK. 230-3 1 of 20 1. PURPOSE 1.1 To establish a policy that is consistent with Industry
More informationan Inspector appointed by the Secretary of State for Communities and Local Government
Appeal Decision Hearing held on 8 October 2013 Site visit made on 8 October 2013 by Jessica Graham BA(Hons) PgDipL an Inspector appointed by the Secretary of State for Communities and Local Government
More informationFlood Risk and Land Use Vulnerability Guidance
Flood Risk and Land Use Vulnerability Guidance UPS-BP-GU2a v.2 UNCONTROLLED DOCUMENT WHEN PRINTED Pag SCOTTISH ENVIRONMENT PROTECTION AGENCY Identifier: LUPS-GU24 Land Use Planning System SEPA Guidance
More informationOFFICE OF HISTORIC RESOURCES City Hall 200 N. Spring Street, Room 559 Los Angeles, CA 90012
City Hall 200 N. Spring Street, Room 559 Los Angeles, CA 90012 February 2, 2015 TO: Jose Huizar, Chair Planning and Land Use Management Committee FROM: Ken Bernstein, AICP Manager, Office of Historic Resources
More informationan Inspector appointed by the Secretary of State for Communities and Local Government
Appeal Decision Inquiry opened on 27 June 2017 Site visit made on 28 June 2017 by C Thorby MRTPI IHBC an Inspector appointed by the Secretary of State for Communities and Local Government Decision date:
More informationDetails of your. Bond. Policy Terms and Conditions. are governed primarily by the laws of a country other than the united states or any of its
Details of your Executive investment Bond Policy Terms and Conditions (ref EIB4) the benefits of the policy providing coverage are governed primarily by the laws of a country other than the united states
More informationREMORTGAGING GUIDE TO REMORTGAGING A PROPERTY
REMORTGAGING GUIDE TO REMORTGAGING A PROPERTY This information guide is intended to provide you with a brief outline of the work involved in a remortgage transaction and to offer a brief insight into the
More informationKWAZULU-NATAL PLANNING AND DEVELOPMENT APPEALS TRIBUNAL HELD AT PIETERMARITZBURG THE PRESERVATION OF MKONDENI MPUSHINI
KWAZULU-NATAL PLANNING AND DEVELOPMENT APPEALS TRIBUNAL HELD AT PIETERMARITZBURG APPEAL NO. PDA 17 In the matter between: WEDGEWOOD OWNERS ASSOCIATION FIRST APPELLANT THE PRESERVATION OF MKONDENI MPUSHINI
More informationNathan Barrett Your ref: Victoria Wharf reply to: My ref: 17/07652/FULL Tel No:
Westminster City Council Development Planning westminster.gov.uk Westminster City Council PO Box 732 Redhill, RH1 9FL Please Nathan Barrett Your ref: Victoria Wharf reply to: My ref: 17/07652/FULL Tel
More information6) While every care is taken that to send three virtual goodie bag inclusions, Conqur shall not be liable for any variation that may occur.
1) Conqur Endurance Group ( Conqur ), the operator of the Skechers Performance Los Angeles Marathon, retains all right, title, and interest in the use of the Skechers Performance Los Angeles Marathon name,
More informationNEWRY, MOURNE & DOWN DISTRICT COUNCIL
NEWRY, MOURNE & DOWN DISTRICT COUNCIL Minutes of the Planning Committee Meeting of Newry, Mourne and Down District Council held on Wednesday 24 October 2018 at 10.00am in the Boardroom, District Council
More informationFEMA FLOOD MAPS Public Works Department Stormwater Management Division March 6, 2018
FEMA FLOOD MAPS Public Works Department Stormwater Management Division March 6, 2018 Presentation Overview FEMA National Flood Insurance Program (NFIP) FEMA Community Rating System (CRS) Flood Insurance
More informationFloodplain Development Permit Application
Floodplain Development Permit Application **All construction will also require a building permit** This is an application packet for a Floodplain Development Permit. Certain sections are to be completed
More informationDry Hire Terms and Conditions
Dry Hire Terms and Conditions Introduction Music Room Solutions Ltd - Terms & Conditions of Dry Hire Terms & Conditions Documents: This document is issued by Music Room Solutions Limited, to describe the
More informationEardisland Neighbourhood Development Plan
Eardisland Parish Council Eardisland Neighbourhood Development Plan A Report to Herefordshire Council of the Independent Examination of the Eardisland Neighbourhood Development Plan Independent Examiner
More informationDEVELOPMENT PERMIT APPLICATION CHECKLIST New: Commercial Industrial Institutional - Multiple Family Residential
FOR OFFICE USE ONLY 5 St. Anne Street St. Albert, AB T8N 3Z9 Phone: (780) 459-1642 Fax: (780) 458-1974 Project: Address: Date: File No.: DEVELOPMENT PERMIT APPLICATION CHECKLIST New: Commercial Industrial
More informationSeptember 2014 Pagham Neighbourhood Plan
September 2014 Pagham Neighbourhood Plan 2014-2029 Basic Conditions Statement Published by Pagham Parish Council for Consultation under the Neighbourhood Planning (General) Regulations 2012. 1 Pagham Neighbourhood
More informationBRITISH COLUMBIA DAM SAFETY REGULATION 44/2000
PDF Version [Printer friendly ideal for printing entire document] BRITISH COLUMBIA DAM SAFETY REGULATION 44/2000 Published by Important: Quickscribe offers a convenient and economical updating service
More informationMill Creek Floodplain Proposed Bylaw Frequently Asked Questions
Mill Creek Floodplain Proposed Bylaw Frequently Asked Questions Q: What is a Floodplain Bylaw? A: A Floodplain Bylaw is a flood hazard management tool to ensure future land use will be planned and buildings
More informationCOURT OF APPEAL FOR BRITISH COLUMBIA
COURT OF APPEAL FOR BRITISH COLUMBIA Citation: Between: And Before: Hik v. Redlick, 2013 BCCA 392 John Hik and Jennie Annette Hik Larry Redlick and Larry Redlick, doing business as Larry Redlick Enterprises
More informationCASE OFFICER REPORT DELEGATED
CASE OFFICER REPORT DELEGATED Subject: Proposal: Application No. Applicant: Agent: 897 Christchurch Road Alterations and change of use of ground floor retail unit (Use Class A1) and associated basement
More informationDETAILS OF YOUR EUROPEAN. terms applicable (ref EO5v3)
DETAILS OF YOUR EUROPEAN collective INVESTMENT BOND PRIIPS terms applicable (ref EO5v3) with OLD MUTUAL INTERNATIONAL IRELAND dac OLD MUTUAL INTERNATIONAL european collective investment bond PRIIPS Part
More informationdetails of your collective investment bond Policy Terms and Conditions
details of your collective investment bond Policy Terms and Conditions (ref CIB4) powered by wealth interactive OLD MUTUAL INTERNATIONAL Collective Investment Bond This document is effective for Collective
More informationan Inspector appointed by the Secretary of State for Communities and Local Government
Appeal Decision Hearing Held on 5 December 2017 Site visit made on 6 December 2017 by Andrew McGlone BSc MCD MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government
More informationan Inspector appointed by the Secretary of State for Communities and Local Government
Appeal Decision Hearing held on 22 February 2017 Site visit made on 22 February 2017 by Jameson Bridgwater PGDipTP MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government
More informationToronto and Region Conservation Authority - Additional Information for the Long Term Accommodation Project
REPORT FOR ACTION Toronto and Region Conservation Authority - Additional Information for the Long Term Accommodation Project Date: February 14, 2017 To: City Council From: Deputy City Manager & Chief Financial
More information8 Lovedale Road Balerno Edinburgh EH14 7DW
DPEA 4 The Courtyard Callendar Business Park Falkirk FK1 1XR Your ref - PPA-230-2112 31 January 2014 Dear Sir, Ref PPA-230-2112 Mansfield Road / Cockburn Crescent,,. 1. The Community Council ( the Council
More informationLEGAL INDEMNITY POLICY OF TITLE INSURANCE FOR RESIDENTIAL PROPERTY COVERAGE FOR KNOWN RISK
LEGAL INDEMNITY POLICY OF TITLE INSURANCE FOR RESIDENTIAL PROPERTY COVERAGE FOR KNOWN RISK ENGLAND & WALES (FORM KR E&W 07/05) SCHEDULE Online File Number nnnnnnnn Policy Number KR (E&W) - xxxxxxxxxxx
More informationRETAIL INSTALMENT PLAN TERMS AND CONDITIONS
1. Introduction 1.1. Please read the Agreement carefully. 1.2. The Facility is only available to individuals aged 18 years or older who are permanent residents of Ireland and for personal or household
More informationan Inspector appointed by the Secretary of State for Communities and Local Government
Appeal Decision Hearing held on 3 August 2016 Site visit made on 3 August 2016 by Roger Catchpole DipHort BSc(hons) PhD MCIEEM an Inspector appointed by the Secretary of State for Communities and Local
More informationApplication to Transfer/Vary or Cancel a Occupation Licence
Application to Transfer/Vary or Cancel a Occupation Licence (Recreational Purposes Only) What is this application form for? This application should be used to transfer or vary an Occupation Licence. You
More informationORIGIN NET Terms & Conditions
ORIGIN NET Date: 01 November 2011 Variation Date: 17 August 2014 RE: Public Matters Ph: 1300 763 151 Email: info@originnet.com.au Page 1 of 15 Origin Net General Terms and Conditions 1. DEFINITIONS In
More informationPATRICK ENGINEERING & SURVEYING
PATRICK ENGINEERING & SURVEYING Patrick L. Brown, R.C.E. 18067 2110 Main Street, Suite A Post Office Box 442 Julian, California 92036 Office (760) 765-1343/Fax (760) 765-2081 E-mail: patrickeng@sbcglobal.net
More informationIN THE HIGH COURT OF NEW ZEALAND AUCKLAND REGISTRY CIV [2017] NZHC 1340
IN THE HIGH COURT OF NEW ZEALAND AUCKLAND REGISTRY CIV-2016-404-2289 [2017] NZHC 1340 BETWEEN AND KIWI PROPERTY GROUP LIMITED AND KIWI PROPERTY HOLDINGS LIMITED Appellants AUCKLAND COUNCIL Respondent Hearing:
More informationFREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality
FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality WHAT IS A FLOOD? The National Flood Insurance Program defines a flood as a general and temporary condition of partial
More informationCHANGE OF USE FROM LAUNDERETTE (USE CLASS SUI GENERIS) TO RETAIL (USE CLASS A1) (RETROSPECTIVE)
Application Number: 08/01677/FUL CHANGE OF USE FROM LAUNDERETTE (USE CLASS SUI GENERIS) TO RETAIL (USE CLASS A1) (RETROSPECTIVE) AT 25 Farthing Grove, Netherfield, Milton Keynes FOR Multi Ecko 8/13 Week
More information2017 Application for Community Flags/ Banners
Town of Gawler PO Box 130, Gawler SA 5118 Ph: 8522 9211 Fax: 8522 9212 Email: communications@gawler.sa.gov.au The Applicant applies to Council for the installation of a flag/banner on Council s purpose
More informationIN THE SUPREME COURT OF APPEAL OF SOUTH AFRICA
REPUBLIC OF SOUTH AFRICA IN THE SUPREME COURT OF APPEAL OF SOUTH AFRICA Case number: 475/2002 Reportable In the matter between: GREGORY JOSEPH PAOLA APPELLANT and JAIVADAN JEEVA N.O TARULATA JEEVA N.O
More informationEXPLANATORY MEMORANDUM TO THE CROSSRAIL (FEES FOR REQUESTS FOR PLANNING APPROVAL) REGULATIONS No. 2175
EXPLANATORY MEMORANDUM TO THE CROSSRAIL (FEES FOR REQUESTS FOR PLANNING APPROVAL) REGULATIONS 2008 2008 No. 2175 1. Introduction 1.1. This explanatory memorandum has been prepared by the Department for
More informationFlood Risk Assessment Appendix 1 to Strategic Environmental Assessment Screening of Amendment No. 1 to Ferrybank/Belview Local Area Plan
Flood Risk Assessment Appendix 1 to Strategic Environmental Assessment Screening of Amendment No. 1 to Ferrybank/Belview Local Area Plan Forward Planning Kilkenny County Council 18/8/2011 1 Introduction
More informationSuffolk County Council: Minerals and Waste Plan; Issues and Options Consultation November 2016.
Suffolk County Council: Minerals and Waste Plan; Issues and Options Consultation November 2016. Representation on behalf of the Mineral Products Association (MPA). Contact: Mark E North, (Director of Planning
More informationan Inspector appointed by the Secretary of State for Communities and Local Government
Appeal Decision Site visit made on 13 June 2013 by J M Trask BSc(Hons) CEng MICE an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 11 July 2013 Appeal
More informationEAIE EXHIBITION 2017 ICWE TERMS AND CONDITIONS
EAIE EXHIBITION 2017 ICWE TERMS AND CONDITIONS 1 GENERAL 1.1 Exhibitors and exhibition management: roles and responsibilities Participation is open to individual exhibitors and groups of exhibitors who
More informationCONDITIONS OF CONTRACT. The Builder must execute and complete the Works in a workmanlike manner and ensure the Works are adequately supervised.
CONDITIONS OF CONTRACT 1. RESPONSIBILITY OF BUILDER The Builder must execute and complete the Works in a workmanlike manner and ensure the Works are adequately supervised. 2. WORK PERFORMED OR MATERIALS
More information2. "Booking Conditions" means the terms and conditions of these booking conditions, including the general notes
Booking Conditions Nobody likes reading the small print but is important. Our Booking Conditions describe our policies and procedures and clarify the contractual relationship between you and the Owner
More informationAppeal Decision. Site visit made on 11 May by David Fitzsimon MRTPI
Appeal Decision Site visit made on 11 May 2010 by David Fitzsimon MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government The Planning Inspectorate 4/11 Eagle Wing Temple
More information0319 Ontario Municipal Board Commission des affaires municipales de l Ontario
ISSUE DATE: Feb.12, 2004 DECISION/ORDER NO: 0319 Ontario Municipal Board Commission des affaires municipales de l Ontario PL020711 The City of Toronto has applied to the Ontario Municipal Board under Section
More informationPlanning and Urban Management (Environmental Impact Assessment) Regulations 2007 SAMOA
1 Planning Urban Management (Environmental Impact Assessment) Regulations 2007 SAMOA Arrangement of provisions 1. Short title commencement 2. Interpretation 3. When an EIA is required 4. Forms of EIA 5.
More information