Control Number : Item Number : 44. Addendum StartPage : 0

Size: px
Start display at page:

Download "Control Number : Item Number : 44. Addendum StartPage : 0"

Transcription

1 Control Number : Item Number : 44 Addendum StartPage : 0

2 SOAH DOCKET NO DOCKET NO APPLICATION OF ENTERGY TEXAS, BEFORE THE STATE OFFICE INC. FOR APPROVAL FOR A OF ;.^. ^ ^ TRANSMISSION COST RECOVERY ADMINISTRATIVE HtAIa.TNG9 ^ FACTOR :..,,. RESPONSE OF ENTERGY TEXAS, INC. TO CITIES' FIRST REQUEST FOR INFORMATION: CITIES 1-1, 2, 3, 4, 5, 6 AND 7 Entergy Texas, Inc. ("ETI" or "the Company") files its Response to Cities' First Request for Information. The response to such request is attached and is numbered as in the request. An additional copy is available for inspection at the Company's office in Austin, Texas. ETI believes the foregoing response is correct and complete as of the time of the response, but the Company will supplement, correct or complete the response if it becomes aware that the response is no longer true and complete, and the circumstance is such that failure to amend the answer is in substance misleading. The parties may treat this response as if it were filed under oath. Respectfully submitted. Steven H. Neinast Steven H. Neinast Entergy Services, Inc. 919 Congress Avenue, Suite 701 Austin, Texas (512) telephone (512) facsimile Attachments: CITIES 1-1, 2,3,4,5,6 AND 7 CERTIFICATE OF SERVICE I certify that a copy of the foregoing Response of Entergy Texas, Inc. to Cities' First Request for Information has been sent by either hand delivery, facsimile, overnight delivery, or U.S. Mail to the party that initiated this request in this docket on this the 10th day of November, Steven H. Neinast Steven H. Neinast

3

4

5 ENTERGY TEXAS, INC. PUBLIC UTILITY COMMISSION OF TEXAS DOCKET NO Response of: Entergy Texas, inc. to the First Set of Data Requests of Requesting Party: Cities Prepared By: DMark Hunter Sponsoring Witness: Khamsune Vongkhamchanh Beginning Sequence No. Ending Sequence No. Question No.: CITIES 1-1. Part No.: Addendum: Question: For each of the projects identified in Table 2 on page 10 of the Direct Testimony of Khamsu.ne Vongkhamchanh please provide the cost estimate for each of the listed transmission projects at the time the projects were initially approved and documentation of any changes to the fixed-price contracts as discussed on page 22, line 13 through page 23, line 8 of Mr. Vongkhamchanh's direct testimony. Response: The initial, approved cost estimate for each of the above referenced transmission projects are listed in the table below. Except for the Sunoco Nederland Interconnect project (P I PPU75592), the projects listed below were not associated with fixed-price contracts. The Sunoco Nederland Interconnect project is the only project that was based on a fixed price contract, and there were no changes to the fixed-price contract of this project BB1 002

6 Question No.: CITIES 1-1 Project Code Initial Cost Estimate Dollars Closed to Plant Description I F1PPU75592 Sunoco Nederland Interconnect S 11,671,801 S 10, FIPPU50537 Ponderosa Switching Station $ 13, $ 10,401,746 3 F I PPSTORM3 Hurricane Ike Restoration $ 78,707,182 $ 6.648,476 4 FIPPU75471 Conroe-to-Cedar Hi11 Line Rebuild $ 7,550,057 $ 6, F1.PPU50817 Petrv Woods Substation $ 5,702,005 $ 5,780,733 6 FIPPU50745 E.TI: Purchase Spare Autotransformer $ 4,972,452 $ 4,495,838 1 ;Tl: I-l:artburg-1lclbig 230 kv Line F 1 PPU75664 Pole Replacement $ 5,169,986 $ 3,931,687 8 FIPPU50778 Ranchland Build New Substation $ 3968,819 $ 3,778,631 Transmission Equipment Failures 9 F I PCUD055I Blanket _ f $ 6,913,619 $ 3^594, F113PU75563 Lewis Creek-Er:^^ t: 12e-conductor Line $4,190,681 $2,872, F1PPi Jasper-Rayburn Line Re-conductorin $ 2,665,380 $ 2,276, FIPPUDQI29 Skvlinin "I'ree Hazard Blanket $ $ 2,139, F1 PPU50850 Johns Gully 138kV Bus Extension $ 3,006,056 $ 2,071, F I PPU50670 Bentwater: Install Line Breaker and Capacitor Bank $ 2,779,700 $ 1.835, F1PPU50731 Dogwood German Pellets 138kV Substation $ 2.480,075 $ 1,681, FIPCUD0279 Transmission Lines Program Blanket $ 32,810,560 S 1,679, FiPPU50757 Eli: I'urchase Spare Autotransform $ 1,751,443 $ 1,429, F1PPU ::;T1: Purchase Spare kV Autotransformer $ 1,597,913 $ 1,409, F I PPUDIZ279 DR279 IC: Transmission Lines Program Blanket $ 24,287,998 $ 1,408, FIPPUT0556 Transmission Substation Failure Blanket $ 12=774,890 S 1, F1.PPU75559 ETI Pansy to South Beaumont Line 62 69kV Upgrade $ 1,967,089 $ 1,214, F1PPU50838 Rivtrin: Replace oil circuit breaker relay panels $ 755,658 $ 1,023,169 1 Total i t S 77,607, BB2 003

7 ENTERGY TEXAS, INC. PUBLIC UTILITY COMMISSION OF TEXAS DOCKET NO Response of. Entergy Texas, Inc. to the First Set of Data Requests of Requesting Party: Cities Prepared By: DMark Hunter Sponsoring Witness: Khamsune Vongkhamchanh/Margaret L. McCloskey Beginning Sequence No. Ending Sequence No. Question No.: CITIES 1-2 Part No.: Addendum: Question: Please provide the rational for including Spare Auto Transformers (Project Codes F1.PPU50745, FI.PPU50757 & FIPPU50863) as Plant in Service rather than Plant Held for Future Use or Materials and Supplies? Response: For the treatment of spare autotransformers, the Company relies on the Uniform System of Accounts. industry guidance, and various Federal Energy Regulatory Commission (FERC) guidance to support its accounting of those projects. - FERC has established the following criteria for recognizing spare equipment as plant in service FERC account 101: the part must be (1) critical to plant operation; (2) be associated with specific plant; and (3) not be subject to normal periodic replacement. First, the spare autotransformers included in the TCRF are critical because ETI must have these spare autotransformers on hand and available at a moment's notice in order to replace other autotransformers that can fail unexpectedly and without notice. These spare autotransformers are essential for emergency needs because of the potential large number of customers that can lose power after a failure of one of these autotransformers, and the long lead times required to manufacture an autotransformer. Second, the spare autotransformers included in the TCRF are associated with specific plant in service. In particular, each of the spares performs a specific set of voltage transformations and has a particular MVA capacity. Third, the spare autotransformers included in the TCRF are not subject to use as normal periodic replacements. The expected life of these transformers range from 30 to 50 years, and these transformers are only replaced on an as-needed basis. Thus, given that the spare auto transformers meet the FE.RC guidance criteria, the costs are properly included in Plant in Service See, e.g., FERC Docket No. OA (NEPOOL and ISO-NE). See also Interpretation No. 50 issued by the National Association of Regulatory Utility Commissioners (NARUC). Further, the Uniform System of Accounts notes that "transformers held in reserve, and normal spare capacity... shall not be included in [Account 105 Electric plant held for future use]." 18 C.F.R (2015) BB37 004

8 ENTERGY TEXAS, INC. PUBLIC UTILITY COMMISSION OF TEXAS DOCKET NO Response of: Entergy Texas, Inc. to the First Set of Data Requests of Requesting Party: Cities Prepared By: DMark Hunter Sponsoring Witness: Khamsune Vont;khatnchanh Beginning Sequence No. Endin^ Sequence No. Question No.: CITIES 1-3 Part No.: Addendum: Question: Please explain the difference between the Transmission Lines Program Blankets (Project Codes FIPCUD0279 & FIPPUDR279) and why they are considered capital replacement programs rather than line maintenance programs. Response: The Transmission Lines Program Blankets (Project Codes PIPCUD0279 and F I PPUDR279) are identical in scope. Project Code F I PCUD0279 is associated with the initial funding amount and Project Code FI PPUDR279 is associated with an incremental funding for the Transmission Lines Program Blankets project. According to the Uniform System of Accounts, expenditures associated with these projects are classified as capital because all work orders in these blankets were created and used to replace various retirement units for transmission line-related equipment. Retirement units (RUs) refer to property or equipment which, upon assembly or purchase, can function as a stand-alone unit. Once the RU is placed in service, the cost of the RU is to be capitalized to the appropriate utility plant account. Please see the attached copies of the Company's Capitalization policy, and the Company's Transmission Line Capitalization Procedure CITIES 1-3 BB6 005

9 ENTERGY ACCOUNTING POLICIES & PROCEDURES Page 1 of 17 Title: CAPITALIZATION Last Revision: Rev. 1 January 19, 2014 Subject Matter Expert: Responsible Officer: Approved By: ie Barras _(_Afyson Mount Drew Marsh 1. POLICY SUMMARY This Policy addresses the Company-wide (all Legal Entities and functional areas, whether regulated or unregulated), requirements applicable to Entergy's capital assets in compliance with Generally Accepted Accounting Principles (GAAP) in the United States, Securities & Exchange Commission (SEC) regulations, Federal Energy Regulatory Commission (FERC) regulations, state and local regulatory guidelines, as well as the Sarbanes- Oxley Act of ^ ^ This Policy applies to any transaction involving the acquisition, internal construction, transfer, disposition of Capital Assets as well as smaller assets or units, including all costs associated with preparing and making the assets or units useful. All employees, agents and contractors of Entergy shall immediately report known, suspected, or potential violations of this Policy by following the procedures described in the Reporting Violations Policy. Please refer to the following detailed Policy for further information CITIES 1-3 BB7 006

10 ENTERGY ACCOUNTING POLICIES & PROCEDURES Page 2 of 17 Title: CAPITALIZATION Last Revision: Rev. 1 1 January 19, 2014 il. DETAILED POLICY 1.0 PURPOSE AND APPLICABILITY The purpose of this Policy is to provide a framework for management to: apply consistent capital approval Policy and procedures to regulated and unregulated businesses in certain circumstances, differences may exist in the appropriate accounting for rate-regulated and unregulated businesses and/or entities whose depreciation rates are not set through Depreciation Studies. Those instances, and the appropriate accounting for each, are described in this Policy. outline the correct accounting treatment for Retirement Units, Minor Items of Property, Capital/Rotable Spare parts, Software Systems, and Plant Design Basis; including the treatment for Additions, Retirements, Replacements, Refurbishments, and Modifications/Betterments. This Policy applies to any transaction involving the acquisition, internal construction, transfer, disposition of Capital Assets as well as smaller assets or units, including all costs associated with preparing and making the assets or units useful. The accounting treatment for both Capital Assets, and equipment or pieces of property with a useful life of less than one year is included in this Policy. This Policy applies to any and all employees of any Entergy System Company, unless otherwise expressly excluded, as well as agents and contractors of any Entergy System Company. The extent to which any specific provision in the Policy covers employees who are represented by a union may depend on negotiations with and/or a collective bargaining agreement with that union. Nothing contained in this Policy should be construed to suggest that employees of a particular subsidiary or affiliate of Entergy Corporation are also employees of Entergy Corporation or any other affiliate or subsidiary of Entergy Corporation. Moreover, this Policy does not create any employment relationship between any person and any Entergy System Company, nor does this Policy confer any contractual right to any person to become or remain an employee of any Entergy System Company CITIES 1-3 BB8 007

11 ENTERGY ACCOUNTING POLICIES & PROCEDURES Page 3 of 17 Title: CAPITALIZATION Last Revision: Rev. 1 January 19, REFERENCES AND CROSS REFERENCES 2.1 The following policies should be read in conjunction with this Policy: Entergv Accounting Po[icies Capital Funding Project Approval Enter-qv System Policies Accounting Approval Authority Code of Entegrity Reporting Violations Investment Approval Process Entergy Procedure Documents Fossil Production Plant Capitalization Procedures Nuclear Plant Capitalization Procedures General! Intangible Plant Capitalization Procedures Substations Capitalization Procedures Transmission Line Capitalization Procedures CITIES 1-3 BB9 008

12 ENTERGY ACCOUNTING POLICIES & PROCEDURES Page 4 of 17 Title: CAPITALIZATION I Last Revision: ^ Rev. 1 January 19, DEFINITIONS 3.1 Capital Asset - Is an asset meeting the definition of a Retirement Unit, Minor Item of Property, Capital Spare, Rotable Spare, Software System, or Plant Design Basis, and which meets the applicable Capitalization Criteria as described in this Policy. 3.2 Capital Funding Proiect -A planned venture that creates a Capital Asset by: adding or improving facilities in compliance with business goals, legal or regulatory requirements; or improving the operating performance of existing facilities. 3.3 PowerPlant- Fixed asset system, used for the set-up, approval, maintenance, record-keeping, and reporting of fixed assets. 3.4 Work Order (WO) - Captures details/charges relative to its funding project. It is used to account for the charges on a project. 3.5 Retirement Unit (RU) - Defined in Section 6.1 below. 3.6 Minor Items of Property - Defined in Section 6.2 below. 3.7 Capital Spare - Defined in Section 6,3 below 3.8 Rotable Spare - Defined in Section 6.4 below 3.9 Software System - Defined in Section 6.5 below 3.10 Plant Design Basis - Defined in Section 6.6 below. Applies only to nuclear plants Addition - Purchase, installation or construction of a new Capital Asset that is added to a larger system. Normally in the form of a Retirement Unit, but which may be any Capital Asset type Betterment- Describes the situation in which a major part of a Retirement Unit is modified or replaced, resulting in the RU's significant improvement or superior performance. This improvement increases the efficiency and, many times, increases the useful life of the Retirement Unit Replacement of a Retirement Unit or System- The removal of a Retirement Unit or system and the substitution of a new unit or system that is of the same type and has the same performance capabilities CITIES 1-3 BB

13 ENTERGY ACCOUNTING POLICIES & PROCEDURES Page 5 of 17 Title: CAPITALIZATION Last Revision: Rev. 1 January 19, Retirement of a Retirement Unit or System - Describes the process by which an operational item is taken out of service, with or without replacement Capitalization Criteria - See Section 7 below 3.16 Rate-Requtated Entity - An entity is considered to be Rate-Regulated when the rates it charges for its products and services to captive customers are set by an independent regulator in a manner that is intended to recover the entity's cost of those products and services. See ASC for additional guidance. The following are generally considered to be Rate Regulated Entities: Entergy Arkansas, Inc. and Subsidiaries Entergy Gulf States Louisiana, L.L.C. Entergy Louisiana, LLC and Subsidiaries Entergy Mississippi, Inc. Entergy New Orleans, Inc. Entergy Texas, Inc. and Subsidiaries System Energy Resources, Inc. Contact Accounting Policy with any interpretative questions Depreciation Study - A Depreciation Study contains extensive information about an entity's assets, their estimated lives, their patterns of replacement, etc. This information is analyzed to determine a depreciation rate for each asset class. The following are entities whose depreciation rates are set using Depreciation Study methodology: The Rate-Regulated entities listed in 3.16, above; and Entergy Nuclear Generation Co (Pilgrim) Entergy Nuc Indian Point 3, LLC Entergy Nuc Fitzpatrick, LLC Entergy Nuclear Indian Point 2 Entergy Nuclear Palisades, LLC 3.18 Refurbishment - If a Retirement Unit is reassembled, overhauled or reworked in a manner that extends the ability to utilize that Retirement Unit beyond its depreciable life as dictated through a Depreciation Study, it may be considered a Refurbishment and the associated costs may be capitalized. To qualify as a Refurbishment, the cost of the Refurbishment must meet the applicable dollar threshold for a Betterment defined in Attachment B for the Entergy Capitalization Policy. Only entities referenced in Section 3.17 of this Policy are permitted to capitalize the cost of Refurbishments Policy - This Capitalization Policy CITIES 1-3 BB11 010

14 ENTERGY ACCOUNTING POLICIES & PROCEDURES Page 6 of 17 Title: CAPITALIZATION Last Revision: Rev. 1 Janua ry 19, RESPONSIBILITY 4.1 The Vice President, Accounting Policy and External Reporting, in coniunction with the Senior Vice President, Chief Accountinq Officer (CAO), and Accounting Policy are responsible for: interpretation and administration of this Policy; and attestation to the conformance of this Policy with accounting rules. 4.2 The Director, Operations Finance Business Partners and Jurisdictional Finance Directors are responsible for the following project activities for entities within their respective function and/or jurisdiction: providing project evaluation guidance to project managers and business unit management; and providing project and capitalization guidance. 4.3 The Vice President, Corporate Development is responsible for managing the Investment Approval Process. 4.4 The Property Accounting Department, under the direction of the Vice President, Accounting Governance and Controls, and in consultation with the Vice President, Accounting Policy and External Reporting, is responsible for: interpreting this Policy in conjunction with daily project approvals; determining whether an expenditure should be capitalized or expensed; bringing any issues related to interpretation to CAO or Accounting Policy; and Approving projects, which include a review of Retirement Units. 4.5 Risk Management and Internal Audit will periodically test for compliance with the Entergy Code of Entegrity, this Policy and attendant procedures, and any related internal control processes CITIES 1-3 BB12 011

15 ENTERGY ACCOUNTING POLICIES & PROCEDURES Page 7 of 17 Title: CAPITALIZATION Last Revision: Rev. 1 January 19, Pro"ect, Managers are responsible for the management of their projects including compliance with this Policy. Specifically, functional areas and Project Managers are responsible for ensuring that the description of their projects and Retirement Units are accurate and updated as needed. Project Managers must ensure: 5.0 DETAILS Whenever possible, costs are estimated for the entirety of a project to allow management to have a complete financial view of a project's scope; When a project includes costs that are both capital, and Operating & Maintenance Expense, separate Work Orders should be utilized to properly capture the costs. However, a single capital Work Order may be utilized for Mass Property Electric and Gas Distribution when activity-based derivation assigns capital and expense costs; That the most up to date in-service dates, completion dates, and as-built estimates are depicted in PowerPlant; and Accurate estimates are reflected in PowerPlant on projects, including proper RU's for additions, removals, and retirements. 5.1 General Requirements - Spending on Capital Funding Projects should NOT begin until approval is obtained in accordance with this Policy, the Capital Funding Project Approval Policy, and the Entergy System Approval Authority Policy, Some storm projects have special requirements that can be found in the Capital Funding Project Approval Policy and the Storm Damage Policy. Contractual arrangements that bind the Company to future spending should not be entered into until approval is obtained in accordance with this Policy, 6.0 TYPES OF CAPITAL ASSETS 6.1 RETIREMENT UNITS (RUs) - The term Retirement Unit (or RU) refers to property or equipment which, upon assembly or purchase, can function as a stand-alone unit. A detailed listing of Retirement Units by function is maintained by Property Accounting The total cost of a Retirement Unit is to include all costs incurred in the acquisition and installation of the Retirement Unit. The components of construction cost can be found in the FERC Uniform System of Accounts Electric Plant Instruction No. 3 (Link to FERC USOA). Also, the cost of any associated Minor Item of Property is included in direct and indirect costs when one is calculating the total cost for any Retirement Unit. Once CITIES 1-3 BB13 012

16 ENTERGY ACCOUNTING POLICIES & PROCEDURES Page 8 of 17 Title: CAPITALIZATION Last Revision: Rev. I January 19, 2014 the RU is placed in service, the cost of the RU is to be capitalized to the appropriate utility plant account When RU's are taken out of service or retired, with or without being replaced, the cost of the RU will then be credited to the same utility plant account that it was capitalized to when it was procured. The cost to be retired, once again includes all of the construction costs that the FERC deems to be appropriate for inclusion. A complete list of RU's can be found in the PowerPlant Estimate Panels, or the Property Accounting Web Page. The appropriate accounting for retirements is discussed further in Section 7.4 below For entities that are not Rate Regulated Entities as defined in Section 3.16 of this Policy: if the cost of removal of a Retirement Unit, or the net book value of the Retirement Unit being removed is significant, Property Accounting should contact Accounting Policy to determine the appropriate accounting for the retirement/removal. 6.2 MINOR ITEMS OF PROPERTY - The associated parts or items of property that compose Retirement Units are considered to be Minor Items of Property Minor Items of Property may be considered Capital Assets when they meet the appropriate Capitalization Criteria (described Section 7), are considered significant with respect to the associated Retirement Unit, and did not previously exist. At a minimum, a Minor Item of Property must meet the appropriate materiality threshold (Attachment A) described in this Policy Minor items can be retired, but may not necessarily be replaced. Here, the usual procedure, which warrants a credit to the plant account to remove the minor item from the books, will not be needed if the minor item's original cost was included as a component of the related Retirement Unit's cost. The salvage and removal costs are recorded as expense For the addition of an item to qualify as a capitalizable Minor Item of Property addition, it must meet certain criteria which vary by function. A Minor Item of Property must also have an estimated life greater than one year, and it must meet the applicable materiality threshold specified in Attachment A. 6.3 CAPITAL SPARES - Capital Spares are limited replacement parts for items of equipment critical to the operations of the plant CITIES 1-3 BB14 013

17 Title: CAPITALIZATION I ENTERGY ACCOUNTING POLICIES & PROCEDURES Page 9 of 17 Last Revision: Rev. 1 January 19, Capital Spares should be accounted for in the same plant accounts, and use the same useful life for depreciation as the specific retirement units to which they are related All of the following criteria must be met for an item to be considered a Capital Spare: a. The item must be essential for emergency needs to continue plant/substation operations b. The item must not have a history of periodic replacement (see Rotable Spare) c. The item cannot be readily available from a vendor or manufacturer, requires long lead time for delivery, and is generally considered to be special order merchandise. d. The item is generally limited in quantity (i.e, only one on hand), not interchangeable with various machinery or equipment, and stored at the site of the related equipment it is intended to replace or repair The cost of removal of the Retirement Unit in operation should be charged to removal cost and the cost to install the spare should be charged to capital The cost of the Retirement Unit replaced, if not repairable, should be retired. If the Retirement Unit can be repaired, or it is likely it will be repaired, the repair cost should be charged to the appropriate maintenance expense account and the Retirement Unit should remain in account 101 (Electric Plant In Service) as the Capital Spare The cost of purchasing a new Capital Spare should be accounted for as a capital purchase if the Capitalization Criteria found in this policy are otherwise met Replacements of assets must be recorded on a Capital WO, including the associated removal costs The cost of maintaining and storing Capital Spares should be accounted for by charging the appropriate operating expense account of the Retirement Unit to which it is related. The inclusion in Account 101 (Electric Plant In Service) does not relieve the requirements for a physical inventory of these items per Instruction C of CITIES 1-3 BB15 014

18 ENTERGY ACCOUNTING POLICIES & PROCEDURES Page 10 of 17 Title: CAPITALIZATION Last Revision: Rev. 1 Januarv 19, 2014 Account 154 (Plant Materials and Operating Supplies). The designation as Capital Spare Parts will be decided by the CAO and Property Accounting. 6.4 ROTABLE SPARES - Rotable Spares are replacement parts for equipment that are necessary for plant operations, but which (unlike Capital Spares) require regular replacement or refurbishment. Several Rotable Spares may be kept to allow for the exchange of commonly rotated parts and for the maintenance, repair, or refurbishment of existing Rotable Spares For an item to be designated a Rotable Spare, it must meet all of the following criteria: a. The rotation of the item must be essential for safe and/or reliable plant operations; and b. The item must be on a periodic rotation schedule The cost of removal of the Retirement Unit in operation should be charged to removal cost and the installation of the spare should be charged to expense The cost of the Retirement Unit replaced, if not repairable, should be retired. If the Retirement Unit can be repaired, or it is likely it will be repaired, the repair cost should be charged to the appropriate maintenance expense account and the Retirement Unit should remain in account 101 (Electric Plant In Service) as the Rotable Spare The cost of purchasing a new Rotable Spare should be accounted for as a capital purchase if the Capitalization Criteria found in this Policy are otherwise met The cost of maintaining and storing Rotable Spares should be accounted for by charging the appropriate operating expense account of the retirement unit to which it is related. The inclusion in Account 101 (Electric Plant In Service) does not relieve the regulatory requirements for a physical inventory of these items per Instruction C of Account 154 (Plant Materials and Operating Supplies). The designation as a Rotable Spare will be decided by the CAO and Property Accounting. 6.5 SOFTWARE SYSTEMS - Software Systems applies to the custom development of a new software program to be used by the Company, whether internally developed by the Company or developed externally (via the use of off-site or in house consultants) CITIES 1-3 BB16 015

19 ENTERGY ACCOUNTING POLICIES & PROCEDURES Page 11 of 17 Title: CAPITALIZATION Last Revision: Rev. 1 January 19, Internally or externally developed software should be capitalized based on the guidance in ASC (formerly SoP 9$-1). Contact Property Accounting for any interpretive questions regarding the capitalization of software related costs For Rate-Regulated Entities; FERC rules permit the capitalization of certain design, administrative and general overhead, and training costs which would otherwise be expensed for non-rate-regulated Entities. The guidance in the FERC Components of Construction Cost and Overhead Construction Cost is the basis for this exception. See Section for a link to the FERC USoA which contains this guidance in Electric Plant Instructions 3 and The development of databases, reports, spreadsheet, calculations, etc. are not considered to be a software programs, and should not be considered for capitalization except as a part of a Software System project Enhancements are defined as modifications to existing internal-use software that result in additional functionality-that is, modifications to enable the software to perform tasks that it was previously incapable of performing. Upgrades and enhancements normally require new software specifications and may also require a change to all or part of the existing software specifications. 6.6 PLANT DESIGN BASIS (NUCLEAR PLANTS ONLY) - Certain projects constituting a change to the "design basis" of a nuclear plant may be capital. Contact Property Accounting for any interpretive questions regarding the capitalization of Plant Design Basis related costs. The following are the guidelines under which projects should be evaluated: A capital change to the design basis of the plant is generally one that requires the filing of a license amendment request (LAR) under CFR 50.59, and where the project team has assessed as probable the likelihood of acceptance by the NRC of that LAR without substantial or material modifications (such that the company does not believe that another evaluated option will ultimately need to be pursued). CFR provides guidance as to when the Company is filing documentation with the NRC that effectively changes design basis documentation via changes to the FSAR (final safety evaluation report) If an LAR will be filed, the following types of costs may potentially be considered capital plant basis design costs: CITIES 1-3 BB17 016

20 ENTERGY ACCOUNTING POLICIES & PROCEDURES Page 12 of 17 Title: CAPITALIZATION Last Revision: Rev. 1 January 19, CAPITALIZATION CRITERIA a. Work to change the design basis documentation related to: A change to a "Facility" which is defined in that section as "structures, systems and components (SSCs) that are described in the final FSAR" and the associated design and performance requirements for such SSCs (as described in the FSAR). b. Work to change the design basis documentation related to a change to procedures under which is defined in that section as "those procedures that contain information described in the FSAR such as how SSCs are operated and controlled (including operator actions and response times)". Changes to the design basis documentation for the specified performance of a test or experiment which are described in as "any activity where any structure, system, or component is utilized or controlled in a manner which is either outside the reference bounds of the design bases as described in the FSAR or inconsistent with the FSAR" will generally be considered O&M Capitalization and depreciation is a process by which Entergy records assets that benefit future periods and matches the recognition of the associated cost of those assets ratably over the period of the assets' benefit. A Capital Asset is an asset that has an estimated service life of longer than one year, and meets the appropriate criteria (including materiality threshold) established by this policy based on its function and classification General materiality thresholds can be found in Attachment A. Materiality thresholds specific to Betterments (discussed in Section 7.2 below) are included in Attachment B Exceptions to the previous rules are as follows: An asset with an expected useful life of less than 1 year from the time of acquisition or completed construction shall be charged to the appropriate maintenance expense account, regardless of its cost. Items listed as Retirement Units on the Property Accounting website require capitalization regardless of cost, if their useful life is 1 year or more The cost of training should generally be expensed as incurred. However, for Rate-Regulated Entities, certain training costs may be capitalized when they CITIES 1-3 BB18 017

21 ENTERGY ACCOUNTING POLICIES & PROCEDURES Page 13 of 17 Title: CAPITALIZATION Last Revision: Rev. I January 19, 2014 relate to the addition of technology that is new to the Company's operations. This treatment should only be applied in the instance of the construction or purchase of a new Capital Asset. In that situation the cost of training may be included in the Capital Funding Project associated with the new Capital Asset Internal labor may be capitalized associated with time spent directly on the construction, or modification (Betterment) of a Capital Asset. These costs should only be capitalized when all other Capitalization Criteria in Section 7 of this Policy have been met. 7.1 Additions Additions of plant result from the purchase or construction of equipment, or other types of assets. Purchases of plant or other assets should be considered a Capital Asset when they meet the criteria above in Section through Additional criteria for constructed Capital Assets are discussed in below For an asset that is being constructed or developed (by internal or external resources), costs should only be capitalized when the plan of work identifies a specific Capital Asset(s), which is/are probable of being placed into service. For the purposes of this Policy, construction shall also be applied to the development of a Software System in conjunction with ASC as appropriate For Rate-Regulated Entities, the guidance in Electric Plant Instructions 3 and 4 should be used to define the costs associated with the project which should be capitalized (see Section for a link to this material) FERC rules also permit Rate-Regulated Entities to capitalize certain costs associated with testing, surveys, plans, and investigations in Account 183. This account may only be used with prior approval from Property Accounting. Note: Property Accounting will approve the use of this account only after 1) consultation with Accounting Policy and the Director, Utility Operations Accounting; and 2) notification of probable recovery from the respective jurisdiction's Director of Finance For non-rate-regulated Entities, GAAP guidance should be followed regarding the costs that should be capitalized as a part of construction. 7.2 Betterments CITIES 1-3 BB19 018

22 ENTERGY ACCOUNTING POLICIES & PROCEDURES Page 14 of 17 Title: CAPITALIZATION Last Revision: Rev. 1 January 19, A modification of an existing Capital Asset may qualify as a Betterment if it meets the appropriate thresholds specified in Attachment B When making the assessment of increases to the output or useful life of an existing Capital Asset, the asset analyzed should be the lowest level which can be separately identified in the property record (usually a Retirement Unit, but which may also be a group of assets if no single Capital Asset can be identified in the property record). Therefore, if an individual Capital Asset has a separate property record, a modification of that Capital Asset may be assessed to determine if it qualifies as a Betterment. If Capital Assets are not entered into the property records on a componentized basis, the lowest level of Capital Asset in the property record that is being modified should be assessed to determine whether the modification will result in an increase to the useful life or output of that Capital Asset. If so, the modification may be capitalized as a Betterment Ordinary and/or recurring maintenance and repairs of Capital Assets, or modifications that do not meet the criteria as Betterments should be recognized in the appropriate maintenance expense account Questions regarding the appropriate accounting for Betterments should be directed to Property Accounting. 7.3 Replacements Replacements of Capital Assets must be recorded on a Capital WO. The Retirement must be recorded along with the addition. See Section 7.4 below for the appropriate accounting treatment for Retirements Costs to remove and dispose of a Capital Asset must be estimated as removal costs. 7.4 Retirements Retirements, as well as Additions and Replacements, are to be accounted for using a Capital WO When retiring a Capital Asset, the Retirement is recorded by crediting its originally installed cost to the utility plant account in which it was originally included Costs to remove and dispose of a Capital Asset must be estimated as removal costs CITIES 1-3 BB20 019

23 ENTERGY ACCOUNTING POLICIES & PROCEDURES Page 15 of 17 Title: CAPITALIZATION Last Revision: Rev. 1 January 19, TRANSFERS AND SALES Property Accounting must be contacted for transfers of Capital Assets between Asset Locations, Legal Entities, Business Units or sales to third parties. 8.0 ATTACHMENTS Attachment A - Materiality Thresholds for Capitalization Attachment B - Criteria for Betterments Designation by Function CITIES 1-3 BB21 020

24 ENTERGY ACCOUNTING POLICIES & PROCEDURES Page 16 of 17 Title: CAPITALIZATION Last Revision: Rev. I January 19, 2014 Attachment A - Materiality Thresholds for Capitalization Function Fossil Production Plant Nuclear General Plant Substation Transmission and Distribution Lines Software Threshold Amount Material Invoice Cost must be greater than $5,000 Material Invoice Cost must be greater than $5,000 Material Invoice Cost must be greater than $5,000 Material Invoice Cost must be greater than $5,000 Material Invoice Cost must be greater than $1,000 Material Invoice Cost must be greater than $50,000 Note: All thresholds apply to all items that are not already classified as Retirement Units. Material Invoice Cost includes all direct costs to construct or acquire an asset and make it ready for service CITIES 1-3 BB22 021

25 ENTERGY ACCOUNTING POLICIES & PROCEDURES Page 17 of 17 Title: CAPITALIZATION Last Revision: Rev. 1 January 19, 2014 Attachment B-- Criteria for Betterments Designation by Function Function Threshold Nuclear The life of an item must be extended by at least 25 lo and the differential value to be capitalized must be greater than $50,000; or The item's performance must be increased by at least 25!o and the differential value to be capitalized must be greate r than $50,000. Fossil Production Plant The life of an item must be extended by the lesser of 3 years or 25% and the differential value to be capitalized must be greater than $50,000; or The item's performance must be increased by at least 25 l0 and the differential value to be capitalized must be greater than $ General/ Intangible Plant Similar rules apply, but the material invoice cost must be materially larger than the "like kind" replacement's material invoice cost in order to be considered as a Betterment. The life of an item must be extended by 25% or 5 years and the differential value to be capitalized must be greater than 1 000; or The item's performance must be increased by at least 25% and the differential value to be capitalized must be reater than $ Transmission Lines * The life of an item must be extended by at least 25% and the differential value to be capitalized must be greater than $10,000; or The item's performance must be increased by at least 25% and the differential value to be capitalized must be reater than $10,000. Substations The life of the item must be extended by at least 25% and the differential value to be capitalized must be -greater than 1Q 000; or, The performance of the item must be increased by at least 25% and the differential value to be capitalized must be greater than $ Software The life of the item must be extended by at least 25% and the differential value to be capitalized must be greater than $50, 000; AND It must meet the definition of an enhancement in Section CITIES 1-3 BB23 022

26 ENTERGY CORPORATION TRANSMISSION LINE CAPITALIZATION PROCEDURES 1.0 Purpose This procedure document defines Entergy Corporation's accounting requirements for Transmission Line Units of Property. This procedure document complies with the Federal Energy Regulatory Commission (FERC) Code of Federal Regulations Part 101, Electric Plant Instruction #10, which requires that all property consist of retirement units and minor items of property. 2.0 Applicability/Scope This procedure document applies to the accounting for all Entergy Corporation Transmission Line Capital Expenditure Authorizations (CWOs), and should be utilized in conjunction with the Entergy Capitalization Policy. 3.0 Definitions 3.1 "Retirement Unit" (RU's) refers to property or equipment which, upon assembly or purchase, can function as a stand-alone unit. When the RU's are put into service, the cost of the RU is to be capitalized to the appropriate utility plant account. 3.2 "Minor Items of Property" refers to the associated parts or items of which Retirement Units (units of property) are composed. 3.3 "Operations and Maintenance of a Retirement Unit or System" reflects operations and maintenance costs charged to Transmission Line expense accounts and includes expenditures related to repairs, minor upgrades, lubrication, cleaning, adjustment, preventative maintenance and painting which are incurred to keep equipment in normal usable condition. Such expenditures may be either minor or major in magnitude and may be routine or non-routine in nature. 3.4 "Replacement of a Retirement Unit or System" is the removal and replacement of a retirement unit or system as identified in the retirement unit listing and the substitution of a new unit or system that is of the same type and has the same performance capabilities. 3.5 "Material Invoice Cost" includes all direct costs to construct or acquire an asset and make it ready for service. Transmission Line Capitalization Procedures Page CITiES 1-3 BB24 023

27 ENTERGY CORPORATION TRANSMISSION LINE CAPITALIZATION PROCEDURES 4.0 Procedure 4.1 Listing of Property/Retirement Units A complete list can be referenced in the PowerPlant Estimate Panels or the Property Accounting Web Page. 4.2 Accounting for Retirement Units Additions, retirements and replacements of Retirement Units are to be accounted for by using capital and retirement CWfJ's. The cost of a Retirement Unit shall include all FERC prescribed direct and indirect costs incurred in the placement of the Retirement Unit, including any associated Minor Items of Property When a Retirement Unit is taken out of service or retired; with or without replacement; the cost of the Retirement Unit shall be credited to the utility plant account in which recorded. The original cost to be retired includes all of the construction costs that the FERC deems to be appropriate for inclusion (see FERC Uniform System of Accounts Electric Plant Instruction No. 3) All assets with an estimated service life less than 1 year are expensed. 4.3 Accounting for Minor Items of Property The cost of an addition to a Retirement Unit of a Minor Item of Property that did not previously exist shall be charged to the appropriate maintenance expense account, except where the minor item represents a substantial addition A substantial minor item addition is defined as the following: 1. The estimated service life of each minor item addition is for one year or more. 2. The Material Invoice Cost (refer to 3.5) is equal to or exceeds $1, If a Minor Item of Property is replaced independently of the Retirement Unit of which it is a part, all costs of the replacement Transmission Line Capitalization Procedures Page CITIES 1-3 BB25 024

28 ENTERGY CORPORATION TRANSMISSION LINE CAPITALIZATION PROCEDURES including property addition, cost of removal and salvage credits shall be recorded in the appropriate maintenance expense account. See Section for those instances in which the replacement of a portion of an existing Retirement Unit would be treated as a Betterment and therefore capitalized as a part of the Retirement Unit A Minor Item of Property that is retired and not replaced requires no separate retirement (credit to the plant account) provided that its cost is included as part of the related Retirement Unit. All costs of removal and salvage shall be recorded as expense. 4.4 Betterment of a Retirement Unit (Unit of Property) Betterment describes the situation in which a major part of a Retirement Unit is modified or replaced, resulting in significant improvement or superior performance. The result of the improved substitute serves to increase the overall efficiency and/or tends to increase the useful life of the Retirement Unit. The accounting treatment for Betterments will be decided on a case by case basis by Property Accounting When making the assessment of increases to the output or useful life of an existing Capital Asset, the asset analyzed should be the lowest level which can be separately identified in the property record (usually a Retirement Unit, but which may also be a group of assets if no single Capital Asset can be identified in the property record). Therefore, if an individual Capital Asset has a separate property record, a modification of that Capital Asset may be assessed to determine if it qualifies as a Betterment. If Capital Assets are not entered into the property records on a componentized basis, the lowest level of Capital Asset in the property record which is being modified should be assessed to determine whether the modification will result in an increase to the useful life or output of that Capital Asset. If so, the modification may be capitalized as a Betterment Ordinary and/or recurring maintenance and repairs of Capital Assets, or modifications which do not meet the criteria as Betterments should be recognized in the appropriate maintenance expense account. Transmission Line Capitalization Procedures Page CITIES 1-3 BB26 025

29 ENTERGY CORPORATION TRANSMISSION LINE CAPITALIZATION PROCEDURES A Betterment that involves the replacement of a Minor Item of Property (refer to 4.3) is generally expensed unless the results involve a significant improvement in performance, or life extension, and the Material Invoice Cost (refer to 3.5) is materially larger than the material invoice cost of a "like kind" replacement. If the cost factor is deemed not to be material (refer to 4.4.6), then the cost of the Betterment is usually charged to the appropriate maintenance expense account A Betterment may involve an addition to plant that did not previously exist. Accounting for such additions would involve capitalization of Retirement Units and expensing Minor Items of Property not meeting the criteria of Section For an item to be designated a Betterment it must meet one of the following criteria: 1. The life of the item must be extended by at least 25 lo and the differential value to be capitalized must be greater than $10,000; or 2. The performance of the item must be increased by at least 25!o and the differential value to be capitalized must be greater than $ 10, Threshold for Capitalization of General Property Refer to the Entergy Corporation General/Intangible Plant Capitalization Procedures located on the Property Accounting Web Page for specific details. Transmission Line Capitalization Procedures Page CITIES 1-3 BB27 026

30 ENTERGY TEXAS, INC. PUBLIC UTILITY COMMISSION OF TEXAS DOCKET NO Response of Entergy Texas, Inc. to the First Set of Data Requests of Requesting Party: Cities Prepared By: DMark Hunter Sponsoring Witness: Khamsune Vongkhamchanh Beginning Sequence No. Ending Sequence No. Question No.: CITiES 1-4 Part No.: Addendum: Question: Please provide a more detailed description of the Transmission Substation Failures Blanket (Project Code F I PPUT0556) and why it is considered a capital replacement prograrn rather than a substation maintenance program. Response: The Transmission Substation Failures Blanket (Project Code F1 PPUT0556) was created to address failures of substation equipment that need immediate attention to preserve the integrity and reliability of the transmission substations. According to the Uniform System of Accounts, expenditures associated with these projects are classified as capital because all work orders in this blanket were created and used to replace various retirement units for substation equipment. Attached is the Company's Substation Capitalization Procedure. For a definition of "retirement unit" and the Company's capitalization policy, please see the Company's response to Cities CITIES 1-4 BB28 027

31 ENTERGY CORPORATION SUBSTATIONS CAPITALIZATION PROCEDURES 1.0 Purpose This procedure document defines Entergy Corporation's accounting requirements for Transmission and Distribution Substation Units of Property. This procedure document complies with the Federal Energy Regulatory Commission (FERC) Code of Federal Regulations Part 101, Electric Plant Instruction #10, which requires that all property consist of retirement units and minor items of property, 2.0 Applicability/Scope This procedure document applies to the accounting for all Entergy Corporation Substation Capital Work Orders (CWOs), and should be utilized in conjunction with the Entergy Capitalization Policy. 3.0 Definitions 3.1 "Retirement Units" (RU's) refers to property or equipment which, upon assembly or purchase, can function as a stand-alone unit. When the RU's are put into service, the cost of the RU is to be capitalized to the appropriate utility plant account 3.2 "Minor Items of Property" refers to the associated parts or items of which Retirement Units (units of property) are composed. 3.3 "Operations and Maintenance of a Retirement Unit" reflects operations and maintenance costs charged to Substation expense accounts and includes expenditures related to repairs, minor upgrades, lubrication, cleaning, adjustment, preventative maintenance and painting which are incurred to keep equipment in normal usable condition. Such expenditures may be either minor or major in magnitude and may be routine or non-routine in nature. 3.4 "Replacement of a Retirement Unit or System" is the removal and replacement of a Retirement Unit or system as identified in the retirement unit listing and the substitution of a new unit or system that is of the same type and has the same performance capabilities. 3.5 "Production Plant/Transmission Plant Demarcations" distinguish between FERC Accounts 315, 324, 334, 345 & FERC Account 353. The Demarcation point is defined as: CITIES 1-4 BB29 028

Overview of Accounting Systems

Overview of Accounting Systems Overview of Accounting Systems Generally Accepted Accounting Principles (GAAP) A series of rules for the treatment of financial matters Developed by the Financial Accounting Standards Board (FASB) FASB

More information

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION ) ) ) ) DIRECT TESTIMONY GREGORY R. ZAKRZEWSKI REGULATORY PROJECT COORDINATOR, REGULATORY ACCOUNTING

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION ) ) ) ) DIRECT TESTIMONY GREGORY R. ZAKRZEWSKI REGULATORY PROJECT COORDINATOR, REGULATORY ACCOUNTING BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION IN THE MATTER OF THE APPLICATION OF ENTERGY ARKANSAS, INC. FOR APPROVAL OF CHANGES IN RATES FOR RETAIL ELECTRIC SERVICE ) ) ) ) DOCKET NO. -0-U DIRECT TESTIMONY

More information

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION APSC FILED Time: 9/28/202 3:46:09 PM: Recvd 9/28/202 3:37:45 PM: Docket 2-069-u-Doc. 9 BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION IN THE MATTER OF AN APPLICATION OF ENTERGY ARKANSAS, INC., MID SOUTH

More information

NB Power Accounting Policy Property Plant & Equipment

NB Power Accounting Policy Property Plant & Equipment Attachment NBEUB IR-40 Accounting_Policy_Property_Plant _and_equipment NB Power Accounting Policy Property Plant & Equipment Scope This accounting policy addresses the following property, plant, and equipment

More information

Entergy Gulf States Louisiana, LLC 2015 Pole Attachment Formula and Calculation for Public Utilities For the Test Year Ended December 31, 2014

Entergy Gulf States Louisiana, LLC 2015 Pole Attachment Formula and Calculation for Public Utilities For the Test Year Ended December 31, 2014 Entergy Gulf States Louisiana, LLC 2015 Pole Attachment Formula and Calculation for Public Utilities For the Test Year Ended December 31, 2014 Ln Data Source Reference [1] USofA [2] Amount 1 Gross Plant

More information

Entergy Louisiana, LLC (5) 2016 Pole Attachment Formula and Calculation for Public Utilities For the Test Year Ended December 31, 2015.

Entergy Louisiana, LLC (5) 2016 Pole Attachment Formula and Calculation for Public Utilities For the Test Year Ended December 31, 2015. Entergy Louisiana, LLC (5) 2016 Pole Attachment Formula and Calculation for Public Utilities For the Test Year Ended December 31, 2015 Ln Description FF1 Ref. [1] USofA [2] Amount 1 Gross Plant 110.4.c

More information

Electric Utility System of Accounts

Electric Utility System of Accounts National Association of Regulatory Utility Commissioners 3rd Partnership Activity of the Energy Regulation Board of Zambia & Pennsylvania Public Utility Commission March 20-23, 2006 Electric Utility System

More information

Tangible Property Regulations - Frequently Asked Questions (irs.gov)

Tangible Property Regulations - Frequently Asked Questions (irs.gov) Tangible Property Regulations - Frequently Asked Questions (irs.gov) Section 162 of the Internal Revenue Code (IRC) allows you to deduct all the ordinary and necessary expenses you incur during the taxable

More information

Form 3115 Change in Accounting Method: Navigating the IRS Repair Regulations

Form 3115 Change in Accounting Method: Navigating the IRS Repair Regulations FOR LIVE PROGRAM ONLY Form 3115 Change in Accounting Method: Navigating the IRS Repair Regulations WEDNESDAY, MAY 4, 2016, 1:00-2:50 pm Eastern IMPORTANT INFORMATION FOR THE LIVE PROGRAM This program is

More information

SCHEDULE 72 INTERCONNECTIONS TO NON-UTILITY GENERATION

SCHEDULE 72 INTERCONNECTIONS TO NON-UTILITY GENERATION Idaho Power Company Second Revised Sheet No. 72-1 I.P.U.C. No. 29, Tariff No. 101 First Revised Sheet No. 72-1 PUBLIC UTILITIES COMMISSION AVAILABILITY Service under this schedule is available throughout

More information

RECITALS. Now, Therefore, in consideration of the mutual covenants and agreements herein set forth, the Parties do hereby agree as follows:

RECITALS. Now, Therefore, in consideration of the mutual covenants and agreements herein set forth, the Parties do hereby agree as follows: LEE COUNTY ELECTRIC COOPERATIVE STANDARD INTERCONNECTION AGREEMENT FOR CUSTOMER-OWNED RENEWABLE GENERATION SYSTEMS GREATER THAN 100 KW AND LESS THAN OR EQUAL TO 1 MW TIER 3 This Interconnection Agreement

More information

IMPORTANT INFORMATION Invitation to Bid No. TS12-S-10 Kindly acknowledge important revisions to the terms and conditions under the bidding documents in details as follows: Volume I of IV 1. TC-SUB-01 Data

More information

The following Information Requests pertain to the spreadsheet file Attachment_H- 1_Formula_Rate_2015_-Run_1_posted_ _(effective_ ) :

The following Information Requests pertain to the spreadsheet file Attachment_H- 1_Formula_Rate_2015_-Run_1_posted_ _(effective_ ) : TGST 1-1: Refer to PNM S 2014 FERC Form 1 page 207, line 50, Account 353 Station Equipment, please provide a description of significant projects ($5 million or more) contributing to the increase of approximately

More information

Southern California Edison Company Tariff Title: Transmission Owner Tariff Tariff Record Title: Service Agreement No. 101 FERC FPA Electric Tariff ENGINEERING, DESIGN AND PROCUREMENT LETTER AGREEMENT BETWEEN

More information

Portland General Electric Company P.U.C. Oregon No. E-18 Original Sheet No. C-1 RULE C CONDITIONS GOVERNING CUSTOMER ATTACHMENT TO FACILITIES

Portland General Electric Company P.U.C. Oregon No. E-18 Original Sheet No. C-1 RULE C CONDITIONS GOVERNING CUSTOMER ATTACHMENT TO FACILITIES P.U.C. Oregon No. E-18 Original Sheet No. C-1 RULE C CONDITIONS GOVERNING CUSTOMER ATTACHMENT TO FACILITIES 1. Acceptance of Electricity Service By establishing or requesting a POD or by continuing an

More information

Tangible Property Regulations Overview Key Provisions for Small Business Taxpayers. Tim Benningfield 07/15/2015

Tangible Property Regulations Overview Key Provisions for Small Business Taxpayers. Tim Benningfield 07/15/2015 Tangible Property Regulations Overview Key Provisions for Small Business Taxpayers Tim Benningfield 07/15/2015 Internal Revenue Code - General Rules Section 162 allows a deduction for ordinary and necessary

More information

ENTERGY System Agreement

ENTERGY System Agreement Entergy Arkansas, Inc., Second Revised Rate Schedule FERC No. 94 Original Sheet No. 1 ENTERGY System Agreement Agreement Among: Entergy Arkansas, Inc. Entergy Gulf States, Inc. Entergy Louisiana, LLC Entergy

More information

FLORIDA POWER & LIGHT COMPANY Cost Measurement & Allocation Department Cost Allocation Manual (CAM) 2016 TABLE OF CONTENTS. Section Description Page

FLORIDA POWER & LIGHT COMPANY Cost Measurement & Allocation Department Cost Allocation Manual (CAM) 2016 TABLE OF CONTENTS. Section Description Page TABLE OF CONTENTS Section Description Page I Introduction 2 II Cost Accounting Concepts 2 III Regulatory Requirements and Reporting 2 FERC Accounting Guidelines 2 FPSC Rule 3 NARUC Guidelines 3 Diversification

More information

APPENDIX IX ATTACHMENT 1 FORMULA RATE PROTOCOLS

APPENDIX IX ATTACHMENT 1 FORMULA RATE PROTOCOLS APPENDIX IX ATTACHMENT 1 FORMULA RATE PROTOCOLS 1. INTRODUCTION SCE shall calculate its Base Transmission Revenue Requirement ( Base TRR ), as defined in Section 3.6 of the main definitions section of

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Southwest Power Pool, Inc. ) Docket No. ER

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Southwest Power Pool, Inc. ) Docket No. ER UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Southwest Power Pool, Inc. ) Docket No. ER16- -000 PETITION OF SOUTHWEST POWER POOL, INC. FOR TARIFF WAIVER Pursuant to Rule 207(a)(5)

More information

TANGIBLE PROPERTY REGULATIONS

TANGIBLE PROPERTY REGULATIONS November 6, 2014 Matthew C. Litz, BerryDunn Jonathan McDonald, BerryDunn TANGIBLE PROPERTY REGULATIONS berrydunn.com FIXED ASSET LIFECYCLE Acquisition Capitalization PIS Classification Disposition 2 AGENDA

More information

STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY DOCKET NO

STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY DOCKET NO STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY DOCKET NO. 1-- APPLICATION OF THE CONNECTICUT LIGHT AND POWER COMPANY DBA EVERSOURCE ENERGY TO AMEND ITS RATE SCHEDULES TESTIMONY OF NED W. ALLIS

More information

ENTERGY STATISTICAL REPORT AND INVESTOR GUIDE

ENTERGY STATISTICAL REPORT AND INVESTOR GUIDE ENTERGY STATISTICAL REPORT AND INVESTOR GUIDE 2016 Our Vision: We Power Life Our Mission: We exist to operate a world-class energy business that creates sustainable value for our four stakeholders owners,

More information

BY ELECTRONIC FILING Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

BY ELECTRONIC FILING Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. ANDREW W. TUNNELL t: (205) 226-3439 f: (205) 488-5858 e: atunnell@balch.com BY ELECTRONIC FILING Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

Rate Code: L L-16 SOUTH CAROLINA PUBLIC SERVICE AUTHORITY (SANTEE COOPER) LARGE LIGHT AND POWER SCHEDULE L-16

Rate Code: L L-16 SOUTH CAROLINA PUBLIC SERVICE AUTHORITY (SANTEE COOPER) LARGE LIGHT AND POWER SCHEDULE L-16 SOUTH CAROLINA PUBLIC SERVICE AUTHORITY (SANTEE COOPER) LARGE LIGHT AND POWER SCHEDULE L-16 Section 1. Availability: (A) Service hereunder is available at Delivery Points on or near the transmission facilities

More information

DIRECT TESTIMONY OF THE REVENUE REQUIREMENTS PANEL

DIRECT TESTIMONY OF THE REVENUE REQUIREMENTS PANEL BEFORE THE NEW YORK STATE PUBLIC SERVICE COMMISSION ----------------------------------------------------------------------------x Proceeding on Motion of the Commission as to the Rates, Charges, Rules

More information

Lee Canova and Lyn Rouchell I. POLICY SUMMARY

Lee Canova and Lyn Rouchell I. POLICY SUMMARY ENTERGY SYSTEM ACCOUNTING POLICIES Title: AFFILIATE TRANSACTIONS Effective Date: September 15, 2007 Prepared by: Jennifer Goodlett Reviewed by: Lee Canova and Lyn Rouchell Approved by: Theo Bunting I.

More information

UNITED STATES SECURITIES AND EXCHANGE COMMISSION WASHINGTON, D.C FORM 10-Q. Ameresco, Inc.

UNITED STATES SECURITIES AND EXCHANGE COMMISSION WASHINGTON, D.C FORM 10-Q. Ameresco, Inc. (Mark One) UNITED STATES SECURITIES AND EXCHANGE COMMISSION WASHINGTON, D.C. 20549 FORM 10-Q þ QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 For the quarterly

More information

News Release. Entergy Reports Fourth Quarter and Full Year Financial Results; Initiates 2019 Earnings Guidance Based on Single New Measure

News Release. Entergy Reports Fourth Quarter and Full Year Financial Results; Initiates 2019 Earnings Guidance Based on Single New Measure Entergy 639 Loyola Avenue New Orleans, LA 70113 Date: February 20, 2019 For Release: Immediately News Release Contact: Neal Kirby (Media) (504) 576-4238 nkirby@entergy.com David Borde (Investor Relations)

More information

Paul M. Blanch Energy Consultant

Paul M. Blanch Energy Consultant 15 October 2014 Paul M. Blanch Energy Consultant Mr. Mark A. Satorius Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Dear Mr. Satorius: SUBJECT: 10 CFR 2.206

More information

Technical Line Common challenges in implementing the new revenue recognition standard

Technical Line Common challenges in implementing the new revenue recognition standard No. 2017-28 24 August 2017 Technical Line Common challenges in implementing the new revenue recognition standard In this issue: Overview... 1 Key accounting and disclosure considerations. 2 Contract duration...

More information

New York State Public Service Commission

New York State Public Service Commission PSC NO. 220 ELECTRICITY ADDENDUM TYPES: SIR NIAGARA MOHAWK POWER CORPORATION ADDENDUM NO. 9 INITIAL EFFECTIVE DATE: NOVEMBER 2, 2018 STAMPS: ISSUED IN COMPLIANCE WITH ORDER IN CASE 18-E-0018 Issued October

More information

Final Regulation of the Capitalization of Tangible Property

Final Regulation of the Capitalization of Tangible Property Final Regulation of the Capitalization of Tangible Property The IRS and Treasury recently issued final tangible property capitalization regulations. The final regulations attempt to bring clarity to a

More information

New York State Public Service Commission

New York State Public Service Commission PSC NO. 220 ELECTRICITY ADDENDUM TYPES: SIR NIAGARA MOHAWK POWER CORPORATION ADDENDUM NO. 7 INITIAL EFFECTIVE DATE: AUGUST 16, 2017 STAMPS: ISSUED IN COMPLIANCE WITH ORDER IN CASE 16-E-0560 Issued August

More information

Property, Plant and Equipment Policy and Procedure Manual

Property, Plant and Equipment Policy and Procedure Manual R I T Rochester Institute of Technology Property, Plant and Equipment Policy and Procedure Manual I. Introduction A. Property, Plant and Equipment (PP&E) 1. PP&E is the term used to refer to tangible long-term

More information

Entergy Louisiana, LLC 2017 Pole Attachment Formula and Calculation for Public Utilities For the Test Year Ended December 31, 2016

Entergy Louisiana, LLC 2017 Pole Attachment Formula and Calculation for Public Utilities For the Test Year Ended December 31, 2016 2017 Pole Attachment Formula and Calculation for Public Utilities For the Test Year Ended December 31, 2016 Ln Description FF1 Ref. [1] USofA [2] Amount 1 Gross Plant 110.4.c 101-106, 114, 107 19,847,012,044

More information

NORTHERN INDIANA PUBLIC SERVICE COMPANY Attachment GG True-Up Adjustment For the Year Ended December 31, 2014

NORTHERN INDIANA PUBLIC SERVICE COMPANY Attachment GG True-Up Adjustment For the Year Ended December 31, 2014 NORTHERN INDIANA PUBLIC SERVICE COMPANY Attachment GG True-Up Adjustment For the Year Ended December 31, 2014 Attachment GG Projected Proportion Actual True Up Revenue of Revenues Revenue Interest allocated

More information

Entergy Reports Fourth Quarter and Full Year Financial Results; Initiates 2018 Earnings Guidance

Entergy Reports Fourth Quarter and Full Year Financial Results; Initiates 2018 Earnings Guidance Entergy 639 Loyola Avenue New Orleans, LA 70113 Date: Feb. 23, 2018 For Release: Immediately News Release Contact: Emily Parenteau (Media) (504) 576-4328 eparent@entergy.com David Borde (Investor Relations)

More information

Tangible Property Regulations

Tangible Property Regulations Tangible Property Regulations Chuck Kosal Ryan Bayer December 6, 2012 Agenda Why is this important? Review of Tangible Property Regulations What s Next - Adoption Common Reactions Why Is This Important?

More information

FERC RECORD RETENTION GUIDELINES. DOCUMENT RETENTION PERIOD CITE Corporate and General. 2 Organizational documents: 18 CFR 125.3

FERC RECORD RETENTION GUIDELINES. DOCUMENT RETENTION PERIOD CITE Corporate and General. 2 Organizational documents: 18 CFR 125.3 FERC RECORD RETENTION GUIDELINES DOCUMENT RETENTION PERIOD CITE Corporate and General 1 Reports to members: Annual reports or statements to members 7 years. 2 Organizational documents: Minute books of

More information

Benchmarking Capitalization Best Practices

Benchmarking Capitalization Best Practices Benchmarking Capitalization Best Practices Jennifer Hoffman, Xcel Energy September 21-22, 2015 OMNI Austin Hotel Downtown Austin, Texas BENCHMARKING C A P I TA L I Z AT I O N B E S T PRACTICES Jennifer

More information

Regulatory Authority Competences in Monitoring the Bookkeeping of the Regulated Companies. Robin Kliethermes Rachel Lewis

Regulatory Authority Competences in Monitoring the Bookkeeping of the Regulated Companies. Robin Kliethermes Rachel Lewis Regulatory Authority Competences in Monitoring the Bookkeeping of the Regulated Companies Commissioner Steve Stoll Robin Kliethermes Rachel Lewis May 17, 2013 1 Overview of Regulatory Accounting Regulatory

More information

Tangible Property Regulations and Tax Update for the Oil and Gas Industry

Tangible Property Regulations and Tax Update for the Oil and Gas Industry and Tax Update for the Oil and Gas Industry Laura Roman, CPA, CMAP Partner, Tax and Strategic Business Services 0 Repair Regulations Affect almost all taxpayers Govern capitalizing and deducting expenditures

More information

HOLY CROSS ENERGY November 3, 2015 GENERATOR INTERCONNECT POLICY

HOLY CROSS ENERGY November 3, 2015 GENERATOR INTERCONNECT POLICY GENERATOR INTERCONNECT POLICY GENERATOR INTERCONNECT (PROCEDURE) GENERATOR INTERCONNECT (GUIDELINES) Page 1 of 50 TABLE OF CONTENTS GENERATOR INTERCONNECT (PROCEDURE)... 4 I. GENERAL OVERVIEW... 5 A. Applicability...

More information

April 28, Southwest Power Pool, Inc., Docket No. ER11- Submission of Formula Rate Template

April 28, Southwest Power Pool, Inc., Docket No. ER11- Submission of Formula Rate Template Secretary Federal Energy Regulatory Commission 888 First Street NE Washington, DC 20426 Re: Southwest Power Pool, Inc., Docket No. ER11- Submission of Formula Rate Template Honorable Secretary Bose: Pursuant

More information

AGREEMENT FOR PURCHASE OF AS-AVAILABLE ENERGY AND/OR PARALLEL OPERATION WITH A QUALIFYING FACILITY TABLE OF CONTENTS

AGREEMENT FOR PURCHASE OF AS-AVAILABLE ENERGY AND/OR PARALLEL OPERATION WITH A QUALIFYING FACILITY TABLE OF CONTENTS ProgressEnergy SECOND REVISED SHEET No. 9.100 CANCELS FIRST REVISED SHEET No. 9.100 AGREEMENT FOR PURCHASE OF AS-AVAILABLE ENERGY AND/OR PARALLEL OPERATION WITH A QUALIFYING FACILITY TABLE OF CONTENTS

More information

Policy Bulletin No. 25 Net Metering. Public Utility District No. 1 of Klickitat County 1313 South Columbus Goldendale, WA 98620

Policy Bulletin No. 25 Net Metering. Public Utility District No. 1 of Klickitat County 1313 South Columbus Goldendale, WA 98620 Policy Bulletin No. 25 Net Metering Public Utility District No. 1 of Klickitat County 1313 South Columbus Goldendale, WA 98620 Interconnection Agreement For Net Energy Metering With Customer Solar, Wind,

More information

US GAAP versus IFRS. The basics. January 2019

US GAAP versus IFRS. The basics. January 2019 versus The basics January 2019 Table of contents Introduction...1 Financial statement presentation...2 Interim financial reporting...5 Consolidation, joint venture accounting and equity method investees/associates...6

More information

Tangible Property Regulations. Crystal Germanese, CPA, MSAT December 18, 2013

Tangible Property Regulations. Crystal Germanese, CPA, MSAT December 18, 2013 Tangible Property Regulations Crystal Germanese, CPA, MSAT December 18, 2013 Tax Disclaimer This presentation is for general informational purposes only. No tax advice is intended to be given. The examples

More information

Excerpt of D On Test Year 2012 General Rate Case For Southern California Edison Company (Pages 1-5, 13-14, , & )

Excerpt of D On Test Year 2012 General Rate Case For Southern California Edison Company (Pages 1-5, 13-14, , & ) Application No.: Exhibit No.: Witnesses: A.13-11-003 SCE-45 T. Godfrey (U 338-E) Excerpt of D.12-11-051 On Test Year 2012 General Rate Case For Southern California Edison Company (Pages 1-5, 13-14, 209-211,

More information

ELECTRIC COOPERATIVE INTERCONNECTION AND PARALLEL OPERATION AGREEMENT FOR DISTRIBUTED GENERATION RATED 2 MW AND LESS

ELECTRIC COOPERATIVE INTERCONNECTION AND PARALLEL OPERATION AGREEMENT FOR DISTRIBUTED GENERATION RATED 2 MW AND LESS ELECTRIC COOPERATIVE INTERCONNECTION AND PARALLEL OPERATION AGREEMENT FOR DISTRIBUTED GENERATION RATED 2 MW AND LESS This Interconnection Agreement ( Agreement ) is made and entered into this day of, 20,

More information

Contents Introduction Authors Comments Financial Statements Non-current Tangible Assets Leases Borrowing Costs Investment Property

Contents Introduction Authors Comments Financial Statements Non-current Tangible Assets Leases Borrowing Costs Investment Property Contents Introduction 3 Authors Comments 4 Financial Statements 5 Non-current Tangible Assets 10 Leases 13 Borrowing Costs 15 Investment Property 16 Non-current Intangible Assets 17 Inventories 19 Share-based

More information

The basics November 2013

The basics November 2013 versus The basics November 2013 Table of contents Introduction... 2 Financial statement presentation... 3 Interim financial reporting... 6 Consolidation, joint venture accounting and equity method investees/associates...

More information

CUSTOMS ~ NOTES UNUSED DRAWBACK REQUIREMENTS UNDER NAFTA AND THE CUSTOMS MODERNIZATION ACT

CUSTOMS ~ NOTES UNUSED DRAWBACK REQUIREMENTS UNDER NAFTA AND THE CUSTOMS MODERNIZATION ACT CUSTOMS ~ NOTES Written by the Law Offices of George R. Tuttle for informational use by the trade and import community on selected topics of general interest on Customs and import related matters. UNUSED

More information

The new revenue recognition standard technology

The new revenue recognition standard technology No. 2014-16 26 August 2014 Technical Line FASB final guidance The new revenue recognition standard technology In this issue: Overview... 1 Scope, transition and effective date... 3 Summary of the new model...

More information

Title Page Southern California Edison Company Tariff Title: Rate Schedule Tariff Record Title: Rate Schedule FERC No. 425 FERC FPA Electric Tariff AMENDED AND RESTATED ELDORADO SYSTEM OPERATINGAGREEMENT

More information

Revenue for the engineering and construction industry

Revenue for the engineering and construction industry Revenue for the engineering and construction industry The new standard s effective date is coming. US GAAP December 2016 kpmg.com/us/frn b Revenue for the engineering and construction industry Revenue

More information

Overview of Differences between International Financial Reporting Standards and Czech Accounting Legislation 2014

Overview of Differences between International Financial Reporting Standards and Czech Accounting Legislation 2014 Overview of Differences between International Financial Reporting Standards and Czech Accounting Legislation 2014 Contents Introduction 3 Authors Comments 4 Financial Statements 5 Non-current Tangible

More information

Revenue Changes for Insurance Brokers

Revenue Changes for Insurance Brokers Insurance brokers will see a change in revenue recognition after adopting Accounting Standards Update (ASU) 2014-09, Revenue from Contracts with Customers (Topic 606), which is now effective for public

More information

ENTERGY MISSISSIPPI, INC. STANDARD INTERCONNECTION APPLICATION AND AGREEMENT FOR RESIDENTIAL NET METERING FACILITIES (for systems 20 kw or less)

ENTERGY MISSISSIPPI, INC. STANDARD INTERCONNECTION APPLICATION AND AGREEMENT FOR RESIDENTIAL NET METERING FACILITIES (for systems 20 kw or less) INSTRUCTIONS: Enter information in the empty fields below and send this form to Entergy Mississippi, Inc. ( Entergy or the Company ). This Standard Interconnection Application and Agreement shall be completed,

More information

ENTERGY STATISTICAL REPORT AND INVESTOR GUIDE

ENTERGY STATISTICAL REPORT AND INVESTOR GUIDE ENTERGY STATISTICAL REPORT AND INVESTOR GUIDE 2015 Our Vision: We Power Life Our Mission: We exist to operate a world-class energy business that creates sustainable value for our four stakeholders owners,

More information

Carolina Power & Light Company 61 d/b/a Progress Energy Carolinas, Inc. TERMS AND CONDITIONS FOR THE PURCHASE OF ELECTRIC POWER

Carolina Power & Light Company 61 d/b/a Progress Energy Carolinas, Inc. TERMS AND CONDITIONS FOR THE PURCHASE OF ELECTRIC POWER Carolina Power & Light Company 61 d/b/a Progress Energy Carolinas, Inc. TERMS AND CONDITIONS FOR THE PURCHASE OF ELECTRIC POWER l. PURCHASE AGREEMENT These Terms and Conditions" provide a mechanism through

More information

PARALLEL OPERATION AGREEMENT FOR RENEWABLE GENERATION OPERATING UNDER TVA APPROVED PROGRAMS

PARALLEL OPERATION AGREEMENT FOR RENEWABLE GENERATION OPERATING UNDER TVA APPROVED PROGRAMS BRIGHTRIDGE INTERCONNECTION AND PARALLEL OPERATION AGREEMENT FOR RENEWABLE GENERATION OPERATING UNDER TVA APPROVED PROGRAMS This Interconnection Agreement ( Agreement ) is made and entered into this day

More information

CAPITALIZATION OF MOVEABLE CAPITAL EQUIPMENT

CAPITALIZATION OF MOVEABLE CAPITAL EQUIPMENT CAPITALIZATION OF MOVEABLE CAPITAL EQUIPMENT Policy Statement This policy is intended to provide assistance in determining the proper accounting for capitalization of moveable capital equipment (also referred

More information

Guidance Regarding Deduction and Capitalization of Expenditures Related to Tangible Property

Guidance Regarding Deduction and Capitalization of Expenditures Related to Tangible Property This document is scheduled to be published in the Federal Register on 09/19/2013 and available online at http://federalregister.gov/a/2013-21756, and on FDsys.gov [4830-01-p] DEPARTMENT OF THE TREASURY

More information

APPLICATION FOR STANDARD CONTRACT BY A QUALIFYING COGENERATOR OR SMALL POWER PRODUCER

APPLICATION FOR STANDARD CONTRACT BY A QUALIFYING COGENERATOR OR SMALL POWER PRODUCER APPLICATION FOR STANDARD CONTRACT BY A QUALIFYING COGENERATOR OR SMALL POWER PRODUCER 1. The undersigned, hereinafter called "Seller," hereby requests that North Carolina Eastern Municipal Power Agency,

More information

FINANCIAL ADMINISTRATION MANUAL

FINANCIAL ADMINISTRATION MANUAL Issue Date: November 2017 Effective Date: Immediate Responsible Agency: Office of the Comptroller General Chapter: ACCOUNTING FOR EXPENDITURES Directive No: 700 Directive Title: CHAPTER INDEX 703 Recording

More information

The IRS has released much-anticipated

The IRS has released much-anticipated IRS Releases Comprehensive Repair/ Capitalization Final Regulations September 20, 2013 Highlights New/Improved Safe Harbors Higher Materials/Supplies Threshold Expanded De Minimis Safe Harbor Special Rules

More information

ROCKY MOUNTAIN POWER First Revision of Sheet No. R12-1 Canceling Original Sheet No. R12-1

ROCKY MOUNTAIN POWER First Revision of Sheet No. R12-1 Canceling Original Sheet No. R12-1 First Revision of Sheet No. R12-1 Canceling Original Sheet No. R12-1 I. - Conditions and Definitions A. Contracts Before building an Extension, the Company may require the Applicant to sign a contract.

More information

ARKANSAS ELECTRIC COOPERATIVE CORPORATION 2006 ANNUAL REPORT

ARKANSAS ELECTRIC COOPERATIVE CORPORATION 2006 ANNUAL REPORT TABLE OF CONTENTS Table of Contents Page FINANCIALS FINANCIAL STATEMENTS AS OF OCTOBER 31, 2006 AND 2005, AND FOR EACH OF THE THREE YEARS IN THE PERIOD ENDED OCTOBER 31, 2006: Balance Sheets 1-2 Statements

More information

FINANCIALS FINANCIAL HIGHLIGHTS

FINANCIALS FINANCIAL HIGHLIGHTS FINANCIALS FINANCIAL HIGHLIGHTS As of October 31 (In Thousands) 2005 2004 Energy sales to members 11,627,224 MWh 11,110,936 MWh Sales to others 416,151 MWh 518,320 MWh Excess energy sales 699,043 MWh 794,592

More information

Financial reporting developments. The road to convergence: the revenue recognition proposal

Financial reporting developments. The road to convergence: the revenue recognition proposal Financial reporting developments The road to convergence: the revenue recognition proposal August 2010 To our clients and To our clients and other friends The Financial Accounting Standard Board (the

More information

The basics December 2011

The basics December 2011 versus The basics December 2011!@# Table of contents Introduction... 2 Financial statement presentation... 4 Interim financial reporting... 6 Consolidation, joint venture accounting and equity method

More information

The basics November 2012

The basics November 2012 versus The basics November 2012!@# Table of contents Introduction... 2 Financial statement presentation... 3 Interim financial reporting... 6 Consolidation, joint venture accounting and equity method

More information

Federal Property Management Standards

Federal Property Management Standards Responsible Executive: Controller Responsible Department: A&FS Review Date: February, 2015 Accounting & Financial Services Federal Property Management Standards POLICY STATEMENT The Controller s Office,

More information

STANDARD INTERCONNECTION AGREEMENT FOR QUALIFYING FACILITIES (QF) 10 KW OR LESS

STANDARD INTERCONNECTION AGREEMENT FOR QUALIFYING FACILITIES (QF) 10 KW OR LESS STANDARD INTERCONNECTION AGREEMENT FOR QUALIFYING FACILITIES (QF) 10 KW OR LESS (Customer) and Roosevelt County Electric Cooperative, Inc. (Utility), referred to collectively as parties and individually

More information

Report on Inspection of KPMG LLP. Public Company Accounting Oversight Board

Report on Inspection of KPMG LLP. Public Company Accounting Oversight Board 1666 K Street, N.W. Washington, DC 20006 Telephone: (202) 207-9100 Facsimile: (202) 862-8430 www.pcaobus.org Report on 2007 Issued by the Public Company Accounting Oversight Board THIS IS A PUBLIC VERSION

More information

TIMKEN EUROPE GENERAL TERMS & CONDITIONS OF SALE 1. TERMS AND CONDITIONS OF SALE

TIMKEN EUROPE GENERAL TERMS & CONDITIONS OF SALE 1. TERMS AND CONDITIONS OF SALE TIMKEN EUROPE GENERAL TERMS & CONDITIONS OF SALE 1. TERMS AND CONDITIONS OF SALE All sales of Timken products (the "Product(s)") by Timken Europe shall be governed by the terms and conditions set forth

More information

Appendix B-2. Term Sheet for Tolling Agreements. for For

Appendix B-2. Term Sheet for Tolling Agreements. for For Appendix B-2 Term Sheet for Tolling Agreements for For 2015 Request For Proposals For Long-Term Developmental Combined-Cycle Gas Turbineand Existing Capacity and Energy Resources in WOTAB DRAFT Entergy

More information

The new revenue recognition standard - software and cloud services

The new revenue recognition standard - software and cloud services Applying IFRS in Software and Cloud Services The new revenue recognition standard - software and cloud services January 2015 Overview Software entities may need to change their revenue recognition policies

More information

New Developments Summary

New Developments Summary June 5, 2014 NDS 2014-06 New Developments Summary A shift in the top line The new global revenue standard is here! Summary After dedicating many years to its development, the FASB and the IASB have issued

More information

US GAAP versus IFRS. The basics. October 2016

US GAAP versus IFRS. The basics. October 2016 versus The basics October 2016 Table of contents Introduction... 2 Financial statement presentation... 4 Interim financial reporting... 8 Consolidation, joint venture accounting and equity method investees/associates...

More information

EL PASO ELECTRIC COMPANY

EL PASO ELECTRIC COMPANY "ARn 1 SCHEDULE Q-8.8 Page 224 of 237 Line Extension Policy and Construction Charges - Line Extensions E C = M the estimated 48 month base revenue from permanent Customers (T)l served from additional line

More information

Smart Grid Small Generator Interconnection Procedures For Distributed Generators Less than 10 MW Connected in Parallel with LIPA s Radial

Smart Grid Small Generator Interconnection Procedures For Distributed Generators Less than 10 MW Connected in Parallel with LIPA s Radial Smart Grid Small Generator Interconnection Procedures For Distributed Generators Less than 10 MW Connected in Parallel with LIPA s Radial Distribution Systems Revised January 1, 2017 TABLE OF CONTENTS

More information

Final and Proposed Regulations on the Deduction and Capitalization Tangible Property

Final and Proposed Regulations on the Deduction and Capitalization Tangible Property Final and Proposed Regulations on the Deduction and Capitalization of Expenditures Related to Tangible Property ////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////

More information

NARUC: REVENUE RECOGNITION JULIE PETIT AUDIT SENIOR MANAGER BRIAN JONES AUDIT SENIOR MANAGER MONDAY, SEPTEMBER 11 TH, 2017

NARUC: REVENUE RECOGNITION JULIE PETIT AUDIT SENIOR MANAGER BRIAN JONES AUDIT SENIOR MANAGER MONDAY, SEPTEMBER 11 TH, 2017 NARUC: REVENUE RECOGNITION JULIE PETIT AUDIT SENIOR MANAGER BRIAN JONES AUDIT SENIOR MANAGER MONDAY, SEPTEMBER 11 TH, 2017 Mazars USA LLP is an independent member firm of Mazars Group. Mazars USA LLP is

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION U.S. Department of Energy, Portsmouth/Paducah Project Office Docket No. RC08-5- REQUEST FOR REHEARING AND CLARIFICATION OF THE NORTH

More information

IMPORTANT INFORMATION Invitation to Bid No. RTS2-S-17 Kindly acknowledge important revisions to the terms and conditions under the bidding documents in details as follows: 1. According to Article F-15.

More information

MODEL DISTRIBUTION COOPERATIVE AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION LONG FORM CONTRACT

MODEL DISTRIBUTION COOPERATIVE AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION LONG FORM CONTRACT APPENDIX A (insert date) MODEL DISTRIBUTION COOPERATIVE AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION LONG FORM CONTRACT This Interconnection Agreement ( Agreement ) is

More information

CHAPTER 24 NON FINANCIAL ASSETS

CHAPTER 24 NON FINANCIAL ASSETS INVENTORY (IAS 2) OBJECTIVE CHAPTER 24 NON FINANCIAL ASSETS The primary issues in accounting for inventories are: - a) the amount to be recognized as an asset and carried forward until the revenues are

More information

RRl of

RRl of Commission/Docket Type of Proceeding Testimony FERC ER08-313E SPS Wholesale Transmission Rebuttal Testimony Formula ER10-192 PSCO Wholesale Production Direct Testimony Formula ER11-2853 PSCO Wholesale

More information

STATE OF NEW JERSEY OFFICE OF ADMINISTRATIVE LAW BEFORE HONORABLE IRENE JONES, ALJ ) ) ) ) ) ) ) ) )

STATE OF NEW JERSEY OFFICE OF ADMINISTRATIVE LAW BEFORE HONORABLE IRENE JONES, ALJ ) ) ) ) ) ) ) ) ) STATE OF NEW JERSEY OFFICE OF ADMINISTRATIVE LAW BEFORE HONORABLE IRENE JONES, ALJ I/M/O the Verified Petition of Rockland Electric Company For Approval of Changes in Electric Rates, Its Tariff For Electric

More information

RUO-MKT A. Limited Warranty. Instruments

RUO-MKT A. Limited Warranty. Instruments Limited Warranty Instruments AB Sciex warrants that all standard components of its new instruments will be free of defects in materials and workmanship for a period of one (1) year (unless otherwise stated)

More information

BEFORE THE PUBLIC SERVICE COMMISSION OF UTAH

BEFORE THE PUBLIC SERVICE COMMISSION OF UTAH R. Jeff Richards (7294) Yvonne R. Hogle (7550) 1407 West North Temple, Suite 320 Salt Lake City, Utah 84116 Telephone: (801) 220-4050 Facsimile: (801) 220-3299 Email: robert.richards@pacificorp.com yvonne.hogle@pacificorp.com

More information

CITY OF PALM COAST POLICIES & PROCEDURES CAPITAL ASSETS

CITY OF PALM COAST POLICIES & PROCEDURES CAPITAL ASSETS CITY OF PALM COAST POLICIES & PROCEDURES CAPITAL ASSETS The acquisition, disposition, and monitoring of City owned property is governed by Chapter 274 of the Florida Statutes. The City will consider capital

More information

Tangible Property Regulations

Tangible Property Regulations Tangible Property Regulations Maryland State Bar Association November 2013 Presented by Eric P. Wallace, CPA ewallace@cpabr.com First Discussion Topic The In-House Issues 1. Identifying the company/client

More information

45-day Comment and Initial Ballot day Final Ballot. April, BOT Adoption. May, 2015

45-day Comment and Initial Ballot day Final Ballot. April, BOT Adoption. May, 2015 Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

(iii) The application of the restriction of section 1605 of the Recovery Act would be inconsistent with the public interest.

(iii) The application of the restriction of section 1605 of the Recovery Act would be inconsistent with the public interest. DE-EE0003 071 /003 (i) Section 1605(a) of the American Recovery and Reinvestment Act of2009 (Pub. L. 111-5) (Recovery Act), by requiring that all iron, steel, and manufactured goods used in the project

More information

APPENDIX C COOPERATION AGREEMENTS, REHABILITATION OF FEDERAL AND NON-FEDERAL FLOOD CONTROL WORKS

APPENDIX C COOPERATION AGREEMENTS, REHABILITATION OF FEDERAL AND NON-FEDERAL FLOOD CONTROL WORKS APPENDIX C COOPERATION AGREEMENTS, REHABILITATION OF FEDERAL AND NON-FEDERAL FLOOD CONTROL WORKS EP 500-1-1 C-1. Purpose. This Appendix provides the format for Cooperation Agreements for rehabilitation

More information

Overview of Differences between International Financial Reporting Standards and Czech Accounting Legislation 2013

Overview of Differences between International Financial Reporting Standards and Czech Accounting Legislation 2013 Overview of Differences between International Financial Reporting Standards and Czech Accounting Legislation 2013 Contents Authors Comments 4 Financial Statements 5 Property, Plant and Equipment 10 Leases

More information